HomeMy WebLinkAboutNCC191895_NOT Closeout Documents_20220118SEDIMENTATION INSPECTION REPORT
Iredell County Planning & Development
Erosion Control Section
349 North Center Street/P.O. Box 788
Statesville, NC 28687
Location: Mooresville Project: Byers Creek Lots Standard Pacific
Person financially responsible: Standard Pacific of the Carolinas, LLC,
Jon Hardy
Address:6701 Carmel Rd., Ste 425
Charlotte, NC 28226
Weather and soil conditions: Sunny, 40's, Workable
Is site currently under Notice of Violation? []Yes ®No
UAA�JllI
Inspection
Type
Initial
❑
Routine
❑
Follow-up
❑
Final
Enforcement
❑
Project #: MVLLE-2020-012
River basin: Catawba
Project location: Perth Road
Photographic Documentation: ❑Yes ®No
❑Prints ❑Slides ❑Video []Digital
Structural BMPs
Functioning
Needs Maintenance
Not Installed
Not Applicable
Construction Entrance
❑
❑
❑
Silt Fence/Outlet
❑
❑
❑
Sediment Basin[Trap
❑
❑
Diversion Berm/Ditch
❑
❑
❑
Permanent Ditches/Checks
11❑
Inlet/Outlet Protection
❑
❑
❑
Other:
❑
❑
❑
❑
If structural BMPs are not functioning properly, note location and corrective action on reverse side of this form14
Vegetative Controls Adequate
Not Adequate
Absent Not Applicable
Stream Buffers r]
❑
❑
Temporary Stabilization ❑
❑
❑
Permanent Stabilization ❑
❑
❑
If vegetation is not adequate, note location and corrective action on reverse side of ttiis form
ErosionlSedimentation
No
Yes -Minor
Yes -Moderate Yes -Severe
Is there ON -SITE erosion occurring?
®
❑
❑
❑
Is there OFF -SITE sediment loss?
®
❑
❑
❑
Did sediment reach a STREAM?
®
❑
❑
❑
If any of the above are "Yes",
note the location and corrective action
on reverse side of this form
Is site in compliance with S.P.C.A. and rules, and ICLDC? If Not Compliant, checiil
violations on second page.
This site is... Compliant Needs Maintenance Not Compliant
❑ ❑
Sediment Inspection Report Continued
Violations: () ❑g. Inadequate buffer zone, G.S. 113A-57(1) & &
❑a. No approved plan, G.S. 113A-57(4) and 15A NCAC 046 .Q107 c Appendix H of the ICLDC
Appendix H of the ICLDC
❑b. Failure to follow approved plan, G.S. 113A-57(5) and Appendix H ❑h. Graded slopes and fills too steep, G.S. 113A-
57(2) or 15A NGAC 04B .0124(d) & Appendix H of
of the ICLDC the ICLDC
❑c. Failure to submit revised plan, G.S. 113A-54.1(b) &
15A NCAC 046 .0118(a) & Appendix H of the ICLDC
❑d. Failure to provide adequate groundcover, G.S. 113A-57(3) &H
15A NCAC 04B .0107(b) or 15A NCAC 04B .0124(e) & Appendix
of the ICLDC
❑e. Insufficient measures to retain sediment on site, G.S. 113A-57(3)
& Appendix H of the ICLDC
❑i. Unprotected exposed slopes, G.S. 113A-57(2)
& Appendix H of the ICLDC
❑j. Failure to install and/or maintain erosion
control measures, 15A NCAC 04E3 .0113 &
Appendix H of the ICLDC
❑k .Failure to self -inspect G,S. 113A-54.1(e) &
15A N.C.A.C. 413.0131 & Appendix H of the
ICLDC
❑f. Failure to take all reasonable measures, 15A NCAC 04B .0105 ❑I. Other (describe)
Appendix H of the ICLDC
Potential NPDES Permit Violation? ❑Yes ®No ❑Not Applicable Describe:
Has sedimentation damage occurred since last inspection? ❑Yes ®No If yes, where?
(Check all that apply)
❑Lake/natural watercourse on the tract ❑Lake/natural watercourse off the tract
❑Other property ❑Roadway ❑Storm sewer
Description:
Degree of damage: ❑Slight ❑Moderate ❑Severe
14
Contact made with: No one Inspection report sent to person financially responsible on this date:' "� /
Comments / Corrective Actions Needed: Permanent ground cover sufficient to restrain
erosion has been established. No additional self -monitoring or self -inspections are required.
Project is in compliance and released under the SPCA. Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by
the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq,nc.gov/Forms/NCG01-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: B. Jordan
Date of inspection: 12/912021
cc:
Phone: 704-878-5388
Time arriving on site: 3:50 pm
Others present:
Time leaving site: 4:00 pm
All erosion and sediment control measures must meet the standards per approver/ Erosion Con trot Plait and the North Carolina Erosion and
Sediment Control Planning and Design Manual