HomeMy WebLinkAboutNCS000423_SCM 2402b_20220210NO R T H CA R O L l k R
24O2b PASSED 11-19-2020
24O2b - Intermodal Transit Center Bioretention
Site Contact
Clint Shoaf
shoafc@concordnc.gov
(704) 920-5407
Inspection Information
Inspection Date: 11-19-2020
1. Debris Cleanout
Clear of trash and debris
2. Vegetation Management
Banks & Surrounding areas mowed
Unwanted vegetation present
Condition of plants
Condition of mulch (double hammered hardwood - 3
inches deep)
3. Erosion
Soil erosion on banks, drainage area, or bottom
4. Sedimentation
Evidence of sedimentation in cell
Forebay volume estimation (< 50% loss)
Engineer Information
Scott Huismann
Scott.Huismann@apexcos.com
(704) 799-6390
Rain in last 24 hours? no
5. Energy Dissipators
Condition at inlet
Condition at outfall
Outfall
Inspect pea gravel diaphragm
6. Inlet
Condition of inlet (cracks, leaks, sedimentation, etc.)
7. Outlet
Condition of outlet structure and outlet pipe
8. Dewatering
Evidence of standing water
9. Overall Functionality
Evidence of bypass
10. Additional Information
I do hereby certify that I conducted an inspection of the SCM described herein. I further certify that at the time of
my inspection this SCM was performing properly and was in compliance with the terms and conditions of the
approved maintenance agreement required by the City of Concord.
Seal
Signature and Date
1
2402b PASSED 11-19-2020
NO Rl'H C.i R-I -:
.a Ylll11lll111
2402b - Intermodal Transit Center Bioretention Pictures
2/9
2402b PASSED 11-19-2020
NO RYN C A R 0 L I ' N A
f
3/9
2402b PASSED 11-19-2020
NO Rl'H C.A RO LI A'R
YYYY
..®rrrrrrrr���
. r.
4L
- a• .rr
,.-ir, ..i
4/9
2402b PASSED 11-19-2020
NORl'H C.i R-I -:
.a Ylll11lll111
5/9
NO R Y N C.A ROLINR
YYYY .srrrrrrrrr��r
ryr P� t u'
2402b PASSED 11-19-2020
6/9
2402b PASSED 11-19-2020
NO R Y N C.A RO LINK
.a Ylll11lll111
7/9
2402b PASSED 11-19-2020
NO R Y N C.A RO LI NR
.�YYYYI IYYY111
�4O
-_00, �.Oeo
i
t.