HomeMy WebLinkAboutNCC193107_Modification Review (Leg Resp Change)_20220217Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 2/14/2022 9:04:11 AM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany A 2/17/2022 8:16:48 AM (Construction COC ADD TO FILE Review - NCC193107)
* Legally Responsible Individual updated to Blake Long on 2/17/2022.
• The task was assigned to EADS\bageorgoulias. The due date is: February 17, 2022 5:00 PM
2/14/2022 9:04 AM
i �M1
itowl�a
NORTH CAROLINA
EnNlmnmrnfel QuoN1y
Certificate of NCC193107
Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters)
Information associated with this permit:
Project Name CLT Central Energy Plant
Address 5501 Josh Birmingham Parkway, City of Charlotte, INC
County Mecklenburg
Latitude 35.2271
Longitude-80.9436
Permittee Listed Holder - Edison Foard - Leeper, A Joint Venture
Legally Responsible Chad Smith
Individual
NC Reference No. NCG01-2019-3107
E&SC Plan ID MECKL-2020-041
Original NOI Tracking 19235
No. *
Date COC Issued * 12/10/2019
Prior Rescission Date This field will populate only if COC has already been rescinded.
Modification Information:
Reason for Closed -Out Lots/Outparcels in E&SC Plan
Modification* Additional Lots/Outparcels Approved - E&SC Revised
Other Revision(s) to E&SC Plan
Legally Responsible Individual and/or Site Contact Has Changed
Multiple Reasons (List)
Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload
applicable sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.)
Documentation NCG01 - NCC193107.pdf 101.52KB
Must be PDF format
North Carolina General Statute 143-215.6113 (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I hereby request modification to coverage under the NPDES Stormwater Permit for the
subject project site. I am familiar with the information contained in this request and to
the best of my knowledge and belief such information is true, complete and accurate.
Specify if you are:* The Legally Responsible Individual
Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
"
Type Name* Blake Long
Title* Project Manager
Organization* Holder - Edison Foard - Leeper, a Joint Venture
Date * 02/14/2022
Email Address* blong@hefljv.com
Email for confirmation
Telephone Number* 8453413628
Contact number if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email Additional email for confirmation
(Optional)
Original Permittee chadsmith@hefljv.com
Email
Original Site Contact jmclure@hefljv.com
Email
Review Date 02/17/2022
Rescinded Since
Submitted?
Request Date 20220214
Formatted
Review Date 20220217
Formatted