Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCS000395_MeckCo 2021 DRAFT FINAL PERMIT_20211215
STATE of NORTH CAROLINA
DEPARTMENT of ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
PERMIT NO. NCS000395
TO DISCHARGE STORMWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
the County of Mecklenburg,
Charlotte-Mecklenburg Schools, Central Piedmont Community College,
and
the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and Pineville
are hereby authorized to discharge stormwater from their municipal separate storm sewer system located:
within the County of Mecklenburg and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint
Hill, and Pineville Jurisdictional Areas as well as facilities owned by Charlotte-Mecklenburg Schools and
Central Piedmont Community College
to receiving waters; Caldwell Station, Four Mile Creek, Gar Creek, Irvins Creek, Lake Norman (Catawba
River), Little Sugar Creek, Long Creek, McAlpine Creek, McCullough Branch, McDowell Creek,
Mountain Island Lake (Catawba River), Sugar Creek, Torrence Creek, and associated unnamed tributaries
within the Catawba River basin and Cane Creek, Clarks Creek, Clear Creek, Duck Creek, Ferreltown
Creek, Goose Creek, Long Branch, N. Fork Crooked Creek, N. Prong Clarke Creek, Ramah Creek, Rocky
River, S. Prong Clarke Creek, S. Prong W. Branch Rocky River, Sherman Branch, Stevens Creek, W.
Branch Rocky River, Wiley Branch, and associated unnamed tributaries within the Yadkin River basin in
accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts
I, II, III, IV, V, VI, VII and VIII hereof.
This permit shall become effective xxx.
This permit and the authorization to discharge shall expire at midnight on xxx.
Signed this day xxx.
for Brian Wrenn, Director
DIVISION OF ENERGY, MINERAL, AND LAND NATURAL RESOURCES
By the Authority of the Environmental Management Commission
PERMIT NO. NCS000395
i
TABLE OF CONTENTS
PART I PERMIT COVERAGE .................................................................................................... 1
PART II FINAL LIMITATIONS AND CONTROLS FOR PERMITTED DISCHARGES ......... 3
SECTION A: PROGRAM IMPLEMENTATION ...................................................................... 3
SECTION B: PUBLIC EDUCATION AND OUTREACH ......................................................... 5
SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION ........................................... 7
SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDDE) .................. 8
SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS ............................................... 10
SECTION F: POST-CONSTRUCTION SITE RUNOFF CONTROLS ..................................... 11
SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING FOR
MUNICIPAL OPERATIONS .......................................................................... 15
SECTION H: TOTAL MAXIMUM DAILY LOADS (TMDLS) .............................................. 17
PART III PROGRAM ASSESSMENT .......................................................................................... 18
PART IV REPORTING AND RECORD KEEPING REQUIREMENTS .................................... 20
PART V STANDARD CONDITIONS .......................................................................................... 23
SECTION A: COMPLIANCE AND LIABILITY .................................................................... 23
SECTION B: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS ............. 26
SECTION C: INSPECTION, ENTRY AND AVAILABILITY OF REPORTS ......................... 27
PART VI LIMITATIONS REOPENER ........................................................................................ 28
PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS 29
PART VIII DEFINITIONS ................................................................................................................ 30
PERMIT NO. NCS000 395
1
PART I PERMIT COVERAGE
A. During the period beginning on the effective date of the permit and lasting until expiration, the
County of Mecklenburg, Charlotte-Mecklenburg Schools, Central Piedmont Community College,
and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and Pineville, herein
referred to as the permittee, is authorized to discharge stormwater from the municipal separate
storm sewer system (MS4) to receiving waters, Caldwell Station, Four Mile Creek, Gar Creek,
Irvins Creek, Lake Norman (Catawba River), Little Sugar Creek, Long Creek, McAlpine Creek,
McCullough Branch, McDowell Creek, Mountain Island Lake (Catawba River), Sugar Creek,
Torrence Creek, and associated unnamed tributaries within the Catawba River Basin and Cane
Creek, Clarks Creek, Clear Creek, Duck Creek, Ferreltown Creek, Goose Creek, Long Branch, N.
Fork Crooked Creek, N. Prong Clarke Creek, Ramah Creek, Rocky River, S. Prong Clarke Creek,
S. Prong W. Branch Rocky River, Sherman Branch, Stevens Creek, W. Branch Rocky River, Wiley
Branch, and associated unnamed tributaries within the Yadkin River Basin. Such discharge will
be controlled, limited and monitored in accordance with the permittee’s Stormwater Quality
Management Program, herein referred to as the Stormwater Plan. The Stormwater Plan shall detail
the permittee’s stormwater management program for the five-year term of the stormwater permit
including, for each of the measures identified in the permit, a narrative description of the program,
a table that identifies each best management practice (BMP) used, the frequency of the BMP, the
measurable goals for each BMP, the implementation schedule, funding and the responsible person
or position for implementation.
B. All discharges authorized herein shall be managed in accordance with the terms and conditions of
this permit. Any other point source discharge to surface waters of the state is prohibited unless it
is an allowable non-stormwater discharge or is covered by another permit, authorization, or
approval.
C. This permit does not relieve the permittee from responsibility for compliance with any other
applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree.
D. This permit covers activities associated with the discharge of stormwater from the MS4 owned and
operated by the permittee within the jurisdictional area of the permittee. The permit applies to
jurisdictional areas of the permittee, as well as areas that seek coverage under this permit through
inter-local or other similar agreements with permittee. Agreements for coverage under this permit
shall be approved by the Division of Energy, Mineral, and Land Resources, herein referred to as
the Division.
E. The Division may deny or revoke coverage under this permit for separate entities and require
independent permit coverage as deemed necessary. In addition, the permittee may petition the
Division to revoke or deny coverage under this permit for specific entities.
F. All provisions contained and referenced in the Stormwater Plan along with all provisions
and approved modifications of the Stormwater Plan are incorporated by reference and are
enforceable parts of this permit.
G. The permit requires the proper implementation of the Stormwater Plan. To the extent
allowable under State and local law, the permittee must develop and implement a
Stormwater Plan in accordance with Section 402(p)(3)(B)(iii) of the Clean Water Act.
The purpose of the Stormwater Plan is to establish the means by which the permittee will
PERMIT NO. NCS000 395
2
describe how it is in compliance with the permit and with the provisions of the Clean
Water Act. Compliance with the six minimum measures in 40 CFR § 122.34(b) and with
the requirements of this permit constitute compliance with the Clean Water Act to reduce
the discharge of pollutants from the MS4 to the maximum extent practicable, to protect
water quality, and to satisfy the applicable water quality requirements of the Clean Water
Act. Implementation of best management practices consistent with the provisions of the
Stormwater Plan constitutes compliance with the standard of reducing pollutants to the
maximum extent practicable.
H. The permit authorizes the point source discharge of stormwater runoff from the MS4. In
addition, discharges of non-stormwater are also authorized through the MS4 of the
permittee if such discharges are:
1. Permitted by and in compliance with another permit, authorization, or approval, including
discharges of process and non-process wastewater, and stormwater associated with
industrial activity; or
2. Determined to be incidental non-stormwater flows that do not significantly impact water
quality and may include:
• water line and fire hydrant flushing;
• landscape irrigation;
• diverted stream flows;
• rising groundwater;
• uncontaminated groundwater infiltration;
• uncontaminated pumped groundwater;
• discharges from uncontaminated potable water sources;
• foundation drains;
• air conditioning condensate (commercial/residential);
• irrigation waters;
• springs;
• water from crawl space pumps;
• footing drains;
• lawn watering;
• residential and charity car washing;
• flows from riparian habitats and wetlands;
• dechlorinated swimming pool discharges;
• street wash water;
• flows from firefighting activities.
3. The Division may require that non-stormwater flows of this type be controlled by
the permittee’s Stormwater Plan.
I. Unless otherwise stated, full compliance with the requirements of the permit is expected
upon the effective date of the permit.
3
PART II FINAL LIMITATIONS AND CONTROLS FOR PERMITTED
DISCHARGES
SECTION A: PROGRAM IMPLEMENTATION
The permittee will implement, manage and oversee all provisions of its Stormwater Plan to
control to the maximum extent practical the discharge of pollutants from its municipal storm
sewer system associated with stormwater runoff and illicit discharges, including spills and illegal
dumping. The overall program implementation will be subject to, at a minimum, an annual
review by the Division to determine implementation status and progression toward meeting the
pollutant control intent of the Stormwater Plan or an assessment that has been reviewed and
approved by the Division. The assessment may be conducted by the local government, another
local government with and NPDES MS4 permit, or an independent third party. This includes, but
is not limited to, the following areas:
1. The permittee shall maintain adequate legal mechanisms, such as regulations, ordinances, policies
and procedures to implement all provisions of the Stormwater Plan. The Division will be notified
of major modifications of these authorities, the reasons and justifications for these changes. The
Division may comment on these modifications as deemed necessary to assure appropriate
implementation of the Stormwater Plan.
2. The permittee must evaluate program compliance, the appropriateness of best management
practices, and progress towards achieving measurable goals at least annually.
3. The permittee will maintain adequate funding and staffing to implement and manage the
provisions of the Stormwater Plan and meet all requirements of this permit. The Stormwater Plan
shall identify a specific position(s) responsible for the overall coordination, implementation, and
revision to the Plan. Responsibilities for all components of the Plan shall be documented and
position(s) assignments provided.
4. The permittee will implement provisions of the Stormwater Plan and evaluate the
performance and effectiveness of the program components at least annually. Results will
be used by the permittee to modify the program components as necessary to accomplish
the intent of the Stormwater Program. If the permittee implements the six minimum
control measures and the discharges are determined to cause or contribute to non-
attainment of an applicable water quality standard, to address the non-attainment, the
permittee shall expand or better tailor its BMPs within the scope of the six minimum
control measures.
5. The permittee is required to keep the Stormwater Plan up to date. Where the permittee determines
that modifications are needed to address any procedural, protocol, or programmatic change, such
changes shall be made as soon as practicable, but not later than 90 days, unless an extension is
approved by the Division. Major modifications to the Stormwater Plan shall be submitted to the
Director for approval. The permittee is required to make available its Stormwater Plan to the
Division upon request. At a minimum, the permittee shall include ordinances, or other regulatory
mechanisms or a list identifying the ordinances, or other regulatory mechanisms providing the
legal authority necessary to implement and enforce the requirements of the permit. The Division
may review reports submitted by the Permittee to assure that the Stormwater Plan is implemented
4
appropriately to address the requirements of the permit. The Division may require modifications
to any part of the Permittee's Stormwater Plan where deficiencies are found. If modifications to
the Stormwater Plan are necessary, the Division will notify the permittee of the need to modify
the Stormwater Plan to be consistent with the permit and will establish a deadline to finalize such
changes to the program.
Pursuant to 40 CFR 122.35, an operator of a regulated small MS4 may share the responsibility to
implement the minimum control measures with other entities provided:
a. The other entity, in fact, implements the control measure;
b. The particular control measure, or component thereof, is at least as stringent as the
corresponding NPDES permit requirement; and
c. The other entity agrees to implements the control measure on behalf of the MS4.
Unless implemented by the State or where delegated by the state, the permittee remains
responsible for compliance if the other entity fails to perform the permit obligation and
may be subject to enforcement action if neither the permittee nor the other entity fully
performs the permit obligation.
6. The Permittee shall maintain, and make available to the Division upon request, written procedures
for implementing the six minimum control measures. Written procedures shall identify specific
action steps, schedules, resources and responsibilities for implementing the six minimum measures.
Written procedures can be free standing, or where appropriate, integrated into the Storm Water
Management Plan.
5
SECTION B: PUBLIC EDUCATION AND OUTREACH
1. Objectives for Public Education and Outreach
Distribute educational materials to the community or conduct equivalent outreach
activities about the impacts of storm water discharges on water bodies and the steps that
the public can take to reduce pollutants in storm water runoff.
2. BMPs for Public Education and Outreach
The permittee shall implement the following BMPs to meet the objectives of the Public Education
and Outreach Program and shall notify the Division prior to modification of any goals.
BMP Measurable Goals
Goals and Objectives The permittee shall maintain define goals and objectives of the
Local Public Education and Outreach Program based on
community wide issues.
Target Pollutants and/or Stressors The permittee shall maintain a description of the target pollutants
and/or stressors and likely sources.
Target Audiences The permittee shall maintain a description of the target audiences
likely to have significant storm water impacts and why they were
selected.
Informational Web Site The permittee shall promote and maintain, an internet web site
designed to convey the program’s message.
Education Materials The permittee shall distribute stormwater educational material to
appropriate target groups. Instead of developing its own
materials, the permittee may rely on Public Education and
Outreach materials supplied by the state, and/or other entities
through a cooperative agreement, as available, when
implementing its own program.
Hotline The permittee shall promote and maintain a stormwater
hotline/helpline for the purpose of public education and outreach.
Public Education and Outreach The permittee shall describe issues, such as pollutants, likely
sources of those pollutants, impacts, and the physical attributes of
stormwater runoff, in their education/outreach program.
The permittee’s outreach program, including those elements
implemented locally or through a cooperative agreement, shall
include a combination of approaches designed to reach the target
audiences. For each media, event or activity, including those
elements implemented locally or through a cooperative
6
BMP Measurable Goals
agreement the permittee shall estimate and record the extent of
exposure.
7
SECTION C: PUBLIC INVOLVEMENT AND PARTICIPATION
1. Objectives for Public Involvement and Participation
Comply with State and local public notice requirements when implementing a public involvement
and participation program.
2. BMPs for Public Involvement and Participation
The permittee shall implement the following BMPs to meet the objectives of the Public
Involvement and Participation Program and shall notify the Division prior to modification of any
goals.
BMP Measurable Goals
Volunteer Program The permittee shall include and promote volunteer opportunities
designed to promote ongoing citizen participation.
Public Involvement The permittee shall provide and promote a mechanism for public
involvement that provides for input on stormwater issues and the
stormwater program.
Hotline The permittee shall promote and maintain a hotline / help line for
the purpose of public involvement and participation.
8
SECTION D: ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDDE)
1. Objectives for Illicit Discharge Detection and Elimination
a. Implement and enforce a program to detect and eliminate illicit discharges into the MS4;
b. Maintain a storm sewer system map, showing the location of all major outfalls and the names
and location of all waters of the United States that receive discharges from those outfalls;
c. Prohibit, through ordinance, or other regulatory mechanism, non-storm water discharges
except as allowed in this permit and implement appropriate enforcement procedures and
actions;
d. Implement a plan to detect and address non-storm water discharges, including illegal
dumping, to the MS4;
e. Inform public employees, businesses, and the general public of hazards associated with
illegal discharges and improper disposal of waste; and
f. Address the following categories of non-storm water discharges or flows (i.e., illicit
discharges) only if you identify them as significant contributors of pollutants to the MS4:
water line flushing, landscape irrigation, diverted stream flows, rising ground waters,
uncontaminated ground water infiltration, uncontaminated pumped ground water, discharges
from potable water sources, foundation drains, air conditioning condensation, irrigation
water, springs, water from crawl space pumps, footing drains, lawn watering, individual
residential car washing, charity car washes, flows from riparian habitats and wetlands,
dechlorinated swimming pool discharges, and street wash water (discharges or flows from
firefighting activities are excluded from the effective prohibition against non-storm water and
need only be addressed where they are identified as significant sources of pollutants to waters
of the United States).
2. BMPs for Illicit Discharge Detection and Elimination
The permittee shall implement the following BMPs to meet the objectives of the Illicit Discharge
Detection and Elimination Program and shall notify the Division prior to modification of any
goals.
BMP Measurable Goals
a. Illicit Discharge Detection and
Elimination Program
Maintain a written Illicit Discharge Detection and Elimination
Program, including provisions for program assessment and
evaluation and integrating program.
b. Legal Authorities The permittee shall maintain an IDDE ordinances or other
regulatory mechanisms that provides the legal authority to
prohibit illicit connections and discharges.
c. Municipal Separate Storm Sewer
System Map
The permittee shall maintain a current map showing major
outfalls and receiving streams; and shall maintain a method to
determine flow direction for the purposes of locating illicit
discharges.
9
BMP Measurable Goals
d. Dry Weather Flow Program The permittee shall maintain a program for conducting dry
weather flow field observations in accordance with written
procedures.
e. Illicit Discharge Investigations The permittee shall maintain written procedures for
conducting investigations of identified illicit discharges.
For each case the permittee shall track and document:
a. the date(s) the illicit discharge was observed;
b. the results of the investigation;
c. any follow-up of the investigation; and
d. the date the investigation was closed.
f. Employee Training The permittee shall implement and document a training
program for appropriate municipal staff, who as part of their
normal job responsibilities, may come into contact with or
otherwise observe an illicit discharge or illicit connection.
g. Public Education The permittee shall inform public employees, businesses, and
the general public of hazards associated with illegal discharges
and improper disposal of waste.
h. Public Reporting Mechanism The permittee shall promote, publicize, and facilitate a
reporting mechanism for the public and staff to report illicit
discharges and establish and implement citizen request
response procedures.
i. Ordinance Enforcement The permittee shall implement a mechanism to track the
issuance of notices of violation and enforcement actions as
administered by the permittee. This mechanism shall include
the ability to identify chronic violators for initiation of actions
to reduce noncompliance.
10
SECTION E: CONSTRUCTION SITE RUNOFF CONTROLS
1. The permittee has a delegated Sediment and Erosion Control Program. As such, the permittee is
responsible for compliance with the Sediment Pollution Control Act of 1973 and Chapter 4 of Title
15A of the North Carolina Administrative Code. The delegated Sediment and Erosion Control
Program effectively meets the maximum extent practicable (MEP) standard for Construction Site
Runoff Controls by permitting and controlling development activities disturbing one or more acres
of land surface and those activities less than one acre that are part of a larger common plan of
development as authorized under the Sediment Pollution Control Act of 1973 and Chapter 4 of
Title 15A of the North Carolina Administrative Code.
2. The permittee shall establish, maintain and enforce local requirements for construction site
operators to control waste such as discarded building materials, concrete truck washout, chemicals,
litter, and sanitary waste at the construction site that may cause adverse impacts to water quality.
3. The permittee shall provide and promote a means for the public to notify the appropriate authorities
of observed erosion and sedimentation problems. The permittee may implement a plan promoting
the existence of the North Carolina Department of Environmental Quality (NCDEQ or DEQ),
Division of Energy, Mineral, and Land Resources “Stop Mud” hotline to meet the requirements of
this paragraph.
11
SECTION F: POST-CONSTRUCTION SITE RUNOFF CONTROLS
1. Objectives for Post-Construction Site Runoff Controls
a. Implement and enforce a program to address storm water runoff from new development and
redevelopment projects, including public transportation maintained by the permittee, that
disturb greater than or equal to one acre, including projects less than one acre that are part of
a larger common plan of development or sale, that discharge into the small MS4. The
program shall ensure that controls are in place that would prevent or minimize water quality
impacts.
b. Implement strategies which include a combination of structural Stormwater Control Measures
(SCM) and/or non-structural best management practices (BMPs) appropriate for the
community;
c. Use an ordinance or other regulatory mechanism to address post-construction runoff from
new development and redevelopment projects; and
d. Ensure adequate long-term operation and maintenance of SCMs.
2. BMPs for Post-Construction Site Runoff Controls
The permittee shall implement the following BMPs to meet the objectives of the Post-
Construction Stormwater Management Program. To the extent there is any conflict between this
permit and the post-construction ordinances adopted by the permittee as approved by the
Division, the post-construction ordinances shall apply with regard to permit compliance.
BMP Measurable Goals
a. Legal Authorities Maintain through ordinance, or other regulatory mechanism,
adequate legal authorities designed to meet the objectives of
the Post-Construction Site Runoff Controls Stormwater
Management program.
The permittee shall have the authority to review designs and
proposals for new development and redevelopment to
determine whether adequate stormwater control measures
will be installed, implemented, and maintained.
The permittee shall have the authority to request information
such as stormwater plans, inspection reports, monitoring
results, and other information deemed necessary to evaluate
compliance with the Post-Construction Stormwater
Management Program.
The permittee shall have the authority to enter private
property for the purpose of inspecting at reasonable times any
facilities, equipment, practices, or operations related to
12
BMP Measurable Goals
stormwater discharges to determine whether there is
compliance the Post-Construction Stormwater Management
Program.
b. Stormwater Control Measures
Strategies which include Stormwater Control Measures
(SCMs) appropriate for the MS4, include, but are not limited
to compliance with 15A NCAC 02H Section .1000
effectively meets the Post-construction Stormwater Runoff
control requirements.
c. Plan Reviews The permittee shall conduct site plan reviews of all new
development and redeveloped sites that disturb greater than
or equal to one acre (including sites that disturb less than one
acre that are part of a larger common plan of development or
sale). The site plan review shall address how the project
applicant meets the performance standards and how the
project will ensure long-term maintenance.
d. Inventory of Projects The permittee shall maintain an inventory of projects with
post-construction structural stormwater control measures
installed and implemented at new development and
redeveloped sites, including both public and private sector
sites located within the permittee’s jurisdiction area that are
covered by its post-construction ordinance requirements.
e. Deed Restrictions and Protective
Covenants
The permittee shall provide mechanisms such as recorded
deed restrictions and protective covenants that ensure
development activities will maintain the project consistent
with approved plans.
f. Long-Term Operation and
Maintenance of Stormwater
Control Measures
The permittee shall implement or require an operation and
maintenance plan for the long-term operation of the SCMs
required by the program. The operation and maintenance plan
shall require the owner of each SCM to perform and maintain
a record of annual inspections of each SCM. Annual
inspection of permitted structural SCMs shall be performed
by a qualified professional.
g. Inspections To ensure that all structural Stormwater Control Measures
(SCMs) are being maintained pursuant to its maintenance
agreement, the permittee shall require the owner to conduct
annual inspections using a qualified professional, document
annual inspections of each project site covered under
performance standards, and submit documentation to the
permittee for review. The permittee may perform additional
inspections if needed to determine compliance of structural
13
BMP Measurable Goals
Stormwater Control Measures (SCMs) with the Post-
Construction Storm Water Management Program.
Before issuing a certificate of occupancy or temporary
certificate of occupancy, the permittee shall conduct a post-
construction inspection to verify that the permittee’s
performance standards have been met or a bond is in place to
guarantee completion.
The permittee shall document and maintain records of
inspection findings and enforcement actions and make them
available for review by the permitting authority.
h. Outreach to Developers The permittee shall make available through paper or
electronic means, ordinances, post-construction
requirements, design standards checklist, and other materials
appropriate for developers. New materials may be
developed by the permittee, or the permittee may use
materials adopted from other programs and adapted to the
permittee’s new development and redevelopment program.
i. Enforcement The permittee shall track the issuance of notices of violation
and enforcement actions. This mechanism shall include the
ability to identify chronic violators for initiation of actions to
reduce noncompliance.
3. Post-construction Stormwater Runoff Controls for New Development
a. In order to fulfill the post-construction minimum measure program requirement the
permittee may use the Department's model ordinance, design its own post-construction
practices that meet or exceed the Department's Stormwater Best Management Practices
Manual on scientific and engineering standards, or develop its own comprehensive
watershed plan that is determined by the Department to meet the post-construction
stormwater management measure required by 40 Code of Federal Regulations §
122.34(b)(5) (1 July 2003 Edition).
b. The permittee shall meet the requirements of the post-construction program for
construction projects that are performed by, or under contract for, the permittee. To meet
this requirement, the permittee may either develop the necessary requirements for post-
construction controls that will pertain to their own projects; or develop procedures to
ensure that the permittee meets these requirements by complying with another entity’s
Phase II Stormwater Management Programs for post-construction. If the permittee
decides to rely on another program for compliance with these program areas for their own
14
projects, they shall indicate in their Stormwater Management Program that the permittee
will fully comply with the requirements of the second party’s post-construction programs.
c. If a federal or state agency does not hold an MS4 NPDES permit for stormwater
management that applies to a particular project within the permittees jurisdictional area,
then the project shall be subject to the permittee’s stormwater management requirements.
d. Pursuant to 15A NCAC 02H .0150, for areas draining to Nutrient Sensitive Waters,
permittees, delegated programs, and regulated entities must use stormwater control
measures (SCMs) that reduce nutrient loading, while still incorporating the stormwater
controls required for the project's density level. In areas where the Department has
approved a Nutrient Sensitive Water Urban Stormwater Management Program, the
provisions of that program fulfill the nutrient loading reduction requirement.
e. Pursuant to 15A NCAC 2H .1050 MDC FOR ALL STORMWATER CONTROL
MEASUREs (SCM), the design volume of SCMs (aka structural BMPs) shall take into
account the runoff at build out from all surfaces draining to the system. Where streets
“convey” stormwater, all structural BMPs shall be sized to treat and control stormwater
runoff from all surfaces draining to the structural BMPs including streets, driveways, and
other built-upon area.
f. Where applicable, the permittee shall ensure that Goose Creek Watershed requirements
are implemented in accordance with 15A NCAC 02B .0602.
15
SECTION G: POLLUTION PREVENTION AND GOOD HOUSEKEEPING FOR
MUNICIPAL OPERATIONS
1. Objective for Pollution Prevention and Good Housekeeping for Municipal Operations
a. Implement an operation and maintenance program that includes a training component and has
the ultimate goal of preventing or reducing pollutant runoff from municipal operations.
b. Provide employee training to prevent and reduce storm water pollution from activities such as
park and open space maintenance, fleet and building maintenance, new construction and land
disturbances, and storm water system maintenance.
2. BMPs for the Pollution Prevention and Good Housekeeping for Municipal
Operations
The permittee shall implement the following BMPs to meet the objectives of the Pollution
Prevention and Good Housekeeping Program and shall notify the Division prior to modification
of any goals.
BMP Measurable Goals
a. Inventory of Municipal
Facilities
The permittee shall maintain, a current inventory of facilities and
operations owned and operated by the permittee with the
significant potential for generating polluted stormwater runoff.
b. Municipal Facility Operation
and Maintenance
The permittee shall maintain and implement, evaluate annually
and update as necessary an Operation and Maintenance (O&M)
program for municipal owned and operated facilities with the
significant potential for generating polluted stormwater runoff.
The O&M program shall specify the frequency of inspections and
routine maintenance requirements.
c. Spill Response Procedures The permittee shall have written spill response procedures for
municipally owned or operated facilities.
d. Pavement Maintenance The permittee shall evaluate BMPs to reduce polluted stormwater
runoff from municipally-owned streets, roads, and public parking
lots within the corporate limits. Within 12 months, the permittee
must update its Stormwater Plan to include the BMPs selected.
The permittee shall evaluate existing and new BMPs annually that
reduce polluted stormwater runoff from municipally owned
streets, roads, and public parking lots within their corporate limits.
The permittee must evaluate the effectiveness of these BMPs
based on cost and the estimated quantity of pollutants removed.
16
BMP Measurable Goals
e. MS4 Operation and
Maintenance
The permittee shall maintain and implement an O&M program for
the stormwater sewer system including catch basins and
conveyance systems that it owns and maintains.
f. Municipal SCM Operation and
Maintenance
The permittee shall maintain and implement an O&M program for
municipally-owned or maintained structural stormwater controls
installed for compliance with the post-construction ordinances
adopted by Mecklenburg County and the Towns of Cornelius,
Davidson, Huntersville, Matthews, Mint Hill, and Pineville on
June 30, 2007 and by the City of Charlotte on July 1, 2008.
The O&M program shall specify the frequency of inspections and
routine maintenance requirements.
The permittee shall inspect and maintain municipally-owned or
maintained structural stormwater controls in accordance with the
schedule developed by permittee. The permittee shall document
inspections and maintenance of all municipally-owned or
maintained structural stormwater controls.
g. Pesticide, Herbicide and
Fertilizer Application
Management
The permittee shall ensure municipal employees and contractors
are properly trained and all permits, certifications, and other
measures for applicators are followed.
h. Staff Training The permittee shall implement an employee training program for
employees involved in implementing pollution prevention and
good housekeeping practices.
i. Vehicle and Equipment
Cleaning
The permittee shall describe and implement measures to prevent
or minimize contamination of the stormwater runoff from all areas
used for vehicle and equipment cleaning.
17
SECTION H: TOTAL MAXIMUM DAILY LOADS (TMDLS)
1. Objective of a Water Quality Recovery Program: Reduce levels of the pollutant of
concern in accordance with approved Waste Load Allocation (WLAs) assigned to
stormwater in an approved TMDL.
2. The Permittee shall comply with the requirements of an approved TMDL.
3. Within 12 months of the final approval of a TMDL, the permittee’s annual reports shall
include a description of existing programs, controls, partnerships, projects, and strategies
to address impaired waters and a brief explanation as to how the programs, controls,
partnerships, projects and strategies address impaired waters.
4. Within 24 months of the final approval of a TMDL, the permittee’s annual reports shall
include an assessment of whether additional structural and/or non-structural BMPs are
necessary to address impaired waters and a brief explanation as to how the programs,
controls, partnerships, projects and strategies address impaired waters.
5. Within 36 months of the final approval of a TMDL, the permittee’s annual reports shall
include a description of activities expected to occur and when the activities are expected to
occur.
6. If subject to an approved TMDL, the Permittee is in compliance with the TMDL if the
permittee complies with the conditions of this permit, including developing and
implementing appropriate BMPs to reduce non-point source pollutant loading to the
maximum extent practicable (MEP). While improved water quality is the expected
outcome, the NPDES MS4 permit obligation is to reduce non-point source pollutant
loading to the maximum extent practicable (MEP). The MS4 Permittee is not responsible
for attaining water quality standards (WQS) at the ambient monitoring stations. The
Division expects attaining WQS will only be achieved through reduction from the MS4,
along with reductions from other nonpoint source contributors.
18
PART III PROGRAM ASSESSMENT
The Division may request additional reporting and monitoring information as necessary to evaluate the
progress and results of the Permittee’s Stormwater Plan.
A. Implementation of the Stormwater Plan will include documentation of all program components that
are being undertaken including, but not limited to, inspections, maintenance activities, educational
programs, implementation of BMPs, enforcement actions, and other stormwater activities.
Documentation will be kept on-file by the permittee for a period of five (5) years and made
available to the Director or his authorized representative upon request.
B. The permittee’s Stormwater Plan shall be reviewed and updated as necessary, but at least on an
annual basis to identify modifications and improvements needed to maximize Stormwater Plan
effectiveness to the maximum extent practicable. The permittee shall develop and implement a plan
and schedule to address any identified modifications and improvements.
C. The permittee shall submit annual reports to the Department no later than September 30 of each
year. The reporting period for each annual repost is July 1 through June 30 of each year.
D. Annual reports shall include appropriate information to accurately describe the progress, status,
and results of the permittee’s Stormwater Plan including, but not limited to, the following
components:
1. A detailed description of the status of implementation of the Stormwater Plan as a whole.
This will include information on development and implementation of each major
component of the Stormwater Plan for the reporting period and schedules and plans for
the year following each report.
2. Describe and justify any proposed changes to the Stormwater Plan. This will include
descriptions and supporting information for the proposed changes and how these changes
will impact the Stormwater Plan (results, effectiveness, implementation schedule, etc.).
3. Document any necessary changes to programs or practices for assessment of management
measures implemented through the Stormwater Plan.
4. A summary of data accumulated as part of the Stormwater Plan throughout the year along
with an assessment of what the data indicates in light of the Stormwater Plan.
5. An assessment of compliance with the permit, information on the establishment of
appropriate legal authorities, inspections, and enforcement actions.
E. The Director may notify the permittee when the Stormwater Plan does not meet one or
more of the requirements of the permit. Within 90 days of such notice, the permittee will
submit a plan and time schedule to the Director for modifying the Stormwater Plan to
meet the requirements. The Director may approve the plan, approve a plan with
modifications, or reject the proposed plan. The permittee will provide certification in
writing in accordance with Part IV, Paragraph 7 (c) to the Director that the changes have
been made. Nothing in this paragraph shall be construed to limit the Director’s ability to
conduct enforcement actions for violations of this permit.
19
F. The Division may request additional reporting information as necessary to evaluate the progress
and results of the permittee’s Stormwater Plan.
PERMIT NO. NCS000395
20
PART IV REPORTING AND RECORD KEEPING REQUIREMENTS
A. Records
The permittee shall retain records of all monitoring information, including all calibration and
maintenance records and copies of all reports required by this permit, for a period of at least five
(5) years from the date of the sample, measurement, report or application. This period may be
extended by request of the Director.
B. Annual Reporting
1. The permittee shall submit annual reports to the Department no later than September 30 of
each year. The reporting period for each annual report is July 1 through June 30 of each
year.
2. The annual report shall document:
a. A summary of past year activities, including where available, specific quantities
achieved and summaries of enforcement actions.
b. A description of the effectiveness of each program component
c. Planned activities and changes for the next reporting period, for each program
component or activity.
d. Fiscal analysis.
3. Reports submitted to satisfy other State Stormwater Reporting requirements satisfy the
annual reporting requirements of this permit to the extent that the reports satisfy Part III,
paragraph B 1-5, Part IV, paragraph B 3 (c) and Part II Section I, Electronic Reporting
[G.S. 143-215.1(b)] of this permit.
4. Completion and submittal of the reporting information contained within the online BIMS
Stormwater Management Program Assessment (SMPA) satisfy Part III, paragraph B 1-5,
Part IV, paragraph B 3 (c) and Part II Section I, Electronic Reporting [G.S. 143-215.1(b)]
of this permit.
C. Twenty-Four Hour Reporting
The permittee shall report to the Division any noncompliance that may constitute an imminent
threat to health or the environment. Any information shall be provided orally within 24 hours
from the time the permittee became aware of the circumstances. A written submission shall also
be provided within 5 days of the time the permittee becomes aware of the circumstances.
The written submission shall contain a description of the noncompliance, and its causes, the
period of noncompliance and if the noncompliance has not been corrected, the anticipated time
compliance is expected to continue, and steps taken or planned to reduce, eliminate, and prevent
reoccurrence of the noncompliance.
PERMIT NO. NCS000395
21
D. Additional Reporting
In order to properly characterize the permittee’s MS4 discharges or to assess compliance with this
permit, the Director may request reporting information on a more frequent basis as deemed
necessary either for specific portions of the permittee’s Stormwater Plan, or for the entire
Program.
E. Other Information
Where the permittee becomes aware that it failed to submit any relevant facts or submitted
incorrect information in a permit application or in any report to the Director, it shall promptly
submit such facts or information.
F. Planned Changes
The permittee shall notify the Director of any planned modifications to the Stormwater Plan.
Notice shall be given as soon as possible when deleting a provision of the approved Stormwater
Plan; or where the modification could significantly change the timeframe for implementation of
parts of the program or negatively influence the effectiveness of the approved program. Notice of
any changes is required at least through the annual report.
G. Report Submittals
1. In accordance with federal reporting requirements established in the final NPDES
Electronic Reporting Rule adopted and effective December 21, 2015, the permittee shall
electronically submit any required annual reports and monitoring data in accordance with
Division guidance on NPDES Electronic Reporting.
2. All reports required herein, not submitted electronically shall be submitted to the
following address:
Department of Environmental Quality
Division of Energy, Mineral, and Land Resources
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
3. All applications, reports, or information, other than those submitted electronically, shall
be signed by a principal executive officer, ranking elected official or duly authorized
representative. A person is a duly authorized representative only if:
a. The authorization is made in writing by a principal executive officer or ranking
elected official;
b. The authorization specified either an individual or a position having
responsibility for the overall operation of a regulated facility or activity or an
individual or position having overall responsibility for environmental/stormwater
matters; and
c. The written authorization is submitted to the Director.
PERMIT NO. NCS000395
22
4. Any person signing a document under paragraphs (a) or (b) of this section shall make the
following certification:
"I certify, under penalty of law, that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and
imprisonment for knowing violations."
PERMIT NO. NCS000395
23
PART V STANDARD CONDITIONS
SECTION A: COMPLIANCE AND LIABILITY
1. Duty to Comply
The permittee shall comply with all conditions of this permit. Any permit noncompliance
constitutes a violation of the Clean Water Act and is grounds for enforcement action; for permit
termination, revocation and reissuance, or modification; or denial of permit coverage upon
renewal application.
a. The permittee shall comply with standards or prohibitions established under Section
307(a) of the Clean Water Act for toxic pollutants within the time provided in the
regulations that establish these standards or prohibitions, even if the permit has not yet
been modified to incorporate the requirement.
b. The Clean Water Act provides that any person who violates a permit condition is subject
to a civil penalty not to exceed the maximum amounts authorized by Section 309(d) of
the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note)
as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently
$37,500 per day for each violation). Any person who negligently violates any permit
condition is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
imprisonment for not more than 1 year, or both. Any person who knowingly violates
permit conditions is subject to criminal penalties of $5,000 to $50,000 per day of
violation, or imprisonment for not more than 3 years, or both. Also, any person who
violates a permit condition may be assessed an administrative penalty not to exceed
$16,000 per violation with the maximum amount not to exceed $177,500. [Ref: Section
309 of the Federal Act 33 USC 1319 and 40 CFR 122.41(a).]
c. Under state law, a daily civil penalty of not more than twenty-five thousand dollars
($25,000) per violation may be assessed against any person who violates or fails to act in
accordance with the terms, conditions, or requirements of a permit. [Ref: North Carolina
General Statutes 143-215.6A]
d. Any person may be assessed an administrative penalty by the Administrator for violating
sections 301, 302, 306, 307, 308, 318 or 405 of this Act, or any permit condition or
limitation implementing any of such sections in a permit issued under section 402 of this
Act. Pursuant to 40 CFR Part 19 and the Act, administrative penalties for Class I
violations are not to exceed the maximum amounts authorized by Section 309(g)(2)(A) of
the Act and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note)
as amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently
$11,000 per violation, with the maximum amount of any Class I penalty assessed not to
exceed $27,500). Pursuant to 40 CFR Part 19 and the Act, penalties for Class II violations
are not to exceed the maximum amounts authorized by Section 309(g)(2)(B) of the Act
and the Federal Civil Penalties Inflation Adjustment Act (28 U.S.C. §2461 note) as
amended by the Debt Collection Improvement Act (31 U.S.C. §3701 note) (currently
$11,000 per day for each day during which the violation continues, with the maximum
amount of any Class II penalty not to exceed $137,500).
PERMIT NO. NCS000395
24
2. Duty to Mitigate
The permittee shall take reasonable steps to minimize or prevent any discharge in violation of this
permit that has a reasonable likelihood of adversely affecting human health or the environment.
3. Civil and Criminal Liability
Nothing in this permit shall be construed to relieve the permittee from any responsibilities,
liabilities, or penalties for noncompliance pursuant to NCGS l43-2l5.3, l43-2l5.6A, 143-215.6B,
143-215.6C or Section 309 of the Federal Act, 33 USC 1319. Furthermore, the permittee is
responsible for consequential damages, such as fish kills, even though the responsibility for
effective compliance may be temporarily suspended.
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve
the permittee from any responsibilities, liabilities, or penalties to which the permittee is or may be
subject to under NCGS l43-2l5.75 et seq. or Section 311 of the Federal Act, 33 USC 1321.
Furthermore, the permittee is responsible for consequential damages, such as fish kills, even
though the responsibility for effective compliance may be temporarily suspended.
5. Property Rights
The issuance of this permit does not convey any property rights in either real or personal
property, or any exclusive privileges, nor does it authorize any injury to private property or any
invasion of personal rights, nor any infringement of federal, state or local laws or regulations.
6. Severability
The provisions of this permit are severable, and if any provision of this permit, or the application
of any provision of this permit to any circumstances, is held invalid, the application of such
provision to other circumstances, and the remainder of this permit, shall not be affected thereby.
7. Duty to Provide Information
The permittee shall furnish to the Director, within a reasonable time, any information which the
Director may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating the coverage issued pursuant to this permit or to determine compliance with this
permit. The permittee shall also furnish to the Director upon request, copies of records required
by this permit.
8. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders
inaccurate, any monitoring device or method required to be maintained under this permit shall,
upon conviction, be punished by a fine of not more than $l0,000 per violation, or by
imprisonment for not more than two years per violation, or by both. If a conviction of a person is
PERMIT NO. NCS000395
25
for a violation committed after a first conviction of such person under this paragraph, punishment
is a fine of not more than $20,000 per day of violation, or by imprisonment of not more than 4
years, or both.
9. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement,
representation, or certification in any record or other document submitted or required to be
maintained under this permit, including monitoring reports or reports of compliance or
noncompliance shall, upon conviction, be punished by a fine of not more than $l0,000 per
violation, or by imprisonment for not more than two years per violation, or by both.
10. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a
request by the permittee for a permit modification, revocation and reissuance, or termination, or a
notification of planned changes or anticipated noncompliance does not stay any permit condition.
11. Duty to Reapply
The permittee is not authorized to discharge after the expiration date. In order to receive
automatic authorization to discharge beyond the expiration date, the permittee shall submit a
permit renewal application and fees as are required no later than 180 days prior to the expiration
date of this permit. Any permittee that has not requested renewal at least 180 days prior to
expiration, or any discharge that does not have a permit after the expiration and has not requested
renewal at least 180 days prior to expiration, will be subject to enforcement procedures as
provided in NCGS 143-215.6 and 33 USC 1251 et seq. The renewal application shall include a
review of the Stormwater Program development and implementation over the life of this permit,
the status of programs and a description of further program development to be implemented over
the future permitting time period.
PERMIT NO. NCS000395
26
SECTION B: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS
1. Proper Operation and Maintenance
The permittee shall at all times properly operate and maintain all facilities and systems of
treatment and control (and related appurtenances) which are owned and/or operated by the
permittee to achieve compliance with the conditions of this permit. Proper operation and
maintenance also includes adequate laboratory controls and appropriate quality assurance
procedures, when necessary. This provision requires the operation of back-up or auxiliary
facilities or similar systems that are installed by a permittee only when the operation is necessary
to achieve compliance with the conditions of the permit.
2. Need to Halt or Reduce not a Defense
It shall not be a defense for a permittee in an enforcement action that it would have been
necessary to halt or reduce the permitted activity in order to maintain compliance with the
condition of this permit.
PERMIT NO. NCS000395
27
SECTION C: INSPECTION, ENTRY AND AVAILABILITY OF REPORTS
l. Inspection and Entry
The permittee shall allow the Director, or an authorized representative (including an authorized
contractor acting as a representative of the Director), or in the case of a facility which discharges
through a municipal separate storm sewer system, an authorized representative of a municipal
operator or the separate storm sewer system receiving the discharge, upon the presentation of
credentials and other documents as may be required by law, to;
a. Enter upon the permittee's premises where a regulated facility or activity is located or
conducted, or where records shall be kept under the conditions of this permit;
b. Have access to and copy, at reasonable times, any records of the permittee that shall be
kept under the conditions of this permit;
c. Inspect at reasonable times any facilities, equipment (including monitoring and control
equipment), practices, or operations of the permittee regulated or required under this
permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or
as otherwise authorized by the Clean Water Act, any substances or parameters at any
location under the control of the permittee.
2. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the
Federal Act, 33 USC 1318, all reports prepared in accordance with the terms of this permit shall
be available for public inspection at the offices of the Division of Energy, Mineral, and Land
Resources. As required by the Act, analytical data shall not be considered confidential.
Knowingly making any false statement on any such report may result in the imposition of
criminal penalties as provided for in NCGS 143-215.6B or in Section 309 of the Federal Act.
PERMIT NO. NCS000395
28
PART VI LIMITATIONS REOPENER
The issuance of this permit does not prohibit the Director from reopening and modifying the permit,
revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations
contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina
Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et. al.
PERMIT NO. NCS000395
29
PART VII ADMINISTERING AND COMPLIANCE MONITORING FEE
REQUIREMENTS
The permittee shall pay the administering and compliance monitoring fee within 30 (thirty) days after
being billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 2H
.0105(b)(4) may cause this Division to initiate action to revoke the permit.
PERMIT NO. NCS000395
30
PART VIII DEFINITIONS
1. Act
See Clean Water Act.
2. Best Management Practice (BMP)
Measures or practices used to reduce the amount of pollution entering surface waters. BMPs can
be structural or non-structural and may take the form of a process, activity, physical structure or
planning (see non-structural BMP). See also SCM.
3. Clean Water Act
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as
amended, 33 USC 1251, et. seq.
4. Common Plan of Development
A construction or land disturbing activity is part of a larger common plan of development if it is
completed in one or more of the following ways:
• In separate stages
• In separate phases
• In combination with other construction activities
It is identified by the documentation (including but not limited to a sign, public notice or hearing,
sales pitch, advertisement, loan application, drawing, plats, blueprints, marketing plans, contracts,
permit application, zoning request, or computer design) or physical demarcation (including but
not limited to boundary signs, lot stakes, or surveyor markings) indicating that construction
activities may occur on a specific plot.
It can include one operator or many operators.
5. Department (DEQ)
Department means the North Carolina Department of Environmental Quality.
6. Division (DEMLR)
The Division of Energy, Mineral, and Land Resources, Department of Environmental Quality.
7. Director
The Director of the Division of Energy, Mineral, and Land Resources, the permit issuing
authority.
PERMIT NO. NCS000395
31
8. EMC
The North Carolina Environmental Management Commission.
9. Illicit Discharge
Any discharge to a MS4 that is not composed entirely of stormwater except discharges pursuant
to an NPDES permit (other than the NPDES MS4 permit), allowable non-stormwater discharges,
and discharges resulting from fire-fighting activities.
10. Industrial Activity
For the purposes of this permit, industrial activities shall mean all industrial activities as defined
in 40 CFR 122.26.
11. Major Municipal Separate Storm Sewer System Outfall (Major Outfall)
Major municipal separate storm sewer system outfall (or ``major outfall'') means a municipal
separate storm sewer outfall that discharges from a single pipe with an inside diameter of 36
inches or more or its equivalent (discharge from a single conveyance other than circular pipe
which is associated with a drainage area of more than 50 acres); or for municipal separate storm
sewers that receive storm water from lands zoned for industrial activity (based on comprehensive
zoning plans or the equivalent), an outfall that discharges from a single pipe with an inside
diameter of 12 inches or more or from its equivalent (discharge from other than a circular pipe
associated with a drainage area of 2 acres or more).
12. Maximum Extent Practicable (MEP)
MEP is defined in the Federal Register (U.S. EPA, 1999, p. 68754). This document says that
“Compliance with the conditions of the general permit and the series of steps associated with
identification and implementation of the minimum control measures will satisfy the MEP
standard.” Minimum control measures are defined in the Federal Register as (1) public education
and outreach, (2) public participation/involvement, (3) illicit discharge detection and elimination,
(4) construction site runoff control, (5) post-construction runoff control, and (6) pollution
prevention/good housekeeping. MEP are the controls necessary for the reduction of pollutants
discharged from a MS4, which consist of a combination of BMPs, control techniques, system
design and such other provisions as described in the SWMP. Implementation of BMPs consistent
with the provisions of the stormwater management program required pursuant to this permit
constitutes compliance with the standard of reducing pollutants to the MEP. Stormwater
management programs must be assessed and adjusted, as part of an iterative process, to maximize
their efficiency and make reasonable progress toward as ultimate goal of reducing the discharge
of pollutants to the MEP.
13. Minimum Design Criteria (MDC)
Minimum Design Criteria (MDC) means those design standards as codified in 15A NCAC 02H
.1050 through 15A NCAC 02H .1062.
PERMIT NO. NCS000395
32
14. Municipal Separate Storm Sewer System (MS4)
Pursuant to 40 CFR 122.26(b)(8) means a conveyance or system of conveyances (including roads
with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels,
or storm drains):
(a) Owned or operated by the United States, a State, city, town, county, district, association,
or other public body (created by or pursuant to State law) having jurisdiction over
disposal of sewage, industrial wastes, stormwater, or other wastes, including special
districts under State law such as a sewer district, flood control district or drainage district,
or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a
designated and approved management agency under Section 208 of the Clean Water Act
(CWA) that discharges to waters of the United States or waters of the State.
(b) Designed or used for collecting or conveying stormwater;
(c) Which is not a combined sewer; and
(d) Which is not part of a Publicly Owned Treatment Works (POTW) as defined in 40 CFR
122.2
15. Non-stormwater Discharge Categories
The following are categories of non-stormwater discharges that the permittee shall address if it
identifies them as significant contributors of pollutants to the storm sewer system: water line
flushing, landscape irrigation, diverted stream flows, rising groundwater, uncontaminated
groundwater infiltration, [as defined in 40 CFR 35.2005(20)], uncontaminated pumped
groundwater, discharges from potable water sources, foundation drains, air conditioning
condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn
watering, individual residential car washing, charity car washing, flows from riparian habitats and
wetlands, dechlorinated swimming pool discharges, and street wash water (discharges or flows
from firefighting activities are excluded from the definition of illicit discharge and only need to
be addressed where they are identified as significant sources of pollutants to waters of the United
States).
16. Non-structural BMP
Non-structural BMPs are preventive actions that involve management and source controls such
as: (1) Policies and ordinances that provide requirements and standards to direct growth to
identified areas, protect sensitive areas such as wetlands and riparian areas, maintain and/or
increase open space, provide buffers along sensitive water bodies, minimize impervious surfaces,
and/or minimize disturbance of soils and vegetation; (2) policies or ordinances that encourage
infill development in higher density urban areas, and areas with existing storm sewer
infrastructure; (3) education programs for developers and the public about minimizing water
quality impacts; (4) other measures such as minimizing the percentage of impervious area after
development, use of measures to minimize directly connected impervious areas, and source
control measures often thought of as good housekeeping, preventive maintenance and spill
prevention.
PERMIT NO. NCS000395
33
17. Outfall
Outfall means a point source as defined by 40 CFR 122.2 at the point where a municipal separate
storm sewer discharges to waters of the United States and does not include open conveyances
connecting two municipal separate storm sewers, or pipes, tunnels or other conveyances which
connect segments of the same stream or other waters of the United States and are used to convey
waters of the United States.
18. Permittee
The owner or operator issued this permit.
19. Point Source Discharge of Stormwater
Any discernible, confined and discrete conveyance including, but not specifically limited to, any
pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be
discharged to waters of the state.
20. Redevelopment
"Redevelopment" has the same meaning as in G.S. 143-214.7.
21. Representative Storm Event
A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72
hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm
event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2
hours without producing any collectable discharge, and then stops, a sample may be collected if a
rain producing a discharge begins again within the next 10 hours.
22. Storm Sewer System
Is a conveyance or system of conveyances which are designed or used to collect or convey
stormwater runoff that is not part of a combined sewer system or treatment works. This can
include, but is not limited to, streets, catch basins, curbs, gutters, ditches, man-made channels or
storm drains that convey stormwater runoff.
23. Stormwater Associated with Industrial Activity
The discharge from any point source which is used for collecting and conveying stormwater and
which is directly related to manufacturing, processing or raw material storage areas at an
industrial site. Facilities considered to be engaged in "industrial activities" include those
activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities
or activities excluded from the NPDES program.
24. Stormwater Control Measures (SCM)
Means those practices as codified in 15A NCAC 02H .1051 through 15A NCAC 02H .1062.
PERMIT NO. NCS000395
34
25. Stormwater Management Program
The term Stormwater Management Program refers to the stormwater management program
that is required by the Phase I and Phase II regulations to be developed by MS4 permittees.
26. Stormwater Plan or Stormwater Management Plan (SWMP)
The Stormwater Plan or SWMP is the written plan that is used to describe and define the
various control measures and activities the permittee will undertake to implement the
stormwater management program to meet the MEP standard.
27. Stormwater Runoff
The flow of water which results from precipitation, and which occurs immediately following
rainfall or as a result of snowmelt.
28. Total Maximum Daily Load (TMDL)
A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and
still meet water quality standards, and an allocation of that amount to the pollutant's sources. A
TMDL is a detailed water quality assessment that provides the scientific foundation for an
implementation plan. The implementation plan outlines the steps necessary to reduce pollutant
loads in a certain body of water to restore and maintain water quality standards in all seasons. The
Clean Water Act, Section 303, establishes the water quality standards and TMDL programs.