Loading...
HomeMy WebLinkAboutWQ0039558_Regional Office Historical File Pre 2018Water Resources LI,IVIRONMLNI AQ, (RTLitY January 9, 2018 Crystal Panico, New Development Program Manager Union County Public Works 500 N. Main Street, Suite 400 Monroe, NC 28112 Dear Ms, Panico: ROY COOPER Gownor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: Permit No, WQ0039558 Union County Public Works Bonterra Village Phase 4 Wastewater Collection System Extension Permit Union County In accordance with your application received December 22, 2017, we are forwarding herewith Permit No. WQ0039558 dated January 9, 2018 to the Union County Public Works (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 1.1.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15.A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Perrnittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 15013 of North Carolina General Statutes, and filed with the Office of .Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolinal. Environmental Quality Water Resources Water Quality Regional.Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Monre$ville, North Carolina 28115 704 663 1699 Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not. result in non-compliance with this permit, regulations, or the Minim -um Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit. (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are Page 6 of 8 discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on. a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ I5A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000; as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-215.6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: UNION COUNTY PUBLIC WORKS PERMIT #: WQO039558 PROJECT: BONTERRA VILLAGE PHASE 4 ISSUE DATE: JANUARY 9, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collecti©n system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CE.RTIFICAT.ION a duly registered Professional En 7ineer in the State of North Carolina, having been authorized to observe ([ periodically, weekly, En full tune) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A. NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force. Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: final Ei Partial (include description) Certification Commentsi'Qualifiers (attaeh if necess NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 MooresvilRe Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 Warm of Wiger Resources State of North Carolina Department of Environtnental Quality Division of 'Water Resources 15A \CM:02 IF .0300 FAST TR ACK SEWER Sl STEM EX FENSION APPI R A FIO \ 1-11A 0-1-16 & SUITOR 1 1NG DO( ! AWN IA1 ION Appleation Number, to he c,olnplo[nA m us ( rmkiec1 or i Ite a:Itn kn ifl be re I, APPLICANT INF()C11,,,ATION I, Applicant's rmtne: tot ion C(')untv (company, nmnieip,ality, tio,A, Iit etei Applicant type: L individual r km Li(.ienel:al Partnership Prival,ely4Qvned „Public, Ltility El] Fed -al ‘::,tateit.`olorily NtilliCipa Signdture 's nafilw: per 1,5i:\ NreV:11(121T.,0,1P6(11), Title: Na.'w [kvcloomao. PTV grlIM \la,cl :I,g 4, Applicant's mailing address: „51)(1N,,)lat ti titry(st („'ity: ',viollsoe Siate, „NC Yip: 2S 1 11 \ppIian nntct nfOrmation, Phone 11011111er: -704 ) 290-4239 1 nuI A ddress-, en, stal_dlaniciyinionL'otinty,n(.7:20 IL PROJECT IN,FORMATION: I, Project name. Bonterra - Phase 4B 2, AppIkatioMProjeci status: L71. Proposed (Nov Permit) ()tiler 1:7 Lxisting Pelinit Project I a modification, nrovl de the existing permit number, WOO() and issued date: If new construction but part ()la master plan, provide the existing, permit number: WQ00 3. County where project is located: J„.fpion 4. Approximate Coordinates (Decimal Degrees't: Latitude: Parcel IDOf applicable): C)702.,,PJ)1,,N1 (or Parcel ID ¢o closest d.„„vwnstream sewert Longitude: -$0.:„:00.„,7' 7OS! TT ANT INFORNIATIoN: professional Ditgineer: John11, Ross, P,L, lje.ense titunhor, Ez195,2,,, Firm: 1:Agt1 1...101).ting.,„10(:::, ai rig .ilddross: qT.1[1t..11(11„,„A„Y3,(!„, C rY tacktill,J1:44 State: NC tth, 28029., Phone number: (704) S1. 42.2.2 1 i I -Address; 11:0§((i)!rlag1„...!!!„i0(.L1,1,1 IV, wAsTEwAntt TREA:VMENT FACILITY (ww'r INTORMATR)N: I, l'acdiiy Name: llvyelye Permit NumberNL:pusit-,,,,„3.5.2 Owner N(strue: t,,uppitCottntv: V. RECLIVIN6 DOWNS 1 REA)1 SEWER INFORMATION (if different than AVW1F): „ Permit Numberis WQ(()37,777 & Qi1„)OZ07121 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection Svsielll Permit Nilinber(!;')111 applicable ). WQCS Owner Nainos1:1„:fliim (,:onuN FORM. 1IA (14-16 Page 1 at GRAVITY SEINER DESIGN CRITERIA (If Applicable) - .021 .11305 & ' rat - Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 200 PVC DIP • Section 11 & Ill of the MDC fOr Permitting of Gravity Sewers contains. information related to design criteria Section 11:1 contains information related to minimum slopes for gravity smel('s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA. (If Applicable).— 02T & AID((Pump Static, s/Force COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS .PROJECT .1.. Pump station number or name: 7: 2, Appro.ximate (oordina(D tes ecimal Degrees): Latitude: Lcingitude: 3, Design flow of the pump statiott: millions gallons per day (firm capacity) 4, (Verational. point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to he permitted (for this Pump Station): Size. ( nehes) Length (feet) Material 6, Power reliability in accordance with 15A NCAC 0.2T SI,105klital: El Standby power source or pump with automatic act i vat i o n and telemetry - 15A NCAC 0217..0305(10( )(II Required for all pump stittions with an average daily llow ,greater than or equal to 1.5,0(10 gallons per day Most he permanent to facility (Jr if the pump stai ion has an average daily flow less than 15,000 gallons per day: El Portable power source with manual aCtiVatiOn, (1111.C. k-co n nect ion receptacle and telemetry I5A .0305(h)(1)(C) El Portable pumping unit with plugged emergency pump 'connection and telemetry - 15A NCAC. 02.1' .0305(11)( !(t. • It shall he demonstrated to. the Division that the portable source is owned or contracted hy the i,ipplicant. ("draba.greement and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' swrage capacities and the rotation schedule of the portable power source or pump., including travel timetraines, shall he provided in the case of a multiple station power outage. FORM: [TA 04-1 b Page 3 of 5 CER`I Ilf ICE► PIONS: Does the submitted sys y with 15 A Nl C"AC:° (' oC ,t Maims (latest vi.r,sitrtt and the Ca- tv^itv Se Yes If No, complete and submit the Vat for review. Approval of the request is required prior to submittal of the Fast Track A documents. Di No Professional Engineer's Certification: ive Design Request applies lication Item 1Ii.I.) VADC 4. apphcahle? at this application for has been reviewed by me and is accttrtate, complete and consistent with the information supplied in the plans, sl° engineering calculations, and all other supporting documentation to the best of troy knowledge, 1 further attest tha caf my knowledge the proposed design has been prepared in accordance with tlac applicable regulations, Gravity Sew Minimum Design Criteria for Gravity Sewers (latest version), and the. Minimum Design Criteria for the East -Track. Permitting of Pump Stations and Force Mains (latest version). Although other professionals pray have developed certain portions of this submittal package, 'inclusion of these materials under my signature and seal signifies l.lrat I have reviewed this material and have judged it to he consistent with the proposed design, NOTE — In accordance with General Statutes I43-215,6A and 143-215.t , any person who knowingly makes any false statement., representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may itacludc a line not to exceed $10,000, as well as civil penalties up to $25,000 per violation, North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NC:AC 02T .0106(h): ©a.lil vi i_f _ N el., fi AYE 1-4.0.04 L .•� _-_.... (Signature Authority's name & title from Application Item has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts caf this application are not completed and that it' all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relieff, andlor criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be. violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. — r NOTE t ,fi13 any person who knowingly makes any falseIn accodance with General 143-�� 15�ta<y and l43.�2. l 5, statement, representation, or certification in any appl.rcai.ion package shall be guilty of a Class 2 tmsdemean or, which may include, a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signa Date: 1'A 04-16 .5 R},90 DEPARTMENT OF THE I?4 T !7. a.. GEOLOGICAL SURVEY 2013 Van Buren Ave, Indian Trail, NC 28079 (704) 882-4222 www.eagteoniine net OR BAKERS QIIAWRANG1Z NOUTII vAlIOL4NA=4u' 1UN CO 7,5i1104fiL $RES USGS SITE MAP SCALE, 1"=1000' JOB NAME. BONTERRA GE PHASE IV CLIENT BONTERRA BUILDERS LOCATION BONTERRA JOB NUMBER: 6004 INDIAN TRAIL. NC EXHIBIT "A" BONTERRA VILLAGE PHASE 4B LOCATED IN INDIAN TRAIL, UNION COUNTY, NORTH CAROLINA A PORTION OF P1D: 07021001M PROJECT AREA = 25.09 ACRES 932 EXISTING PHASE 4A r 931 926 837 838 839 840 841 842 843 844 845 z °m 925 924923922 19209199189 TOP FLIGHT DRIVE 852 853 854 855 851 856 850 857 849 858 848 859 847 860 846 861 THESSALLUAN LANE 862 863 XILINGOL DR. 880 879 878 877 876 875 874 873 864 865866 867 EXISTING PHASE 1 872 868 8 881 882 883 884 885 886 887 888 889 900 899 903 904 J�8. 905 m DAVONA DALE LN. 895 t THIS MAP IS NOT A CERTIFIED SURVEY AND HAS NOT BEEN REVIEWED BY A LOCAL GOVERNMENTAL AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT REGULATIONS TAX PARCEL 07021001M Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Union County Project Name for which flow is being requested: Bonterra, Phase 4B More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Twelve Mile Creek WWTP b. WWTP Facility Permit #: NC0085359 All flows are in MGD c. WWTP facility's permitted flow 6.0 * Does not include 3MGD diversion to 6 Mile d. Estimated obligated flow not yet tributary to the WWTP 1.6673 e. WWTP facility's actual avg. flow 3.82 f. Total flow for this specific request 0.0285 g. Total actual and obligated flows to the facility 5.5158 h. Percent of permitted flow used 91.93 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and Pump Station (Name or Number) Firm Capacity, * MGD Poplin Rd 3.639 (A) Design Average Daily Flow** (Firm / pf), MGD 1.456 Approx. Current Avg. Daily Flow, MGD 0.9574 (B) (C) Obligated, Not Yet Tributary Daily Flow, MGD 0.1860 the WWTP: (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow Available Capacity*** 1.1434 0.3126 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Nanning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Twelve Mile Creek WWTP Downstream Permit Number: WQ0037777 & WQ0020712 Page 1 of 6 FTSE 04-16 Y t°tt tt attttttt tau t"its at :e'erttt'tt ttt` try t t.1; tti I tc'tt tt�ttt tt f 1tt this Est°st:t hatw 1tc t t�yttltattd ttintst and than cause arty capita <t it ' t'� 1 tt . t < tltta t'"' t i•''t t` b�'t.t't1Ra41" Cat 2" il.t�`(� n in 1 � `'14t1 l 1 ISI'I' 5 s 3�"kC tstt�i tct tEt t t°1 itt g ttt tttt ;t"tt 11< ttt ttttd r tt train] 1rt ttt � t tt t i ti tl't . 1t tl l ttt tata ticttt Ott'' } 1 abet! tprovernent s,t t t t h .r ttttpite h t bitten per tt ttt;tor lstrt it}'t ttchati t bed� t t ttt�! far" . ci�tc tt, ti t tt. 1 t t II t 1t data. +�' c. t°tint t tl tt atl tt6i ttt tttt its t t 1i t .ct ttt tt�x itt ; c tic tt ttt 1 11 Itltt t11. ttt cdplant-tit the t ; poIhib 1 party tt tatr t � t tat °"I" I: 4 1 Pri Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. PLANNING ASSESSMENT ADDENDUM (PAA) Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page3 of 6 FTSE 04-16 PPPInstructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA) r'SectionI a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As ofJanuary 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f1 h. Percent of permitted flow used: Equals [(g / c}* 100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8 % Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 04-16 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in thepermitting process. (A) (B) Design Firm Average Pump Station Capacity Daily Flow (Name or Number) MGD (Firm / pf) Kaw Creek PS 0.800 0.320 Approx. Current Avg. Daily Flow, MGD 0.252 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary FIow Plus Daily Flow, Obligated Available MGD Flow Capacity* 0.080 0.332 -0.012 Valley Road PS 1.895 0.758 0.472 0.135 0.607 0.151 Page 5 of 6 FTSE 04-16 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is <0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this FIow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated., not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 04-16 BONTERRA VILLAGE - PHASE 4B Project Narrative The proposed project is a single family home subdivision with associated, utilities, stormwater management facilities and landscaping. Phase 4B of the project consists of 100 single family lots. The proposed sanitary sewer extension is designed to convey 100% domestic sanitary sewer from proposed development to 8"' sanitary sewer mains from phase 1 and phase 4A of the development and ultimately to an existing Union County Public Works 15" sanitary sewer main running parallel to an unnamed tributary to North Fork. Crooked Creek. Flow is calculated as follows: 100 - Single Family Homes 100 x 285 gpd= 28,500 Total Proposed Flow (PHASE 4B) = 28,500 GPD December 21, 2017 Ms. Crystal Outlaw Panic°, PE. New Development Program Manager Union County Public Works 500 N. Main St, Suite 500 Monroe, NC 28112 RE: Bonterra Village Phase 4B Average Bedroom County Indian Trail, NC WQRO�rt The Bonterra Village community, Phase 4B, wilI contain a mix of homes with an average of 3 bedrooms. Sincerely, Mike VP of Land Development Bonterra Builders PO ER ROAD HEWS, NC 811;34 OFFICE: 704-821-8020 FAX: 704-821-6045 WEBSITE: WWW.BONTERRABUILDERS.COM Union Coun Union County Public Works 500 North Main Street Suite 400 Monroe, NC 28112 T. 704-296-4210 www,unuoncountync.gov Transmitta To: NO Department of Environmental Quality Division of Water Resources - Mooresville Regional Offiice 610 East Center Avenue Mooresvi le, N.C. 28115 Attention. Regarding: Date: October 19, 2017 Sanitary Sewer to serve Bonterra„ Phase 4B We are sending you: These are transmitt For approval Remarks: Signed. Date No, d and checked below: Received by: Copy of letter Hans Cover Letter Fast Track Application Copy of Fast Track Application USGS Topo Map ee.t Level Map Flow Tracking Form $480 00 Check (Application Fee) For your ; a! As requested use Prints Shop Drawings Descripti0n Peter W. Brown Date: Other For review and commen Central Files: APS SWP 1/8/2018 Permit Number WQ0039558 Permit Tracking Slip Program Category Status Project Type Non -discharge In review New Project Permit Type Version Gravity Sewer Extension, Pump Stations, 8. Pressure Sewer Extensions A Primary Reviewer ori.tuvia Coastal SWRuIe Permitted Flow 28,500 Facility Permit Classification Individual Permit Contact Affiliation Facility Name Major/Minor Region Bonterra Village - Phase 48 Minor Mooresville Location Address County Union Facility Contact Affiliation Owner _ Owner Name Owner Type Union County Govemment - County Owner Affiliation Cindy Coto Dates/Events 500 N Main St Monroe NC 28112 Orig Issue 1/9/2018 Scheduled App Received Draft Initiated Issuance Public Notice issue Effective Expiration 10/23/2017 1/9/2018 1/9/2018 Regulated Activities Requested /Received Events Subdivision Wastewater collection Outfall Additional information requested 10/27/17 Additional information received Waterbody Name Streamlndex Number Current Class Subbasin Ei E V`EDEN E:iDE.N WIE FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: UNION COUNTY PUBLIC WORKS PERMIT WQ0039558 PROJECT: BONTFRRA VILLAGE PHASE 4 ISSUE DATE: JANUARY 9, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition 7 of this permit until the Division. has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt, Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page .footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject .the Pennittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Pcrrnittee is prepared to operate & maintain the wastewater collection system rrnitted hereinp portions there C • Petriiap Zkdijerni-itij- P 611 7 15_ Printed Nam6, Title Signs Date ..:4NGINEER'S CERTIFICATION I, Nitatthew 7.. Kirchner, RE:, as a duly registered Professional Fineer in the State of North Carolina, having been authorized to observe (El periodically, El weekly, LJ fuJi time) the .construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources(Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Purnp Stations and Force Mains adopted June I, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal wisignature & date: LI Final El Partial (include description) Lots 837-844, 847-858, 876-880, 917-926, 031-936 Certification Comments/Qualifiers (attach if necessary NC DWR - Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 nu. t,r, r.e, imn, Ile, rt !on Caen 42 t Union County Public Works 500 North Main Street Smite 400 Monroe, NO 28112 T, 704-296-4210 ww.unioncountync.gov Transmittal To: NCDEQ Mooresville Regional thce 610 East Center Ave. Mooresville, NC 28115 Attention: Ms, Dee Browder Date: May 17, 2019 Regarding: Sanitary Sewer to Serve Bonterra 4B We are sending you: Copies Date 5-13-19 5-17-19 Copy of letter Plans Print 2 j' Other Shop Drawings No. j Description Record Drawings Engineer's Partial Certification for Sewer (Perrnit # W00039558) These are transmitted and checked below: For approval Remarks: Signed: Received by: For your use As requested Date: For review and comment FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: UNION COUNTY PUBLIC WORKS PERMIT #: WQ0039558 PROJECT: BONTERRA VILLAGE PHASE 4 ISSUE DATE: JANUARY 9, 018 This project shall not be considered complete nor allowed to opera e in accordance with standard Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted hereitt ;portions thereof AA/ ';PC Printed Na Sicnatttre ENGINEER'S CERTIFICATION "ION 1, Matthems C`. Kirchner, P.E. , as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe (Q periodically, [] weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date; 0 Final 0 Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX„ (704)-633-6040