Loading...
HomeMy WebLinkAboutNCS000423_SCM 1976_20220210NO R T H CA R O L l k R 1976 PASSED 04-05-2021 1976 - Airport South Development Area Phase 1 B Wet Pond Site Contact Clint Shoaf shoafc@concordnc.gov (704) 920-5407 Inspection Information Inspection Date: 04-05-2021 1. Debris Cleanout Clear of trash and debris 2. Vegetation Management Banks & Surrounding areas mowed Unwanted vegetation present Condition of wetland plants 3. Erosion Soil erosion on banks, drainage area, or outlet 4. Sedimentation Forebay sediment level Pond volume estimation (< 25% loss) 5. Energy Dissipators Condition at inlet Condition at outlet/outfall 6. Inlet Condition of pipe/swale (cracks, leaks, sedimentation, woody growth) Engineer Information Scott Huismann Scott.Huismann@apexcos.com (704) 799-6390 Rain in last 24 hours? no 7. Outlet Condition of orifice (drawdown device) Condition of riser, outlet, and trash rack 8. Emergency Spillway & Dam Condition of spillway Condition embankments & dam 9. Mechanical Devices Yearly drain valve inspection 10. Visual Inspection Appearance of water (sheen, muddy, oily, clear, algae, etc.) Mosquito larvae or heavy mosquito presence 11. Forebay Embankment Condition of forebay embankment (breached?) 12. Water Elevation Water Level? I do hereby certify that I conducted an inspection of the SCM described herein. I further certify that at the time of my inspection this SCM was performing properly and was in compliance with the terms and conditions of the approved maintenance agreement required by the City of Concord. Seal Signature and Date 1/5 1976 PASSED 04-05-2021 NO R Y N C.A RO LINK .a111111111111 1976 - Airport South Development Area Phase 1 B Wet Pond Pictures 2/5 1976 PASSED 04-05-2021 NO R Y N C.A RO LIYR .a Ylll11lll111 3/5 1976 PASSED 04-05-2021 NO RYN C A R 0 L I ' N A .aMlllllllllll i 4/5 1976 PASSED 04-05-2021 L O R I N C A R O L I N A AIIIIIIIIII k 5/5