HomeMy WebLinkAboutWQ0042882_More Information (Received)_20220110Date: August 6, 2021
To: Craig A. and Shannon B. Carter, 8271 Quail Hollow Drive, Harrisburg, NC 28075
From: Daniel W. and Kami J. Downey, 10506 Abberly Village Ln. Apt. 701, Fredericksburg, VA 22407
Subject: Intent to purchase land on Abilene Rd, Concord NC 28025 (Cabarrus Co PIN 55498193060000)
The following sets forth the basic terms upon which we would be prepared to purchase land on Abilene
Rd, Concord NC 28025 (Cabarrus Co PIN 55498193060000).
Contingent upon the State of North Carolina's approval of AWT's design of non -discharge surface
application Waste Water Treatment Systems (WWTS), we agree to purchase the land for $15, 0OOOOO.
�L
r
W. Dow
ey/KamiJ. Downey
111111"•=mms
Cukipui
A. Carter / Sha non B. Carter
Notary
Date
IC/ ak0,9,)
Engineers and Soil Scientists
Agri -Waste Technology, Inc.
501 N. Salem Street, Suite 203
Apex, North Carolina 27502
919-859-0669
www.agriwaste.com
Poorva Mokashi, Engineer I
NC Department of Environmental Quality
Division of Water Resources / Water Quality Permitting
NPDES Industrial Permitting, Wastewater Branch
512 N. Salisbury Street
Raleigh, NC 27604
Subject: Application No. WQ0042882
Additional Information Request
Downey Property WWTS
Abilene Road.
Concord, NC 28025, Cabarrus County
SFR Wastewater Irrigation System
Dear Ms. Mokashi,
1/11 /2022
Thank you for your comments regarding the application for the Downey Property WWTS
(Application No. WQ0042882).
Below, please find a response to each of the questions/comments listed in your letter
dated December 2, 2021. To facilitate the review of this response, I have included each
point from the comment letter in bold.
Comments in section "E. Property Ownership Documentation" will be addressed in a
separate response letter including all updated waivers and easements once the Carter
Property has been divided and ownership of the divided property has been transferred to
the Downey's.
F. Soil Evaluation:
1. A portion of the Ksat permeameter test worksheets is cut-off on the left and
right edges. Please resubmit these pages. For Ksat#1, from what is seen in the
graph, steady state equilibrium has not been achieved because the tail -end of
the curve is not horizontal and the last three values of flow rate are varying
significantly with time. Please provide an explanation for this result.
The Ksat Parameter test worksheets are re -attached to this document. For Ksat #1 In an
effort to maintain conservative numbers, the readings from 2:03 to 3:03 were selected in
order to calculate a final Ksat rate associated with this test location. Beyond that time an
increase in the rate was noted, which cannot always be explained or known due to the
nature of these tests — however, it's often assumed that this related the filling of void
spaces or root channels after the wetting front reaches these areas for the first
time. Given the consistency of the other tests and the fact that this test would have
eventually stabilized at an ultimately higher rate than that which was selected, we feel
this is appropriate and justified to use. Steady state should not be confused with 3
identical sequential readings. Data can fluctuate in both a positive and negative direction
over the readings at each interval in time, but if a trend line is applied to the data and it is
horizontal in nature then that is the intent of these tests.
Thank you for your assistance with this review. If you have any further questions or
comments, please feel free to contact me at 919-367-6316 or via email at
cmcgee@agriwaste.com.
Regards,
(14 i mcik-
Chris E. McGee, L.S.S
V.P. of Soils and Environmental Testing
ATTACHMENT 6: KSAT Information
10
Constant -Head Borehole Permeameter Test
Solution: USBR 7300-89 Condition I (Deep WT or Impermeable layer)
(File Name • USBR-7300-89-Cond. I
Project Name • Downey
Boring No . • KSAT #1
Solution and Terminology (USBR 7300-89 Condition I)*
Project No
Investigators......: T. Hackney & C. McGee
KB = QV/(21tH2)[In(H/r+((H/r)2+1)°'5}-((H/r)2+1)°'5/(H/r)+1/(H/r))]
Project Location...: Abilene Road, Cabarrus County
Date • April 28, 2021
where:
Boring Depth • 28 in (Specify units)
WCU Base Ht. h: 10.0 cm***
KB: (Coefficient of Permeability) @ base Tmp. TB °C: 25
WCU Susp. Ht. 5: 15.2 cm
Q: Rate of flow of water from the borehole
Boring Diameter...: 8.9 cm
Boring Radius r • 4.45 cm
Const. Wtr. Ht. H: 25.2 cm
H: Constant height of water in the borehole
Soil/Water Tmp. T: 25 °C
H/r** 5.7
r: Radius of the cylindrical borehole
Dyn. Visc. @ T • 0.000891 kg/m•s
Dyn. Visc. @ TB.: 0.000891 kg/m•s
V: Dynamic viscosity of water @ T °C/Dyn. Visc. of water @ TB °C
VOLUME
(ml)
Volume Out
(ml)
TIME
(h:mm:ss A/P)
Interval Elapsed Time
Flow Rate q
(ml/min)
KB Equivalent Values
(hr:min:sec) I (min)
(Pm/sec) I (cm/sec) I (cm/day) I (in/hr) I (ft/day)
Start Soak
10:20:00 AM
129
#VALUE!
10:33:00 AM
0:13:00
13.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
129
0
11:03:00 AM
0:30:00
30.00
0.00
0.0
0.00E+00
0.0
0.00
0.00
129
0
11:33:00 AM
0:30:00
30.00
0.00
0.0
0.00E+00
0.0
0.00
0.00
129
0
12:03:00 PM
0:30:00
30.00
0.00
0.0
0.00E+00
0.0
0.00
0.00
65
64
12:33:00 PM
0:30:00
30.00
2.13
0.1
1.42E-05
1.2
0.02
0.04
131
12:33:00 PM
50
81
1:03:00 PM
0:30:00
30.00
2.70
0.2
1.80E-05
1.6
0.03
0.05
132
1:03:00 PM
68
64
1:33:00 PM
0:30:00
30.00
2.13
0.1
1.42E-05
1.2
0.02
0.04
132
1:33:00 PM
92
40
2:03:00 PM
0:30:00
30.00
1.33
0.1
8.89E-06
0.8
0.01
0.03
59
33
2:33:00 PM
0:30:00
30.00
1.10
0.1
7.33E-06
0.6
0.01
0.02
29
31
3:03:00 PM
0:30:00
30.00
1.02
0.1
6.78E-06
0.6
0.01
0.02
131
3:03:00 PM
48
83
3:33:00 PM
0:30:00
30.00
2.77
0.2
1.84E-05
1.6
0.03
0.05
132
3:33:00 PM
82
51
4:03:00 PM
0:30:00
30.00
1.68
0.1
1.12E-05
1.0
0.02
0.03
Natural Moisture •
Consistency • 5, P
Total Time
(min)
Enter KB Value:
7.67E-02
7.67E-06
0.7
0.01
0.02
USDA Txt./USCS Class: M; C
Water Table Depth: 10+ ft.
Averaged lowest 3 values (2:03 - 3:03)
Struct./% Pass. #200..:
Init. Saturation Time.:
343.00
*USBR 7300-89. Condition I exists when the distance from the water surface in the borehole to the water table or an impermiable layer is 23X the depth of the water in the borehole. **H/r z5 - 510. ***Model JP-M1: h =
15cm, Model JP-M2 (3"): h = 10cm, Model JP-JR2 (2") h = 17cm. Johnson Permeameter, LLC. Revised 12/04/2015
Flow Rate Q vs. Total Elapsed Time
3.00
E
2.50
K 2.00
3
0
LL 1.50
1.00
0.50
0.00
50 00 150 200 250 300 350 400
-0.50
Total Elapsed Time (min)
I I I I I I I I I I
Constant -Head Borehole Permeameter Test
Solution: USBR 7300-89 Condition I (Deep WT or Impermeable layer)
(File Name • USBR-7300-89-Cond. I
Project Name • Downey
Boring No . • KSAT #2
Solution and Terminology (USBR 7300-89 Condition I)*
Project No
Investigators......: T. Hackney & C. McGee
KB = QV/(2n.H2)(In(H/r+((H/r)2+1)°'5}-((H/r)2+1)°5/(H/r)+1/(H/r))]
Project Location...: Abilene Road, Cabarrus County
Date • April 28, 2021
where:
Boring Depth • 29 in (Specify units)
WCU Base Ht. h: 10.0 cm***
KB: (Coefficient of Permeability) @ base Tmp. TB °C: 25
WCU Susp. Ht. 5: 15.2 cm
Q: Rate of flow of water from the borehole
Boring Diameter...: 8.9 cm
Boring Radius r • 4.45 cm
Const. Wtr. Ht. H: 25.2 cm
H: Constant height of water in the borehole
Soil/Water Tmp. T: 25 °C
H/r** 5.7
r: Radius of the cylindrical borehole
Dyn. Visc. @ T • 0.000891 kg/m•s
Dyn. Visc. @ TB.: 0.000891 kg/m•s
V: Dynamic viscosity of water @ T °C/Dyn. Visc. of water @ TB °C
VOLUME
(ml)
Volume Out
(ml)
TIME
(h:mm:ss A/P)
Interval Elapsed Time
Flow Rate q
(ml/min)
KB Equivalent Values
(hr:min:sec) I (min)
(Pm/sec) I (cm/sec) I (cm/day) I (in/hr) I (ft/day)
Start Soak
10:25:00 AM
125
#VALUE!
10:34:00 AM
0:09:00
9.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
125
0
11:04:00 AM
0:30:00
30.00
0.00
0.0
0.00E+00
0.0
0.00
0.00
125
1
11:34:00 AM
0:30:00
30.00
0.02
0.0
1.11E-07
0.0
0.00
0.00
64
61
12:04:00 PM
0:30:00
30.00
2.02
0.1
1.34E-05
1.2
0.02
0.04
132
12:04:00 PM
115
18
12:34:00 PM
0:30:00
30.00
0.58
0.0
3.89E-06
0.3
0.01
0.01
101
14
1:04:00 PM
0:30:00
30.00
0.45
0.0
3.00E-06
0.3
0.00
0.01
90
12
1:34:00 PM
0:30:00
30.00
0.38
0.0
2.56E-06
0.2
0.00
0.01
80
10
2:04:00 PM
0:30:00
30.00
0.33
0.0
2.22E-06
0.2
0.00
0.01
53
27
2:34:00 PM
0:30:00
30.00
0.90
0.1
6.00E-06
0.5
0.01
0.02
19
34
3:04:00 PM
0:30:00
30.00
1.13
0.1
7.55E-06
0.7
0.01
0.02
132
3:04:00 PM
96
36
3:34:00 PM
0:30:00
30.00
1 20
0.1
8.00E-06
0.7
0.01
0.02
67
30
4:04:00 PM
0:30:00
30.00
0.98
0.1
6.56E-06
0.6
0.01
0.02
37
30
4:34:00 PM
0:30:00
30.00
1.00
0.1
6.67E-06
0.6
0.01
0.02
Natural Moisture •
Consistency • S, P
Total Time
(min)
Enter KB Value:
7.07E-02
7.07E-06
0.6
0.01
0.02
Averaged Lst 3 Values (3:34 - 4:34)
USDA Txt./USCS Class: M; C
Water Table Depth: 10+ ft.
Struct./% Pass. #200..:
Init. Saturation Time.:
369.00
*USBR 7300-89. Condition I exists when the distance from the water surface in the borehole to the water table or an impermiable layer is z3X the depth of the water in the borehole. **H/r z5 - 510. ***Model JP-M1: h =
15cm, Model JP-M2 (3"): h = 10cm, Model JP-JR2 (2") h = 17cm. Johnson Permeameter, LLC. Revised 12/04/2015
Flow Rate Q vs. Total Elapsed Time
g 2.50
E
c; 2.00
1.50
3
0
LL
1.00
�•
0.50
*74
0.00
♦
0 50 100 150 200 250 300 350 400
-0.50
Total Elapsed Time (min)
I I I I I I I I I I
Constant -Head Borehole Permeameter Test
Solution: USBR 7300-89 Condition I (Deep WT or Impermeable layer)
(File Name • USBR-7300-89-Cond. I
Project Name • Downey
Boring No . • KSAT #3
Solution and Terminology (USBR 7300-89 Condition I)*
Project No
Investigators......: T. Hackney & C. McGee
KB = QV/(2TtH2)(In(H/r+((H/r)2+1)°'5}-((H/r)2+1)°5/(H/r)+1/(H/r))]
Project Location...: Abilene Road, Cabarrus County
Date • April 28, 2021
where:
Boring Depth • 26 in (Specify units)
WCU Base Ht. h: 10.0 cm***
KB: (Coefficient of Permeability) @ base Tmp. TB °C: 25
WCU Susp. Ht. 5: 15.2 cm
Q: Rate of flow of water from the borehole
Boring Diameter...: 8.9 cm
Boring Radius r • 4.45 cm
Const. Wtr. Ht. H: 25.2 cm
H: Constant height of water in the borehole
Soil/Water Tmp. T: 25 °C
H/r** 5.7
r: Radius of the cylindrical borehole
Dyn. Visc. @ T • 0.000891 kg/m•s
Dyn. Visc. @ TB.: 0.000891 kg/m•s
V: Dynamic viscosity of water @ T °C/Dyn. Visc. of water @ TB °C
VOLUME
(ml)
Volume Out
(ml)
TIME
(h:mm:ss A/P)
Interval Elapsed Time
Flow Rate q
(ml/min)
KB Equivalent Values
(hr:min:sec) I (min)
(Pm/sec) I (cm/sec) I (cm/day) I (in/hr) I (ft/day)
Start Soak
10:15:00 AM
130
#VALUE!
10:32:00 AM
0:17:00
17.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
130
0
11:02:00 AM
0:30:00
30.00
0.00
0.0
0.00E+00
0.0
0.00
0.00
128
2
11:32:00 AM
0:30:00
30.00
0.05
0.0
3.33E-07
0.0
0.00
0.00
121
7
12:02:00 PM
0:30:00
30.00
0.23
0.0
1.56E-06
0.1
0.00
0.00
113
9
12:32:00 PM
0:30:00
30.00
0.28
0.0
1.89E-06
0.2
0.00
0.01
105
8
1:02:00 PM
0:30:00
30.00
0.27
0.0
1.78E-06
0.2
0.00
0.01
97
8
1:32:00 PM
0:30:00
30.00
0.25
0.0
1.67E-06
0.1
0.00
0.00
90
8
2:02:00 PM
0:30:00
30.00
0.25
0.0
1.67E-06
0.1
0.00
0.00
82
8
2:32:00 PM
0:30:00
30.00
0.27
0.0
1.78E-06
0.2
0.00
0.01
73
9
3:02:00 PM
0:30:00
30.00
0.28
0.0
1.89E-06
0.2
0.00
0.01
65
8
3:32:00 PM
0:30:00
30.00
0.27
0.0
1.78E-06
0.2
0.00
0.01
57
8
4:02:00 PM
0:30:00
30.00
0.27
0.0
1.78E-06
0.2
0.00
0.01
49
8
4:32:00 PM
0:30:00
30.00
0.27
0.0
1.78E-06
0.2
0.00
0.01
Natural Moisture •
Consistency • VS, VP
Total Time
(min)
Enter KB Value:
1.78E-02
1.78E-06
0.2
0.00
0.01
Water Table Depth: 10+ ft.
Used Last Value
USDA Txt./USCS Class: M; C
Struct./% Pass. #200..:
Init. Saturation Time.:
377.00
*USBR 7300-89. Condition I exists when the distance from the water surface in the borehole to the water table or an impermiable layer is 23X the depth of the water in the borehole. **H/r 35 - 510. ***Model JP-M1: h =
15cm, Model JP-M2 (3"): h = 10cm, Model JP-JR2 (2") h = 17cm. Johnson Permeameter, LLC. Revised 12/04/2015
Flow Rate Q vs. Total Elapsed Time
0.30
• •
0.25
a
re 0.20
0
LL 0.15
0.10
0.05
0.00
•
0 50 100 150 200 250 300 350 400
-0.05
Total Elapsed Time (min)
I I I I I I I I I I
E
a
E
666
CO
T 0