No preview available
HomeMy WebLinkAbout20220038 Ver 1_More Info Received_202202031 Anderson, Mitchell L From:Kris Carlson <kcarlson@carlsonfarmer.com> Sent:Thursday, February 3, 2022 11:47 AM To:Anderson, Mitchell L Subject:[External] Cochran Seawall Footing Repair (Project ID 20220038) Attachments:Cochran, Robert - Footing Letter to NCDEQ.doc CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.    Hi Mitchell, please find attached the clarification statement for the application for project number 20220038.  Please feel free to call me with any questions or to forward this on to Raleigh. Thanks for all your help in this  matter.  Kris    Kris Carlson Carlson-Farmer, Inc.  General Contractors  PO Box 350  Rutherfordton, NC 28139  (828) 289-0807 (mobile)  (828) 286-0317 (office)  (828) 286-8482 (fax)  kcarlson@carlsonfarmer.com (e-mail)  www.carlsonfarmer.com (website)    _ _______ ___ CARLSON-FARMER, INC.___ _________ G E N E R A L C O N T R A C T O R S POST OFFICE BOX 350, RUTHERFORDTON, NORTH CAROLINA February 3, 2022 Mr. Mitchell Anderson Environmental Specialist – Asheville Regional Office Water Quality Regional Operations Section NCDEQ – Division of Water Resources 2090 US Hwy 70 Swannanoa, NC 28778 Re: Cochran Seawall Footing Repair (Project ID – 20220038) This letter is to inform you that the work to be done to reinforce and repair the existing concrete seawall footings will be done when the lake levels are safely lower than the existing seawall footings. The footing repairs will be formed with ¾” plywood and 2 x 4 framing and the concrete will be placed through a pumping mechanism located on the driveway above the house. The concrete will be allowed to cure for a minimum of 30 days prior to the lake level being raised. Please feel free to call me if should have any further questions. Regards, Kris Carlson (828) 286-0317 info@carlsonfarmer.com www.carlsonfarmer.com (828) 286-8482 (fax)