HomeMy WebLinkAboutNC0003760_Compliance Inspection_20220223United States Environmental Protection Agency
E PA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 IN I 2 LI 3 I NC0003760 111 121 22/02/16 117
Type
18 H
IIIIIIIIIII
Inspector Fac Type
191 S I 20111
21IIIIII IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
671 I 7° I3 I 711 1 72 I N I 731 1 74 71
I I 1
I I I I I I 180
l
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
E.I. DuPont Kinston Plant
4693 Hwy 11 N
Grifton NC 28530
Entry Time/Date
10:OOAM 22/02/16
Permit Effective Date
17/04/01
Exit Time/Date
02:30PM 22/02/16
Permit Expiration Date
22/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Jeffrey Alan White/ORC/252-522-6443/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Emily A Price,4693 N C Hwy 11 N Grifton NC 28530/Plant Manager/252-559-7043/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran Sludge Handling DispoFacility Site Review Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Robert E Bullock DWR/WARO WQ/252-948-3843/ 2/23/2022
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
31
NPDES yr/mo/day
N C 0003760 111 121 22/02/16
I17
Inspection Type
18 [j
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Robbie Bullock and Robert Tankard (Washington Regional Office, DWR), Doug Dowden and Amir
Adaryani (NPDES permitting), Brianna Young and Thom Edgerton (Stormwater), Bill Hunnakee and
Mary Siedlecki (Hazardous Waste Section) met with Emily Price (Plant Manager), Alex Torres (EHS
Manager), Shelby Arellano (Environmental Engineer), Jeff White (ORC), and David Suggs (Backup
ORC) to discuss new NPDES and Stormwater permit.
The review period for this inspection was November 2020 through December 2021. Over the review
period the facility received a Notice of Violation in April 2021 for Aquatic Toxicity violation. The facility
did not monitor Stormwater Outfalls 004, 005 and 006 for Mercury in June 2021.
During the inspection it was discussed if the "Equalization Basins" are lined. There is a concrete
barrier on the side walls of the aeration basin.
DuPont's NPDES permit is set to expire on March 31, 2022. A renewal application has been submitted
and the existing permit will remain effective until a new permit is issued. This permit renewal will
separate Stormwater Outfalls and NPDES outfalls with each program issuing their own permit. During
this inspection the six outfalls that are currently listed in the NPDES permit as well the newly proposed
NPDES and Stormwater outfalls were visited.
Page# 2
Permit: NC0003760
Inspection Date: 02/16/2022
Owner - Facility: E.I. DuPont Kinston Plant
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable II ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Comment: Jeff White is the ORC with Randall Harrell and David Suggs as the Backup ORC's.
The October DMR was reviewed for accuracy with no discrepancies found.
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new MODE
application?
Is the facility as described in the permit? • ❑ ❑ ❑
Page# 3
Permit: NC0003760
Inspection Date: 02/16/2022
Owner - Facility: E.I. DuPont Kinston Plant
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
# Are there any special conditions for the permit? • ❑ ❑ ❑
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • ❑ ❑ ❑
Comment: The current permit is effective until March 31, 2022. A renewal application has been
submitted and the existing permit will remain effective until a new permit is issued.
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Yes No NA NE
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ ❑ •
Comment: Sanitary sewer goes through a "Muffin Monster" solids grinder before the wastewater is
sent to the Wastewater treatment plant.
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Yes No NA NE
❑ • ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
▪ ❑ ❑ ❑
Comment: There are two equalization basins located at the WWTP. On the day of inspection a
sump pump was pumping wastewater to the WWTP. There is an overflow pipe located
in the equalization basin that discharges to the aeration basin in the event of a high
level in the Equalization Basin.
The "Equalization Basins" are not lined and only the side walls of the aeration basin
have a concrete barrier.
Aeration Basins
Mode of operation
Type of aeration system
Yes No NA NE
Surface
Page# 4
Permit: NC0003760
Inspection Date: 02/16/2022
Owner - Facility: E.I. DuPont Kinston Plant
Inspection Type: Compliance Evaluation
Aeration Basins Yes No NA NE
Is the basin free of dead spots? • ❑ ❑ ❑
Are surface aerators and mixers operational? • ❑ ❑ ❑
Are the diffusers operational? ❑ ❑ • ❑
Is the foam the proper color for the treatment process? • ❑ ❑ ❑
Does the foam cover less than 25% of the basin's surface? • ❑ ❑ ❑
Is the DO level acceptable? • ❑ ❑ ❑
Is the DO level acceptable?(1.0 to 3.0 mg/I) • ❑ ❑ ❑
Comment:
Nutrient Removal Yes No NA NE
# Is total nitrogen removal required? • ❑ El ❑
# Is total phosphorous removal required? • El El El
Type Biological
# Is chemical feed required to sustain process? El • El El
Is nutrient removal process operating properly? • El ❑ ❑
Comment: Nutrient removal is biological
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
Comment:
Pumps-RAS-WAS
Are pumps in place?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ • ❑
• ❑ ❑ ❑
❑ ❑ ❑ •
Yes No NA NE
Page# 5
Permit: NC0003760
Inspection Date: 02/16/2022
Owner - Facility: E.I. DuPont Kinston Plant
Inspection Type: Compliance Evaluation
Pumps-RAS-WAS
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment:
Drying Beds
Is there adequate drying bed space?
Is the sludge distribution on drying beds appropriate?
Are the drying beds free of vegetation?
# Is the site free of dry sludge remaining in beds?
Is the site free of stockpiled sludge?
Is the filtrate from sludge drying beds returned to the front of the plant?
# Is the sludge disposed of through county landfill?
# Is the sludge land applied?
(Vacuum filters) Is polymer mixing adequate?
Comment: Sludge is taken to the landfill for disposal
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: Hach calibrated the effluent flow meter on December 9, 2021
Yes No NA NE
II El El El
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • ❑ ❑ ❑
Is sample collected below all treatment units? • ❑ ❑ ❑
Is proper volume collected? • El El El
Is the tubing clean? • El El El
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 • ❑ El El
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type • El El El
representative)?
Page# 6
Permit: NC0003760
Inspection Date: 02/16/2022
Owner - Facility: E.I. DuPont Kinston Plant
Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Comment: Outfall 001 sampler is flow proportional and the sampler temperature on the day of
inspection was 3 degrees
Outfall 002 sampler is on constant time and Constant volume. The sampler is iced
when samples are taken
Outfall 003 sampler is on constant time and constant volume. The sampler temperature
on the day of inspection was 3 degrees
Outfalls 004, 005 and 006 are Stormwater outfalls.