Loading...
HomeMy WebLinkAboutGW1-2022-01523_Well Construction - GW1_20220120 WELL CONSTRUCTION RECORD(GW-1)��,,, For Internal Use Only: P yI 1.Well Contractor Information: I RANDY OWNBY 14.WATERZONES Well Contractor Name FROM TO DESCRIPTION � v •(.... , o �;�:C,� 289 fr• 290 It. 3214A , `, '•,t�` ft. 95 ft. j NC Well Contractor Certification Number ,� �^��� 15.OUTER CASING for'mul=sed wells OR LINER if a livable AIR DRILLING INC -'.. FROM TO DIAMETER THICKNESS MATERIAL J' ft ft �in: Company Name 311576 ``+ 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State, Variance,etc.) ft. ft. in. 3.Well Use(check well use): ft. ft. in. Water Supply Well: 17.SCREEN FROM TO DIAMETER --;SLOTSIZE THICKNESS MATERIAL ❑Agricultural ❑MunicipaUPublic ft. ft. in. ❑Geothermal(Heating/Cooling Supply) PJResidential Water Supply(single) ft. ft. in. ❑Ind ustrial/Commercial ❑Residential Water Supply(shared) 18.GROUT. ❑Irri ation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 fL 20 ft- GROUT ❑Monitoring ❑Recovery fa ft. Injection Well: ft ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if a livable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft ft ❑Experimental Technology ❑Subsidence Control ft ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION color,hardness,soiVrock type,grain sae,etc. 0 ft 85 ft. DIRT 4.Date Well(s)Completed- 3-5-2021 Well ID# 85 ft 305 ft- ROCK ft ft. 5a.Well Location: DAVID T MARTIN f`' Facility/Owner Name Facility ID#(if applicable) ft ft. 134 COTTAGE CT, MOORESVILLE,N.C. 28117 ft ft. Physical Address,City,and Zip ft ft REDELL 21•REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22.Certifie 350 38.411 N 800 49.202 W 3/5/2021 6.Is(are)the well(s): ❑Permanent or ❑Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the wells)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or ONo 15A NCAC 01C.0100 or 15A NCAC 01C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under�21 remarks section or on the back of this form_ 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS' 9.Total well depth below land surface: 305 (ft) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if dierent(example-3@200'and 2@100') 40 24a. For All Wells: Original form Ito Division of Water Resources (DWR), f Static water level below top of casing: (ft) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 IJwater level is above casing,use"+" I1.Borehole diameter: 6 (in,) 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699.-1636 12.Well construction method: 24c.For Water Supply and Open-Loop'Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed 1 FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gP m) 5 Method of test: AIR Permit Program,1611 MSC,Raleigh,NC 27699-1 61 1 13b.Disinfection type: HTH Amount: Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018