Loading...
HomeMy WebLinkAbout20220054 Ver 1_Shoreline Stabilization_20220110Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email* donna.lancasterdocks@gmail.com Please provide an email address for payment and requests for more information here. Owner Information: Name: * William Derek Tilley Email: * tillarusky@gmail.com Phone Number: (704)450-0752 (xxx)xxx-xxxx Mailing Address: * Street Address 566 Laurel Cove Road Address Line 2 City Statesville Postal / Zip Code 28677-2476 Is there an agent working on the project?* Yes No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Tilley Dredge and Shoreline State / Province / Region NC Country US If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File • Look up address Property Address Lookup: * Street Address 566 Laurel Cove Road Address Line 2 City State / Province / Region Statesville NC Postal / Zip Code Country 28677-2476 US Latitude: * 35.679502 Longitude: * -80.970141 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level * Tilley Site Plan and Dredge Disposal 2. I SMB Forms.pdf Tilley Duke Energy Excavation 5.51 MB Application.pdf Please use the diagram at the link below: https:Hedocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) Tilley Photographs.pdf 761.62KB 4. Location of the property (where work is to be conducted) Nearest Town: * Statesville County: * Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* Laurel Cove Lot 23„ 566 Laurel Cove Rd, Statesville, NC 28677 Include phase/lot number Directions to site: * From I-77 NB, Exit 42, Left onto US-21 NB thru Troutman, Left onto Old Mountain Road, Left onto Buffalo Shoals Road, Left onto Laurel Cove Road. Property is at the end of the road straight ahead. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: Residential Residential, undeveloped, etc. 6. Property Size 1.102 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Shoreline refresh with Class A and B rip -rap for shoreline stabilization and erosion control. Dredge area around new dock location for boating access. 8. How will the work be done?* ✓ From Land ✓ From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 5,226 sf square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 500 sf construction corridor square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted: * (number of trees, for instance) None Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Donna P. Hrko Signature: Submittal Date: 1/10/2022 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20220054 Version: * Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Doug Perez:eads\djperez Mooresville Regional Office - (704) 663-1699 No Payment Needed Fee Received • Need Fee - send electronic notification • $240.00 $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO: STREET ADDRESS; 566 Laurel Cove Road Statesville, NC 28677 Please print: PLAN NO: Owner: William Derek Till Property Owner; PARCEL ID: 4710479898 The undersigned, registered property owners of the above noted property, do herebyauthorize Donna P. Hrko (Contractor/Agent) of Lancaster Custom Dock and Lift Systems, Inc. (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): Telephone: 704-4 0-0752 We hereby certify the above information submitted in this application is true and accurate tothe best of our knowledge, Authorized Signature 12-1-2021 Date Authorized Signature Date State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 1SA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRaNM EN AL QUALITY FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ PLormal Water Level � r ■. li �I � Shoreline ii lza� W ilk to e. cillyn + 0.r3d -ka e+r ac-V, Q ba-v7 )i i e v)4- barn 1r', Plan View FORM: SSGP 02-2017 Full Pond/ Normal water Level " ngore" iine ` r 2 ft. x 15D fc addittdW clearing lfn(C .ry La ke (At Full Pond/ Normal Water Level) �>redqe �[Q x 41•) W ►+l�t-'req � r< �'� � 5 7� sir &I,r,rldor Lake IAI Full Ponds No l Wary Level) Existing dock / 30 ft.7 ft 3Ftx lsoft Below 1c11 pond/ NWL arxlsaft R ip ra p ahpNe Full pond/ PfWL A AMPLE Page 1 of 3 O r► 0.,r5. Plan View aQ\ ys•� 31-11 pcl_m 1 g1 MI r � � V AO l� l g'y 1 r Zlll ' �r � ' •,$�� li��L�iiiil C] � _� lilll nn CL o D O n 2�z� ��. o x n ti m rA U1 � � CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: �{ r As county: 1 r 1 A t j .re 5 eSv I l le, iN C• 8c� 77 Owner: V V, i is Y 1 ; Print I &, . Contractor/agent: Print igna The approval is for the purpose and design described in yoGr application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application, [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243(6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B. .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A !NCAC 028.0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notijicotion hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted A the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): t Date: 1/6/22, 11:36 AM Property Data Iredell County Property Data Parcel Number: 4710479898,000 Inquiry Date: 1/6/2022 Disclaimer: While every effort is made to keep information provided over the internet accurate and up-to-date, the County does not certify the authenticity or accuracy of such information, No warranties, express or implied, are provided for the records and/or mapping data herein, or for their use or interpretation by the User. Property Map 1 I � I I S I Sf J Owner/Property Info Tax Account Number: 80067064 Old Parcel Number: iso3Lo1000Aa23 Owner Name: TILLEY WILLIAM ❑ Nlalling Address: 566 LAUREL COVE RD STATESVILLE NC 28677 Property Location: LAUREL COVE RD Lot Number: 23 Legal Description: LAUREL COVE SHTA PB9-41-11A Municipal information Township Code: 15 City Code: oo Neighborhood Code: 15017 Value Information - Cguent ygar Pro p Rerpcd Card {P�} Building Value: 608750 Other Building Features: 18460 Land Value: 322000 Tax Assessed Value: 949210 Deferred: o Land Information - &eg stl er of Deeds n ' Search web3.mobile311.com/IredellReportlreport.aspx?PIN=4710479898.000 1/2 116/22, 11:36 AM Date Recorded 20191025 Exemption Null Document Type Deed Book Dead Page wa 19E 1006 Tax Code I Tax Code 2 C ADVLTAX Null Property Data Plat Book & Page 9-41 Tax Code 3 FR06ADVLTAX Land Area Land Type Zoning 1.25 AC R20 Tax Code 4 Tax Code 5 Null Null zoning Contact Info. Iredell County 7D4.878.3119 Harmony 704,878.3118 Love Valley 704-878.3118 City of Statesville 704,878.3575 Town of Troutman 704.528,7600 Town of Mooresville 704.662.7040 Village of Davidson 704.892.7591 web 3.mobi1e311.CamllredeIIReportlrepart -aspx7PI N=471 G479898,000 212 1/6122, 1:51 PM ConnectGlS Feature Report https://ired e11.con nectgis.00m/DownloadFile, ashx?i=_ags_mapc12837bba4d944ee9623e8cf2597583bx.htm&t=print ill DREDGE SPOIL ❑ spngai_ FARM Project Name/address: r r 1'ev V,� i r y Co po 1 ltliroen�rress; G VuIQ�I MTY�YPr Parcel #: Parcel/lot size Dl Disposal area required (sq ft and/or acreage) Ire-A77— . Acknowledgement of ►votlf►cvtifl 1, er , am aware that the site must adhere to all state regulations and rules r garding sediment and erosion control and water quality. And give permission for Name of Individual and Company to dispose of their dredge material at the above stated location Owner: 5 Pri t ! 5igna ure Date: 1 ! Along with form, please provide: .-Aerial of parcel/lot (County G15j Photo of proposed spoil site Identified proposed spoil site Iredel! County Property Data Disclaimer: While every effort is made to keep Information provided over the interneL accurate and up-to-date, the County does not certify the authenticity or accuracy of such information. No warranties, express or implied, are provided for the records and/or mapping data herein, or for their use or interpretation by the User, Owner/Property Lnfo Tax Account Number: 77374349 Old Parcel Number: 1702N04000A001 Owner Name: BIG DADDYS OF LAKE NORMAN Mailing Address: 1162 a1VER HWY MOORESVILLE NC 28117 Property Location: ROBINSON RD Lot dumber: PT1 Legal De5crlption: WEST LAKE VALLEY PB11-52 BIG DADDYS ANNEX PI345-79 t-Ulalcipal [[irarmatlon Township Code: 17 City Code: o3 Neighborhood Code: 03060 Value Infr:-- Cument-Yekr PrDppg itecord C�..(_j Building Value. 0 Other Building Features: 9390 Land Value: 207480 Tax Assessed Value: 21686o Deferred: w Date Recorded 19911T Tax In€ormatian ExCMptiarl Nell Regist ❑ D Qnline Searc Document Type peed Book peed Page Plat BOOK WQ SZ3 933 45-79 AA Oil Tot Ining 2,73 AC fx Tax Code 1 Tax Cade C AOVLTAx Tax Code 3 Tax Code 4 Tbx Code 5 CI03ADVLTAX Null Null Null t-Urrent Zorlillu Cr iltar! r Iredell County 7U4.878.3118 Harmony 704.878.3118 Love Valley 704.878.3118 City Of Statesville 7M-878.3575 Town of Troutman 704,52s.7600 Town of Mooresville Village of Davi(Ison 704-662,7040 704.892.7591 ,IWCONNECTGIS WES H�Srr•1t'. P srs :•r� l�,z . dell County_rW i 1 I F rr r- • _ r� fi• rlrrr 38-N 14 N1 �r Iredell Printed October 19, 2021 See Below for Disclaimer Addresses lnfrasM,-t ,re honRe.idential Use Residential Use Streets €tlterftate Ramp US H,4y ` State Hrr3r Malrr Road Local Road Residential l n: Private inactive Parcels Hooks jP�aarcels L_; ;,::rPPP Parcel Labels City LimitS Iop 1I. �1 " ; Lake Normar f fredell Courttyline � I •:. 1 � - r-z NC Cout'1tie5 S r �^ ' : ' iE Feet 'ha maps prepared for this website are generated from recorded deeds, plats, and other public records. risers of these maps are hereby notified that the informationrrovided herein should be verified. Iredetl County assumes no legal responsibilities for any of the information contained on this site. Users are advised that the use of ny of this information is at their awn risk- All maps an this site were prepared using a 1000411- Grid based upon the North Carolina State Plane Coordinate System from he 1993 North American Datum. The delinquent real proporty tax overlay is updated monthly. The inforrnatton presented is not intended m be used or relied upon as ,fficial not iceaf tax liens- For additional information rvnarriinn rss .. ....__ ____ Dune Energy Lake Services Guidance for Completing an Excavation Permit Application Note: If you are proposing excavation in association with the permitting of a new or expanded facility under the Marina or Conveyance Programs, you do not need to complete this application. Instead, you should incorporate the excavation request into the permit application for the marina/conveyance using the appropriate application. Step 1: Contact Duke Energy Lake Services Complete "Part I" of the application and develop a drawing of the proposed excavation area. Contact Duke Energy Lake Services to schedule a site visit. Lake Services will conduct a site visit to determine if Duke Energy will accept an excavation permit application for the proposed work. If the Lake Services representative determines the application process may procee, he/she will initial Part I of the application. d Step 2: Draft Application Development Complete Parts II-III.A-G and. Part V of the Excavation Permit Application. Step 3: Agency Consultation Send the draft application developed during Step 2 to the agencies for review and comment on the proposed activity. Refer to the Agency / Organization List available from Duke Energy to determine which federal, state, regional, and local agencies and organizations require consultation or review. Note; Duke Energy reserves the right to require consultation with additional organizations beyond those included in the Agency / Organization List. Each agency / organization must be provided at Ieast 30 days prior notification. Evidence must be provided (e.g., response letter or Certified Mail receipt} in the complete application to show each agency / organization was given the opportunity to review the proposal. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. All permits must be valid at time of application and have a term longer than the Projected schedule for completing the permitted project. What to Ex ect Durin A--ncy Review and Comment: ■ You will typically receive a letter from each agency / organization either documenting its concurrence with your proposal, requiring additional information, recommending modifications, or offering no comment. You must address each agency's / organization's comments with a follow-up letter and in your final application as described in part IV. • If you do not receive any documentation from an agency / organization within 30 days of its receipt of your proposal, you must provide the agency / organization with a follow-up letter requesting comment on your proposal within 15 days from the date of the follow-up letter. If You still do not receive any response as a result of the second letter, type "NO RESPONSE" Duke Energy Page 1 of 13 Excavation Program rev 10/1r1019 at the top of the follow-up letter and include it in the application along with proof of the agency's 1 organization's receipt of the letter (e.g., Certified Mail receipt). You may proceed with the application process recognizing, however, that if its comments came later in the application process, you will be required to address them. From the United States army Corps of Engineers {Corps}: (* * Note — The Corps may have additional forms to submit for your proposal and an additional fee.) If the excavation can be done under the requirements of the General Permit (GP) or a Nationwide Permit (NWP), you will typically receive a copy of the Corps' tear sheet documenting authorization and providing any additional instructions. If the excavation isn't covered under the GP or a NWP, you'll be required to obtain an individual 404 Dredge and Fill permit from the Corps. You must receive written documentation from the Corps that your application either (1) meets the requirements of the GP or a NWP or (2) the proper 404 Dredge and Fill permit has been received before Duke Energy can process your application. From the North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources: (Vote NCDEQ may have additional forms to submit for your proposal and an additional fee) If the proposal meets the requirements of the Clean Water Act Sect. 40I Water Quality Certification, you will typically receive a letter from the NCDEQ Division of Water Resources documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter requiring additional information or recommending modifications. You must receive wri en documentation from NCDEQ noting any required Sect. 401 Certification has been received before Duke Energy can process your application. • From the North Carolina Wildlife Resources Commission (NCWRC); If you do not receive any documentation from the NCWRC within 30 days of their receipt of your application, you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application process, you will be required to address them. From the South Carolina Department of Health and Environmental Control (SCDHEC): (Note --- SCDHEC may have additional forms to submit for your proposal and an additional fee) The SCDHEC conducts a joint application process with the [USACDE in S.C. If the proposal meets any applicable requirements of the Clean Water Act Sect_ 401 Water Quality Certification, you will typically receive a letter from SCDHEC documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter from USACDE requiring additional information for the agencies participating in the joint application process. You must receive written documentation from SCDHEC noting Sect. 401 Certification has been received if required before Duke Energy can process your application. ■ From the South Carolina Institute ofArchaeology andAnthropology (SCL4A). The applicant must wait 30 days after receiving the signed postal returned receipt. If a response from SCIAA has not been received by this time you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application review process, you will also be required to address them,. Duke Energy Excavation Prograrn Page 2 of 13 rev 1011n019 Step 4: Final Application & Submittal to Duke Energy Following the consultation process, finalize the application. The final application submitted to Duke Energy should incorporate all comments and recommendations provided by agencies and organizations during the agency consultation process as well as copies of all permits received. In addition to the final application include the following: • One check payable to Duke Energy for the application fee and security deposit • If applicable, a separate check payable to the appropriate Habitat Enhancement Program fund • Signed Excavation Program Applicant's Agreement Note: Co -applicants must also submit the application fees and applicable 1EP fees with the application. Duke Energy Page 3 of 13 rev lO1lPZ0I9 Excavation Program Duke Enierey Excavation permit Application Form FOR DUKE ENERGV USE DAILY Duke File No. Application Fee S Security Deposit S Chock # Date Recv'd Initials — Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Date 96 Z � ' C Initials-i 91— Date Final Protection/Avoidance Ares Markings Field - Verified Approved to Stan Work By * : luitials Date Date Completion Required (P)Int) 09+) Date of Any Approved Extension Initials Date Passed Closeout Inspection* lnkWS Any Stop Work orders or SMG Violations*? (check one) Oyes ONO (If Yes. expla n in pART V) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that Deice Energy changed) heck to applicant Orders with application. with Approval Letter and high iigltt any changes. File copies of Approval and Close-ottt Checklists and any Stop Work Part L Applicant information (Please Print) Name Telephone 7 - q -1 -, - 'r1; Email address: + 1 11 e Address Mailing Address (f di, f�erent) r VTIA 18 7 Contractor Company ' G. Contractor Contact Person Telephone 9- o Contractor Email. Address: �t -CIo � m LAKE LOT INFORMATION Pars: 97(0��� g�a Lake Qr_tnCounty 1LL City V 1 State N—C Tax Map No. - 1 Subdivision r CON e. Lot 1 Section No. Z�J Lot Sine 1. cres `� �c3dr1;'lonctl�n�c�.L Duke Energy Page 4 of 13 Excavation Program rev 101112019 Duke MUM Excavation Permit Anplication Form Are there any Co -Applicants*? (check one) OYes MNo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional Information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. .NOTE: InWalling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection 16 Zi3 w u Initials (Duke Energy)( 1 Cif— (applicant/contractor) . Duke Energy Page 5 of 13 Excavation Program rev 1411)2019 Duke Enem Excavation Permit Application Form Part II. Description of Project A. Basic Information l . Type of excavation: (check one) 2. Purpose of excavation: (check one) ❑ Water Intake Channel ❑ Other (spew): 3. Lake user category: (check one) ❑Commercial Marina ❑other (specify): XNew excavation ❑ Maintenance excavation 1d Boat Access Channel ❑ Wastewater Discharge Channel ICt dvate ❑Residential Marina ❑Public 4. Max. Excavation Area Dimensions (ft): Length I Width Depth (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in #4) 5. VoIume of Excavated Material (TOTAL for the project): Cubic yards 6. Type of material removed (applicant determines by field sample ifpractical): C �d y -j11 �- 4 dal 7. Excavation Site area: Acre (s) Disposal Site area: It 0Acres) 8. Total Disturbed Area (including equipment staging area): %CO Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) Des Jo 10. Do you claim title to the disposal area? (check one) ❑Yes No 11. Do you claim title to the equipment staging area? (check one) Yes Vo 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) Yes �o (If Yes, specify): 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached orosionD condtrol plan and disposal area design): �r� e %N'1+11 iD y-ecLC tj e 1�Ca80,Q yb��cr� . 'Vl(Xce MC4P-r,Cd6 m 110?ge- bar e� aul awa MPA �CYiS Q.nd inw5o� dispo-axlsi+e Duke Duke Ene>ry Exeavation Permit Application Form 14. Type(s) of excavation equipment to be used: Lonr� reQc� 1tC c�Ver�pY. t 5y, Q r+reach IS. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) NYes ONo (Ifyes, explain) t-Ail laoa �t rner►}�� �ra�+r, F teeca¢n ,►��1 ►IC4S+er Cumm o>� t�cc� �;., ' �a��- �'h r', ems. 51 �`G 0 n L-CLV' e N o rmcc � 15. WilI return water re-enter the reservoir? (Check one) ❑Yes ONo (If Yes, specify points) of re-entry and show on Excavation Area Drawing) VIA 17. Is there an existing facility (e.g. pier) that access is beingmaintained to by conduc ing the excavation`? ❑Yes *o New pi er 4 dodgy be Consfr=. (If Yes, provide the existing permit number. IfN , i elude a sca� drawing o the pro osed L facility). Permit # X-ei, chef rr tVC�}e �46 �t�1 et, �vie;r .- 'D li)cad ❑ r� . 18. Total planned duration of the work (Include f rst equipment mobilization, excavation through final mitigation meal e complete): START �_ 1 FINISH 1 (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev ] 011 r1o19 Excavation Program L M E■1 m IL Duke Enem Excavation Permit Annlication Form C. Applicant's SjgqgqjM Comments: Applicant Name (print) Applicant Signature* 1 1y Y---Date } Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co-Applieant blame (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature's Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 10/1/2019 Excavation Program Duke Enera Excavation Permit Avelication Form Part III. Additional Information A. Deed and Survey Plat: A copy of the deed and registered survey plat or other instrument under which each applicant and co -applicant claims title to the affected property (the shoreline adjoining the excavation area, equipment staging area, area crossed by any spoil and return water lines, and the disposal area). if the applicant(s) is(are) not the owner(s) of said property, then forward a copy of the deed and registered survey plat or other instrument under which the owner(s) claim title plus written authorization from the owner(s) to carry out the project on their land. B. Excavation Area Drawing: An accurate drawing of the area to be excavated The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed excavation area and equipment staging areas; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); property corners far project front lots; the full pond elevation contour and lines dividing the cove width into equal thirds (as applicable); approximate volume in cubic yards of the material to be excavated; point(s) of return water re-entry; the boundaries of any adjoining areas that are to be specifically avoided or protected during the work and the location (address) of the disposal area for the excavated material. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] C. Disposal Area Drawing: An accurate drawing of the proposed design for the disposal area. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the Proposed disposal area; lake, county, city, cove, tributary, road and subdivision names and Iot numbers (as applicable); the full pond elevation contour (unless disposal is well away from the lake); the boundaries of any adjoining areas that are to be specifically avoided or protected during the work; the location (address) of the excavation area from which the material came and a statement of the disposal area's capacity with all dimensions labeled that were used in the volume calculation. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Also note for projects larger than one (1) acre in North Carolina, including excavated, equipment staging, and disposal areas, you must submit an erosion control lan. For projects larger than two (2) acres in South Carolina, including excavated, equipment staging and disposal areas, you must submit an erosion control plan. For projects < two (2) acres in South Carolina, you must submit a completed standard reporting form for construction sites disturbing two (2) acres or less to the South Carolina Dept. of Health and Environmental Control (SCDHEC) - Stormwater Management D, Vicinity Map and Driving Directions; A vicinity map and directions by road showing directions to both the excavation area and disposal area. Include the latitude and longitude of both the excavation area and the disposal area. Part IV. Agency Reviews and Approvals Begin this section with a summary table of all agencies consulted and applicant response to agency comments as shown in the example table below. Agencies should be listed in the order Duke Energy Page I I of 13 Excavation Program rev 10/D20I9 Duke Energy Excavation Permit Avylication Form shown in the Agency/Organization List. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. Table IV-i. Sam le A enc Comment and Response Table Agency Comment The activity is approved as A eny 2 The on -site well provides drinking water to the public.. Please contact Mr, Smith to discuss the proposed changes and potential issues associated with our ro osal. You must contact us immediately if endangered species are located during the course of construction, Azencv 3 Contacted Mr. Smith on 111120xx. No further action needed. Applicant will contact Agency -2if endangered species are located during construction Requested agency comments on 111124xx and NA again on 21I120xx. No response as of 2116120xx. fI ersc 4 Section 401 Water Quality Certification Applicant will comply with the conditions of the 401 Water Quality Certification Following the table of agency comments and applicant responses, include a table of permits and certifications issued by the reviewing agencies. As with the table of agency comments and applicant responses, agencies should be listed in the same order as they are listed in the Agency/Organization List. Table IV-2. Sam le Agency Permits and Certifications Table Agency Permit/Certification Name Date of Date of Issuance Ex iratio Agency l Surface Water Withdrawal Permit Agency 2 , Section 401 Water Quality Certification Following the two summary tables, include a copy of all correspondence to and from any local, regional, state and federal agencies or other organizations with which you are required to consult, including any required permits (e.g., Section 401 water quality certifications, Section 404 dredge/fill permits, building permits, etc.) or other approvals or comments which have been obtained from these organizations regarding this activity. Include a copy of any local, regional, state or federal regulations or guidelines that will be followed. All permitting issues must be resolved and clearly documented. Correspondence should be organized in the order the agencies are listed on the Agency/Organization list with the applicant's request for comments followed by additional correspondence in chronological order. All permits must be valid at time of Duke Energy Page 12 of 13 Excavation Program rev 1011Y2019 Duke EnerLyv Excavation -Permit Application Form application and have a term longer than the projected schedule for completing the permitted project. Part V. Additional Information Provide relevant additional information. Reference previous parts as applicable. Include the FERC-required Environmental Assessment if you were directed to do so during the initial site visit. If there are co -applicants, this is where their information would be provided (see Part I). Duke Energy g Exeavati0 Program Pa 13 of 13 rev 1DI1M14 u�ELLJ p�'i m tlllilllll � E of iil5,11 llltlt i' 1 Id- �f Vl E, �-- 91 � f + r rlyr 1 W g I �E a `\� \ E 2?i� J ilitillil Lo 0 \ 1 f 1 litltl f I .pSFf' �rjR4u- a S 5 N e tC-t 8 0 Ln �� 7 ---�"7—----Iff — — wj i ��W (� I of — [_. —�i 4_4__'1__1 4_-�-­-�__._j e t r Y, +4 -+44- _4 T LJ L 1 f L A_ _7 —j . ..... f T F _ILI r IT Calendar By; ate roafPa Mart Free Printables: Calendars ma aps gmh Tar _Em��r —S_ets rL UU, > | � � � | ` ��� � � � A Fl DUKE ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site canhavea big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUKE ENERGY CIO LAKE SERVICES — EC 12 Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: William Derek Tilley Street Address (at lake): 566 urel Cove Road Lake Name: Norman Subdivision Name: Laurel Cove Property Section: Lot #: City: Statesville County: Iredell State: NC Zip: 28677 Telephone: 704-45 0-0752 Directions (from major road or highway): From I-77 NB Exit 42, Left onto US-21NB, Left onto Old Mountain Road, Left onto Buffalo Shoals Road, Left onto Laurel Cove Road. Property is straight ahead at the very end of the road. Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the back of this form if desired to draw us a map to the site. DUKE ENERGY DIRECTIONS BY ROAD FORM EANCASTER CUSTOM DOCKS DISPOSAL SITE Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site canhavea big impact on permitting processing time. Please complete this foam and return it along with your completed application to: DUKE ENERGY C/O LAKE SERVICES —EC 12 Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: Street Address (at lake): 1 l 62 River Hi wa Mcoresviile NC � g 1 l � Lake Name: Norman Subdivision Name: _kig Dadd 's of Property Section: Lot #: City: Mooresville County: Ired ll State: NC Zip: 28I 17 Telephone: _ 744-,;61- Directions (from major road or highway): From 1-77 NB, Exit 36, Left onto NC- 1 SD WB, Disposal Area is on the right behind Big Daddy's Restaurant Complex. Descriptive Structure(s) on property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the back of this foram if desired to draw us a map to the site. 097to MPJ I a. Excavation Project User's Agreement Utter yy (Please fill in the blanks. Please Print) k Date j- Z_L_ TO, Duke Energy c/o Lake Services - EC 12Q 526 S. Church. Street Charlotte, NC 28202 RE: Excavation For. (S,%bdivision,and Lqt #'s or Other (LakelCountylaty) (Applicant's full name) i hereby agrees to comply with all recommendations, requirements and/or conditions of D e Energy, General Permit(s) (if applicable) and other federal, sVte and 1pcal agency requirements pertaining to the application to excavate for the purpose of a In addition, Ilwe have read and agree to comply with Duke Energy's current Shoreline Management Plan (SMP) or other applicable guidelines, much of which is repeated herein, and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission (FERC) project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen (1 S) months from the date of written approval by Duke Energy, unless specifically noted otherwise in the application or unless I/we obtain approval for a single, time extension (maximum of one year) in writing from Duke Energy. I/we understand that if the SMP or other applicable guidelines or rules change during any extension period, Ilwe will be expected to comply with the new requirements to the maximum extent practicable. Ilwe also recognize that failure to complete the excavation within this build -out period will require the filing of a new application within the then_ current SMP or other applicable guidelines and the new application must include any applicable fees and security deposits. Ilwe attest to be the owner(s) or lease holder(s) of the land immediately adjoining the Project Boundary where the excavation activity is to take place, or if not the owner or lease holder, Ilwe have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the proposal within the Project Boundary adjacent to their land. I/we attest to be the owner(s) or lease holder(s) of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder, ]Ave have included proof of title to the property and written authorization from the owner(s) or lease holder(s) to carry out the work on their land. Duke &bc:W Page 1 PXV: wraoxn Ilwe understand that all excavation work must lie done directly in front of mylour property and as specified in Duke Energy's approval. Uwe also understand that access channels must run Perpendicular to the shoreline white within the third of the cove area that is nearest mylour property. 1/we understand that for proposed excavations, I1we must notify the appropriate local, state and federal agencies in advance of the activity by sending them a completed copy of Duke Energy's Excavation Permit Application Form and other required information. I/we understand that written authorization and/or other permits may be required by some of these agencies and such required authorizations must be olstained before Uwe submit the final application to Duke Energy. At FERC-licensed reservoirs, Ilwe understand that except for maintenance excavations, any excavation exceeding 2000 cubic yards of material removed or any excavation or shoreline stabilization work needed to support an application that requires FERC review does itself require specific review and approval by the FERC before Duke Energy can issue any approvals. Ilwe agree that unless specifically approved otherwise in the application, explosives will not be used as part of this excavation activity. I/we understand that every reasonable effort must be made to minimize any adverse impact on fish, wildlife and other natural resources. Ilwe understand that applicants in South Carolina proposing excavations that are not covered under the General Permit, or are greater than 150 cubic yards, must receive prior written authorization from the South Carolina Department of Health and Environmental Control (SCDHEC) or the US Army Corps of Engineers (as applicable) before submitting the completed application to Duke Energy. Ilwe agree that excavation activities will not occur during the months of March, April, May and June because of the potential impacts to fish spawning areas. Ilwe understand that trees and vegetation growing within or adjoining the lake play an important role in its overall environmental condition, and the ecological benefit the vegetation has on fish and wildlife habitat directly supports a sound and healthy lake environment. Uwe also understand that unauthorized removal of shoreline vegetation (e.g. button bushes, willows, cattails, etc,) and/or disturbance of the shoreline buffer may result in suspension or denial of lake use Permitting requests, forfeiture of security deposits and require re-establishment of vegetation at mylour expense, particularly if the disturbance is found to be in violation of state or local ordinances or impacts FERC project buffers- 1 /we agree all excavated material will be placed in upland areas, landward of the Project Boundary, and confined to prevent erosion and sedimentation back into the lake or nearby streams. Duce EMW Page 2 Rev: 416xnx0 Uwe agree to adequately stabilize all excavated material and all disturbed shoreline to prevent erosion and runoff into the lake. Ihve understand that the double handling of excavated material will not be allowed; therefore, all excavated material must be placed above the Project Boundary in one handling. Uwe have designed the hydraulic excavation process (if any will he awed) so that return water re- enters the lake in the same general vicinity and cove as the excavation, to the maximum extent practicable. Uwe agree that the proposed excavation will not be for the purpose of creating additional shoreline, will not alter the Project Boundary or the full pond contour, and will not impact threatened or endangered species, historic properties, or environmentally -important areas, unless special public entity provisions were made in the application. .Uwe recognize that it is mylour responsibility to clearly locate in the field and label on mylour work area drawings any areas that require specific protection or avoidance during this excavation work. Examples of these protection/avoidance areas include but are not limited to, any Environmental Areas, Natural Areas or Impact Minimization Zones as identified by Duke Energy; jurisdictional wetlands; historic properties; rare or threatened species; and buried gas, water, sewer, electric or communications lines. Uwe agree to provide rrrylour contractor with a copy of these work area drawings showing these areas to stress the necessary protection measures. Ilwe agree that if any archaeological resources (e.& pottery shards, Indian artifacts, etc.) are discovered during the excavation, work shall be hatted immediately. Ilwe will then notify Duke Energy and the State Historic Preservation Office to determine what measures, if any, Ilwe must Pursue to protect or salvage the archaeological resources. Ihve agree that any excavation from within the Project Boundary will not exceed the volume as outlined in the application and will remove and disturb onlywhat is abso k1XAgqq1g.,M to achieve the project's stated purpose. Ilwe agree to be fully responsible for the permitted lake use and Ilwe understand that this responsibility is considered to transfer automatically along with ownership and leases of the adjoining tract. Uwe understand Duke Energy representatives may issue Stop Work Directives for violations of the SMP or other applicable guidelines and other consequences may result from such violations, including but not limited to suspension or cancellation of approved permits, increases in fees, modification or removal of non -complying structures and restoration of disturbed areas at mylour own expense or loss of any consideration for future lake use permits. Uwe agree to immediately comply with any Stop Work Directives, to fully cooperate with Duke Energy and other agencies as necessary, and to perform the necessary remedial actions within the specified time frame. °A" EwW Page 3 xs.: a+ataxa I/we agree to develop any required mitigation plans and to complete any required mitigation activities at my/our own expense within the specified time frames. 1/we recognize that the excavation work is not considered complete and deposits will not be refunded until the Mitigation requirements (if any) have been satisfactorily fulfilled. duri e to noti Duke Ener hone when the excavation is initiated. and to ensure th t Burin the excavation jgL16wilt t Duke Ener 's in royal letter in a clear wate r f bag at the job site and vi ible from the ater's e. I/we agree to notify Duke Energy in writinn when the excavation is completed (including any required mitigation measures) and that the excavation was completed per the approved application, so a close-out inspection can be performed. IAve recognize security deposits will not be refunded if any violations of the SMP, other applicable guidelines, or this user's agreement occur. I/we understand there will be no change in hydro project operations as a result ofthe excavation and/or utilization of the excavated area. I/we agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims, liability, loss or damage that may anise from this excavation project. Ilwe understand that this user's agreement does not, in any way, constitute the transfer of any rights in real property and that mylour use and enjoyment of FERC project and Duke Energy lands and waters shall not hinder the general public's iawfui use and enjoyment of the same. Sincerely, %! -Applicant's Name (Print) Applicant's signature Co -Applicant's Name {Print) Co -Applicant's Name (Print) Co -Applicant's Natne (print] CO -Applicant's Name (Print) Co -Applicant's signature CO -Applicant's Signab= Co -Applicant's Signature Co -Applicant's Signature Duke rnw Page 4 nay; vwmzo Y ► a } t?• } r I 'A,U ' III f 7 !ly Alf d P ": Law