HomeMy WebLinkAbout20131222 Ver 1_DCM Permit_20140121Permit Class
NEB'
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
ur
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A -118
X Excavation and/or filling pursuant to NCGS 113 -229
Permit Number
7 -14
Issued to R. E. Mayo Seafood c/o Carol Potter, P® Box 100, Hobucken, NC 28537
4Z i }Authorizing development in Pamlico County adl to the ICW, at 183 Mayo Road, I
F4r`Y Hobucken , as requested in the permittee's application dated 8/27/13 (MP -1) and
x.8/26/13 (MP -2), including the attached workplan drawings (4), all dated 8/21/13
-This permit, issued on Janua 14.2014 is subject to compliance with the application where consistent
_�� p � J p Pp �
with the permit), all applicable regulations, special conditions and notes set forth below Any violation of these terms may
be subject to fines, imprisonment or civil action, or may cause the permit to be null and void.
W
£�V
k ?_-
Y 41
�y��
Shoreline Stabilization
'l-) The authorized bulkhead shall adhere to the alignment depicted on the attached workplan drawings
and shall be constructed in a straight line between the corners of the two adjacent bulkheads.
=;2) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the
structure.
_ (See attached sheet for Additional Conditions)
it
( -This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date An appeal requires resolution prior to work initiation or
fcontmuance as the case may be
4 _ This permit must be accessible on -site to Department
{per §onnel when the project is inspected for compliance
=' Any maintenance work or project modification not covered
hereunder requires further Division approval
`.All work must cease when the permit expires on
December 3l, 2017
" w - `- ,4n issuing this permit, the State of North Carolma agrees
'ter h' -that your project is consistent with the North Carolina Coastal
`n
-Management Program
Signed by the authority of the Secretary of DENR and the
Chapman of the Coastal Resources Commission
This
� Braxton C. Davis, Director
vision of Coastal Management
JAN 2 1 2014
accepted
Signature of Permittee
z_
r�
R. E. Mayo Seafood
ADDITIONAL CONDITIONS
Permit # 7 -I4
Page 2 of 2
3) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other
suitable materials approved by department personnel. No excavation landward of the authorized
alignment is permitted except for that which may be required for the construction of the bulkhead wall
and deadmen cables, etc.
4) All backfill material shall be clean and free of any pollutants except in trace quantities.
5) All backfill material shall be obtained from a high ground source and confined behind the permitted
bulkhead
Sedimentation and Erosion Control
-1-6) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters.
7) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales or berms, etc). At a minimum, a silt fence shall be properly installed immediately
landward of the bulkhead cap immediately following completion of backfilling activities.
8) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion
within thirty days of project completion
General
9) The permittee and/or his contractor shall meet with a representative of the Division prior to project
initiation in order to discuss the conditions set forth in this permit
10) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required
I, NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808 -2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many development or
land disturbing activities are not allowed within the Environmental Management Commission's
Neuse River Buffer Contact a representative of the Division of Water Resources at (252) 946-
648 1 for more information concerning allowable uses within the Neuse River Buffer.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No SAW -
2014 -00071