HomeMy WebLinkAbout20130653 Ver 1_Muddy Run II Addendum Approval_20140331Strickland, Bev
From: Kulz, Eric
Sent: Monday, March 31, 2014 8:50 AM
To: Strickland, Bev
Subject: FW: Approval Letter: NCEEP Mitigation Plan- Muddy Run II ADDENDUM / Duplin County/ SAW
2012 -01387 / EEP# 95354
Attachments: eApproval Letter_Comments_Muddy Run II Addend um_2012- 01387.docx.pdf
13 -0653
Eric W. Kulz
Environmental Senior Specialist
401 and Buffer Permitting Unit
NCDENR - Division of Water Resources -
1650 MSC
Raleigh, NC 27699 -1650
Phone: (919) 807 -6476
Water Quality Permitting Section
E -mail correspondence to and from this address may be subject to the North Carolina Public
Records Law and may be disclosed to third parties
- - - -- Original Message---- -
From: Crumbley, Tyler SAW [ mailto: Tyler.Crumbley(@usace.army.mil]
Sent: Friday, March 21, 2014 9:59 AM
To: Baumgartner, Tim
Cc: bowers.todd(@epa.gov; Karoly, Cyndi; Kulz, Eric; Jones, Scott SAW; Marella Buncick
( Marella Buncick(@fws.gov); McLendon, Scott C SAW; Cox, David R.; Jurek, Jeff; Pearce, Guy;
Sollod, Steve; Wilson, Travis W.; Emily Jernigan(@fws.gov; Kathryn Matthews(@fws.gov;
Montgomery, Lori; Wicker, Henry M JR SAW; Miguez, Kristin; Sugg, Mickey T SAW; Shaver, Brad E
SAW; Beter, Dale E SAW; Gregson, Jim; Baker, Virginia; Chapman, Amy; Homewood, Sue; Tugwell,
Todd SAW; Crumbley, Tyler SAW
Subject: Approval Letter: NCEEP Mitigation Plan- Muddy Run II ADDENDUM / Duplin County / SAW
2012 -01387 / EEP# 95354
Mr. Baumgartner,
Attached is the approval letter for the Muddy Run II Draft Mitigation Plan ADDENDUM, along
with all the comments that were generated during the IRT's review of the project on the
Mitigation Plan Review Portal.
When the permit application is submitted for Nationwide Permit #27 authorization, a copy of
this letter should be included along with a copy of the Final Mitigation Plan. Also, please
ensure that the Final mitigation plan is posted to NCEEP's documents portal so that all
members of the IRT have access to the Final plan.
Please let me know if you have any questions about the process or the attached letter.
Tyler Crumbley
Regulatory Division
Wilmington District
U.S. Army Corps of Engineers
11405 Falls of Neuse Road
Wake Forest, NC 27587
(919) 846 -2564
1
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403 -1343
REPLY TO
ATTENTIONOF: 21 March, 2014
Regulatory Division
Re: NCIRT Review and USACE Approval of the Muddy Run 11 Plan ADDENDUM; SAW 2012 - 01387;
EEP EMS 495354
Mr. Tim Baumgartner
North Carolina Ecosystem Enhancement Program
1652 Mail Service Center
Raleigh, NC 27699 -1652
Dear Mr. Baumgartner:
The purpose of this letter is to provide the North Carolina Ecosystem Enhancement Program
(NCEEP) with all comments generated by the North Carolina Interagency Review Team (NCIRT)
during the 30 -day comment period for the Muddy Run II Plan ADDENDUM, which closed on 22
February, 2014. These comments are attached for your review.
Based on our review of these comments, we have determined that no major concerns have been
identified with the Mitigation Plan ADDENDUM.
The Final Mitigation Plan and ADDENDUM is to be submitted with the Preconstruction Notification
(PCN) Application for Nationwide permit approval of the project along with a copy of this letter and a
summation of the addressed comments. If it is determined that the project does not require a
Department of the Army permit, you must still provide a copy of the Final Mitigation Plan, along with a
copy of this letter, to the appropriate USACE field office at least 30 days in advance of beginning
construction of the project. Please note that this approval does not preclude the inclusion of permit
conditions in the permit authorization for the project, particularly if issues mentioned above are not
satisfactorily addressed. Additionally, this letter provides initial approval for the Mitigation Plan, but
this does not guarantee that the project will generate the requested amount of mitigation credit. As you
are aware, unforeseen issues may arise during construction or monitoring of the project that may require
maintenance or reconstruction that may lead to reduced credit.
Thank you for your attention to this matter, and if you have any questions regarding this letter,
the mitigation plan review process, or the requirements of the Mitigation Rule, please call me at 919-
846 -2564.
Sincerely,
Digitally signed by
CRU MBLEY.TYLER.AUTRY.
1007509975
Date: 2014.03.21 09:52:08
- 04'00'
Tyler Crumbley
Regulatory Specialist
Enclosures
Electronic Copies Furnished:
NCIRT Distribution List
CESAW -RG /Wicker
CESAW- RG- L /Beter
NCEEP /Kristin Miguez
REPLY TO
ATTENTION OF:
CESAW -RG /Crumbley
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403 -1343
MEMORANDUM FOR RECORD
3 March, 2014
SUBJECT: Muddy Run II Plan ADDENDUM- NCIRT Comments During 30 -day Mitigation Plan
Review
PURPOSE: The comments listed below were posted to the NCEEP Mitigation Plan Review Portal
during the 30 -day comment period in accordance with Section 332.8(g) of the 2008 Mitigation
Rule.
NCEEP Project Name: Muddy Run II Plan ADDENDUM, Duplin County, NC
USACE AID #: SAW- 2012 -01387
NCEEP #: 95354
30 -Day Comment Deadline: 22 February, 2014
1. Eric Kulz, NCDWR, 19 February, 2014:
• We have reviewed the addendum and have no issues with the proposed revisions to
the original plan.
Digitally signed by
CRUMBLEY.TYLER.A
UTRY.1007509975
Date: 2014.03.21
/S/ 09:52:31 - 04'00'
Tyler Crumbley
Regulatory Specialist,
Regulatory Division