HomeMy WebLinkAboutSW6211201_Supplement-EZ Form_20220128SUPPLEMENT-EZ COVER PAGE
LOAD SUPPLEMENT FORMS
PROJECT INFORMATION
1 Project Name
The Glen
2 Project Area ac
11.18
3 Coastal Wetland Area ac
0
4 Surface Water Area (ac)
0.4
5
Is this project High or Low Density?
High
6
1 Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)
30 feet
8
Will the vegetated setback remain vegetated?
Yes
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
N/A
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
Sand Filter
17
Rainwater Harvesting (RWH)
18
Green Roof
19
Level Spreader -Filter Strip (LS-FS)
20
Disconnected Impervious Surface (DIS)
21
Treatment Swale
22
IDry Pond
23
StormFilter
24
Silva Cell
25
Bayfilter
26
Filterra
LOAD SUPPLEMENT FORMS
DESIGNER CERTIFICATION
27
Name and Title:
Andrew S Petty, VP
28
Organization:
Curry Engineering Group, PLLC
29
Street address:
205 South Fuquay Avenue
30
City, State, Zip:
Fuquay-Varina, NC
31
Phone number(s):
919-552-0849
32
Email:
andy@curryeng.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that
the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
g �FESS 1 ���✓�r'_
SEAL
36823
G
2022.01.27 11.06.08 -
05'00'
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project have low density areas?
No
4
If so, number of low density drainage areas
0
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
N/A
Wet Pond
5
Total drainage area (sq ft
487000.8
328007
6
Onsite drainage area (sq ft
487000.8
328007
7
Offsite drainage area (sq ft
-
8
Total BUA in project (sq ft)
121704 sf
121704 sf
9
New BUA on subdivided lots (subject to
ermitting) (sq ft
82500 sf
82500 sf
10permitting)
New BUA not on subdivided lots (subject to
s
39204 sf
39204 sf
11
Offsite BUA (sq ft
-
12
Breakdown of new BUA not on subdivided lots:
-
-
- Parking (sq ft
34848 sf
34848 sf
- Sidewalk (sq ft
4356 sf
4356 sf
- Roofs ft
-
-
- Roadway s ft
-
- Future (sq ft
-
- Other, please specify in the comment box
below (sq ft)
-
sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft
-
14
New infiltrating permeable pavement not on
Isubdivided lots (sq ft)
-
15permitting)
Existing BUA that will remain (not subject to
s ft
-
16
Existing BUA that is already permitted (sq ft
-
-
17
Existing BUA that will be removed (sq ft
-
-
18
Percent BUA
25%
37%
19
Design storm inches
1.0 in
20
Design volume of SCM cu ft
13035 cf
21
Calculation method for design volume
Simple
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
WET POND
1
Drainage area number
1
2
Minimum required treatment volume cu ft
10494 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 021H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
71.50
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
72.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
77.00
23
Elevation of the permanent pool fmsl
77.50
24
Elevation of the top of the vegetated shelf (fmsl)
78.00
25
Elevation of the temporary pool (fmsl)
78.50
26
Surface area of the main permanent pool (square feet)
8089
27
Volume of the main permanent pool cubic feet
26772 cf
28
Average depth of the main pool (feet)
4.03 ft
29
Average depth equation used
Equation 3
301
If using equation 3, main pool perimeter (feet)
406.0 ft
31
If using a uation 3, width of submerged veg. shelf feet
3.0 ft
32
Volume of the forebay (cubic feet)
5070 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
30 in
35
Design volume of SCM cu ft
13035 cf
36
Is the outlet an orifice or a weir?
Orifice
371
If orifice, orifice diameter (inches)
2 in
38
If weir, weir height (inches)
39
If weir, weir length inches
Drawdown time for the temporary pool (days)
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
40
2.49
41
Yes
42
Are berms or baffles provided to improve the flowpath?
Yes
43
Depth of forebay at entrance (inches)
36 in
44
Depth of forebay at exit (inches)
18 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Centipede
541
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 3 11:05 AM 1/27/2022