HomeMy WebLinkAboutWQ0035784_Extension Approval_20220208From: Plummer,Lauren To: Donald Feller; Christopher GARNIC Cc: Madelyn Mills; Eric Youngs; Caudle. Caitlin; Thornburg. Nathaniel Subject: RE: [External] - RE: Cottages of Boone Permit Modification Application Requests Date: Tuesday, February 8, 2022 10:54:00 AM Attachments: imaae001.ono Don, I apologize for the delay, we are currently discussing the modification requests internally. With regards to the extension request, the Non -Discharge Branch will grant the 60-day extension to account for the schedule provided by the engineering consultant, Brooks Engineering. The extended deadline is now April 6, 2022 as requested. The Non -Discharge Branch requests that an update be provided by March 7, 2022 regarding the status of the remaining items for the response submittal. Please feel free to contact me if you have any questions regarding the new due dates. Sincerely, Lauren Raup-Plummer, PE Environmental Engineer III Non -Discharge Branch Department of Environmental Quality 919-707-3660 office Lauren. Plummer(aDncdenr.gov 512 N. Salisbury St 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Effective September 20, 2021, the Non -Discharge Branch is at half-staff. As a result, our response and review times may be slower than normal. Thank you in advance for your patience. From: Donald Feller <dfeller@envirolinkinc.com> Sent: Tuesday, February 8, 2022 7:17 AM To: Christopher GARNIC <christopher.garnic@mapletree.com.sg> Cc: Madelyn Mills <mmills@envirolinkinc.com>; Eric Youngs <eyoungs@envirolinkinc.com>; Plummer,Lauren <lauren.plummer@ncdenr.gov> Subject: RE: [External] - RE: Cottages of Boone Permit Modification Application Requests CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Ms. Plummer, We wanted to follow up on the Extension request for the Permit Renewal and Modification Applications for the Cottages of Boone NPDES permit submitted on Friday February 4, 2022. We have not received any response as of this morning, and want to verify that our information is not considered late since the original submittal date was February 7, 2022. If you could please provide an update on the extension status as of this morning we would appreciate. Thanks for your time and attention on this matter. Sincerely, Don Feller Operations Manager - Envirolink of Ohio Area Manager— Envirolink of NC Mountains Region (919) 441-2091 dfellerC@envirolinkinc.com www.envirolinkinc.com ENVIROLINK From: Christopher GARNIC <christopher.garnicCo�mapletree.com.sg> Sent: Monday, February 7, 2022 5:26 PM To: Donald Feller <dfellerC@envirolinkinc.com> Subject: [External] - RE: Cottages of Boone Permit Modification Application Requests EXTERNAL EMAIL: Do not click any links or open any attachments unless you trust the sender and know the content is safe. Hi Don, Did we hear back from Lauren yet? Thanks. Best, Chris From: Donald Feller <dfellerC@envirolinkinc.com> Sent: Friday, February 4, 2022 1:27 PM To: Plummer,Lauren <lauren.plummerC@ncdenr.gov>; Caudle, Caitlin <caitlin.caudle(@ncdenr.gov> Cc: Eric Youngs <evoungs(@envirolinkinc.com>; Madelyn Mills <mmills(@envirolinkinc.com>; Christopher GARNIC <christopher.garnicl@mapletree.com.sg>; Sean DWYER <sean.dwyerC@mapletree.com.sg> Subject: Cottages of Boone Permit Modification Application Requests CAUTION: This email originated from outside of the organization. Do not click links or open attachment unless you recognize the sender and know the content is safe. Lauren, This email is to serve as a description of the items we will be requesting in the Cottages of Boone Permit Modification Application. The first item is to show the location of the existing knife valve used to transfer raw wastewater from the Equalization Basin to the drum screen. This valve was installed by a previous operations company and has been used to replace the originally permitted Equalization pumps as means of conveyance of the raw wastewater into the plant. This valve has been used for several years with out issue, and is currently the only means of conveyance in service. The original EQ pumps have been disconnected from all piping in the EQ tank, with no plans to reconnect or return to service in the future. The second item being requested is permission to install a gravity overflow pipe from the Equalization Basin to which would connect on the discharge side of the knife valve and lead directly to the drum screen. The purpose would be for allowing the raw wastewater to overflow the EQ basin in a high level situation and gravity feed to the plant in a controlled manner. This line would essentially eliminate the raw wastewater from overflowing the top of the EQ tank an hitting the ground, resulting in a reportable spill, and entering the environment via the storm drain system surrounding the plant. If allowed to install this controlled overflow piping, whenever the EQtank gets to a high level and the lift stations continue to push flow to the tank, it will be carried out of the EQtank at around the 90% vertical height of the EQtank and be directed straight to the plant treatment process. Thank you for working with the Cottages of Boone, and considering our requests in the Permit Modification Application being submitted. Thank you. Sincerely, Don Feller Operations Manager - Envirolink of Ohio Area Manager— Envirolink of NC Mountains Region (919) 441-2091 dfellerPenvirolinkinc.com www.envirolinkinc.com E:NVIROI.INK This email and any attachment is intended for the intended recipient(s) only, and may contain confidential information. If received in error, please delete and notify the sender immediately. Do not forward or disseminate to other parties. Due to inherent nature of internet communication, we are not liable for damages whatsoever due to any computer virus that may be transmitted.