HomeMy WebLinkAboutNCC193113_NOT Closeout Documents_20220106North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Gates Project: Suffolk Swamp Winfall 230 kv Rebuild Sect. 3 River basin: Chowan
Person financially responsible: Dominion Energy NC - Mark Allen, Director ET Project #: GATES-2020-001
Project Development
Address: 10900 Nuckols Road, 4th Floor, Glen Allen, VA 23060
1. Project Location: HWY 158, Sunbury
Pictures: No
2. Weather and soil conditions: cloudy, warm, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: December 9, 2021
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NP®FS
10. Comments: General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at: https://edocs.deg.nc.goy/Forms/NCG01-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process
Reported by: Bradley West Others present:
Date of inspection: December 7, 2021 Time arriving on site: 11:05 AM Time leaving site: 12:00 PM
cc: