HomeMy WebLinkAbout20220044 Ver 1_More Info Received_20220210Strickland, Bev
From: Michael Brame <mbrame@pilotenviro.com>
Sent: Thursday, February 10, 2022 2:17 PM
To: Homewood, Sue
Cc: Gibby, Jean B SAW
Subject: [External] RE: Chestnut Grove SD - Forsyth
Attachments: 19-002-GROVE PARK -IMPACT MAPS.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Afternoon Sue,
On the attached plan, the rip rap outlet pad for stream crossing 2 was reduced to the minimum length required by
DEMLR. The downstream end of the pipe has been raised to reduce the slope and follow the slope of the existing
grade. Please let me know if you need anything else in order to issue the PCN/401. Thank -you.
Sincerely,
Michael T. Brame
336.708-4620 (c)
336.310.4527 (o)
PO Box 128
Kernersville, NC 27285
www.pilotenviro.com
mbrame@pilotenviro.com
PII.OTA- .
PILOT E N V I P Q N M E N 7 A L, I N C
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Monday, February 7, 2022 9:00 AM
To: Michael Brame <mbrame@pilotenviro.com>
Cc: Gibby, Jean B SAW <jean.b.gibby@usace.army.mil>
Subject: Chestnut Grove SD - Forsyth
Mike,
I have reviewed the application material for this project and have the following comments/items that need to be
addressed:
1. The culvert design for Crossing #2 in the perennial stream indicates that the slope will be almost 4%. The
Division has found that pipes at this slope installed within piedmont streams has the significant potential to
cause upstream headcuts. Therefore we request that the culvert be designed to be installed "at grade".
2. The culvert design for Crossing #2 includes a 60" long riprap pad. This impact is significant. The Division
requests that the applicant consider alternative designs that would limit the length of the riprap pad. If
alternative designs are not feasible, please note that the Division will consider this impact to be a permanent
loss of water due to the length of the riprap pad, when combined with the culvert impacts.
i
The Division will consider this application to be "on hold" until receipt of a response to the above items.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
RS PARKER HOMES, LLC.
502 HICKORY RIDGE DR.
GREENSBORO, NC 27409
CONTACT: GREG GARRETT
E: BRAXTONREANDDEV@GMAIL.COM
P: (336) 841-6699
N8926'31'W
N/F
DANIEL R. NIFONG
8560 CENTER GROVE CHURCH RD.
PIN: 5873-89-1545
DB. 3135, PG. 00693
ZONING:
LN,
TACV ECHURCH
MOMS CHURCHDS
4-80-8834
CLEMNC
I PG. 1624
ING:AG
83jg CENTER GR02E CA CH RD
CLEMMONS NC
PIN: 5874-90-06
I DB. 3521, PG. 42
ZONING: AG
N NA
MIPI AEL G. ARAAN
8336 CENTER GROVE CHURCH RD.
PIN: 5874-90-4622
DB. 3247, PG. 3631
ZONING:
1
N8952'20"E 263.91'�
goo
26265± S
PASSIVE OPEN SPACE U
0.55 ACRES 9650± SFQ_3) AA, 4/°
-24319± SF
NA
CHRISTOPHER P COLLINS
8496 CENTER GROVE CHURCH RD.
PIN: 5873-89-4787
DB. 2070. PG. 0843
ZONING: AG
,i 3473±
20679± SF
1ti
(35419± SF
20 �%
192692 33 69± SF
1 '6
gi
M G • -
a
164.65'
7715± SF
STREAM
CROSSING
3909± SF-)
043+
' 19981± S
7743± SF
3332± SF
20055± SF
20236± S
ACTIVE OPEN SP
0.65 ACR 0
�4851±
22744± SF
22483± SF
(26)
25421± SF
n� �22020± SF
23 6885± SF
17585± SF -
1270.00' Total
TYPE
LINEAR
IMPACT
ACERAGE
OF IMPACT
RIP RAP
IMPACT
PERMENANT
STREAM
175'
0.019 AC
0.01 AC
TEMPORARY
STREAM IMPACT
30'
0.005 AC
-
N8959'31"W Euc N
STREAM/ WETLAND
IMPACT MAP
GROVE PARK
Sc
CENTER GROVE BAPTIST CHURCH
8750 LASATER RD.
PIN: 5663-09-0774
DB. 1809, PG. 2811
ZONING:
N/F
CENTER GROVE BAPTST CHURCH
8750 LAS0TER RD.
PIN:580874
DB. 1609, 09, PG.PG. 2811
ZONINCC-S
30.
UNDISTURBED
BUFFER
SCALE: 1 "=250'
GREEN MOUNTAIN
ENGINEERING, PLLC
7A WENDY CT
GREENSBORO, NC 27409
Tel: 336.294.9394
CERTIFICATE NO. P-0826
www.greenmountainengineers.com
INV
OUT: 773.62
15 LF & 90 SF
TEMPORARY
SANDBAG COFFERED
DAM FOR PUMP
AROUND METHOD
(SEE DETAIL)
79
78
ALUMINUM
WIN GWALL
HEADWALL
IN
77
RS PARKER HOMES,
502 HICKORY RIDGE
GREENSBORO, NC 2
CONTACT: GREG GARRETT
E: BRAXTONREANDDEV@GMAIL.COM
P: (336) 841-6699
INV OUT: 770.80
\ INTERMITTENT
43 SF OF KEYED STREAM
IN RIP RAP
12'Lx11'Wxl'D RIP
RAP OUTLET
KEYED INTO
STREAM BANK
-.-�-
�.
+l-.-
BURBERRY
S
8" DIWM
PROPOSED
24
GRADE
S
INI
PAR
M
TON
f
1
ALUMINUM
ENDWALL
I
i •
I
.I1r9!I!ThIl911!,
CMP
PPE
I. IN:
773.62
'
® ,.949
IMBEDDED
MINIMUM
CMP PIPE
INLET TO BE
,
�
NATIVE
S
AT EXISTING
EXISTING
GRADE
GRADE
INV.
I
OUT 770.80
LLC.
12'Lx11'Wxl'D RIP
.4
DR.
'409
RAP OUTLET
CTDC/kRA/ \AIETI Atkin
IRAIDAI
GROVE PARK
TEMPORARY SILT
FENCE
90
TREAM OUTFALL SIDE
HALL BE RESTORED AND
AINTAINED TO
RECONSTRUCTION
ONDITIONS.
80
SCALE: 1 "=40' H
TO BE
1"=4'V
1'
INTO GREEN MOUNTAIN
OIL ENGINEERING, PLLC
70
7A WENDY CT
GREENSBORO, NC 27409
Tel: 336.294.9394
CERTIFICATE NO. P-0826
www. green mo u ntai n en gi n eers. co m
T MAP
INV
OUT: 746.42
15 LF & 200 SF
TEMPORARY
SANDBAG COFFERED
DAM FOR PUMP
AROUND METHOD
(SEE DETAIL)
119.55
76
ACC
75
CMP PIPE INLE
TO BE IMBEDDEI
1' INTO NATIV
SOI
74
57 LF &
353 SF
PERMANENT
STREAM
IMPACT
ALLUMINUM
HEADWALL
STP-121
INV OUT: 746.00 _ STREAM
155 SF OF KEYED
IN HP RAP
:SS
ROAD
SUBGRADE
—
PROPOSED
GRADE
M:T:
ALUM
NI
ALUMINUM
WINGWALL
TENDWAL
HEADWALL
—�/
/
/
T
I
I
!
0
INV
36'
STP-121
of 66"
OUT:
746.42
CMP
Q
1.33%
T
INV
OUT:74
EXISTING
GRADE
r
0
RS PARKER HOMES, LLC.
502 HICKORY RIDGE DR.
GREENSBORO, NC 27409
CONTACT: GREG GARRETT
E: BRAXTONREANDDEV@GMAIL.COM
P: (336) 841-6699
+
60
JM
L
50
6.00
40
+ /b
PERENMAL
22'Lx16.5'Wx2.25'D
RIP RAP OUTLET KEYED
INTO STREAM BANK
TEMPORARY SILT
FENCE
NOTE_
STREAM OUTFALL SIDE
SHALL BE RESTORED AND
MAINTAINED TO
PRECONSTRUCTION
CONDITIONS.
22'Lx16.5'Wx2.25'D
RIP RAP OUTLET KEYED
INTO STREAM BANK
SCALE: 1 "=40' H
1 "=4' V
GREEN MOUNTAIN
ENGINEERING, PLLC
7A WENDY CT
GREENSBORO, NC 27409
Tel: 336.294.9394
CERTIFICATE NO. P-0826
www.greenmountainengineers.com
STREAM/ WETLAND IMPACT MAP
GROVE PARK
TYPE
LINEAR
IMPACT
ACERAGE
OF IMPACT
RIP RAP
IMPACT
PERMENANT
STREAM
175'
0.019 AC
0.01 AC
TEMPORARY
STREAM IMPACT
30>
0.005 AC
—
60
PLAN VIEW WITH PUMP
NOT TO SCALE
1. BEGIN STREAM CROSSING IN THE MORNING ON A DAY WHEN
THERE IS NO CHANCE FOR RAIN.
2. SET UP HIGH —CAPACITY PUMP AND SAND —BAG BERM
SYSTEM AS SHOWN.
3. INSTALL SPLASH OUTLET AT DISCHARGE END OF PIPE, (SEE
DETAIL).
4. OPERATE PUMP AS NEEDED, CONTINUOUS OR PERIODICALLY
DEPENDING ON FLOWS.
5. SECURE PUMP INFLOW AND OUTFLOW PIPES IN PLACE WITH
STAKES AND CABLE OR ROPES AS NEEDED TO PREVENT
MOVEMENT.
6" MIN.
FREEBOARD
PLAN VIEW NTH SLOPE STABILIZATION
NOT TO SCALE
6. AFTER THE STORM CULVERT IS PLACED
IN THE STREAM, REBUILD THE STREAM
BANKS AND ARMOR THEM WITH RIP —RAP
STREAM iprpASIM DETAILS
tl/l YIP 11?
MOSS SECTION OF SPLASH DONUT
PLAN VIEW OF SPLASH DONUT
CROSS SEC1110N OF' STREAM MTh SLOPE STABIUZATION
NOT TO SCALE
RS PARKER HOMES, LLC.
502 HICKORY RIDGE DR.
GREENSBORO, NC 27409
CONTACT: GREG GARRETT
E: BRAXTONREANDDEV@GMAIL.COM
P: (336) 841-6699
f�a
GREEN MOUNTAIN
ENGINEERING, PLLC
7A WENDY CT
GREENSBORO, NC 27409
Tel: 336.294.9394
CERTIFICATE NO. P-0826
www.greenmountainengineers.com
STREAM/ WETLAND IMPACT MAP
GROVE PARK