Loading...
HomeMy WebLinkAboutGW1-2022-01573_Well Construction - GW1_20220120 WELL CONSTRUCTION - RECORD(GW�� � For Internal Use Only: 1.Well Contractor Information: RANDY OWNBY �' A���. la,WATER ZONES Well Contractor Name — �.�-' FROM TO DESCRIPTION �� 289 IL 290 ft- 3214A �P' ft fL NC Well Contractor Certification Number ` YS.OUTER CASING for multi cased'wells OR LINER ifa 1icable AIR DRILLING INC FROM TO DIAMETER THICKNESS7 MATERIAL 0 ft. 72 ft- 6 PVC, Company Name 16.INNER CASING OR TUBING eothermal closed-loop) 2.Well Construction Permit#: 350676 FROM TO DIAMETER THICKNESS I MATERIAL List all applicable well construction permits(i.e.UIC,County,State,Variance,etc.) ft. ft. in. 3.Well Use(check well use): ft ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOTSIZE THICKNESS MATERW. ❑Agricultural ❑Municipal/Public ft. ft. in.' ❑Geothermal(Heating/Cooling Supply) OResidential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑hT] atlon ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 IL 20 IL GROUT POURED ❑Monitoring ❑Recovery ft. ft. Injection Well: ft fL ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. fL ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION color,hardness,soiUrock gpe,grain sae,etc 0 1- 62 ft. DIRT 4.Date Well(s)Completed: 4- -'2021 Well ID# 62 1" 305 ft- ROCK 59.Well Location: ft. ft. PORTER&CRESS BUILDERS ft fL Facility/Owner Name Facility ID#(if applicable) ft. ft. 825 POTNECK RD,SALISBURY,N.C. 28147 ft. ft. Physical Address,City,and Zip ft. ft. ROWAN 21.-REMARKS" County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certi on: 350 46.245 N 800 31.199 w 4/8/2021 6.Is(are)the well(s): IlPermanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ONo 15A NCAC 02C.0100 or 15A NCAC 02C,0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner- repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well'details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 305 (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths ifdierent(example-3 a200'and 2@100') 10.Static water level below top of casing: 50 (fL) 24a. For All Wells: Original for to Division of Water Resources (DWR), If water level is above casing,use"+" Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 I1.Borehole diameter: 6 (in,) 24b.For Injection Wells:Copy to DWI" Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: 24c.For Water Supply and Open-L:'oop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.,For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gpm) 15 Method of test: AIR Permit Program,1611 MSC,Raleigh;NC 27699-1 61 1 13b.Disinfection type: HTH Amount: I Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018