No preview available
HomeMy WebLinkAbout20220044 Ver 1_More Info Received_20220210Strickland, Bev From: Michael Brame <mbrame@pilotenviro.com> Sent: Thursday, February 10, 2022 2:17 PM To: Homewood, Sue Cc: Gibby, Jean B SAW Subject: [External] RE: Chestnut Grove SD - Forsyth Attachments: 19-002-GROVE PARK -IMPACT MAPS.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon Sue, On the attached plan, the rip rap outlet pad for stream crossing 2 was reduced to the minimum length required by DEMLR. The downstream end of the pipe has been raised to reduce the slope and follow the slope of the existing grade. Please let me know if you need anything else in order to issue the PCN/401. Thank -you. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com mbrame@pilotenviro.com PII.OTA- . PILOT E N V I P Q N M E N 7 A L, I N C From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Monday, February 7, 2022 9:00 AM To: Michael Brame <mbrame@pilotenviro.com> Cc: Gibby, Jean B SAW <jean.b.gibby@usace.army.mil> Subject: Chestnut Grove SD - Forsyth Mike, I have reviewed the application material for this project and have the following comments/items that need to be addressed: 1. The culvert design for Crossing #2 in the perennial stream indicates that the slope will be almost 4%. The Division has found that pipes at this slope installed within piedmont streams has the significant potential to cause upstream headcuts. Therefore we request that the culvert be designed to be installed "at grade". 2. The culvert design for Crossing #2 includes a 60" long riprap pad. This impact is significant. The Division requests that the applicant consider alternative designs that would limit the length of the riprap pad. If alternative designs are not feasible, please note that the Division will consider this impact to be a permanent loss of water due to the length of the riprap pad, when combined with the culvert impacts. i The Division will consider this application to be "on hold" until receipt of a response to the above items. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 RS PARKER HOMES, LLC. 502 HICKORY RIDGE DR. GREENSBORO, NC 27409 CONTACT: GREG GARRETT E: BRAXTONREANDDEV@GMAIL.COM P: (336) 841-6699 N8926'31'W N/F DANIEL R. NIFONG 8560 CENTER GROVE CHURCH RD. PIN: 5873-89-1545 DB. 3135, PG. 00693 ZONING: LN, TACV ECHURCH MOMS CHURCHDS 4-80-8834 CLEMNC I PG. 1624 ING:AG 83jg CENTER GR02E CA CH RD CLEMMONS NC PIN: 5874-90-06 I DB. 3521, PG. 42 ZONING: AG N NA MIPI AEL G. ARAAN 8336 CENTER GROVE CHURCH RD. PIN: 5874-90-4622 DB. 3247, PG. 3631 ZONING: 1 N8952'20"E 263.91'� goo 26265± S PASSIVE OPEN SPACE U 0.55 ACRES 9650± SFQ_3) AA, 4/° -24319± SF NA CHRISTOPHER P COLLINS 8496 CENTER GROVE CHURCH RD. PIN: 5873-89-4787 DB. 2070. PG. 0843 ZONING: AG ,i 3473± 20679± SF 1ti (35419± SF 20 �% 192692 33 69± SF 1 '6 gi M G • - a 164.65' 7715± SF STREAM CROSSING 3909± SF-) 043+ ' 19981± S 7743± SF 3332± SF 20055± SF 20236± S ACTIVE OPEN SP 0.65 ACR 0 �4851± 22744± SF 22483± SF (26) 25421± SF n� �22020± SF 23 6885± SF 17585± SF - 1270.00' Total TYPE LINEAR IMPACT ACERAGE OF IMPACT RIP RAP IMPACT PERMENANT STREAM 175' 0.019 AC 0.01 AC TEMPORARY STREAM IMPACT 30' 0.005 AC - N8959'31"W Euc N STREAM/ WETLAND IMPACT MAP GROVE PARK Sc CENTER GROVE BAPTIST CHURCH 8750 LASATER RD. PIN: 5663-09-0774 DB. 1809, PG. 2811 ZONING: N/F CENTER GROVE BAPTST CHURCH 8750 LAS0TER RD. PIN:580874 DB. 1609, 09, PG.PG. 2811 ZONINCC-S 30. UNDISTURBED BUFFER SCALE: 1 "=250' GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE NO. P-0826 www.greenmountainengineers.com INV OUT: 773.62 15 LF & 90 SF TEMPORARY SANDBAG COFFERED DAM FOR PUMP AROUND METHOD (SEE DETAIL) 79 78 ALUMINUM WIN GWALL HEADWALL IN 77 RS PARKER HOMES, 502 HICKORY RIDGE GREENSBORO, NC 2 CONTACT: GREG GARRETT E: BRAXTONREANDDEV@GMAIL.COM P: (336) 841-6699 INV OUT: 770.80 \ INTERMITTENT 43 SF OF KEYED STREAM IN RIP RAP 12'Lx11'Wxl'D RIP RAP OUTLET KEYED INTO STREAM BANK -.-�- �. +l-.- BURBERRY S 8" DIWM PROPOSED 24 GRADE S INI PAR M TON f 1 ALUMINUM ENDWALL I i • I .I1r9!I!ThIl911!, CMP PPE I. IN: 773.62 ' ® ,.949 IMBEDDED MINIMUM CMP PIPE INLET TO BE , � NATIVE S AT EXISTING EXISTING GRADE GRADE INV. I OUT 770.80 LLC. 12'Lx11'Wxl'D RIP .4 DR. '409 RAP OUTLET CTDC/kRA/ \AIETI Atkin IRAIDAI GROVE PARK TEMPORARY SILT FENCE 90 TREAM OUTFALL SIDE HALL BE RESTORED AND AINTAINED TO RECONSTRUCTION ONDITIONS. 80 SCALE: 1 "=40' H TO BE 1"=4'V 1' INTO GREEN MOUNTAIN OIL ENGINEERING, PLLC 70 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE NO. P-0826 www. green mo u ntai n en gi n eers. co m T MAP INV OUT: 746.42 15 LF & 200 SF TEMPORARY SANDBAG COFFERED DAM FOR PUMP AROUND METHOD (SEE DETAIL) 119.55 76 ACC 75 CMP PIPE INLE TO BE IMBEDDEI 1' INTO NATIV SOI 74 57 LF & 353 SF PERMANENT STREAM IMPACT ALLUMINUM HEADWALL STP-121 INV OUT: 746.00 _ STREAM 155 SF OF KEYED IN HP RAP :SS ROAD SUBGRADE — PROPOSED GRADE M:T: ALUM NI ALUMINUM WINGWALL TENDWAL HEADWALL —�/ / / T I I ! 0 INV 36' STP-121 of 66" OUT: 746.42 CMP Q 1.33% T INV OUT:74 EXISTING GRADE r 0 RS PARKER HOMES, LLC. 502 HICKORY RIDGE DR. GREENSBORO, NC 27409 CONTACT: GREG GARRETT E: BRAXTONREANDDEV@GMAIL.COM P: (336) 841-6699 + 60 JM L 50 6.00 40 + /b PERENMAL 22'Lx16.5'Wx2.25'D RIP RAP OUTLET KEYED INTO STREAM BANK TEMPORARY SILT FENCE NOTE_ STREAM OUTFALL SIDE SHALL BE RESTORED AND MAINTAINED TO PRECONSTRUCTION CONDITIONS. 22'Lx16.5'Wx2.25'D RIP RAP OUTLET KEYED INTO STREAM BANK SCALE: 1 "=40' H 1 "=4' V GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE NO. P-0826 www.greenmountainengineers.com STREAM/ WETLAND IMPACT MAP GROVE PARK TYPE LINEAR IMPACT ACERAGE OF IMPACT RIP RAP IMPACT PERMENANT STREAM 175' 0.019 AC 0.01 AC TEMPORARY STREAM IMPACT 30> 0.005 AC — 60 PLAN VIEW WITH PUMP NOT TO SCALE 1. BEGIN STREAM CROSSING IN THE MORNING ON A DAY WHEN THERE IS NO CHANCE FOR RAIN. 2. SET UP HIGH —CAPACITY PUMP AND SAND —BAG BERM SYSTEM AS SHOWN. 3. INSTALL SPLASH OUTLET AT DISCHARGE END OF PIPE, (SEE DETAIL). 4. OPERATE PUMP AS NEEDED, CONTINUOUS OR PERIODICALLY DEPENDING ON FLOWS. 5. SECURE PUMP INFLOW AND OUTFLOW PIPES IN PLACE WITH STAKES AND CABLE OR ROPES AS NEEDED TO PREVENT MOVEMENT. 6" MIN. FREEBOARD PLAN VIEW NTH SLOPE STABILIZATION NOT TO SCALE 6. AFTER THE STORM CULVERT IS PLACED IN THE STREAM, REBUILD THE STREAM BANKS AND ARMOR THEM WITH RIP —RAP STREAM iprpASIM DETAILS tl/l YIP 11? MOSS SECTION OF SPLASH DONUT PLAN VIEW OF SPLASH DONUT CROSS SEC1110N OF' STREAM MTh SLOPE STABIUZATION NOT TO SCALE RS PARKER HOMES, LLC. 502 HICKORY RIDGE DR. GREENSBORO, NC 27409 CONTACT: GREG GARRETT E: BRAXTONREANDDEV@GMAIL.COM P: (336) 841-6699 f�a GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE NO. P-0826 www.greenmountainengineers.com STREAM/ WETLAND IMPACT MAP GROVE PARK