Loading...
HomeMy WebLinkAboutWQ0038958_Complete File - Historical_20171231ROY COOPER Governor Environmertia Quality January 6, 2017 Jason Teller Waxhaw Mill Ventures, LLC 6225 Carmel Road Charlotte, NC 28226 Subject: Permit No. WQ0038958 Waxhaw Mill Ventures, LLC Cotton Fiats Wastewater Collection System Extension Permit Union County Dear Mr. Teller: In accordance with your application received January 3, 2017, we are forwarding herewith Permit No. WQ0038958 dated January 6, 2017, to Waxhaw Mill Ventures, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference, Please pay particular attention to the following conditions contained within this permit: Condition U.1: This permit shall not be automatically transferable; a request must be made and approved. Condition I1.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. ,,- Nothing Compares`- ., date o North Carolina i Environmental Quality 610 E. Center Avenue, Suite 3000 Mooresville, North Celina 28115 704-663-1699 If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.gov. Sincerely, by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional. Office Division of Water Resources, NCDEQ cc: Marc A. Houle, P.E. (e-copy) Barbara Gross (e-copy) Tommy Rowland (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) • Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Waxhaw Mill Ventures, LLC Union County for the construction and operation of approximately 289 linear feet of 8-inch gravity sewer to serve the Cotton Flats project,. and the discharge of zero gallons per day of additional collected domestic wastewater(flow-previously -allocated-to-site;-redevelopment) into -the -Union County existing -sewerage system, pursuant to the application received January 3, 2017 , and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12,1996, as applicable; the Division's Minimum Design. Criteria for the Fast -Track. Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until -rescinded and shallbe subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor. Water Quality Regional,Operations Section Mooresville Regiona1Office, • Division of Water Resources, NCDEQ - Permit Number: WQ0038958 Permit Issued: . January 6, 2017 SUPPLEMENT TO PERMIT COVER SHEET Waxhaw Mill Ventures, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Union County Twelve Mile Creek Wastewater Treatment Plant in accordance with Permit Number NC0085359. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 27; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1. No 'new additional flow in excess of the quantity permitted herein, zero GPD shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow_ has- been submitted to and approved by the Division. [15A NCAC 02T.0304(b)] 2. This permit shall become voidable unless the agreement between Waxhaw Mill Ventures, LLC,and Union County for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)] 3. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and shall be a condition of this permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statutes §143-215.6A to §143-215.6C for violation of or failure to actin accordance with the terms and conditions of this permit. [15A NCAC 02T.0115] II. STANDARD CONDITIONS 1.. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be Submitted' to the Division accompanied :by documentation from the parties involved, and other supporting materials as may -be appropriate. The. approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 027.0104; G.S 143-215.1(d3)j 2. This .permit shall' become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this -pen -bit; 15A-NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12; 1996, as applicable; the Division's Minimum Design Criteria for- 4 the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless 'specifically mentioned herein. [15A NCAC 02T.0110] 3: This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative "maintenance schedule, spare parts inventory and overflow response has been developed and Implemented. d. Pump stations thatare not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. ' • e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. - f. A general observation of the entire se versystem shall be conducted at least once per year. g. -Overflows and bypasses shall be re;por"ted tOthe appropriate Division regional office in accordance - with 15A NCAC 213 .0506(a), and public notice shall 'be'provided .as required by North Carolina 'General; Statute §143-215:1C. + - ',.- _L - A Grease Control Program is in place as follows:-' 1. For public owned collection` systems, the Grease Control -Program°shall include at least - %biannual distribution of educational materials for - residential users and both commercial andwr legal meansto regwre'grease interceptors at existing establishments `,The plan'shall also -x --ter : '7 --rvwwA..,p'�„_^,� ?.. :�� - .s . ..._ . F ; include legal means -for inspections.of the grease interceptors, enforcement for violators }and the legal means`to cost olgreasepntering the -system from other public`and private satellite '1 wer syste!'ris ..�_u _ _. _ �.� .� �• 2For; privately` owned collection'systems,Ihe'Grease.Control Program shall include'at-least bi- - 1,1 Y. rr��_r i h.,,.� --�..ei..r - S >: . - '. r. :-:; �-.- ..-....-1 = l •�_ w r. A annual dist'ributionrof grease education=.materiaFs t▪ o-users`of the -collection system'Jiy""'-the permittee,or its repceserrtative SFr { r' Grease educationY hatenals shall be}distrlbutedymore ▪ often than regwred m Parts.(1] and (2} of this 5ubparagraph�f necessary to prevent grease related sanitary sewer overtlows • S. r i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system., 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the -Division -of -Emergency -Ma nagement-at-telephone-number-(800)-858-0368-or-(919)-733-3300: — Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most 'current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] , : ,7. Upon completion of construction and prior to operation of these permitted facilities, the completed :Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the iform.A complete certification is.one isone where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary .to the wastewater collection ,system ,extension prior to completion of this• Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to "s appropriate enforcement actions ; 3 ,. ,- • , r If the • permit is issued to a private entity with an Operational Agreement, then a copy of the Articles ` ' . `: ':,-,_,. . ,_ ;,. .th � ,.�.1..n.-,M. .m. --•,. s 4 �.,- ri=', 3�..„k«s� �. - :..i . i-y . -a_ t:+ x-r i __« .. h^- � -`fir• ..-r•��:--n ..._:.. ,..� i of incorpora•tion, Declarations/Covenants/Restrictions; and,•Bylaws that have been appropriately' ,filed with.the applicable,County's:Register,of:Deeds:office•shall be submitted, with; the certification. - -.. .. ti a t,r0P-•,-ra - r'4 -'a 'i ,07• ,- b ' -. - .-z_09,g.t�[.. ?� r -- 1.r --..3 A complete certification is -one where the form' is; fully executed and the, supporting documents are - - �- - provided as applicable:} Supporting,docurnentation shall�include the following `* i rF `ivy µ� : ry,IFftt �. h fir{, rF r. y r Yx+wr ^r«e i .: • • .+r. 7':{ - ^ . .� .^'%" . °, .. �' . H w r., L'k;$. `'.jai^"+,.u.'!.'�s";rais .. •.•,. L _'::.. ...✓'. i' . .,{[`v r--rr Y i s'=�.%."•_ � = nS ; .4 .r:wti5'. g-1:.ww; - -r e ,air t marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b.:. One copy of the supporting applicable design calculations including pipe and pumpsizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection; detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. • c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. 'Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design —Criteria -will be- reviewed -on-a -case=by-case basis -and -each -on -its -own -merits -- Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated . on a case -by -case basis. Resolution of such request shall be evident priorto completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] • 9.-A.copy.ofthe construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. ;Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum ."Design Criteria for the FastTrack Permittrrig of Pump Statio n and Force Mains adopted Jane 1,-2000,' as applicable; and other supporting materials may subject the Permittee to an enforcement action • Abe Division, in accordance with North .Caroliria General Statutes §143-215.6A through §143-215.6C, - r "vr . --=." , construction of additional or replacement wasteiathr collection facilities, and/or referral of the North- r 4 -Carolina-licensed Professional Engineer to the licensing. board ' [15A NCAC,02T .0104; 15A NCAC 02T.. 0108(b)] , f y L " : - r ' 11.-In the event that the wastewater collection facilities fail ,to perform satisfactorily,, including the _ creation of nuisance conditions, the Permittee'shall takelmmediate corrective action, inc u i g - IS l.a �. _ ,R �., � �.1 - +,--r_x'xry,_r-P`j ^1 - -..,,A ax= +, '' x•s; : �.5 ' �C a.. • • • • 4 as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)} 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- 215.1(b)] FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: PERMIT #: PROJ ECT: ISSUE DATE: Waxhaw Mill Ventures, LLC WQ0038958 Cotton Flats January 6, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. • PERM ITTEE'S-CERTI EICATION 1, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ,(❑ periodically,. ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above'Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction"suchthat the construction was observed to be built within substantial complianceof this permit; 15A NCAC O21"; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000,"as applicable; and other supporting materials:. North Carolina Professional Engineer's Seal w/signature &;date: °` • ~^Final ❑ Partial (include description) : Certif Cation Co nm nts/Qualifiers (attach if necessary): I 77, ir ATE OF NORTH CAROLINA COUNTY OF union Permit No. t4 p O a-5a 961 3. DEVELOPER'S OPERATIONAL AGREEMENT This GREEMENT made pursuant to G.S. 143-215.1 (d1) and entered into this 6 ' day of 62t41.0n - , by and between the North Carolina Environmental Management Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and Waxhaw Mill Ventures, LLC • , a corporation/general partnership registered/licensed to do business in the State of North Carolina, hereinafter known as the DEVELOPER WITNES SETH: 1. The DEVELOPER is the owner of the certain Iands lying in Union County, upon which it is erecting and will erect dwelling units and other improvements, said development to be known as Cotton Flats (hereinafter the Development). 2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wastewater treatment works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewage disposal to serve the Development on said lands. 3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S. 143- 215.1 to construct, maintain, and operate the Disposal System. 4._ The-DE-VEL-OP-ER-has-created-or-shall-create-unit ownership -in -said -dwellings -units; -other improvements — and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration), pursuant to Chapter 47C or 47F of the North Carolina General Statutes. 5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration, the (Unit Owners' Association) (hereinafter Association), a non-profit corporation organized and existing under and by the virtue of the laws of the State of North Carolina, for the purpose, among others, of handling the property, affairs and business of the Development; of operating, maintaining, re -constructing and repairing the common elements of the lands and improvements subject to unit ownership, including the Disposal System; and of collecting dues and assessments to provide funds for such operation, maintenance, re -construction and repair. 6. The. COMMISSION desires to assure that the Disposal System of the Development is properly constructed, maintained and operated in accordance with law and permit provisions in order to protect the quality of the waters of the State and the public interest therein. NOW,. THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto, the COMMISSION and DEVELOPER do hereby mutually agree as follows: 1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate and maintain such systems and facilities in accordance with applicable permit provisions and Iaw. 2. The DEVELOPER shall not transfer errship and/or control of the Disposal System to the Association until construction has been completed in accordance with the permit and approved plans, and the staff of the Division of Water Resources has inspected and. approved of the facilities. In order to change the name of the permit holder, the DEVELOPER must request that the pernnt be reissued to the Association. Tie request must include a copy-ofthe AssociationaBylaws and Declaration. • The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPERS successor. rfVr N- 'rs,-.T, nn ,., The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and appurtenances thereto are part of the common elements and shall thereafter be properly maintained and operated in conformity with law and the provisions of the permit for construction, operation, repair, and maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater treatment, collection and disposal system as a common element which will receive the highest priority for expenditures by the Association except for Federal, State, and Iocal taxes and insurance. 5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will be maintained out of the common expenses. In order to assure that there shall be funds readily available to repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses, the Declaration and Association Bylaws shall provide that.a fund be created out of the common expenses. Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part of the yearly budget. 6. In the event the common expense allocation and separate fund are not adequate for the construction, repair, and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any time. 7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city, town, village, county, water and sewer authorities, or other unit of government shall hereinafter become available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the existing and future wastewater of the Development to be accepted and discharged into said governmental system, and shall convey or transfer as much of the Disposal System and such necessary easements as the —___—__govemmentaLunit.may_sequire_as_condition_ofaccepting_theDevelopment's wastewater. 8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for the Association to enter into voluntary dissolution without having made adequate provision for the , continued proper maintenance, repair and operation of its Disposal System, the DEVELOPER shall provide in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having transferred its said system and facilities to some person, corporation or other entity acceptable to and approved by the COMMISSION by the issuance of a permit. 9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and operation of the Disposal System. 10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the Association. IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized representative of the parties hereto on the day and year written as indicated by each of the parties named below: FOR THE ENVIRONMENTAL MANAGEMENT'COMMISSION a.ua Aid Verdi-4-as I. j, (-- Name of DEV .. OPER B: . Jay Zimmerman, .G. (Signa Director, Division of Water Resources - Print Nance arcl it e (Date) I?. [1 - - 4 3. r.r1 )11 K. rvoiT-nO 1.1 11...�:. Division of Water Re State of North Carolina epartrnent of Environmental Quality Division of Water Resources 15A NCAC 02T ,0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTiN( DOCUMENTATION Application Number A d or the a + Lled113 t)ta-rt) APPLICANT INFORMATION: Applicant's name: '4Vaxhaw Mill Ventur•e.s, Q I 1(company, municipality, 1-1OA, r. Applicant type; Ittdivicltral Corporation © General Partnership I itlr 4. Apj City: Charlotte State: NCC' +. Applicant's contact irtfornaa Phone number: (70=1) 507-2039 Email Address: "relict r ci7dventurcti com Fede al ure authCit'rty's name: ri Stale County D Muni.cipal Teller Partne r address: 622'' IL PRt' JECTINFORMATiON: 1 Project name: Cotton Flats Zip: 28226- •net © Privately=-()wrned Public IJ © Other per _I.SA NC AC 02"F 010(a(l�) 2. Application/Project status: Proposed (New Pert Permit/Project If a modification„ provide the existing permit number:: W000 and issued date: If new construction but part or a master plan, provide the existing permit number: WQ00 3, County where project is lr?cited: t1=lt;rtan 4, Approximate Coordinates (Decimal Degrees): Latitude: 5. Parcel iD (if applicable): 0.5-1 10-002 (or Parcel 11:) to closest downstream sewer*" iii. CONSULTANT INFORMATION: 1. Professional Engineer Marc A.Ho Pr Firm: Yarbroui**"Mitts & Houle. Inc. Mailing address: P:0. ICctx 1 198 City:. Pineville State: NI' Zip: 7)8273- Phone number: (704) 556-1990 Email Address march n ASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: Facility Narne: Twelve Mile Creek Permit Number: NO 0(t85359 Owner Name: Union County nsc Number: 14911 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): mit Number(s): WQ0021064 wnstream (Receiving) Sewer Size: 8 inch System \Vide Collection System Permit Number(s) (if applicable): tu'C?CS Owner Name(s): Union County Public Works FORM: FTA 04-'1 VI. GENERAL REQUIREMENTS 1. lithe Applicantis a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? 0 Yes 0No N/A 2. if the /N.pplicant is a Developer of lots to he sold, has a Developer's OperationaL,NgreetnentifORMLTAM been attached? 0 Yes 0No NI/A 3. If the Applicant e/Property OwnersAssociation, has an Operational A.greement (FORM: HOA) been attached? 0 Yes ON° NIA 4. Origin of wastewater (check all that apply): 0 Residential Owned El Retail (stores, centers, malls) Residential Leased Ej Retail with food preparatiorilservice LI School / preschool I day care Food and drink facilities Businesses/ offices ./ factories El Medical /denial / veterinaly facilities 0 Church LJ Nursing Home 5, Nature of wastewater : 100 o Domestic/Commercial % COmmerci3I % industrial (See I5A NCAC 02T ,0103(201) >Is there a Pretreatment Program in effect? 6, Has a flow reduction been approved under 1.5A NCAC 02T .0 LI 4(f)? E Yes !Ives, provide a copy,of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type see 02T.0114(11 Daily Design Flow "'b 0 Car Wash 0 Hotel andlor Motels El Swimming Pool /Clubhouse El Swimming PooVFilter Backwash 0 Other (Explain in Attachment) . of tin its Flow Total 0 . a See I 5A NG, 02T .01 141),L(dIte)(1)and (0(21 for caveats to wastewater des"gn flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses: public access facilities locatednear high public use areas; and residential property' located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-41.. Per ISA NCAC 021' .0114(c), design flow rates for establishments not identified [in table I5A. NC.AC, 02'1.0,1 I.„4] shall be determined using available flow data, water using -fixtures, occupancy or operation patterns, and other measured data, 3. Wastewater generated by project: 0 GPD (per 15A NC: .,„021.01141 DO not include future flows or previously permitted allocations If permitted flow is zero, indicate why: Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit Number Rehabilitation or replacement of existing sewer with no new flow expected. 0 Other (Explain): FORNI: ETA 04-16 Page 2 of 5 VI . GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02T .0305 I. Summarize gravity sewer to be permitted: itv Sewers): • Section It & 111 of the MDC for Permitting of Gravity Sewers contains information related to design criteria Section III contains information related to minimum slopes for gravity sewer(s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation ofthe MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump $tationstF'qrce Mains) COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: ?: Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow (tithe pump station: millions gallons per day (tirnt capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDFI) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 1 5,A,NCAC 02T .0305(11).W: 0 Standby power source or pump with automatic activation and telemetry - 15,A NCAC 02T .0305(h)(1)(}3); • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: 0 Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(1)( 1)(C) or 0 Portable pumping unit with plugged emergency pump connection and telemetry - ISA NCAC 021' .0305(h)(1)(C): • It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (drafi agreement) and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, includine travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 r SETBACKS & SEPARATIONS ( 2 .0200 & 15.A NCAC 02T .0305(1)): 1. Does the project comply with all separations found in 15A NCAC 021' .030,5(f) & (g) )1 5A NCAC 02T,0305(fcontains minimum separations that shall be provided for se Setback Parameter* Storm sewers and other utilities not listed below (vertical) Water mains (vertical -water over sewer including in benched trenches) Water mains (horizontal) Reclaimed water lines (vertical ecla med over sewer) Reclaimedwater lines (horizontal - reclaimed over se. systems: No Separation Required 24 inches 8 inches **Any private or public water supply source, including any wells. WS-1 waters of Class I or Class II impounded. reservoirs used as a source of drinking ater **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) **Any: other streain, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation 0 feet 8 inches 2 feet 00 50 feet 10 feet Any basement Top slope of embankment or cuts of 2 feet or more vertical hcig Drainage systems and interceptor drains Any swimming pools Final earth grade (vertical) 5 feet 10 feet 0 fee fee 10 feet 36 inches ) 15A NCAC 02T,030.5(g) contains alternatives where separations in 02T,0305(f) cannot be achieved. ) **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ) If noncompliance with 02T,0305(1) or (g),. see Section .X. of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ) See the Division's draft separation requirements for situations where separation cannot be meet No variance is required if the alternative design criteria specified is utilized in design and construction ) As built documents should reference the location of areas effected Yes El No 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? E Yes El No ) This would include Trout Buffered Streams per 15A NCAC 2B4O202 4. Does the project comply with an individual 404 Permit or any 401 Certifications.? Yes fl No ) Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ) Information can be obtained from the 401 & Buffer 'Permitting Branch 5. Does project comply with 1.5A 'Ncikc 02E()I 05()(6) (additional permits/certifications)? Yes jNo Per I.5A NCAC 02T,0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance ofthis permit is contingent on issuance oldependent permits (erosion and sedimentation control plans, stormwater management plans, etc.), 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 1.5ANCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. I] Yes No ) If yes, include an atta.chment with details for each line, including type (aerial line, size, material, and location),. High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 pr .. CERTIFICATIONS: I . Does the submitted system comply with 15A MAC 021, the Minimum Design Criteria for the Permitting_ of Purnp Station,s and Force MainsAlatest versiont and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? Yes E No lfNo, complete and submit the VariancetAlternative Design Request application (VADC 10-14) and supporting documents for review. Approval theyequest.is required prior to submittal of the Fast Track Application and supporting documents. Professional Engineer's Certification: C- 1, (Professional Engineer's name from AppIircation Ite attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my k.nowledge, 1 further attest that to the best. of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pum.p Stations and Force Mains (latest version). .Although other professionals may have developed certain portions oft:his submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and. .have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215,6A and 143-215,6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 mis emeanor, which may: include a fine not to exceed S10,000, as well as civil penalties up to S25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per I 5A NCAC 02T .0106(b): 1, Z:41:‘,, • attest that this application for (Signature Authority's name A'z. title from Application Item LI) has been reviewedby me and is accurate and complete to the best of my knowledge,. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of vvastewater from this non - discharge system to surthce waters or the land will result in an immediate enforcement action that .may include civil penalties, injunctive relief, andlor criminal prosecution, I will make .no claim against the Division fWater Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE ---- in accordance with General Statutes 143-215.6A and 1.43-215„6B, any person who knowingly makes any fake statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S10,000 as well as civil penalties up to 525,000 per violation. Date: 71 FORM: FTA 04-16 Page 5 of 5 No Elaine Secretary Pt C olina Pew a 6 NC 27626PN Click Here To:: View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Legal: VVaxhaw rtlill "Ventures LLC ed Liability ornpa r infor Scald: Status: Annual Report Status; Citizenship: Date Formed: Fiscal nth State of incorporation: Registered Agent Corporate Addresse> Mailing 1453525 CurrentActie Under Review LLC Notice Domestic 6/19/2015 December NC Teller Jason 6225 Carmel Road Charlotte, NC 28226 Principal ttf : 6225 Carmel Road Charlotte NC 28226 Reg Office 6225 Carmel Road Charlotte, NC 2822 Reg Mailing: 6225 Carmel Road CharlotteNC 28226 .„i Account Login Register Camper y Ofti iatd All LLCs are managed by their managers pursuant to N,C,G,S, 57D-6-2O: 0LC WAXI- M'v'!' MONROE RD UNION COUNTY DEPARTMENT OF PUBLIC WORKS 500 North Main Street, Suite 500, Monroe, NC 28112 Phone: (704)296-4210 • Pax:(704)296-4232 December 20, 2016 Mr. Marc Houle Yarbrough -Williams & Houle, Inc. 730 Windsor Oak Court Charlotte, NC 28273 Re: Sewer Treatment Capacity Cotton Flats (Private) Dear Mr. Houle: Union County Public Works Department can accept the 289 LF of 8" sewermain for the above mentioned project. This project is a redevelopment and therefore will be permitted as zero flow. The existing flow has already been allocated in the previous development. If you have any questions please don't hesitate to call. Sincerely: 0E4-4;40 C stal 0. Panico, PE COP/pwb F:IWINWORDIMISCIFLWACEPTNOFLOW.doc PrFIVIR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Waxhaw Mill Ventures, LLC Project Name for which flow is being requested: Cotton Flats (Private) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Twelve Mile Creek WWTP b. WWTP Facility Permit #: NC0085359 All flows are in MGD c. WWTP facility's permitted flow 6.0 * Does not include 3MGD diversion to 6 Mile d. Estimated obligated flow not yet tributary to the WWTP 1.6916 e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 4.19 0.00 5.8816 98.03 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the Pump Station (Name or Number) N/A Firm Capacity, * MGD (A) Design Average Daily Flow** (Firm / pf), MGD Approx. Current Avg. Daily Flow, MGD (B) (C) Obligated, Not Yet Tributary Daily Flow, MGD WWTP: (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow Available Capacity* * * * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A -Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Twelve Mile Creek WWTP Downstream Permit Number: WQ0021064 Page 1 of 6 FTSE 04-16 III. Certification Statement: I Crystal O. Panico certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. 10- ‘-)6t.-47f-: /V2-010 Signing �1 ffi furl Signature Date Page 2 of 6 FTSE 04-16 prir PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < O. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 04-16 prr Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the Iast two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8% Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 04-16 Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) Design Firm Average Pump Station Capacity Daily FIow (Name or Number) MGD (Firm / pf) Kaw Creek PS 0.800 0.320 Approx. • Current Avg. Daily Flow, MGD 0.252 Valley Road PS 1.895 0.758 0.472 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity* 0.080 0.332 -0.012 0.135 0.607 0.151 Page 5 of 6 FTSE 04-16 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is < 0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant Iikelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 04-16 Corporations Division Page 1 of 1 North Carolina Elaine F. Marshall DEPARTMENT oFTHE Secretary SECRETARY OF STATE PO Box 29622 Raleigh. NC 27626-0822 (919)807-2000 Click Here To: Account Login Register View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Legal: Waxhaw Mill Ventures, LLC Limited Liability Company Information Sosld: Status: Annual Report Status: Citizenship: Date Formed: Fiscal Month: Registered Agent: Corporate Addresses 1453525 Current -Active Current Domestic 6/19/2015 December Teller, Jason Mailing: Principal Office: Reg Office: Reg Mailing: 6225 Carmel Road Charlotte, NC 28226-8204 6225 Carmel Road Charlotte, NC 28226-8204 6225 Carmel Road Charlotte, NC 28226-8204 6225 Carmel Road Charlotte, NC 28226-8204 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Managing Member : Jason Teller 6225 Carmel Rd Charlotte NC 28226 https://www.sosnc.gov/Search/profcorp/10841414 1/4/2017 UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, N.C. 28115 Attention: Regarding:: Sanitary Sewer to serve Cotton Flats (Private) We are sending you: Copies Date No. 1 12/20/16 TRANSMITTAL Date: 12/30/16 Copy of letter Plans Prints P Shop Drawings Other 12/8/16 12/7/16 12/7/16 2/20/16 1113/16 2018 Description Sewer Capacity Letter Cover Letter Fast Track Application opy of Fast Track Application Flow Tracking Form 480.00 Check (Application Fee) Developer's Operational Agreement These are transmitted as checked below: For approval 0 For your use — As requested For review and comments Remarks: Signed: � ' Afogin.,— - Received by: Date: ber 8, 2016 UGT7 i tilt* 1,1 Re: Cotton Flats FTA Cover The ing ite :ter NC i'kf:l.s 0475 L, t atlT 2 vate Sault UT,E -» rirr, y Sewer Syste s are submitted for the Fa Tract Sewer pplica°rfi n for Cotton Flats: . One Original and one opy of the FT .. 4-C Cover Letter Application Fee 4 SE04-16 USGS Topo Map Street Level Map 7. Operational Agree en The system i rrrx use dev an gravity sanitary sewer system. Tfre flow allocated is 28,330 GPO to servea I p rent including restaurant, office space, and 63 apartment units. 730 Wh earOsE Cour lrrc villa, 2814 70 .. i. 9 7i) .i3.505 Central Files: APS _ SWP 1/6/2017 Permit Number WQ0038958 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Version Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRufe Permitted Flow 0 Facility Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name MajorlMinor Region Cotton Flats Minor Mooresville Location Address County 403 E S Main St Union Facility Contact Affiliation Waxhaw NC 28173 Jason Teller Owner 6225 Carmel Rd Charlotte NC 28226 Owner Name Waxhaw Mill Ventures LLC Dates/Events Owner Type Non-Govemment Owner Affiliation Jason Teller 6225 Carmel Rd Charlotte NC 28226 Orlg Issue 1/6/2017 Scheduled App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 1/3/2017 1/6/2017 1/6/2017 Regulated Activities Requested /Received Events Condominium Additional information requested Wastewater collection Outfali Additional information received Waterbody Name Streamlndex Number Current Class Subbasin Water Resources Environmental Quality June 26, 2017 Jason Teller Waxhaw Mill Ventures, LLC 6225 Carmel Road Charlotte, NC 28226 SUBJECT: Final Engineering Certification Acknowledgement Project: Cotton Flats Permit No. WQ0038958 Permittee: Waxhaw Mill Ventures, LLC County: Union Dear Mr. Teller: LE ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project on June 23, 2017. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal.ncdenr.org/web/wq/swo/ps/cs/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact me at (704) 235-2143. Sincerely, Barry Love Environmental Specialist cc: Marc Houle, P.E., (Yarbrough -Williams & Houle, Inc., P.O. Box 1198, Pineville, NC 28134) Central Files MRO Nothing Comparest State of North Carolina 1 Environmental Quality { Water Resources L Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue. Suite 301 1 Mooresville. North Carolina 28115 704-663-1699 'FAST TRACK SEWER ENGINEERING CERTIFICATION PERIVIITTEE: Waxhaw Mill Ventures, LLC PERMIT IC WOOD:3895B PROJECT: Cotton Flats ISSUE DATE: January 6, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. it should be submitted in a manner that documents the Division's receipt, Send the required documentation the Regional Supervisor, Water Quality Region& Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to corn pletion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTECS CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Pe rmittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof, 1") A c(4\el ) CD Printed Narne, Title Sture ENGINEER'S CERTIFICATION Date „ as a duIy registered Professional Eneer in the State of North Carolina, ha been authorized to observe 1periodicafly, L. weekly, J fuH time) the construction of the project name and location as refere ced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations arid Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: final fl Partial (include description) CertifiCation Comments/Qualifiers (attach if necessary): Sive, of North (5n ia5ry Wated Rod urctd Water Quality ReportaI Optiahan5 5Ioore.'s,111c R.ronp,4 fliTket 610 East Certter SLad.e 301 . Noah Carohrd 25 LI. 5 Low Pressure Air Tes Project Name (11:70 /7106 ic:/a/....s- Contractor Startin Manhole - 3.1 Ending__ Manhole Pi e Diameter Length inches (feet) $ date nd Test Time minutes 2 3 51- ndrel Test Form otven4,-/ Groundwater psiq) Witnesseg/ Test Pressure Start si Drop si Pressure Pass/Fail ndrel Pass/Fail Pet N Manhole Vacuum Test Form Contractor Test Manhole No. Time Start. Drop Pass/Fail Test Pressure (or station) (SECONDS) (psig) 7 10" 10' 10' 10' 10' 7 5 -4-i7 10' 10' 10' 10' 10' 0' 10' 10' 10' 0' 10' 10' 0' 10' 10' 10' 10' 10' 0'