Loading...
HomeMy WebLinkAboutNCC220495_NOI Signed Certification_20220217CG01 Notice of Intent (NO]) Certification Fort Directions: Print this form, complete, scan and upload to the electronic NOL Then, mail the original form to the NC DEM LR Stormwater Program (with $100 check if paying by check) at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 61h Floor (Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BUN ACCEPTED A5 COMPLETE, H1 1 I you ,-11.,9 MUST.131= COMPLETE W....-t AN OR1G1NAL Sty }XTOIII ;aNQT �SIGITAL} [44 CF13 422 22 Per NC General Statute 143-215.68 (i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that (check all boxes to indicate your agreement): I am the person responsible for the Construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. I will abide by all conditions of the NICG010000 :; neg Penn t, and the approved Erosion and Sediment Control Plan. If the approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan) of the NCG0100100 General Pert -,sit. I will nonetheless ensure that all conditions of Part 11 of the permit are met on the project at all times. I hereby request coverage under the �U: 0143I 00 "'ener_�" Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Name of Project (must match Ala): Spencer VFD Specific Lot Numbers (must match Alb): NIA Legally Responsible Organizational Entity (must match B1): Spencer Mountain Road VFD Legally Responsible Person (must match B2 & B3): Gary Hilton Title of Legally Responsible Person (must match B3b): Deputy Chief Name & Title of Signed if Authorized Individual Differs from Legally Responsible Person: Phone Number: 704-922-4747 * IMPORTANT NOTE: This form must be signed by a responsible corporate of.fithat owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section 8, Item (6) of the NCG010000 permit.