HomeMy WebLinkAboutNCC220842_ESC Approval Submitted_20220222Dep
nent of
WATAUGA COUNTY Plannng�&1Inspections
126 Poplar Grove Connector • Boone, North Carolina 28607
FEBRUARY 15, 2022
SCOUT, INC
183 OLD TUMI PIKE EAST RD
BANNER ELK, NC 28604
Deal- Sirs:
Phone (828) 265-8043
TTY 1-800-735-2962
Voice 1-800-735-8262
or 711
FAX (828) 2 65-8 08 0
This office has reviewed the subject sedimentation and erosion control plan. We find the
plan to be acceptable with following conditions and hereby issue this letter of approval,
This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0029.
Be advised that Title 15 NCAC 413.0017(a) requires that a copy of the approved erosion
control plan be on file at the job site. Also, you should consider- this letter to give the
Notice required by GS 113A-61(d) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance oriented,
requiring protection of the natural resources and adjoining properties. If following
commencement of this project it is determined that the plan is inadequate to meet the
requirements of the Sedimentation and Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and its
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance
with Federal State water quality laws, regulations, and rules. In addition,
local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form which you have provided. You are requested to file
an amended form if there is any change in the information included on the form. In
addition, it would be helpfiil if you notify this office of the proposed starting date for this
project. Please notify us when you plan to have a preconstruction conference, and we
will plan to attend,
Please be aware that if more than one acre is to be disturbed by this project, you will
need to apply for a general storm water permit NCGOI (Construction Activities)
through NC Department of Energy, Mining and Land Resources (DEMLR).
Your cooperation is appreciated and we look forward to working with you on this
proj ect.
Sincerely,
/maX,
Chris Grubb
Planner/Property Development Coordinator
PROJECT NAME: 105 BYPASS SITE
PROJECT ID: G20220002
LOCATION: 105 BYPASS
DISTURBANCE: 7 ACRES
SUBMITTED BY: JOHN GARNER
DATE RECEIVED: 1/11/2022