HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 81280 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Monday, February 14, 2022 7:16 AM
To: david.gross@union-power.com
Cc: matt.baucom@union-power.com; chopkins@pike.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for Weddington-Marvin IOOkV Tie Line was not accepted for
the following reason:
Al2. Acres to be disturbed must match approved E&SC documentation.
B 1/D6. The entity listed on B 1 must match the company/firm who is responsible for land-disturbing activity
listed on the FRO form, NOI Certification form, and Tab E (certification tab).
D1. Ensure this date matches the approve/issue date of your E&SC documentation (grading permit/letter of
approval).
E. The person that certifies this form must be the same person listed as the permittee (Tab 132) and on NOI
Certification Form (Tab 139). If signing as authorized responsible person, that person must also sign the NOI
certification form.
Please submit a new NOI. To pre-populate the new NOI, select'Yes' for the first question& enter NOI number
81280. Contact Brooklyn.Broussard@ncdenr.gov with questions. Thank you.
For additional support, please visit our NPDES Stormwater Construction Program website at
https:Hdeq.nc.gov/NCGOI. The NOI application no. for this project is 81280.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i