Loading...
HomeMy WebLinkAboutWQ0024333_Regional Office Historical File Pre 2018Michael F. Easley. Governor William G. Ross Jr.. Secretary North Carolina Department of Environment and Natural Resources Alan Vie Klimek. P.E. Director Division of Water Quality September 13, 2004 Mr. Russell Colbath, Director of Water Resources City of Monroe Post Office Box 69 Monroe, North Carolina 28111 Subject: Permit No. WQ0024333 City of Monroe Poplin Retail Wastewater Collection System Extension Union County, North Carolina Dear Mr. Colbath: In accordance with your application received on September 1, 2004, we are forwarding herewith Permit No. WQ0024333, dated September 13, 2004, to the City of Monroe for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 919 North Main Street Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663.6040 Internet h2o.enr.state.nc.us Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer —50% Recycled/10% Post Consumer Paper Na thCarolin Naturally Mr. Russell Colbath Page 2 September 13, 2004 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is'hereby granted to the City of Monroe for the construction and operation of approximately 2,112 linear feet of fl- inch gravity sewer to serve 366,835 square feet of retail space as part of the Poplin Retail project, and the discharge of 44,020 gallons per day of collected domestic wastewater into the City of Monroe's existing sewerage system, pursuant to the application received September 1, 2004, and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the City of Monroe WWTP (NPDES No. NC0024333) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Sonja Williams at (704) 663-1699. Sincerely, L•= 4,,-4, for Alan W. Klimek, P.E. cc: Union County Health Department Mooresville Regional Office, Water Quality Section (WWi'F Permit No. NC0024333) John Combs, R.L. Horvath Associates, Inc. Water Quality Central Files NDPU Files NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1 C. 1 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction Record Drawings," and one copy of the supporting design calculations to the North Carolina Department of Environment and Natural Resources, Water Quality, 919 North Main Street, Mooresville, N.C. 28115. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. in the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 2 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733- 3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Fomi CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 13th day of September, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,O i2-�Z--- for Alan W. Klimek,(P'E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0024333 3 Fast Track Engineering Certification Permit No. W00024333- September 13, 2004 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial E Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (E periodically, ❑ weekly, ['full time) the construction of the Poplin Retail, Union County project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - 'Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE 919 N. MAIN STREET MOORESVILLE NC 28115 ATTN: DEE BROWDER The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. z 0 0 lu. APPLICATION for C ViTY SE`#Y'ERS, PUMP STATiONS,AND FORCE MAINS USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI w la, City of Monroe Full Legal Name (company, municipality, HOA, utility, etc.) lb Russell G. Colbath, Water Resources Director Signing ©ftieial Name and Title (Please review 1 »A NCAC 2H .0206(b) for authorized signing omoalsi) 1 c. The legal entity who will own this system is: CI Individual ❑ Federal It Municipality ❑ State/County ❑ Private Partnership 0 Corporation 0 Other (specify): Application Number: (to be completed by DWQ) W i PAGE 3 3 1 d. PP=O. Box 69 Street Address North Carolina State 1 h. 704-282-4601 Telephone 2. Project (Facility) Ie r, • 2a, Poplin Retail 704-283-8492 Facsimile Brief Project Name (permit will refer to this name) < 3, Contact Person: le. Monro 1g, 2d1'I1-0069' Zip Code 1 i. rcolbath monroenc.o E-mail ire Project is Located Q 3a. John. M. Combs, P.E. RL Horvath Asso .tes, Inc., Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 423-266-4990 �3c- jcombs?@rlhorva.th.rim, Phone Number E-mail 1. Project is New 0 Modification (of an existing permit) If Modification, Permit No.. For modifications, attach a separate sheet clearly explaining the reason for the modification (Le. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate protect information in B(7) and B(10-11) that has already been included in the original permit. 2. Owner is e' Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. if sold, facilities owned by a (must choo ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction III) El Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction iV) ❑ Selling units (lots, townhomes, etc. - go to Item 8(2b)) 3. City of Monroe Owner of Wastewater Treatm 4a, Monroe WWTP mw � Name of WW TF 5a. C'ity,of Monroe rr Owner of Downstream Sewer Receiving Sewer Size The origin of this wastewater is (check all that ,apply): Treating 0 Residential Subdivision ApartmentslCondominiurm ❑ Mobile Home Park School ❑ Restaurant ❑ Office ewater From This Project 4b. NC00 24333 WWTF Permit No. on Permit Number of Downstream Sewer (if known El Car Wash ❑ Institution 0 Hospital ❑ Church O Nursing Home S144PPIN AZ Other (specify) 7, Volume of wastewater to be permitted in this project: 44 , 0agallons per day 100 % Domestic/Co % Industrial % Other (spe If the permitted flow is zero, indicate why: interceptor Line - Flow will be permitted is subsequent permits that connect to this line Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected erial loc clM4 vi Jr*rr lets 2S 4 r: I414 Skr., FT"A 02'01 Rev n fi4 J r' ., • i • • .C.1. •r • • 4, • `CRACK APPLICATION for GRAVITY SEWERS, PtIIVIP STATIONS, AND FORCE AINS PAGE 4 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(l)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .02190)(3). 366,835 SF @ 120 gal/100 SF - 44,a.a gal/day 10. Summary of Sewer Linea to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) °2112 LF 0 0 ENTER TOTAL LINE LENGTH IN MILES 0 ,4.6 0 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID (self chosen - as shown o plans for cross-reference Design Flow Operational Point Gravity or Force Main (use the pull down menu) Gravity Power Reliability Option (1- dual line feed; 2- permanent generator'wFATS 3- MGD) GPM TDH portable generator witelemetry; 4-wet well storage) 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force; Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H ,0200 as applicable? Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION t3. Have the following permits /certifIcetions been submitted for approval? WetlandfStream Crossings - General Permit or 401 Certification? 0 Yes 0 No ® N/A Sedimentation and Erosion Control Plan'? 0 Yes 0 No t N/A Stormwater? 0 Yes 0 No NIA F"TA 0'/10 - Rev. ? 04104 � '' ~ . .� ' ^ �. 1 ~ .'z.. .0 ' . ' I ` . ' .` . '' .' ~ � '`. , I `..�)`'f� : ` ° y ` ' ppprK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 0 H v LL V re H 4) Li 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02103 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: _ _ _ _ _ ® A Stream Classification is not needed because ail parts of the project are at least 100 feet away from any down slope waterbody; AND, ❑ A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. — - - - Location ID on Map (self chosen - as shown on map for cross-reference) Name of Waterbody County Union River Basin Yadkin Waterbody Stream Index Waterbody Classification Submit the 8.5" x 11" COLOR topographic map as required in instruction VI regardless of whether a classification is provided! Applicant's Certification: 1, Russell G. Colbath attest that this application for Poplin Retail has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application am not completed and that if all required supporting documentation and attachments are not included, this application package is .subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10, 000 as well as civil penalties up to $25, 000 per violation. Signing Official Signature CO Z I attest that this application for Poplin Retail has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and alt other supporting documentation to the best of my knowledge. I- I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable a regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1998, and the Minimum V Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed Er- classification in accordance with Division guidance. Although certain portions of this submittal package may have been H developed by other professionals, inclusion of these materials under my signature and seal signifies that l have reviewed CL this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes LLJ 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any 0 application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil Date 2. Professional Engineer's Certification: Q penalties upto$25,000per violation. - --- 2a. John M. Combs, P.E. Professional Engineer Name 2b. RL Horvath Associates, Inc. 2. Engineering Firm Address 537 Market Street, Suite LL20 ,u\tlllllllll!rrll h/fi SEAL , nJ 2d. Chattanooga 2e. TN 2f. 37402 - vp''.FNGINEf$•Gj �- 1_ City - - — -r— I State ' Zip ����-"V Ai. ..CO 2g.423-266-49902h.423-266-57002i. jcombs@rlhorvath.com OS- urfrlLb4.- Telephone I Facsimile I E-mail Seal, Signature & Date FTA 07./01 - Rev. 2 04/04 Topo Down oad Photo Download USGS Tope Maps No topo iasemap :24K/25k Series 00K Series 50K Series TopoZone Pro [II Shaded Relief [11 Street Maps Aerial Photos ryi Slack and White color Infrared Plop Size Small Medium Large ...° Huge View Scale 1 : 5©,©00 Update Coordinate Format DD.DDD Coordinate Datum WGS84/NAD83 11Show target Email this map Bookmark this map Print this map MA F 0191°N, 80.5822°W ('WG584/NA© USGS Bakers Quad Elevation 653.4 ft / 199.2 m (USGS NED 0.7 1.4 2.1 0.4 0.8 1.2 1.6 TopoZone.corn ) 1999-2004 Maps a la carte, Inc. - All rights reserved Use of this site is governed by our Crondihons and Terms of Use. We care about your privacy - please read our Privacy Statement. • 09/13/04 Permit Number W00024333 Permit Tracking Slip Program Category Non -discharge Status Project Type In review New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Individual ` Extensions Primary Reviewer Permit Contact Affiliation sonja.williams Permitted Flow 44020 Facility Facility Name Poplin Retail Location Address Owner t Major/Minor Region Minor Mooresville County Union Facility Contact Affiliation Owner Name Owner Type City of Monroe Government - Municipal Owner Affiliation Russell Co!bath, Director Resources Water PO Box 69 Monroe Dates/Events NC 28111 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 09/01 /04 13fo4 Regulated Activities Requested/Received Events Commercial or industrial, other Additional information requested Wastewater collection Additional information received Outfall NULL Waterbody Name Stream Index Number Current Class Subbasin TO RL Horvath Associates, Inc. Consulting Engineers • Planners 16 ponsultant Place Ste. 201 Durham, NC 27707 P.O. Box 51806 Durham, NC 27717-1806 (919) 490-4990 Fax (919) 490-8953 Mot-1 "tSC43,AZG-cam � •+tt �[ s.Jl °i [ cl 0o2.--r4 S 2 (t 11,RUVIA@E 1T RA DATE JOH NO. k CO3O-q Si godtr,( ATTENTIO �A wI,o-tp4r. .. RE: r-ZeTAC' In ��112a.it i Sc ii r, Cte» -3 7 WE ARE SENDING YOU 0 Attached 0 Under separate cover via A-egi e^--- _ the following items: O Shop drawings O Copy of letter O Prints ❑ Change order ❑ Plans O Samples 0 Specifications ❑ COPIES PATE I NO. DESCRIPTION 2 C�+za�c-r fit_ �Ppc�c-ta--� ( - �' weer OF ENVIR(p4:r! -•{ f V c Lidos tt l URAL RESOti ' CES ,�'V.i..... r 9 . SEP 0 1 20fl4 THESE ARE TRANSMITTED as checked below: Er< approval ❑ For your use O As requested ❑ For review and comment ❑ Approved as submitted O Approved as noted ❑ Returned for corrections O Resubmit O Submit O Return efiyi "`"s1: ZLE: Ia} copies for approva� copies for distribution corrected prints ❑ FOR BIDS DUE 0 PRINTS RETURNED AFTER LOAN TO US REMARKS I�u SE y&J &t ,a Qt)r&iar\JS i fit- c= o 'g- I A-1- q11-ziek• yea COPY TO SIGNED' If enclosures are not as noted, kindly notify us at once. CITY OF MONROE P.O. BOX 69 — MONROE, NC 28111,4)069 FAX 7O4-283-9098 Sonja Williams NC DENR-DWQ Non -Discharge Permitting Unit 919 N Main St Mooresville, North Carolina 28115 Re: Gravity Sewer Extension for Poplin Retail Center Dear Ms Williams: Please find enclosed one original and one copy of a gravity sewer extension fast track application along with an 8.5" x 1 1" 7,5-minute USGS Topographic Map for the proposed Poplin Retail. Center. Also enclosed is a check for the $400 00 application fee. The City's Standard Specifications for Sanitary Sewer will be used. Please call me at (704) 282-4604 if you have any additional questions or concerns. Respectfully, s ne S. Wingo, P.E. Resources Engineering Supervisor Mr. ,Russ Colbath, P.E, Ms, Crystal Outlaw, EJ. Ms, Jennifer Hornberger, E .1. Mr. Jim Loyd, P.E. Mr, Randy Griffin Mr. Phil. St.. Martin File: Poplin Retail Center (05-53(42)) I:ISUB-DIVISIONSIO5-53 Poplin Retail Ceritcr\42-Peanuts for ConstructiorztAP-Sed€�cc