Loading...
HomeMy WebLinkAboutWQ0036400_Regional Office Historical File Pre 2018NCDENR North Carona Department of Environment and Natural Resources Division of Water Quality Pat McCrory Thomas A, Reeder Governor Director July 30, 2.013 Town of Indian Trail Mr. Joe Fivas, Town Manger P.O. Box 2430 Indian Trail, N.C. 28079 John Skvarla, III Secretary Subject" Permit No, WQ0036400 Modification Town of Indian Trail Chestnut Park Wastewater Collection System Extension Union County Dear Mr. Fivas: In accordance with your application received July 12, 2013, we are forwarding Permit No, WQ0036400, dated July 30, 201.3 to the Town of Indian Trail for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference, It shall be responsibility of the Union County Public Works to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with the North Carolina General Statute §143-215.6A through §143-215=6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board, if any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit, This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made, this permit shall be final and binding. 1617 Mail Service Cuter, Raleigh, N Location: 512 N Salisbury St Paleligh, North C elina C' Phone: 91 +-66'-6,3001 FAX:619_807-6492 Internet: lwWw rcwaterqua tttr tq hCano!ina trirall// Mr. Joe Fivas W00364C10 If you need additional information concerning this matter, please contact Ms. B. Dee Browder at (704) 235-2203 or via e-mail at dee.browder@nedenr.gov. Sincerely, for Thomas A. Reeder, Director Division of Water Quality cc: John D. Barnard, P.E., (electronic copy) Barnard Engineering„, Water Quality Central Files PERCS (electronic copy) AwA „If! NCDENR STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the The Town of Indian Trail Union County for the construction and operation of approximately 411 linear feet of 6-inch gravity sewer; and the discharge of 5,000 gallons per day of collected domestic, wastewater into Crooked Creek WWTP existing sewerage system, pursuant to the application received July 12, 2013, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. Permit issued this the 30`h day of July, 2013. for Thomas A. Reeder, Director Division of Water Quality By Authority of The Environmental Management Commission Permit Number: WQ0036400 Modification SUPPLEMENT PERMIT COVER SHEET ' The Town of Indian Trail is hereby authorized to: ° Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Crooked Creek Wastewater Treatment Facility (NPDES Permit No. NCO069841) prior to being discharged into the receiving stream. Permitting of this project dues not constitute an acceptance of any part of the project that does not meet 15A NCAC 2l; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, I996as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, ZUOO as applicable, unless specifically mentioned herein. Division approval is based ooacceptance ofthe certification provided by North Carolina -licensed Professional Engineer in the application, It shall be the Permittee~s responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions, 11. STANDARD CONDITIONS L This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permhume, vfnrms| permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Dki5inn's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000as applicable; and other supporting materials unless specifically mentioned herein. l This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The wastewater collection facilities shall beproperly maintained and operated a\all times, The Pennittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A N[AC2T .8483. If an individual permit is not required' the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stat ons that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). 'Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g- Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (1) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification: The Permittee shall report by telephone to a water quality staff member at the Mooresville Regional Office, telephone number 704-663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not tb interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 7, Per 15A NCAC 2T,0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable, Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc, b, One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project, Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be dearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial); Permit modifications are required for any changes resulting in non- cornpliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria, Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit, Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 8. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities, 9. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215,6A through §143 -215,6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. r10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance Conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. FAST TRACK ENGINEERING CERTIFICATION Permittee: Town of Indian Trail Permit No. WQ0036400 Project: Chestnut Park Isstie Date:" 07/30/2013 Complete and submit this form to the permit issuing regional office with the following: One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension, Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format_ Record drawings should indicate the design and the marked up changes during construction, Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form, Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. Modifications should be submitted prior to certification. This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. PERMITTEE'S CERTIFICATION , the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title S nature Date ENGINEER'S CERTIFICATION Partial El Final " as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, weekly, El full time) the construction of the subject project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, 15A NCAC 02T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's Seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS SURFACE WATER PROTECTION SUPERVISOR Mooresville REGIONAL OFFICE .610 East Center Ave., Suite 301 Mooresville, NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI Owner/Perrniittee: Town of Indian Trail Application Number: (to be completed by DWQ) Full Legal Name (company, municipality, HOA, utility, etc.) lb, Joe Fives, Town Manager Signing Official Name and Title (Please review 15A NCAC 2T The legal entity who will own this system is: ❑ Individual ❑ Federal ® Municipality ❑State/CountyD Private Partnership 0 Corporatipn,[J Other 1 d. PO Box 2430 Mailing Address North Carolina Z State h. 704-821-5401 z Telephone Project (Facility) lnfor 2a. Chestnut Park Brief Project Name (permit will refer to this name) 3. Contact Person: 3a, John Barnard, Barnard Engineering 704-821-9045 Facsimile ion: 06 (b) for authorized signing officials! e. Indian Trail City 1 g. 28079 Zip Code townmanager admin.indiantratl.org E-mail here Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application 3b, 704-42.1-3067' Phone Number Project is 0 New an existing permit) 3c. 1dbarnard22@gmail.com E-mail Modification, Permit No.: WQ0036400 2, Owner is 0 Public (skip to Item 8(3)) 2a, If private, applicant will be: Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) Union County Private (go to Item 2(a)) 2b. If sold, facilities owned by a (must choose on 0 Public Utility (Instruction C) 0 Homeowner Assoc./Developer (Instruction D) Owner of Wastewater Treatment Facility (WNW) Treating Wastewater From This Project 4a. Crooked Creek. WWTP 4b. NC 0069841 Name of WWTF WWTF Permit No. 5a. Union County Owner of Downstrea 5b. Sewer Receiving Sewer Size 6. The origin of this wastewater is (check all that apply): 0 Residential Subdivision 0 Apartments/Condominiums Mobile Home Park School Restaurant Office Gravi Force Main c. WQ 0001160 Permit # of Downstre ❑ Retail (Stores, shopping centers) Institution ❑ Hospital 0 Church ❑ Nursing Home Other (specify);_ Park (Instruction E) IOQ% Domestic/Commercia % Industrial (attach description,) (RO: contact your Regional Office Pretreatment staff) Other (specify): 7. Volume of wastewater to be allocated or permitted for this particular project: 0 gallons per day *Do not include future flows or previously permitted allocations (5000 gpd previously Permitted) 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA 12107 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f), No Additional Flow 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 6" Length (feet) 717-306 = 411 LF New Gravity or Additional Force Main New Gravity 11, Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID N/A Design Flow (MGD) 0 (self chosen s shown on plans/map for reference Power Reliability Option Operational Point 1 - permanent generator w/ATS; Force Main Size Force Main Length GPM ©TDH 2 - portable generator w/MTS 0 1— Pump Station Location ID N/A (self chosen - as shown on plans/map for reference) icE 2 Design Flow Power Reliability Option IX (MGD) Operational Point 1 - permanent generator 'MATS; Force Main Size Force Main Length 0 GPM ©TDH 2 - portable generator w/MTS u. Pump Station Location ID N/A (self chosen as shown on plans/map for reference Design Flow Operational Point Power Reliability Option (MGD) GPM TOH 1 - permanent generator w/ATS; Force Main Size Force Main Length © 2 - portable generator wIMTS 12 Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? D Yes No If Yes, permit number of 2nd treatment facility (RO — if 'yes" to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? Yes D No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07 cn 0 ave the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? Li Yes El No N/A Sedirndntation and Erosion Control Plan? Stormwater? Yes 0 No N/A Yes E] No El N/A 15. Does this project include any high priority lines, [see 15A NCAC 02T 0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: E] and provide details la. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, . eqk 1:.` c , attest that this application for C F.-- Lk- has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as we as civil penalties up to $25,000 per violation. Sign 9 Date' ENGINEERING DESIGN D ENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, 27gats D. evierlari , attest that this application for Lij e...41 t4.4- A k r has been ,,,.., , reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials ,1 under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design, Note: In accordance with NC General Statutes 143-215, 6A and 143-215,6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor 1 which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, 2a. John D. Barnard, P.E. Professional Engineer Name 2b, Barnard Engineering, P.C. Engineering Firm 2c, 1534 Saratoga Blvd. Mailing Address 2d, Indian Trail 2e. NC 2f. 28079 City State Zip 2g, 704-421-3067 2h, N/A Telephone Facsimile 2i, `dbarnard22 E-mail C B A I itto"‘ NC PE Seal, Signature & Date FTAI2/07 USGS Map for Utility Application 'done \OocumeetaVfolectsVOL ,4 Town of Indian Trait i4 Acre P ttlUtality Sable rttals'4U Chestnut Park Indian Trail, MC Town of Indian Trail 730 Blythe Drive 740094sic OCV9T©Pu.p3 BARNAR© ENGINEERING. P.C. 1534 Saratoga & yd., Indian TrtaaI, NC a&oi 5 (7(4) 421-3067 www. barnnrdengineeringpccom N.C. boom No. C-3679 I epartmuent of Env!. State of North Carolina nt and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 06/13) Project Applicant Nance: 'aunty Project Name for Which flow is being requested: Chestnut Park e (Modification) More than crne F7SF may be required far a single project if the owner of the kFiri'TP is not re stations along the route of the proposed wastewater flow. pump Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crooked Creek b. WWTP Facility Permit : NC0069841 All flows are in, °"CD c, WWTP facility`s permitted flow 1.90 d. Estimated obligated flow not yet tributary to the WWTP 0.3641 e. WWTP facility's actual avg. flow 1.09 f .. Total flow for this specific request 0 * g. "Total actual and obligated flows to the facility 1.4541 h. Percent of permitted flow used 76.53 * No Additional Flow Needed. 5,00() gpd. was previously penritted. I1. Complete this section for each pump seat: proposed wastewater :flow. List pump stations located between the pa lee t eaa rtection point and the WWTP:. (A) (B) (C) (D)=(B+C) O=(A-D) Design obligated, Average Daily Approx. Not. Yet Total Current Flow** Current Avg. Tributary Flow Plus (Firm / pf), Daily Flow, Daily low, obligated Available MGD MGD M.CD Flow Capacity*** Pump Station (Name or Number) Capacity,* MGD 4'ou sponsible for along the route of this * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service, ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaki factor (pf) not less than 2.5. age 1 of 6--3 ppriPPP., *** A Pia *rig Assessment Addendum shall be attached for each pump station located between the project connection point and the WWII' where the Available Capacity is < h. I1. Certification Statement: I Charles P. O'Cain, P.E. certify to the best of my knowledge that the addition o��f the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all, attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing (`; /Jielal Signati Page 2 ofm 3 FTSE PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pu.arrp station listed in Section 11 where .Available Capacity is < O. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated', Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity.. (P:) in Pump Station , and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded C a.pital Project that will provide the required planned capacity, namely is in design err ernder construction with and/or planned completion in d. The following applies: Therefore: Given reasonably expected condi,tiotas and planning information, there is s ui :dent. justification to allow this flow to be permitted, without a significant Likelihood of over -allocating capacity in the system infrastructure. 1 understand that this does not relieve the collection system owner front complying with G.S. 143-215.67(a) which prohibits the it trAuction of any waste in excess of the capacity of the waste disposal system. Page 3 of-4„3 UNION COUNTY DEPARTMENT OF PUBLIC WORKS 500 North Main Street, Suite 500, Monroe, NC 28112 Phone: (704)296-4210 • Fax: (704)296-4232 July 10, 2013 Mr. John Barnard Barnard Engineering 1534 Saratoga Blvd. Indian Trail, NC 28079 Re: Sewer Treatment Capacity Chestnut. Park — Private Portion (Permit # 1 'Q0036400) Dear Mr. Barnard: Union County Public Valor' rnent can accept the decrease in linear footage of the 6" sewermain f r the abov mentioned project. The linear footage will decrease 306 LF for a tot l of 411 LF o pipe. The flow has already been allocated in this permit; therefore jo ate" anal flow is needed. If you have any questions please don't hesitate to call. Sincerely: Charles P. O'Cain, PE CPO/pwb �::\VN C UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, N.C. 28115 Attention: Ms. Dee Browder TRANSMITTAL Regarding: Sanitary Sewer to serve Chestnut Park - Private (Modification) We are sending you: Date: 7/9/13 Q Copy of letter Plans Prints © Shop Drawings Other Copies Date No. Description 1 7/10/13 1 6/10/13 1 6/10/13 Sewer Capacity Letter Non -Discharge Permit Application Copy of Non -Discharge Permit Application 7/10/13 Flow Tracking Form 6/13/13 004226 $480.00 Check (Application Fee) These are transmitted as checked below: For approval LI For your use As requested 0 For review and comments Remarks: Received by: Date: Permit Number WQ0036400 Central Files: APS SWP^ 07/29/13 Permit Tracking Slip Program Category Status Project Type Non -discharge Active Major modification Permit Type Fast Track Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer samar.bou-ghazale Coastal SW Rule Permitted Flow 5000 Facility Version 1.10 Permit Classification Individual Permit Contact Affiliation Facility Name Major/Minor Region Chestnut Park Minor Mooresville Location Address County Union Facility Contact Affiliation Owner Owner Name Owner Type Town of Indian Trail Government - Municipal Dates/Events Owner Affiliation Joe Fivas Manager Town PO Box 2430 Lake Park NC 28079 Orig Issue App Received 03/07/13 07/29/13 Scheduled Draft Initiated Issuance Public Notice Issue Effective Expiration 07/29/13 07/29/13 Regulated Activities Re • uested/Received Events Wastewater collection Additional information requested Additional information received Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin TRACK ENGINEERING CERTIFICATION Permittee: iown ofIndian Trail Permit No. WQ0036400 Project: Chestnut Park Issue Date: 07/30/2013 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format. Record drawings should indicate the design and the marked up changes during construction • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. Modifications should be submitted prior to certification. This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation, Therefore, it is highly recommended that this certification be sent in a manner that rovides proof of receipt by the Division. PlERAIITTEE:SCERTIFICATION i( the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements , the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. cwc 7 Printed Name, Title S nature ENGINEER'S CERTIFICATION El Partial Final Date -r a duly registered Professional Engineer in the State of North Carolina, g been authorized 'to observe akrperiodically, El weekly, El full time) the construction of the subject project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit 15A NCAC 02T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, and other supporting materials. North Carolina Professional Engineers Seal, signattiscvaKflate: Nik"CArto,, " SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS SURFACE WATER PROTECTION SUPERVISOR Mooresville REGIONAL OFFICE 610 East Center Ave., Suite 301 Mooresville, NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. ° 10. In the event that the wastewater collection facilities to perform satisfactorily,)mdudi�� the' creation of nuisance conditions, the Permitte shall take immediate corrective action, including those as may he required by this Division, such as the construction of additional or replacement facilities. lI' The issuance of this permit shall not exempt the Pe/mittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed byother government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC Jn .0200 erosion and sedimentation control requirements in 15A N(]\[ [h. 4 and under the Division's General Permit NCG810OOO and any requirements pertaining towetlands under 15AN[ACZB.OZO0and I5AN[AC2H.Q5M UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Suite 301 Mooresville, N.C. 28115 Attention: Ms. Dee Browder Regarding: Engineer's Certification for Chestnut Park (Private) TRANSMITTAL Date: 11/4/13 We are sending you: Li Copy of letter Hans r Prints [1 Shop Drawings Other Copies 1 No. Description Record Drawings Engineer's Certification for Sewer (Permit #k WQ0036400) These are transmitted as checked below:. El For approval For your use 0 As requested n For review and comments Remarks: Signed: Received by: Date: