Loading...
HomeMy WebLinkAbout20220137 Ver 1_Pre-Construction Notification (PCN) Form_20220208 DWR mrlsloa of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6,2021 Ver 4.2 Please note:fields marked with a red asterisk*below are required. You will not be able to submit the form until all mandatory questions are answered. Also,if at any point you wish to print a copy of the E-PCN,all you need to do is right-click on the document and you can print a copy of the form. Below is a link to the online help file. https:Hedoes.deq.nc.gov/WaterResources/0/edoc/624704/PCN%2OHelp/2OFile/202018-1-30.pdf A. Processing Information County(or Counties)where the project is located:* Nash Is this a NCDMS Project* Yes No Click Yes,only if NCDMS is the applicant or co-applicant. Is this project a public transportation project?* Yes No This is any publicly funded by municipal,state or federal funds road,rail,airport transportation project. Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: U-5947 WBS#* 46884.1.1 (for NCDOT use only) la.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted? Yes No 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps?* Yes No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): List all NW numbers you are applying for not on the drop down list. 1d.Type(s)of approval sought from the DWR: check all that apply 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?' Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so,attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No Acceptance Letter Attachment Click the upload button or dreg and drop files here to attach document FILE TYPE MUST BE PDF 1 It.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No Link to trout information:http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx B. Applicant Information U 1a.Who is the Primary Contact?* Chad Coggins 1c.Primary Contact Phone:" 1b.Primary Contact Email:* (xxx)xxx-xxxx tccoggins@ncdot.gov (252)640-6427 1d.Who is applying for the permit?* Owner Applicant(other than owner) (Check all that apply) 1a.Is there an Agent/Consultant for this project? Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: (for Corporations) 2d.Address* Street Address P.O.Box 3165 Address Line 2 City State/Province/Region Wilson NC Postal/Zip Code Country 27895 USA 2e.Telephone Number:* (xxx)xxx-xxxx (252)640-6400 2f.Fax Number: (xxx)xxx-xxxx 2g.Email Address: tccoggins@ncdot.gov C. Project Information and Prior Project History 1.Project Information la.Name of project:* U-5947 Benvenue Roundabout 1 b.Subdivision name: (if appropriate) NA 1c.Nearest municipality/town: Rocky Mount 2.Project Identification U 2a.Property Identification Number: 2b.Property size: (tax PIN or parcel ID) (In acres) N/A 3 2c.Project Address Street Address Intersection of Benvenue Road,Hunter Hill Road,and US 64 Address Line 2 City State/Province/Region Rocky Mount NC Postal/Zip Code Country 27804 Nash 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees.Use between 4-6 digits(unless you are using a survey-grade GPS device)after the decimal place as appropriate,based on how the location was determined. (For example,most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude:" Longitude: 35.96681 77.80318 ex:34.208504 -77.796371 3. Surface Waters 3a.Name of the nearest body of water to proposed project: Goose Branch 3b.Water Resources Classification of nearest receiving watei C;NSW Surface Water Lookup 3c. What river basins)is your project located in?* Tar-Pamlico 3d.Please provide the 12-digit HUC in which the project is located. 030201010903 River Basin Lookup 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This project lies at the confluence of locally and regionally important transportation corridors of US 64(4-lane divided),Hunter Hill Road,Benvenue Rd,and Battle Park Lane.Existing land use in the area includes a mix of commercial,residential,and Public(Municipal)Parkland. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past? Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: (inter nittent and perennial) 25 4h.Explain the purpose of the proposed project: The purpose of the project is to improve the intersection operations for current and future traffic at the NC 43(Benvenue Road)and US 64 Bypass Offramp intersection. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: This project is centered around the installation of a roundabout at the intersection of Benvenue Road and the US 64 Eastbound Offramp.The project will require moving and upsizing the existing drainage structure to an enclosed system(See attached Plans/Permit drawings).Standard roadbuilding equipment will be utilized to remove existing asphalt,perform grading, install drainage and put down new asphalt.The existing drainage network will be upgraded and realigned to conform with the adjusted alignment.Due to the nature of the project there are no indirect impacts anticipated. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: See attached Permit Drawings 5b.If the Corps made a jurisdictional determination,what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: Example:SAW-2017-99999 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Chad Coggins Agency/Consultant Company: NCDOT Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre-construction notification. No D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts(including temporary impacts)proposed on the site,then complete this question for all stream sites impacted. "S."will be used in the table below to represent the word"stream". 11 3a.Reason for impact*(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* �re,.Stream Type* 3f.Type of 3g.S.width* 3h.Impact Jurisdiction* length* S1 Site 1 Permanent Bank Stabilization �Fs, ranch Perennial Both 10 23 Average(feet) (linear feet) S2 Site 1 Temporary Dewatering Goose Branch Perennial Both 10 25 Average(feet) (linear feet) "All Perennial or Intermittent streams must be verified by DWR or delegated local government. 31.Total jurisdictional ditch impact in square feet: 0 31.Total permanent stream impacts: 23 31.Total temporary stream impacts: 25 31.Total stream and ditch impacts: 48 3j.Comments: There will be approximately 30'of open ditch lined with riprap to dissipate stormwater flow prior to discharge into Goose Branch. 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer,then complete the chart below.Individually list all buffer impacts below. 6a.Project is in which protect basin(s)? Check all that apply. Neuse Tar-Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b.Impact Type*(?) 6c.Per or Temp*(?) 6d.Stream name* 6e.Buffer mitigation required?" 6f.Zone 1 impact* 6g.Zone 2 impact* F777 P Goose Branch No 561 E(-1u-r-:1-- et) t) :::: 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 561.00 0.00 Zone 1 Zone 2 Total combined buffer impacts: 561.00 0.00 61.Comments: E. Impact Justification and Mitigation u 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:* This project was designed in a manner that completely avoids any wetland impacts and only minor impacts to the riparian buffer and stream bank.The storm water discharge that requires the only jurisdictional impacts on this property has been designed to impact an area of riparian buffer that is currently managed turf and provides no thermal cover(tree canopy).Due to the lack of canopy or extensive root mat,the stormwater outlet will not require extensive clearing or grubbing activities to install. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: BMPs and Permit Conditions will be strictly observed throughout construction and all erosion control devices will be monitored and inspected per NPDES Guidelines. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Impacts associated with this project do not meet the thresholds for requiring mitigation. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) Recent changes to the stormwater rules have required updates to this section.*** 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? • Yes No 1 b.All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures(SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? Level Spreader Vegetated Conveyance(lower SHWT) Wetland Swale(higher SHWT) Other SCM that removes minimum 30%nitrogen Proposed project will not create concentrated stormwater flow through the buffer (check all that apply) For a list of options to meet the diffuse flow requirements,click here. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes No Comments: See Stormwater Management Plan included with Permit Drawings G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land? Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No Comments:* MCDC Available upon request 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project(based on past and reasonably anticipated future impacts)result in additional development,which could impact nearby downstream water quality?* Yes No 3b.If you answered"no,"provide a short narrative description. This is a single and complete project intended to address specific traffic safety issues at an adjacent intersection. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* • Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8?* Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* IPAC,onsite evaluations,and direct correspondence with Mr.Gary Jordan(USFWS). 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat? EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map(does not include archaeological data: http_//gis.ncdcr.gov/hpoweb/ 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status(e.g.,National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU Letters attached for Archaeology and Architecture 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: Goose Creek is a FEMA regulated stream.Based on the effective model,Benvenue Road does not overtop during the 100-Year flood event,so the majority of excavation will be in an ineffective area from the culvert.Additionally,the excavation if modeled in a cross-section would be given an ineffective area since it is perpendicular to the flow.Since we are not proposing fill in the floodplain,all the proposed excavation would be within ineffective areas. 8c.What source(s)did you use to make the floodplain determination?* NCFRIS Miscellaneous Comments Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or dreg and drop files here to attach document HA NoSurveyRevised.pdf 548.16KB U-5947 No Archaeological Survey.pdf 6.67MB U-5947_Permit_Drawings_20220114.pdf 1.56MB U-5947_Buffer_Drawings_20220114.pdf 939.75KB USFWS_NCDOT_U-5947 Official Concurrence.pdf 168.62KB U-5947 Vicinity.pdf 149.83KB File must be PDF or KMZ Signature * By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name:* Chad Coggins Signature* Date 1/27/2022