Loading...
HomeMy WebLinkAboutNC0060526_Permit (Issuance)_20081020NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0060526 Pope Industrial Park WWTP Document Type: 'Permit Issuance - Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Technical Correction Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: October 20, 2008 Whigs document is printed on reuse paper - ignore any content on the reirerse side Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality OCT 2 0 2008 Mr. Duke Finley Pope Industrial Park II Ltd. PTP 6512 Six Forks Road, Suite 501 B Raleigh, North Carolina 27615 Subject: Issuance of NPDES Permit NC0060526 Pope Industrial Park WWTP Wake County Dear Mr. Finley: Division personnel have reviewed and approved your application for renewal of the subject permit. Accordingly, we are forwarding the attached NPDES discharge permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). This permit includes one change from the draft permit sent to you on May 7, 2008. Attachment A (6), Communications Plan, has been added to facilitate better communications to tenants as to what contaminants should not be introduced into the collection system / treatment facility. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty (30) days following receipt of this letter. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding. Please note that this permit is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the permit. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, the Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Bob Guerra at telephone number (919) 733-5083, extension 539. Si e ely, C n H. Sulli Enclosure: NPDES Permit NC0060526 cc: Central Files Raleigh Regional Office / Surface Water Protection NPDES Unit Mailing Address 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Fax (919) 807-6492 Location 512 N. Salisbury St. Raleigh, NC 27604 No%rthCaro1ina Naturally Internet: www.newatergualitv.org Customer Service 1-877-623-6748 An Equal opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper NC0060526 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Pope Industrial Park II, LTD. is hereby authorized to discharge wastewater from a facility located at the Pope Industrial Park WWTP 5602 Fayetteville Road, South of Raleigh Wake County to receiving waters designated as and unnamed tributary to Swift Creek, within the Neuse River Basin in. accordance .with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This permit shall become effective December 1, 2008. This permit and authorization to discharge shall expire at midnight on February 28, 2013. Signed this day (OCT 2 0 2008 en H. Sullins Director Division of Water Quality By Authority of the Environmental Management Commission NC0060526 SUPPLEMENT TO PERMIT COVER SHEET All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements, terms, and provisions included herein. Pope Industrial Park II, LTD. is hereby authorized to: 1. Continue to operate an existing 0.008 MGD wastewater treatment system with the following components: • Bar Screen • Extended Aeration Tank • Single train 10,000 gallons • Secondary Clarifiers • 1,535 gallons 851,350 gallons • Sludge holding tank • 1,400 gallons • Chlorine Contact chamber • 1,250 gallons • Dechlorination Chamber • 210 gallons • Cascade Post aeration The facility is located south of Raleigh at the Pope Industrial Park WWTP off Fayetteville Road (Highway 401 South) in Wake County. 2. Discharge from said treatment works (Outfall 001) at the location specified on the attached map into an unnamed tributary to Swift Creek, classified WS-III- NSW waters in the Neuse River Basin. Pope Industrial Park WWTP Latitude: 35° 42' 23" N Longitude: 78° 39' 55" W Receiving Stream: UT to Swift Creek Stream Class: WS-Ell-NSW State Grid: Lake Wheeler Permitted Flow: 0.008 MGD Drainage Basin: Neuse River Basin Sub -Basin: 03-04-02 NPDES Permit No. NC0060526 Wake. County 1 NC0060526 A. (1.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During the period beginning on the effective date of this permit and lasting until expiration, the Permittee is authorized to discharge from outfall 001. Such discharges shall be limited and monitored by the Permittee as specified below: EFFLUE NT .$ar., , :?l{'.. CHARACTERISTIC . 7 .. .. ......... N»..-.,.t. .. ...v . V ; I IMITS ' r,r ; .t Y , ri C t , >> ���- r{ {{ ;�� N ?g , .' .. Ei7_... 3. ..-;:. , h - ' > MV NITORING . � ,t. }} , .A_•;`:IV.,40 rs. 4 � .... ";REQUIRE N , , } - rf . ...�..:.. -. ._.+�'s+a s'.wR.`K:.. t,.. ... . _..,. any „Monthly Average �.. -- Daily , ' Maximurrt'V.j1refiDenr :Measure ek y t- SampieType .cTSamp(e L ocatlon . s .`{ _ ' -`_ Flow 0.008 MGD Continuous Recording Influent or Effluent Total Monthly Flow Monitor & Report Monthly Recorded or Calculated Influent or Effluent BOD, 5-day (20°C) (April 1— October 31) 5.0 mg/L 7.5 mg/L Weekly Grab Effluent BOD, 5-day (20°C) (November 1— March 31) 10.0 mg/L 15.0 mg/L Weekly Grab Effluent Total Suspended Residue 30.0 mglL 45.0 mglL Weekly Grab Effluent NH3 as N (April 1— October 31) 2.0 mglL 10.0 mglL Weekly Grab Effluent NH3 as N (November 1— March 31) 4.0 mg/L 20 mg/L Weekly Grab Effluent Dissolved Oxygen2 Monitor & Report Weekly Grab Effluent, Upstream & Downstream Fecal Coliform (geo mean) 200/100 mL 400/100 mL Weekly Grab Effluent Total Residual Chlorine 17 µg1L 2/Week Grab Effluent Temperature (°C) Monitor & Report Daily Grab Effluent Temperature (°C) Monitor & Report Weekly Grab Effluent, Upstream & Downstream TKN (mg/L) Monitor & Report Monthly Composite Effluent NO2—N+ NO3-N (mg/L) Monitor & Report Monthly Composite Effluent TN (mg/L)3 Monitor & Report Monthly Composite Effluent TN Load4 Monitor & Report(pounds/month) Monitor & Report(pounds/year) Monthly Annually Calculated Calculated Effluent Effluent Total Phosphorus Monitor & Report Monthly Composite Effluent pH5 Monitor & Report Weekly Grab Effluent Footnotes: 1. Upstream = 100 feet upstream of discharge, Downstream = 300 feet downstream of discharge. 2. The daily average dissolved oxygen effluent concentration shall not be less than 6.0 mg/L. 3. For a given water sample, TN=TKN+NO +NO3-N, where TN is Total Nitrogen and TKN is Total Kjeldahl Nitrogen. 4. TN load is the mass load of Total Nitrogen discharged in a given period of time [See Condition A. (2)]. 5. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units. There shall be no discharge of floating solids or visible foam in other than trace amounts. NC0060526 A. (2). CALCULATION OF TOTAL NITROGEN LOADS 1. The Permittee shall calculate monthly and annual TN Loads as follows: (1) Monthly TN Load (lb/mo) = TN x TMF x 8.34 where: TN = the average Total Nitrogen concentration (mg/L) of the composite samples collected during the month TMF = the Total Monthly Flow of wastewater discharged during the month (MG/mo) 8.34 = conversion factor, from (mg/L x MG) to pounds (2) Annual TN Load (lb/yr) = Sum of the 12 Monthly TN Loads for the calendar year 2. The Permittee shall report monthly Total Nitrogen results (mg/L and lb/mo) in the appropriate discharge monitoring report for each month and shall report each year's annual results (lb/yr) with the December report for that year. A. (3.) TOTAL NITROGEN ALLOCATIONS a. The following table lists the Total Nitrogen (TN) allocation(s) assigned to, acquired by, or transferred to the Permittee in accordance with the Neuse River nutrient management rule (T15A NCAC 02B .0234) and the status of each as of permit issuance. For compliance purposes, this table does not supercede any TN limit(s) established elsewhere in this permit or in the NPDES permit of a compliance association of which the Permittee is a Co-Permittee Member. ALLOCATION' TYPE ns SOURCE � ; V .DATE : , ALLOCATION AMOUNT �I : ` STATUS. Estuary (Ib/yr) ; , ,J.:.- Discharge (IbIyr) Base Assigned by Rule (T15A NCAC 02B .0234) 12R/97; 4/1/03 81 162 Active Footnote: (1) Transport Factor = 50% A. (4.) AMMONIA REOPENER The Division may re -open this permit to require more stringent effluent limits for ammonia nitrogen (NH3 as N) pending any subsequent rules establishing nutrient restrictions in the Swift Creek watershed. NC0060526 A. (5.) INDUSTRIAL WASTE SURVEY ➢ Pope Industrial Park NC0060526 shall collect, from everu "New" occupant/business, information contained in the "Industrial Waste Survey" o "New" occupant/ business information contained in the "Industrial Waste Survey" shall be submitted no later than sixty (60) from date of occupancy. ➢ Pope Industrial Park NC0060526 shall collect from every current occupant/business information contained in the "Industrial Waste Survey" (Attached). ➢ Submit completed Industrial "Industrial Waste Survey forms" no later than ninety (90) days from date of permit issuance to the following address: Division of Water Quality Surface Water Protection Section Attention: Bob Guerra 1617 Mail Service Center Raleigh, NC 27699-1617 A. (6.) COMMUNICATIONS PLAN No later than ninety (90) days after the issuance date of this permit, the Permittee shall submit to the Division a Communications plan. The plan shall include, at a minimum, the following elements: ➢ Describe a strategy for informing utility customers of their potential impacts on treatment system performance and appropriate practices for minimizing those impacts, including a schedule for implementation of the strategy. At a minimum, include the following elements: • oil and grease contributions to the collection and treatment system, • introductory material for new tenants, describing acceptable waste disposal practices, common problem practices, notification procedures in case of emergency ➢ This plan should be updated and distributed to tenants on a quarterly basis (January, April, July and October) of each year the permit is in effect to assure that tenants remain attentive to the need to avoid inappropriate disposal into the collection system, NC0060526 This form has been sent to your business to determine types and sources of wastewater that are entering the Pope Industrial Wastewater Treatment facility NPDES NC0060526. This form must be completed to assure compliance with applicable wastewater pretreatment requirements. If you have any question or concerns while completing the form please contact Pope Industrial Park II, LTD at 919-846-3500. Name of Business Address City/State/Zip Code Telephone: Fax: Number of Employees What Standard Industrial Classification (SIC) Code(s) do you report under: - f ---- f - - - - 9 ---- • Briefly describe your business include products manufactured or services performed es and approximate volume used in gallons per day for each use, including facility washdown water. Water Use Volume Used (gallons per day) Process: Facility Washdown Domestic(bathrooms, cafeteria) Total: NPDES regulations require that an Authorized Representative of the User sign all reports to the wastewater plant authority. Authorized Representative is defined as a Person responsible for Principle Business decisions or other policy decisions for the facility. To the Best of my knowledge the information on this form is true and accurate, Signature Date Title Return this form within 30 days to: Pope Industrial Park 6512 Six Forks Road, Suite 501-B Raleigh, NC 27615 Neuse Hearing Permits Subject: Neuse Hearing Permits From: Gil Vinzani <Gil.Vinzani@ncmail.net> Date: Thu, 09 Oct 2008 16:42:31 -0400 To: James Mckay <James.McKay@ncmail.net>, vanessa Manuel <Vanessa.Manuel@ncmail.net>, bob Guerra <Bob.Guerra@ncmail.net>, ron Berry <Ron.Berry@ncmail.net> Neuse Hearing Permit Writers: Now that we have the Public Hearing Officer's report, we can send these final permits up to Coleen for signature. Please get them ready for issuance, leaving both the date on the cover letter blank and the permit issued date blank. We can use a stamp for the proper date after Coleen signs. I think we are safe in using a permit effective date of December 1, 2008. If you have any questions regarding your permits, please see me. Thanks, Gil Gil Vinzani <Gil.vinzaninancmail.net> Supervisor, Eastern NPDES Program NC Division of Water Quality 1 of 1 10/13/2008 7:37 AM State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Coleen H. Sullins, Director MEMORANDUM To: From: Subject: Michael Douglas NCDENR / DEI-I / Regional engineer Raleigh Regional Office Robert Guerra NPDES Unit Review of Draft NPDES Permit NC0060526 Pope Industrial Park WWTP Wake County NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 1\4Ai ! 2 2008 Please indicate below your agency's position or viewpoint on the draft permit and return this form by June 7, 2008. If you have any questions on the draft permit, please contact me at the telephone number or e-mail address listed at the bottom of this page. RESPONSE: (Check one) Concur with the issuance of this permit provided the facility is operated and maintained properly, the stated effluent limits are met prior to discharge, and the discharge does not contravene the designated water quality standards. Concurs with issuance of the above permit, provided the following conditions arc met: Act C{A7 Opposes the issuance of the above perinit, based on reasons stated below, or attached: Signed 4,('t / { ' Date:Ap0 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 919 733-5083, extension 539 (fax) 919 733-0719 VISIT us ON THE INTERNET @ http://h2o.enr.slate.nc.usINPDES Bob.Guerra@ ncmail.net AFFIDAVIT OF PUBLICATION NORTH CAROLINA. Wake County. ) ss. PUBLIC NOTICE STATE OF NORTH CAROLINA ENVI RONMENTAL MANAGEMENT COMMISSION/ NPDES UNIT 1617 MAIL SERVICE CENTER RALEIGH, NC 27699-1617 NOTIFICATION OF INTENT TO ISSUE A NPDES WASTEWATER PERMIT On the basis of thorough staff review and application of NC General Statute 143.215.1 and 15A NCAC 02H.0109 and other lawful standards and regula- tions, the North Carolina En- vironmental Management Commission proposes 10 is- suea"Notional PollutaM-Dis- charge Elimination System (NPDES) wastewater dis- charge permit to the per- son(s) listed below effective 45 days from the publish date of this notice. Written comments regarding the proposed permit will be accepted until 30 days after the publish date of this notice. All comments received prior to that date ore considered in the final determinations re- garding the proposed permit. The Director of the NC Divi- sion of Water Quality may decide 10 hold a public meet- ing for the proposed permit, should the Division receive a significant degree of public Interest. Copies of the draft permit and other supporting Information on file used to determine con- ditions present in the draft permit are available upon re- quest and payment of the costs of reproduction. Mail comments and/or requests for information to the NC Di- vision of Water Quality at the above address or call Dina Sprinkle (919) 733-5083, exten- sion 363 at the Point Source Branch. Please include the NPDES permit number (be- low) in any communication. Interested persons may also visit the Division of Water Quality at 512 N. Salisbury Street, Raleigh, NC 27604-1148 between the hours of B:00 a.m. and 5:00 p.m. to review information on file. NPDES . Permit Number The ab N00060526, Pope Industrial Pork has appl Iqd for o permit renewal for o facility located in Wake County discharging treated wastewater into an unnamed tributary to Swift Creek In the Neuse River Ba- sin. Currently, BOD5, ammo- nia, fecal coliform and total residual chlorine are water quality limited. This dis- charge may affect future al- locations in this portion of the receiving stream. N&O:Nay 10,awe • Pu,G b kNS`;: Before the undersigned, a Notary Public of Chatham County North Carolina, duly commissioned and authorized to administer oaths, affirmations, etc., personally appeared Debra Peebles, who, being duly sworn or affirmed, according to law, doth depose and say that she is Billing Manager -Legal Advertising of The News and Observer a corporation organized and doing business under the Laws of the State of North Carolina, and publishing a newspaper known as The News and Observer, in the City of Raleigh , Wake County and State aforesaid, the said newspaper in which such notice, paper, document, or legal advertisement was published was, at the time of each and every such publication, a newspaper meeting all of the requirements and qualifications of Section 1-597 of the General Statutes of North Carolina and was a qualified newspaper within the meaning of Section 1- 597 of the General Statutes of North Carolina, and that as such she makes this affidavit; that she is familiar with the books, files and business of said corporation and by reference to the files of said publication the attached advertisement for NC DMSION OF WATER QUALITY was inserted in the aforesaid newspaper on dates as follows: 05/10/08 Account Number: 73350833 3d from the books and files of the aforesaid Corporation and publication. Debra Peebles, Billing Manager -Legal Advertising Wake County, North Carolina Sworn or affirmed to, and subscribed before me, this 12 day of MAY , 2008 AD ,by Debra Peebles. In Testimony Whereof, I have hereunto set my hand and affixed my official seal, the day and year aforesaid. � t Vuolaa.)— Janet Scroggs, Notary Public My commission expires 14`s of March 2009. NPDES REGIONAL WATER QUALITY STAFF REPORT AND RECOMMENDATIONS (This form is best filled out on computer, rather than hard copy) Date: 1/10/2008 To: NPDES Discharge Permitting Unit Attn. NPDES Reviewer: Bob Guerra County: Wake Permitee: Pope Industrial Park II, Ltd. Application/ Permit No.: NC0060526 Staff Report Prepared By: Bill Reid, WCDES Project Name: Pope Industrial Park WWTP SOC Priority Project? (Y/N) N If Yes, SOC No. A. GENERAL INFORMATION 1. This application is (check all that apply): ❑ New ® Renewal El Modification 2. Was a site visit conducted in order to prepare this report? ® Yes or ❑ No. a. Date of site visit: 1/4/2008 b. Person contacted and telephone number: Amanda Hall (ORC), EnviroLink (252-236-1582); Duke Finley, (919-846-3500) c. Site visit conducted by: Bill Reid w/Wake County DES and Bob Guerra, DWQ NPDES Unit d. Inspection Report Attached: ® Yes or ❑ No. 3. Keeping BIMS Accurate: Is the following BIMS information (a. through e. below) correct? ❑ Yes or ® No. If No, please either indicate that it is correct on the current application or the existing permit or provide the details. If none can be supplied, please explain: Discharge Point(FM this section only if BIMS or Application Info is incorrect or missing) (If there is more than one discharge pipe, put the others on the last page of this form.) a. Location OK on Application ®, OK on Existing Permit ®, or provide Location: The facility's address appears to be correct. However, the discharge location is farther upstream than indicated on current permit and in BIMS. The correct Lat./Long. is 35 deg. 42' 32" N/78 deg. 39' 55" W b. Driving Directions OK on Application ❑, OK on Existing Permit ❑, or provide Driving Directions (please be accurate): Proceeding on US 401S, south of Raleigh, go approximately 1.4 miles beyond the US70/US401 split and turn right into Pope Industrial Park (Transport Drive). The WWTP is located off the end of Transport Drive. Follow paved drainage swale to the WWTP. c. USGS Quadrangle Map name and number OK on Application ®, OK on Existing Permit ®, or provide USGS Quadrangle Map name and number: Lake Wheeler, E24NW d. Latitude/Longitude OK on Application ❑, (check at http://topozone.com These are often inaccurate) OK on Existing Permit ❑, or provide Latitude:35 4" ' jz "Longitude: 7e ems? ' j-j- e. Receiving Stream OK on Application ®, OK on Existing Permit ®, or provide Receiving Stream or affected waters: UT of Swift Creek NPDES REGIONAL WATER QUALITY STAFF REPORT AND RECOMMENDATIONS a. Stream Classification: WS-III, NSW b. River Basin and Sub basin No.: 03-04-02 c. Describe receiving stream features and downstream uses: water supply, recreation, fishing For NEW FACILITIES Proceed to Section C. Evaluation and Recommendations (For renewals or modifications continue to section B) B. DESCRIPTION OF FACILITIES AND WASTE(S) (renewals and modifications only) 1. Describe the existing treatment facility: The description of the treatment units in the permit (Supplement to Permit cover Sheet) is accurate. Effluent flow measurement is also present. 2. Are there appropriately certified ORCs for the facilities? ® Yes or ❑ No. Operator in Charge: Amanda Hall Certificate # 23237 (Available in BIMS or Certification Website) Back- Operator in Charge: Numerous operators @ EnviroLink, Inc Certificate # 3. Does the facility have operational or compliance problems? Please comment: The WWTP has a history of problems meeting effluent limits. Numerous BOD5, NH3-N and Fecal Coliform violations are listed on the attached BIMS report for the period from March 2004 through October 2007. It should be noted that following rehab work performed on the WWTP's aeration system, and solids removal from bottom of aeration and contact tanks, during summer of 2006, the WWTP operated without any limit violations for the months between July 2006 and July 2007. The limit violations started occurring again in July, August, September, and November of 2007. The period of compliance demonstrates to this writer, the WWTP can meet effluent limits if is well maintained, carefully operated, and if the tenants do not introduce chemicals to the faciltiy that disrupt it's operation. There have been operational problems resulting from tenants discharging wastewater other than domestic sewage in the system. Summarize your BIMS review of monitoring data (Notice(s) of violation within the last permit cycle; Current enforcement action(s)): See attached BIMS report. Are they currently under SOC, ❑ Currently under JOC, ❑ Currently under moratorium 0? Have all compliance dates/conditions in the existing permit, SOC, JOC, etc. been complied with? 0 Yes or 0 No. If no, please explain: 4. Residuals Treatment: PSRP ❑ (Process to Significantly Reduce Pathogens, Class B) or PFRP ❑ (Process to Further Reduce Pathogens, Class A)? Are they liquid or dewatered to a cake? Land Applied? Yes ❑ No ❑ If so, list Non -Discharge Permit No. Contractor Used: Landfilled? Yes ❑ No❑ If yes, where? FORM: NPDES-RRO 06/03, 9/03 2 NPDES REGIONAL WATER QUALITY STAFF REPORT AND RECOMMENDATIONS Other? Contractor handles residuals removal. Atlantic De -Watering removes residuals for composting at McGill facility. Adequate Digester Capacity? Yes ® No ❑ Sludge Storage Capacity? Yes ® No ❑ Please comment on current operational practices: 5. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes or ® No. If yes, please explain: C EVALUATION AND RECOMMENDATIONS 1. Alternative Analysis Evaluation: has the facility evaluated the non -discharge options available? Give regional perspective for each option evaluated: Spray Irrigation: Connect to Regional Sewer System: Subsurface: Other Disposal Options: 2. Provide any additional narrative regarding your review of the application: Due to the compliance and operational problems noted above, the system should be connected to Raleigh's collection system once it is available. The 8000 gpd WWTP is currently receiving approximately 1300 gpd of wastewater (average flow for 11-2006 through 10-2007). The small extended aeration can easily be impacted by non -domestic water that impacts pH of the influent, that results in a high orgainic loading or that is toxic to the WWTP's biological culture. The permittee needs to continue efforts to educate tenants regarding what can or can not be discharged to the system. Additionally the WWTP must be well maintained and carefully operated to help ensure it operates in compliance with the permit until the collection system is connect to Raleigh. 3. List any items that you would like NPDES Unit to obtain through an additional information request. Make sure that you provide a reason for each item: Recommended Additional Information Reason 4. List specific Permit requirements that you recommend to be removed from the permit when issued. Make sure that you provide a reason for each condition: FORM: NPDES-RRO 06/03, 9/03 3 NPDES REGIONAL WATER QUALITY STAFF REPORT AND RECOMMENDATIONS Recommended Removal Reason 5. List specific special requirements or compliance schedules that you recommend to be included in the permit when issued. Make sure that you provide a reason for each special condition: Recommended Addition Reason The permittee should have an ongoing plan for educating the tenants and their employees regarding the problems associated with discharging inapropriate wastes into the wastewater system. Compliance history and operational problems noted above. 6. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office; ❑ Hold, pending review and approval of required additional information by NPDES permitting office; ® Issue; ❑ Deny. If deny, please state reasons: Reminder: attach inspection report f Yee was checke for 2 d 7. Signature of report preparer: Signature of WQS regional supervisor: Date: I). ADDITIONAL REGIONAL STAFF REVIEW ITEMS If next page is not used, PLEASE set printer for pages 1 through 3 to avoid wasting paper. Use this page for facilities with more than one Discharge Pipe Discharge Point: (Fill this section only if BIMS or Application Info is incorrect or missing) a. Location OK on Application ❑, OK on Existing Permit ❑, or provide Location: b. Driving Directions OK on Application ❑, OK on Existing Permit ❑, or provide Driving Directions (please be accurate): FORM: NPDES-RRO 06/03, 9/03 4 Finley COMMERCIAL REALTORS' August 30, 2007 Mr. Charles H. Weaver NPDES Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Mr. Weaver: AUG 3 1 2007 Please find enclosed the NPDES permit renewal package for Pope Industrial Park WWTP including the application, sludge management plan description and map of the outfall location. Since the last permit renewal period, an Effluent Flowmeter has been added. No other changes have occurred since the current permit became effective. If you should have additional questions please contact me. Sincerely Duke Finley P. O. BOX 97215 RALEIGH, NORTH CAROLINA 27624 919-846-3500 Sludge Management Plan for Pope Industrial Park WVVTP NC0060526 Wake County The sludge produced at Pope Industrial Park WWTP is generated from the stabilization processes oc G rrin M,tipactivated sludge aeration tanks at the facility. ���,sludge is transferred from the bottom of each secondary clarifier' a sludge holding tank. When the sludge in the tank is of sufficient volume and consistency, it is removed. The organization that conducts the sludge removal is Atlantic Dewatering Services. The sludge goes through a dewatering process in which the sludge is added to a polymer mixing system, allowing the sludge to be thickened. The coagulative ability of the polymer allows for additional separation of sludge and clear effluent or filtrate, which is returned to the headworks of the wastewater treatment facility for additional treatment. The sludge and water separation occurs on -site and the residual biosolids are then taken to McGill Environmental and ultimately become compost. FACT SHEET FOR EXPEDITED PERMIT RENEWALS ex edited Dermit renewal - ...- Reviewer/Date LiPG 4/140/ • Permit Number . NGDo'pnS Q. (o Facility Name • Qom )net II trtI kirk_ (Al WIT) Basin Name/Sub-basin number i\l tuah 0 304 Q g Receiving Stream UT S w i f1 Stream Classification in Permit IA) S - l I / tsiSLI/ Does permit need NH3 limits? 1 N 0 Does permit need TRC limits? //p Does permit need Enteroccoci limit?. /\f ti Does permit have toxicity testing? NO Does permit have Special Conditions? YeS - • Does permit have instream monitoring? Y S Is the stream impaired (on 303(d) list)? } -5 ' us compliance concerns? Any obvious p -- o D � /-fIread / TS<S �� � � 3 Any permit mods since last permit? YeS Existing expiration date al jog New expiration date A /3 New permit effective date Miscellaneous Comments (DOH Itiglin YES_ This is a SIMPLE EXPEDITED permit renewal (administrative renewal with no changes, or only minor changes such as TRC, NH3, name/ownership changes). YES_ This is a MORE COMPLEX EXPEDITED permit renewal (includes Special Conditions (such as EAA, Wastewater Management Plan), Conventional WTP, 303(d) listed, toxicity testing, instream monitoring, compliance concerns, phased limits). Basin Coordinator to make case -by - case decision. YES_ This permit CANNOT BE EXPEDITED for one of the following reasons: • Major Facility (municipal/industrial) • Minor Municipals with pretreatment program • Minor Industrials subject to Fed Effluent Guidelines (lb/day limits for BOD, TSS, etc) • Limits based on reasonable potential analysis (metals, GW remediation organics) • Permitted flow > 0.5 MGD (requires full Fact Sheet) • Permits determined by Basin Coordinator to be outside expedited process TR Version 9/7/2007 4