HomeMy WebLinkAbout20141169 All Versions_SW Management Plan_20140130
ATN Revised 3/31/05
in the wetland summary.The pile areas are too small to show in the permit drawings, but they have been accounted forAlso, there is temporary fill in wetlands at sites 3 and 4 due to
the piles for the work bridges.There is permanent fill in wetlands at sites 3 and 4 due to the piles for the proposed bridges. TOTALS:
Site
No.
654321
437+00 to 446+00 -L-432+00 to 434+00 -L-389+02 to 399+75 -L-
372+50 to 374+50 -L-329+50 to 331+50 -L-302+50 to 303+50 -L-
17+00 to 18+48.13
17+51 to 22+00
11+50 to 12+5017+00 to 19+00
(From/To)
-Y3RPD-
-Y3RPA-
-DRV4--DRV3-
Station
Bank Stabilization
2@ 8'X8' RCBC
Dual BridgesDual Bridges
36" RCP-IV48" RCP-IV36" RCP-IV48" RCP-IV
Size / Type
Structure
WETLAND PERMIT IMPACT SUMMARY
Permanent
Wetlands
<0.01
Fill In
5.641.600.860.760.082.34
(ac)
Wetlands
Temp.
<0.01
Fill In
0.060.06
(ac)
WETLAND IMPACTS
Excavation
Wetlands
0.060.06
(ac)
in
Mechanized
in Wetlands
Clearing
0.300.130.050.060.020.04
(ac)
Wetlands
Clearing
Hand
1.971.250.72
(ac)
in
Permanent
impacts
<0.01
0.040.030.01
SW
(ac)
SHEET 1 of 4
SURFACE WATER IMPACTS
Temp.
impacts
<0.01
0.010.01
(ac)
SW
NC DEPARTMENT OF TRANSPORTATION
WBS - 34442.1.1 (R-2514D)
Permanent
DIVISION OF HIGHWAYS
ChannelExisting
Impacts
239.00
218
(ft)
16
JONES COUNTY
5
Existing
Channel
Impacts
Temp.
81.00
(ft)
5031
2/28/2014
Natural
Stream
Design
0.00
(ft)
ATN Revised 3/31/05
Site 7 includes 0.25 Ac. permanent fill to a pond.TOTALS:
Site
No.
1413121110
987
527+50 to 529+50 -L-520+07 to 520+23 -L-504+00 to 506+00 -L-
473+00 to 475+00 -L-463+00 to 463+50 -L-458+02 to 458+33 -L-
490+50 to 496+00 -L-476+50 to 480+00 -L-
(From/To)
Station
Bank Stabilization
Bank Stabilization
54" RCP-IV
36" RCP-IV36" RCP-IV36" RCP-IV36" RCP-IV
Size / Type
Structure
WETLAND PERMIT IMPACT SUMMARY
Permanent
Wetlands
<0.01
Fill In
2.720.340.010.310.960.380.540.18
(ac)
Wetlands
Temp.
Fill In
0.00
(ac)
WETLAND IMPACTS
Excavation
Wetlands
0.00
(ac)
in
Mechanized
in Wetlands
Clearing
<0.01
0.060.020.01
0.260.060.090.02
(ac)
Wetlands
Clearing
Hand
0.00
(ac)
in
Permanent
impacts
0.060.010.05
SW
(ac)
SHEET 2 of 4
SURFACE WATER IMPACTS
Temp.
impacts
<0.01
<0.01<0.01
(ac)
SW
NC DEPARTMENT OF TRANSPORTATION
WBS - 34442.1.1 (R-2514D)
Permanent
DIVISION OF HIGHWAYS
Existing
Channel
Impacts
456.00
230196
(ft)
1218
JONES COUNTY
Existing
Channel
Impacts
Temp.
41.00
(ft)
2120
2/28/2014
Natural
Stream
Design
0.00
(ft)
ATN Revised 3/31/05
TOTALS:
Site
No.
21201918171615
26+00 to 30+00 -Y10-608+00 to 612+50 -L-41+00 to 41+50 -Y8A-591+50 to 592+50 -L-33+50 to 35+00 -Y8A-584+00 to 588+00 -L-11+00 to 13+50 -Y8A-562+00 to 563+00 -L-548+16 to 552+75530+12
to 531+75 -L-
535+00 to 536+67 -L-
(From/To)
Station
Bank StabilizationBank Stabilization
36" RCP-IV36" RCP-IV18" RCP-IV36" RCP-IV42" RCP-IV78" RCP-IV
Size / Type
Structure
WETLAND PERMIT IMPACT SUMMARY
Permanent
Wetlands
Fill In
5.261.580.301.350.611.390.03
(ac)
Wetlands
Temp.
Fill In
0.00
(ac)
WETLAND IMPACTS
Excavation
Wetlands
0.010.01
(ac)
in
Mechanized
in Wetlands
Clearing
0.540.030.060.200.070.160.02
(ac)
Wetlands
Clearing
Hand
0.00
(ac)
in
Permanent
impacts
0.130.060.010.06
SW
(ac)
SHEET 3 of 4
SURFACE WATER IMPACTS
Temp.
impacts
<0.01<0.01<0.01
(ac)
SW
NC DEPARTMENT OF TRANSPORTATION
WBS - 34442.1.1 (R-2514D)
Permanent
DIVISION OF HIGHWAYS
Existing
Channel
Impacts
1258
644282292
(ft)
1426
JONES COUNTY
Existing
Channel
Impacts
Temp.
(ft)
482127
2/28/2014
Natural
Stream
Design
(ft)
0
ATN Revised 3/31/05
OVERALL PROJECT TOTALS:TOTALS:
Site
No.
2322
19+00 TO 20+00
26+07 to 26+67
-Y10RPA-
-Y10RPA-
(From/To)
Station
Bank Stabilization
Size / Type
Structure
BRIDGE
WETLAND PERMIT IMPACT SUMMARY
Permanent
Wetlands
<0.01
Fill In
0.020.02
(ac)
13.65
Wetlands
Temp.
Fill In
0.00
(ac)
0.06
WETLAND IMPACTS
Excavation
Wetlands
0.00
(ac)
in
0.07
Mechanized
in Wetlands
Clearing
0.00
(ac)
1.10
Wetlands
Clearing
Hand
0.160.16
(ac)
in
2.13
Permanent
impacts
0.00
SW
(ac)
0.23
SHEET 4 of 4
SURFACE WATER IMPACTS
Temp.
impacts
0.00
(ac)
SW
NC DEPARTMENT OF TRANSPORTATION
0.02
WBS - 34442.1.1 (R-2514D)
Permanent
DIVISION OF HIGHWAYS
ChannelExisting
Impacts
1953.00
0.00
(ft)
JONES COUNTY
Existing
Channel
Impacts
Temp.
170.00
0.00
(ft)
2/28/2014
Natural
Stream
Design
0.00
(ft)
0.00
TOTAL:
SITE NO.
87654
321
STRUCTURE SIZE /
DUAL BRIDGESDUAL BRIDGES
2@8'X8' RCBC
60" RCP-IV42" RCP-IV78" RCP-IV48" RCP-IV
54"RCP-IV
BRIDGE
TYPE
388+28 TO 395+18 -
371+98 TO 374+73 -
507+43 TO 513+23 534+33 TO 537+28 529+50 TO 532+45 473+16 TO 474+13 301+70 TO 303+89
18+45 TO 20+27 10+65 TO 10+78 18+28 TO 22+07
(FROM/TO)
-Y10RPA-
STATION
-DRV4- -DRV3-
-L--L--L--L--L-
L-L-
CROSSING
ROAD
XXXXXX
BUFFER IMPACTS SUMMARY
BRIDGE
TYPE
XXX
X
PARALLEL
IMPACT
ZONE 1
51444
(ft
3120911778
63142143
2
)
ALLOWABLE
IMPACT
ZONE 2
26264
(ft
12501
4679
20836975
2
)
26
TOTAL
77708
109934371018753(ft
4226
2
)
26
ZONE 1
111154
(ft
3816718952190671684418124
2
)
MITIGABLE
SHEET 1 OF 1
ZONE 2
73477
(ft
2550412261126151148511612
2
)
N.C. DEPT. OF TRANSPORTATION
PROJECT: 34442.1.1 (R-2514D)
DIVISION OF HIGHWAYS
184631TOTAL
(ft
6367131213316822832929736 2
JONES COUNTY
)
2/28/2014
REPLACEMENT
ZONE 1
(ft
2
BUFFER
)
ZONE 2
(ft
2
)
Rev. May 2006
TOTAL:
SITE NO.
8754
32
18+45 -Y10RPA-
18+28 -DRV3-
(FROM/TO)
507+43 -L-529+50 -L-473+16 -L-388+28 -L-371+98 -L-
STATION
TO 20+27 -Y10RPA-
TO 22+07 -DRV3-
TO 513+23 -L-TO 532+44 -L-TO 474+13 -L-TO 395+18 -L-TO 374+73 -L-
WETLANDS IN BUFFER IMPACTS SUMMARY
ZONE 1
WETLANDS IN
(ft
2
BUFFERS
8426728108153082413011630
)
4163
928
ZONE 2
(ft
2
3817311272
)
20321432839595675096
379
SHEET 1 OF 1
N.C. DEPT. OF TRANSPORTATION
PROJECT: 34442.1.1 (R-2514D)
DIVISION OF HIGHWAYS
JONES COUNTY
2/28/2014
Rev. Jan 2009