Loading...
HomeMy WebLinkAbout290034_Compliance Evaluation Inspection_20210712Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Owner Name: Arrival Time: L.611l{\FxvirnS Pe Y1,1 i S L'Ol V ` Phone: '3 (o - 250 -3 & o ( (C� a'.5a i D 114 County: 0A U AW\ Region: wS i20 Mailing Address: Physical Address: Facility Contact: Departure Time: Owner Email: Ipsi 5ke�rh 6-TA QenA-bA Nr z2c-“I VC in � k O-Pt 1n Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Phone: Ga vM 61 V1K.› t2 I 1 Integrator: Certification Number: Certification Number: Latitude: 3S 6 35 i SZ Longitude: 6 ° 61 Mw1 1OG g et-bwaYcs Dev\-\-DA , Hwy SY-e.c.rk Ida, rman Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Layer Non -Layer Non -La ers Pullets Turke Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Dairy Cow Dairy Calf Dairy Heifer Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow 0 Yes pKiNo D NA ❑ NE ❑ Yes ❑No ❑NA El NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ Yes ❑ Yes ❑ No ONo gNo ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page 1 of 3 5/12/2020 Continued 'Facility Number: J ` - 3 'Date of Inspection: —4- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 71No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): tr 3o Z� Z1 I 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes gNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes gNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? lyf Yes ❑ No I] NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes $No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes VI No ❑ NA ❑ NE ❑ Yes Io ❑ NA ❑ NE ❑ Yes jEi No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? - ❑ Yes cgNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes gNo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes XNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ,Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes IgNo ❑ NA ❑ NE the appropriate box. ❑ WUP EChecklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 1. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes VNo ❑ NA ❑ NE a�- aste Application Weekly Freeboard 0 �� �� Write Transfer eather Code Rainfall Stocking rop Yield 0120 Minute Inspections Iponthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0,No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE Page 2 of 3 5/12/2020 Continued Facility Number: ZQ - 3 Z1 Date of Inspection: 7' 1Z 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? • 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ Yes No ❑ NA ❑ NE ❑ Yes TA.No ❑ NA ❑ NE 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes lirNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ NoNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes kio ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes IYNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes sNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ,NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes giNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes j:KNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes g' No ❑ NA ❑ NE Comments (refer to question PI): Explain any YES answers and/or any additional recommendations or any other comments. Use drowlugsof facility to better explain situations (use additional pages as necessary). 1s64,u zoo. 5umon hovebetA 5eX 04,05vt �(��-ho s out .flu O \M , reu � c w NO War, e a ai& 76M. g Y alp f��,%(\P 2oz7.� May hoNtnok pit mycksjai lust �� erk,u►� Sl ud e s�,Ne wae(7 II QI girl AD aQyy'r wc� i\jef5\' QAAYnk d ,coo e�\ 55iALs?Mole vle! Qc?,ed siAu. last- �nS�ec�lrvn, e ,VA4 s \An T yes Cuwe 1c2ov ,m t-\� N 4� 0115 k w ��l S�,�n� c rni Via wait WI e4- 5erik b�j e ri►at t has yra.{7 da b 'NV'S i �l -��� rn i,m 1 a�- ackf,. �i hdie5 � � s�� Iry �,y� �-e bit �Y` � 5 � �6 � 4rac�.ea wP�ds o��b�r+wvviul-tS, pl"nAi+) •Tre►Y f�a u \P cues (\O r V\ (tie C -1-i care Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 rtAAv \Ca6A6 „cc Phone: Date: g369 -43(0-4(0RR //Z /tO7I 5/12/20 0