HomeMy WebLinkAbout20140108 Ver 1_Approval Letter_20140211TWJ
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A. Reeder John E. Skvarla, III
Governor Director Secretary
February 11, 2014
DWR # 14 -0108
Beaufort County
Mr. Rick Jackson
1947 Whichard Cherry Lane
Salisbury, NC 28146
Subject: AUTHORIZATION CERTIFICATE PER THE TAR - PAMLICO RIPARIAN BUFFER PROTECTION RULES
(15A NCAC 02B.0259 and SESSION LAW 2012 -200) WITH ADDITIONAL CONDITIONS
Rick Jackson Garage Addition
Dear Mr. Jackson:
You have our approval for the impacts listed below for the purpose described in your application dated February 4,
2014, received by the Division of Water Resources (Division) on February 4, 2014. Please note that you should get
any other federal, state or local permits before proceeding.with your project, including those required by (but not
limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This
Authorization Certificate shall expire five (5) years from the date of this letter.
This approval requires you to comply with the following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and general conditions of
the Buffer Rules are met. No other impacts are approved, including incidental impacts.
Type of Impact
Amount
Amount
Plan location/ Reference
Approved (units)
Approved (units)
Attached
Permanent
Temporary
Buffers —Zone 2
227 (square feet)
0 (square feet)
As -Built Survey Map
B1
2. Protective Fencing
All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the
construction area on the project site shall be clearly marked (example- orange fabric fencing) prior
to any land disturbing activities and must be maintained on the property until the project phase is
completed.
Water Quality Regional Operations Section
943 Washington Square Mall, Washington, North Carolina 27889
Phone: 252- N6M811 FAK 252- 975 -3716
Internet www.ncoater ofq
An Equj oppmf urdy i Afirmafive Acgon Employer
Mr. Rick Jackson
DWR 4 14 -0108
BUFFER AUTHORIZATION
Page 2 of 3
3. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non - erosive
velocities through the protected stream buffers and will not re- concentrate before discharging into
the stream as identified within 15A NCAC 2B.0259(5).
4. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre- Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
5. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Authorization. If you
change your project, you must notify the Division and you may be required to submit a new
application package with the appropriate fee. If the property is sold, the new owner must be given
a copy of this approval letter and Authorization and is responsible for complying with all conditions.
6. This approval and its conditions are final and binding unless contested.
This Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 1506 by filing a
written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A
petition form may be obtained from the OAH at http: / /www.ncoah.com/ or by calling the OAH Clerk's Office at
(919) 431 -3000 for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is
considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH
during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state
holidays).
The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along
with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed
transmission.
Mailing address for the OAH:
If sending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
One (1) copy of the petition must also be served to DENR:
If sending via delivery service (UPS, Fed Ex, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609 -6285
Lacy Presnell, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Mr. Rick Jackson
DWR # 14 -0108
BUFFER AUTHORIZATION
Page 3 of 3
Raleigh, NC 27699 -1601
This letter completes the review of the Division under the Tar - Pamlico Riparian Buffer Rules as described in 15A
NCAC 02B .0259 and Session Law 2012 -200. Please contact Anthony Scarbraugh at 252- 948 -3924 or
anthony.scarbraugh @ ncdenr.eov if you have any questions or concerns.
Sincerely,
David May, P.G.
Regional Supervisor
DWR Water Quality Regional Operation Section
Washington Regional Office
Attachment: As -Built Survey Map
cc: File
Jennifer Burdette, DWR 401 & Buffer Permitting Unit
Steve Trowel 1, DCM WaRO
Brad Horton, Horton Contractors, Inc., 206 N Market Street, Washington, NC 27889
Michael D. Bowers, 1545 Oakridge Drive, Salisbury, NC 28146
,
,
y,
a��+► a �aa� M�s.�zostIV
41 16S
L7 dpi (nw�,H 72 f S I n
N e
All
w �� Om i
1y S ON
Od of 03
rn
{a .k Co Cb
♦n �1 � r7 �l ii'O fro r1 � M��IVI4�Z 7
i