Loading...
HomeMy WebLinkAboutGW1-2022-01281_Well Construction - GW1_20220127 w ®, NORTH CAROLINA ilk WELL CONSTRUCTION RECORD (GW-1 ) EnvfronmertmfQua(Iry Form GW-1 Well Construction Electronic Form North Carolina Department of Environmental Quality Division of Water Resources November1 Submission ID# GW 1-2022-01281 Are you submitting a scanned form?* Yes • No CONTACT INFORMATION ....................................................................................................................... Contact Name* Email Address* Jonathan Kamionka office@billswelldrilling.com Is this a revision to the form you have previously submitted?* Yes No WELL CONSTRUCTION INFORMATION 1.Who is installing these wells?* Owner Well Contractor 1.Well Contractor Information: Certiticate# Cert Level First Name Last Name Company Name 3465 A JONATHAN KAMIONKA BILLS WELL DRILLING CO, INC. 2.Well Construction Permit#: List all applicable well construction permits(i.e.Monitoring Wells,UIC,County,CCPCUA,etc.) What type of well is this?* Injection Well Non-Water Supply Well Water Supply Well(includes irrigation wells) 3.Water Supply Well* Geothermal (Heating/Cooling Supply) Industrial/Commercial Irrigation Municipal/Public/Community Residential Water Supply(single) Residential Water Supply(shared) Wells> 100,000 GPD 4.Date well was completed and ID# Date Well Completed* Well ID# Well Yield 12/15/2021 #10 70 (gallons per minute)" 5.Well Location Facility/Owner Name* Blueberry Bay Facility ID# (Required) (If applicable) County* Parcel Identification No. (PIN) Bladen 137400557229 Physical Address* Street Address 13135 NC-41 Address Line 2 City State/Province/Region Harrells NC Postal/Zip Code Country 28444 us Latitude* 34.7277020000 Longitude*78.2015119000 Decimal degrees Decimal degrees ......... ......... ......... ......... ......... ......... ..... ......... 6.Is(are)the well(s):* Permanent Temporary 7.Is this a repair to an existing well:* Yes No If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction,only 1 GW-1 is needed. 8a.Indicate TOTAL NUMBER of wells drilled: 1 9.Total well depth below land surface: (ft.) 9a.What is the depth of the casing from ground 61 surface? For multiple wells list all depths if different 61 (example-3@200'and 2@100') in feet 10.Static water level below top of casing: (ft.) 11.Borehole diameter: 10 8 If water level is above casing,use"+" in inches 12.Well construction method: Auger Air Rotary Cable Tool Direct Push Mud Rotary Rotosonic Other 13. FOR WATER SUPPLY WELLS ONLY: 13a.Yield(gpm) 70 13a.Method of test: If applicable pumped 13b. Disinfection type:* 13b.Amount: HTH 1 cup 14.WATER BEARING/FRACTURE ZONES From To Description 37 57 in feet in feet 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) From To Diameter Thickness Material 2.00 37.00 4.00 sch40 PVC in feet in feet in inches 57.00 61.00 4.00 sch40 PVC in feet in feet in inches 17.SCREEN From To Diameter Thickness Material 37.00 57.00 4.00 sch40 PVC in feet in feet in inches 18.GROUT From To Material Emplacment Method&Amount 0.00 20.00 bentonite poured in feet in feet 19. SAND/GRAVEL PACK(if applicable) From To Material Emplacment Method 20.00 61.00 #3 Gravel poured in feet in feet 20. DRILLING LOG From To Description(color, hardness,soil/rock type,grain size,etc.) 0.00 57.00 brown sand in feet in feet 57.00 61.00 clay in feet in feet 21. Remarks 22.Site diagram or additional well details: You may upload additional well construction information here. pdf only CERTIFICATION INFORMATION * By signing this form, I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23.Certification Signature of Certified Well Contractor