HomeMy WebLinkAbout20140090 Ver 1_Application_20140124Draft Minutes from the Interagency 4B Hydraulic Design Review Meeting
U-2579B Winston-Salem Northern Beltway (Eastern Section) from I-40 Bus/US 421
to US 158 in Forsyth County
A Hydraulic Design Review Meeting was held on Wednesday January 23, 2008 in
the Hydraulics Design Conference Room at the NCDOT Century Center Complex
from 9:00 am – 11:00 am
Team Members:
John Thomas: USACE (present)
Marella Buncick: USFWS (present)
Marla Chambers: NCWRC (present)
Amy Euliss: NCDWQ (not-present)
Brian Wrenn: NCDWQ (not-present)
Chris Militscher: EPA (not-present)
Kathy Matthews: EPA (present)
Donnie Brew: FHWA (present)
David Harris: NCDOT, REU (not-present)
Tony Houser: NCDOT, Roadway (present)
Lonnie Brooks: NCDOT, Structures (present)
Derrick Weaver: NCDOT, PDEA (not-present)
Rachelle Beauregard: NCDOT, NEU (not-present)
Keith Raulston: NCDOT, Division 9 (present)
Participants:
Andrew Nottingham, NCDOT Hydraulics
Will Hines, Sungate Design Group
David Wainwright: NCDWQ
Troy Wilson, USFWS
Kent Boyer, NCDOT Division 9
Gene Noderino, NCDOT NEU
Missy Dickens, NCDOT PDEA
Vasim Barodawala, NCDOT Roadway
John Braxton, NCDOT Roadway
Lee Moore, NCDOT Roadway
Roy Girolami, NCDOT Structures
John Arms, NCDOT Hydraulics
Greg Price, NCDOT NEU
Minutes:
General Introduction was initiated by Andrew Nottingham. Introductions were made by
all in attendance.
General Comments:
The Hydraulics Engineer stated that where it was practicable, guardrail and shoulder
berm gutter were eliminated and 4:1 fill slopes were used.
The Hydraulics Engineer stated that proposed cross-pipes located on Jurisdictional
Streams (JS) would be increased by one pipe size and buried 20% (except in locations
where Agencies requested that a Drop Box be used).
The Hydraulics Engineer stated that in locations where the storm drainage outlet pipe was
a 15 or 18 inch pipe, a Preformed Scour Hole would be used where practicable.
Sheet 4:
No Impact from U-2579B. Begin Construction starts on Sheet 5.
Sheet 5:
JS (unnamed tributary to Lowery Mill Creek) located on Sheet 5 and 20: The Hydraulics
Engineer stated that the proposed double barrel box culvert will have a sill in one barrel.
The Agencies requested that baffles also be placed in the box culvert.
Wetland located near Begin Construction: The Hydraulics Engineer stated that an Energy
Dissipater would be used at this location.
JS located near Station 495+00: The Hydraulics Engineer stated that the three storm
drainage systems taken to this outlet would connect to each other using a Junction Box
and that there would only be one outlet pipe.
Sheet 6:
JS located near Station 502+00: Use a Drop Box at the outlet of the cross-pipe in order to
dissipate as much energy as possible prior to stormwater re-entering the natural stream
channel. Due to the steepness of the proposed cross-pipe, this is preferable to using an in
stream riprap dissipater. In cases where a Drop Box is used, no need to bury inlet of pipe.
JS located near Station 506+00: Use a Drop Box at the outlet of the cross-pipe.
JS located near Station 509+00: No comment.
Sheet 7:
JS located near Station 523+00: No comment.
Sheet 8:
Wetland located near Station 527+00: The Hydraulics Engineer stated that the inlet invert
of the proposed cross-pipe would be placed at the same elevation as the water surface
elevation in the wetland.
Pond: There was some discussion about whether or not the pond would be kept and if this
area could be used for mitigation. At this time, NCDOT does not know because
negotiations with the current property owners have not taken place.
Sheet 9:
No impact.
Sheet 10:
Martin Mill Creek and Tributary to Martin Mill Creek: After a lengthy discussion where
the pros and cons for several alternatives were discussed, based on a general consensus, it
was decided that a minimum length bridge (about 225 feet) will span Martin Mill Creek
and that a box culvert would convey the Tributary to Martin Mill Creek. The Hydraulics
Engineer stated that a sill would be placed in one of the barrels of the box culvert. The
Agencies requested that baffles be placed in the box culvert.
Sheet 11
JS located parallel to the roadway (Sheet 10 and 11): The Hydraulics Engineer stated that
the stream would be piped along the toe of fill due to the large amount of excavation that
would be required for an open channel. It was also stated that there would be a short
channel change at the inlet in order to protect the proposed roadway embankment. Use a
Drop Box at the outlet of the proposed pipe.
JS located near Station 572+00 (Sheet 11 and 12): The JS is completely impacted by the
proposed roadway. The Hydraulics Engineer stated that a lateral ditch would be used to
take the stormwater along the toe of fill to a point where the length of the proposed cross-
pipe can be significantly reduced. The Agencies suggested that the proposed cross-pipe
tie directly into the proposed pipe that is carrying the JS located parallel to the roadway.
Sheet 12:
JS located near Station 575+00: No comment.
Sheet 13:
No impact.
Sheet 14:
No impact.
Sheet 15:
JS located near Station 616+00 (Kerners Mill Creek): The Hydraulics Engineer stated
that a triple barrel box culvert is proposed at this crossing. The Agencies requested that
baffles be placed in the box culvert and that a sill be placed in one of the barrels. There
was some discussion about using a bottomless culvert or a wider box culvert that could
match the width of the natural channel. NCDOT Hydraulics stated that in order to use a
bottomless culvert, there would have to be bedrock located fairly close to the surface.
Bedrock had been observed in the upper portion of the stream, but was not clearly evident
in the lower portion. NCDOT will investigate if a bottomless culvert can be used.
NCDOT Structures stated that using a wider box culvert would not be practicable due to
the thickness of the top slap required.
The Hydraulics Engineer stated that a majority of the storm drainage from the roadway
would be taken to an area located near Station 619+00 Left where the proposed cross-
pipe would act as an outlet control device and provide as much detention as practicable.
JS located near Station 629+00 (Smith Creek): The Hydraulics Engineer stated that
bridges would be used to span the stream.
Sheet 16:
JS and Pond located parallel to the roadway near Station 635+00: The JS and Pond are
completely impacted by the proposed roadway. It was brought to our attention that there
are wetlands associated with this JS that are not currently shown on the plans.
The Hydraulics Engineer stated that the areas inside of the Loops and between the Ramps
would be designed and used as a Detention Basin as much as practicable.
At this point, the allotted time for the 4B Meeting ran out and it was stated that the 4B
Meeting would have to be continued in 2 months.
Meeting adjourned.
Draft Minutes from the Interagency 4B Hydraulic Design Review Meeting
U-2579B Winston-Salem Northern Beltway (Eastern Section) from I-40 Bus/US 421
to US 158 in Forsyth County
A Hydraulic Design Review Meeting was held on Wednesday, March 12, 2008, in
the Hydraulics Design Conference Room at the NCDOT Century Center Complex
from 9:30 am – 11:00 am. This meeting was a continuation of the meeting held on
January 23, 2008.
Team Members:
John Thomas: USACE (present)
Marella Buncick: USFWS (present)
Marla Chambers: NCWRC (not-present)
Amy Euliss: NCDWQ (not-present)
David Wainwright: NCDWQ (present)
Chris Militscher: EPA (present)
Kathy Matthews: EPA (present)
Donnie Brew: FHWA (not-present)
David Harris: NCDOT, REU (not-present)
Tony Houser: NCDOT, Roadway (present)
Lonnie Brooks: NCDOT, Structures (not present)
Derrick Weaver: NCDOT, PDEA (not-present)
Rachelle Beauregard: NCDOT, NEU (present)
Keith Raulston: NCDOT, Division 9 (present)
Participants:
Andrew Nottingham, NCDOT Hydraulics
Will Hines, Sungate Design Group
Greg Price: NEU
Felix Davila, FHWA
Kent Boyer, NCDOT Division 9
Gene Noderino, NCDOT NEU
Missy Dickens, NCDOT PDEA
Vasim Barodawala, NCDOT Roadway
John Braxton, NCDOT Roadway
Roy Girolami, NCDOT Structures
Paul Ervin, NCDOT Structures
Minutes:
Chris Militscher (EPA) noted that Marla Chambers (NCWRC) could not make the
meeting but had provided comments to him to present at the meeting.
Sheet 16:
The Hydraulics Engineer stated that the areas inside of the Loops and between the Ramps
would be designed and used as a Detention Basin as much as practicable and that the
ultimate outlet will be taken directly to Smith Creek by way of a 4 foot base channel with
riprap.
Sheet 17:
An additional wetland will be delineated near Station 662+50.
JS located at Station 667+00 (Fishers Branch): The Hydraulics Engineer stated that the
box culvert would be a triple barrel due to FEMA requirements and that two of the
barrels would have a sill.
Sheet 18:
JS located at Station 667+00 (Fishers Branch): The Hydraulics Engineer stated that the
storm drainage system will be taken directly to Fishers Branch by way of a 4 foot base
channel with riprap, with the exception of the stormwater from the shoulder berm gutter,
which will be taken to a Preformed Scour Hole.
Sheet 19:
JS located at Station 688+50: The upstream pond will be completely drained and the
downstream pond will be temporarily drained to an elevation below construction. The
Agencies asked if there could be a Stream Restoration in the drained upstream pond.
NCDOT will investigate.
Stormwater from the shoulder berm gutter will be taken to a Preformed Scour Hole.
Sheet 20:
JS (unnamed tributary to Lowery Mill Creek) located on Sheet 5 and 20: The Hydraulics
Engineer stated that the proposed double barrel box culvert will have a sill in one barrel.
The Agencies requested that baffles also be placed in the box culvert.
Sheet 21:
The Project ends before US 158 crosses Lowery Mill Creek. The Hydraulics Engineer
described the proposed storm drainage systems and stated that existing drainage patterns
and outfalls were basically being kept the same with the exception of the existing storm
drainage outlet located immediately downstream of the US 158 crossing, which will be
relocated immediately upstream of the US 158 crossing.
Sheet 22:
No impact.
Sheet 23:
No impact.
Sheet 24:
No impact.
Sheet 25:
No impact.
Sheet 26:
Smith Creek: The Hydraulics Engineer stated that a combination of retaining walls and
1.5:1 fill slopes with riprap were being proposed in order to avoid permanent impact and
relocation of Smith Creek that would also impact the adjacent ponds. The Agencies
expressed some concern that the water quality of Smith Creek would be temporarily
impacted during construction of the retaining walls. NCDOT stated that the retaining
walls, type unknown at this time, would have less of an impact, both during construction
and permanently, than the alternative of using 1.5:1 slopes along the entire length.
The Agencies expressed some concern that the existing box culvert under Business I-40
is undersized due to evidence of a large scour hole located at the outlet. NCDOT stated
that based on the hydraulic calculations, the box culvert was not undersized.
Sheet 27:
Smith Creek: The Hydraulics Engineer stated that 1.5:1 fill slopes with riprap were being
proposed in order to avoid permanent impact and relocation of Smith Creek that would
also impact the adjacent ponds.
An additional Jurisdictional Stream will be delineated upstream of Station 65+00 -Y4-.
Sheet 28:
JS located at Station 107+50 -Y4- (downstream): The Hydraulics Engineer stated that
three cross-pipes (two under Business I-40 and one under Ramp B) will be connected
using a Junction Box just downstream of Ramp B and that there would be only one outlet
pipe. The Junction Box will serve as a Drop Box.
An additional Jurisdictional Stream will be delineated upstream of Station 104+50 -Y4-
(outlet of pond).
An additional Jurisdictional Stream will be delineated downstream of the existing 18”
cross-pipe located at Station 109+50 -Y4-.
Sheet 29:
No impact.
Sheet 30:
It was stated that the stream located south of Business I-40 and running parallel to the
roadway embankment was Jurisdictional. The Hydraulics Engineer stated that the fill
slope in this area has been steepened to 1.5:1 with riprap in order to avoid any impact.
The Hydraulics Engineer stated that existing drainage patterns are being maintained.
The Project ends before Business I-40 crosses Salem Creek.
Sheet 31:
The Hydraulics Engineer stated that an Energy Dissipater will be used at the end of the
proposed storm drainage system, which is located about 200 feet from Salem Creek.
The Project ends before SR 2667 crosses Salem Creek.
Meeting adjourned.
Minutes from the Interagency 4C Permit Drawing Review Meeting
U-2579B in Forsyth County (1st Half)
July 17, 2013
1:00 PM – 2:30 PM
Team Members:
John Thomas, USACE (present)
Marella Buncick, USFWS (present)
Marla Chambers, NCWRC (present)
Amy Euliss, NCDWQ (present)
Chris Militscher, EPA (phone)
Felix Davila, FHWA (present)
Minutes:
General Introduction was initiated. Introductions were made by all in attendance.
Sheet 05-1:
Delineate impacts to JS upstream of 42-inch cross-pipe.
Sheet 05-2:
(General Comment): Breakout stream bank stabilization. Show length of stabilization in
Summary.
Breakout perennial and intermittent. Break line is at 2GI between -L- and Ramp.
Sheet 05-3:
(General Comment): Show floodplain benches for box culvert. Include Detail on Plans.
Sheet 6:
Station 508+00 -L-: Label Tributary as Site 5A.
Participants:
Stephen Morgan, Hydraulics
Will Hines, Sungate Design Group
Brad Smith, Sungate Design Group
Doumit Ishak, Construction Management
Lee Moore, Roadway Design
Tony Houser, Roadway Design
Mark Staley, REU
Charles Hunt, Structures
Steve McKee, Utilities
Jamshid Hafshejani, Utilities
Rachelle Beauregard, NES
Greg Price, NES
Elizabeth Lusk, NES
Byron Moore, NES
Keith Raulston, Division 9
Station 504+00 rt. Do not show as Bank Stabilization since excavating.
Sheet 7:
No Comments.
Sheet 8:
No Comments.
Sheet 10:
Station 557+00 -L- Right: Investigate whether stream bank stabilization is needed at the
intersection of the tail ditch and stream or if a wider grass lined tail ditch is needed?
Site 9: Any Utility Impacts? NCDOT Utilities to provide information.
Site 10: The question was if a Plunge Pool was needed at the 60-inch outlet. This was
discussed at the 4B Meeting and it was decided that the drainage structure upstream of
the outlet would be a drop box. The drop box has been designed with a 2.3-foot drop and
the 60-inch outlet pipe has a 0.5% slope.
Sheet 11:
Label tributary coming from the east as Site 10A.
Label begin J.S.
Small wetland impact not shown near 571+50
Sheet 15-1:
Site 11 (JS located along ROW Station 618+00 -L- Right): Relocate JS and tie to Kerners
Mill Creek. Show impact to JS. Does this JS need a separate Site number? This needs a
separate site number.
Tie 48-inch cross-pipe to box culvert instead of wingwall. According to Structures this
would be acceptable. The sill and floodplain bench would need to be switched to the
other side of the box culvert.
At this point, the allotted time for the 4C Meeting ran out and it was stated that the 4C
Meeting would have to be continued next month (August).
Meeting adjourned.
Minutes from the Interagency 4C Permit Drawing Review Meeting
U-2579B in Forsyth County (2nd Half)
August 22, 2013
1:00 PM – 2:30 PM
Team Members:
John Thomas, USACE (present)
Marella Buncick, USFWS (present)
Marla Chambers, NCWRC (present)
Amy Euliss, NCDWQ (present)
Chris Militscher, EPA (phone)
Felix Davila, FHWA (present)
Minutes:
General Introduction was initiated. Introductions were made by all in attendance.
Sheet 15-1:
Site 12: Contain channel change within PDE.
Sheet 15-2:
Site 14: Show impacts to JS between riprap embankment and Smith Creek.
Participants:
Stephen Morgan, Hydraulics
Will Hines, Sungate Design Group
Josh Clemmons, Sungate Design Group
Doumit Ishak, Construction Management
Lee Moore, Roadway Design
Tony Houser, Roadway Design
Mark Staley, REU
Charles Hunt, Structures
Steve McKee, Utilities
Jamshid Hafshejani, Utilities
Rachelle Beauregard, NES
Greg Price, NES
Elizabeth Lusk, NES
Byron Moore, NES
Brett Feulner, NES
Ahmad Al-Sharawneh
Keith Raulston, Division 9
Diane Hampton, Division 9
Greg Errett, City of Winston-Salem
Sheet 16:
No Comments.
Sheet 17:
Site 18: Show Floodplain Bench.
Site 19: Utilities has a concern with placing the new sanitary sewer line in the wetland.
Therefore, Utilities asked if the proposed 3 @ 60” cross-pipes could be moved closer to
the box culvert. The Hydraulics Engineer will investigate.
Sheet 18:
Station 668+50 -L- Rt: The agencies asked if the PSH was needed. They suggested that
a riprap pad rip rap base ditch be used instead of the PSH.
Sheet 19:
Site 20: There were some questions about why a bridge was not required or if the project
could end just before the crossing and place the crossing on the next section of the project
which has not been scheduled for construction. Roadway Design said that they would
look into possibly adjusting the end of project and noted the R/W limits will change to
not show a take on the Booth property.
Sheet 20:
Site 21: Fill in wetland will be a total take.
Sheet 25:
No Comments.
Sheet 26:
Site 23: Need to tie the JS tributary to the lateral ditch. Impacts to the JS tributary need
to be shown and labeled as Site 23A.
USFWS asked if a sill and floodplain bench can be proposed for the box culvert. The
Hydraulic Engineer’s response was that this location is in a FEMA Detailed Study and
the existing box culvert did not have a sill. Therefore, the hydraulic requirements for
obtaining a CLOMR from FEMA may not allow for proposing a sill.
Station 54+50 -Y4- Rt: Label as Site 25. On Smith Creek, call for streambank
stabilization. For the JS tributary, place riprap on banks only. The Permit Drawing for
this area needs to be blown up in order for the impacts to be seen clearly.
Label Smith Creek.
Sheet 27:
Site 24 Outlet: Use streambank stabilization and label as Site 24B.
Sheet 27-1:
Site 24: Change to Site 24 and 24A. Show impacts to JS.
Site 27-2:
Site 25: Riprap banks only.
Sheet 28:
Missing legend for Wetland Impact.
Site 28-1:
Site 26: JS impact should be Site 27A.
Site 27: Site should be labeled Site 27A, 27B and 27C.
Missing legend for Wetland Impact.
Site 30:
Site 28: Pull back pipe outlet and riprap. Eliminate Site 28.
Summary Sheets:
Subtotal each sheet.
Meeting adjourned.
Mitigation Plan
Winston Salem Northern Beltway
Forsyth County, North Carolina
T.I.P. Number U-2579B
WBS No. 34839.1.1
August 22, 2013
1.0 BASELINE INFORMATION
Transportation Improvement Project (TIP) U-2579B involves the construction of a new section of
highway known as the Winston Salem Northern Beltway in Forsyth County. The proposed
construction of U-2579B involves unavoidable impacts to jurisdictional resources within USGS
hydrologic unit 03040101 of the Upper Pee Dee River Basin. NCDOT proposes to offset a portion of
these impacts with on-site mitigation.
TIP U-2579B is located in the Central Piedmont Ecoregion. The topography in the project study area is
generally characterized as rolling hills with moderately steep slopes along the drainage ways.
Elevations in the study area range from 850 to 900 feet above mean sea level (USGS 1971). The project
study area and surrounding area consists of low density rural, residential, commercial, agricultural, and
forested areas.
The mitigation site selection and mitigation work plan sections of this plan will refer to the
identification labels given the affected jurisdictional resources in the associated permit drawings.
2.0 OBJECTIVES
The goal of the proposed onsite mitigation is to offset and mitigate for a portion of the impacts from the
construction of U-2579B by restoring the natural flow regime to the stream channel through the
removal of the dam and establishment of riparian buffer areas. This mitigation will result in a total of
450 linear feet of stream restoration.
3.0 SITE SELECTION
The proposed mitigation site is located within the proposed right-of-way for U-2579B. The site was
evaluated both internally as well as discussed and reviewed with regulatory personnel during
concurrence meetings and a field visit on August 1, 2013 with Amy Euliss of DWQ and Marella
Buncick of the USFWS. The existing site conditions are described in this section.
U-2579B Mitigation Site 1-UT to Fisher Branch (ONE ID #034-004)
This site is located on plan sheet 19 from approximately Station 687+80 to 691+56 and coincides with
Permit Drawing Site 20. An USACE Stream Quality Assessment Worksheet was not completed for
this site because the site is currently a pond. UT to Fishers Branch has a NCDWQ Best usage
classification of WS-III. The proposed work to UT to Fishers Branch includes the removal of the
concrete dam on the UT to Fishers Branch. UT to Fisher Branch is a jurisdictional perennial stream
where it enters NCDOT Right of Way. After the stream enters NCDOT Right of Way it becomes a
pond that has been created by the construction of a concrete dam that is over 50 years old. The dam will
be covered by roadway fill and therefore will be removed. The majority of the pond has an intact
wooded buffer with some incidental clearing near the dam for access to the pond and dam.
1
4.0 MITIGATION WORK PLAN
The mitigation site will be constructed along with the construction of its associated section of the
roadway project. Following the successful completion of the pond draining and stabilization, the site
will be replanted with appropriate native tree species. The stream restoration areas will be stabilized
by planting a mix of live stakes on three foot centers and matting with coir fiber on the banks as
necessary. Reforestation plans are attached and can be found in Appendix A.
Native seed and mulch will be applied on all disturbed areas within the mitigation sites for stabilization
purposes according to guidance and standard procedures of NCDOT’s Roadside Environmental Unit.
An as-built report will be submitted within 60 days of completion of the project.
The Natural Environment Section shall be contacted to provide construction assistance to ensure that
each mitigation area is constructed appropriately.
U-2579B- Mitigation Site 1
The pond associated with this mitigation area, will be drained as part of the construction of U-2579B.
The stream mitigation will be conducted within the drained pond. The Contractor will develop a Pond
Drainage Plan for this pond and submit the plan to the Engineer at the preconstruction conference for
approval. The Pond Drainage Plan shall include but not be limited to procedures and rate of water
drawdown, sediment control measures, water quality monitoring, fish and wildlife relocation plan,
shall address procedures avoiding the inundation of a receiving body of water with deoxygenated or
nutrient rich water resulting in impacts to aquatic life or algae bloom and procedures for maintaining
downstream channel stability
After the pond is drained, a natural flow regime will be restored. An evaluation of the stream channel
will be conducted following dam removal. If any stabilization is needed on the channel it will be
conducted at that time. Reforestation of the stream buffer will be conducted following any required
channel work. Based on preliminary measurements, NCDOT will restore 450 ft. of the stream system
within this drained pond area.
5.0 PERFORMANCE STANDARDS
An As-built will be submitted within 60 days of completion of the project. The As-built will document
changes in the dimension, pattern, profile, vegetation plantings, and structures of the constructed
channels.
Success for vegetation monitoring within the riparian buffer areas are based on the survival of at least
260 stems of five year old trees at year five. Assessment of channel stability will be based on the
survival of riparian vegetation and lack of significant bank erosion, channel widening or down-cutting.
6.0 MONITORING REQUIREMENTS
All of the mitigation sites will be monitored according to the April 2003 Stream Mitigation Guidelines.
The following components of Level 1 monitoring will be performed each year of the 5-year monitoring
period: reference photos, plant survival (i.e., identify specific problem areas (missing, stressed,
damaged or dead plantings), estimated causes and proposed/required remedial action); visual
inspection of channel stability. Physical measurements of channel stability/morphology will not be
performed. A monitoring report will be submitted within 60 days after completing the monitoring.
2
7.0 DETERMINATION OF CREDITS
NCDOT proposes to supplement mitigation provided by EEP with 450 feet of onsite stream mitigation.
NCDOT proposes a 1:1 mitigation ratio for a total of 450 feet of stream credits.
An as-built report will be submitted within 60 days of completion of the each mitigation site to verify
actual mitigation areas constructed and planted. The success of the mitigation areas and
determination of final credits will be based upon successful completion and closeout of the monitoring
period.
7.1 CREDIT RELEASE SCHEDULE
NCDOT proposes immediate, full release of the proposed mitigation to offset the unavoidable impacts
associated with U-2579B.
8.0 GEOGRAPHIC SERVICE AREA
The proposed Geographic Service Area (GSA) for the mitigation sites is composed of the 8-digit
Hydrologic Cataloging Unit (HUC) 03040101.
9.0 SITE PROTECTION INSTRUMENT
The mitigation area is within the NCDOT Right-of-Way for the project. It will be managed to prohibit
all use inconsistent with the use as a mitigation property, including any activity that would materially
alter the biological integrity or functional and educational value of the site, consistent with the
mitigation plan.
The site will be placed on the Natural Environment Section’s (NES) Mitigation GeoDatabase. This
database is provided to all NCDOT personnel as a record of mitigation sites and their attributes,
including prohibited activities. NCDOT is held by virtue of the permit associated with these mitigation
sites and the associated roadway impacts to protect the sites in perpetuity.
10.0 MAINTENANCE PLAN
The mitigation sites will be held by NCDOT and placed on the NES Mitigation GeoDatabase. Once
monitoring is completed and the sites are closed out, they will be placed in the NCDOT Stewardship
Program for long term maintenance and protection.
If an appropriate third party recipient is identified in the future, then the transfer of the property will
include a conservation easement or other measure to protect the natural features and mitigation value
of the site in perpetuity.
11.0 LONG TERM ADAPTIVE MANAGEMENT PLAN
The sites will be managed by NCDOT according to the mitigation plan. Encroachments into the areas
will be investigated and appropriate measures taken to minimize any negative effects. In the event that
unforeseen issues arise that affect the management of the site, any remediation will be addressed by
NCDOT in coordination with the Interagency Review Team.
12.0 FINANCIAL ASSURANCES
NCDOT is held by permit conditions associated with U-2579B to construct, monitor, and steward the
mitigation sites. NCDOT has established funds for each project and within each Division to monitor
mitigation sites and protect them in perpetuity.
3
WETLAND AND SURFACE WATER IMPACTS PERMIT
SITE 1
SITE 2
SITE 3
SITE 4
SITE 5
SITE 6
SITE 7
SITE 8
SITE 9
SITE 10
SITE 11
SITE 12
SITE 13
SITE 14
SITE 15
SITE 16
SITE 17
SITE 18 SITE 19
SITE 20
SITE 21
SITE 22
SITE 23
SITE 24
SITE 25
SITE 26
SITE 27
SITE 29
SHEET 1 OF 64
PERMIT DRAWING
SITE 31
SITE 28
SITE 30
25
DHV
D
T
V
=
=
=
=
=
=
60
18
%
%
MPH
ADT
ADT 2030
% *
0
0
0
PROFILE (HORIZONTAL)
34839.2.10
34839.2.5
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
P.E.
SIGNATURE:
SIGNATURE:
DIVISION OF HIGHWAYS
2006 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
See Sheet 1-A For Index of Sheets
9
/
19
/
2
0
1
3
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
p
s
h
_
s
i
t
e
j
h
a
r
v
e
y
1000 Birch Ridge Dr., Raleigh NC, 27610
C
O
N
T
R
A
C
T
:
STATE HIGHWAY DESIGN ENGINEER
D
E
P
A
R
T
MEN
T
O
F TRA N S PORTA
T
I
O
N
S
T
A TEOFNORT
H
C AR
O
LI
N
A
FORSYTH COUNTY
T
I
P
P
R
O
J
E
C
T
:
U
-
2
5
7
9
B
U-2579B
10
70
LEE ANN MOORE
VICINITY MAP
NorfolkSouthern
%
%
(
66
(
66
.1
5
POTSta. 160+23.40
BEG. PROJ.
U-2579B
END. PROJ.
U-2579B
50 50 100
50 25 50 100
10 20 10 5
-
Y
2
-
-
Y
1
-
-
Y
2
A
-
-
Y3
-
-Y
4 -
SMITH CREEK
-L- STA 692+32.98
-Y 5-
TONY HOUSER, PE
TOTAL LENGTH OF PROJECT U-2579B = 4.06 Miles.
* TTST 12 %DUAL 6 %
See Sheet 1-B For Conventional Symbol
U
S
1
5
8
W
AL
KE
RT
O
W
N
M
O
R
RIS
R
D.
U
S -4 21 / I-40 BU
S .
TO
G
R EE
N
S B O
R O
W
ILL
IS
T
O
N
R
D
.
OLD BELEW S CREEK RDREIDSVILLE RDOLD BELEW S CREEK RD
RICKARD
RD
.
LA
MO
ND DR.WRANGLER
DR
.
O
L
D
H
O
L
L
O
W
R
D.
H
O
P
K
I
N
S
R
D
BLUFF SCHOOL RD
E
L
L
I
O
T
D
R
D
O
E
R
U
N
D
R
.
LI
N
VI
L
L
E
R
D
KERNERSVILLE RD
SCHOOL RDOLD VALLEY
RAILROAD
W EST MOUNTAIN ST
OF WALKERTOWN AND KERNERSVILLE
A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES
C
I
T
Y
LIM
IT
CITY
LIM
IT
C
IT
Y
CITY
L
IM
IT
KE
R
N
E
R
S
VILL
E
KERNERSVILLE
C
IT
Y
L
I
M
I
T
L
IM
IT
K E R N E R SV ILL E
K
E
R
N
E
R
S
V
IL
L
E
C
IT
Y
KERNERSVILLECIT
Y
LIMIT
WA
LK
ER
TO
WN
C
IT
Y
LI
MI
T
WALKERTOWN
W
A
LKE
R
T
O
W
N
CITY
LIMIT
CITY LIM
IT
KERNERSVILLE
L
I
M
I
T
K
E
R
N
E
R
S
VI
L
L
E
CI
T
Y
K
ER
N
ER
SV
ILL
E
C
ITY
LIM IT
W A
LKER
TO
W N
C
ITY
LIMIT
W A
LKE
R
T
O
W N
LI
MI
T
KERNERSVILLE
CITYLIMIT
CI
T
Y
LI
MI
T
KERN
ERS
VI
LLE
A
B
C
D
SA
LE
M
TO
W IN
S TO
N
-L- STA 478+00.00
C
ITY
LIMIT
A
D
CI
T
Y
LI
MI
T
K
E
R
N
E
RS
VI
L
L
E
-Y5- STA. 26+62.28
BEGIN BRIDGE
-Y5- STA. 30+97.13
END BRIDGE
34839.1.1 N/A PE
R
O
A
D
G
U
T
H
RIE
C
ITY
LIM
IT
K
ERN
ERS
VILL
E
R
A
ILRO
A
D
S
O
U
TH
E
R
N
N
O
R
F
O
LK
R
O
A
D
MO
U
N
TA
IN
WE
ST
-
Y3
-
-Y
2A
-
HASTIN
GS HILL RD
SR 2687
H
A
S
TI
N
G
S
HI
L
L
R
D
S
R 26
8
7
PISGAH CHURCH RD
SR 2410
WEST MOUNTAIN RD
SR 2377
M
O
R
RI
S
R
O
A
D
S
R
2
4
0
7
GU
T H R IE R D .
W
A L K E R T O W
N
SR 2385
-L- STA. 641+70.82
BEGIN BRIDGE
-Y2- STA. 18+99.25
BEGIN BRIDGE
-Y2- STA. 21+41.18
END BRIDGE
-Y4CD- STA. 45+76.53
BEGIN BRIDGE
-Y1- STA. 32+93.77
BEGIN BRIDGE
-Y1- STA. 35+26.34
END BRIDGE
C
R
E
E
K
M
A
R
T
I
N
M
I
L
L
C
R
E
E
K
MI
L
L
C
R
EEK
RD
.
BELE
W
S
R
O
A
D
C
H
U
RC
H
PISG
A
H
HASTINGS
HILL RD
31
16
2
3
24
25
174
52
0
2
1
6
72
2
8
9
10 11
12
13
14
15
1
9
18
29
30
28
27
26
2010 53,560
79,880
-Y7-
-Y5A-
-Y5A- POT Sta. 45+00.00 LA
-Y5- POT Sta. 45+00.00 LB =
IDENTITY
%
INTERSTATE
40
BUS
421
158
158
US
US
US
WINSTON SALEM NORTHERN BELTWAY (EASTERN SECTION)
(FUTURE I-74) FROM US 158 TO I-40 BUS/US 421
WIDENING, GRADING, PAVING, DRAINAGE, SIGNING, SIGNALS,
CULVERTS AND STRUCTURES.
TO US 311
BEG. PROJ. U-2579B
R
O
A
D
K
E
R
N
E
R
S
VI
L
L
E
T
O
END PROJ. U-2579B
ENGINEER
HYDRAULICS
ENGINEER
DESIGN
ROADWAY
WINSTON-SALEM
NO
RTH
ERN
B
EL
T
W
AY
-L-
(FUTURE I-74)
WALKERTOWN
C
IT
Y
LIM
IT
WALKERTOWN CITY
L IM IT
-Y2- OFF-SITE DETOUR ROUTE
G
ER R
Y
D
R
.
-Y
6 -
CREEKMARTIN MILL
CREEKMARTIN MILL
-L- STA. 555+73.00
BEGIN BRIDGE
-L- STA. 557+98.01
END BRIDGE
-Y4RPA- STA. 15+19.24
BEGIN BRIDGE
-Y4RPA- STA. 19+00.50
END BRIDGE
-Y4CD- STA. 31+63.73
BEGIN BRIDGE
-Y4CD- STA. 34+68.98
END BRIDGE
-L- STA. 627+13.78
BEGIN BRIDGE
-L- STA. 630+18.74
END BRIDGE
-Y4RPBD- STA. 25+40.00
BEGIN BRIDGE
-Y4RPBD- STA. 27+80.00
END BRIDGE
-Y4CD- STA. 47+88.32
END BRIDGE
-L- STA. 643+82.64
END BRIDGE
FUNC CLASS=INTERSTATE
FSTR HPPNHF-0918(46)
R\W UTIL
R\W
-Y5A- STA. 69+53.11
END BRIDGE
-Y4RPBD- STA. 43+04.00
BEGIN BRIDGE
-Y5- STA. 24+06.99
END BRIDGE
-Y5- STA. 22+95.35
BEGIN BRIDGE
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III
STA. 54+72.30
-Y4RPBD-
END BRIDGE
STA. 51+70.14
-Y4RPBD-
BRIDGE
BEGIN
-Y4RPBD- STA. 45+17.13
END BRIDGE
OCTOBER 21, 2014
F
A
R
M
R
D
B
IG
M
IL
L
-Y5A- STA. 66+78.58
BEGIN BRIDGE
-L- STA. 582+85.67
BEGIN BRIDGE
-L- STA. 585+60.73
END BRIDGE
LENGTH OF STRUCTURE PROJECT U-2579B = 0.19 Miles.
LENGTH OF ROADWAY PROJECT U-2579B = 3.86 Miles.
JUNE 19, 2012
W.E. 843.3
POOL
FISH HATCHERY
W. E. 847.2
POND
FISH HATCHERY
W. E. 843.4
POND
FISH HATCHERY
W. E. 859.7
POND
W. E. 855.7
POND W. E. 855.6
POND
W. E. 853.1
POND
W. E. 854.5
POND
W. E. 855.7
POND
POND W.E. 8420
W.E. 839.1HATCHERY
W. E. 852.8POND
POND
W. E. 852.7
PONDW.E. 832.9
PONDW.E. 843.0
PONDW.E. 843.4
SR 2405 OLD BELEWS CREEK RD 6.2 m BST
SHEET 2 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
S S
S
S
S
S
S
WETLAND
DENOTES FILL INFF
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
E E IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 1
SITE 2
SITE 3
S
S S S
S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
5
j
h
a
r
v
e
y
8
/
1
7
/
9
9
5U-2579B
M
A
TC
H
LIN
E
-
L
-
S
TA
.
5
0
0
+
8
3
S
H
E
E
T
6
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
4
7
5
+
0
0
S
H
E
E
T
4
MATCHLINE
-
Y1
-
STA
. 23+65
SHEET
20
MATCHLINE
-
Y1
-
STA
. 44+00
SHEET
21
17,480
55,960
15,520
53,560
26,440
83,480
22,160
79,880
BELTWAY
US 158 (REIDSVILLE ROAD)
0 50’ 50’ 100’ 25’
DUAL = 3%
TTST = 5%
DIR = 60%
DHV = 10%
-Y1-
-L-
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
3,460
6,580
3,400
5,800
3,680
6,240
1,220
1,860
2010 ADT
2030 ADT
TRAFFIC DIAGRAM
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
, 11/
5
/
12
-
P
A
R
C
E
L
N
U
M
B
E
R
3
R
E
M
O
V
E
D
4
7
5
4
8
0
4
8
5
5
0
0
25
4
9
0
4
9
5
2
0
25
3
0
20
2
5
15
2
0
15
2
0
1
5
15
15
30
35
40
US
15
8
B
S
T
US
15
8
2
8
’ B
S
T
25
30
35
40
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
F
F
F
C
C
200’
245’
+30
CHO
RD
CHO
RD
CHORD
CHORD
CHORD
2GI
JB w/MH
2GI
2GI
2GI
2GI
2GI
2GI
CB
2GI
CB
2GI
2GI
CB
CB
2GI
CB
2GI
CB
2GI
BDO
2GI
BDO
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
JB w/Slab Lid
2GI
2GI
2GI
2GI
BDO
2GI
2GI-A 2GI-A 2GI-A
2GI-A
2GI-A
3GI-A
3GI-A
2GI-A
2GI-A
2GI-A
FS
FSFS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
HW
AT END BRIDGE
BEGIN SHOULDER BERM GUTTER
JB w/MH
FS
FS
FS
FS
FS
FS
FS
STA 478+20 TO 480+50 -L- LT
BERM DITCH
STA 23+90 TO 25+20 -Y1RPA- RT
BERM DITCH
AND RETAIN EXISTING 15" RCP
ADJUST SLOPE STAKES
D
Min. D=1.5 Ft.
6:1
Fill
Slope
2:1
W
( Not to Scale)
FALSE CUT
DETAIL #1
N.G.
6:1
D
Min. D = 2 ’
W = 5’ Min.
AND FLAT GRATE
2GI W/ NARROW SLOTS
SLOT
2GI W/ NARROW
DI
W/ ELBOW
18" CSP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
W/ ELBOW
15" CSP
W/ ELBOW
18" CSP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2@7’x6’ RCBC
RIP RAP
CLASS ’I’
2GI-A
COLLAR
SLOT FLAT GRATE
2GI W/ NARROW
SLOT FLAT GRATE
2GI W/ NARROW
COLLAR
SLOT FLAT GRATE
2GI W/ NARROW
REMOVE
SLOT FLAT GRATE
2GI W/ NARROW
2 ELBOWS
15" CSP W/
2GI
2 ELBOWS
15" CSP W/
SLOT FLAT GRATE
2GI W/ NARROW
COLLAR
EXTEND
RETAIN AND REMOVE HW
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 18+30 TO 20+65 -Y1LPA- LT
EST 37 SY FF
EST 15 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
3:14:
1
GROUND
NATURAL
DETAIL #2
SPECIAL BACK OF CURB CUT DITCH
(NOT TO SCALE)
FROM STA 12+00 TO 18+00 -Y1LPD- RT
FROM STA 12+00 TO 16+50 -Y1LPA- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 22+90 TO 24+60 -Y1- RT
FROM STA 478+10 TO 479+00 -L- RT
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM FROM STA. 41+25 TO 41+56 -Y1- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 41+58 TO 42+02 -Y1- LT
FROM STA. 27+62 TO 27+97 -Y1- RT
SEE DETAIL#2
SWALE BEHIND C&G
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#2
SWALE BEHIND C&G
SEE DETAIL #1
FALSE CUT
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 25 CY
SEE DETAIL#8
HEAD DITCH
EST. DDE 9 CY
SEE DETAIL #7
TAIL DITCH
EST. DDE 20 CY
SEE DETAIL #8
TAIL DITCH
STA. 42+50 -Y1- LT
BERM GUTTER
END SHOULDER
EXTEND
RETAIN AND
-Y1- LT
STA. 41+30
BERM GUTTER
BEGIN SHOULDER
GUTTER STA 28+10 -Y1- RT
END SHOULDER BERM
23+90 -Y1RPA- RT
STA 22+75 TO
BERM DITCH
EST 16 SY FF
EST 5 TONS
SEE DETAIL #33
(BANKS ONLY)
CLASS ’B’ RIP RAP
2:1Natural
Ground
Filter Fabric
d
2:
1
( Not to Scale)
Type of Liner= Class B Rip-Rap
DETAIL #33
TAIL DITCH
Natural
Ground
d= 1.5Ft.
SEE DETAIL#
EST 463 SY FF
EST 172 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
42" RCP-III
4
2
"
RC
P
-
III
42" RCP-III 42" RCP-III
2
4
"
RC
P
-
III 18
" RCP-III
2
4
"
RC
P
-
III
15" RCP-IV
42" RCP-III 42" RCP-III 42" RCP-III
1
5
"
R
C
P
-
I
I
I
18
"
RCP
-IV
3
0
" RC
P-
IV
2 4 " RC P -III
24" RCP-IV15" RCP-III
24" RCP-III
24" RCP-III
18" RC
P-III
15"
RCP-III
3
6
"
RC
P
-
III
3
6
"
RC
P
-
III
15" RCP-IV
2
4
"
R
C
P-
III
24" RCP-III
24" RCP-III
15" RC
P-III
15" RCP-IV
15" RCP-III
18" RCP-III
15" R
CP-III
18
" RC
P-III
18
" RC
P-III
15" RCP-IV
15
" RC
P-
IV
15
" RC
P-
IV
30" RCP-V
30" RCP-IV
15" RCP-IV
15
"
RC
P-
IV
42" RCP-III
42
" RCP
-IV
15" RC
P-IV
15
" RC
P-III
18" RCP-III 18" RCP-III
18
"
RC
P
-
III
15
"
RC
P
-
III
18" RC
P-III
2
4"
RCP-III
15
" RC
P-III
3
0
"
RC
P
-
III
15
"
RC
P
-
III
15" RCP-III
3
0
"
RC
P
-
III
3
0
"
R
C
P
-
III
3
0
"
R
C
P-
III
15
"
RC
P
-
IV
15" RCP-III
15" RCP-III
15" RCP-III
15" RCP-III
15" RCP-III
STA 35+76 -Y1- LT
END OF BRIDGE TO
SHOULDER BERM GUTTER
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
EST. FF +/- 106 SY
EST. DDE +/- 125 CY
EST. CLASS I RIPRAP +/- 105 TONS
ENERGY DISSIPATOR BASIN
STA 24+00 -Y1- LT
END SHOULDER BERM GUTTER
BENCH
FLOODPLAIN
INV=844.95
INV=843.66
1
2
"
D
I
C
H
A
N
G
E I
N
M
A
T
E
RI
A
L
A
P
P
R
O
X.
L
O
C
A
TI
O
N
O
F
12"
V
C
12"
DI
S
O
IL
B
SR 2 4 0 5 O LD B E LE W S CR E EK RD 17 ’ B S T
S
10’ C
O
N
C
S
1S BKD
B
B
C
SS
S
S
S
OIL
GATE
M
TL
GATEMTL
S
S
SOI
L
15
" R
C
P
B
G
AT
E
MT
L
4
8
" C
O
NC
2
S
B
KD
1
5
’ B
ST
CON
C
W
WD
DK
BK WALL
G
R
G
R
SOIL
B
B
GR
BLK
WALL
S
OIL
15" R
C
P
3
S
B
W
4
S
B
W
4SBW
4 SB W
4SB
W
4
S
B
W
3SBW
4SB
W
3SBW
60" CMP
18
" C
L
AY
C
O
NC
HW
3
0
" R
C
P
42" RCP
48" CONC
5S
B
W
12
" R
C
P
12
" R
C
P
12
" R
C
P
GR
GR
GR
48" CONC2
S
B
KD
W
60" WW
W/
L
T
MTL
B
SOIL
B
SOI
L
15
" R
C
P
15
" R
C
P
(
A
B
A
N
D
)
17’ CONC
D
I
C
O
N
C
HW
W
CONC
GR
4
S
B
W
2
4
" R
O
C
K
WA
L
L
WD
D
K
1S
B
K
D
3
6
" C
O
N
C
15
" R
C
P
R
UINS
S
OIL
B
T
T
T
12
" DI
12
" DI
12 " D I
30" RCP
INV=867.69
INV=872.30
42" RCP
60" CMP
18" CLAY
15"
R
CP
DAN T. WESTMORELAND
LARRY W. WHICKER
JANE W. WHICKER
E
IP
150
.00’
EXIS
T
ING
R
/
W
E
XIS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
DAN WESTMORELAND
JANE WHICKER &
KAREN WESTMORELAND
DAN WESTMORELAND
KAREN WESTMORELAND
DAN WESTMORELAND
DAN T. WESTMORELAND
DAN T. WESTMORELAND
60.00’
E
X
IS
T
ING
R
/
W
E
X
IS
T
ING
R
/
W
EIP
E
IP
DAN T. WESTMORELAND
DAN T. WESTMORELAND
DAN WESTMORELAND
JANE WHICKER &
DAN WESTMORELAND
JANE WHICKER &
CAROL WESTMORELAND
T
O
WN
O
F
WA
L
KE
R
T
O
WN
TOWN OF WALKERTOWN
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
20’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
SUSAN K. MORETZ
FREDERICO B. MORETZ
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
& REALTY CO.
PEGG DEVELOPMENT
SHEET 3 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
S S
S
S
S
S
S
WETLAND
DENOTES FILL INFF
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
E E IN WETLAND
DENOTES EXCAVATION
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 1
SITE 2
SITE 3
S
S S S
S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
8
5
8
8
5
8
858
8
6
0
8
6
0
8
6
0
8
6
2
862
8
6
4
864
8
6
48
6
6
866
8
6
6
8
6
6
8
6
8
8
6
8
868
8
6
8
8
6
8
8
68 8
7
0
870
870
870
8
7
0
870
8 7 0
870
8
7
0
8
7
0
8
7
0
8
7
0
8
7
0
8
7
0
870
8
7
2
872
8
7
2
872
8
7
2
8
7
2
8
7
2
8
7
2
872
8
7
4
874
8
7
4
8
7
4
8
7
4
8
7
4
8
7
4
8
7
4
874
874
8
7
4
8
7
6
876
8
7
6
8
7
6
876
8
7
6
8
7
6
8
7
6
8
7
6
876
8
7
6
876
8
7
6
876
876
8
7
8
8
7
8
878
8
7
8
8
7
8 878
8
7
8
878
8
7
8
878
8
7
8
878
8
7
8
878
878
87
8
878
8
7
8
878
878
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
880
880
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8 8 0
880 880
8
8
0
8
8
0
880
880
8
8
0
880
8
8
0
8
80
8
8
0
8
8
08808
8
0
8808
8
2
8
8
2
8
8
2
8
8
2
8
8
2
8 8 2
882
8
8
2
8
8
2
8
8
2
8
8
2
8
8
2
882
8
8
2
8
8
2
8
8
2
882
882 882
882
8
8
2
882
8
8
2
882
884
8
8
4
8
8
4
8
8
4
8
8
4
884
8
8
4
884
884
8
8
4
8
8
4
8848
8
4
8
8
4
8
8
4
8
8
4
884
884
8
8
4
884
886
8
8
6
886
8
8
6
8
8
6
8
8
6
886
886
8
8
6
8
8
6
8
8
6
8
8
6
8
8
6
8
8
6
8
8
6
8
8
6
886
8
8
6
8
8
6
886
886
886
8
8
6
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
8
888
8
8
8
888
8
8
8
8
8
8
8
8
8
8
8
8
888
8
8
8
888
8
8
8
888
888
8
8
8
8
8
8888
888
890
8
9
0
890
890
8
9
0
890
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
890 8
9
0
890
890 8
9
0
890890
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
890
8
9
0
8
9
0
890
8
9
0
8
9
0
8
9
0
890
890
8
9
0
890
8
9
0
8
9
0
890890892
8
9
2
892
8 9 2
8
9
2
892
8
9
2
8
9
2
8
9
2
8
9
2
892
8
9
2
892
8
9
2
892
8
9
2
8
9
2
892
892
8
9
2
892
8
9
2
892892
892
892
8
9
2
894
8
9
4
894
8 9 4
8
9
4
8
9
4
8
9
4
8
9
4
894
8
9
4
894
8
9
4
894
894
8
9
4
8
9
4
894
894
8
9
4
894
8
9
4
894
894
8
9
4
894894
894
894
894
896
896
896
896
896
8
9
6
8
9
6
8
9
6
8
9
6
8
9
6
896
896
896
8
9
6
8
9
6
8
9
6
8
9
6
896
896
8
9
6
8
9
6
8
9
6
896
8
9
6
896
896
896
8
9
6
8
9
6
8
9
6
898
898
898
8
9
8
898
898
898
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
8
9
8
898
89
8
898898
898
898
8
9
8
898
8
9
8
8
9
8
898
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900900
9
0
0
9
0
0
9
0
0
9
0
0
900
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
9
0
0
9
0
0
900 9
0
0
900
900
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900
9
0
0
900
9
0
0
900
9
0
0
900
9
0
0
900900
9
0
0
900
9
0
0
900
9
0
0
9
0
0
900900
9009
0
0
9
0
2
9
0
2
902
902
902
902
9 0 2
9
0
2
902
9
0
2
902
9
0
2
9
0
2
902
9
0
2
902
9
0
2
9
0
2
9
0
2
9
0
2
902
9
0
2
902
9
0
2
902
9
0
2
902
902
902
9
0
4
904
904
904
9
0
4
904
9 0 4
9
0
4
9
0
49
0
4
904
9
0
4
904
904
9
0
4
904
9
0
4
9
0
4
9
0
4
9
0
4
904904
9
0
4
904
9
0
4
904
9
0
4
904
906
906
9
0
6
9
06
9
0
6
906
9
0
6
906
906
9
0
6
9
0
6
9
0
6
906
9
0
6
906
906
9
0
6
9
0
6
9
0
6
9
0
6
906
9
0
6
906
906
9
0
6
906
906
906
908
908
9
0
8
908
908
9
0
8
9
0
8
908
9
0
8
9
0
8
9
0
8
9
0
8
908
908
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8908
908
9
0
8
908
9
0
8
908
908
9
0
8
9
0
8
9
10
910
910
9
1
0
9
10
9
1
0
910
9
10
9
10
9109
10
9
10
9
10
910
910
9
1
0
910
9
10
9
10
9
10
9
10
9
10
9
10
910
910
910
9 1 0
910
9
10
9
1
0
9
1
0
9
10
9
10
910
910
9
1
0
9
10
910
910
9
1
0
9
10
910
9
10
9
10
910
910
9
10
9
10
910
910
910
9
10
9
1
0
9
10
910
910
910
9
1
2
912
9
1
2
912
912
912
9
12
9
1
2
9
12
9
12
912
9
12
912
9
1
2
9
12
912
912
9
1
2
912
9
12
912
9
1
2
912
912
9
12
9
12
9
12
9
12
9
1
2
9
12
912
9
1
4
914
914
914
914
914
9
14
9
1
4
9
14
9
1
4
914
9
14
914
9
14
9
14
9
1
4
914
914
914
914
9
14
914
9
1
4
9
14
9
14
914
9
14
914
914
9
1
6
9
1
6
916
916916
916
9
16
916
9
16
916
916
9
16
916 916
9
16
9
1
6
916
9
1
6
916
9
16
916
9
1
6
9
16
9
1
6
916
916
9
1
6
916
918
918
9
1
8
918
9 1 8
9
18918
9 1 8
918
9
18
9
1
8
918
918
9
18
9
1
8
9
18
9
1
8
9
18 918
9
18
9
1
8
9
1
8
9
18
918
9
18
9
1
8
9
18
9
1
8
9
1
8
9
1
8
918
918
918
920
920 9
2
0
920
9
2
0
920
9
2
0
920
920
920
920
920
9
2
0
9
2
0
9
2
0
9 2 0
9
2
0
920
920 920
9
2
0
9
2
0
920
920
920
920
9
2
0
9
2
0
9
2
0
9
2
0
920
9
2
0 9
2
0
920
9
2
0
920
920
9
2
0
920
920
920
9
2
0
920
9
2
0
920
9
2
0
920
9
2
0
920
9
2
0
920
9
2
0
920
9
2
0
920
922
922
9
2
2922
922
922
9
2
2
9
2
2
9
2
2
922
922
9
2
2
922 922
9
2
2
922
9
2
2
922
922
922
922
922
922
922
9
2
2
922
9
2
2
9
2
2
922
922
922
924
924
924
924924
924
9
2
4
924
9
2
4
924
924
9
2
4
9
2
4
9
2
4
9
2
4 9
2
4
924
924
9
2
4
9
2
4
9
2
4
924
924
9
2
4
924
9
2
4
926
926
9
2
6
9
2
6
926
926
9
2
6
9
2
6
926
9
2
6
9
2
6
9
2
6
9
2
6
9
2
6
926
9
2
6
926
9
2
6
926
9
2
6
926
926
9
2
6
9
2
6
9
2
8
9
2
8
928
928
928
928
9
2
8
928
928
9
2
8
928
9
2
8
9
2
8
928
9
2
8
9
2
8
928
9
2
8
9
2
8
928
9
2
8
9
2
8
9
2
8
9
2
8
928
9
3
0
9
3
0
9
3
0
930
930
9
3
0
930
930930
930
930
9
3
0
9
3
0
930
930
930
9
3
0
9
3
0
9
3
0
930
9
3
0
9
3
0
9
3
0 930
930
9
3
0
9
3
0
9
3
0
9
3
0
930
930
9
3
0
930
9
3
0
930
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
930
932
9
3
2
9
3
2
932
932
9
3
2
932
9
3
2
9
3
2
932
9
3
2
932 932
9
3
2
9
3
2
932
9
3
2
9
3
2
9
3
2
9
3
2
9
34
9
3
4
934
934
934
934
934
9
3
4
9
3
4
9
3
4
9
3
4
9
3
4
934
934
9
3
4
934
9
3
4934 9
3
4
9
3
4
934
934
936
936
9
3
6
936
936
9
3
6
936
9
3
6
9
3
6
9
3
6
9
3
6
9
3
6 9
3
6
9
3
6
936
936
936
9
3
6
9
3
6
9
3
6
9
3
69
3
6
9
3
8
93 8
9
3
8
938
938
9
3
8
9
3
8
9
3
8
9
3
8
9
3
8
9
3
8
938
9
3
8
9
3
8
9
3
8
9
3
8
9
3
8
940
94
0
9
4
0
940
940
9
4
0
940
940
94
0
9
4
0
940
9
4
0
9
4
0
940
9
4
0
9
4
0
940
9
4
0
940
940
9
4
0
940
940
9
4
0
9
4
0
9
4
0
940
942
942
9
4
2
942
9
4
2
942
9
4
2
9
4
2
942
942
9
4
2
942
9
4
4
9 4 4
9 4 4
944
9
4
4
94
4
944
944
9
4
4
9
4
4
9
4
4
9
4
6
946
946
9
4
6
9
4
6
9
4
6
948
8
5
0
850
850
85
0
8
5
0
8
5
0
8
5
0
8
6
0
860
8
6
0
8
6
0
860
860
8
6
0
8
6
0
8
6
0
8
6
0
8
6
0
8
6
0
860
860
860
860
8
6
0
860
860
860
860
860
860
870
870
870
870
870
870
870
8
7
0
8
7
0
8
7
0
870
8
7
0
8
7
0
8
7
0
870
870
870
8
7
0
870
870
870
8
7
0
87
0
870
8
7
0
8
7
0
8
7
0
87
0
8
7
0
8
7
0
8
7
0
870
880
880
880
880
8
80
880
8
8
0
8 8 0
880
880
8
8
0
880
880
8
8
0
880
880
880
8
8
0
880
8
8
0
8
8
0
8
8
0
8
8
0
880
8
8
0
8
8
0
880
8
8
0
880
880
880
880
8
8
0
8
8
0
8
8
0
880
8
8
0
8
8
0
8
8
0
8
8
0
880
8
8
0
880
880
8
8
0
8
8
0
880
8
8
0
8
8
0
8
8
0
880
8
8
0
8
8
0
880
880
8
8
0
880
880
89
0
890
890
890
8
9
0
890
890
8
9
0
8
9
0
89
0
890
8
9
0
8
9
0
890
890
8
9
0
890
890
890
8
9
0
8
9
0
890
8
9
0
890
8
9
0
8
9
0
8
9
0
890
890
890
890
8
9
0
8
9
0
890
8
9
0
8
9
0
890
890
89
0
890890
890
890
890
8
9
0
8
9
0
8
9
0
8
9
0
890
890
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
890
890
890
890
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
9
0
0
900
900
900
9
0
0
9
0
0
900
900
9
0
0
9
0
0
900
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
9
0
0
9
0
0
900
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900900
900
9
0
0
900
9
0
0
9
0
0
900
9
0
0
900
900
900
9
0
0
900
9
0
0
900
900
900
9
0
0
9
0
0
900
900
900
9
0
0
9
0
0
9
0
0
9
00
900
9
0
0
900
900
900
9
0
0
9
0
0
9
0
0
900
9
0
0
9
0
0
900
900
900
9
0
0
900
900
900
900
900
900
9
0
0
9
0
0
910
9
10
9
10
9
10
9
10
910
910
9
1
0
9
10
9
10
910
910910
9
10
9
10
9
10
9
10
910
9
10
910
9
10
9
10
9
10
9
10
9
10
9
10
9
10
910
910
9
10
9
10
9
1
0
910
910
910
9
1
0
910
9
10
9
10
910
9
10
9
10
910
9
1
0
910
910
9
10
9
10
9 10
910
910
9
10
9
1
0
9
1
0
9
10
910
910
9
10910
910
9
1
0
9
1
0910
910
9
10
9
1
0
9
10
910
910
910
910
9
1
0
910
910
910
920
920
920
920
920
920
920
9
2
0
920
920
920
920
920
9
20
920
920
9
2
0
9
2
0
9
2
0
920
920
920
920
920
920
9
2
0
920
920
920
920
920
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
92
0
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
920
920
9
2
0
9
2
0
920
920
9
2
0
920
920
9
2
0
9
2
0
920920
9
2
0
920
92
0
9
2
0
9
2
0
920
9
2
0
9
2
0
9
2
0
9
2
0
930
930
9
3
0
9
30
93
0
930
930
930
9
3
0
930930
930
930
930
9
30
9
3
0
9
3
0
930
930 930
9
3
0
9
3
0
930
9
30
9
3
0
9
3
0
9
3
0
9 3 0
9
3
0
9
3
0
9
3
0
9
30
9
3
0
9
3
0
930
930
9
30
930
9
3
0
930
930
9
3
0
9
3
0
9
3
0
930
930
940
940 940
9
4
0
9
4
0
940
9
4
0
9
4
0
940
940
940
9
4
0
940
9
4
0
9
4
0
940
9
4
0
9
4
0
940940
9
4
0
940
9
4
0
9
4
0
940
9
4
0
94
0
9
4
0
9
4
0
940
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
5
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
5U-2579B
M
A
TC
H
LIN
E
-
L
-
S
TA
.
5
0
0
+
8
3
S
H
E
E
T
6
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
4
7
5
+
0
0
S
H
E
E
T
4
MATCHLINE
-
Y1
-
STA
. 23+65
SHEET
20
MATCHLINE
-
Y1
-
STA
. 44+00
SHEET
21
17,480
55,960
15,520
53,560
26,440
83,480
22,160
79,880
BELTWAY
US 158 (REIDSVILLE ROAD)
0 50’ 50’ 100’ 25’
DUAL = 3%
TTST = 5%
DIR = 60%
DHV = 10%
-Y1-
-L-
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
3,460
6,580
3,400
5,800
3,680
6,240
1,220
1,860
2010 ADT
2030 ADT
TRAFFIC DIAGRAM
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
, 11/
5
/
12
-
P
A
R
C
E
L
N
U
M
B
E
R
3
R
E
M
O
V
E
D
4
7
5
4
8
0
4
8
5
5
0
0
25
4
9
0
4
9
5
2
0
25
3
0
20
2
5
15
2
0
15
2
0
1
5
15
15
30
35
40
US
15
8
B
S
T
US
15
8
2
8
’ B
S
T
25
30
35
40
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
F
F
F
C
C
200’
245’
+30
CHO
RD
CHO
RD
CHORD
CHORD
CHORD
2GI
JB w/MH
2GI
2GI
2GI
2GI
2GI
2GI
CB
2GI
CB
2GI
2GI
CB
CB
2GI
CB
2GI
CB
2GI
BDO
2GI
BDO
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
JB w/Slab Lid
2GI
2GI
2GI
2GI
BDO
2GI
2GI-A 2GI-A 2GI-A
2GI-A
2GI-A
3GI-A
3GI-A
2GI-A
2GI-A
2GI-A
FS
FSFS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
HW
AT END BRIDGE
BEGIN SHOULDER BERM GUTTER
JB w/MH
FS
FS
FS
FS
FS
FS
FS
STA 478+20 TO 480+50 -L- LT
BERM DITCH
STA 23+90 TO 25+20 -Y1RPA- RT
BERM DITCH
AND RETAIN EXISTING 15" RCP
ADJUST SLOPE STAKES
D
Min. D=1.5 Ft.
6:1
Fill
Slope
2:1
W
( Not to Scale)
FALSE CUT
DETAIL #1
N.G.
6:1
D
Min. D = 2 ’
W = 5’ Min.
AND FLAT GRATE
2GI W/ NARROW SLOTS
SLOT
2GI W/ NARROW
DI
W/ ELBOW
18" CSP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
W/ ELBOW
15" CSP
W/ ELBOW
18" CSP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2@7’x6’ RCBC
RIP RAP
CLASS ’I’
2GI-A
COLLAR
SLOT FLAT GRATE
2GI W/ NARROW
SLOT FLAT GRATE
2GI W/ NARROW
COLLAR
SLOT FLAT GRATE
2GI W/ NARROW
REMOVE
SLOT FLAT GRATE
2GI W/ NARROW
2 ELBOWS
15" CSP W/
2GI
2 ELBOWS
15" CSP W/
SLOT FLAT GRATE
2GI W/ NARROW
COLLAR
EXTEND
RETAIN AND REMOVE HW
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 18+30 TO 20+65 -Y1LPA- LT
EST 37 SY FF
EST 15 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
3:14:
1
GROUND
NATURAL
DETAIL #2
SPECIAL BACK OF CURB CUT DITCH
(NOT TO SCALE)
FROM STA 12+00 TO 18+00 -Y1LPD- RT
FROM STA 12+00 TO 16+50 -Y1LPA- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 22+90 TO 24+60 -Y1- RT
FROM STA 478+10 TO 479+00 -L- RT
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM FROM STA. 41+25 TO 41+56 -Y1- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 41+58 TO 42+02 -Y1- LT
FROM STA. 27+62 TO 27+97 -Y1- RT
SEE DETAIL#2
SWALE BEHIND C&G
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#2
SWALE BEHIND C&G
SEE DETAIL #1
FALSE CUT
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 25 CY
SEE DETAIL#8
HEAD DITCH
EST. DDE 9 CY
SEE DETAIL #7
TAIL DITCH
EST. DDE 20 CY
SEE DETAIL #8
TAIL DITCH
STA. 42+50 -Y1- LT
BERM GUTTER
END SHOULDER
EXTEND
RETAIN AND
-Y1- LT
STA. 41+30
BERM GUTTER
BEGIN SHOULDER
GUTTER STA 28+10 -Y1- RT
END SHOULDER BERM
23+90 -Y1RPA- RT
STA 22+75 TO
BERM DITCH
EST 16 SY FF
EST 5 TONS
SEE DETAIL #33
(BANKS ONLY)
CLASS ’B’ RIP RAP
2:1Natural
Ground
Filter Fabric
d
2:
1
( Not to Scale)
Type of Liner= Class B Rip-Rap
DETAIL #33
TAIL DITCH
Natural
Ground
d= 1.5Ft.
SEE DETAIL#
EST 463 SY FF
EST 172 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
42" RCP-III
4
2
"
RC
P
-
III
42" RCP-III 42" RCP-III
2
4
"
RC
P
-
III 18
" RCP-III
2
4
"
RC
P
-
III
15" RCP-IV
42" RCP-III 42" RCP-III 42" RCP-III
1
5
"
R
C
P
-
I
I
I
18
"
RCP
-IV
3
0
" RC
P-
IV
2 4 " RC P -III
24" RCP-IV15" RCP-III
24" RCP-III
24" RCP-III
18" RC
P-III
15"
RCP-III
3
6
"
RC
P
-
III
3
6
"
RC
P
-
III
15" RCP-IV
2
4
"
R
C
P-
III
24" RCP-III
24" RCP-III
15" RC
P-III
15" RCP-IV
15" RCP-III
18" RCP-III
15" R
CP-III
18
" RC
P-III
18
" RC
P-III
15" RCP-IV
15
" RC
P-
IV
15
" RC
P-
IV
30" RCP-V
30" RCP-IV
15" RCP-IV
15
"
RC
P-
IV
42" RCP-III
42
" RCP
-IV
15" RC
P-IV
15
" RC
P-III
18" RCP-III 18" RCP-III
18
"
RC
P
-
III
15
"
RC
P
-
III
18" RC
P-III
2
4"
RCP-III
15
" RC
P-III
3
0
"
RC
P
-
III
15
"
RC
P
-
III
15" RCP-III
3
0
"
RC
P
-
III
3
0
"
R
C
P
-
III
3
0
"
R
C
P-
III
15
"
RC
P
-
IV
15" RCP-III
15" RCP-III
15" RCP-III
15" RCP-III
15" RCP-III
STA 35+76 -Y1- LT
END OF BRIDGE TO
SHOULDER BERM GUTTER
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
EST. FF +/- 106 SY
EST. DDE +/- 125 CY
EST. CLASS I RIPRAP +/- 105 TONS
ENERGY DISSIPATOR BASIN
STA 24+00 -Y1- LT
END SHOULDER BERM GUTTER
BENCH
FLOODPLAIN
INV=844.95
INV=843.66
1
2
"
D
I
C
H
A
N
G
E I
N
M
A
T
E
RI
A
L
A
P
P
R
O
X.
L
O
C
A
TI
O
N
O
F
12"
V
C
12"
DI
S
O
IL
B
SR 2 4 0 5 O LD B E LE W S CR E EK RD 17 ’ B S T
S
10’ C
O
N
C
S
1S BKD
B
B
C
SS
S
S
S
OIL
GATE
M
TL
GATEMTL
S
S
SOI
L
15
" R
C
P
B
G
AT
E
MT
L
4
8
" C
O
NC
2
S
B
KD
1
5
’ B
ST
CON
C
W
WD
DK
BK WALL
G
R
G
R
SOIL
B
B
GR
BLK
WALL
S
OIL
15" R
C
P
3
S
B
W
4
S
B
W
4SBW
4 SB W
4SB
W
4
S
B
W
3SBW
4SB
W
3SBW
60" CMP
18
" C
L
AY
C
O
NC
HW
3
0
" R
C
P
42" RCP
48" CONC
5S
B
W
12
" R
C
P
12
" R
C
P
12
" R
C
P
GR
GR
GR
48" CONC2
S
B
KD
W
60" WW
W/
L
T
MTL
B
SOIL
B
SOI
L
15
" R
C
P
15
" R
C
P
(
A
B
A
N
D
)
17’ CONC
D
I
C
O
N
C
HW
W
CONC
GR
4
S
B
W
2
4
" R
O
C
K
WA
L
L
WD
D
K
1S
B
K
D
3
6
" C
O
N
C
15
" R
C
P
R
UINS
S
OIL
B
T
T
T
12
" DI
12
" DI
12 " D I
30" RCP
INV=867.69
INV=872.30
42" RCP
60" CMP
18" CLAY
15"
R
CP
DAN T. WESTMORELAND
LARRY W. WHICKER
JANE W. WHICKER
E
IP
150
.00’
EXIS
T
ING
R
/
W
E
XIS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
DAN WESTMORELAND
JANE WHICKER &
KAREN WESTMORELAND
DAN WESTMORELAND
KAREN WESTMORELAND
DAN WESTMORELAND
DAN T. WESTMORELAND
DAN T. WESTMORELAND
60.00’
E
X
IS
T
ING
R
/
W
E
X
IS
T
ING
R
/
W
EIP
E
IP
DAN T. WESTMORELAND
DAN T. WESTMORELAND
DAN WESTMORELAND
JANE WHICKER &
DAN WESTMORELAND
JANE WHICKER &
CAROL WESTMORELAND
T
O
WN
O
F
WA
L
KE
R
T
O
WN
TOWN OF WALKERTOWN
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
20’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
SUSAN K. MORETZ
FREDERICO B. MORETZ
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
& REALTY CO.
PEGG DEVELOPMENT
E E IN WETLAND
DENOTES EXCAVATION
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
12.5 25 50250
PLANS
MECHANIZED CLEARING
EXCAVATION
FILL IN WETLAND
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
05-1U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
5
_
S
I
T
E
1
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 4 OF 64
PERMIT DRAWING
SURFACE WATER
IMPACTS IN
S S SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL IN
SITE 1
S
S S S
S S S
2
0
C
C
F
F
F
F
F
F
F
C
JB w/Slab Lid
HW
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
SLOT FLAT GRATE
2GI W/ NARROW
COLLAR
EXTEND
RETAIN AND REMOVE HWEST 37 SY FF
EST 15 TONS
RIP RAP
CLASS ’B’
SEE DETAIL#2
SWALE BEHIND C&G
SEE DETAIL#3
LATERAL 2’ BASE DITCH
EST. DDE 20 CY
SEE DETAIL #8
TAIL DITCH
GUTTER STA 28+10 -Y1- RT
END SHOULDER BERM
SEE DETAIL#EST 463 SY FFEST 172 TONSCLASS "B" RIPRAPTOE PROTECTION W/
42" RCP-III
4
2
"
RC
P
-IV
BENCH
FLOODPLAIN
42"
RCP
12
" R
C
P
12
"
R
C
P
GR
GR
GR
48" CONC
2
S
B
K
D
W
60" WW
W/
L
T
MTL
B
C
O
N
C
H
W
42"
RCP
E
IP
150
.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
DAN WESTMORELAND
JANE WHICKER &
T
O
WN
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
SUSAN K. MORETZ
FREDERICO B. MORETZ
& REALTY CO.
PEGG DEVELOPMENT
12.5 25 50250
PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
05-2U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
5
_
S
I
T
E
2
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
S S SURFACE WATER
DENOTES IMPACTS IN
SURFACE WATER
IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SURFACE WATER
TEMP IMPACTS IN
SHEET 5 OF 64
PERMIT DRAWING
SITE 2
S
S
S
S
S
S
S
S
S
S
S
S
S
2
0
1
5
C
C
C
C
C
C
F
F
F
F
F
2GI
2GI
2GI
2GI
2GI-A
FSFS
FS
JB w/MH
FS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST 16 SY FF
EST 5 TONS
SEE DETAIL #33
(BANKS ONLY)
CLASS ’B’ RIP RAP
30" RCP
-
I
I
I
1
5
"
R
C
P
-
I
I
I
15" RCP-III
3
0
"
R
C
P
-
I
I
I
3
0
"
R
C
P
-
III
3
0
"
R
C
P
-
III
S
B
G
A
T
E
MT
L
S
OIL
4SBW
4 SB W
4
S
B
W
3SBW
KAREN WESTMORELAND
DAN WESTMORELAND
DAN T. WESTMORELAND
12.5 25 50250
PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
05-3U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
5
_
S
I
T
E
3
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SURFACE WATER
IMPACTS IN
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SURFACE WATER
TEMP IMPACTS IN
SHEET 6 OF 64
PERMIT DRAWING
S S
S
S
S
S
S
SITE 3
MATCHLINE
-
Y1
-
STA
. 23+65
SHEET
20
F
C
F
F
F
F
2@7’x6’ RCBC
RIP RAP
CLASS ’I’
EST 37 SY FF
EST 15 TONS
RIP RAP
CLASS ’B’
EST. DDE 20 CY
SEE DETAIL #8
TAIL DITCH
SEE DETAIL#
EST 463 SY FF
EST 172 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
STA 24+00 -Y1- LT
END SHOULDER BERM GUTTER
BENCH
FLOODPLAIN
48"
CONC
5S
B
W
12
"
R
C
P
12
" R
C
P
12
"
R
C
P
GR
GR
GR
48" CONC
2
S
B
K
D
W
60" WW
W/
L
T
MTL
E
IP
T
O
WN
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
SUSAN K. MORETZ
FREDERICO B. MORETZ
STEPHANIE C. WESTMORELAN
DARRELL T. WESTMORELAND &
& REALTY CO.
PEGG DEVELOPMENT
SHEET 7 OF 64
PERMIT DRAWINGSSSURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 4
SITE 5
SITE 5A
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
166
ES-S39EI
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
6
j
h
a
r
v
e
y
8
/
1
7
/
9
9
6U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
0
0
+
8
3
S
H
E
E
T
5
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
1
2
+
0
0
S
H
E
E
T
7
5
0
5
5
10
F
F
F
F
F
F
CHORD
2GI
2GI-A
2GI-A
FS
FS
FS
HW
HW
STA 510+35 -L- RT
END SHOULDER BERM GUTTER
STA 509+50 -L- LT
END SHOULDER BERM GUTTER
JB w/MH
REMOVE
JB w/MH
SPRING BOX
CONNECTORS
AND ROD AND LUG
30" CSP W/ 2 ELBOWS
2GI W/ FLAT GRATE
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
STA. 501+50 -L- RT
BERM GUTTER
BEGIN SHOULDER
2GI W/ FLAT GRATE
2GI W/ FLAT GRATE 2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 507+60 TO 509+10 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 507+00 TO 512+00 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 505+50 TO 507+55 -L- LT
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 11+48 TO 11+52 -Y1RPD- LT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 504+03 TO 504+38 -L- RT
SEE DETAIL#14
W/ 316 SY FF
EST. 117 TONS
LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
EST. DDE 10CY
SEE DETAIL#7
TAIL DITCH
EST. DDE 10CY
SEE DETAIL#9
TAIL DITCH
SEE XSC STA 510+50 TO 512+00 -L- RT
FILL SLOPE SHOULD BE 4:1 OR FLATTERSEE DETAIL#12
W/ 883 SY FF
EST. 336 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
FLAT GRATE
2GI W/
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
DETAIL #32
TAIL DITCH
Natural
Ground
FROM STA. TO STA.
2:1
EST. 47 FF
EST. 21 TONS
SEE DETAIL #32
(BANKS ONLY)
CLASS ’I’ RIP RAP
SEE DETAIL#6
EST. 231 SY FF
EST. 86 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
EST. DDE 20CY
SEE DETAIL#9
TAIL DITCH EST. 47 FF
EST. 21 TONS
SEE DETAIL #32
(BANKS ONLY)
CLASS ’I’ RIP RAP
18"
R
C
P-I
V
1
5
"
R
C
P
-
IV
15" RCP-IV
4
8
"
R
C
P-
C
D
4
8
"
R
C
P-
C
D
54" RCP-III
48" RCP-CD
48" RCP-CD
54" RCP-III
1
5
"
R
C
P
-
IV
3
0
"
R
C
P
-
IV
30" RCP-III 30" RCP-III30" RCP-III
1
5
"
R
C
P
-
IV
15
"
R
C
P
-
IV
8" DIP
STA 500+99.79 -L- LT
BEGIN SHOULDER BERM GUTTER
3
0
"
C
M
P
1
S
B
K
D
S
W. E. 897.3POND
GRAU-350
3
0
"
C
M
P
I
N
V
=
8
6
0.
1
5
I
N
V
=
8
6
0.
3
8
DAN T. WESTMORELAND
EIP
STONE
KAREN WESTMORELAND
DAN WESTMORELAND
BAPTIST CHURCH
GOSPEL LIGHT
ILENA B. DILLON
ROBERT J. DILLON
FORSYTH COUNTY
TOWN OF WALKERTOWN
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
TOWN OF WALKERTOWN
SHEET 8 OF 64
PERMIT DRAWINGSSSURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 4
SITE 5
SITE 5A
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
8
6
0
8
6
0
8
6
0
860
8
6
0
860
8
6
0
860
8
7
0
8
7
0
870
870
870
8
7
0
870
870
8
7
0
870
870
870
870
8
7
0
870
870
8
7
0
8
7
0
8
7
0
8
7
0
8
7
0
870
870
880
8
8
0
8
8
0
8
8
0
8
8
0
880
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
880
880
880
880
880
880
8 8 0
880
8
8
0
880
8 8 0
8
8
0
880
880
880
880
8
8
0
8
8
0
880
880
880
8
8
0
8
8
0
880
8
8
0
8
8
0
8
8
0
890
8
9
0
890
890
8
9
0
890
890
890
8
9
0
890
890
8
9
0
890
8
9
0
8
9
0
890
8
9
0
890
8
9
0
890
890
890
8
9
0
8
9
0
890
890
890
890
8
9
0
8
9
0
8
9
0
8
9
0
890
8 9 0
8
9
0
8
9
0
8
9
0
890
8
9
0
8
9
0
890
900
9
0
0
9
0
0
900
9
0
0
900
900
9
0
0
900
900
900
9
0
0
9
0
0
9
0
0
900
900
9
00
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
9
0
0
9
0
0
9
0
0
900
9
0
0
910
910
9
10
9
10
9
1
0
910
910
910
910
910
910
9
10
9
10
910
910
9
1
0
910
910
9
10
910
9
10
9
10
9
10
9
10
910
920
9
2
0
9
2
0
920
920
920
9
2
0
9
2
0
9
2
0
166
ES-S39EI
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
6
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
6U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
0
0
+
8
3
S
H
E
E
T
5
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
1
2
+
0
0
S
H
E
E
T
7
5
0
5
5
10
F
F
F
F
F
F
CHORD
2GI
2GI-A
2GI-A
FS
FS
FS
HW
HW
STA 510+35 -L- RT
END SHOULDER BERM GUTTER
STA 509+50 -L- LT
END SHOULDER BERM GUTTER
JB w/MH
REMOVE
JB w/MH
SPRING BOX
CONNECTORS
AND ROD AND LUG
30" CSP W/ 2 ELBOWS
2GI W/ FLAT GRATE
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
STA. 501+50 -L- RT
BERM GUTTER
BEGIN SHOULDER
2GI W/ FLAT GRATE
2GI W/ FLAT GRATE 2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 507+60 TO 509+10 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 507+00 TO 512+00 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 505+50 TO 507+55 -L- LT
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 11+48 TO 11+52 -Y1RPD- LT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 504+03 TO 504+38 -L- RT
SEE DETAIL#14
W/ 316 SY FF
EST. 117 TONS
LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
EST. DDE 10CY
SEE DETAIL#7
TAIL DITCH
EST. DDE 10CY
SEE DETAIL#9
TAIL DITCH
SEE XSC STA 510+50 TO 512+00 -L- RT
FILL SLOPE SHOULD BE 4:1 OR FLATTERSEE DETAIL#12
W/ 883 SY FF
EST. 336 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
FLAT GRATE
2GI W/
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
DETAIL #32
TAIL DITCH
Natural
Ground
FROM STA. TO STA.
2:1
EST. 47 FF
EST. 21 TONS
SEE DETAIL #32
(BANKS ONLY)
CLASS ’I’ RIP RAP
SEE DETAIL#6
EST. 231 SY FF
EST. 86 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
EST. DDE 20CY
SEE DETAIL#9
TAIL DITCH EST. 47 FF
EST. 21 TONS
SEE DETAIL #32
(BANKS ONLY)
CLASS ’I’ RIP RAP
18"
R
C
P-I
V
1
5
"
R
C
P
-
IV
15" RCP-IV
4
8
"
R
C
P-
C
D
4
8
"
R
C
P-
C
D
54" RCP-III
48" RCP-CD
48" RCP-CD
54" RCP-III
1
5
"
R
C
P
-
IV
3
0
"
R
C
P
-
IV
30" RCP-III 30" RCP-III30" RCP-III
1
5
"
R
C
P
-
IV
15
"
R
C
P
-
IV
8" DIP
STA 500+99.79 -L- LT
BEGIN SHOULDER BERM GUTTER
3
0
"
C
M
P
1
S
B
K
D
S
W. E. 897.3POND
GRAU-350
3
0
"
C
M
P
I
N
V
=
8
6
0.
1
5
I
N
V
=
8
6
0.
3
8
DAN T. WESTMORELAND
EIP
STONE
KAREN WESTMORELAND
DAN WESTMORELAND
BAPTIST CHURCH
GOSPEL LIGHT
ILENA B. DILLON
ROBERT J. DILLON
FORSYTH COUNTY
TOWN OF WALKERTOWN
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
TOWN OF WALKERTOWN
SHEET 9 OF 64
PERMIT DRAWINGSSSURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 6S
S
S
S
S
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
7
j
h
a
r
v
e
y
8
/
1
7
/
9
9
7U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
12
+
0
0
S
H
E
E
T
6
M
A
T
C
H
LIN
E
-
L
-
S
TA
.
5
2
4
+
6
2
S
H
E
E
T
8
MATCHLINE - Y2 - STA. 15+61 SHEET 22
M
A
T
C
H
L
I
N
E
-
Y
2
-
S
T
A.
24+
81
S
H
E
E
T
23
5
15
5
2
0
2
0
S
R
2
3
8
5
WALKE
R
T
OWN /
GUT
H
R
IE
R
D
2
0
’ B
S
T
END W.W. FENCE
END W.W. FENCE
BEGIN
W.W. FENCE
BEGIN
W.W. FENCE
F
F
FF
F
C
C
C
C
C
C
C
C
C
C
C
F
2GI
2GI
2GI
JB w/MH
2GI
2GI
2GI
2GI
1
5
"
15
"
FS
FS
2GI-A
2GI-A FS
FS
FS
FS
FS
HW
STA 522+00 -L- RT
BEGIN SHOULDER BERM GUTTER
STA 521+50 -L- LT
BEGIN SHOULDER BERM GUTTER
FS
2 ELBOWS
15" CSP W/
2GI
EST 38 SY FF
EST 17 TONS
RIP RAP
CLASS ’I’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FROM STA 512+50 TO 513+45 -L- LT
FROM STA 511+75 TO 512+50 -L- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 522+60 TO 523+50 -L- LT
FROM STA 522+00 TO 523+20 -L- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 522+42 TO 522+45 -L- LT
SEE DETAIL#4
LATERAL ’V’ DITCH
SEE DETAIL#4
LATERAL ’V’ DITCH
S
E
E
P
R
O
F
I
L
E
F
O
R
G
R
A
D
E
S
P
E
C
I
A
L
D
I
T
C
H
G
R
A
D
E
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 6CY
SEE DETAIL #9
HEAD DITCH
-BEGIN BRIDGE
STA 18+60 -Y2- LT&RT
SBG
TBDI
TBDI
SEE DETAIL#6
EST. 139 SY FF
EST. 51 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 185 SY FF
EST 69 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
30" RCP-III
2
4
"
R
C
P
-
I
II
24" RCP-III 24" RCP-III
2
4
"
R
C
P
-
IV
2 ELBOWS
15" CSP W/
15"
R
C
P-
I
I
I
15"
R
C
P
-
I
I
I
15"
R
C
P-III
18
"
R
C
P
-
I
II
18" RCP-III 18" RCP-III
4
8
"
R
C
P
-
I
V
4
8
"
R
C
P
-
I
V
15" RCP-IV
12
"
R
C
P
POND
WE 878.1’
3
6
"
C
O
N
C
GR
S
S
G
R
W/
L
T
S
O
IL
S
S S
S
S
H
T
R
W
D
K
W
D
W/
L
T
SOIL
SOIL
GR
G
R
S
RUINS
S
1S
F
D
SOIL
T
8
" DI
GR
AU 3
5
0
CAT-1
GRAU-350
CAT-1
B
-
7
7
GR
AU 3
5
0
B
-
7
7
G
RAU
3
5
0
G
RAU
3
5
0
TYPE-
III
TYPE-
III
12
"
R
C
P
FAMILY TRUST
THE TABOR
ILENA B. DILLON
ROBERT J. DILLON
16’ ACCESS EASEMENT DB 1111 PG 1
16’ ACCESS EASEMENT DB 1948 PG 287
BAPTIST CHURCH
GOSPEL LIGHT
WILMA D. WALKER
RONALD H. WALKER
WILMA JEAN DILLON WALKER
RONALD H. WALKER
ILENA B. DILLON
ROBERT J. DILLON
ROBERT JEFFREY BARBER
T
O
WN
O
F
WA
L
KE
R
T
O
WN
TOW
N
O
F
W
A
LK
E
R
TOW
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FO
R
SY
T
H
COU
N
TY
JAMES DAVID DILLON
W/
L
T
W/
L
T
W/
L
T
W/
L
T
SHEET 10 OF 64
PERMIT DRAWINGSSSURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 6S
S
S
S
S
S
880
8
8
0
8
8
0
880
880
880
880
890
8
9
0
8
9
0
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
890
890
890
8
9
0
890
900
900
900
900
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900
9
0
0
900
9
0
0
900
900
9
0
0
9
0
0
9
10
910
9
1
0
9
1
0
910
9
10
9
1
0
9
1
0
9
1
0
9
1
0
910
910
9
10
9
1
0
9
1
0
910
910
920
920
920
9
2
0
9
2
0
920
9
2
0
9
2
0
920
9
2
0
9
2
0
920
9
2
0
9
2
0
920
9
2
0
9
2
0
9
2
0
9
2
0
9
3
0
930
9
3
0
930
930
9
3
0
9
3
0
9
3
0
930
930
9
3
0
9
3
0
930
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
4
0
940
940
9
4
0
9
4
0 9
4
0
9
4
0
9
4
0
9
4
0
940
9
4
0
9
4
0
940
940
940
9
4
0
9
4
0
9
4
0
9
4
0
9
4
0
9
4
0
9
4
0
9
4
0
940
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
7
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
7U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
12
+
0
0
S
H
E
E
T
6
M
A
T
C
H
LIN
E
-
L
-
S
TA
.
5
2
4
+
6
2
S
H
E
E
T
8
MATCHLINE - Y2 - STA. 15+61 SHEET 22
M
A
T
C
H
L
I
N
E
-
Y
2
-
S
T
A.
24+
81
S
H
E
E
T
23
5
15
5
2
0
2
0
S
R
2
3
8
5
WALKE
R
T
OWN /
GUT
H
R
IE
R
D
2
0
’ B
S
T
END W.W. FENCE
END W.W. FENCE
BEGIN
W.W. FENCE
BEGIN
W.W. FENCE
F
F
FF
F
C
C
C
C
C
C
C
C
C
C
C
F
2GI
2GI
2GI
JB w/MH
2GI
2GI
2GI
2GI
1
5
"
15
"
FS
FS
2GI-A
2GI-A FS
FS
FS
FS
FS
HW
STA 522+00 -L- RT
BEGIN SHOULDER BERM GUTTER
STA 521+50 -L- LT
BEGIN SHOULDER BERM GUTTER
FS
2 ELBOWS
15" CSP W/
2GI
EST 38 SY FF
EST 17 TONS
RIP RAP
CLASS ’I’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FROM STA 512+50 TO 513+45 -L- LT
FROM STA 511+75 TO 512+50 -L- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 522+60 TO 523+50 -L- LT
FROM STA 522+00 TO 523+20 -L- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 522+42 TO 522+45 -L- LT
SEE DETAIL#4
LATERAL ’V’ DITCH
SEE DETAIL#4
LATERAL ’V’ DITCH
S
E
E
P
R
O
F
I
L
E
F
O
R
G
R
A
D
E
S
P
E
C
I
A
L
D
I
T
C
H
G
R
A
D
E
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 6CY
SEE DETAIL #9
HEAD DITCH
-BEGIN BRIDGE
STA 18+60 -Y2- LT&RT
SBG
TBDI
TBDI
SEE DETAIL#6
EST. 139 SY FF
EST. 51 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 185 SY FF
EST 69 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
30" RCP-III
2
4
"
R
C
P
-
I
II
24" RCP-III 24" RCP-III
2
4
"
R
C
P
-
IV
2 ELBOWS
15" CSP W/
15"
R
C
P-
I
I
I
15"
R
C
P
-
I
I
I
15"
R
C
P-III
18
"
R
C
P
-
I
II
18" RCP-III 18" RCP-III
4
8
"
R
C
P
-
I
V
4
8
"
R
C
P
-
I
V
15" RCP-IV
12
"
R
C
P
POND
WE 878.1’
3
6
"
C
O
N
C
GR
S
S
G
R
W/
L
T
S
O
IL
S
S S
S
S
H
T
R
W
D
K
W
D
W/
L
T
SOIL
SOIL
GR
G
R
S
RUINS
S
1S
F
D
SOIL
T
8
" DI
GR
AU 3
5
0
CAT-1
GRAU-350
CAT-1
B
-
7
7
GR
AU 3
5
0
B
-
7
7
G
RAU
3
5
0
G
RAU
3
5
0
TYPE-
III
TYPE-
III
12
"
R
C
P
FAMILY TRUST
THE TABOR
ILENA B. DILLON
ROBERT J. DILLON
16’ ACCESS EASEMENT DB 1111 PG 1
16’ ACCESS EASEMENT DB 1948 PG 287
BAPTIST CHURCH
GOSPEL LIGHT
WILMA D. WALKER
RONALD H. WALKER
WILMA JEAN DILLON WALKER
RONALD H. WALKER
ILENA B. DILLON
ROBERT J. DILLON
ROBERT JEFFREY BARBER
T
O
WN
O
F
WA
L
KE
R
T
O
WN
TOW
N
O
F
W
A
LK
E
R
TOW
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FO
R
SY
T
H
COU
N
TY
JAMES DAVID DILLON
W/
L
T
W/
L
T
W/
L
T
W/
L
T
SHEET 11 OF 64
PERMIT DRAWING
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
F
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
F
F
WETLAND
DENOTES FILL INFF
SITE 7
P
P
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
8
j
h
a
r
v
e
y
8
/
1
7
/
9
9
8U-2579B
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
2
4
+
6
2
S
H
E
E
T
7
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
3
7
+
0
0
S
H
E
E
T
9
NOTE:
FOR -L- PROFILE, SEE SHEET 34
MORRIS RD
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
5
2
5
5
3
0
5
3
5
0
2
0
2
F
F
F
C
C
CC
C
+90.00 -L-
280.00’
+24.47 -L-
241.05’
-L- +33.00
307.00’
-L- +95.46
356.05’
-L- +40.08
299.33’
(
(
)
)
NCDOT
2GI
2GI
2GI-A
FS
FS
FS
FSFS
HW
STA 528+75 -L- LT
END SHOULDER BERM GUTTER
CONNECTORS
AND ROD AND LUG
30" CSP W/ 2 ELBOWS
2GI-A
2GI W/ FLAT GRATE
2GI W/ FLAT GRATE 2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
2GI-A
EL=878.2
INV. IN
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #30
Elev.= 880.0
879.9
N.W.S. Elev.=
NG
1.0’MIN.
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #30
Elev.= 880.0
879.9
N.W.S. Elev.=
NG
1.0’MIN.
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FROM STA 527+08 TO 528+75 -L- LT
FROM STA. 525+00 TO STA. 528+15 -L- RT
SEE DETAIL#30
ROCK FILL IN POND
SEE DETAIL#5
LATERAL 3’ BASE DITCH
EST. 3 TONS
CLASS I RIP RAP
1
5
"
R
C
P
-
IV
15
"
R
C
P
-
IV
18" RCP-III
4
8
"
R
C
P
-
I
V
4
8
"
R
C
P
-
I
V
24" RCP-III24" RCP-III
15
" RC
P-IV
3
0
"
R
C
P
-
IV
24" RCP-III
1
8
"
R
C
P
-
III
1
8
"
R
C
P
-
III
REMOVE
15"
STA 528+46.90 -L- RT
END SHOULDER BERM GUTTER
POOL
WD DK
CONC
2S
B
K
D
B
S
T
36" STONE
3
6" S
T
O
N
E
STONE36"
S
T
O
N
E
3
6
"
CONC
1
2
"
R
C
P
1SFD
G
S
4 8 " C O N C48"
C
O
N
C
12" HDPE
12"
H
DP
E
CONC
CONC
BST
DI
GR
36" VIN
YL
S
DI
BK WALL
GATEMTL
GATE
MTL
1SFD
C
O
NCHT
R
P
O
O
L
2SFD
6 0 " C O N C
36" L
O
G
GR
SI
LO
DI
W
D
D
K
12
" HD
P
E
MTL GATE
48" W W
B
5SB
W HTR
L
T
C
O
N
C
48" CHL
4
8
"
C
H
L
W
D
&
W
W
48"
GR
6
0"
W
D
W/LT
4
8
"
W
D
R
AI
L
&
W
W
4SB W
WS
15" RCP48" WD RAIL & WW
G
R
S
B
B
10
’ B
S
T
12" RCP
4 S B W
G
A
T
E
M
T
L
3
6
"
W
W
&
1
S
B
W
4
S
B
W
3
6
"
V
IN
Y
L
W
A
L
L
B
K
W
A
L
L
B
K
15
"
R
C
P
1
5
"
R
C
P
GR
9’ BST
S
R
2
4
0
7
M
O
R
RI
S
R
D
18’
B
S
T
W/LT
W
2SFD
W
15
"
R
C
P
W
GR
LT
W
D
D
K
WD
D
K
D
K
W
D
W
CONCG
W
POND
WE 877.9’
B
S
T
12"
HD
P
E
POND
WE 878.2’
W
D
4
8
"
W
D
R
A
I
L
3
6"
W
D
R
AI
L
48"
W
D
R
AIL
4
8"
W
D
R
AI
L
12
" R
C
P
12" RCP
RAMPWD
RAIL48" WD
W/LT
RIPRAP
T
T
8"
DI
8"
DI
CAT-1
GRAU-350
CAT-1
GRAU-350
TES
TES
TES
TES
1
2
"
R
C
P
RUINSSPILLWAY
ROCK WALL
GWEN WELBORN-FAGERBERG
JOSEPH R. DANIELS
D
B
13
0
3
P
G
16
3
3
0
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
WILMA JEAN DILLON WALKER
RONALD H. WALKER
FAMILY TRUSTTHE TABOR
FAMILY TRUST
THE TABOR
ELBERT S. GOFF
MILDRED C. GOFF
SUSANNA L. MCCASKILL
MICHAEL L. MCCASKILL
60.00’50.00’EXISTING R/
W
EXISTING R/
W
GWENDOLYN KORNEGAY
JUDGE KORNEGAY
ELLEN JANE POPE HILTON
WILLARD AMBROSE HILTON
FAMILY TRUST
THE TABOR
TOWN OF WALKERTOWN
T O W N O F W A L K E R T O W N
FORSYTH COUNTY
F O R S Y T H C O U N T Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
EILEEN P. CHAMBERS
SHEET 12 OF 64
PERMIT DRAWING
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
F
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
F
F
WETLAND
DENOTES FILL INFF
SITE 7
P
P
870
870
870
870
880
880
880
880 880
880
8
8
0
8
8
0
8
8
0
8
8
0
880
8
8
0
880
8
8
0
8
8
0
880
8
8
0
8
8
0
8
8
0
8
8
0
880880
880
880
8
8
0
8
8
0
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
890
8
9
0
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
8
9
0
890
890
890
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900
9
0
0
9
0
0
900
9
0
0
9
0
0
900
9
0
0 900
900
9
0
0
9
0
0
9
0
0
9
1
0
9
1
0
910
910
9
1
0
9
10
9
1
0
910
9
1
0
9
10
9
10
910
9
1
0
910
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
920
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
920
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
30
9
3
0
930
9
3
0
9
3
0
930
930
930
9
3
0
930
9
3
0
9
3
0
9
3
0
930
930
9
4
0
9
4
0
9
4
0
940
9
4
0
9
40
940
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
0
8
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
8U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
2
4
+
6
2
S
H
E
E
T
7
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
3
7
+
0
0
S
H
E
E
T
9
NOTE:
FOR -L- PROFILE, SEE SHEET 34
MORRIS RD
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
5
2
5
5
3
0
5
3
5
0
2
0
2
F
F
F
C
C
CC
C
+90.00 -L-
280.00’
+24.47 -L-
241.05’
-L- +33.00
307.00’
-L- +95.46
356.05’
-L- +40.08
299.33’
(
(
)
)
NCDOT
2GI
2GI
2GI-A
FS
FS
FS
FSFS
HW
STA 528+75 -L- LT
END SHOULDER BERM GUTTER
CONNECTORS
AND ROD AND LUG
30" CSP W/ 2 ELBOWS
2GI-A
2GI W/ FLAT GRATE
2GI W/ FLAT GRATE 2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
2GI-A
EL=878.2
INV. IN
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #30
Elev.= 880.0
879.9
N.W.S. Elev.=
NG
1.0’MIN.
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #30
Elev.= 880.0
879.9
N.W.S. Elev.=
NG
1.0’MIN.
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FROM STA 527+08 TO 528+75 -L- LT
FROM STA. 525+00 TO STA. 528+15 -L- RT
SEE DETAIL#30
ROCK FILL IN POND
SEE DETAIL#5
LATERAL 3’ BASE DITCH
EST. 3 TONS
CLASS I RIP RAP
1
5
"
R
C
P
-
IV
1
5
"
R
C
P
-
IV
18" RCP-III
4
8
"
R
C
P
-
IV
4
8
"
R
C
P
-
IV
24" RCP-III24" RCP-III
15
" RC
P-IV
3
0
"
R
C
P
-
I
V
24" RCP-III
18
"
R
C
P
-
III
18
"
R
C
P
-
I
II
REMOVE
15"
STA 528+46.90 -L- RT
END SHOULDER BERM GUTTER
POOL
WD DK
CONC
2S
B
K
D
B
S
T
36" STONE
3
6" S
T
O
N
E
STONE36"
S
T
O
NE
3
6
"
CONC
1
2
"
R
C
P
1SFD
G
S
4 8 " C O N C48"
C
O
N
C
12" HDPE
12"
H
DP
E
CONC
CONC
BST
DI
GR
36" VIN
YL
S
DI
BK WALL
GATEMTL
GATE
MTL
1SFD
C
O
NCHT
R
P
O
O
L
2SFD
6 0 " C O N C
36" L
O
G
GR
SI
LO
DI
W
D
D
K
12
" HD
P
E
MTL GATE
48" W W
B
5SB
W HTR
L
T
C
O
N
C
48" CHL
4
8
"
C
H
L
W
D
&
W
W
48"
GR
6
0"
W
D
W/LT
4
8
"
W
D
R
AI
L
&
W
W
4SB W
WS
15" RCP48" WD RAIL & WW
G
R
S
B
B
10
’ B
S
T
12" RCP
4 S B W
G
A
T
E
M
T
L
3
6
"
W
W
&
1
S
B
W
4
S
B
W
3
6
"
V
IN
Y
L
W
A
L
L
B
K
W
A
L
L
B
K
15
"
R
C
P
1
5
"
R
C
P
GR
9’ BST
S
R
2
4
0
7
M
O
R
RI
S
R
D
18’
B
S
T
W/LT
W
2SFD
W
15
"
R
C
P
W
GR
LT
W
D
D
K
WD
DK
D
K
W
D
W
CONCG
W
POND
WE 877.9’
B
S
T
12"
H
D
P
E
POND
WE 878.2’
W
D
4
8
"
W
D
R
A
I
L
3
6"
W
D
R
AI
L
48"
W
D
R
AIL
4
8"
W
D
R
AI
L
12
" R
C
P
12" RCP
RAMPWD
RAIL48" WD
W/LT
RIPRAP
T
T
8
"
DI
8"
DI
CAT-1
GRAU-350
CAT-1
GRAU-350
TES
TES
TES
TES
1
2
"
R
C
P
RUINSSPILLWAY
ROCK WALL
GWEN WELBORN-FAGERBERG
JOSEPH R. DANIELS
D
B
13
0
3
P
G
16
3
3
0
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
WILMA JEAN DILLON WALKER
RONALD H. WALKER
FAMILY TRUSTTHE TABOR
FAMILY TRUST
THE TABOR
ELBERT S. GOFF
MILDRED C. GOFF
SUSANNA L. MCCASKILL
MICHAEL L. MCCASKILL
60.00’50.00’EXISTING R/
W
EXISTING R/
W
GWENDOLYN KORNEGAY
JUDGE KORNEGAY
ELLEN JANE POPE HILTON
WILLARD AMBROSE HILTON
FAMILY TRUST
THE TABOR
TOWN OF WALKERTOWN
T O W N O F W A L K E R T O W N
FORSYTH COUNTY
F O R S Y T H C O U N T Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
EILEEN P. CHAMBERS
SHEET 13 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
S
S
S
S
S
S
S
S
S
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
S
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 8
SITE 9
SITE 10
S
S
S
S
S
SITE 31
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
0
j
h
a
r
v
e
y
8
/
1
7
/
9
9
10U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
4
9
+
3
9
S
H
E
E
T
9
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
6
1+
6
1
S
H
EET
11
WESTON BROOKE TRAIL
5
5
0
5
6
0
0
4
0
4
0
4
0
4
5
5
5
F
F
F
C
C
F
F
F
F
C
C
F
38
+75.00 -L-
200.00’
CHORD
CHORD
CHORD
CHORD
NCDOT
(
()
)NCDOT
2GI
2GI
2GI
2GI
2GI-A
FS
FS
FS
FS
FS
2GI-A
2GIFS
FS
REMOVE
GRATE
2GI W/ FLAT GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
MCF
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
2@10’x6’ RCBC
REMOVE
RIP RAP
CLASS ’I’
2 ELBOWS
15" CSP W/
AT BEGIN BRIDGE
END SHOULDER BERM GUTTER
RIP RAP
CLASS ’I’
Natural
Ground 2:
1 D
B
( Not to Scale)
Flatter4:1 or
Slope
Fill
SPECIAL LATERAL BASE DITCH
DETAIL #10
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 552+50 TO 553+40 -L- LT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 560+70 TO 560+97 -L- RT
SEE DETAIL#10
SPECIAL LATERAL 2’ BASE DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 4CY
SEE DETAIL#9
TAIL DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
DETAIL 32
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
TAIL DITCH
Natural
Ground
EST. DDE +/- 54 CY
SEE DETAIL#17
TAIL DITCH
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. TO STA.
SILL
EST 75 SY FF
EST 40 TONS
SEE DETAIL 32
(BANKS ONLY)
CLASS I RIP RAP
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
42" RCP-III
42" RCP-III
1
5
"
R
C
P
-
I
I
I
42
"
CSP
15
"
RC
P
-
IV
15
"
RC
P
-
IV
15" RCP-IV
15" RCP-IV
EST. FF +/- 89 SY
EST. DDE +/- 102 CY
EST. CLASS I RIPRAP +/- 88 TONS
W/ OUTLET CHANNEL
ENERGY DISSIPATOR BASIN
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
ENERGY DISSIPATOR BASIN
STA 554+22.53 -L- RT
BEGIN SHOULDER BERM GUTTER
60" RCP-III
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
8
" V
C
8
"
D
I
8
" V
C
CONC HW
12" RCP
COLUMNSBK COLUMNSBK
10’
B
S
T
36" WD RAIL & WW
POOL
7
2"
W
DCONC2SBKD
W
15" CMP
W
8’
C
O
N
C
60" CONC
2SBKD
S
15" RCP
10’ C
O
NC
W
4
8
" C
O
NC
2S
FD
C
O
N
C
72" WD
W
C
O
N
C
2-60" RCP
PONDWE 850.2
3
6
"
W
W
3
6
"
W
W
36" WW
SR 2575 WESTON BROOKE TRAIL 21’ BST
3
6
"
W
D
&
W
W
R
AI
L
P
OOL
GRAU-350
CAT-1
B-77
B-77
B-77
B-77
B-77
B-77
B-77
T
E
S
T
E
S
60" R
CP
60" R
CP
CONC HW
DANNY CAUDILL
DANNY CAUDILL
MARGARET LUCINDA ROBBINS LINVILLE
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
3
0
’
D
R
A
I
N
A
G
E/
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
P
B
3
0
P
G
1
7
9
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
DANNY T. CAUDILL
CHARLENE L. CAUDILL
DANNY CAUDILL
KATHY SMITH
CRAIG SMITH
DANNY CAUDILL
MELISSA WHITE
DAVID WHITE
6
0.0
0’
EXISTING R/W
EIP
EIP
EIP
EIP
EIP
CHARLES LEWIS, ET AL
2
0
’ S
A
N
IT
A
R
Y
S
E
WE
R
E
A
S
E
ME
N
T
2
0
’ S
A
NIT
A
R
Y S
E
WE
R
E
A
S
E
ME
NT
Q3 DEVELOPEMENT LLC
MARY C. CHESMAR
BRENDA L. CHESMAR AND
RANDI MARIE CARRIER
AND
BRADLEY FRITZ CARRIER
MILCH
BRIAN MICHAEL
ENTERPRISES LLC
SHUGART
ENTERPRISES LLC
SHUGART
EN
T
ER
PR
ISE
S
L
LC
SHUGAR
T
SUSAN WILSON
CHRISTOPHER WILSON
NINA REYNOLDSRICHARD REYNOLDS
SHEET 14 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
S
S
S
S
S
S
S
S
S
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
S
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 8
SITE 9
SITE 10
S
S
S
S
S
SITE 31
840
8
5
0
8
5
0
8
5
0
850
850
8
5
0
8
5
0
8
5
0
8
5
0
850
850
850
850
8 5 0
850
8
5
0
850
8
5
0
850
850
8
5
0
850
850
8
5
0
8
5
0
850
8
5
0
8
5
0
8
5
0
8
5
0
850
8
5
0
850
850
8
5
0
850
8
5
0
850
8
5
0
850
8
5
0
850
850
8
6
0
8
6
0
8
6
0
860
860
860
8
6
0
860
8
6
0
8
6
0
860
8
6
0
8
6
0
8
6
0
860
8
6
0
860
8
6
0
8
6
0
8
6
0
860
860
860
860
860
860
860
8
7
0
870
8
7
0
8
7
0
870
8
7
0
8
7
0
870
8
7
0
8
7
0
8
7
0
870
870
8
7
0
8
7
0
8
7
0
8
7
0
870
870
8
7
0
8
7
0
880
880
880
880
880
8
8
0
880
880
880
880
8
8
0
880
8
8
0
8
8
0
880
880
8
8
0
8
8
0
8
9
0
890
890
8
9
0
890
8
9
0890
890
890
8
9
0
8
9
0
8
9
0
890
890
8
9
0
890
890
9
0
0
9
0
0
900
900
9
0
0
9
0
0
9
0
0
900
9
0
0
9
0
0
900
910
910
910
910
9
1
0
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
0
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
10U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
4
9
+
3
9
S
H
E
E
T
9
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
6
1+
6
1
S
H
EET
11
WESTON BROOKE TRAIL
5
5
0
5
6
0
0
4
0
4
0
4
0
4
5
5
5
F
F
F
C
C
F
F
F
F
C
C
F
38
+75.00 -L-
200.00’
CHORD
CHORD
CHORD
CHORD
NCDOT
(
()
)NCDOT
2GI
2GI
2GI
2GI
2GI-A
FS
FS
FS
FS
FS
2GI-A
2GIFS
FS
REMOVE
GRATE
2GI W/ FLAT GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
MCF
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
2@10’x6’ RCBC
REMOVE
RIP RAP
CLASS ’I’
2 ELBOWS
15" CSP W/
AT BEGIN BRIDGE
END SHOULDER BERM GUTTER
RIP RAP
CLASS ’I’
Natural
Ground 2:
1 D
B
( Not to Scale)
Flatter4:1 or
Slope
Fill
SPECIAL LATERAL BASE DITCH
DETAIL #10
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 552+50 TO 553+40 -L- LT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 560+70 TO 560+97 -L- RT
SEE DETAIL#10
SPECIAL LATERAL 2’ BASE DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 4CY
SEE DETAIL#9
TAIL DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
DETAIL 32
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
TAIL DITCH
Natural
Ground
EST. DDE +/- 54 CY
SEE DETAIL#17
TAIL DITCH
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. TO STA.
SILL
EST 75 SY FF
EST 40 TONS
SEE DETAIL 32
(BANKS ONLY)
CLASS I RIP RAP
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
42" RCP-III
42" RCP-III
1
5
"
R
C
P
-
I
I
I
42
"
CSP
15
"
RC
P
-
IV
15
"
RC
P
-
IV
15" RCP-IV
15" RCP-IV
EST. FF +/- 89 SY
EST. DDE +/- 102 CY
EST. CLASS I RIPRAP +/- 88 TONS
W/ OUTLET CHANNEL
ENERGY DISSIPATOR BASIN
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
ENERGY DISSIPATOR BASIN
STA 554+22.53 -L- RT
BEGIN SHOULDER BERM GUTTER
60" RCP-III
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
8
" V
C
8
"
D
I
8
" V
C
CONC HW
12" RCP
COLUMNSBK COLUMNSBK
10’
B
S
T
36" WD RAIL & WW
POOL
7
2"
W
DCONC2SBKD
W
15" CMP
W
8’
C
O
N
C
60" CONC
2SBKD
S
15" RCP
10’ C
O
NC
W
4
8
" C
O
NC
2S
FD
C
O
N
C
72" WD
W
C
O
N
C
2-60" RCP
PONDWE 850.2
3
6
"
W
W
3
6
"
W
W
36" WW
SR 2575 WESTON BROOKE TRAIL 21’ BST
3
6
"
W
D
&
W
W
R
AI
L
P
OOL
GRAU-350
CAT-1
B-77
B-77
B-77
B-77
B-77
B-77
B-77
T
E
S
T
E
S
60" R
CP
60" R
CP
CONC HW
DANNY CAUDILL
DANNY CAUDILL
MARGARET LUCINDA ROBBINS LINVILLE
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
3
0
’
D
R
A
I
N
A
G
E/
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
P
B
3
0
P
G
1
7
9
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
DANNY T. CAUDILL
CHARLENE L. CAUDILL
DANNY CAUDILL
KATHY SMITH
CRAIG SMITH
DANNY CAUDILL
MELISSA WHITE
DAVID WHITE
6
0.0
0’
EXISTING R/W
EIP
EIP
EIP
EIP
EIP
CHARLES LEWIS, ET AL
2
0
’ S
A
N
IT
A
R
Y
S
E
WE
R
E
A
S
E
ME
N
T
2
0
’ S
A
NIT
A
R
Y S
E
WE
R
E
A
S
E
ME
NT
Q3 DEVELOPEMENT LLC
MARY C. CHESMAR
BRENDA L. CHESMAR AND
RANDI MARIE CARRIER
AND
BRADLEY FRITZ CARRIER
MILCH
BRIAN MICHAEL
ENTERPRISES LLC
SHUGART
ENTERPRISES LLC
SHUGART
EN
T
ER
PR
ISE
S
L
LC
SHUGAR
T
SUSAN WILSON
CHRISTOPHER WILSON
NINA REYNOLDSRICHARD REYNOLDS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
0
A
_
L
s
t
a
5
5
9
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
910
900
890
880
870
860
850
840
SHEET 15 OF 64
PERMIT DRAWING
CULVERT SURVEY & HYDRAULIC DESIGN REPORT
Stream Classification (Such as Trout, High Quality Water, etc.)
100200 0 100 200
BED
BED
WE
WE
TB RT
TB RT
TB LT
TB LT
GP EL=903.42
SKEW=100
2@10’x6’ RCBC
CL STA 559+74 -L-
O
2.03:1 SKEWED
2:1 NORMAL
2.03:1 SKEWED
2:1 NORMAL
ON 10-24-07=848.0
NWSE AND WSE
2@10’x6’ RCBC
HW
BEVELED
-DEBRIS POTENTIAL: MODERATE
OBSERVED IN THE 100 YR FLOOD PLAIN
-THERE WERE NO DWELLINGS OR STRUCTURES
-BED MATERIALS: SILT, SAND, COBBLES
ON SLOPE 0.69%
BED ELEV 844.74
NOT IN FEMA AREA
YADKIN RIVER BASIN
SHEET 16 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
SITE 10
SITE 10A
BEGIN JS
S
S
S
S
S S S
S
S
S
S
SS
S
S
S
S S
S
S
S
S
S S
S
S
S
S
SS
F
F F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
1
j
h
a
r
v
e
y
8
/
1
7
/
9
9
11U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
6
1
+
6
1
S
H
E
E
T
1
0
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
7
4
+
3
6
S
H
EET
12
R
O
B
B
IN
S PE
R
C
H
WE
ST
C
T
AF
T
O
N
P
A
R
K
D
R
5
7
0
5
6
5
C
C
C
F
FF
F
F
F
CHORD
CHORD
CHORD
CHORD
CHORD
CHORD
2GI
2GI
2GI
2GI
FSFS
FS
FS
HW
4OTCB
HW
JB w/MH
4OTCB
REMOVE
REMOVE
REMOVE
JB w/MH
1
8
"
C
S
P
FS
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
REMOVE
CONNECTORS
AND ROD AND LUG
24" CSP W/ 2 ELBOWS
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #24
d
d= 5 Ft.
b= 10 Ft.
B= 3 Ft.
Min. D= 2 Ft.
Fabric
Filter
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 566+75 TO 569+25 -L- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 561+45 TO 565+50 -L- RT
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #11
b= 5 Ft.
B= 3 Ft.
Min. D= 2 Ft.
FROM STA 572+50 TO 576+60 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #13
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 569+30 TO 572+50 -L- LT
FROM STA 567+00 TO 568+70 -L- RT
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#13
W/ 600 SY FF
EST. 231 TONS
LATERAL 3’ BASE DITCH W/ CLASS ’B’ RIP RAP
SEE DETAIL#11
LATERAL 3’ BASE DITCH
EST. 258 SY FABRIC
EST. 106 TONS
SEE DETAIL#24
LATERAL 3’ BASE DITCH W/ CLASS "B" RIPRAP
Type of Liner= Class ’B’ Rip-Rap
SEE DETAIL#6
EST 625 SY FF
EST 232 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
EST 75 SY FFEST 40 TONSSEE DETAIL 32(BANKS ONLY)CLASS I RIP RAP
60" RCP-IV
15" RCP-IV
1
5
"
R
C
P
-
I
V
60"
RCP-IV
60"
RCP-IV
2
4
"
R
C
P
-
I
V
42" RC
P-C
D
42" RC
P-C
D
18" RCP-IV
15
"
R
C
P
-
IV
15
"
RC
P
-
IV
15" RCP-IV
60" RCP-III
8" VC
IN
V
=847.01’
T
O
P=854.31’
6
0
" R
C
P
F
E
S
R
OB
B
IN
S P
E
R
C
H
WE
ST
C
T
18’ B
ST
4
8"
C
ONC
4
8
" C
O
N
C
W
D
DK
4
8"
CO
N
C
12’ B
S
T
10 ’ B
ST
4
8"
CONC
12
’ B
S
T
4
8"
C
ONC
4
8
"
C
O
N
C
B ST
AF
T
ON
P
AR
K
18’
B
S
T
2SFD
2SFD
1SFD
1S FD
1S
FD
12’
BS
T
2
S
F
D
10’ CO N C
15" H
D
PER
O
B
B
IN
S PE
R
C
H
C
T 20’ B
ST
C
O
N
C
4
8"
48
"
CONC
W
D
2
S
F
D
25’
C
ON
C
1S
F
D
12’ C
ON
C
15"
R
C
P
C
ONC
R
O
B
BI
NS
P
E
R
C
H
T
R
AI
L 20’
B
S
T
20’ B
ST
W
D
DK
W
D
D
K
W
D
D
K
CO
NC
C
O
N
C
B
S
T
B
S
T
AREA U/C
CAT-1 GRAU-350
T
E
S
T
E
S
C
O
NC
HW
18 " R
C
P
42" RCP
INV=887.07
INV=892.75
BOARD OF EDUCATION
WINSTON-SALEM/FORSYTH COUNTY
MELODY R. ANDERSON
CECIL K. ANDERSON &
VETERANS AFFAIRS
SECRETARY OF
TAMMY THOMAS
DAVID SCOTT THOMAS &
STANLEY STIGALL
CHARLIE MARTIN
5
0.0
0’
E
X
IST
IN
G
R
/W
E
X
IST
IN
G
R
/W
50.00’
E
XI
S
TI
NG
R/
W
E
XIS
TI
NG
R/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
ELLEN COLETTE MATHIS
CHARLES AARON MATHIS, JR.
MELINDA ANDERSON WOOD
RICHARD KEVIN WOOD
LISA HOLLOWAY
BOBBY D. HOLLOWAY
NICOLE A. HOWARD
CLAY M. HOWARD
KIMBERLY D. SCOTT
RONALD L. SCOTT, JR.
50.0
0’E
X
IST
IN
G
R
/W
E
X
IST
IN
G
R
/W
50.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
5
0.0
0’
E
X
IST
IN
G
R
/W
E
X
IST
IN
G
R
/W
MELODY ROBBINS ANDERSON
KAYE ROBBINS FULP
MABEL S. ROBBINS
R.R. ROBBINS
BONNIE M. ROBBINS
RICHARD R. ROBBINS
KEYA LEAK
WILLIE LEAK
EI
P
AMY MESSERSMITH
ELLSWORTH MESSERSMITH, JR.
EMILY EBERT MCDUFFIE
DAVID KEITH MCDUFFIE
EMILY EBERT MCDUFFIEDAVID KEITH MCDUFFIE
SHUGART ENTERPRISES, LLC
BONN
IE
M
. ROBB
INS
R
ICHARD
R
. ROBB
INS
E
D
WA
R
D
R
IC
HA
R
D
S
O
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FO
R
SY
TH
C
O
U
N
TY
T
O
W
N
OF
K
E
R
N
E
R
S
VI
L
L
E
TO
WN
O
F K
ER
N
ER
SV
ILLE
20’ SANITARY SEW
ER EASEMENT
MICHELL OELKER
KEITH OELER &
APRIL L. CRAFFORD
JONATHAN L. BRITT &
HELEN R. PAIGE
&
JAMES R. PAIGE SR.
STANLEY R. STIGALL
ENTERPRISES LLC
SHUGART
ENTERPRISES LLC
SHUGART
ENTERPRISES LLC
SHUGART
SHEET 17 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
SITE 10
SITE 10A
BEGIN JS
S
S
S
S
S S S
S
S
S
S
SS
S
S
S
S S
S
S
S
S
S S
S
S
S
S
SS
F
F F
850
850
850
850
8
6
0
860
860
860
860
860
8
6
0
8
6
0
860
8
6
0
860
860
860
860
8
6
0
860
8
7
0
870
870
870
870
8
7
0
870
870
870
870
870870
870
870
8 7 0
8
7
0
870
8
7
0
870
870
870
870
870
8
7
0
8
8
0
8
8
0
8
8
0
8
8
0
880
880
8
8
0
8
8
0
880
880880
880
8
8
0
8
8
0
880
8
8
0
8
8
0
8 8 0
880
880
880 880
880
880
880
880
8
8
0
880
880
8
8
0
88
0
880
8
8
0
880
8
8
0
880
880
8
8
0
890
890
890
8
9
0
8
9
0
8
9
0
890
890
8
9
0
890
890
890
8
9
0
890
890890
8
9
0
890
890
890
8
9
0
890
89
0
890
890
890
890
8
90
890
8
9
0
890
890
890
8
9
0
8
9
0
8
9
0
900
900
900
900
900
9
0
0
900
900
9 0 0
900
9
0
0
900
900
9
0
0
900
9
0
0
9
0
0 900
900
900
900
900
9
00
9
0
0
900
900
900
900
900
9
0
0
9
0
0
900
900
9
0
0
900
900
910
9
1
0
910
910
910
910
910
910
910
910
910
910
910
9
10
910
9
10
9
10
910
910
920
9
2
0
920
920
920
920 930
9
3
0
9
3
0
930
930 930
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
1
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
11U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
6
1
+
6
1
S
H
E
E
T
1
0
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
7
4
+
3
6
S
H
EET
12
R
O
B
B
IN
S PE
R
C
H
WE
ST
C
T
AF
T
O
N
P
A
R
K
D
R
5
7
0
5
6
5
C
C
C
F
FF
F
F
F
CHORD
CHORD
CHORD
CHORD
CHORD
CHORD
2GI
2GI
2GI
2GI
FSFS
FS
FS
HW
4OTCB
HW
JB w/MH
4OTCB
REMOVE
REMOVE
REMOVE
JB w/MH
1
8
"
C
S
P
FS
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
REMOVE
CONNECTORS
AND ROD AND LUG
24" CSP W/ 2 ELBOWS
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #24
d
d= 5 Ft.
b= 10 Ft.
B= 3 Ft.
Min. D= 2 Ft.
Fabric
Filter
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 566+75 TO 569+25 -L- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 561+45 TO 565+50 -L- RT
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #11
b= 5 Ft.
B= 3 Ft.
Min. D= 2 Ft.
FROM STA 572+50 TO 576+60 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #13
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 569+30 TO 572+50 -L- LT
FROM STA 567+00 TO 568+70 -L- RT
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#13
W/ 600 SY FF
EST. 231 TONS
LATERAL 3’ BASE DITCH W/ CLASS ’B’ RIP RAP
SEE DETAIL#11
LATERAL 3’ BASE DITCH
EST. 258 SY FABRIC
EST. 106 TONS
SEE DETAIL#24
LATERAL 3’ BASE DITCH W/ CLASS "B" RIPRAP
Type of Liner= Class ’B’ Rip-Rap
SEE DETAIL#6
EST 625 SY FF
EST 232 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
EST 75 SY FFEST 40 TONSSEE DETAIL 32(BANKS ONLY)CLASS I RIP RAP
60" RCP-IV
15" RCP-IV
1
5
"
R
C
P
-
I
V
60"
RCP-IV
60"
RCP-IV
2
4
"
R
C
P
-
I
V
42" RC
P-C
D
42" RC
P-C
D
18" RCP-IV
15
"
R
C
P
-
IV
15
"
RC
P
-
IV
15" RCP-IV
60" RCP-III
8" VC
IN
V
=847.01’
T
O
P=854.31’
6
0
" R
C
P
F
E
S
R
OB
B
IN
S P
E
R
C
H
WE
ST
C
T
18’ B
ST
4
8"
C
ONC
4
8
" C
O
N
C
W
D
DK
4
8"
CO
N
C
12’ B
S
T
10 ’ B
ST
4
8"
CONC
12
’ B
S
T
4
8"
C
ONC
4
8
"
C
O
N
C
B ST
AF
T
ON
P
AR
K
18’
B
S
T
2SFD
2SFD
1SFD
1S FD
1S
FD
12’
BS
T
2
S
F
D
10’ CO N C
15" H
D
PER
O
B
B
IN
S PE
R
C
H
C
T 20’ B
ST
C
O
N
C
4
8"
48
"
CONC
W
D
2
S
F
D
25’
C
ON
C
1S
F
D
12’ C
ON
C
15"
R
C
P
C
ONC
R
O
B
BI
NS
P
E
R
C
H
T
R
AI
L 20’
B
S
T
20’ B
ST
W
D
DK
W
D
D
K
W
D
D
K
CO
NC
C
O
N
C
B
S
T
B
S
T
AREA U/C
CAT-1 GRAU-350
T
E
S
T
E
S
C
O
NC
HW
18 " R
C
P
42" RCP
INV=887.07
INV=892.75
BOARD OF EDUCATION
WINSTON-SALEM/FORSYTH COUNTY
MELODY R. ANDERSON
CECIL K. ANDERSON &
VETERANS AFFAIRS
SECRETARY OF
TAMMY THOMAS
DAVID SCOTT THOMAS &
STANLEY STIGALL
CHARLIE MARTIN
5
0.0
0’
E
X
IST
IN
G
R
/W
E
X
IST
IN
G
R
/W
50.00’
E
XI
S
TI
NG
R/
W
E
XIS
TI
NG
R/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
ELLEN COLETTE MATHIS
CHARLES AARON MATHIS, JR.
MELINDA ANDERSON WOOD
RICHARD KEVIN WOOD
LISA HOLLOWAY
BOBBY D. HOLLOWAY
NICOLE A. HOWARD
CLAY M. HOWARD
KIMBERLY D. SCOTT
RONALD L. SCOTT, JR.
50.0
0’E
X
IST
IN
G
R
/W
E
X
IST
IN
G
R
/W
50.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
5
0.0
0’
E
X
IST
IN
G
R
/W
E
X
IST
IN
G
R
/W
MELODY ROBBINS ANDERSON
KAYE ROBBINS FULP
MABEL S. ROBBINS
R.R. ROBBINS
BONNIE M. ROBBINS
RICHARD R. ROBBINS
KEYA LEAK
WILLIE LEAK
EI
P
AMY MESSERSMITH
ELLSWORTH MESSERSMITH, JR.
EMILY EBERT MCDUFFIE
DAVID KEITH MCDUFFIE
EMILY EBERT MCDUFFIEDAVID KEITH MCDUFFIE
SHUGART ENTERPRISES, LLC
BONN
IE
M
. ROBB
INS
R
ICHARD
R
. ROBB
INS
E
D
WA
R
D
R
IC
HA
R
D
S
O
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FO
R
SY
TH
C
O
U
N
TY
T
O
W
N
OF
K
E
R
N
E
R
S
VI
L
L
E
TO
WN
O
F K
ER
N
ER
SV
ILLE
20’ SANITARY SEW
ER EASEMENT
MICHELL OELKER
KEITH OELER &
APRIL L. CRAFFORD
JONATHAN L. BRITT &
HELEN R. PAIGE
&
JAMES R. PAIGE SR.
STANLEY R. STIGALL
ENTERPRISES LLC
SHUGART
ENTERPRISES LLC
SHUGART
ENTERPRISES LLC
SHUGART
SHEET 18 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 11
SITE 11A
SITE 13
SITE 14
SITE 12
S
S
S
S
S
S
S
S
S
S
S
S
S
S
TS
TS
S
S S
S S S
S
S S
S
S
S
S
S
S
S
TS
W
L
B
WL
B
W
LB
WLB
WL
B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
2
0
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
j
h
a
r
v
e
y
8
/
1
7
/
9
9
15U-2579B
M
A
T
C
H
LI
N
E
-
L-
S
T
A
.
6
0
8
+
9
2
S
H
E
E
T
1
4
M
A
TC
H
LIN
E
-
L-
S
TA
.6
3
3
+
0
0
S
H
EE
T
16
MATC
H
LIN
E -Y4
RPBD
- STA.32
+
2
1
SH
EE
T
16
M
A
T
C
H
LI
N
E -
Y
4
R
P
A-
S
T
A.2
0
+
5
0
S
H
E
E
T
16
TRAFFIC DIAGRAM
-L-
21,300
27,300
24,660
36,980
32,600
43,800
2010 ADT
2030 ADT 47,720
61,160
5,360
7,280
4,940
5,420
6,600
11,800
53,560
79,880
DUAL = 5%
TTST = 6%
DIR = 60%
DHV = 10%
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
-Y4- (US 421/I-40 BUS. )
BELTLINE
R
I
G
H
T
O
F
WA
Y
R
E
V
I
S
I
O
N
,
11
/
5
/
12
-
P
A
R
C
E
L
9
8
A
A
D
D
E
D
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
11
/
5
/
12
-
P
A
R
C
E
L
9
8
A
D
J
U
S
T
E
D
O
N
P
L
A
N
S
T
O
M
A
K
E
I
T
V
I
S
I
B
L
E
2
"
P
L
2
"
P
L
2" PL
6" DI
6
"
D
I
6
"
D
I
6" DI
6" DI
2
" P
L
6" DI
6"
DI
2" P
L
2
" P
L
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R
)
(ATUR)
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R)
(ATUR)
(
A
T
U
R)
(
A
TUR)
(
A
T
U
R
)
(
A
T
U
R)
6
10
6
15
6
2
0
6
2
5
6
3
0
10
1
5
2
0
10
15
2
0
2
5
3
0
10
15
2
0
2
5
3
0
3
5
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
F
F
F
F
F
C
C
NCDOT
(
NCDOT
(
(
)
)
CHO
RD
CHO
RD
CHORD
CHORD
NCDOT
(
(
)
)
NCDOT
(
()
)
(
(
)
)
NCDOT
(
(
2GI
2GI
2GI
2GI
2GI
2GI
3GI-A
3GI-A
FS
FS
FS
FS
FSFS
3@10’X9’ RCBC
AT BEGIN BRIDGE
END SHOULDER BERM GUTTER
2GI
FS
REMOVE
REMOVE
REMOVE
GRADE TO DRAIN
GRADE TO DRAIN
CUT AND FILL
COMBINATION OF
GRADE TO DRAIN WITH
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI-A W/ FLAT
GRATE
2GI-A W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI-A W/ FLAT
HW
CL ’I’ RIPRAP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
36" CSP W/ 2 ELBOWS
3@10’x9’ RCBC
GRATE
2GI-A W/ FLAT
GRADE TO DRAIN
1
5"
C
S
P
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FROM STA 630+50 TO 633+35 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1 2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 619+50 TO 621+25 -L- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. 627+85 TO 628+85 -L- RT
SEE DETAIL#5
LATERAL 3’ BASE DITCHSEE DETAIL#5
LATERAL 3’ BASE DITCHTO BEGIN BRIDGE
STA 24+00 -Y4RPBD- LT
SHOULDER BERM GUTTER
DDE= 200 CY
30’ BASE CHANNEL
EST. DDE 18 CY
SEE DETAIL#8
HEAD DITCH
SEE DETAIL #17
EST. DDE 44 CY
W/ CL ’I’ RIPRAP
3’ BASE DITCH
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 24+00 TO 25+40 -Y4RPBD- LT
FROM STA 30+20 TO 33+50 -Y4RPBD- RT
FROM STA 16+50 TO BOX CULVERT -Y4RPBD- RT
FROM STA 625+00 TO 626+00 -L- RT
FROM STA 619+00 TO 619+35 -L- LT
FROM BOX CULVERT TO STA 616+25 -L- LT
STA. 626+30 -L- RT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
FLAT GRATE
2GI W/
FS2GI
MCF
MCF
FLAT GRATE
2GI W/
AND ROD&LUG CONNECTORS
5’ CSP W/ 2 ELBOWS1
SEE DETAIL#6
EST 154 SY FF
EST 57 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 272 SY FF
EST 101 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 509 SY FF
EST 189 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL #6
EST 216 SY FF
EST 80 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 336 SY FF
EST 126 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
W/ 2365 SY FF
EST. 333 TONS
CLASS ’I’ RIP RAP
EST. DDE 330CY
SEE DETAIL#25
TAIL DITCH
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
STA 31+00 -Y4RPBD- RT
END BRIDGE TO
SBG
15" RCP-IV
HW
15" RCP-IV
18
"
R
C
P
-
I
V
1
5
"
RC
P
-
I
V
18" RCP-IV
1
5
"
R
C
P
-
I
V
15
"
RC
P
-
IV
24" RCP-IV
24" RCP-IV
24" RCP-IV
4
8
" RC
P-
C
D
30" RCP-IV
3
0
"
RC
P
-
I
V
18
"
RC
P
-
I
I
I
15" RCP-III
18" RCP-III
15
"
RC
P
-
I
V
15" RCP-III
15
"
RC
P
-
I
V
15
"
RC
P
-
I
V
15
"
RC
P-
I
I
I
15" RCP-III
18" RCP-III
36"
C
SP
15
"
R
C
P-
I
V
15
" RC
P-IV
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
15" RCP-IV
Natural Natural
Ground Ground2:12:
1
( Not to Scale)
Filter Fabric
B
Type of Liner= Class ’I’ Rip-Rap
DETAIL #34
CHANNEL CHANGE
B= 15.0 Ft.
1 foot
Key In Rip Rap
FROM STA. 19+98 TO 21+22 --Y4RPBD- RT
EST +/-375 TONS
CLASS ’I’ RIP RAP
SEE DETAIL #34
CHANNEL CHANGE
CHANNEL
FILL IN EXISTING
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE DETAIL#6
EST 154 SY FF
EST 57 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 54 SY FF
EST 20 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#14
W/ 328 SY FF
EST. 100 TONS
W/ CLASS B RIPRAP
LATERAL V-DITCH
STA 609+68.44 -L- RT
BERM GUTTERBEGIN SHOULDER
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
236’
+85.00 -Y4RPBD-
222’
+40 -Y4RPBD-
4
8
" RC
P-
C
D
RIP RAP
CLASS ’I’
EST. DDE 40 CY
SEE DETAIL #8
TAIL DITCH
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 18+00 TO 18+88 -Y4RPBD- RT
FROM STA. 23+43 TO 23+49 -Y4CD- LT
SILL
8" VC
8
"
V
C
8"
V
C
8" DI
8" VC
8
"
V
C
8" VC
18" VC
18
" VC
18
" VC
36
"
VC
36"
V
C
24
"
VC
2
4
" VC
2
4
"
V
C
2
4
"
V
C
18
"
V
C
18
" V
C
L
O
C
A
T
I
O
N
A
P
P
R
O
X
.
SCRUB
15" RCP
HTR
HTR
WD
S
S
S
10’
B
S
T
L
T
W
W
L
T
W/L
T
GERRY RD 20’ BST
B
L
K
W
A
L
L
S
S
S
S
S
72" C
HL
S
2SBK APT
2
S
B
K
A
P
T
2
S
B
K
A
P
T
2
S
B
K
A
P
T
18" RCP
LT
3
0
"
C
&
G
B
S
T
3
0
"
C
&
G
CONC
CONC
CONC
CONC
CONC
DI
CB LT
CONC
H
U
N
T
E
R
L
A
N
E
2
3
’
B
S
T
L
T
TIMBER RIDGE 19’ BST
L
T
3
0
"
C
&
G
SOIL
S
OIL
48" CONC
H
T
R
H
T
R
H
T
R
S S
CANOPYMTL
HT
R
C
A
N
O
P
Y
MT
L
C
A
N
O
P
Y
MT
L
C
A
NO
P
Y
MT
L
W
S
L
T
W
/
L
T
W
/
L
T
W
/
L
T
HTR
S
GR
W
4
8
"
W
W
12"
R
C
P
PUMP STATION RD 12’ BST
48" WW
48" WD
G
R
12
"
R
C
P
1
2
"
R
C
P
G
R
1S
F
D
WALL
BK
C
ON
C
3
6
"
W
S
GR
W1SFD
H
TR
WS
12
" R
C
P
H
T
R
12
" R
C
P
12
" R
C
P
2
4
" R
C
P
18
" RC
P
H
T
R
GUY
2SFD
48" CONC
C
O
N
C
9
’
C
O
N
C
15" RCP
LT
2 S B KD
15" RCP
23 ’ B S T
L
T
CONC
D
I
2
S
B
K
D
2SBKD
2
S
B
K
D
2SBKD
2SBKD
2SBKD
CONC
CONC
10’ CONC
10’ CONC
10’ CONC
WASHINGTON CT 20’ BST
4
8
"
C
O
N
C
48" C
O
N
C
C
O
N
C
L
T
K
O
I
P
O
N
D
4
8
"
C
O
N
C
15
"
R
C
P
15
"
R
C
P
15
"
R
C
P
L
T
2SFD
4
8
"
W
D
&
W
W
4
8
"
C
O
N
C
9’ CONC
4
8
"
C
O
N
C
2SBKD
CONC
S
LT
1
5
"
R
C
P
FOUNDATION
1
5
"
R
C
P
L
T
1
5
"
R
C
P
15
"
R
C
P
4
8
"
C
O
N
C
4
8
"
B
K
1
5
"
R
C
P
L
T
LT
BK WALL
L
O
N
G
W
A
L
K
D
R
2
0
’
B
S
T
G
S
ABAND
2SFD
WALLBK
WALKBK
15’ CONC
1
0
’
C
O
N
C
10’ C
O
N
C
2SB
KD
2
S
B
KD
2SBKD
48
" C
ON
C
4
8
" C
O
N
C
48" CONC
CONC
30"C&G
30
"C&G
3
0
"C
&
G
POO
L
CONC
48"IRON
S
R
4
2
4
1
R
E
G
E
N
T
S
P
A
R
K
R
D
2
6’
B
S
T
8’ CONC
W
D
D
K
DK
WD
WD DK
WD DK
CONC
W
D
D
K
W
D
D
K
D
I
15
"
R
C
P
BST
3
0
"
C
&
G
S
C
R
U
BS
C
R
U
B
S
C
R
U
B
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
15
"
R
C
P
15
"
R
C
P
W
D
D
K
W
D
D
K
W
D
D
K
D
K
W
D
L
T
15" RCP
CONC
W
CONC
CONC
CONC
DKWD 1
8
"
R
C
P
15
"
R
C
P
1
5
"
R
C
P
15" RCP
1
5
"
R
C
P
D
I
D
I
18" RCP
24" CMP
15
" RC
P
W/
L
T
CONC
CONC48" CO
NC
72’ LATTICE
GR
W
/
L
T
LT
LT
GRAU-350
B-77
B-77
B-77
B-77
B-77
GRAU-350
G
R
A
U-
350
B-
77
B-
77
B-
77
CAT-
1
B-77
B-77
B-
77
B-77
CAT- 1
TYPE M350
TYPE M350
B-77
B-77
TES
TES
TYPE B-77
18" RCP
INV=857.12 INV=857.47
1
5
"
R
C
P
D
I
15
"
R
C
P
18
"
R
C
P
D
I
15" RCP
15
" RC
P
15
"
R
C
P
D
I
D
I
SANDRA F. SHREVE
FLORINE SMITH SYKES
BRANDON P. MILLER
DEBORAH P. MILLERDORIS CROTTS
KAYLON C. CROTTS
GLADYS L. CROTTS
JOHN R. CROTTS
JOHN NATHAN TABOR
PENNSTON CORP.
20’ DRAINAGE EASEMENT PB 33 PG 115
2
0
’
D
R
A
I
N
A
G
E
E
A
S
E
M
E
N
T
P
B
3
3
P
G
11
5
20’ DRAINAGE EASEMENT PB 33 PG 115
20’ S
A
NIT
A
R
Y SE
WE
R E
ASE
ME
NT P
B 36 P
G 16
2
0
’ S
AN
IT
ARY
S
EWER
EAS
EMENT
P
B 3
6
P
G 16
20’ DRAINAGE EASEMENT PB 33 PG 115
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
16
20’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B 36
P
G 16
EIP
EIP
EIP
EIP EIP
HELEN ELLIOTT
HELEN ELLIOTT
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MARCIA H. POTTER
DENNIS L. POTTER
SUSAN E. HANSON
JAMES M. HANSON
CYNTHIA M. LUDWIG
KENNETH M. LUDWIG
PENNSTON CORP.
SUZANNE TEDDER
RUSSELL F. TEDDER
ANNE C. FRAZIER
MARK H. FRAZIER
CONNIE J. CALDWELL
SIDNEY N. CALDWELL
BARBARA MURRAY
JAMES D. MURRAY
GINA MORRISON
RONALD J. MORRISON
REBECCA KARR
JAMES R. KARR
PENNSTON CORP.PENNSTON CORP.
PENNSTON CORP.
MICHAL E. DEMATTE
DAVID L. DEMATTE
ALLISON THOMASON
SAMUEL L. THOMASON
JANE E. STEPHENS SUNTER
MARK J. SUNTER
GAYLE W. BURGENER
STEPHEN D. BURGENER
GAYLE W. BURGENER
STEPHEN D. BURGENER
PENNSTON CORP.
60.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
60.00’
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
E
X
I
S
T
I
N
G
R/
W
E
X
I
S
T
I
N
G
R/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
IN
G
R
/
W
60.00’
ALISA K. YANNOPOULOS
GEORGE S. YANNOPOULOS
ALISA K. YANNOPOULOS
GEORGE S. YANNOPOULOS
JESSIE COELL HAUSER
GEROLENE WIDENER HAUSER
GLADYS L. CROTTS
JOHN R. CROTTS
BERDINA SMITH
JOHN ROY CROTTS JR.
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
60
.00
’
E
XIS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MISTY P. VEGA
SILVESTRE VEGA CASTILLO
EXISTING R/W
EXISTING R/W
6
0.0
0’
EIP
EIP
EIP
EIP
GINA CHILDRESS
WOODROW H. CHILDRESS JR.
EIP
EIP
HELEN ELLIOTT
VICKIE O. DAVIS
PHILLIP A. DAVIS
DONNA PRANKE
CLIFFORD T. PRANKE
POPE L.E. BUILDING CO. INC.
GEROLENE HAUSER
JESSIE C. HAUSER
LISA LYNNAE’DARBY HOLNESS
KENWORTH FITZGERALD HOLNESS
KAREN R. YOKLEY
BRENT E. YOKELY
KATHERINE ARMSTRONG
STEPHEN T. ARMSTRONG
JOHN W. DAVIS III
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
HELEN ELLIOTT
20
’ S
AN
IT
AR
Y SE
WE
R
E
A
S
E
ME
NT
2
0
’ S
ANIT
ARY S
EWER EAS
EME
NT
2
0
’ S
ANIT
ARY
S
EWE
R
E
AS
EME
NT
20’ SANITARY SEWER EASEMENT
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
2
5
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
1
6
20’ SANITARY SEWER EASEMENT
20’ SANITARY SEWER EASEMENT
2
0’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
DB 1345 PG 455
REGRESS EASEMENT
INGRESS/EGRESS/
TOWN OF KERNERSVILLE
3
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
33
PG
115
20
’ D
R
A
IN
A
G
E
E
A
S
EM
E
N
T
FULLER
GREGORY
DEBORAH B. GAITHER
JOHN A. GAITHER
DIANE RICH
JAMES D. RICH
TAWNY S. HONAKER
FORMERLY
KENNETH & KENDRA SHOWALD
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
L
T
W/L
T
W
/
L
T
W
/
L
T
W/
L
T
W
/
L
T
SHEET 19 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 11
SITE 11A
SITE 13
SITE 14
SITE 12
S
S
S
S
S
S
S
S
S
S
S
S
S
S
TS
TS
S
S S
S S S
S
S S
S
S
S
S
S
S
S
TS
8
2
0
8
2
0
8
2
0
8
2
0
8
2
0
820820
820
820
82
0
8
2
0
8
2
0
8
2
0
82
0
8
2
0
8
2
0
8
2
0
8 2 0
82
0
820
82 0
8
2
0
8
2
0
820
820
820
8
2
082
0
820
820
82
0
8
2
0
8
2
0
820
820
820
820
820
820
820
820
8
2
0
8
2
0
82
0
820
8
2
0
820
82
0
82
0
82
0
8
2
0
820
8
2
0
820
820
8
2
0
8
2
0
8
2
0
8
20
8
2
0
8
3
0
83
0
8
3
0
83
0
83
0
8
3
0
8
3
0
830
83
0
83
0
8
30
83
0
830
830
830
830
8
3
0
8
3
0
8
3
0
830
830
830
830
830
8
3
0
83
0
8
3
0
830
8
3
0
830
830
830
8
3
0
830
83
0
8
3
0
830
830
8
30
830
830
830
8
3
0
8
30
8
3
0
830
830
830
8
3
0
830
830
830
830
830
830
8
30
830
830
8
3
0
830
830
830
8
3
0
830
830
830
830
830
8
3
0
8
3
0
8
3
0
8
3
0
8
4
0
840
8
4
0
840
840
840
840
84
0
8
4
0
8
4
0
840
840
840
8
4
0
84
0
8
4
0
840
8
4
0
840
840
84
0
840
840
84
0
8
4
0
840
840
8
4
0
8
40
840
840
840
8
4
0
8
4
0
8
4
0
8
40
8
4
0
840
840
840
840840
8
4
0
8
4
0
840840
8
4
0
840
840
84
0
840 840
840
840
8
4
0
840
8
4
0
8
4
0
8
4
0
840
84
0
84
0
840
840
84
0
840
840
8
4
0
840
8
4
0
8
40
840
8
4
0
8
4
0
84
0
8
4
0
8
4
0 84
0
840
840
8
40
850
85
0
850
850
850
850
8
5
0
8
5
0
8
5
0
8
5
0
850
850
850
850
850
850
8
50
850
8
5
0
850
850
850
850
850
850
850
850
850
850
850
850
850
850
850
850
85
0
8
5
0
8
5
0
8
5
0
8
5
0
8
5
0
85
0
8
5
0
8
5
0
850
850
85
0
850
85
0
8
5
0
8
5
0
8
5
0
8
5
0
850
85
0
8
50
8
50
8
5
0
850 850
8
5
0
850
8
5
0
8
50
8
5
0
850
850
8
5
0
8
5
0
850
850
850
850
8
5
0
8
5
0
850
850
8
5
0
8
5
0
860
860
860
860
8
6
0
860
8
6
0
8
6
0
8
6
0
86
0
860
860
860
8
6
0
8
6
0
860
8
6
0860
860
860
860
860
860
860
860
860
860
860
86
0
86
0
860
860
8
6
0
8
60
8
6
0
860
860
8
60
8
6
0
8
6
0
860
860
8
6
0
860
860
860
860
860
860
860
860
8
6
0
8
6
0
860
8
60
860
860
8
6
0
860
8
6
0
86
0
8
6
0
8
6
0
86
0
86
0
860
8
6
0860
8
6
0
860
8
6
0
8
6
0
870
870
870
870
8
7
0
8
7
0
870
870
870
870
870
8
7
0
8
7
0
870
870
870
870
870
870
870
870
870
8
7
0
870
870
8
7
0
8
7
0
870
8
70
8
7
0
870
870
87
0
870
870
870
8
70
8
7
0
870
8
7
0
870
8
7
0
8
7
0
870
8
7
0 870
8
7
0
870
8
7
0
8 7 0
870
8
7
0
880
880
8
8
0
8
8
0
880
880
880
880
8
8
0
880
880
880
880
880
880
880
880
8
8
0
8
8
0
880
8
8
0
88
0
880
880
880
880
880
8
8
0
8
8
0
880
880
8
8
0
8
8
0
890
89
0
89
0
890
890
890
890
89089
0
W
L
B
WL
B
W
LB
WLB
WL
B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
2
0
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
15U-2579B
M
A
T
C
H
LI
N
E
-
L-
S
T
A
.
6
0
8
+
9
2
S
H
E
E
T
1
4
M
A
TC
H
LIN
E
-
L-
S
TA
.6
3
3
+
0
0
S
H
EE
T
16
MATC
H
LIN
E -Y4
RPBD
- STA.32
+
2
1
SH
EE
T
16
M
A
T
C
H
LI
N
E -
Y
4
R
P
A-
S
T
A.2
0
+
5
0
S
H
E
E
T
16
TRAFFIC DIAGRAM
-L-
21,300
27,300
24,660
36,980
32,600
43,800
2010 ADT
2030 ADT 47,720
61,160
5,360
7,280
4,940
5,420
6,600
11,800
53,560
79,880
DUAL = 5%
TTST = 6%
DIR = 60%
DHV = 10%
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
-Y4- (US 421/I-40 BUS. )
BELTLINE
R
I
G
H
T
O
F
WA
Y
R
E
V
I
S
I
O
N
,
11
/
5
/
12
-
P
A
R
C
E
L
9
8
A
A
D
D
E
D
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
11
/
5
/
12
-
P
A
R
C
E
L
9
8
A
D
J
U
S
T
E
D
O
N
P
L
A
N
S
T
O
M
A
K
E
I
T
V
I
S
I
B
L
E
2
"
P
L
2
"
P
L
2" PL
6" DI
6
"
D
I
6
"
D
I
6" DI
6" DI
2
" P
L
6" DI
6"
DI
2" P
L
2
" P
L
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R
)
(ATUR)
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R)
(ATUR)
(
A
T
U
R)
(
A
TUR)
(
A
T
U
R
)
(
A
T
U
R)
6
10
6
15
6
2
0
6
2
5
6
3
0
10
1
5
2
0
10
15
2
0
2
5
3
0
10
15
2
0
2
5
3
0
3
5
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
F
F
F
F
F
C
C
NCDOT
(
NCDOT
(
(
)
)
CHO
RD
CHO
RD
CHORD
CHORD
NCDOT
(
(
)
)
NCDOT
(
()
)
(
(
)
)
NCDOT
(
(
2GI
2GI
2GI
2GI
2GI
2GI
3GI-A
3GI-A
FS
FS
FS
FS
FSFS
3@10’X9’ RCBC
AT BEGIN BRIDGE
END SHOULDER BERM GUTTER
2GI
FS
REMOVE
REMOVE
REMOVE
GRADE TO DRAIN
GRADE TO DRAIN
CUT AND FILL
COMBINATION OF
GRADE TO DRAIN WITH
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI-A W/ FLAT
GRATE
2GI-A W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI-A W/ FLAT
HW
CL ’I’ RIPRAP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
36" CSP W/ 2 ELBOWS
3@10’x9’ RCBC
GRATE
2GI-A W/ FLAT
GRADE TO DRAIN
1
5"
C
S
P
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FROM STA 630+50 TO 633+35 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1 2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 619+50 TO 621+25 -L- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. 627+85 TO 628+85 -L- RT
SEE DETAIL#5
LATERAL 3’ BASE DITCHSEE DETAIL#5
LATERAL 3’ BASE DITCHTO BEGIN BRIDGE
STA 24+00 -Y4RPBD- LT
SHOULDER BERM GUTTER
DDE= 200 CY
30’ BASE CHANNEL
EST. DDE 18 CY
SEE DETAIL#8
HEAD DITCH
SEE DETAIL #17
EST. DDE 44 CY
W/ CL ’I’ RIPRAP
3’ BASE DITCH
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 24+00 TO 25+40 -Y4RPBD- LT
FROM STA 30+20 TO 33+50 -Y4RPBD- RT
FROM STA 16+50 TO BOX CULVERT -Y4RPBD- RT
FROM STA 625+00 TO 626+00 -L- RT
FROM STA 619+00 TO 619+35 -L- LT
FROM BOX CULVERT TO STA 616+25 -L- LT
STA. 626+30 -L- RT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
FLAT GRATE
2GI W/
FS2GI
MCF
MCF
FLAT GRATE
2GI W/
AND ROD&LUG CONNECTORS
5’ CSP W/ 2 ELBOWS1
SEE DETAIL#6
EST 154 SY FF
EST 57 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 272 SY FF
EST 101 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 509 SY FF
EST 189 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL #6
EST 216 SY FF
EST 80 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 336 SY FF
EST 126 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
W/ 2365 SY FF
EST. 333 TONS
CLASS ’I’ RIP RAP
EST. DDE 330CY
SEE DETAIL#25
TAIL DITCH
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
STA 31+00 -Y4RPBD- RT
END BRIDGE TO
SBG
15" RCP-IV
HW
15" RCP-IV
18
"
R
C
P
-
I
V
1
5
"
RC
P
-
I
V
18" RCP-IV
1
5
"
R
C
P
-
I
V
15
"
RC
P
-
IV
24" RCP-IV
24" RCP-IV
24" RCP-IV
4
8
" RC
P-
C
D
30" RCP-IV
3
0
"
RC
P
-
I
V
18
"
RC
P
-
I
I
I
15" RCP-III
18" RCP-III
15
"
RC
P
-
I
V
15" RCP-III
15
"
RC
P
-
I
V
15
"
RC
P
-
I
V
15
"
RC
P-
I
I
I
15" RCP-III
18" RCP-III
36"
C
SP
15
"
R
C
P-
I
V
15
" RC
P-IV
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
15" RCP-IV
Natural Natural
Ground Ground2:12:
1
( Not to Scale)
Filter Fabric
B
Type of Liner= Class ’I’ Rip-Rap
DETAIL #34
CHANNEL CHANGE
B= 15.0 Ft.
1 foot
Key In Rip Rap
FROM STA. 19+98 TO 21+22 --Y4RPBD- RT
EST +/-375 TONS
CLASS ’I’ RIP RAP
SEE DETAIL #34
CHANNEL CHANGE
CHANNEL
FILL IN EXISTING
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE DETAIL#6
EST 154 SY FF
EST 57 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 54 SY FF
EST 20 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#14
W/ 328 SY FF
EST. 100 TONS
W/ CLASS B RIPRAP
LATERAL V-DITCH
STA 609+68.44 -L- RT
BERM GUTTERBEGIN SHOULDER
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
236’
+85.00 -Y4RPBD-
222’
+40 -Y4RPBD-
4
8
" RC
P-
C
D
RIP RAP
CLASS ’I’
EST. DDE 40 CY
SEE DETAIL #8
TAIL DITCH
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 18+00 TO 18+88 -Y4RPBD- RT
FROM STA. 23+43 TO 23+49 -Y4CD- LT
SILL
8" VC
8
"
V
C
8"
V
C
8" DI
8" VC
8
"
V
C
8" VC
18" VC
18
" VC
18
" VC
36
"
VC
36"
V
C
24
"
VC
2
4
" VC
2
4
"
V
C
2
4
"
V
C
18
"
V
C
18
" V
C
L
O
C
A
T
I
O
N
A
P
P
R
O
X
.
SCRUB
15" RCP
HTR
HTR
WD
S
S
S
10’
B
S
T
L
T
W
W
L
T
W/L
T
GERRY RD 20’ BST
B
L
K
W
A
L
L
S
S
S
S
S
72" C
HL
S
2SBK APT
2
S
B
K
A
P
T
2
S
B
K
A
P
T
2
S
B
K
A
P
T
18" RCP
LT
3
0
"
C
&
G
B
S
T
3
0
"
C
&
G
CONC
CONC
CONC
CONC
CONC
DI
CB LT
CONC
H
U
N
T
E
R
L
A
N
E
2
3
’
B
S
T
L
T
TIMBER RIDGE 19’ BST
L
T
3
0
"
C
&
G
SOIL
S
OIL
48" CONC
H
T
R
H
T
R
H
T
R
S S
CANOPYMTL
HT
R
C
A
N
O
P
Y
MT
L
C
A
N
O
P
Y
MT
L
C
A
NO
P
Y
MT
L
W
S
L
T
W
/
L
T
W
/
L
T
W
/
L
T
HTR
S
GR
W
4
8
"
W
W
12"
R
C
P
PUMP STATION RD 12’ BST
48" WW
48" WD
G
R
12
"
R
C
P
1
2
"
R
C
P
G
R
1S
F
D
WALL
BK
C
ON
C
3
6
"
W
S
GR
W1SFD
H
TR
WS
12
" R
C
P
H
T
R
12
" R
C
P
12
" R
C
P
2
4
" R
C
P
18
" RC
P
H
T
R
GUY
2SFD
48" CONC
C
O
N
C
9
’
C
O
N
C
15" RCP
LT
2 S B KD
15" RCP
23 ’ B S T
L
T
CONC
D
I
2
S
B
K
D
2SBKD
2
S
B
K
D
2SBKD
2SBKD
2SBKD
CONC
CONC
10’ CONC
10’ CONC
10’ CONC
WASHINGTON CT 20’ BST
4
8
"
C
O
N
C
48" C
O
N
C
C
O
N
C
L
T
K
O
I
P
O
N
D
4
8
"
C
O
N
C
15
"
R
C
P
15
"
R
C
P
15
"
R
C
P
L
T
2SFD
4
8
"
W
D
&
W
W
4
8
"
C
O
N
C
9’ CONC
4
8
"
C
O
N
C
2SBKD
CONC
S
LT
1
5
"
R
C
P
FOUNDATION
1
5
"
R
C
P
L
T
1
5
"
R
C
P
15
"
R
C
P
4
8
"
C
O
N
C
4
8
"
B
K
1
5
"
R
C
P
L
T
LT
BK WALL
L
O
N
G
W
A
L
K
D
R
2
0
’
B
S
T
G
S
ABAND
2SFD
WALLBK
WALKBK
15’ CONC
1
0
’
C
O
N
C
10’ C
O
N
C
2SB
KD
2
S
B
KD
2SBKD
48
" C
ON
C
4
8
" C
O
N
C
48" CONC
CONC
30"C&G
30
"C&G
3
0
"C
&
G
POO
L
CONC
48"IRON
S
R
4
2
4
1
R
E
G
E
N
T
S
P
A
R
K
R
D
2
6’
B
S
T
8’ CONC
W
D
D
K
DK
WD
WD DK
WD DK
CONC
W
D
D
K
W
D
D
K
D
I
15
"
R
C
P
BST
3
0
"
C
&
G
S
C
R
U
BS
C
R
U
B
S
C
R
U
B
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
15
"
R
C
P
15
"
R
C
P
W
D
D
K
W
D
D
K
W
D
D
K
D
K
W
D
L
T
15" RCP
CONC
W
CONC
CONC
CONC
DKWD 1
8
"
R
C
P
15
"
R
C
P
1
5
"
R
C
P
15" RCP
1
5
"
R
C
P
D
I
D
I
18" RCP
24" CMP
15
" RC
P
W/
L
T
CONC
CONC48" CO
NC
72’ LATTICE
GR
W
/
L
T
LT
LT
GRAU-350
B-77
B-77
B-77
B-77
B-77
GRAU-350
G
R
A
U-
350
B-
77
B-
77
B-
77
CAT-
1
B-77
B-77
B-
77
B-77
CAT- 1
TYPE M350
TYPE M350
B-77
B-77
TES
TES
TYPE B-77
18" RCP
INV=857.12 INV=857.47
1
5
"
R
C
P
D
I
15
"
R
C
P
18
"
R
C
P
D
I
15" RCP
15
" RC
P
15
"
R
C
P
D
I
D
I
SANDRA F. SHREVE
FLORINE SMITH SYKES
BRANDON P. MILLER
DEBORAH P. MILLERDORIS CROTTS
KAYLON C. CROTTS
GLADYS L. CROTTS
JOHN R. CROTTS
JOHN NATHAN TABOR
PENNSTON CORP.
20’ DRAINAGE EASEMENT PB 33 PG 115
2
0
’
D
R
A
I
N
A
G
E
E
A
S
E
M
E
N
T
P
B
3
3
P
G
11
5
20’ DRAINAGE EASEMENT PB 33 PG 115
20’ S
A
NIT
A
R
Y SE
WE
R E
ASE
ME
NT P
B 36 P
G 16
2
0
’ S
AN
IT
ARY
S
EWER
EAS
EMENT
P
B 3
6
P
G 16
20’ DRAINAGE EASEMENT PB 33 PG 115
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
16
20’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B 36
P
G 16
EIP
EIP
EIP
EIP EIP
HELEN ELLIOTT
HELEN ELLIOTT
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MARCIA H. POTTER
DENNIS L. POTTER
SUSAN E. HANSON
JAMES M. HANSON
CYNTHIA M. LUDWIG
KENNETH M. LUDWIG
PENNSTON CORP.
SUZANNE TEDDER
RUSSELL F. TEDDER
ANNE C. FRAZIER
MARK H. FRAZIER
CONNIE J. CALDWELL
SIDNEY N. CALDWELL
BARBARA MURRAY
JAMES D. MURRAY
GINA MORRISON
RONALD J. MORRISON
REBECCA KARR
JAMES R. KARR
PENNSTON CORP.PENNSTON CORP.
PENNSTON CORP.
MICHAL E. DEMATTE
DAVID L. DEMATTE
ALLISON THOMASON
SAMUEL L. THOMASON
JANE E. STEPHENS SUNTER
MARK J. SUNTER
GAYLE W. BURGENER
STEPHEN D. BURGENER
GAYLE W. BURGENER
STEPHEN D. BURGENER
PENNSTON CORP.
60.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
60.00’
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
E
X
I
S
T
I
N
G
R/
W
E
X
I
S
T
I
N
G
R/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
IN
G
R
/
W
60.00’
ALISA K. YANNOPOULOS
GEORGE S. YANNOPOULOS
ALISA K. YANNOPOULOS
GEORGE S. YANNOPOULOS
JESSIE COELL HAUSER
GEROLENE WIDENER HAUSER
GLADYS L. CROTTS
JOHN R. CROTTS
BERDINA SMITH
JOHN ROY CROTTS JR.
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
60
.00
’
E
XIS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MISTY P. VEGA
SILVESTRE VEGA CASTILLO
EXISTING R/W
EXISTING R/W
6
0.0
0’
EIP
EIP
EIP
EIP
GINA CHILDRESS
WOODROW H. CHILDRESS JR.
EIP
EIP
HELEN ELLIOTT
VICKIE O. DAVIS
PHILLIP A. DAVIS
DONNA PRANKE
CLIFFORD T. PRANKE
POPE L.E. BUILDING CO. INC.
GEROLENE HAUSER
JESSIE C. HAUSER
LISA LYNNAE’DARBY HOLNESS
KENWORTH FITZGERALD HOLNESS
KAREN R. YOKLEY
BRENT E. YOKELY
KATHERINE ARMSTRONG
STEPHEN T. ARMSTRONG
JOHN W. DAVIS III
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
HELEN ELLIOTT
20
’ S
AN
IT
AR
Y SE
WE
R
E
A
S
E
ME
NT
2
0
’ S
ANIT
ARY S
EWER EAS
EME
NT
2
0
’ S
ANIT
ARY
S
EWE
R
E
AS
EME
NT
20’ SANITARY SEWER EASEMENT
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
2
5
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
1
6
20’ SANITARY SEWER EASEMENT
20’ SANITARY SEWER EASEMENT
2
0’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
DB 1345 PG 455
REGRESS EASEMENT
INGRESS/EGRESS/
TOWN OF KERNERSVILLE
3
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
33
PG
115
20
’ D
R
A
IN
A
G
E
E
A
S
EM
E
N
T
FULLER
GREGORY
DEBORAH B. GAITHER
JOHN A. GAITHER
DIANE RICH
JAMES D. RICH
TAWNY S. HONAKER
FORMERLY
KENNETH & KENDRA SHOWALD
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
L
T
W/L
T
W
/
L
T
W
/
L
T
W/
L
T
W
/
L
T
25 50 100500
PLANS
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
15-1U-2579B
9
/
2
0
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
_
S
I
T
E
1
1
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 20 OF 64
PERMIT DRAWING
SITE 11
SITE 11A
SITE 13
SITE 12
S
S
S
S
S
S
S
S
S
S
S
S
S
S
TS
TS
S
S
S
S
S
S
S
TS
W
L
B
WL
B
W
LB
WLB
WL
B
2
"
P
L
2
"
P
L
6" DI
6
"
D
I
6" DI
2
" P
L
(
A
T
U
R
)
(
A
T
U
R
)
(ATUR)
(
A
T
U
R
)
(
A
TU
R)
6
1
5
6
2
0
15
2
0
2
5
2
0
2
5
F
F
F
F
F
F
F
F
C
C
F
F
F
FC
C
NCDOT
(
(
)
)
CHO
RD
CHO
RD
CHORD
()
NCDOT
(
()
)
(
(
)
)
NCDOT
2GI
2GI
3GI-A
3GI-A
FS
FS
FS
3@10’X9’ RCBC
AT BEGIN BRIDGE
END SHOULDER BERM GUTTER
GRADE TO DRAIN
GRADE TO DRAIN
CUT AND FILL
COMBINATION OF
GRADE TO DRAIN WITH
REMOVE
REMOVE
REMOVE
REMOVE
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI-A W/ FLAT
GRATE
2GI-A W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI-A W/ FLAT
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
36" CSP W/ 2 ELBOWS
3@10’x9’ RCBC
GRATE
2GI-A W/ FLAT
GRADE TO DRAIN
TO BEGIN BRIDGE
STA 24+00 -Y4RPBD- LT
SHOULDER BERM GUTTER
DDE= 200 CY
30’ BASE CHANNEL
EST. DDE 18 CY
SEE DETAIL#8
HEAD DITCH
STA. 626+30 -L- RT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
FLAT GRATE
2GI W/
FS2GI
SEE DETAIL#6
EST 154 SY FF
EST 57 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 272 SY FF
EST 101 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL #6
EST 216 SY FF
EST 80 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
HW
18" RCP-IV
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
24" RCP-IV
24" RCP-IV
24" RCP-IV
4
8
" RC
P-
C
D
30" RCP-IV
3
0
"
R
C
P
-
I
V
1
8
"
R
C
P
-
I
I
I
15" RCP-III
18" RCP-III
1
5
"
R
C
P
-
IV
15" RCP-III
15
"
RC
P-I
V
15
" RC
P-IV
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
15" RCP-IV
EST +/-375 TONS
CLASS ’I’ RIP RAP
SEE DETAIL #34
CHANNEL CHANGE
CHANNEL
FILL IN EXISTING
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE DETAIL#6
EST 154 SY FF
EST 57 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 54 SY FF
EST 20 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#14
W/ 328 SY FF
EST. 100 TONS
W/ CLASS B RIPRAP
LATERAL V-DITCH
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
236’
+85.00 -Y4RPBD-
222’
+40 -Y4RPBD-
4
8
" RC
P-
C
D
RIP RAP
CLASS ’I’
EST. DDE 40 CY
SEE DETAIL #8
TAIL DITCH
SILL
8" VC
8"
V
C
8" DI
8" VC
8
"
V
C
18
" V
C
36
"
VC
36"
V
C
2
4
"
VC
2
4
" V
C
2
4
"
V
C
7
2
" C
HL
CONC
CONC
2 S B K D
CONC
D
I
2SBKD
2
S
B
K
D
2SBKD
2SBKD
2SBKD
CONC
CONC
10’ CONC
10’ CONC
10’ CONC
4
8
"
C
O
N
C
48" C
O
N
C
15
"
R
C
P
1
5
"
R
C
P
L
T
4
8
"
W
D
&
W
W
4
8
"
C
O
N
C
2SBKD
CONC
S
LT
1
5
"
R
C
P
FOUNDA
TION
1
5
"
R
C
P
L
T
1
5
"
R
C
P
1
5
"
R
C
P
4
8
"
C
O
N
C
4
8
"
B
K
1
5
"
R
C
P
L
T
L
T
BK WALL
L
O
N
G
W
A
L
K
D
R
2
0
’
B
S
T
ABAND
2SFD
WALLBK
WALKBK
15’ CONC
1
0
’
C
O
N
C
10’ C
O
N
C
2S
B
KD
2
S
B
KD
48
" C
O
N
C
48" CONC30"C&G
8’ CONC
D
K
WD
WD DK
CONC
W
D
D
K
W
D
D
K
D
I
SCRUB
SCRUB
W
D
D
K
D
K
W
D
CONC
DKWD 1
8
"
R
C
P
1
5
"
R
C
P
1
5
"
R
C
P
24" CMP 48" CO
NC
72’ LATTICE
GRAU-350
G
R
A
U-
3
5
0
B-
77
B-
77
TES
TES
1
5
"
R
C
P
D
I
1
5
"
R
C
P
1
8
"
R
C
P
D
I
PENNSTON CORP.
20’ DRAINAGE EASEMENT PB 33 PG 115
2
0
’
D
R
A
I
N
A
G
E
E
A
S
E
M
E
N
T
P
B
3
3
P
G
11
5
20’ DRAINAGE EASEMENT PB 33 PG 115
20’ S
A
NIT
A
R
Y SE
WE
R E
ASE
ME
NT P
B 36 P
G 16
2
0
’ S
AN
IT
A
R
Y
S
E
WE
R
E
A
S
E
ME
N
T
P
B
3
6
P
G
16
20’ DRAINAGE EASEMENT PB 33 PG 115
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
16
EIP
HELEN ELLIOTT
HELEN ELLIOTT
EIP
PENNSTON CORP.
GINA MORRISON
RONALD J. MORRISON
REBECCA KARR
JAMES R. KARR
PENNSTON CORP.PENNSTON CORP.
PENNSTON CORP.
MICHAL E. DEMATTE
DAVID L. DEMATTE
60.00’E
X
I
S
T
I
N
G
R/
W
E
X
I
S
T
I
N
G
R/
W
EIP
EIP
DONNA PRANKE
CLIFFORD T. PRANKE
POPE L.E. BUILDING CO. INC.
LISA LYNNAE’DARBY HOLNESS
KENWORTH FITZGERALD HOLNESS
KAREN R. YOKLEY
BRENT E. YOKELY
JOHN W. DAVIS III
HELEN ELLIOTT
20
’ S
AN
IT
A
R
Y
S
E
WE
R
E
A
S
E
ME
N
T
20’ SANITARY SEWER EASEMENT
2
5
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
1
6
20’ SANITARY SEWER EASEMENT
20’ SANITARY SEWER EASEMENT
2
0’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
DB 1345 PG 455
REGRESS EASEMENT
INGRESS/EGRESS/
TOWN OF KERNERSVILLE
P
B
33
P
G
115
20
’
D
R
A
IN
A
G
E
E
A
S
EM
E
N
T
DEBORAH B. GAITHER
JOHN A. GAITHER
DIANE RICH
JAMES D. RICH
S S SURFACE WATER
DENOTES IMPACTS IN
25 50 100500
PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
15-2U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
_
S
I
T
E
1
4
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 21 OF 64
PERMIT DRAWING
SITE 14
S
S S
S S S
S
S S
M
A
T
C
H
LIN
E
-
L-
S
T
A
.
6
3
3
+
0
0
S
H
E
E
T
16
M
A
T
C
H
LI
N
E -
Y
4
R
P
A-
S
T
A.2
0
+
5
0
S
H
E
E
T 16
6
3
0
3
5
F
F
2GI
2GI
FS
FS
2GI
FS
REMOVE
GRATE
2GI W/ FLAT
1
5
"
C
S
P
MCF
MCF
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
15
"
R
C
P
-
III
15" RCP-III
18" RCP-III
18
" V
C
W
18
" R
C
P
H
T
R
GUY
SCRUB
GR
W
/
L
T
GRAU-350
B-77
B-77
B-77
B-77
B-77
B-77
B-77
CAT- 1
TYPE M350
TYPE M350
B-77
B-77
SANDRA F. SHREVE
GLADYS L. CROTTS
JOHN R. CROTTS
BERDINA SMITH
EIP
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
W
/
L
T
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
5
A
_
L
s
t
a
6
1
5
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 22 OF 64
PERMIT DRAWING
DIVISION OF HIGHWAYS
N. C. DEPARTMENT OF TRANSPORTATION
CULVERT SURVEY & HYDRAULIC DESIGN REPORT
ADDITIONAL INFORMATION AND COMPUTATIONS
Stream Classification (Such as Trout, High Quality Water, etc.)
HYDRAULICS UNIT
8
2
0
0 100100200300 200 300 400 500
820
840
860
880
O
USGS REGRESSION 25% IMP ZONED RS9 AND RS12 (RES 9000-12000 SF)
=841.8
EXST 100 YR
=841.5
EXST 50 YR
=842.9
PROP 100 YR
=842.2
PROP 50 YR
=
8
4
1
.
5
E
XS
T
5
0
Y
R SKEWED 3.02:1
NORMAL 2:1
SKEWED 2.44:1
NORMAL 2:1
FEMA DETAILED STUDY AREA
YADKIN RIVER BASIN
833.0’
819.0’SLOPE=2.35%
BED EL=825.82
3@10’x9’ RCBC
PERFORMANCE TABLE
30’30’
BEVELED HW
BEDROCK
-DEBRIS POTENTIAL: MODERATE
OBSERVED IN THE 100 YR FLOOD PLAIN
-THERE WERE NO DWELLINGS OR STRUCTURES
-BED MATERIALS: SILT, SAND, COBBLES, AND ROCK
7-20-07=834.78
NWSE AND WSE ON
C
O
N
N
EC
TO
RS
A
N
D
RO
D
A
N
D
LU
G
15 " C
SP W / 2 ELBO
W S
G
RA
TE
2G
I-A
W / FLA
T
GP EL=873.51’
SKEW=55
3@10’x9’ RCBC
CL STA 616+45 -L-
TB LT
TB LT
TB RT
TB RT
WS
WS
YADKIN RIVER BASIN
SHEET 23 OF 64
PERMIT DRAWING
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
SITE 14
SITE 15
SITE 16
SITE 15A
S
S
S
S
S
S
S
S
S
F
F
F
F
F
F
F
F
F
S
S
S
S
S
SS
S
S
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
6
j
h
a
r
v
e
y
8
/
1
7
/
9
9
16U-2579B
MATCHLINE -Y4- STA.82+26 SHEET 27
M
A
TC
H
LIN
E
-
L
-
S
TA
.6
3
3
+
0
0
S
H
EET
15
MATCHLINE -Y4- STA.102+90 SHEET 28
M
ATC
H
LIN
E
-
L
-
STA
.6
5
6
+
5
1 SH
EET
17
TRAFFIC DIAGRAM
-L-
MATC
H
LIN
E - Y4
RPBD
- STA.3
2
+
2
1 SH
EET 15
M
A
T
C
H
LI
N
E -
Y
4
R
P
A -
S
T
A.2
0
+
5
0
S
H
E
E
T
1
5
M ATCHLINE -Y4RPB- STA.19+00 SHEET 28
MATCHLINE -Y5- STA. 38+50 SHEET 28
21,300
27,300
24,660
36,980
32,600
43,800
2010 ADT
2030 ADT
MATCHLINE -Y4RPA- STA.26+95 SHEET 27 MATCHLINE -Y5- STA.18+00.00 SHEET 27MATCHLINE -Y4RPBD- STA.63+00.00 SHEET 27
47,720
61,160
5,360
7,280
4,940
5,420
6,600
11,800
53,560
79,880
DUAL = 5%
TTST = 6%
DIR = 60%
DHV = 10%
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
-Y4- (US 421/I-40 BUS. )
BELTLINE
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
, 11/
5
/
12
-
P
L
A
N
S
A
D
J
U
S
T
E
D
S
O
T
H
A
T
P
A
R
C
E
L
9
8
I
S
V
I
S
B
L
E
O
N
P
L
A
N
S
6
3
5
6
4
0
6
4
5
6
5
0
6
5
5
5
25
30
35
15
20
25
30
1
5
20
2
5
3
5
4
0
4
5
50
60
15
4
0
4
5
5
0
5
5
6
0
15
10
15
2
0
10
15
2
0
20
25
30
85
90
95
100
GERRY RD 20’ BST
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
C
F
C
C
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
F
F
F
F
+10
200’
+00.00 -Y5-
50.00’
30.00’
+63.61 -Y5DET-
50.00’
73.00’
-Y5DET-
+50.00
CHORD
CHO
RD
NCDOT
(
(
)
)
NCDOT
()
NCDOT
(
()
)
NCDOT()
NCDOT
()
NCDOT
)
)
()
NCDOT
(
()
)
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
CB
CB
CB
CB
CB
CB CB
CB
2GI
CB
2GI
BDO
CB
2GI
2GI
2GI
2GI
2GI
2GI
JB w/MH
2GI
JB w/MH
2GI
4OTCB
2GI
2GI
2GI
2GI
JB w/MH
4OTCB
15
"
C
S
P
3GI-A
3GI-A
2GI-A
2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
HW
HW
HW
JB w/MH
JB w/MH
2
4"
CS
P
FS
FS
FS
FS
FS
REMOVE
2GI
2GI
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
P
PLUG
REMOVE
REMOVE
REMOVE
REMOVE
DITCH
TIE TO EXISTING
GRATE
2GI W/ FLAT
REMOVE
MATERIAL
FILL W/ FLOWABLE
2GI
FS
2GI
FS
REMOVE
2GI
FS
REMOVE
RETAIN
RETAIN
RETAIN
JB w/ MH
CONVERT TO
2GI
Conv. OTCB To 2GI
FS
REMOVE
P
P
PLUG
RETAIN
FS
2GI
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2 ELBOWS
15" CSP W/
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
W/ ELBOW
" CSP18
STA 18+50 TO 19+95 -Y4LPD- RT
BERM DITCH
15
" CSP
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
GRATE
2GI W/ FLAT GRATE
2GI W/ FLAT
STA 42+25 TO BEGIN BRIDGE -Y4RPBD- LT
SHOULDER BERM GUTTER
REMOVE
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
REMOVE FES
REMOVE HW
REMOVE FES
FLAT GRATE
2GI W/
REMOVE
REMOVE
2 ELBOWS
15" CSP W/
STA. 31+60 -Y5- TO BEGIN BRIDGE
SHOULDER BERM GUTTER
STA. 55+20 -Y4RPBD- LT TO END BRIDGE
SHOULDER BERM GUTTER
STA. 640+50 -L- RT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
EST 60 SY FF
EST 30 TONS
RIP RAP
CLASS ’I’
EST 22 SY FF
EST 6 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TONS
RIP RAP
CLASS ’I’
EST 75 SY FF
EST 40 TONS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TONS
RIP RAP
CLASS ’I’
FROM
STA
18+
25
TO
19+
25
-Y4RPD
- LT
Natural
Ground
( Not to Scale)
2:12:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FROM STA 638+35 TO 640+55 -L- LT
FROM STA 630+50 TO 633+35 -L- RT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #13
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 644+00 TO 646+05 -L- LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 59+75 TO 60+15 -Y4RPBD- RT
FROM STA 17+20 TO 17+50 -Y4LPD- RT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #25
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 4 Ft.
Max. d= 3 Ft.
Min. D= 3 Ft.
FROM STA. 19+29 TO 21+12 -Y4RPA- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
AT
T
E
R
2:
1
OR
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA. 39+01 TO STA. 39+35 -Y4CD- LT
SEE DETAIL#6
TOE PROTECTION
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE DETAIL#13
W/ 385 SY FF
EST. 148 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 3’ BASE DITCH
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
W/ 108 SY FF
EST. 40 TONS
SEE DETAIL#20
W/ CLASS ’B’ RIP RAP
SPECIAL LATERAL ’V’ DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
FLAT GRATE
2GI W/ NARROW SLOT
STA. 640+50 -L- LT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
CONNECTORS
AND ROD AND LUG
24" CSP W/ 2 ELBOWS
W/ 2 ELBOWS
15" CSP
SEE DETAIL#6
EST 386 SY FF
EST 143 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 432 SY FF
EST 160 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#27
EST 66 SY FF
EST 32 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
SEE DETAIL#27
EST 66 SY FF
EST 32 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
18" RCP-III
18" RCP-III
15
"
RC
P
-
III
15" RCP-III
42" RCP-C
D
42" RCP-C
D
15
"
RC
P
-
IV
15
"
RC
P-
III
18
"
RC
P-
IV
15
"
RC
P-
III
18
" RC
P-
III
24" RCP-III
24"
R
C
P-III
2
4
"
RC
P-
III
15" RCP-III
18
" RC
P-
III 24"
RCP-III
15" RCP-III
18" RCP-III
1
5
"
R
C
P-III
15" RCP-IV
15" RCP-III
2
4
"
R
C
P-I
V
24" RCP-IV
15" RCP-III
30"
R
C
P-III
15"
R
C
P-III
15
"
RC
P-
III
TRENCHLESS INSTALLATION 48" WELDED STEEL
15" RCP-III
15" RCP-IV
24" RCP-V
24" RCP-V
24" RCP-IV
24" RCP-III
18
" RC
P-
IV
18" RCP-III
15"
R
C
P-I
V
18
"
RC
P-
III
15" RCP-III
1
5
"
R
C
P
-
I
V
18" RCP-III 18" RCP-IV 1
5
"
R
C
P-
III
18" RCP-III
54"
RCP-V
54"
RCP-V
60" RCP-C
D
60" RCP-C
D
15
"
RC
P
-
III
18" RCP-III
15" RCP-III
15" RCP-III
15" RCP-IV
2GI
15
" RC
P-III
FS
2OTCB
FLAT GRATE
2GI W/
SHOULDER BERM GUTTER
SEE DETAIL #6
TO STA 50+00 -Y4RPBD- LT
STA 47+15 -Y4RPBD-
TOE PROTECTION
SEE SHEET 2-TT
PSH
STA 22+72.73 -Y4RPA- LT
BEGIN SHOULDER BERM GUTTER
STA 24+50 -Y4RPA- LT
END SHOULDER BERM GUTTER
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 26+50 TO 29+40 -Y4RPD- RT
FROM STA 60+00 TO 62+50 -Y4RPBD- LT
GRATE
2GI W/ FLAT
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
24" RCP-III
18"
R
C
P-C
D
15" CSP
W/2 ELBO
WS
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
SC
R
U
B
U
CS
H
T
R
S
4
8
"
4
S
B
W
18
"
R
C
P
15" RCP
18" CMP
18" RCP
4" HDPE
C
O
N
C
HW
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
I
P
E
E
N
D
2
4
"
R
C
P
FE
S
F
E
S
18
"
R
C
P
15
"
R
C
P
4
2
"
R
C
P
1S
F
D
3
S
B
W
10
’ BST
S
R
2
6
8
7
H
AS
T
INGS
H
ILL
R
D
2
2
’ B
S
T
12
" R
C
P
B
WD
W /LT
S
1S
B
KD
20
’ CONC
GR
S
S
1S
B
KD
20’ CONC
72" CHL
7
2
" WD
15
’ BST
1S
B
KD
18’ BST
S
1S
F
D
36" CONC
48" PLASTIC
1S
F
D
WD
CONC
3
6
"C
O
N
C
C
A
N
O
P
Y
M
T
L
S
W
4
8
" P
LA
S
T
IC
1SBW
48"WW
15
"
R
C
P
WEAVIL RIDGE RD GR
1S
B
K
D
3
6
" B
K
60" CHL
W/
L
T
1S
F
D
GR
S
12’ CONC
1S
B
K
D
4
8
" C
O
N
C
12" RCP
W
/
L
T
12
" R
C
P
15
" RC
P
C
ON
C
2
S
B
KD
4
8
" C
HLW
G
CONC
WD
2SBKD
GR
G
R
GR
12
" R
C
P
12
" R
C
P
S
R
2
6
8
7
H
AS
T
IN
GS
H
ILL
R
D
2
0
’ B
S
T
S
B
S
GATEMTL
GATEMTL SILO
2S
F
D
W/
L
T
1SFD
S
B
S
T
20’ BST
CONC CURB
CONC
CURB
G
3
6
"
C
O
N
C
B
K
W
A
L
L
B
K
WA
L
L
48" 5SELEC
60" WD
48" WW
48" WW
M
T
LM
T
L
M
T
L
M
T
L
6
0
"WW&
1S
B
W
DOCKWD
1SLOGD
S
S
S
C
A
N
OP
Y
MT
L
HT
R
C
O
N
C
BST
4
8
" CHL
6
0
" CH
L
6
0
"W
W
&
1S
B
W
GERRY RD 20’ BST
F
O
U
NDATI
ON
A
BAND
12" RCP 12" RCP
HTR
HTR
HTR
HTR
S
S
S
W
W
/
L
T
W
/
L
T
W/LT
1S
B
KD
S
W
D
B
1SFD
S
W
D
GR
12
" R
C
P
12
" R
C
P
B
6
0
"W
W
&
1S
B
W
W/
L
T
W/
L
T
3
6
"
WW&
1S
B
W
M
T
L
M
T
L
48" WW
60" WD
15
"
R
C
P
18
"
R
C
P
15
"
R
C
P
GATE
M
T
L
W/LT
6
0
"WW
1S
B
W
6
0
"W
W
&
1S
B
W
WD
DK
WD
DK
D
KWD
4
8
" C
O
N
C
4
8
"
B
K
WD
DK
WD
DK
G
A
TE
MTL
3
6
" C
O
N
C
12
" R
C
P
WD
D
K
CONC
CONC CURB
CONC CURB
S
OIL
G
R
12
" R
C
P
GR
GR
6
0
" C
HL
3
6
"
C
O
N
C
1S
B
K
D
D
K
W
D
G
R
G
R
G
R
W/LT
48"WW&1SBW
D
I
D
I
D
I
D
I
D
I
2
4"
RCP
D
I
D
I
PONDW.E.852.7
P
ON
D
W.E
.8
6
5
.5
SCRUB
SCRUB
5
S
E
L
E
C
4
S
B
W
S
C
R
U
B
SCRUB
SCRUB
4SBW
4
S
B
W
5
S
E
L
E
C
BST
36" CONC
S
C
R
U
B
I-
4
0
B
U
S
WB
L
U
S
4
2
1
N
B
L
2
6
’
B
S
T
I-
4
0
B
U
S
E
B
L
U
S
4
2
1 S
B
L
2
6
’ B
S
T
10’ CONC
4
8
" P
L
A
S
T
IC
R
A
IL
9’ CONC
RAIL
3
S
B
W
3
S
B
W
S
HTR
HTR
HTR
HTR
HTR
H
T
R
HTR
HTR
s
12" RCP
12" RCP
W/LT
W/
L
T
12" RCP
12" RCP
CANOPYMTL
15" RCP 12" RCP
15" RCP
HTR
CANOPYMTL
G
R
W
LT
W
W/LT
G
R
3
6
"
C
H
L
4
8
"
C
H
L
S
SW
4
8"
C
H
L
SW
3
6"
W
D
HTR
S
G
R
GR
S
OIL
W/
L
T
L
TW S
4
8"
W
D
S
R
2
8
2
7
H
A
M
M
O
N
D
S
T
17’
B
S
T
S
48" CHL
15" RCP
15" RCP
4
8"
C
H
L
G
R
LT
W/
L
T
12" RCP
G
R G
R
S
W
7
2"
W
D S
S
4
8"
C
H
L
S
S
4
8"
C
H
L
HTR
HT
R
HT
R
HTR
HTR
HT
R
H
T
R
HT
R
H
T
R
HT
R
HTR
2SBKD
CANOPYMTL
1
2
"
R
C
P
12"
R
C
P
GR
SS
LT
12" RCP G
R
S
OIL48" CHL
12" RCP
12" RCP
S
GR
G
R
GR
LT
W
1
2
"
R
C
P
1
2
"
R
C
P
GR
SOIL
W
15
"
R
C
P
12
" R
C
P
12
" R
CP
15
" R
C
P
GR
GR
GR
GR
GR
GR
S
S
W
W
W
S
S
S
1SFD
S
SS
S
S
S
S
SS
S
G
CANOPYMTL
W
W
W
W
S
W
W
24" RCP
18" RCP
1
8
"
R
C
P
1
8
"
R
C
P
ABANDHTR
G
R
GR
GR
S
1S
F
D
CONC
36"
ABANDS
S
S
SW
S
S
S
12"
R
C
P
12
"
R
C
P
S
4
8"
W
W
48" WW
4
8"
C
H
L
GR
4
8
"
W
W
GR
GR
4
WW
1S
B
W
H
T
R
SCRUB
SCRUB
SCRUB
SCRUB
W
. E
. 852
.8
APPROX
S
C
R
U
B
S
36" WW&1SBW
GR
GR
4
8"
C
H
L
W
POND
T
IMB
E
R
S
HTR
HT
R
HTR
S
R
2
8
2
8
R
A
C
H
E
L
S
T
17’
B
S
T
18"
R
C
P
18
"
R
C
P
6
" HDPE
6" DIP
W/
L
T
W
/
L
T
W/
L
T
PONDW. E. 852.7
W/L
T
12" RCP
12
" R
C
P
GR
W
T
W
16
" D
I
16
" DI
16
" D
I
6
" D
I
6
" D
I
6
" DI
4
" P
L
4
" P
L
4
" P
L
GRAU-350
GRAU-350
GRAU-350
GRAU-350
C
AT
-
1
B-77
B-77
B-77
B-77
GRAU-350
B-77
B-77
CAT-
1
CAT-1
CAT-1
G
R
A
U
-
3
5
0
B-77CAT-1
B-77
B-77
CAT-1
GRAU-350
GRAU-350
CAT-1
GRAU-350
CAT-1
GRAU-350
ATTENUATOR
TYPE-350
TYPE
B-
7
7
G
RAU
3
5
0
G
RAU
3
5
0
B-77
B-77
B-77
GRAU-350 CAT-1
C
A
T-
1
G
RAU
3
5
0
G
RA
U
3
5
0
C
A
T-
1
TYPE
B-
7
7
TYPE
B-
7
7
TYPE
B-
7
7
TYPE
B-
7
7
TYPE
B-
7
7
G
RAU
3
5
0
TYPE
B-
7
7
TYPE
B-
7
7
G
RAU
3
5
0
TYPE B-77
TYPE B-77
TY
PE B-77
TYPE B-77
G
R
A
U 350
T
L-3
T
Y
P
E
B-
7
7
TYPE B-77
6" DIP
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
IP
E
E
N
D
6 " HDPE
42" RCP
4" HDPE
INV=866.23INV=858.11
18" RCP
INV=865.36INV=864.14
24" R
C
P
F
E
S
F
E
S
15" RCP C
B
C
B
C
B
C
B
C
BC
B
18"
R
C
P
18
"
R
C
P
18"
RC
P
18"
R
C
P
C
B
18"
RCP
18" RCP
18
"
R
C
P
18" RCP
15" RCP
C
O
NC
H
W
MABEL HAM
DOROTHY T. BAKER
DOROTHY A. BAKER
BERDINA SMITH
SANDRA F. SHREVE
FLORINE SMITH SYKES
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
REGIONAL REALTY INC.
TED F. SWAIM JR.
LOUIS D. REECE
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
EVA TAYLOR
30’ ACCESS EASEMENT DB 1538 PG 142
3
0
’ A
CCE
S
S
EA
S
E
MENT
DB
2
0
3
0
P
G
12
7
9
3
0
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
16
4
7
P
G
4
0
2
60
.00
’
E
XIS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
E
IP
E
IP
E
IP
E
IP
E
IP
E
IP
E
IP
W.L. TRULL
FAY C. WOODS
ROLAND WILLIS WOODS
PATTI RHODES
JERRY W. RHODES
60.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
60.00’
6
0.0
0’
EXISTING R/W
EXISTING R/W
E
IP
E
IP
W
A
D
E
S
M
IT
H
272.00’
294.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
WADE SMITH
M
IL
D
R
E
D
S
.
S
M
IT
H
W
A
D
E
W
.
S
M
IT
H
C
H
A
R
L
E
S
M
.
S
IM
M
O
N
S
TRACY LEE DEBUSK
E
IP
ALBERT RAY LONG
E
X
IS
T
IN
G
R
/
W
278.00’
E
X
IS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
60.00’
E
X
IS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
E
IP
E
IP
FAYE PEDDYCORD
REX LANIER PEDDYCORD
FAYE PEDDYCORD
REX LANIER PEDDYCORD
250.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
XIS
T
ING
R
/
W
60
.00
’
EXIS
T
ING
R/
W
R/W MON
R
/
W
MO
N
R
/
W
M
O
N
R
/
W
M
O
N
R
/
W
M
O
N
E
IP
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
PENNY NELSON ENSCORE
RICHARD LEE ENSCORE
272.00’
E
IP
IM
O
G
E
N
E
L
.
E
L
A
M
MELODY MYERS PEDDYCORD
STEPHEN MICHAEL PEDDYCORD
ANGELA WAUGH
JOHN LEWIS WAUGH
FAYE G. PEDDYCORD
REX L. PEDDYCORD
GARY LEE WEAVIL
GEROLENE HAUSER
JESSIE C. HAUSER
JAMES R. ATKINS
GAIL MILLER
BURLEY B. MILLER
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
BETSY GORDON
BOBBY F. GORDON
SEVENTH DAY ADVENTISTS
ASSOCIATION OF
SOUTHERN UNION CONFERENCE
ZEPEDA
DAVID TORRES
JEAN SNYDER LOCKLEAR
BURNICE LOCKLEAR JR.
BARBARA M. SHORT
ANDREW HOLDER
KENNETH
(FORMERLY - GRIFFIN FAMILY PRESERVATION TRUST)
NC D.O.T.
T
O
W
N
O
F
K
E
R
N
E
R
S
V
IL
L
E
T
O
W
N
O
F
K
E
R
N
E
R
S
V
IL
L
E
F
O
R
S
Y
T
H
C
O
U
N
T
Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
;
;
;
;
E
IP
26.28’
+37.41
5
.2
2
’
+
3
1.0
1
1
15
.
4
1
’
+
8
6
.
6
8
9
6
.
0
8
’
+
8
6
.
6
1
89.
7
9’
+
0
6.8
4
B
R
IA
N
J
.
S
IM
M
O
N
S
R
E
N
E
E
F
A
B
IN
IA
K
&
PRESERVATION TRUST
GRIFFIN FAMILY
LINDA W. REED
BETTY W. PEDDYCORD
DONALD L. PEDDYCORD
TIMOTHY C. SMITH
TAWNY S. HONAKER
FORMERLY
KENNETH & KENDRA SHOWALD
CAROL DEBUSK
LEROY G. DEBUSK
DEE CONRAD
FORMERLY
FLOYD & KONNIE CONRAD
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
ALBERT RAY LONG
IMOGENE L. ELAM
W/
L
T
LT
LT
W
/
L
T
W/L
T
W
/
L
TW
/
L
T
SHEET 24 OF 64
PERMIT DRAWING
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
WETLAND
DENOTES FILL INFF
SITE 14
SITE 15
SITE 16
SITE 15A
S
S
S
S
S
S
S
S
S
F
F
F
F
F
F
F
F
F
S
S
S
S
S
SS
S
S
S
830
8
3
0
8
3
0
8
3
0
830
830
830
8
4
0
840
8
4
0
8
4
0
840
840
840
840
840
840
840
840
850
8
5
0
8
5
0
8
5
0
8
5
0
8
5
0
850
8
5
0
8
5
0
8
5
0
850
8
5
0
8
50
8
5
0
8
5
0
8
5
0
850
8
5
0
850
850
850
850
850
8
5
0
8
5
0
850
850 850
850
8
5
0
860
860
860
8
6
0
8
6
0
8
6
0
860
8
6
0
860
860 860
860
8
6
0
8
6
0
8
6
0
860
860
8
6
0
860
860
860
860
860
860
860
8
6
0
860
860
860
8
6
0
8
6
0
86
0
860
8
6
0
8
6
0
860
870
870
8
7
0
8
7
0
870
8
7
0
870
870
870
870
8
7
0
8
7
0
8
7
0
8
7
0
870
87
0
8
7
0
87
0
870
870
870
870
87
0
870
8
7
0
8
7
0
870
870
870
8
7
0
870
8
70
870
8
7
0
870
870
8
8
0
880
8
8
0
8
8
0
880
880
880
880
880
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
8
8
0
880
880
880
880
880
880
880
880
880
880
880
880
880
880
8
8
0
8
8
0
8
8
0
8
8
0
880 880
880
880
880
8
8
0
8
8
0
880
880
880
880
880
8
9
0
8
9
0
8
9
0
890
890
890
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
890
8
90
8
9
0
890
8
9
0
8
9
0
890
890
890
890
890
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
8
9
0
890
8908
9
0
890
890
890
890
890
8
90
890
890
890
8
9
0
8
9
0
8
9
0
8
9
0
890
8
9
0
8
9
0
890
890
890
890
8
9
0
8
9
0
9
0
0
9
0
0
9
0
0
900
900
900
900
900
900
9
0
0
900
90
0
9
0
0
900
900
900
9
0
0
900
900
9
0
0
9
0
0
900
900
9
0
0
9
0
0900
900
900
900
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900
900
900
900
9
0
09
0
0
9
0
0
900
900
900
900
900
9
00
900
900
9
0
0
900
900900
9
0
0
900
900
900
900
900
900
900
900
900
900
900
9
0
0 9
0
0
9
0
0
9
0
0
9
0
0
9
0
0
900
900
900
9
0
0
9
0
0
900
900
9
1
0
9
10
910
910
910
9
10
910
910
910
910
9
1
0
9
10
910
910
910
9
10
910
9
10
910
910
910
9
10
910
910
910
9
10
9
10
910
910
910
910
9
10
9
10
9
10
9
10
9
10
910
910
910 910
910
910
910
9
10
9
10
910
9
10
910
9
10
910
9
10
9
1
0
910
9
10
910
910
9
10
9
10
910
910
9109
10
910
910
910
9
10
910
910
9
1
0
9
10
910
910
910
910
9
1
0
9
1
0
910
910
910
910
9
2
0
920
9
2
0920
9
2
0
9
2
0
920
920 920
920
920
920
920
920
9
2
0
920
920
9
20
920
920
9
2
0
920
920
920
920
92
0
9
2
0
920
920
920
9
2
0
9
2
0
9
2
0
920
9
2
0
920
920
920
9
2
0
920
9
2
0
920
920
920
920
920
920
9
2
0
920
9
20
9
2
0
9
2
0
9
2
0
920
9
2
0
920
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
9
2
0
920
9 2 0
920
92
0
920
930
9
3
0
9
3
0
930
930
930
930
930
9
3
0
930
930
9
3
0
930
930
9
30
930
930
930
9
3
0
9
3
0
930
9
3
0
930
9
3
0
930
930
930
9
3
0
9
3
0
930
9
3
0
930
9
3
0
930
9
3
0
930
9
3
0
930
930
930
930
930
930
940
9
4
0
9
4
0
9
40
940 940
9 40
9
4
0
940
9
4
0
9
4
0
9
4
0
940
940
9
4
0
9
4
0
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
6
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
16U-2579B
MATCHLINE -Y4- STA.82+26 SHEET 27
M
A
TC
H
LIN
E
-
L
-
S
TA
.6
3
3
+
0
0
S
H
EET
15
MATCHLINE -Y4- STA.102+90 SHEET 28
M
ATC
H
LIN
E
-
L
-
STA
.6
5
6
+
5
1 SH
EET
17
TRAFFIC DIAGRAM
-L-
MATC
H
LIN
E - Y4
RPBD
- STA.3
2
+
2
1 SH
EET 15
M
A
T
C
H
LI
N
E -
Y
4
R
P
A -
S
T
A.2
0
+
5
0
S
H
E
E
T
1
5
M ATCHLINE -Y4RPB- STA.19+00 SHEET 28
MATCHLINE -Y5- STA. 38+50 SHEET 28
21,300
27,300
24,660
36,980
32,600
43,800
2010 ADT
2030 ADT
MATCHLINE -Y4RPA- STA.26+95 SHEET 27 MATCHLINE -Y5- STA.18+00.00 SHEET 27MATCHLINE -Y4RPBD- STA.63+00.00 SHEET 27
47,720
61,160
5,360
7,280
4,940
5,420
6,600
11,800
53,560
79,880
DUAL = 5%
TTST = 6%
DIR = 60%
DHV = 10%
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
-Y4- (US 421/I-40 BUS. )
BELTLINE
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
, 11/
5
/
12
-
P
L
A
N
S
A
D
J
U
S
T
E
D
S
O
T
H
A
T
P
A
R
C
E
L
9
8
I
S
V
I
S
B
L
E
O
N
P
L
A
N
S
6
3
5
6
4
0
6
4
5
6
5
0
6
5
5
5
25
30
35
15
20
25
30
1
5
20
2
5
3
5
4
0
4
5
50
60
15
4
0
4
5
5
0
5
5
6
0
15
10
15
2
0
10
15
2
0
20
25
30
85
90
95
100
GERRY RD 20’ BST
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
C
F
C
C
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
F
F
F
F
+10
200’
+00.00 -Y5-
50.00’
30.00’
+63.61 -Y5DET-
50.00’
73.00’
-Y5DET-
+50.00
CHORD
CHO
RD
NCDOT
(
(
)
)
NCDOT
()
NCDOT
(
()
)
NCDOT()
NCDOT
()
NCDOT
)
)
()
NCDOT
(
()
)
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
CB
CB
CB
CB
CB
CB CB
CB
2GI
CB
2GI
BDO
CB
2GI
2GI
2GI
2GI
2GI
2GI
JB w/MH
2GI
JB w/MH
2GI
4OTCB
2GI
2GI
2GI
2GI
JB w/MH
4OTCB
15
"
C
S
P
3GI-A
3GI-A
2GI-A
2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
HW
HW
HW
JB w/MH
JB w/MH
2
4"
CS
P
FS
FS
FS
FS
FS
REMOVE
2GI
2GI
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
P
PLUG
REMOVE
REMOVE
REMOVE
REMOVE
DITCH
TIE TO EXISTING
GRATE
2GI W/ FLAT
REMOVE
MATERIAL
FILL W/ FLOWABLE
2GI
FS
2GI
FS
REMOVE
2GI
FS
REMOVE
RETAIN
RETAIN
RETAIN
JB w/ MH
CONVERT TO
2GI
Conv. OTCB To 2GI
FS
REMOVE
P
P
PLUG
RETAIN
FS
2GI
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2 ELBOWS
15" CSP W/
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
W/ ELBOW
" CSP18
STA 18+50 TO 19+95 -Y4LPD- RT
BERM DITCH
15
" CSP
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
GRATE
2GI W/ FLAT GRATE
2GI W/ FLAT
STA 42+25 TO BEGIN BRIDGE -Y4RPBD- LT
SHOULDER BERM GUTTER
REMOVE
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
REMOVE FES
REMOVE HW
REMOVE FES
FLAT GRATE
2GI W/
REMOVE
REMOVE
2 ELBOWS
15" CSP W/
STA. 31+60 -Y5- TO BEGIN BRIDGE
SHOULDER BERM GUTTER
STA. 55+20 -Y4RPBD- LT TO END BRIDGE
SHOULDER BERM GUTTER
STA. 640+50 -L- RT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
EST 60 SY FF
EST 30 TONS
RIP RAP
CLASS ’I’
EST 22 SY FF
EST 6 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TONS
RIP RAP
CLASS ’I’
EST 75 SY FF
EST 40 TONS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TONS
RIP RAP
CLASS ’I’
FROM
STA
18+
25
TO
19+
25
-Y4RPD
- LT
Natural
Ground
( Not to Scale)
2:12:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FROM STA 638+35 TO 640+55 -L- LT
FROM STA 630+50 TO 633+35 -L- RT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #13
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 644+00 TO 646+05 -L- LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 59+75 TO 60+15 -Y4RPBD- RT
FROM STA 17+20 TO 17+50 -Y4LPD- RT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #25
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 4 Ft.
Max. d= 3 Ft.
Min. D= 3 Ft.
FROM STA. 19+29 TO 21+12 -Y4RPA- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
AT
T
E
R
2:
1
OR
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA. 39+01 TO STA. 39+35 -Y4CD- LT
SEE DETAIL#6
TOE PROTECTION
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE DETAIL#13
W/ 385 SY FF
EST. 148 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 3’ BASE DITCH
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
W/ 108 SY FF
EST. 40 TONS
SEE DETAIL#20
W/ CLASS ’B’ RIP RAP
SPECIAL LATERAL ’V’ DITCH
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
FLAT GRATE
2GI W/ NARROW SLOT
STA. 640+50 -L- LT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
CONNECTORS
AND ROD AND LUG
24" CSP W/ 2 ELBOWS
W/ 2 ELBOWS
15" CSP
SEE DETAIL#6
EST 386 SY FF
EST 143 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#6
EST 432 SY FF
EST 160 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
SEE DETAIL#27
EST 66 SY FF
EST 32 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
SEE DETAIL#27
EST 66 SY FF
EST 32 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
18" RCP-III
18" RCP-III
15
"
RC
P
-
III
15" RCP-III
42" RCP-C
D
42" RCP-C
D
15
"
RC
P
-
IV
15
"
RC
P-
III
18
"
RC
P-
IV
15
"
RC
P-
III
18
" RC
P-
III
24" RCP-III
24"
R
C
P-III
2
4
"
RC
P-
III
15" RCP-III
18
" RC
P-
III 24"
RCP-III
15" RCP-III
18" RCP-III
1
5
"
R
C
P-III
15" RCP-IV
15" RCP-III
2
4
"
R
C
P-I
V
24" RCP-IV
15" RCP-III
30"
R
C
P-III
15"
R
C
P-III
15
"
RC
P-
III
TRENCHLESS INSTALLATION 48" WELDED STEEL
15" RCP-III
15" RCP-IV
24" RCP-V
24" RCP-V
24" RCP-IV
24" RCP-III
18
" RC
P-
IV
18" RCP-III
15"
R
C
P-I
V
18
"
RC
P-
III
15" RCP-III
1
5
"
R
C
P
-
I
V
18" RCP-III 18" RCP-IV 1
5
"
R
C
P-
III
18" RCP-III
54"
RCP-V
54"
RCP-V
60" RCP-C
D
60" RCP-C
D
15
"
RC
P
-
III
18" RCP-III
15" RCP-III
15" RCP-III
15" RCP-IV
2GI
15
" RC
P-III
FS
2OTCB
FLAT GRATE
2GI W/
SHOULDER BERM GUTTER
SEE DETAIL #6
TO STA 50+00 -Y4RPBD- LT
STA 47+15 -Y4RPBD-
TOE PROTECTION
SEE SHEET 2-TT
PSH
STA 22+72.73 -Y4RPA- LT
BEGIN SHOULDER BERM GUTTER
STA 24+50 -Y4RPA- LT
END SHOULDER BERM GUTTER
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 26+50 TO 29+40 -Y4RPD- RT
FROM STA 60+00 TO 62+50 -Y4RPBD- LT
GRATE
2GI W/ FLAT
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
24" RCP-III
18"
R
C
P-C
D
15" CSP
W/2 ELBO
WS
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
SC
R
U
B
U
CS
H
T
R
S
4
8
"
4
S
B
W
18
"
R
C
P
15" RCP
18" CMP
18" RCP
4" HDPE
C
O
N
C
HW
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
I
P
E
E
N
D
2
4
"
R
C
P
FE
S
F
E
S
18
"
R
C
P
15
"
R
C
P
4
2
"
R
C
P
1S
F
D
3
S
B
W
10
’ BST
S
R
2
6
8
7
H
AS
T
INGS
H
ILL
R
D
2
2
’ B
S
T
12
" R
C
P
B
WD
W /LT
S
1S
B
KD
20
’ CONC
GR
S
S
1S
B
KD
20’ CONC
72" CHL
7
2
" WD
15
’ BST
1S
B
KD
18’ BST
S
1S
F
D
36" CONC
48" PLASTIC
1S
F
D
WD
CONC
3
6
"C
O
N
C
C
A
N
O
P
Y
M
T
L
S
W
4
8
" P
LA
S
T
IC
1SBW
48"WW
15
"
R
C
P
WEAVIL RIDGE RD GR
1S
B
K
D
3
6
" B
K
60" CHL
W/
L
T
1S
F
D
GR
S
12’ CONC
1S
B
K
D
4
8
" C
O
N
C
12" RCP
W
/
L
T
12
" R
C
P
15
" RC
P
C
ON
C
2
S
B
KD
4
8
" C
HLW
G
CONC
WD
2SBKD
GR
G
R
GR
12
" R
C
P
12
" R
C
P
S
R
2
6
8
7
H
AS
T
IN
GS
H
ILL
R
D
2
0
’ B
S
T
S
B
S
GATEMTL
GATEMTL SILO
2S
F
D
W/
L
T
1SFD
S
B
S
T
20’ BST
CONC CURB
CONC
CURB
G
3
6
"
C
O
N
C
B
K
W
A
L
L
B
K
WA
L
L
48" 5SELEC
60" WD
48" WW
48" WW
M
T
LM
T
L
M
T
L
M
T
L
6
0
"WW&
1S
B
W
DOCKWD
1SLOGD
S
S
S
C
A
N
OP
Y
MT
L
HT
R
C
O
N
C
BST
4
8
" CHL
6
0
" CH
L
6
0
"W
W
&
1S
B
W
GERRY RD 20’ BST
F
O
U
NDATI
ON
A
BAND
12" RCP 12" RCP
HTR
HTR
HTR
HTR
S
S
S
W
W
/
L
T
W
/
L
T
W/LT
1S
B
KD
S
W
D
B
1SFD
S
W
D
GR
12
" R
C
P
12
" R
C
P
B
6
0
"W
W
&
1S
B
W
W/
L
T
W/
L
T
3
6
"
WW&
1S
B
W
M
T
L
M
T
L
48" WW
60" WD
15
"
R
C
P
18
"
R
C
P
15
"
R
C
P
GATE
M
T
L
W/LT
6
0
"WW
1S
B
W
6
0
"W
W
&
1S
B
W
WD
DK
WD
DK
D
KWD
4
8
" C
O
N
C
4
8
"
B
K
WD
DK
WD
DK
G
A
TE
MTL
3
6
" C
O
N
C
12
" R
C
P
WD
D
K
CONC
CONC CURB
CONC CURB
S
OIL
G
R
12
" R
C
P
GR
GR
6
0
" C
HL
3
6
"
C
O
N
C
1S
B
K
D
D
K
W
D
G
R
G
R
G
R
W/LT
48"WW&1SBW
D
I
D
I
D
I
D
I
D
I
2
4"
RCP
D
I
D
I
PONDW.E.852.7
P
ON
D
W.E
.8
6
5
.5
SCRUB
SCRUB
5
S
E
L
E
C
4
S
B
W
S
C
R
U
B
SCRUB
SCRUB
4SBW
4
S
B
W
5
S
E
L
E
C
BST
36" CONC
S
C
R
U
B
I-
4
0
B
U
S
WB
L
U
S
4
2
1
N
B
L
2
6
’
B
S
T
I-
4
0
B
U
S
E
B
L
U
S
4
2
1 S
B
L
2
6
’ B
S
T
10’ CONC
4
8
" P
L
A
S
T
IC
R
A
IL
9’ CONC
RAIL
3
S
B
W
3
S
B
W
S
HTR
HTR
HTR
HTR
HTR
H
T
R
HTR
HTR
s
12" RCP
12" RCP
W/LT
W/
L
T
12" RCP
12" RCP
CANOPYMTL
15" RCP 12" RCP
15" RCP
HTR
CANOPYMTL
G
R
W
LT
W
W/LT
G
R
3
6
"
C
H
L
4
8
"
C
H
L
S
SW
4
8"
C
H
L
SW
3
6"
W
D
HTR
S
G
R
GR
S
OIL
W/
L
T
L
TW S
4
8"
W
D
S
R
2
8
2
7
H
A
M
M
O
N
D
S
T
17’
B
S
T
S
48" CHL
15" RCP
15" RCP
4
8"
C
H
L
G
R
LT
W/
L
T
12" RCP
G
R G
R
S
W
7
2"
W
D S
S
4
8"
C
H
L
S
S
4
8"
C
H
L
HTR
HT
R
HT
R
HTR
HTR
HT
R
H
T
R
HT
R
H
T
R
HT
R
HTR
2SBKD
CANOPYMTL
1
2
"
R
C
P
12"
R
C
P
GR
SS
LT
12" RCP G
R
S
OIL48" CHL
12" RCP
12" RCP
S
GR
G
R
GR
LT
W
1
2
"
R
C
P
1
2
"
R
C
P
GR
SOIL
W
15
"
R
C
P
12
" R
C
P
12
" R
CP
15
" R
C
P
GR
GR
GR
GR
GR
GR
S
S
W
W
W
S
S
S
1SFD
S
SS
S
S
S
S
SS
S
G
CANOPYMTL
W
W
W
W
S
W
W
24" RCP
18" RCP
1
8
"
R
C
P
1
8
"
R
C
P
ABANDHTR
G
R
GR
GR
S
1S
F
D
CONC
36"
ABANDS
S
S
SW
S
S
S
12"
R
C
P
12
"
R
C
P
S
4
8"
W
W
48" WW
4
8"
C
H
L
GR
4
8
"
W
W
GR
GR
4
WW
1S
B
W
H
T
R
SCRUB
SCRUB
SCRUB
SCRUB
W
. E
. 852
.8
APPROX
S
C
R
U
B
S
36" WW&1SBW
GR
GR
4
8"
C
H
L
W
POND
T
IMB
E
R
S
HTR
HT
R
HTR
S
R
2
8
2
8
R
A
C
H
E
L
S
T
17’
B
S
T
18"
R
C
P
18
"
R
C
P
6
" HDPE
6" DIP
W/
L
T
W
/
L
T
W/
L
T
PONDW. E. 852.7
W/L
T
12" RCP
12
" R
C
P
GR
W
T
W
16
" D
I
16
" DI
16
" D
I
6
" D
I
6
" D
I
6
" DI
4
" P
L
4
" P
L
4
" P
L
GRAU-350
GRAU-350
GRAU-350
GRAU-350
C
AT
-
1
B-77
B-77
B-77
B-77
GRAU-350
B-77
B-77
CAT-
1
CAT-1
CAT-1
G
R
A
U
-
3
5
0
B-77CAT-1
B-77
B-77
CAT-1
GRAU-350
GRAU-350
CAT-1
GRAU-350
CAT-1
GRAU-350
ATTENUATOR
TYPE-350
TYPE
B-
7
7
G
RAU
3
5
0
G
RAU
3
5
0
B-77
B-77
B-77
GRAU-350 CAT-1
C
A
T-
1
G
RAU
3
5
0
G
RA
U
3
5
0
C
A
T-
1
TYPE
B-
7
7
TYPE
B-
7
7
TYPE
B-
7
7
TYPE
B-
7
7
TYPE
B-
7
7
G
RAU
3
5
0
TYPE
B-
7
7
TYPE
B-
7
7
G
RAU
3
5
0
TYPE B-77
TYPE B-77
TY
PE B-77
TYPE B-77
G
R
A
U 350
T
L-3
T
Y
P
E
B-
7
7
TYPE B-77
6" DIP
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
IP
E
E
N
D
6 " HDPE
42" RCP
4" HDPE
INV=866.23INV=858.11
18" RCP
INV=865.36INV=864.14
24" R
C
P
F
E
S
F
E
S
15" RCP C
B
C
B
C
B
C
B
C
BC
B
18"
R
C
P
18
"
R
C
P
18"
RC
P
18"
R
C
P
C
B
18"
RCP
18" RCP
18
"
R
C
P
18" RCP
15" RCP
C
O
NC
H
W
MABEL HAM
DOROTHY T. BAKER
DOROTHY A. BAKER
BERDINA SMITH
SANDRA F. SHREVE
FLORINE SMITH SYKES
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
REGIONAL REALTY INC.
TED F. SWAIM JR.
LOUIS D. REECE
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
EVA TAYLOR
30’ ACCESS EASEMENT DB 1538 PG 142
3
0
’ A
CCE
S
S
EA
S
E
MENT
DB
2
0
3
0
P
G
12
7
9
3
0
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
16
4
7
P
G
4
0
2
60
.00
’
E
XIS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
E
IP
E
IP
E
IP
E
IP
E
IP
E
IP
E
IP
W.L. TRULL
FAY C. WOODS
ROLAND WILLIS WOODS
PATTI RHODES
JERRY W. RHODES
60.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
60.00’
6
0.0
0’
EXISTING R/W
EXISTING R/W
E
IP
E
IP
W
A
D
E
S
M
IT
H
272.00’
294.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
WADE SMITH
M
IL
D
R
E
D
S
.
S
M
IT
H
W
A
D
E
W
.
S
M
IT
H
C
H
A
R
L
E
S
M
.
S
IM
M
O
N
S
TRACY LEE DEBUSK
E
IP
ALBERT RAY LONG
E
X
IS
T
IN
G
R
/
W
278.00’
E
X
IS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
60.00’
E
X
IS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
E
IP
E
IP
FAYE PEDDYCORD
REX LANIER PEDDYCORD
FAYE PEDDYCORD
REX LANIER PEDDYCORD
250.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
XIS
T
ING
R
/
W
60
.00
’
EXIS
T
ING
R/
W
R/W MON
R
/
W
MO
N
R
/
W
M
O
N
R
/
W
M
O
N
R
/
W
M
O
N
E
IP
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
PENNY NELSON ENSCORE
RICHARD LEE ENSCORE
272.00’
E
IP
IM
O
G
E
N
E
L
.
E
L
A
M
MELODY MYERS PEDDYCORD
STEPHEN MICHAEL PEDDYCORD
ANGELA WAUGH
JOHN LEWIS WAUGH
FAYE G. PEDDYCORD
REX L. PEDDYCORD
GARY LEE WEAVIL
GEROLENE HAUSER
JESSIE C. HAUSER
JAMES R. ATKINS
GAIL MILLER
BURLEY B. MILLER
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
BETSY GORDON
BOBBY F. GORDON
SEVENTH DAY ADVENTISTS
ASSOCIATION OF
SOUTHERN UNION CONFERENCE
ZEPEDA
DAVID TORRES
JEAN SNYDER LOCKLEAR
BURNICE LOCKLEAR JR.
BARBARA M. SHORT
ANDREW HOLDER
KENNETH
(FORMERLY - GRIFFIN FAMILY PRESERVATION TRUST)
NC D.O.T.
T
O
W
N
O
F
K
E
R
N
E
R
S
V
IL
L
E
T
O
W
N
O
F
K
E
R
N
E
R
S
V
IL
L
E
F
O
R
S
Y
T
H
C
O
U
N
T
Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
;
;
;
;
E
IP
26.28’
+37.41
5
.2
2
’
+
3
1.0
1
1
15
.
4
1
’
+
8
6
.
6
8
9
6
.
0
8
’
+
8
6
.
6
1
89.
7
9’
+
0
6.8
4
B
R
IA
N
J
.
S
IM
M
O
N
S
R
E
N
E
E
F
A
B
IN
IA
K
&
PRESERVATION TRUST
GRIFFIN FAMILY
LINDA W. REED
BETTY W. PEDDYCORD
DONALD L. PEDDYCORD
TIMOTHY C. SMITH
TAWNY S. HONAKER
FORMERLY
KENNETH & KENDRA SHOWALD
CAROL DEBUSK
LEROY G. DEBUSK
DEE CONRAD
FORMERLY
FLOYD & KONNIE CONRAD
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
ALBERT RAY LONG
IMOGENE L. ELAM
W/
L
T
LT
LT
W
/
L
T
W/L
T
W
/
L
TW
/
L
T
25 50 100500
PLANS
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
16-1U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
6
_
S
I
T
E
1
5
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 25 OF 64
PERMIT DRAWING
SITE 14
SITE 15
SITE 16
SITE 15A
S
S
S
S
S
S
S
S
S
F
F
F
F
F
F
F
F
F
S
S
S
S
S
SS
S
S
S
M
A
TC
H
LIN
E
-
L
-
S
TA
.6
3
3
+
0
0
S
H
E
E
T
15
M
A
T
C
H
LI
N
E -
Y
4
R
P
A -
S
T
A.2
0
+
5
0
S
H
E
E
T
1
5
6
3
5
6
4
0
6
4
5
5
4
5
50
4
0
4
5
5
0
15
10
15
10
15
2
0
90
95
F
F
F
F
F
F
C
C
C
F
F
C
F
F
F
F
F
F
F
F
C
C F
NCDOT
)
)
2GI
2GI
2GI
2GI
2GI
2GI
CB
CB
CB
2GI
4OTCB
15
"
C
S
P
FS
FS
FS
FS
FS
FS
HW
HW
HW
JB w/MH
JB w/MH
2
4"
CS
P
FS
REMOVE
REMOVE
REMOVE
REMOVE
P
PLUG
REMOVE
GRATE
2GI W/ FLAT
REMOVE
MATERIAL
FILL W/ FLOWABLE
2GI
FS
2GI
FS
REMOVE
2GI
FS
REMOVE
RETAIN
RETAIN
RETAIN
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
REMOVE
REMOVE
REMOVE
REMOVE
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
REMOVE FES
REMOVE HW
REMOVE FES
STA. 640+50 -L- RT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
EST 60 SY FF
EST 30 TONS
RIP RAP
CLASS ’I’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TONS
RIP RAP
CLASS ’I’
EST 75 SY FF
EST 40 TONS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TONS
RIP RAP
CLASS ’I’
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE DETAIL#13
W/ 385 SY FF
EST. 148 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 3’ BASE DITCH
SEE DETAIL#5
LATERAL 3’ BASE DITCH
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
STA. 640+50 -L- LT TO BEGIN BRIDGE
SHOULDER BERM GUTTER
SEE DETAIL#27
EST 66 SY FF
EST 32 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
SEE DETAIL#27
EST 66 SY FF
EST 32 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
18" RCP-III
18" RCP-III
15
"
RC
P
-
III
15" RCP-III
42" RCP-C
D
42" RCP-C
D
15
"
RC
P
-
IV
15
"
RC
P
-
III
18
"
RC
P
-
IV
15
"
RC
P
-
III
30"
R
C
P-III
15
"
R
C
P
-
III
TRENCHLESS INSTALLATION 48" WELDED STEEL
15"
R
C
P-I
V
18" RCP-IV
18" RCP-III
54"
RCP-V
54"
RCP-V
60" RCP-C
D
60" RCP-C
D
1
5
"
R
C
P
-
III
2OTCB
SEE DETAIL #6
TO STA 50+00 -Y4RPBD- LT
STA 47+15 -Y4RPBD-
TOE PROTECTION
24" RCP-III
18
"
R
C
P
-
C
D
15" CSP
W/2 ELBO
WS
SC
R
U
B
18" CMP
18" RCP
4" HDPE
C
O
N
C
H
W
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
I
P
E
E
N
D
2
4
"
R
C
P
FE
S
F
E
S
18
"
R
C
P
15
"
R
C
P
4
2
"
R
C
P
W
/
L
T
20
’ BST
G
3
6
"
C
O
N
C
B
K
W
A
L
L
B
K
W
A
L
L
48" 5SELEC
M
T
LM
T
L
M
T
L
6
0
"
W
W
&
1S
B
W
DOCKWD
1SLOGD
S
S
S
C
A
N
O
P
Y
MT
L
H
T
R
C
O
N
C
BST
4
8
" C
HL
6
0
" C
H
L
6
0
"W
W
&
1S
B
W
F
O
U
N
D
A
TI
O
N
A
BA
N
D
15
"
R
C
P
M
T
L
6
0
"
W
W
&
1S
B
W
W/LT
D
I
D
I
D
I
2
4
"
RCP
D
I
D
I
PONDW.E.852.7
P
O
N
D
W.E
.8
6
5
.5
36" CONC
S
C
R
U
B
I
-
4
0
B
U
S
WB
L
U
S
4
2
1
N
B
L
2
6
’
B
ST
I-
4
0
B
U
S
E
B
L
U
S
4
2
1
S
B
L
2
6
’ B
S
T
HT
R
H
T
R
HTR
H
T
R
H
T
R
H
T
R
H
T
R
HT
R
GR1
2
"
R
C
P
15
"
R
C
P
12
" R
C
P
12
" R
C
P
15
" R
C
P
GR
GR
GR
GR
GR
GR
S
W
W
W
S
S
S
S
G
CANOPYMTL
W
W
W
W
S
24" RCP
18" RCP
1
8
"
R
C
P
1
8
"
R
C
P
ABANDHTR
G
R
ABANDS
S
S
SW
S
S
S
GR
4
WW
1S
B
W
SCRUB
SCRUB
W
. E
. 852
.8
S
C
R
U
B
POND
T
IMB
E
R
S
HT
R
18
"
R
C
P
6
" HDPE
6" DIP
W
/
L
T
W/
L
T
PONDW. E. 852.7
12
" R
C
P
G
R
GRAU-350
GRAU-350
GRAU-350
C
A
T
-
1
B-77
B-77
B-77
B-77
CAT-1
G
R
A
U
-
3
5
0
B-77CAT-1
B-77
B-77
CAT-1
GRAU-350
CAT-1
B-77
B-77
B-77
C
A
T-
1
G
RA
U
3
5
0
G
R
A
U
3
5
0
C
A
T
-
1
6" DIP
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
I
P
E
E
N
D
6
"
HDPE
42" RCP
4" HDPE
INV=866.23INV=858.11
18" RCP
INV=865.36INV=864.14
2
4
"
R
C
P
F
E
S
F
E
S
15" RCP C
B
C
B
C
BC
B
18"
R
C
P
18
"
R
C
P
C
B
18"
RCP
18" RCP
C
O
N
C
H
W
DOROTHY T. BAKER
DOROTHY A. BAKER
BERDINA SMITH
SANDRA F. SHREVE
FLORINE SMITH SYKES
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
TED F. SWAIM JR.
LOUIS D. REECE
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
EVA TAYLOR
3
0
’ A
C
C
E
S
S
E
A
S
E
ME
N
T
D
B
2
0
3
0
P
G
12
7
9
3
0
’
A
C
C
E
S
S
E
ASEMENT DB 1647 PG 402
60
.00
’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
EXISTING R/W
E
IP
E
X
IS
T
IN
G
R
/
W
278.00’
E
X
IS
T
IN
G
R
/
W
EIP
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
272.00’
(FORMERLY - GRIFFIN FAMILY PRESERVATION TRUST)
NC D.O.T.
T
O
W
N
O
F
K
E
R
N
E
R
S
V
IL
L
E
F
O
R
S
Y
T
H
C
O
U
N
T
Y
;
;
TAWNY S. HONAKER
FORMERLY
KENNETH & KENDRA SHOWALD
W
/
L
T
W
/
L
TW
/
L
T
SHEET 26 OF 64
PERMIT DRAWINGSSSURFACE WATER
DENOTES IMPACTS IN
S
S
S
S
S
S
S
S
S
S
S
S
S
S
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 17
SITE 18
SITE 19
S S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S S S
F
F
F
F
F
TS
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
7
j
h
a
r
v
e
y
8
/
1
7
/
9
9
17U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
6
5
6
+
5
1
S
H
E
E
T
1
6
M
A
TC
H
LIN
E
-
L-
S
TA
.6
6
8
+
17
S
H
EET
18
6
6
0
6
6
5
10
6
5
7
0
10
15
8:1 TAPER
F
F
F
C C
C
C C
F
F
F F
F
CHORD
CHORD
CHORD
CHORD
CHORD
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI-A
2GI-A
2GI-A 2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
JB w/MH
SPRING BOX
STA 666+25 -L- RT
BEGIN SHOULDER BERM GUTTER
SILL
SPRING BOX
G
R
A
T
E
2G
I W
/
F
L
A
T
3@12’x10’ RCBC
RIP RAP
CLASS ’I’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
RIP RAP
CLASS ’I’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FROM STA 18+25 TO 19+25 -Y4RPD- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 659+00 TO 661+00 -L- RT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 657+60 TO 663+80 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #21
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA 663+80 TO 666+70 -L- LT
SEE DETAIL#4
LATERAL V-DITCH
SEE DETAIL#12
W/ 957 SY FF
EST. 417 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#6
EST 309 SY FF
EST 114 TONS
CLASS "B’ RIPRAP
TOE PROTECTION W/
1
8
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
8"
D
I
P
HW
HW
HW
18
" RC
P
-III
24" RCP-III 30" RCP-III
30" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
3 0 " RC P -III
3 0 " RC P -IV
3 0 " RC P -IV
30" RCP-III
15"
R
C
P-III
15
"
RC
P
-
III
30" RCP-III
15
"
RC
P
-
III
30" RCP-III
6
0
"
R
C
P
-
I
V
6
0
"
R
C
P
-
I
V
6
0
"
R
C
P
-
I
V
8"
D
I
P
8" DIP
SEE DETAIL #21
W/ 544 SY FF
EST. 209 TONS
W/ CLASS ’I’ RIP RAP
LATERAL 3’ BASE DITCH
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
E
S
T
7
S
Y
F
F
E
S
T
2
T
O
N
S
R
IP
R
A
P
C
L
A
S
S
’B
’
GRATE
2GI W/FLAT
15" RCP-IV
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
1
5
"
V
C
15
"
V
C
15
"
V
C
2SFD
S
S
4
8
"
C
H
L
36"C
O
N
C
S
GR
W/
L
T
G
S
C
O
N
C
W
D
D
K
SCRUB
8 8 7 .9
W .E .
SCRUB
GRAU-350
ATTENUATOR
TYPE-350
CAT-1
CAT-1 GRAU-350
30’ ACCESS EASEMENT DB 1538 PG 142
EIP
EIP
EIP
KENNETH ANDREW HOLDER
REBECCA WHITLEY LADD
CHARLES SPENCER LADD JR.
GROUP GGK, LLC
GLENN D. HART
FAYE G. PEDDYCORD
REX L. PEDDYCORD
BETSY GORDON
BOBBY F. GORDON
KENNETH ANDREW HOLDER
F
O
R
S
Y
T
H
C
O
U
N
T
Y
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
2
0
’
S
A
N
IT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
ERIC Z. MYERS
SHEET 27 OF 64
PERMIT DRAWINGSSSURFACE WATER
DENOTES IMPACTS IN
S
S
S
S
S
S
S
S
S
S
S
S
S
S
WETLAND
DENOTES FILL INFF
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 17
SITE 18
SITE 19
S S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S S S
F
F
F
F
F
TS
S
8
4
0
840
8
4
0
8
4
0
840
840
8
4
0
8
4
0
8
4
0
840
840
8
4
0
8
4
0
8
4
0
840
8
4
0
8
4
0
8
4
0
840
840
8
4
0
8
4
0
840
840
8
4
0
8
4
0
840
8
5
0
8
5
0
8
5
0
8
5
0
850
850
850
850 850
850
850
850
85
0
850
8
5
0
850
8
5
0
8
5
0
8
6
0
8
6
0
8
6
0
860
860
8
6
0
860
8
6
0
860
860
860
860
860
860
860
8
6
0
8
6
0
8
6
0
8
6
0
860
8
6
0
870
870
8
7
0
8
7
0
870
870
870
870
870
8
7
0
870
8
7
0
87
0
8
7
0
870
870
870
870
870
8
7
0
8
7
0
8
7
0
870
880
880
8
8
0
8
8
0
880
8
8
0
880
880
880
880
88 0
880
880
880
880
880
880
880
880
8
8
0
8
8
0
8
8
0
8
9
0
890
890
8
9
0
8
9
0
890
890
890
890
8
9
0
8
9
0
8
9
0
890
890
890
890
8
9
0
890
890
890
8
9
0
890
8
9
0
890
8
9
0
9
0
0
9 0 0
900
9
0
0
9
0
0
9
0
0
900
9
0
0
900
900
900
900
900
900
900
9
0
0
9
0
0
9
0
0
9
1
0
910
910
9
10
910
910
910
910
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
7
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
17U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
6
5
6
+
5
1
S
H
E
E
T
1
6
M
A
TC
H
LIN
E
-
L-
S
TA
.6
6
8
+
17
S
H
EET
18
6
6
0
6
6
5
10
6
5
7
0
10
15
8:1 TAPER
F
F
F
C C
C
C C
F
F
F F
F
CHORD
CHORD
CHORD
CHORD
CHORD
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI-A
2GI-A
2GI-A 2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
JB w/MH
SPRING BOX
STA 666+25 -L- RT
BEGIN SHOULDER BERM GUTTER
SILL
SPRING BOX
G
R
A
T
E
2G
I W
/
F
L
A
T
3@12’x10’ RCBC
RIP RAP
CLASS ’I’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
RIP RAP
CLASS ’I’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FROM STA 18+25 TO 19+25 -Y4RPD- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 659+00 TO 661+00 -L- RT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 657+60 TO 663+80 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #21
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA 663+80 TO 666+70 -L- LT
SEE DETAIL#4
LATERAL V-DITCH
SEE DETAIL#12
W/ 957 SY FF
EST. 417 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#6
EST 309 SY FF
EST 114 TONS
CLASS "B’ RIPRAP
TOE PROTECTION W/
1
8
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
8"
D
I
P
HW
HW
HW
18
" RC
P
-III
24" RCP-III 30" RCP-III
30" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
3 0 " RC P -III
3 0 " RC P -IV
3 0 " RC P -IV
30" RCP-III
15"
R
C
P-III
15
"
RC
P
-
III
30" RCP-III
15
"
RC
P
-
III
30" RCP-III
6
0
"
R
C
P
-
I
V
6
0
"
R
C
P
-
I
V
6
0
"
R
C
P
-
I
V
8"
D
I
P
8" DIP
SEE DETAIL #21
W/ 544 SY FF
EST. 209 TONS
W/ CLASS ’I’ RIP RAP
LATERAL 3’ BASE DITCH
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
E
S
T
7
S
Y
F
F
E
S
T
2
T
O
N
S
R
IP
R
A
P
C
L
A
S
S
’B
’
GRATE
2GI W/FLAT
15" RCP-IV
BENCH
FLOODPLAIN
BENCH
FLOODPLAIN
1
5
"
V
C
15
"
V
C
15
"
V
C
2SFD
S
S
4
8
"
C
H
L
36"C
O
N
C
S
GR
W/
L
T
G
S
C
O
N
C
W
D
D
K
SCRUB
8 8 7 .9
W .E .
SCRUB
GRAU-350
ATTENUATOR
TYPE-350
CAT-1
CAT-1 GRAU-350
30’ ACCESS EASEMENT DB 1538 PG 142
EIP
EIP
EIP
KENNETH ANDREW HOLDER
REBECCA WHITLEY LADD
CHARLES SPENCER LADD JR.
GROUP GGK, LLC
GLENN D. HART
FAYE G. PEDDYCORD
REX L. PEDDYCORD
BETSY GORDON
BOBBY F. GORDON
KENNETH ANDREW HOLDER
F
O
R
S
Y
T
H
C
O
U
N
T
Y
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
2
0
’
S
A
N
IT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
ERIC Z. MYERS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
7
A
_
L
s
t
a
6
6
7
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 28 OF 64
PERMIT DRAWING
CULVERT SURVEY & HYDRAULIC DESIGN REPORT
ADDITIONAL INFORMATION AND COMPUTATIONS
8
3
0
860
850
840
830
0 100 200100200
870
-Y4CD-
15
"
FEMA DETAILED STUDY AREA
YADKIN RIVER BASIN
GP EL=865.11
SKEW=82 30
3@12’x10’ RCBC
CL STA 667+15 -L-
O
2.02:1 SKEWED
2:1 NORMAL
2.02:1 SKEWED
2:1 NORMAL
TB RT
TB RT
TB LTTB LT
WS
WS
EXST BED
EXST BED
3@12’x10’ RCBC
1
1
-
2
8
-
0
7
=
8
3
6
.
7
N
W
S
E
A
N
D
W
S
E
O
N
=844.3
PROP 100 YR
=844.0
EXST 100 YR
=844.0
PROP 50 YR
=843.8
EXST 50 YR
11-28-07=826.7
NWSE AND WSE ON
ON SLOPE 0.34%
BED EL-833.72S
I
LL
HW
BEVELED
3@60" RCP
RCP=838.3
INV OUT 3@60"
RCP=840.5
INV IN 3@60"
SHEET 29 OF 64
PERMIT DRAWING
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
SITE 19
FF
F
F
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
8
j
h
a
r
v
e
y
8
/
1
7
/
9
9
18U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
6
6
8
+
1
7
S
H
E
E
T
1
7
M
A
T
C
H
LIN
E
-
L-
S
T
A
.
6
8
1
+
0
4
S
H
E
E
T
1
9
6
7
0
6
7
5
6
8
0
7
5
8
0
8
5
C
C
C
C
F
C
C
+25.00 -L-
230.00’
CHORD
CHORD
C
H
O
R
D CHORD
CHORD
CHORD
CHORD
CHORD
CHORD
NCDOT
(
(
)
)
NCDOT
(
(
)
)
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI-A
2GI-A
2GI-A
2GI-A
2GI-A
2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
W/ ELBOW
30" CSP
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #25
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 4 Ft.
Max. d= 3 Ft.
Min. D= 3 Ft.
FROM STA. 667+88 TO 669+14 -L- RT
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
30" RCP-III 30" RCP-III
1
5
"
R
C
P
-
I
I
I
4
8
"
R
C
P
-
I
I
I
48" RCP-III
15" RCP-IV
42" RCP-III
3
0
"
R
C
P
-
I
I
I
3
0
"
R
C
P
-
I
I
I
36" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
30" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
II
I
1
5
"
R
C
P
-
I
I
I
24" RCP-III
15
"
R
C
P
-
III
15
"
RC
P
-
III
15
"
RC
P
-
III
18" RCP-III
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
STA 671+50 TO 674+00 -L- LT
BERM DITCH
STA 671+50 - 672+50 -L- LT
BERM DITCH
30"
2OTCB
GRATE
2GI W/FLAT
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
W/ 313 SY FF
EST. 125 TONS
CLASS ’I’ RIP RAP
EST. DDE 170CY
SEE DETAIL#25
TAIL DITCH
EST 50 SY FF
EST 26 TONS
RIP RAP
CLASS ’I’
STA 669+00 -L- RT
END SHOULDER BERM GUTTER
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
EST 7 SY FF
EST 2 TONS
CLASS ’B’ RIP RAP
EST. DDE 12CY
SEE DETAIL #7
TAIL DITCH
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 668+51 TO STA. 668+53 -L-
CAT-1
GRAU 350 TL-3
TYPE B-77
GLENN D. HART
REBECCA HINE WEAVIL
WILLIAM LEWIS WEAVIL
REBECCA HINE WEAVIL
WILLIAM LEWIS WEAVIL
GLENN D. HART
MARCIA S WEAVIL
RANDY NELSON WEAVIL
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
100
102
ERIC Z. MYERS
GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE
GANESHWAR SHIWCHARRAN
GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE
HOLDEN M. SIZEMORE
ANDREW S. MANGIACAPRE AND
EIP
EIP
EIP
EIP
EXISTING R/W
SHEET 30 OF 64
PERMIT DRAWING
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
WETLAND
DENOTES FILL INFF
SITE 19
FF
F
F
840
8
4
0
840 8
4
0
8
4
0
8
4
0
840
850
8
5
0
8
5
0
850
850
8
5
0
8
5
0
8
6
0
8
6
0
8
6
0
860
8
6
0
8
6
0
860
8
6
0
8
6
0
8
6
0
8
7
0
8
7
0
8
7
0
8
7
0
870
870
870
870
8
7
0
870
8
7
0
8
7
0
8
7
0
8
7
0
870
880
8
8
0
8
8
0
880
880
880
880
880
8
8
0
880
8
8
0
8
8
0
8
8
0
8
8
0
880
8
8
0
880
8 8 0
880
8
8
0
890
8
9
0
8
9
0
8
90
890
890
8
9
0
8
9
0
890
890
890
890
8
9
0
8
9
0
8
9
0
8
9
0
890
890
890
890
890
890 890
890
9
0
0
9
0
0
900
900
9
0
0
900
900
9
0
0
9
0
0
900
900
9
0
0
900 900
900 900
900
900
900
9
0
0
900
910
910
9
1
0
910
910
910
9
1
0
910
910
910
910
9
2
0
920
920
920
9
2
0
9
2
0
920
920
9
2
0
9
2
0
9
3
0
9
3
0
9
3
0
9
3
0
930
9
3
0
9
3
0
940 940
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
8
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
18U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
6
6
8
+
1
7
S
H
E
E
T
1
7
M
A
T
C
H
LIN
E
-
L-
S
T
A
.
6
8
1
+
0
4
S
H
E
E
T
1
9
6
7
0
6
7
5
6
8
0
7
5
8
0
8
5
C
C
C
C
F
C
C
+25.00 -L-
230.00’
CHORD
CHORD
C
H
O
R
D CHORD
CHORD
CHORD
CHORD
CHORD
CHORD
NCDOT
(
(
)
)
NCDOT
(
(
)
)
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI-A
2GI-A
2GI-A
2GI-A
2GI-A
2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
W/ ELBOW
30" CSP
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #25
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 4 Ft.
Max. d= 3 Ft.
Min. D= 3 Ft.
FROM STA. 667+88 TO 669+14 -L- RT
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
30" RCP-III 30" RCP-III
1
5
"
R
C
P
-
I
I
I
4
8
"
R
C
P
-
I
I
I
48" RCP-III
15" RCP-IV
42" RCP-III
3
0
"
R
C
P
-
I
I
I
3
0
"
R
C
P
-
I
I
I
36" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
30" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
II
I
1
5
"
R
C
P
-
I
I
I
24" RCP-III
15
"
R
C
P
-
III
15
"
RC
P
-
III
15
"
RC
P
-
III
18" RCP-III
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
STA 671+50 TO 674+00 -L- LT
BERM DITCH
STA 671+50 - 672+50 -L- LT
BERM DITCH
30"
2OTCB
GRATE
2GI W/FLAT
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
W/ 313 SY FF
EST. 125 TONS
CLASS ’I’ RIP RAP
EST. DDE 170CY
SEE DETAIL#25
TAIL DITCH
EST 50 SY FF
EST 26 TONS
RIP RAP
CLASS ’I’
STA 669+00 -L- RT
END SHOULDER BERM GUTTER
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
EST 7 SY FF
EST 2 TONS
CLASS ’B’ RIP RAP
EST. DDE 12CY
SEE DETAIL #7
TAIL DITCH
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 668+51 TO STA. 668+53 -L-
CAT-1
GRAU 350 TL-3
TYPE B-77
GLENN D. HART
REBECCA HINE WEAVIL
WILLIAM LEWIS WEAVIL
REBECCA HINE WEAVIL
WILLIAM LEWIS WEAVIL
GLENN D. HART
MARCIA S WEAVIL
RANDY NELSON WEAVIL
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
100
102
ERIC Z. MYERS
GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE
GANESHWAR SHIWCHARRAN
GROUP INC.
KEYSTONE GROUP INC.
KEYSTONE
HOLDEN M. SIZEMORE
ANDREW S. MANGIACAPRE AND
EIP
EIP
EIP
EIP
EXISTING R/W
SHEET 31 OF 64
PERMIT DRAWING
S
S
S
S
S
S
S S SURFACE WATER
DENOTES IMPACTS IN
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
SITE 20
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
9
j
h
a
r
v
e
y
8
/
1
7
/
9
9
19U-2579B
M
A
T
C
H
LIN
E
-
L-
S
T
A
.
6
8
1+
0
4
S
H
E
E
T
18
6
8
5
6
9
0
6
9
5
9
0
9
5
8:1 TAPER
F F
F
F
F
C
C
C
C
C
F
C
F
CHORD
2GI
2GI
2GI
2GI
2GI
2GI
BDO
2GI-A
FS
FS
FS
FS
FS
HW
STA 692+33 -L- RT
END SHOULDER BERM GUTTER
FS
STA 687+90 -L- LT
BEGIN SHOULDER BERM GUTTER
STA 690+50 -L- LT
END SHOULDER BERM GUTTER
FS
2GI
FS
STA 688+00 -L- RT
REVISE FILL SLOPE 2.75:1
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #31
Elev.= 850.0
845.7
N.W.S. Elev.=
NG
EST 108 SY FF
EST 51 TONS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 108 SY FF
EST 51 TONS
RIP RAP
CLASS ’I’
STA. 687+90 TO 688+98 -L- RT
SEE DETAIL#31
ROCK FILL IN POND
SEE DETAIL#31
ROCK FILL IN POND
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
W/ ELBOW
42" CSP
STA 686+50 -L- RT
BEGIN SHOULDER BERM GUTTER
18
"
RC
P
-
III
18" RCP-III
18
"
R
C
P
-
III 42" RCP-IV
42" RCP-IV
15" RCP-IV
15
"
RC
P
-
IV
15
"
RC
P
-
IV
7
2
" RC
P-
V
7
2
" RC
P-
V
18
"
RC
P
-
III
18
"
R
C
P
-
IV
SEE SHEET 2-TT
PSH
GRAU-350
GRAU-350
CAT-1
JONAH R. MOTSINGER
SHELBA J. TALLEY
MARCIA S. WEAVIL
RANDY NELSON WEAVIL
MARCIA S WEAVIL
RANDY NELSON WEAVIL
GLENDA JUNE COCKERHAM
PATTY WEAVIL MABE
15
6.7
4’
+
7
3.3
7
10’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
9
5
4
P
G
8
P
B
13
P
G
2
0
3
4
0’
S
T
R
E
E
T
EIP
EIP
EIP
CHARLES JERRY HART
CHARLES JERRY HART
WANDA L. BOOTH
BOBBY LEE MOORE
CHARLES JERRY HART
CHARLES JERRY HART
FRANCIS L. MANUEL
BILLIE MANUEL
SHEET 32 OF 64
PERMIT DRAWING
S
S
S
S
S
S
S S SURFACE WATER
DENOTES IMPACTS IN
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
SITE 20
8
4
0
8
4
0
850
850
850
850
8
5
0
8
5
0
8 5 0
8
5
0
850
8
5
0
850
8
50
850
8
6
0
860
860
8
6
0
8
6
0
8
6
0
860
860
8
6
0
860
8
6
0
860
8
6
0
860
860
8
6
0
860
860
860
8
6
0
860
860
8
7
0
870
870
870
870
870
870
870
870
870
870
870
870
8
7
0
8
7
0
8
7
0
8
7
0
870
8
7
0
8 7 0
8
7
0
8 7 0
870
870870
8
7
0
8
7
0870
8
7
0
870
870
8
7
0
880
880
880
8
8
0
880
880
880
880
880
880
880
880
8
8
0
880
880
880
880
880
8
8
0
8
8
0
8
8
0
8
8
0
880
880
8
8
0
880
8 8 0
880
880
880
880
8
8
0
8
8
0
880
8 8 0
8
8
0
8
8
0
880
8
8
0
8
9
0
890
8
9
0
890
890
890
890
890
890
890
890
890
890
890
890
8
9
0
890
890
89
0
890
890
890
8
9
0
890
890
890
8
9
0
890
890
8
9
0
8
9
0
8
9
0
890
8
9
0
890
890
890
890
890
890
890
900
9
0
0
900
900
900
900
9
0
0
9
0
0
900
900
900
900
900
900
900
900
900
900
9
0
0
900
9 0 0
900
9
0
0
900
900
9
0
0
9
0
0
900
900
9 0 0
9
0
0
900
900
900
910
910
910
910
910
910
910
9
10
910
9
1
0
910
910
9
1
0
910
910
9
10
9 1 0
910
920
9
2
0
920
9
2
0
920
9
2
0
9
2
0
920
920
9
2
0
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
1
9
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
19U-2579B
M
A
T
C
H
LIN
E
-
L-
S
T
A
.
6
8
1+
0
4
S
H
E
E
T
18
6
8
5
6
9
0
6
9
5
9
0
9
5
8:1 TAPER
F F
F
F
F
C
C
C
C
C
F
C
F
CHORD
2GI
2GI
2GI
2GI
2GI
2GI
BDO
2GI-A
FS
FS
FS
FS
FS
HW
STA 692+33 -L- RT
END SHOULDER BERM GUTTER
FS
STA 687+90 -L- LT
BEGIN SHOULDER BERM GUTTER
STA 690+50 -L- LT
END SHOULDER BERM GUTTER
FS
2GI
FS
STA 688+00 -L- RT
REVISE FILL SLOPE 2.75:1
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
GRATE
2GI W/ FLAT
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #31
Elev.= 850.0
845.7
N.W.S. Elev.=
NG
EST 108 SY FF
EST 51 TONS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 108 SY FF
EST 51 TONS
RIP RAP
CLASS ’I’
STA. 687+90 TO 688+98 -L- RT
SEE DETAIL#31
ROCK FILL IN POND
SEE DETAIL#31
ROCK FILL IN POND
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
W/ ELBOW
42" CSP
STA 686+50 -L- RT
BEGIN SHOULDER BERM GUTTER
18
"
RC
P
-
III
18" RCP-III
18
"
R
C
P
-
III 42" RCP-IV
42" RCP-IV
15" RCP-IV
15
"
RC
P
-
IV
15
"
RC
P
-
IV
7
2
" RC
P-
V
7
2
" RC
P-
V
18
"
RC
P
-
III
18
"
R
C
P
-
IV
SEE SHEET 2-TT
PSH
GRAU-350
GRAU-350
CAT-1
JONAH R. MOTSINGER
SHELBA J. TALLEY
MARCIA S. WEAVIL
RANDY NELSON WEAVIL
MARCIA S WEAVIL
RANDY NELSON WEAVIL
GLENDA JUNE COCKERHAM
PATTY WEAVIL MABE
15
6.7
4’
+
7
3.3
7
10’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
9
5
4
P
G
8
P
B
13
P
G
2
0
3
4
0’
S
T
R
E
E
T
EIP
EIP
EIP
CHARLES JERRY HART
CHARLES JERRY HART
WANDA L. BOOTH
BOBBY LEE MOORE
CHARLES JERRY HART
CHARLES JERRY HART
FRANCIS L. MANUEL
BILLIE MANUEL
SHEET 33 OF 64
PERMIT DRAWING
S
S
S
S
S
S
S
S
S
S
S
S
S S S
IN WETLAND
D
E
N
O
TES EXCAVATION
WETLAND
DENOTES FILL INFF
SITE 21
SITE 3
F
F
SITE 3A SITE 3B
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
2
0
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
0
j
h
a
r
v
e
y
8
/
1
7
/
9
9
20U-2579B
M
A
TC
H
LIN
E
-
Y1-
S
TA
.
2
3
+
6
5
S
H
EE
T
5
10
15
2
0
10
10
10
-
Y7
-
-D
R
1-
10’
10’
10
1
5
2
0
END W.W. FENCE
BEGIN W.W. FENCE
F
F
F
F
F
F
F
C
C
C
C
C
F
F
F
F
CC
SILL
REMOVE
REMOVE
2GI
2GIBDO
2GI
GRATES
NARROW SLOT
REMOVE
REMOVE
REMOVE
HW
REMOVE
2GI
2GI
W/ FLAT GRATE
NARROW SLOT
W/ FLAT GRATE
2GI NARROW SLOT
W/ FLAT GRATE
2GI NARROW SLOT
REMOVE
STA 22+75 -Y1- RT
BERM GUTTER
BEGIN SHOULDER
W/ ELBOW
24" CSP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2@7’x6’ RCBC
STA 18+50 -Y1- LT
BEGIN SHOULDER BERM GUTTER
REMOVE
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 28 SY FF
EST 11 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 10+65 TO 12+90 -Y7- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 23+00 TO 26+00 -Y1- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 19+35 TO 21+80 -Y1- RT
FROM STA 22+90 TO 24+60 -Y1- RT
Natural
Ground 2:
1 D Slope
Ditch
Front
B
( Not to Scale)
SPECIAL CUT BASE DITCH
Flatter4:1 or
DETAIL #19
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 17+00 TO 19+00 -Y1- RT
B
Natural Natural
Ground Ground3:1
3:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #18
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 11+31 TO 11+51 -Y1- RT
SEE DETAIL#19
SPECIAL 2’ CUT BASE DITCH
SEE DETAIL#6
TOE PROTECTION
EST
. 3
TON
S
CLASS
’B
’
RIPRAP
EST. DDE=24CY
SEE DETAIL#18
HEAD DITCH
SEE DETAIL#12
W/ 432 SY FF
EST. 165 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#12
W/ 300 SY FF
EST. 114 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#3
W/ 397 SY FF
EST. 151 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
24"
RCP-III
24
"
RCP-III
2
4
"
RC
P
-
I
II
15"
15"
24
"
24
"
15" RCP-IV
15" RCP-IV
15
"
RC
P
-
I
V
36" RCP-III
SEE SHEET 2-TT
PSH
S
T
A
2
4
+
0
0
-
Y
1
-
LT
E
N
D
S
H
O
U
LD
E
R
B
E
R
M
G
U
T
T
E
R
BENCH
FLOODPLAIN
FES
18" RCP
18" RCP
DI
18" RCP
MTL
WD DK
36" CMP
W/LT
18" RCP W/LT
10
’
B
S
T
2SFD
W
BK WALL
W/LT
48" CONC
2SBKD
BK WALL
S
48" WD
S
H
T
R
W/LT
12" RCP
G
R
2SFD
S
S
W/LT
WD WALL
15" RCP
1SFD
S
GR
W/LT
W/LT
S
1SFD
W/LT
MTL
MT
L
W/LT
W/LT
S
R
2
6
6
5
E
S
T
H
E
R
LN
18
’ B
S
T
S
15
" R
C
P
12’
C
ON
C
4
8
" C
O
N
C
2SBKD
5’ X 5’ CONC
12" RCP
BST
B
S
T
IN
A L
N
BST
W
3
6
"
C
O
N
C
2SFD
C
O
N
C
B
S
T
W
W
G
R
S
W
W
48" CONC
W
D
US 158
BST
US 158
BST
T
T
T
8" DI
8" DI
8" DI
12
"
S
T
12
"
S
T
12
"
S
T
12" S
T
6
"
D
I
6
"
D
I
(A
T
U
R
)
GR
AU
-
3
5
0
GR
AU
-
3
5
0
CAT-1
GRAU
350
CUL1
CUL2
CUL3CUL4
1-
5
X
5
B
A
R
R
E
L
CE1
HW1
HW2
CE2
DI
36" CMP
18
" RC
P
18
"
R
C
P
12" RCPFES
18
"
R
C
P
REBECCA ANN FREEMAN
BILLY RAY MITCHELL
CAROL JONES MITCHELL
REBECCA W. FREEMAN
15
0
.0
0
’
EXISTING R/W
EXISTING R/W
MARY ANN PHILLIPS
WAYNE E. PHILLIPS, JR.
EIP
EIP
EIP
EIP EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
FRANCES B. WHICKER
JAMES N. WHICKER
MEARILEASE HARDY, TRUSTEES
RAMOND F. HARDY
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’
60.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
JACQUELINE CUSTER
TERRY K. CUSTER
REBECCA C. STRAUSS
KEITH E. STRAUSS
MARSHALL S. BROWN
BILLY RAY MITCHELL
CAROL JONES MITCHELL
DONALD ROBER JONES
MARY MYERS
JAMES R. MYERS, III
MARY B. MYERS
JAMES R. MYERS III &
ALVIN L. LINDSAY
TOWN OF WALKERTOWN
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
TOWN OF WALKERTOWN
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
EIP
EIP
EIP
TOWN OF WALKERTOWN
FORSYTH COUNTY
PLAINSMAN DEVELOPMENT CORP
NANCY FLINCHUM
CLAUDE DICKERSON, JR.
W/LT
SHEET 34 OF 64
PERMIT DRAWING
S
S
S
S
S
S
S
S
S
S
S
S
S S S
IN WETLAND
D
E
N
O
TES EXCAVATION
WETLAND
DENOTES FILL INFF
SITE 21
SITE 3
F
F
SITE 3A SITE 3B
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
8
8
0
88
0
8
80880 880
8
9
0
890
8
9
0
890
890
8
9
0
89
0
890
8
9
0
890
890
890
890
8
9
0
8
9
0
890
890
8
9
0
890
8
9
0
890
89
0
8
9
0
8
9
0
8
9
0
890
8
9
0
900
9
0
0
900
9
0
0
9
0
0
900
9
0
0
900
9
0
0
900
90
0
900
90
0
900
9
00
9
0
0
900
900
900
900
90
0 900
900 900
900
9
0
0
9
0
0
9
0
0
9
10
910
9
1
0
910
9
10
9
1
0
910
9
1
0
9
1
0
9
1
0
910
910
910
91
0
9
10
910
9
10
910
910
9
1
0
910
910 910
910
9
1
0
9
1
0
910 910
9 10
9
1
0
910
910
920
920
920
9
2
0
92
0
9
2
0
9
2
0
920
920
920
920
92
0
920
92
0
920
920
920
9
2
0
92
0
920
9
2
0
930
930
9
3
0
93
0
9
3
0
9
3
0
9
3
0
93
0
9
3
0
930
9
3
0
930
9
3
0
930
940
940
940
940
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
2
0
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
0
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
20U-2579B
M
A
TC
H
LIN
E
-
Y1-
S
TA
.
2
3
+
6
5
S
H
EE
T
5
10
15
2
0
10
10
10
-
Y7
-
-D
R
1-
10’
10’
10
1
5
2
0
END W.W. FENCE
BEGIN W.W. FENCE
F
F
F
F
F
F
F
C
C
C
C
C
F
F
F
F
CC
SILL
REMOVE
REMOVE
2GI
2GIBDO
2GI
GRATES
NARROW SLOT
REMOVE
REMOVE
REMOVE
HW
REMOVE
2GI
2GI
W/ FLAT GRATE
NARROW SLOT
W/ FLAT GRATE
2GI NARROW SLOT
W/ FLAT GRATE
2GI NARROW SLOT
REMOVE
STA 22+75 -Y1- RT
BERM GUTTER
BEGIN SHOULDER
W/ ELBOW
24" CSP
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2@7’x6’ RCBC
STA 18+50 -Y1- LT
BEGIN SHOULDER BERM GUTTER
REMOVE
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 28 SY FF
EST 11 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 10+65 TO 12+90 -Y7- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 23+00 TO 26+00 -Y1- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 19+35 TO 21+80 -Y1- RT
FROM STA 22+90 TO 24+60 -Y1- RT
Natural
Ground 2:
1 D Slope
Ditch
Front
B
( Not to Scale)
SPECIAL CUT BASE DITCH
Flatter4:1 or
DETAIL #19
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 17+00 TO 19+00 -Y1- RT
B
Natural Natural
Ground Ground3:1
3:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #18
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 11+31 TO 11+51 -Y1- RT
SEE DETAIL#19
SPECIAL 2’ CUT BASE DITCH
SEE DETAIL#6
TOE PROTECTION
EST
. 3
TON
S
CLASS
’B
’
RIPRAP
EST. DDE=24CY
SEE DETAIL#18
HEAD DITCH
SEE DETAIL#12
W/ 432 SY FF
EST. 165 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#12
W/ 300 SY FF
EST. 114 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#3
W/ 397 SY FF
EST. 151 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
24"
RCP-III
24
"
RCP-III
2
4
"
RC
P
-
I
II
15"
15"
24
"
24
"
15" RCP-IV
15" RCP-IV
15
"
RC
P
-
I
V
36" RCP-III
SEE SHEET 2-TT
PSH
S
T
A
2
4
+
0
0
-
Y
1
-
LT
E
N
D
S
H
O
U
LD
E
R
B
E
R
M
G
U
T
T
E
R
BENCH
FLOODPLAIN
FES
18" RCP
18" RCP
DI
18" RCP
MTL
WD DK
36" CMP
W/LT
18" RCP W/LT
10
’
B
S
T
2SFD
W
BK WALL
W/LT
48" CONC
2SBKD
BK WALL
S
48" WD
S
H
T
R
W/LT
12" RCP
G
R
2SFD
S
S
W/LT
WD WALL
15" RCP
1SFD
S
GR
W/LT
W/LT
S
1SFD
W/LT
MTL
MT
L
W/LT
W/LT
S
R
2
6
6
5
E
S
T
H
E
R
LN
18
’ B
S
T
S
15
" R
C
P
12’
C
ON
C
4
8
" C
O
N
C
2SBKD
5’ X 5’ CONC
12" RCP
BST
B
S
T
IN
A L
N
BST
W
3
6
"
C
O
N
C
2SFD
C
O
N
C
B
S
T
W
W
G
R
S
W
W
48" CONC
W
D
US 158
BST
US 158
BST
T
T
T
8" DI
8" DI
8" DI
12
"
S
T
12
"
S
T
12
"
S
T
12" S
T
6
"
D
I
6
"
D
I
(A
T
U
R
)
GR
AU
-
3
5
0
GR
AU
-
3
5
0
CAT-1
GRAU
350
CUL1
CUL2
CUL3CUL4
1-
5
X
5
B
A
R
R
E
L
CE1
HW1
HW2
CE2
DI
36" CMP
18
" RC
P
18
"
R
C
P
12" RCPFES
18
"
R
C
P
REBECCA ANN FREEMAN
BILLY RAY MITCHELL
CAROL JONES MITCHELL
REBECCA W. FREEMAN
15
0
.0
0
’
EXISTING R/W
EXISTING R/W
MARY ANN PHILLIPS
WAYNE E. PHILLIPS, JR.
EIP
EIP
EIP
EIP EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
FRANCES B. WHICKER
JAMES N. WHICKER
MEARILEASE HARDY, TRUSTEES
RAMOND F. HARDY
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’
60.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
JACQUELINE CUSTER
TERRY K. CUSTER
REBECCA C. STRAUSS
KEITH E. STRAUSS
MARSHALL S. BROWN
BILLY RAY MITCHELL
CAROL JONES MITCHELL
DONALD ROBER JONES
MARY MYERS
JAMES R. MYERS, III
MARY B. MYERS
JAMES R. MYERS III &
ALVIN L. LINDSAY
TOWN OF WALKERTOWN
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
TOWN OF WALKERTOWN
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
EIP
EIP
EIP
TOWN OF WALKERTOWN
FORSYTH COUNTY
PLAINSMAN DEVELOPMENT CORP
NANCY FLINCHUM
CLAUDE DICKERSON, JR.
W/LT
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
0
A
_
Y
1
s
t
a
2
2
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 35 OF 64
PERMIT DRAWING
CULVERT SURVEY & HYDRAULIC DESIGN REPORT
ADDITIONAL INFORMATION AND COMPUTATIONS
920
910
900
0 100100200 200 RTLT
890
880
2@7’x6’ RCBC
23 -
Y1-
O
GP EL=916.72
SKEW=40
2@7’x6’ RCBC
CL STA 23+11 -Y1-
2
@
7
’
x
6
’
R
C
B
C
-DEBRIS POTENTIAL: MODERATE
OBSERVED IN THE 100 YR FLOOD PLAIN
-THERE WERE NO DWELLINGS OR STRUCTURES
-BED MATERIALS: SAND, SILT, COBBLES
TB LT
TB LT
TB RT
TB RT
WS
BED
BED
WS
=893.5
EXST 100 YR
=887.8
PROP 100 YR
=887.2
PROP 50 YR
=893.3
EXST 50 YR
I
N
LE
T
N
G
A
T
C
U
LV
E
R
T
HW
BEVELED
8-23-07=882.3
NWSE AND WSE ON
TO BE REMOVED
EXISTING CULVERT
5X5 RCBC
SLOPE=0.97%
BED ELEV=879.42
A
P
P
R
O
X
I
M
A
T
E
LY
2
8
.
3
F
T
’
B
’
R
I
P
R
A
P
.
P
LA
C
E
B
A
F
F
LE
S
I
N
C
U
LV
E
R
T
.
O
T
H
E
R
W
I
S
E
U
S
E
C
LA
S
S
M
A
T
E
R
I
A
L,
I
F
A
V
A
I
LA
B
LE
,
A
N
D
U
S
E
S
T
O
C
K
P
I
LE
E
X
C
A
V
A
T
E
D
S
I
T
E
B
E
D
O
F
R
E
LA
T
I
V
E
B
A
F
F
LE
E
LE
V
A
T
I
O
N
S
.
P
LA
C
E
B
E
D
M
A
T
E
R
I
A
L
T
O
T
O
P
SHEET 36 OF 64
PERMIT DRAWING
WETLAND
DENOTES FILL INFF
SITE 22
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
5
j
h
a
r
v
e
y
8
/
1
7
/
9
9
25U-2579B
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
4
3
+
6
5
S
H
E
E
T
2
6
NOTE :
M
A
T
C
H
LI
N
E
-
Y
4
S
T
A
.
3
0
+
5
0
S
H
E
E
T
2
4
PAVED SHOULDER
1. FOR - Y4EB - PROFILE SEE SHEET 50
2. FOR - Y4WB - PROFILE SEE SHEET 55
3
5
4
0
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
F
F
F
F
F
F
F
C
C
C
C
C C
RETAIN
2GI
FS
RETAIN AND EXTEND
HW
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
JB w/ MH
2GI
Conv. OTCB To 2GI
FS
RETAIN Conv. OTCB To 2GI
FS
2GI FS
RETAIN AND EXTEND
REMOVE FES
2GI
COLLAR 2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
2GI
FS
REMOVE
STA 41+00 -Y4- LT
BEGIN SHOULDER BERM GUTTER
COLLAR
JB w/ MH
COLLAR
REMOVE FES
MIN. HEIGHT 1.0’
DITCH BLOCK
REMOVE FES
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
FS
FS
MATERIAL
FILL W/ FLOWABLE
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 39 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 35+02 TO 35+27 -Y4- LT
EST. DDE 40CY
SEE DETAIL#9
HEAD DITCH
EST. DDE 17CY
SEE DETAIL#9
TAIL DITCH
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
AT
T
E
R
2:
1
OR
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA. 40+30 TO RCBC -Y4- RT
SEE DETAIL#27
EST 779 SY FF
EST 380 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
36" WELDED STEEL
TRENCHLESS INSTALLATION
15" RCP-III
42" RCP-III
15" RCP-III
15"
RCP-III
1
5
"
R
C
P
-
IV
1
5
"
R
C
P
-
IV
36" RCP-III
24" RCP-III
JB w/ MH
24" RCP-III
24" RCP-III
18" RCP-III
SEE SHEET 2-TT
PSH
60" CHL
18" CMP
24" RCP
60" CHL
MTL
2
S
B
KD
2S
B
K
D
15’ C
ONC
30" C&G
B
R
E
NT
C
R
E
E
K
R
D
2
6’
B
S
T
8 4 " WD
48" CONC
S
W
HTRWD DK
DI
DI
F
E
S
DI
2 4 " R C P
2 4 " R C P
DI
F E S
F E S
15" RCP
FISH HATCHERY
W. E. 859.7
POND
S
W/LT
LT
18"
RCP
LT
4
8"
CONC
18"
V
C
18
"
V
C
GRAU-350
CAT-1GRAU-350
CAT-1
18
"
C
M
P
15" RCP
CB
CBCBCB
18" RCP
DAVID D. WEAVER
AMY J. MEAD
THEODORE R. MEAD
EIP
LINDA MAYES HOPKINS
HELEN H. PRINCE
ARNOLD G. KING
HA T. DAM
ARNOLD G. KING
THOMAS W. PRINCE
2
0’
S
TORM
S
EW
ER
EAS
EM
ENT
P
B
3
4
P
G
1
3
4
EIP
EIP
EIP
ARNOLD G. KING
THOMAS W. PRINCE
ARNOLD G. KING
THOMAS W. PRINCE
KRISTI R. RECORD
CHARLES LEO RECORD
2
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
R/W MON
R/W MON
EIP
EIP
SUSAN E. KUBIAK
TIMOTHY A. KUBIAK
TOWN OF KERNERSVILLE
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
20’ S
A
NIT
A
R
Y SE
WE
R E
ASE
ME
NT
;
;
W/LT
SHEET 37 OF 64
PERMIT DRAWING
WETLAND
DENOTES FILL INFF
SITE 22
850
850
850
850
850
850
850
850
850
850
850
860
860
860
860
860
860
860
860
8
6
0
8
6
0
8
6
0
8
6
0
860
860
8
60
8
6
0
860
8
6
0
860
860
860
870
8
7
0
8
7
0
870
8
7
0
8
7
0
870
870
870
870
8
7
0
870
870
8
7
0
870
8
7
0
870870
870
8
7
0
8
7
0
8
7
0
870
8
7
0
870
880
880
8
8
0
8
8
0
8
8
0
880
8
8
0
8
8
0
880
8
80
880
880
880
880
880
880
8
8
0
880
8
8
0
8
8
0
8
8
0
890
8
9
0
890
8 9 0
890
890
890
890
890
890
8
9
0
8
9
0
8
9
0
890
890
890
890
890
890
890
890
890
890
9
0
0
9
0
0
9
0
0
900
900
900
900
900
900
9
0
0
900
9
0
0
9
0
0
900
900
9
0
0
900
900
9
0
0
9
0
0
9
0
0
900
9
10
910
9
10
9
1
0
910910
910
9
10
910
910
910
9
10
910
910
910
910
9
1
0
9
1
0
910
9
10
9
2
0
9
2
0
9
2
0
9
2
0
920
920
9
2
0
920
9
2
0
920
9
2
0
920
9
3
0
9
3
0
930
930
9
30
9
3
0
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
5
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
25U-2579B
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
4
3
+
6
5
S
H
E
E
T
2
6
NOTE :
M
A
T
C
H
LI
N
E
-
Y
4
S
T
A
.
3
0
+
5
0
S
H
E
E
T
2
4
PAVED SHOULDER
1. FOR - Y4EB - PROFILE SEE SHEET 50
2. FOR - Y4WB - PROFILE SEE SHEET 55
3
5
4
0
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
F
F
F
F
F
F
F
C
C
C
C
C C
RETAIN
2GI
FS
RETAIN AND EXTEND
HW
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
JB w/ MH
2GI
Conv. OTCB To 2GI
FS
RETAIN Conv. OTCB To 2GI
FS
2GI FS
RETAIN AND EXTEND
REMOVE FES
2GI
COLLAR 2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
2GI
FS
REMOVE
STA 41+00 -Y4- LT
BEGIN SHOULDER BERM GUTTER
COLLAR
JB w/ MH
COLLAR
REMOVE FES
MIN. HEIGHT 1.0’
DITCH BLOCK
REMOVE FES
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
FS
FS
MATERIAL
FILL W/ FLOWABLE
EST 5 SY FF
EST 1 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 39 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 35+02 TO 35+27 -Y4- LT
EST. DDE 40CY
SEE DETAIL#9
HEAD DITCH
EST. DDE 17CY
SEE DETAIL#9
TAIL DITCH
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
AT
T
E
R
2:
1
OR
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA. 40+30 TO RCBC -Y4- RT
SEE DETAIL#27
EST 779 SY FF
EST 380 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
36" WELDED STEEL
TRENCHLESS INSTALLATION
15" RCP-III
42" RCP-III
15" RCP-III
15"
RCP-III
1
5
"
R
C
P
-
IV
1
5
"
R
C
P
-
IV
36" RCP-III
24" RCP-III
JB w/ MH
24" RCP-III
24" RCP-III
18" RCP-III
SEE SHEET 2-TT
PSH
60" CHL
18" CMP
24" RCP
60" CHL
MTL
2
S
B
KD
2S
B
K
D
15’ C
ONC
30" C&G
B
R
E
NT
C
R
E
E
K
R
D
2
6’
B
S
T
8 4 " WD
48" CONC
S
W
HTRWD DK
DI
DI
F
E
S
DI
2 4 " R C P
2 4 " R C P
DI
F E S
F E S
15" RCP
FISH HATCHERY
W. E. 859.7
POND
S
W/LT
LT
18"
RCP
LT
4
8"
CONC
18"
V
C
18
"
V
C
GRAU-350
CAT-1GRAU-350
CAT-1
18
"
C
M
P
15" RCP
CB
CBCBCB
18" RCP
DAVID D. WEAVER
AMY J. MEAD
THEODORE R. MEAD
EIP
LINDA MAYES HOPKINS
HELEN H. PRINCE
ARNOLD G. KING
HA T. DAM
ARNOLD G. KING
THOMAS W. PRINCE
2
0’
S
TORM
S
EW
ER
EAS
EM
ENT
P
B
3
4
P
G
1
3
4
EIP
EIP
EIP
ARNOLD G. KING
THOMAS W. PRINCE
ARNOLD G. KING
THOMAS W. PRINCE
KRISTI R. RECORD
CHARLES LEO RECORD
2
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
R/W MON
R/W MON
EIP
EIP
SUSAN E. KUBIAK
TIMOTHY A. KUBIAK
TOWN OF KERNERSVILLE
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
20’ S
A
NIT
A
R
Y SE
WE
R E
ASE
ME
NT
;
;
W/LT
SHEET 38 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
S
SS
S
S
S
S S
S
S S
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 23A
SITE 23
S
S
S
S
S
SSS
SMITH CREEK
SMITH CREEK
SITE 28
S
SS
SSS
S
SITE 23B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
2
2
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
6
b
s
m
i
t
h
8
/
1
7
/
9
9
26U-2579B
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
4
3
+
6
5
S
H
E
E
T
2
5
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
5
6
+
6
1
S
H
E
E
T
2
7
NOTE :
1. FOR -Y4EB- PROFILE SEE SHEET 50-51
2. FOR -Y4WB- PROFILE SEE SHEET 55-56
PAVED SHOULDER
4
5
5
0
5
5
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
F
F
F
F
F
F F
C
C C
C
STA 50+00 TO 50+50 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
STA. 46+00 -Y4- LT
END SHOULDER BERM GUTTER
STA. 55+50 -Y4- RT
END SHOULD BERM GUTTER
STA 55+50 TO 66+00 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
2GI FS
2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
REMOVE
2GI W/ FLAT GRATE 2GI W/ FLAT GRATE
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
COLLAR
REMOVE FES
18" RCP
2GI
2GI
FS
FS
FS
RETAIN AND EXTEND
Conv. OTCB To 2GI
COLLAR
RETAIN AND EXTEND
2GI W/ FLAT GRATE
3:13:1
5’
( Not to Scale)
EARTH BERM
DETAIL #16
STA. 47+93 -Y4- LT
N.G.N.G.
862.0’
MATERIAL
FILL W/ FLOWABLE
HW
BORE AND JACK
30" STEEL PIPE
2GI-A
SEE DETAIL#16
EARTH BERM
RIP RAP
CLASS ’I’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
RIP RAP
CLASS ’I’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 53+85 TO 54+50 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. 44+68 TO 47+53 -Y4- LT
SEE DETAIL#3
LATERAL 2’ BASE DITCH
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
AT
T
E
R
2:
1
OR
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA. 40+30 TO RCBC -Y4- RT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA. 53+05 TO 53+85 -Y4- LT
EST. 37 SY
EST. 18 TONS
(TO WATERS EDGE)
RIP RAP
CLASS ’I’
SEE DETAIL#6
EST 123 SY FF
EST 46 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
15
"
R
C
P
-
I
V
1
5
"
R
C
P
-
IV
15
"
R
C
P
-
I
II
15" RCP-IV
15
"
R
C
P
-
I
V
1
5
"
R
C
P
-
II
I
18" RCP-III
15" RCP-IV
30" RCP-III
30"
R
C
P-III
T
R
E
N
C
H
L
E
S
S
I
N
S
T
A
L
L
A
T
I
O
N
3
0
"
W
E
L
D
E
D
S
T
E
E
L
COLLAR
24" RCP-III
RCP-III
24"
SEE SHEET 2-TT
PSH
535 SY FF
EST. 206 TONS
CLASS ’I’ RIP RAP
EST. DDE 235CY
SEE DETAIL#17
TAIL DITCH
EST. DDE 5CY
SEE DETAIL #7
HEAD DITCH
SEE DETAIL#27
EST 779 SY FF
EST 380 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 45+14 TO STA. 45+18 -Y4- LT
RIP RAP
CLASS ’I’
MTLSILT IN THIS BARREL
P
L
A
S
T
I
C
5
5
"
3-8’X9’ CONC
15" CMP
D
A
M
D
A
M
PIER
MTL
CONC BLD
MTL
MTL
MTL
60" CHL
GR
WD PIER
1S
F
D
3
6
" C
O
N
C
S
G
R
MTL
MTL
MTL
S
1SFD
POOL
WD DK
S
W
S
S S
S
S
B
C
O
N
C
CANOPYMTL
GR
CONC
S
W/LT
DI
18
"
R
C
P
F
E
S
DI
DI
F
E
S
12
" R
C
P
12
"
R
C
P
FISH HATCHERY
W. E. 847.2
POND
FISH HATCHERY
W. E. 859.7
POND
W. E. 855.7
POND
W. E. 855.6
POND
S
S
96" CHL&3SBW
24" RCP
24" RCP
STONE WALL
18"
V
C
18"
VC
18" VC
1
8"
V
C
1
8"
VC
18" VC
18
"
V
C
T
GRAU-350
2
4
"
R
C
P
2
4
"
R
C
P
F
E
S
18
"
R
C
P
F
E
S
18
"
C
M
P
STONE RET WALL
5
5
"
P
L
A
S
T
I
C
I
N
V
=
8
6
1.
5
2
CBCBCB
3-8X9 BARRELS
CUL1CUL2
CUL3CUL5
CUL4CUL6
HW1
CE1
CUL7 CUL8
CUL9
CE2
HW2
CUL10
CUL11
CUL12SILT IN THIS BARREL
HAROLD DAVID HOPKINS, JR.
PATTIE CRANFILL
HAROLD D. CRANFILL
2
0’
S
T
OR
M
S
E
W
E
R
E
AS
E
M
E
NT
P
B
4
2
P
G
13
7
2
0
’
S
T
O
R
M
S
E
WE
R
E
A
S
E
M
E
N
T
P
B
4
2
P
G
13
7
LINDA MAYES HOPKINS
NANCY B. PEGRAM
JERRY M. PEGRAM
RONALD LEE ANGEL SR.
JAMES LEON BERRY
LYNN ANGEL BERRY
20’ SANITARY SEWER EASEMENT
;
;
LAWRENCE E. POPE
SHEET 39 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
S
SS
S
S
S
S S
S
S S
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 23A
SITE 23
S
S
S
S
S
SSS
SMITH CREEK
SMITH CREEK
SITE 28
S
SS
SSS
S
SITE 23B
8
4
0
840
8
4
0
840
840
840
840
8
4
0
840
840
840 840
840
840
840
840
8
5
0
850
850
850
850
8
5
0
8
5
0
850
850
8
5
0
850
850850
850
850
850
850
850
850 850
850
850
850
850
850
850
850
8
5
0
8
5
0
850
8
50
850
850
850
850
850
8
5
0
850
850
850
850
850
850
850850
850
850
850
8
5
0
850
8
5
0
850850850850 850
8
5
0850 850850
850
8
6
0
8
6
0
8
6
0
8
6
0
860
8
6
0
8
6
0
860 860
860
860
860
860
860
860
860
860
8
6
0
860
860
860
860
860
860
860
8
6
0
860
860
860
8
6
0
860
860
860
860 860
860
860
860
860
860
860
8
6
0
8
6
0
860
860
860
860
860
8
6
0
860
870
8
7
0
8
7
0
870 870
870
8
7
0
8
7
0
870
870 870
870
870
870
8
7
0
870
870
8
7
0
870870
870
870
870
870
870
870
870
870
8
7
0
8
7
0
8
8
0
8
8
0
8
8
0
8
8
0
880
880
880
880
880 880
8
8
0
8
8
0
8
8
0
8
8
0
880
8
8
0
8
8
0
880
880
8
8
0
8
8
0
880
8
9
0
8
9
0
890
890
890
890
890
890
8
9
0
9
0
0
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
10
/
2
2
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
6
_
c
o
n
b
s
m
i
t
h
8
/
1
7
/
9
9
26U-2579B
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
4
3
+
6
5
S
H
E
E
T
2
5
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
5
6
+
6
1
S
H
E
E
T
2
7
NOTE :
1. FOR -Y4EB- PROFILE SEE SHEET 50-51
2. FOR -Y4WB- PROFILE SEE SHEET 55-56
PAVED SHOULDER
4
5
5
0
5
5
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
F
F
F
F
F
F F
C
C C
C
STA 50+00 TO 50+50 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
STA. 46+00 -Y4- LT
END SHOULDER BERM GUTTER
STA. 55+50 -Y4- RT
END SHOULD BERM GUTTER
STA 55+50 TO 66+00 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
2GI FS
2GI W/ FLAT GRATE
2GI W/ FLAT GRATE
REMOVE
2GI W/ FLAT GRATE 2GI W/ FLAT GRATE
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
COLLAR
REMOVE FES
18" RCP
2GI
2GI
FS
FS
FS
RETAIN AND EXTEND
Conv. OTCB To 2GI
COLLAR
RETAIN AND EXTEND
2GI W/ FLAT GRATE
3:13:1
5’
( Not to Scale)
EARTH BERM
DETAIL #16
STA. 47+93 -Y4- LT
N.G.N.G.
862.0’
MATERIAL
FILL W/ FLOWABLE
HW
BORE AND JACK
30" STEEL PIPE
2GI-A
SEE DETAIL#16
EARTH BERM
RIP RAP
CLASS ’I’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 8 TONS
RIP RAP
CLASS ’B’
RIP RAP
CLASS ’I’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 53+85 TO 54+50 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. 44+68 TO 47+53 -Y4- LT
SEE DETAIL#3
LATERAL 2’ BASE DITCH
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
AT
T
E
R
2:
1
OR
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FROM STA. 40+30 TO RCBC -Y4- RT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA. 53+05 TO 53+85 -Y4- LT
EST. 37 SY
EST. 18 TONS
(TO WATERS EDGE)
RIP RAP
CLASS ’I’
SEE DETAIL#6
EST 123 SY FF
EST 46 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
15
"
R
C
P
-
I
V
1
5
"
R
C
P
-
IV
15
"
R
C
P
-
I
II
15" RCP-IV
15
"
R
C
P
-
I
V
1
5
"
R
C
P
-
II
I
18" RCP-III
15" RCP-IV
30" RCP-III
30"
R
C
P-III
T
R
E
N
C
H
L
E
S
S
I
N
S
T
A
L
L
A
T
I
O
N
3
0
"
W
E
L
D
E
D
S
T
E
E
L
COLLAR
24" RCP-III
RCP-III
24"
SEE SHEET 2-TT
PSH
535 SY FF
EST. 206 TONS
CLASS ’I’ RIP RAP
EST. DDE 235CY
SEE DETAIL#17
TAIL DITCH
EST. DDE 5CY
SEE DETAIL #7
HEAD DITCH
SEE DETAIL#27
EST 779 SY FF
EST 380 TONS
CLASS "I" RIPRAP
TOE PROTECTION W/
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 45+14 TO STA. 45+18 -Y4- LT
RIP RAP
CLASS ’I’
MTLSILT IN THIS BARREL
P
L
A
S
T
I
C
5
5
"
3-8’X9’ CONC
15" CMP
D
A
M
D
A
M
PIER
MTL
CONC BLD
MTL
MTL
MTL
60" CHL
GR
WD PIER
1S
F
D
3
6
" C
O
N
C
S
G
R
MTL
MTL
MTL
S
1SFD
POOL
WD DK
S
W
S
S S
S
S
B
C
O
N
C
CANOPYMTL
GR
CONC
S
W/LT
DI
18
"
R
C
P
F
E
S
DI
DI
F
E
S
12
" R
C
P
12
"
R
C
P
FISH HATCHERY
W. E. 847.2
POND
FISH HATCHERY
W. E. 859.7
POND
W. E. 855.7
POND
W. E. 855.6
POND
S
S
96" CHL&3SBW
24" RCP
24" RCP
STONE WALL
18"
V
C
18"
VC
18" VC
1
8"
V
C
1
8"
VC
18" VC
18
"
V
C
T
GRAU-350
2
4
"
R
C
P
2
4
"
R
C
P
F
E
S
18
"
R
C
P
F
E
S
18
"
C
M
P
STONE RET WALL
5
5
"
P
L
A
S
T
I
C
I
N
V
=
8
6
1.
5
2
CBCBCB
3-8X9 BARRELS
CUL1CUL2
CUL3CUL5
CUL4CUL6
HW1
CE1
CUL7 CUL8
CUL9
CE2
HW2
CUL10
CUL11
CUL12SILT IN THIS BARREL
HAROLD DAVID HOPKINS, JR.
PATTIE CRANFILL
HAROLD D. CRANFILL
2
0’
S
T
OR
M
S
E
W
E
R
E
AS
E
M
E
NT
P
B
4
2
P
G
13
7
2
0
’
S
T
O
R
M
S
E
WE
R
E
A
S
E
M
E
N
T
P
B
4
2
P
G
13
7
LINDA MAYES HOPKINS
NANCY B. PEGRAM
JERRY M. PEGRAM
RONALD LEE ANGEL SR.
JAMES LEON BERRY
LYNN ANGEL BERRY
20’ SANITARY SEWER EASEMENT
;
;
LAWRENCE E. POPE
SHEET 40 OF 64
PERMIT DRAWING
6.25 12.5 2512.5 0
PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
26-1 U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
6
_
S
I
T
E
2
8
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SSSSMITH CREEK
SITE 28
F
STA. 55+50 -Y4- RT
END SHOULD BERM GUTTER
STA 55+50 TO 66+00 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
2GI W/ FLAT GRATE
Conv. OTCB To 2GI
COLLAR
RETAIN AND EXTEND
2GI W/ FLAT GRATE
EST. 37 SY
EST. 18 TONS
(TO WATERS EDGE)
RIP RAP
CLASS ’I’
15" RCP-IV
TRENCHLESS INSTALLAT
I
O
N
3
0
"
W
E
L
D
E
D
S
T
E
E
L
24" RCP-III
D
A
M
D
A
M
PIER
DI
24" RCP
2
4
"
R
C
P
CB
;
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
6
A
_
Y
4
s
t
a
4
6
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 41 OF 64
PERMIT DRAWING
CULVERT SURVEY & HYDRAULIC DESIGN REPORT
ADDITIONAL INFORMATION AND COMPUTATIONS
Stream Classification (Such as Trout, High Quality Water, etc.)
0 100100200 200 RTLT
840
850
860
870
TB LTTB LT
TB RT
TB RT
BED
BED
WE
WE
HW
BEVELED
EL=846.02
EL=843.52
EL=845.52
.75’
MATERIAL +/-20 CY
BACKFILL W/ SELECT
O
=857.2
EXST 50 YR
=857.1
PROP 50 YR
=858.1
EXST 100 YR
=858.0
PROP 100 YR
FEMA DETAILED STUDY AREA
YADKIN RIVER BASIN
DA’S AT EXST SITES AND USGS QUAD
2.83:1 SKEWED
2:1 NORMAL
2.83:1 SKEWED
2:1 NORMAL
ON 8-1-07=847.0
NWSE AND WSE
TOE WALL
SKEW=45 12’37"
GP EL=863.67 EBL
RETAIN AND EXTEND 3@8’x9’ RCBC
STA 45+65.43 -Y4-
-DEBRIS POTENTIAL: MODERATE
OBSERVED IN THE 100 YR FLOOD PLAIN
-THERE WERE NO DWELLINGS OR STRUCTURES
HAVE BEEN EXTENDED PREVIOUSLY.
AT THE INLET. IT APPEARS THAT THE CULVERT MAY
-THERE IS A CRACK IN THE WALL OF THE CULVERT
CULVERT
-WING WALL ON INLET END HAS SEPARATED FROM
-BED MATERIALS: SAND, SILT, ROCK
YADKIN RIVER BASIN
SHEET 42 OF 64
PERMIT DRAWING
(
P
O
N
D
)
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
S
S
S
W
E
T
L
A
N
D
D
E
N
O
T
E
S
F
I
L
L
I
N
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 24A
SITE 25
SITE 24
SITE 30
S SS
S
S
S
S
F
F
F
F
FF
S
S
S
SITE 24
SMITH CREEK
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
IO
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
7
j
h
a
r
v
e
y
8
/
1
7
/
9
9
M
A
TC
H
LIN
E
-
Y
4
-
S
T
A
.
8
2
+
2
6
S
H
E
E
T
16
M
A
T
C
H
LIN
E
-
Y4
-
S
TA
.
5
6
+
6
1
S
H
E
E
T
2
6
27U-2579B
M
A
TC
H
LIN
E
-
Y
4
RP
B
D
-
S
T
A
.
6
3
+
0
0
S
H
E
E
T
16
M
A
TC
H
LIN
E
-
Y
4
RP
A
-
S
TA
.
2
6
+
9
5
S
H
E
E
T
16
M
A
TC
H
LIN
E
-
Y
5
-
S
T
A
.
18
+
0
0
.
0
0
S
H
E
E
T
2
7
10
30
3
5
4
0
6
5
7
0
7
5
8
0
8
5
20
6
0
6
5
7
0
7
5
8
0
30
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
C
C
C
C
C
C
C
C
C
C
C
+40.00 -Y5-
60.00’
NCDOT
()
)(
()
NCDOT
()
NCDOT
NCDOT
(
(
)
)NCDOT
(
(
)
)
NCDOT
(
(
)
)
NCDOT
NCDOT
(
(
(
(
)
)
)
)
NCDOT
NCDOT
NCDOT
(
(
(
(
(
(
)
)
)
)
)
)
NCDOT
(
()
)
NCDOT
()
NCDOT
(
(
)
)
NCDOT
(
()
)
NCDOT
(
()
)
NCDOT
(
()
)
NCDOT
()
P
P
PLUG
2GI
2GI2GI
2GI
Conv. OTCB To 2GI
P
P
PLUG
Conv. OTCB To 2GIP
P
PLUG
REMOVE
BDO
STA 55+50 TO 66+00 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
RETAIN AND EXTEND
COLLAR
REMOVE FES
COLLAR
RETAIN AND EXTEND
REMOVE FES
FS FS
FS
REMOVE FES
COLLAR
COLLAR
RETAIN AND EXTEND RETAIN AND EXTEND
REMOVE
2GIFS
COLLAR
FS
FS
REMOVE
P
REMOVE FES
FS
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
COLLAR
RETAIN AND EXTEND
COLLAR
HW
2GIFS
REMOVE
2GIFS
2GI
2GI
FS
REMOVE
2GI
FS
MOVERE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
2GI
FS
FS
2GI
FS
FS
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
TIE TO EXISTING DITCH
TIE TO EXISTING DITCH
REMOVE FES
REMOVE FESJB w/MH
HW
RETAINING WALL
ELBOW
30" CSP W/
2GI-A
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2GI
BDO
FS W/ ELBOW
24" CSP
REMOVE FES
REMOVE HW
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 47 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 47 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FROM STA. 65+28 TO 65+80 -Y4- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 31+25 TO 32+00 -Y4RPA- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 71+25 TO 73+25 -Y4- LT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1 2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 73+25 TO 75+00 -Y4- LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 70+50 TO 75+45 -Y4RPBD- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 75+36 TO 75+48 -Y4RPBD- RT
FROM STA. 65+22 TO STA. 65+81 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #26
*When B is < 6.0’
Type of Liner= Class ’B’ Rip-Rap
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA. 73+48 TO 75+71 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. 73+21 TO 73+48 -Y4- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 37+36 TO 37+46 -Y4- LT
SEE DETAIL#12
W/ 353 SY FF
EST. 134 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
SEE DETAIL#14
W/ 270 SY FF
EST. 100 TONS
LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
SEE DETAIL#20
W/ 764 SY FF
EST. 283 TONS
SPECIAL LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 19CY
SEE DETAIL#8
HEAD DITCH
EST. 3TONS
CLASS ’B’ RIP RAP
EST. 3TONS
CLASS ’B’ RIP RAP
EST. DDE 35CY
EXCAVATE TO ELEV. 838.0
EST. DDE 12CY
SEE DETAIL#9
TAIL DITCH
EST. DDE 8CY
SEE DETAIL#8
HEAD DITCH
W/ 529 SY FF
EST. 161 TONS
CLASS ’B’ RIP RAP
EST. DDE 170CY
SEE DETAIL#26
TAIL DITCH
248 SY FF
EST. 95 TONS
CLASS ’I’ RIP RAP
EST. DDE 105CY
SEE DETAIL#17
TAIL DITCH
STA 56+25 TO 59+50 -Y4- LT
BERM DITCH
CONNECTORS
ROD AND LUG
2 ELBOWS AND
15" CSP W/
FLAT GRATE
2GI W/
-Y4RPA- LT
STA.37+00 TO STA.40+00
SBG
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
SEE DETAIL#6
EST 177 SY FF
EST 66 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
15
"
15"
30" RCP-III 30" RCP-III
15" RCP-III 15" RCP-III
TREN
C
HLESS IN
STALLATIO
N
4
2
" WELDED
STEEL
3
0
" RC
P-III
15" RCP-III
18
"
C
S
P
3
0
" RC
P-III
18"
R
C
P-
III
18" RCP-III
2
4
" RC
P-
III
15" RCP-III 15" RCP-III
3
0
"
RC
P
-
II
I
18
"
R
C
P
-
I
I
I
1
5
"
R
C
P-III
18" RCP-III
18" RCP-III 18" RCP-III 30" RCP-III
30" RCP-III
18" RCP-III
SEE DETAIL#4
LATERAL ’V’ DITCH
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
1
5
"
R
C
P
-
I
I
I
15
"
RC
P
-
III
15" RCP-III
STA. 64+80 TO 66+58 -Y4RPBD- RT
BERM DITCH
SEE DETAIL#20
STA 81+24 TO 83+07 -Y4 RPBD- RT
SPECIAL LATERAL ’V’ DITCH W/CLASS ’B’ RIP RAP
REMOVE
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
VAR.
5.0’
D
2:
1
LIM
ITS
C
LEARIN
G( Not to Scale)
BERM DITCH
10.0’ V.C.d
Geotextile
DETAIL #34
Type of Liner=CLASS ’B’ RIPRAP
FROM STA. 67+20 TO STA. 70+50 -Y4RPBD- RT
W
A
LL
N
O
ISE
2.0’
6.0’
Max. d=1.5 Ft.
Min. D=1.5 Ft.
9.0’
SEE DETAIL#34
BERM DITCH
2GI
2GI
1
8
"
R
C
P-III
18" RCP-III
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
1
5
"
C
S
P
1
5
"
C
S
P
EST 11 SY FF
EST 6 TONS
RIP RAP
CLASS ’I’
3
0
" RCP
F
ES
18" RCP18" RCP
F
E
S
SCRUB
W.E. 843.3
18" RCP
DAM
D
AM
GR
I-40 BUS WBL US 421 NBL 24’ BST
I-40 BUS EBL US 421 SBL 24’ BST
60" CHL
60" CHL
60" CHL
60" CHL
MTL
MTL
MTL
MTLDI
18
"
R
C
P
F
E
SF
E
S
DI
18" RCP
DI
CONC HWHW
CONC
12" RCP
FISH HATCHERY
W. E. 843.4
POND
SCRUB
SCRUB
SCRUB
9’ BST
9’ BST
BST
BST
POND
W.E. 8420
W.E. 843.4
60" CHL
MTL
MTL
MTL
48" WW
B
S 72" MTL
RIDING
RING
GR
S
SO
IL
HTR
1SBKD
1SBKD1SBKD
1SFD
1SFD
48" CONC 48" CONC48" CONC
S
FAST CREST DR 20’ BST
9
’
C
O
N
C
1SFD
2SBKD
1SBKD2SFD1SBKD
1SBKD
1SBKD
1SFD
1SBKD
1SBKD
18’ CONC
1SBKD
9’ BST
G
W
GR
20’ CONC
GR
1SBKD
60" CHL
W
1SFD
G
CONC
S 72" WD
GR
36" CONC
7
2
"
C
H
L
S
60" CHL
W/LT
W/LT
S
7
2
" WD
9
’
C
O
N
C
36" CONC
7
2
"
W
D
S
48" CONC
W/LT
9
’
C
O
N
C
16’ CONC
CONC
4
8
"
C
O
N
C
10’ CONC
BST
BST
72" WD
72" WD
S
18
" R
C
P
48" CHL
S
60" CHL
DK
WD
60" CHL
1SBKD
S
WD DK
1SFD
S
CONC
72" WD
1SBKD
1SBKD
S
S
S
2SBKD
2SFD
DK
WD WD DK
MONT CREST DR 20’ BST
1SBKD
4
8
"
C
O
N
C
4
8
"
C
O
N
C
H
E
D
G
E
M
O
R
E
D
R
2
0
’
B
S
T
12
’
C
O
N
C
9
’ CONC
4
8
"
C
H
L 18
"
R
C
P
18
"
R
C
P
15
"
R
C
P
15
"
R
C
P
10
’
C
ON
C
10
’
C
ON
C
14
’
C
O
N
C
3
6
"
C
O
N
C
8
’
C
ON
C
B
L
U
F
F
S
C
H
O
O
L
R
D
2
0
’
B
S
T
10
’
C
ON
C C
O
N
C
10
’
C
O
N
C
18" RCP
CB
JB
JB
12" RCP
12" RCP 12" RCP
12" RCP
18
"
R
C
P
15" RCP
APPROX JB
15" RCP DI
2
4
"
R
C
P
2
4
"
R
C
P
OWNER PER PROPERTY APPROX JB
OWNER PER PROPERTY APPROX JB
18" RCP
12
" PLAST
IC
12
" RCP
DI
DI
DI
DI
18
" R
C
P
DI
3
0
" R
C
P
F
E
S
F
E
S
18
"
C
M
P
DI
18" RCP
F
E
S
F
E
S
DI
12" RCP
12’ CONC
16’ CONC
4
8
"
C
O
N
C
1SFD
CONC
1SBKD
12’ CONC
60" WD
1SBKD
S
S
60" WD
4
8
"
C
O
N
C
10’ CONC
S
S
1SBKD
10’ BST
4
8
"
C
O
N
C
S
1SBKD
BST
1S
BKD
48" CHL
15
’ CONC
48" CHL
1SFD
1SBKD
1SBKD
14’ CONC
3
6
"
C
O
N
C
CONC
7
2
"
C
H
L
36" CONC
6
0
"
WD
8
’
B
S
T
8
’
B
S
T
1SBKD
1S
B
K
D
16’ CONC1S
B
KD
s
s
1SBKD
CONC
60" CONC
CONC
S
S
2SBKD
CONC
GR
12
" RCP
12
" RC
P
S
G
A
T
E
M
T
L
6
0
"
C
H
L
19
’
B
S
T
MTL
12" R
C
P
JB18" RCP
12" RCP
8
"
R
C
P
G
R
48" CONC
48" CONC
48" CONC
48" CONC
36" CONC
CONC WD DK
CONC
WD DK
36" CONC
48" CONC
CONC
CONC
36" CONCJB
3
6
"
C
O
N
C
36" CONC
4
8
"
C
O
N
C
LT
4
8
"
C
O
N
C
CONC
G
R
GATE
CONC
12
" HDPE
36" CONC
3
6
"
C
O
N
C
P
A
T
IO
S
T
O
N
E
W
D
D
K
S
PLANTER
TIMBERS
T
IM
B
E
R
S
5
S
B
W
5
S
B
W
6
0
"
W
D
POOL
8
"
R
C
P
POOL
DI
DI
DI
B
S
T
BST
POOL
S
C
R
U
B
S
C
R
U
B
B
S
T
3SBW
18" RCP
W.E.
839.1
HTRSS
WD
W
1
S
F
D
W
D
GR
GR
G
R
W
H
ATCH
ERY
SCRUB
SCRUB
4
8
"
W
D
R
A
IL
P
OND
W.
E. 8
3
2.9
P
O
N
D
W.E. 843.0
POND
W.E. 843.4TOP=844.55
INV=836.45
TOP=N/A
INV=N/A
LOCATION
APPROX.
1
8
"
V
C
18" VC
18
" V
C
T
16" D
I
16" D
I
6"
D
I
4
" P
L
6
"
D
I
6
"
D
I
6
"
D
I
6" DI
6" DI
6" DI
6" DI
6
"
D
I
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R
)
6
"
D
I
GRAU-350
CAT-1
CAT
-1
GRAU-350
CAT-1 GRAU-350
GRAU
350
TES
TES
TYPE-III
GRAU 350 TL-3
18
"
R
C
P
3
0
" R
C
P
F
E
S
18
"
R
C
P
F
E
S
18
" R
CP
F
E
S
18
" RC
P
CB
18
"
R
C
P
F
E
S
3
0
" R
C
P
F
E
S
F
E
S
F
E
S
18
"
C
M
P
CB
2
4
"
R
C
P
18
"
R
C
P
CB
18
"
R
C
P
CBCBCBCB
15" RCP
18
" R
C
P
CB
F
E
S
18" RCP
CB
CB
JB
JB
JB
CB
APPROX JB
OWNER PER PROPERTY APPROX JB
OWNER PER PROPERTY APPROX JB
2
4
"
R
C
P
15" RCP
12" RCP
CB
S
IZ
E
/
T
Y
P
E
U
N
K
N
O
W
N
E
N
D
U
N
K
N
O
W
N
S
IZ
E
/
T
Y
P
E
U
N
K
N
O
W
N
E
N
D
U
N
K
N
O
W
N
SIZE/TYPE UNKNOWN
18
" R
C
P
U
N
K
N
O
W
N
E
N
D
12" RCP U
N
K
N
O
W
N
E
N
D
UNKNOWN
SIZE/TYPE
UNKNOWN
SIZE/TYPE
CONC HW
CONC HW
12" RCP INV=914.71
UNKNOWN
END
UNKNOWN
END
UNKNOWN
SIZE/TYPE INV=915.05
12" RCP
UNKNOWN
END
UNKNOWN
SIZE/TYPE
UNKNOWN
SIZE/TYPE
UNKNOWN
END 12" RCP
INV=921.87 12" RCP
CB INV=921.89CB
CB
18" RCP
DI
CB CB
12
" PLA
ST
IC
UNKNOWN
S
IZE
/TY
PE
UNKNOWN
END
12
" RCP
UNKNOWN
SIZE
/TYPE
UNKNOWN
END
VINCENT GLENN BAKER
BILL G. BROCK
JOAN G. DICKEY
EIP
30’ ACCESS EASEMENT DB 1647 PG 402
EIP
EIP
CHARLES ALLEN KEARNS
JEWEL S. LANKFORD
PATRICIA GALBOE
ROBERT J. GALBOE
MERIDETH M. SULLIVAN
MICHAEL A. SULLIVAN
EDWARD MADDOX
CLAYRON WEBB
LARRY M. WEBB
VIRGINIA L. WOLFE
JIMMY L. WOLFE
NOVELLA W. SNYDER
RICHARD S. SNYDER
SANDRA B. ROSE
LARRY S. ROSE
JEAN OLIVEROS
CARLOS Z. OLIVEROS
G.L.G. CORPORATION
CREOLA TUNING
MARCELENE HAMPTON
LARRY W. HAMPTON
MARGARET A. MCDONALD
BERNICE LEAZER
PERRY R. LEAZER
SHEILA KEY
BRIAN V. KEY
RHONDA T. WHITE
JEFFREY K. WHITE
HELEN EGAN
PHILLIP R. EGAN
JEROME SCOTT BEESON
MILDRED PATTERSON
JAMES H. PATTERSON JR.
MARGARET C. CHESNEY
JOHN A. CHESNEY
REBECCA WHITAKER
KENNETH GRAY WHITAKER
GAE MAROTZ
WILLIAM MAROTZ
ALISTEEN C. KING
SYLVESTER L. MARTIN
30’ACCESS EASEMENT DB 1819 PG 3160 30’ACCESS EASEMENT DB 1819 PG 3160
10’ DRAIN/UTILITY EASEMENT 10’ DRAIN/UTILITY EASEMENT
10’ DRAIN/UTILITY EASEMENT
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MELISSA ADAMS
JAMES B. ADAMS
MARTHA MARIE SOYARS
ROBERT JAMES FEESER
CHRISTINE M COX
ALAN B. COX
EIP
EIPEIP
10’ DRAIN/UTILITY EASEMENT
10’ DRAIN/UTILITY EASEMENT
EIP
DOROTHY W. FLYNN
JEAN M. MACK
PHILLIP D. MACK
LINDA JOHNSON
BENJAMEN JOHNSON
DOROTHY T. JORDAN
EIP
EIP
EIP
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
FAYE PEDDYCORD
REX LANIER PEDDYCORD
FAYE PEDDYCORD
REX LANIER PEDDYCORD
RONALD LEE ANGEL SR.
RONALD LEE ANGEL SR.
RONALD LEE ANGEL SR.
JEFFREY WAYNE MASTEN
60.00’
2
8
2
.
0
0
’
3
0
0
.
0
0
’
EXISTING R/W
EXISTING R/W
EXISTING R/WEXISTING R/W
EXISTING R/W
EXISTING R/W
60.00’
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60.00’
60.00’
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60
.00
’
E
X
IS
T
ING
R
/
W
E
X
IS
T
ING
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EIP
E
X
IS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
E
X
IS
T
IN
G
R
/
W
EIP
EIP
E
X
IS
T
IN
G
R
/
W
EIP
E
X
IS
T
IN
G
R
/
W
R/W MON
EIP
EIP
E
X
IS
T
IN
G
R
/
W
2
5
0
.
0
0
’
C
A
T
H
E
R
IN
E
A
N
N
R
E
IN
L
N
O
R
B
E
R
T
H
E
R
M
A
N
N
R
E
IN
L
C
A
T
H
E
R
IN
E
A
N
N
R
E
IN
L
N
O
R
B
E
R
T
H
E
R
M
A
N
N
R
E
IN
L
TOWN OF KERNERSVILLE
FORSYTH COUNTY
HASTINGS HILL LTD PARTNERSHIP
HASTINGS HILL LTD PARTNERSHIP
20’ S
A
N
IT
A
R
Y
S
EW
ER
EA
S
EM
E
N
T
;
;
DONALD R. MARTIN
GINA C. BROWN
MARK A. BROWN
MIRIAM E. ADAMS
RONALD M. ADAMS
VOLREE JOHNSTON
RICHARD LEO JOHNSTON
MICHELE L. WOOD
KEITH R. WOOD
RHEANELL A. BAKER
DAVID J. BAKER
CAROLYN T. LOWRY
WILLIE HERMAN LOWRY
JENNIFER H. FUNK
WAYNE ALLEN FUNK
JOSEPH MARSHALL
KAREN MARIE BUOYER
MAX DUNCAN BUOYER
IMOGENE
L
. ELAM
JANET
ARLENE
LANEY
GARY
IVAN
LANEY
W/LT
SHEET 43 OF 64
PERMIT DRAWING
(
P
O
N
D
)
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
WETLAND
DENOTES FILL INFF
S S SURFACE WATER
DENOTES IMPACTS IN
S
S
S
W
E
T
L
A
N
D
D
E
N
O
T
E
S
F
I
L
L
I
N
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SITE 24A
SITE 25
SITE 24
SITE 30
S SS
S
S
S
S
F
F
F
F
FF
S
S
S
SITE 24
SMITH CREEK
830
8
3
0
8
3
0
8
3
0
8
3
0
830
8
3
0
830
8
3
0
8
3
0
8
4
0
840
8
4
0
8
4
0
840
840
840
8
4
0
840
840840840840
840
840
84
0
840
840
840
840
840 840
840
840
840
840
8
4
0
8
4
0
8
4
0
840
840
8
4
0
8
4
0
840
840
840
840
840
840
8
40
840 840
840
840
840
8
4
0
840
850
850
850
850
850
850
850
850
850
8
5
0
850
850 850
850
850
850
850
850
850
850
850
8
5
0
850
8
5
0
8
5
0
8
5
0
850
850
85
0
8
5
0
850
850
850
850
8
5
0
8
5
0
850
850
850
850
850
850
850
850
8
5
0
8
5
0
850
850
850
8
5
0
850
850
8
5
0
850
850
850
85
0
850
8
6
0
860
860
860
860
8
6
0
860
860
860
8
60
8
6
0
8
6
0
8
6
0
860
860
860
860
860
860
8
6
0
860
860
860
860 860
860
860
860
860
8
6
0
860
860
8
6
0
8
6
0
860
860
860
860
860
8
6
0
86
0
8
6
0
860
860
860
860 860
860 860
860 860
860
860
860
8
6
0
8
6
0
860
860
8
6
0
860
860
8
7
0
870
870
8
7
0
870
870
870
870
8
7
0
870
870
870 870
870
870
870
870
8
7
0
870
870
8
7
0
8
7
0
870
870
870
870
870
870
870
870
8
7
0
870
870 870
870
8
7
0
870
870 870
8
7
0
8
7
0
8
7
0
8
7
0
870
8
7
0
8
7
0
870
87
0
870
8
8
0
880
8
8
0
88
0
880
880
880 880
8
8
0 880
880 880
880
880
880
880
880
880
880
880
8
8
0
880
8
8
0
8
8
0
8
8
0
8
8
0 880
880
880
880
880
880
880
8
8
0
880
880
880
8
8
0
8
8
0
880
880
880
8
9
0
890
890
890
8
9
0
890
890
89
0
890
890
890
8
9
0
8
9
0
890
890
890
890
890
890
890
890
890
890
890
890890
890
890
890
8
9
0
890
890
8
90
890
890
8
9
0
890
890
89
0
8
9
0
890
890
890
890
9 0 0
900
900 900
900
9
0
0
9
0
0
900
9
0
0
9
0
0
900
900
900
900 900
900
900
900
9
0
0
900
900
900
900
9
0
0
900
900
900
900
900
910
910
910
910
910
9
1
0
9
10
9
1
0
9
10
9
1
0
910
910
910
910
910
910
9
1
0
910
910
910
920
920
9
2
0
9
2
0
9
2
0
920
920
920
920
9
2
0
9
2
0
920
920
920
9
3
0
930
930
9
30
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
30
9
30
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
9
30
9
3
0
940
940
9
4
0 940
9
4
0
940
940
940
940
9
4
0
940
940
940
940
9
4
0
9
4
0
9
4
0
9
4
0
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
7
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
M
A
TC
H
LIN
E
-
Y
4
-
S
TA
.
8
2
+
2
6
S
H
E
E
T
16
M
A
TC
H
LIN
E
-
Y4
-
S
TA
.
5
6
+
6
1
S
H
E
E
T
2
6
27U-2579B
M
A
T
C
H
LIN
E
-
Y
4
R
P
B
D
-
S
T
A
.
6
3
+
0
0
S
H
E
E
T
16
M
A
T
C
H
LIN
E
-
Y4
R
P
A
-
S
TA
.
2
6
+
9
5
S
H
E
E
T
16
M
A
TC
H
LIN
E
-
Y
5
-
S
TA
.
18
+
0
0
.
0
0
S
H
E
E
T
2
7
10
30
3
5
4
0
6
5
7
0
7
5
8
0
8
5
20
6
0
6
5
7
0
7
5
8
0
30
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
C
C
C
C
C
C
C
C
C
C
C
+40.00 -Y5-
60.00’
NCDOT
()
)(
()
NCDOT
()
NCDOT
NCDOT
(
(
)
)NCDOT
(
(
)
)
NCDOT
(
(
)
)
NCDOT
NCDOT
(
(
(
(
)
)
)
)
NCDOT
NCDOT
NCDOT
(
(
(
(
(
(
)
)
)
)
)
)
NCDOT
(
()
)
NCDOT
()
NCDOT
(
(
)
)
NCDOT
(
()
)
NCDOT
(
()
)
NCDOT
(
()
)
NCDOT
()
P
P
PLUG
2GI
2GI2GI
2GI
Conv. OTCB To 2GI
P
P
PLUG
Conv. OTCB To 2GIP
P
PLUG
REMOVE
BDO
STA 55+50 TO 66+00 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
RETAIN AND EXTEND
COLLAR
REMOVE FES
COLLAR
RETAIN AND EXTEND
REMOVE FES
FS FS
FS
REMOVE FES
COLLAR
COLLAR
RETAIN AND EXTEND RETAIN AND EXTEND
REMOVE
2GIFS
COLLAR
FS
FS
REMOVE
P
REMOVE FES
FS
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
COLLAR
RETAIN AND EXTEND
COLLAR
HW
2GIFS
REMOVE
2GIFS
2GI
2GI
FS
REMOVE
2GI
FS
MOVERE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
2GI
FS
FS
2GI
FS
FS
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
REMOVE
TIE TO EXISTING DITCH
TIE TO EXISTING DITCH
REMOVE FES
REMOVE FESJB w/MH
HW
RETAINING WALL
ELBOW
30" CSP W/
2GI-A
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
2GI
BDO
FS W/ ELBOW
24" CSP
REMOVE FES
REMOVE HW
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 47 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 47 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FROM STA. 65+28 TO 65+80 -Y4- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 31+25 TO 32+00 -Y4RPA- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 71+25 TO 73+25 -Y4- LT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1 2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 73+25 TO 75+00 -Y4- LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 70+50 TO 75+45 -Y4RPBD- RT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 75+36 TO 75+48 -Y4RPBD- RT
FROM STA. 65+22 TO STA. 65+81 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #26
*When B is < 6.0’
Type of Liner= Class ’B’ Rip-Rap
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA. 73+48 TO 75+71 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FROM STA. 73+21 TO 73+48 -Y4- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FROM STA. 37+36 TO 37+46 -Y4- LT
SEE DETAIL#12
W/ 353 SY FF
EST. 134 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
SEE DETAIL#14
W/ 270 SY FF
EST. 100 TONS
LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
SEE DETAIL#20
W/ 764 SY FF
EST. 283 TONS
SPECIAL LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 19CY
SEE DETAIL#8
HEAD DITCH
EST. 3TONS
CLASS ’B’ RIP RAP
EST. 3TONS
CLASS ’B’ RIP RAP
EST. DDE 35CY
EXCAVATE TO ELEV. 838.0
EST. DDE 12CY
SEE DETAIL#9
TAIL DITCH
EST. DDE 8CY
SEE DETAIL#8
HEAD DITCH
W/ 529 SY FF
EST. 161 TONS
CLASS ’B’ RIP RAP
EST. DDE 170CY
SEE DETAIL#26
TAIL DITCH
248 SY FF
EST. 95 TONS
CLASS ’I’ RIP RAP
EST. DDE 105CY
SEE DETAIL#17
TAIL DITCH
STA 56+25 TO 59+50 -Y4- LT
BERM DITCH
CONNECTORS
ROD AND LUG
2 ELBOWS AND
15" CSP W/
FLAT GRATE
2GI W/
-Y4RPA- LT
STA.37+00 TO STA.40+00
SBG
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
SEE DETAIL#6
EST 177 SY FF
EST 66 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
15
"
15"
30" RCP-III 30" RCP-III
15" RCP-III 15" RCP-III
TREN
C
HLESS IN
STALLATIO
N
4
2
" WELDED
STEEL
3
0
" RCP-
III
15" RCP-III
18
"
C
S
P
3
0
" RC
P-III
18"
R
C
P-
II
I
18" RCP-III
2
4
" RC
P-
III
15" RCP-III 15" RCP-III
3
0
"
R
C
P
-
I
II
18
"
R
C
P
-
II
I
1
5
"
R
C
P-III
18" RCP-III
18" RCP-III 18" RCP-III 30" RCP-III
30" RCP-III
18" RCP-III
SEE DETAIL#4
LATERAL ’V’ DITCH
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
1
5
"
R
C
P
-
I
I
I
15
"
RC
P
-
II
I
15" RCP-III
STA. 64+80 TO 66+58 -Y4RPBD- RT
BERM DITCH
SEE DETAIL#20
STA 81+24 TO 83+07 -Y4 RPBD- RT
SPECIAL LATERAL ’V’ DITCH W/CLASS ’B’ RIP RAP
REMOVE
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
VAR.
5.0’
D
2:
1
LIM
ITS
C
LEA
RIN
G( Not to Scale)
BERM DITCH
10.0’ V.C.d
Geotextile
DETAIL #34
Type of Liner=CLASS ’B’ RIPRAP
FROM STA. 67+20 TO STA. 70+50 -Y4RPBD- RT
W
A
LL
N
O
IS
E
2.0’
6.0’
Max. d=1.5 Ft.
Min. D=1.5 Ft.
9.0’
SEE DETAIL#34
BERM DITCH
2GI
2GI
1
8
"
R
C
P-III
18" RCP-III
CONNECTORS
AND ROD AND LUG
18" CSP W/ 2 ELBOWS
1
5
"
C
S
P
1
5
"
C
S
P
EST 11 SY FF
EST 6 TONS
RIP RAP
CLASS ’I’
3
0
" R
C
P
F
ES
18" RCP18" RCP
F
E
S
SCRUB
W.E. 843.3
18" RCP
DAM
D
A
M
GR
I-40 BUS WBL US 421 NBL 24’ BST
I-40 BUS EBL US 421 SBL 24’ BST
60" CHL
60" CHL
60" CHL
60" CHL
MTL
MTL
MTL
MTLDI
18
"
R
C
P
F
E
SF
E
S
DI
18" RCP
DI
CONC HWHW
CONC
12" RCP
FISH HATCHERY
W. E. 843.4
POND
SCRUB
SCRUB
SCRUB
9’ BST
9’ BST
BST
BST
POND
W.E. 8420
W.E. 843.4
60" CHL
MTL
MTL
MTL
48" WW
B
S 72" MTL
RIDING
RING
GR
S
SO
IL
HTR
1SBKD
1SBKD1SBKD
1SFD
1SFD
48" CONC 48" CONC48" CONC
S
FAST CREST DR 20’ BST
9
’
C
O
N
C
1SFD
2SBKD
1SBKD2SFD1SBKD
1SBKD
1SBKD
1SFD
1SBKD
1SBKD
18’ CONC
1SBKD
9’ BST
G
W
GR
20’ CONC
GR
1SBKD
60" CHL
W
1SFD
G
CONC
S 72" WD
GR
36" CONC
7
2
"
C
H
L
S
60" CHL
W/LT
W/LT
S
7
2
" WD
9
’
C
O
N
C
36" CONC
7
2
"
WD
S
48" CONC
W/LT
9
’
C
O
N
C
16’ CONC
CONC
4
8
"
C
O
N
C
10’ CONC
BST
BST
72" WD
72" WD
S
18
" R
C
P
48" CHL
S
60" CHL
DK
WD
60" CHL
1SBKD
S
WD DK
1SFD
S
CONC
72" WD
1SBKD
1SBKD
S
S
S
2SBKD
2SFD
DK
WD WD DK
MONT CREST DR 20’ BST
1SBKD
4
8
"
C
O
N
C
4
8
"
C
O
N
C
H
E
D
GE
M
O
R
E
D
R
2
0
’
B
S
T
12
’
C
ON
C
9
’ CON
C
4
8
"
C
H
L 18
"
R
C
P
18
"
R
C
P
15
"
R
C
P
15
"
R
C
P
10
’
C
ON
C
10
’
C
ON
C
14
’
C
O
N
C
3
6
"
C
O
N
C
8
’
C
ON
C
B
LU
F
F
S
C
H
O
O
L
R
D
2
0
’
B
S
T
10
’
C
O
N
C C
ON
C
10
’
C
O
N
C
18" RCP
CB
JB
JB
12" RCP
12" RCP 12" RCP
12" RCP
18
"
R
C
P
15" RCP
APPROX JB
15" RCP DI
2
4
"
R
C
P
2
4
"
R
C
P
OWNER PER PROPERTY APPROX JB
OWNER PER PROPERTY APPROX JB
18" RCP
12
" PLAST
IC
12
" RCP
DI
DI
DI
DI
18
" R
C
P
DI
3
0
" R
C
P
F
E
S
F
E
S
18
"
C
M
P
DI
18" RCP
F
E
S
F
E
S
DI
12" RCP
12’ CONC
16’ CONC
4
8
"
C
O
N
C
1SFD
CONC
1SBKD
12’ CONC
60" WD
1SBKD
S
S
60" WD
4
8
"
C
O
N
C
10’ CONC
S
S
1SBKD
10’ BST
4
8
"
C
O
N
C
S1SBKD
BST
1S
B
KD
48" CHL
15
’ CONC
48" CHL
1SFD
1SBKD
1SBKD
14’ CONC
3
6
"
C
O
N
C
CONC
7
2
"
C
H
L
36" CONC
6
0
"
W
D
8
’ B
S
T
8
’
B
S
T
1SBKD
1S
B
K
D
16’ CONC1S
B
KD
s
s
1SBKD
CONC
60" CONC
CONC
S
S
2SBKD
CONC
GR
12
" RCP
12
" RC
P
S
G
A
T
E
M
T
L
6
0
"
C
H
L
19
’
B
S
T
MTL
12" R
C
P
JB18" RCP
12" RCP
8
"
R
C
P
GR
48" CONC
48" CONC
48" CONC
48" CONC
36" CONC
CONC WD DK
CONC
WD DK
36" CONC
48" CONC
CONC
CONC
36" CONCJB
3
6
"
C
O
N
C
36" CONC
4
8
"
C
O
N
C
LT
4
8
"
C
O
N
C
CONC
G
R
GATE
CONC
12
" HDPE
36" CONC
3
6
"
C
O
N
C
P
A
T
IO
S
T
O
N
E
W
D
D
K
S
PLANTER
TIMBERS
T
IM
B
E
R
S
5
S
B
W
5
S
B
W
6
0
"
WD
POOL
8
"
R
C
P
POOL
DI
DI
DI
B
S
T
BST
POOL
S
C
R
U
B
S
C
R
U
B
B
S
T
3SBW
18" RCP
W.
E.
839.
1
HTRSS
WD
W
1
S
F
D
W
D
GR
GR
G
R
W
H
ATCH
ERY
SCRUB
SCRUB
4
8
"
W
D
R
A
I
L
P
OND
W.
E. 8
3
2.9
P
O
N
D
W.E. 843.0
POND
W.E. 843.4TOP=844.55
INV=836.45
TOP=N/A
INV=N/A
LOCATION
APPROX.
1
8
"
V
C
18" VC
18
" V
C
T
16" D
I
16" D
I
6" D
I
4
" PL
6
"
D
I
6
"
D
I
6
"
D
I
6" DI
6" DI
6" DI
6" DI
6
"
D
I
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R
)
6
"
D
I
GRAU-350
CAT-1
CAT
-1
GRAU-350
CAT-1 GRAU-350
GRAU
350
TES
TES
TYPE-III
GRAU 350 TL-3
18
"
R
C
P
3
0
" RCP
F
E
S
18
"
R
C
P
F
E
S
18
" R
CP
F
E
S
18
" RCP
CB
18
"
R
C
P
F
E
S
3
0
" R
C
P
F
E
S
F
E
S
F
E
S
18
"
C
M
P
CB
2
4
"
R
C
P
18
"
R
C
P
CB
18
"
R
C
P
CBCBCBCB
15" RCP
18
" R
C
P
CB
F
E
S
18" RCP
CB
CB
JB
JB
JB
CB
APPROX JB
OWNER PER PROPERTY APPROX JB
OWNER PER PROPERTY APPROX JB
2
4
"
R
C
P
15" RCP
12" RCP
CB
S
IZ
E
/
T
Y
P
E
U
N
K
N
O
W
N
E
N
D
U
N
K
N
O
WN
S
IZ
E
/
T
Y
P
E
U
N
K
N
O
WN
E
N
D
U
N
K
N
O
WN
SIZE/TYPE UNKNOWN
18
" R
C
P
U
N
K
N
O
W
N
E
N
D
12" RCP U
N
KN
O
WN
E
N
D
UNKNOWN
SIZE/TYPE
UNKNOWN
SIZE/TYPE
CONC HW
CONC HW
12" RCP INV=914.71
UNKNOWN
END
UNKNOWN
END
UNKNOWN
SIZE/TYPE INV=915.05
12" RCP
UNKNOWN
END
UNKNOWN
SIZE/TYPE
UNKNOWN
SIZE/TYPE
UNKNOWN
END 12" RCP
INV=921.87 12" RCP
CB INV=921.89CB
CB
18" RCP
DI
CB CB
12
" PLAST
IC
UNKNOWN
S
IZ
E
/TY
PE
UNKNOWN
END
12
" RCP
UNKNOWN
SIZE/TYPE
UNKNOWN
END
VINCENT GLENN BAKER
BILL G. BROCK
JOAN G. DICKEY
EIP
30’ ACCESS EASEMENT DB 1647 PG 402
EIP
EIP
CHARLES ALLEN KEARNS
JEWEL S. LANKFORD
PATRICIA GALBOE
ROBERT J. GALBOE
MERIDETH M. SULLIVAN
MICHAEL A. SULLIVAN
EDWARD MADDOX
CLAYRON WEBB
LARRY M. WEBB
VIRGINIA L. WOLFE
JIMMY L. WOLFE
NOVELLA W. SNYDER
RICHARD S. SNYDER
SANDRA B. ROSE
LARRY S. ROSE
JEAN OLIVEROS
CARLOS Z. OLIVEROS
G.L.G. CORPORATION
CREOLA TUNING
MARCELENE HAMPTON
LARRY W. HAMPTON
MARGARET A. MCDONALD
BERNICE LEAZER
PERRY R. LEAZER
SHEILA KEY
BRIAN V. KEY
RHONDA T. WHITE
JEFFREY K. WHITE
HELEN EGAN
PHILLIP R. EGAN
JEROME SCOTT BEESON
MILDRED PATTERSON
JAMES H. PATTERSON JR.
MARGARET C. CHESNEY
JOHN A. CHESNEY
REBECCA WHITAKER
KENNETH GRAY WHITAKER
GAE MAROTZ
WILLIAM MAROTZ
ALISTEEN C. KING
SYLVESTER L. MARTIN
30’ACCESS EASEMENT DB 1819 PG 3160 30’ACCESS EASEMENT DB 1819 PG 3160
10’ DRAIN/UTILITY EASEMENT 10’ DRAIN/UTILITY EASEMENT
10’ DRAIN/UTILITY EASEMENT
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MELISSA ADAMS
JAMES B. ADAMS
MARTHA MARIE SOYARS
ROBERT JAMES FEESER
CHRISTINE M COX
ALAN B. COX
EIP
EIPEIP
10’ DRAIN/UTILITY EASEMENT
10’ DRAIN/UTILITY EASEMENT
EIP
DOROTHY W. FLYNN
JEAN M. MACK
PHILLIP D. MACK
LINDA JOHNSON
BENJAMEN JOHNSON
DOROTHY T. JORDAN
EIP
EIP
EIP
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
FAYE PEDDYCORD
REX LANIER PEDDYCORD
FAYE PEDDYCORD
REX LANIER PEDDYCORD
RONALD LEE ANGEL SR.
RONALD LEE ANGEL SR.
RONALD LEE ANGEL SR.
JEFFREY WAYNE MASTEN
60.00’
2
8
2
.
0
0
’
3
0
0
.
0
0
’
EXISTING R/W
EXISTING R/W
EXISTING R/WEXISTING R/W
EXISTING R/W
EXISTING R/W
60.00’
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60.00’
60.00’
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60.00
’
EXIS
T
ING
R/
W
E
XIS
T
ING
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EIP
E
X
IS
T
IN
G
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
E
X
IS
T
IN
G
R
/
W
EIP
EIP
E
X
IS
T
IN
G
R
/
W
EIP
E
X
IS
T
IN
G
R
/
W
R/W MON
EIP
EIP
E
X
IS
T
IN
G
R
/
W
2
5
0
.
0
0
’
C
A
T
H
E
R
IN
E
A
N
N
R
E
IN
L
N
O
R
B
E
R
T
H
E
R
M
A
N
N
R
E
IN
L
C
A
T
H
E
R
IN
E
A
N
N
R
E
IN
L
N
O
R
B
E
R
T
H
E
R
M
A
N
N
R
E
IN
L
TOWN OF KERNERSVILLE
FORSYTH COUNTY
HASTINGS HILL LTD PARTNERSHIP
HASTINGS HILL LTD PARTNERSHIP
2
0’ SA
N
IT
A
R
Y
S
EW
E
R
EA
S
EM
EN
T
;
;
DONALD R. MARTIN
GINA C. BROWN
MARK A. BROWN
MIRIAM E. ADAMS
RONALD M. ADAMS
VOLREE JOHNSTON
RICHARD LEO JOHNSTON
MICHELE L. WOOD
KEITH R. WOOD
RHEANELL A. BAKER
DAVID J. BAKER
CAROLYN T. LOWRY
WILLIE HERMAN LOWRY
JENNIFER H. FUNK
WAYNE ALLEN FUNK
JOSEPH MARSHALL
KAREN MARIE BUOYER
MAX DUNCAN BUOYER
IMOGENE
L
. ELAM
JANET
ARLENE
LANEY
GARY
IVAN
LANEY
W/LT
WETLAND
DENOTES FILL INFF
12.5 25 50250
PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
27-1U-2579B
9
/
19
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
7
_
S
I
T
E
2
4
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
SHEET 44 OF 64
PERMIT DRAWING
S S SURFACE WATER
DENOTES IMPACTS IN
SITE 30
SITE 24A
SITE 24
S SS
S
S
S
S
F
F
F
F
FF
S
S
SITE 24
SMITH CREEK
8
0
6
5
F
F
F
F
F
F
F
C
C
C
C
NCDOT
(
(
)
)
P
P
PLUG
2GI
2GI2GI
2GI
STA 55+50 TO 66+00 -Y4- RT
W/ ROCK PLATING
REVISE FILL SLOPES TO 1.5:1
REMOVE FES
COLLAR
COLLAR
RETAIN AND EXTEND RETAIN AND EXTEND
REMOVE
2GIFS
COLLAR
FS
FS
REMOVE
P
REMOVE FES
FS
HW
RETAINING WALL
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 47 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
EST 47 SY FF
EST 20 TONS
RIP RAP
CLASS ’I’
EST. DDE 19CY
SEE DETAIL#8
HEAD DITCH
EST. DDE 35CY
EXCAVATE TO ELEV. 838.0
CONNECTORS
ROD AND LUG
2 ELBOWS AND
15" CSP W/
15" RCP-III 15" RCP-III
TREN
C
H
LE
SS
IN
STALL
ATIO
N
4
2
" W
ELD
ED
S
TE
E
L
3
0
" RC
P-I
I
I
15" RCP-III
18" RCP-III 30" RCP-III
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
15" RCP-III
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
3
0
" R
C
P
F
E
S
I-40 BUS WBL US 421 NBL 24’ BST
I-40 BUS EBL US 421 SBL 24’ BST
60" CHL
60" CHL
MTL
MTL
MTL
MTLDI
18
"
R
C
P
F
E
S
SCRUB
SCRUB
9’ BST
9’ BST
BST
BST
60" CHL
MTL
MTL
MTL
1SFD
G
CONC
S 72" WD
GR
60" CHL
4
8
"
C
H
L
DI
18" RCP
F
E
S
POOL
CAT-1
3
0
" R
C
P
F
E
S
18
"
R
C
P
F
E
S
F
E
S
CB
18
"
R
C
P
CB
GINA C. BROWN
MARK A. BROWN
12.5 25 50250
PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
27-2U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
7
_
S
I
T
E
2
5
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SHEET 45 OF 64
PERMIT DRAWING
S
S
S
SITE 25
S
3
5
4
0
7
5
30
F
F
C
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
COLLAR
RETAIN AND EXTEND
COLLAR
FS
2GI
REMOVE FES
JB w/MH
EST 11 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 12CY
SEE DETAIL#9
TAIL DITCH
CONNECTORS
ROD AND LUG
2 ELBOWS AND
15" CSP W/
FLAT GRATE
2GI W/
-Y4RPA- LT
STA.37+00 TO STA.40+00
SBG
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
1
8
"
C
S
P
3
0
" RC
P-
III
18"
R
C
P-
I
I
I
18" RCP-III
2
4
"
RC
P
-
III
18" RCP-III
EST 11 SY FF
EST 6 TONS
RIP RAP
CLASS ’I’
18
" R
C
P
DI
3
0
" R
C
P
F
E
S
F
E
S
18
"
C
M
P
F
E
S
MTL
S
C
R
U
B
CAT
-1
GRAU-350
3
0
" R
C
P
F
E
S
F
E
S
18
"
C
M
P
CB
18
" R
C
P
CB
F
E
S
JOAN G. DICKEY
60.00’
E
X
IS
T
IN
G
R
/
W
EIP
E
X
IS
T
IN
G
R
/
W
R/W MON ;
SHEET 46 OF 64
PERMIT DRAWING
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
SITE 26
SITE 27A
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
F
F
F
F
F
SITE 27C
SITE 27B
SITE 27B
SITE 27A
WETLAND
DENOTES FILL INFF
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
8
j
h
a
r
v
e
y
8
/
1
7
/
9
9
28U-2579B
M
A
T
C
H
LIN
E
-
Y4
-
S
TA
.
10
2
+
9
0
S
H
E
E
T
16
M
A
TC
H
LIN
E
-
Y5
-
S
TA
. 3
8
+
5
0
S
H
EET
16
MATCHLINE -Y4RPB- STA.19+00 SHEET 16
M
A
TC
H
LIN
E
-
Y4
-
S
T
A
.
12
4
+
7
0
S
H
E
E
T
2
9
M
A
T
C
H
LIN
E
-
Y6
-
S
TA
.
2
3
+
9
4
.
15
S
H
E
E
T
2
9
(CO N STRU CTED U N D ER TIP PRO JECT U -2579G)
M
A TCH LINE -Y 5A- STA .62+50 SHEET 29
5
0
5
5
6 0
3
0
3
5
4
0
2
5
3
0
4
0
45
10
5
110
115
12
0
2
5
3
0
3
5
10
15
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
FF
F
C
C
C
C
F
F
F F
C
C
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
NCDOT
(
()
)
NCDOT
(
()
)
P
PLUG
P
RETAIN
2GI
REMOVE
P
P
PLUG
2GI
JB w/MH
JB w/MH
P
PLUG
REMOVE
P
P
PLUG
P PLUG
HW
P
PLUG
2GI
PPLUG
RETAIN Conv. OTCB To 2GI
RETAIN
RETAIN
RETAIN
JBw/ MH
CONVERT TO
REMOVE
TO 2GI
CONVERT2GI
FS
COLLAR
RETAIN AND EXTEND
REMOVE REMOVE
FS
COLLARRETAIN AND EXTEND
FS
FS
MOVERE
2GI
FS
FS
Conv. OTCB To 2GI
REMOVE
REMOVE FES
RETAIN AND EXTEND
COLLAR
COLLAR
2GI
REMOVE
MATERIAL
FILL W/ FLOWABLE
GRADE TO DRAIN
P
P
PLUG
REMOVE
REMOVE
DITCH
TIE TO EXIST.
FS
FS
2GI
REMOVE
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
FS
2GI-A
2GI-A
2GI-A
2 ELBOWS
24" CSP W/
REMOVE FES
REMOVE
REMOVE FES
REMOVE FES
REMOVE FES
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 6 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 19+90 TO 22+50 -Y4RPB- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 105+30 TO 107+10 -Y4- LT
FROM STA 22+50 TO 23+90 -Y4RPB- LT
FROM STA. 117+85 TO 118+25 -Y4- LT
4:1 or
Flatter Fill
Slope
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
Natural
Ground 2:
1 D
DETAIL #15
Min. D= 2 Ft.
FROM STA. 25+60 TO 27+85 -Y6- RT
Natural Natural
Ground Ground
2:
1 2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 36+42 TO 36+67 -Y4RPC- LT
SEE DETAIL#15
SPECIAL LATERAL ’V’ DITCH
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#12
W/ 312 SY FF
EST. 27 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 5CY
SEE DETAIL#7
HEAD DITCH
SEE DETAIL#12
W/ 247 SY FF
EST. 94 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
DETAIL #32
TAIL DITCH
Natural
Ground
FROM STA.107+50 TO STA.107+61
2:1
REMOVE
EST. 62 SY
EST. 33 TONS
EST. DDE +/- 15 CY
SEE DETAIL#32
(BANKS ONLY)
CLASS ’I’ RIP RAP
EST. 11 SY
EST. 3 TONS
CLASS ’B’ RIP RAP
EST. 11 SY
EST. 3 TONS
RIP RAP W/ FF
CLASS ’B’
RETAIN
REMOVE
COLLAR
REMOVE
EXTEND
RETAIN AND
15" RCP-III
18" RCP-III 18" RCP-III
1
8
"
R
C
P-III
18
"
RC
P
-
III
1
5
" RC
P
-III
T
R
E
N
C
H
LE
S
S
I
N
S
T
A
LLA
T
I
O
N
4
2
"
W
E
L
D
E
D
S
T
E
E
L
30"
RC
P-
V
30" RCP-III
18" RC
P-IV
18"
R
CP-III
18" RCP-IV
18"
RCP-III
18"
30"
R
C
P-III
30" RCP-V
15" RCP-III
54" RCP-III
30" RCP-III
3
0
"
RC
P
-
III
24" R
C
P-III
15"
EL=882.3
INV. IN
SEE DETAIL#6
EST 170 SY FF
EST 63 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
REMOVE FES
EXST 72" CONC DITCH
RETAIN +/-64’ OF
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
SEE DETAIL#12
W/ 318 SY FF
EST. 121 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
FLAT GRATE
2GI W/
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA. 107+20 TO 108+22 -Y4- LT
2GIFS
15" RCP-III
18"
STA 110+91 TO 112+75 -Y4- LT
BERM DITCH
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
18 "
18" RC
P-III 24"24"
STA 118+41 TO 119+20 -Y4- LT
BERM DITCH
STA 122+00 TO 125+90 -Y4- LT
BERM DITCH
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
5’NEGATIVE ACCESS EASEMENT
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
LI
T
Y
E
A
S
E
M
E
N
T
PEGGY
E
. SM
ITH
ROYCE
B
. SM
ITH
P
B
3
3
P
G
11
2
0’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
10’ UTILITY EASEMENT
2
5
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
16
2
1
P
G
2
8
2
5
EIP
EIP
EIP
E
IP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
E
IP
EIP
EIP
EIP
EIPEIPEIPEIPEIPEIP
EIP
WADE SMITH
WADE SMITH
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
5’NEGATIVE ACCESS EASEMENT 5’NEGATIVE ACCESS EASEMENT5’NEGATIVE ACCESS EASEMENT
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
IL
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
IL
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
50.00’
E
XI
S
TI
N
G
R/
W
E
XI
S
T
I
N
G
R/
W
5’ UTILITY EASEMENT
5’ UTILITY EASEMENT
PB 33 PG 44
20’ SANITARY SEWER EASEMENT
P
B
3
3
P
G
4
4
2
0’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
3
P
G
4
4
2
0’
S
ANI
TARY
S
EW
ER
EAS
EM
ENT
50.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W
5
0.
0
0
’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
I
N
G
R
/
W
50.00’
50.00’
SA
M
U
EL
LA
R
R
Y
STEPH
EN
S
E
X
IS
T
IN
G
R
/
W
60.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
10’ UTILITY EASEMENT
10’ UTILITY EASEMENT
10’ UTILITY EASEMENT
EXISTING R/W
EXISTING R/W
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.0
0
’
WADE SMITH
ANTHONY GURLEY
REBECCA S. GURLEY
TAMMY W. SIMMONS
BRIAN D. SIMMONS
EIP
6
0
.0
0
’
5’ NEGATIVE ACCESS EASEMENT
5’ NEGATIVE ACCESS EASEMENT
10’
UTI
LIT
Y
E
AS
E
ME
NT
10’ UTILITY EASEMENT
10
’ U
T
IL
IT
Y
E
AS
E
ME
N
T
10
’ U
T
IL
IT
Y
E
A
S
E
ME
N
T
WADE WESSLEY SMITH JR.
EIP
EI
P
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’
EXISTING R/W
EIP
EXISTING R/W
SADIE S. WEAVIL
EIP
E
IP
EXISTING R/W
E
X
IS
T
IN
G
R
/
W
EIP
MICHAEL J. ROUTH
NANCY W. GOSSARD
JERRY G. GOSSARD
KAREN FLEMING
MICHAEL FLEMING
BRENDA C. SHELLEY
WILLIAM R. SHELLEY
LAVONDA FAYE GADDY
JOHN AVERY GADDY
CATHERINE WHISMAN MORGAN
JEFFREY DALE MORGAN
ANN FLYNN WATKINS
JAMES ALLAN WATKINS
CAROL M. WESTMORELAND
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
HOMEOWNERS ASSOCIATION
DOE RUN
HOMEOWNERS ASSOCIATION
DOE RUN
DONNA L. HESTER
MICHAEL A. HESTER
KELLY THOMPSON
MICHAEL G. THOMPSON
LEIGH YARBROUGH
ERIC J. YARBROUGH
SHERRI D. BERRIER
STEPHEN PEGG
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
HENRIETTA J. STEWART
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
SHERESE R. ROBBINS
ROBERT W. ROBBINS
RACQUEL INGRAM
CHINNO INGRAM
ALEJANDRO ROCHA
EDWARD GUNTER
JOHN TYSON
TERESA A. TYSON
CHRISTINA R. NEWSOM
DONALD R. NEWSOM
JOHN H. WOOD
TALEONA L. MAYFIELD
KELVIN L. MAYFIELD
CATHY P. RAYLE
RONALD W. RAYLE JR.
CHARISSA FISCHER
MICHAEL J. FISCHER
CARLA DESHAZO HOLT
DONNIE ORLANDO HOLT
DORIS M. DUMAS
BARRY D. HUFF
KIMBERLY J. LYNCH
TIMOTHY D. LYNCHWADE SMITH JR.
WADE SMITH JR.
BERRIER CONSTRUCTION COMPANY, INC.
KAREN MANNING
SOPHIA BLACK
PERRIN BLACK
DANIEL A. MCKENZIE
PEGGY E. SMITH
ROYCE B. SMITH
IRVIN MAURICE JOHNSON
RHONDA FAYE JOHNSON
THOMAS E. JOHNSON
SUSAN P. MILLER
LACY BEN MILLER
C
I
T
Y
O
F
WI
N
S
T
O
N-
S
A
L
E
M
CITY OF W
INSTON-SALEM
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
TOWN OF KERNERSVILLE
TOWN OF KERNERSVILLE
FORSYTH COUNTY
FORSYTH COUNTY
KIP J. MILLER
W
IN
S
T
O
N
-
S
A
L
E
M
C
IT
Y
O
F
F
O
R
S
Y
T
H
C
O
U
N
T
Y
;
;
20’ SAN. SEWER EASEMENT
E
I
P
EI
P
E
XI
S
TI
N
G
R/
W
E
XI
S
TI
N
G
R/
W
LAVONDA FAYE GADDY
JOHN AVERY GADDY
CATHERINE WHISMAN MORGAN
JEFFREY DALE MORGAN
ALYCE W. GRAHAM
TIMOTHY A. GRAHAM
KIM L. CASHWELL-MURRAY
WILLIAM L. MURRAY
PEGGY E. SMITH
ROYCE B. SMITH
JILL WHITE NELSON
SHANNON WILSON NELSON
T
O
WN O
F
KE
R
N
E
R
S
V
IL
L
E
F
O
R
S
Y
T
H C
O
U
NT
Y
29.48’
+22.19
BRIAN J. SIMMONS
RENEE FABINIAK &
JOEL A. TAWNEY
YVONNE L. GONALEZ
JOSEPH GONZALEZ
DONALD J. BROWN
JENNIFER S. SHIELDS
TOD W. SHIELDS
TINA Y. PEGG
GARY D. PEGG
FES
18" RCP
FES
FES
18" RCP
3
0"
R
C
P
F
E
S
F
E
S
F
E
S
2
4
"
R
C
P
F
E
S
DI
1SFD
1SFD
S
POOL
W
W
D
G
G
R
12" RCP
12" RCP
W
36" CONC
CON
C
B
S
WD
48"W
W
15" RCP
12" RCP
GUY
12" RCP
S
R
2
6
3
2
S
E
D
GE
GAR
D
E
N
R
D
2
0
’ B
S
T
SR 2657 HASTINGS HILL RD 22’ BST
AME
R
S
H
AM
C
T
2
1’ B
S
T
16’ CONC
20’ CONC
S
48" IRON
2
S
B
K
D
3
6
"
C
O
N
C
2
S
B
K
D
2SBKD
2SB
K
D
2
S
B
KD
2SBKD
2
S
B
K
D
2
S
B
K
D
1SBKD
2
0
’
C
O
N
C
12
’ CONC
12’ CONC
12’ CONC
12
’
C
O
N
C
4
8
"
C
O
N
C
W
D
48"C
O
N
C
48"C
O
N
C
48"CONC
12"
H
DPE
15" HDPE
15
"
H
D
P
E
1
5
"
H
D
P
E
15"
H
DP
E
LT
LT
18" RCP
FES
48" CONC
15" CMP
15
" R
C
P
LT
AMERSHAM CT 21’ BST
MTL
MTL
60"WW 1SBW
60"WW 1SBW
POOL
W/LT
LT
LT
L
T
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
1
2
’
C
H
L
1
2
’
C
H
L
S
C
O
N
C
72" CHL&1SBW
72" CHL&1SBW
BST
12’ CHL
48"CONC
GERRY RD 20’ BST
B
K
B
K
S
S
S
6
0
" C
H
L
4
8
"
W
W
LT
4
8
"
P
L
A
S
T
I
C
12
" RCP
S
B
C
O
N
C
6
0
"B
K
BK WALL
18
"
C
M
P
GATE
MTL
12" RCP W/LT
15" RCP
LT
4
8
" CONC
15"
R
CP
CONC
18" RCP
18" RCP
18
" R
CP
MTL MTL
MTL
48"CONC
W
D
D
K
W
D
DK
WD DK
W
D
D
K
DKWD
D
K
W
D
4
8
" WW&
1S
B
W
6
0
"
W
D
S
O
I
L
2
S
B
K
DW
D
D
K
18" RCP
18" RCP
18" RCP
DK
WD
W/LT
GAZEBO
WD
D
K
W/LT
12" RCP
36" CONC
1SBKD
APPROX
S
DK
WD CONC
B
S
T
D
K
W
D
DI
DI
I-40 BUS WBL US 42 NBL 23’ BST
10’ BST
I-40 BUS EBL US 42 SBL 24’ BST
11’ BST
4’ BST
4’ BST
48" WW&PLASTIC RAIL
48"
W
W&
WD RAIL
WALL
12’ CONC 48" PLASTIC RAIL
SCRUB
SCRUB
SCRUB
P
OND
WE
.8
8
4
.6
DI
DI
DI
DI
DI
DI
DI
CON
C
48" PLASTIC RAIL
48" PLASTIC RAIL
18"
R
C
P
W/LT
1SBKD
S
S
1
2
’
B
S
T
2
S
B
KD
11’ CONC
12’ CONC
12’ CONC
15"
H
D
P
E
DI
POOL HOUSECONC
L
T
L
T
L
T
L
T
B
K
B
K
W/LT
48" CONC
4
8
"
WW
&
1S
B
W
B
S
T
36" WW&1SBW
10
’ B
S
T
LT
B
S
T
T
E
N
NI
S
C
O
U
R
T
S
48" PLASTIC RAIL
18"
R
C
P
18"
R
CP
2
4
"
R
C
P
F
E
S
CB
C
B
CB
18" RCP
FES
12" PLASTIC OVER FES
DI BUILT
CB
30" RCP
FES
FES
CB
18" RCP 15" RCP
18" CMP
1
5
"
R
C
P
15
"
R
C
P
1
5
"
R
C
P
W
D
S 30" C&G
7
2
"
W
D
10’ CONC
1SBKD
36" CONC
1S
B
K
D
48" CONC
1
4
’
C
O
N
C
48" C
HL
60"
W
D
S
S 3
0
"
W
D
POOL
W
1S
B
K
D
2
S
B
K
D
2S
B
K
D
10’ CONC
15
’
C
O
N
C10
’
C
O
N
C
15" HDPE
15" H D PE 15" R
CP12" HDPE
48" CONC
48" CONC
4
8
" C
ON
C
S
BST
2
S
F
D
L
T
LT
LT
L
T
S
R
4
2
0
8
B
E
N
S
M
IT
H
R
D
2
0
’
B
S
T
MTL
MTL
MTL
60" CHL&1SBW
W/LT
15" RCP
C
O
N
C
BST
1
S
F
D
3
6
"
C
O
N
C
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
CONC
3
6
"
C
O
N
C
2
S
B
K
D
2
S
B
K
D
CONC
2S
B
K
D
C
O
N
C
CONC
B
K WAL
L
2
S
B
K
D
CONC
W/LT
W/LT
W/LT
WD DK
W/LT
MTLMTL
CB
L
T
W
D
D
K
WD DK
LT
1S
B
K
D
DK
WD
D
K
W
D
LT
LT
CONC
CONC
C
O
N
C
CONC
W
D
D
K
W
D
D
K
W
D
D
K
C
O
N
C
DK
WD
MTL
CONC
R
A
I
L
4
8
"
W
D
&
W
W
4
8
" P
L
A
S
T
IC
RA
IL & WW
RIPRAP
BST
BST
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
10’ BST
10’ BST
10’ CONC
24"
R
CP
W/LT
1SF
D
72" CHL
1S
B
K
D
36" CONC
9’
C
O
N
C
S
W
D
2
S
B
K
D 10
’
C
O
N
C
48" CONC
48" CONC
AMERSHAM CT 21’ BST
C
O
N
C
60" CHL 1SBW
SR 2825 GERRY RD 20’ BST
CONC
B
K
L
T
10’ CONC
48" PLASTIC
2
S
B
K
D
MTL
DEER RACK CIR 22’ BST
G
R
RAIL48" WD&WW
LT
S
CONCCONC
CONCCONCCONC
C
O
N
C
2
S
B
K
D
4
8"
S
T
O
N
E
2SBKD
7
2"
W
D
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
1
5
"
R
C
P
15
"
R
C
P
W
D
D
K
LT
1
2
’
C
H
L 12’ CHL
C
O
N
C
P
L
A
N
T
E
R
S
S
OIL
WALL36" WD
2
S
B
K
D
D
O
E
R
U
N
D
R
6.
5
m
B
S
T
8
"
V
C
8
"
V
C
8
"
V
C
CAMERA
T
T
EOI
T
T
W
T
T
W
16" DI
16" DI
16
" D
I
16" DI
6" DI
6"
D
I
6" DI
6" DI
8" DI8" DI8" DI8" DI8" DI
6
"
D
I
6
"
DI
6
"
D
I
6
"
DI
6" DI
4"
P
L
4" PL
4" PL
4" PL
6
" DI
2
"
P
L
2
"
P
L
2
"
P
L
2
"
P
L
2
"
P
L
2" PL
(
A
T
U
R
)
(
A
T
U
R)
(
A
T
U
R)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R)
(
A
T
U
R)
6
" D
I (
A
T
U
R
)
CAT-1GRAU-350
GRAU-350 GRAU-350
GRAU-350
GRAU-350
GRAU-350
CAT-1
AT-1
G
R
A
U 350
GRAU 350 TL-3TYPE B-77
CB
18"
R
C
P
F
E
S
3
0"
R
C
P
F
E
S
18
"
C
M
P
CB
18" R
CP
FES
FES
18"
R
C
P
U
N
K
N
O
WN
S
IZ
E
/
T
Y
P
E
15
"
C
M
P
ELBOW
APPROXCB
CB
CB
CB
CB
CB
CB
CB CB
CB
30"
R
C
P
F
ES
F
E
S
CB
DI
UNKNOWNSIZE/TYPE
1
8
"
R
C
P
18" RCP
18
" RCP
UNKNOWN
SIZE/TYPE
18
"
R
C
P
15
"
R
C
P
18" RCP
U
N
K
N
O
WN
T
Y
P
E
/
S
IZ
E
18"
R
C
P
18"
R
CP
CB
CB
CB
18" RCP
18
"
R
C
P
F
E
S
12" PLASTIC
12" PLASTIC
OVER FES
DI BUILT
18" RCPFES
15" PLASTIC
15" PLA
STIC
FES
15" P
L
A
S
TI
C
LT
SHEET 47 OF 64
PERMIT DRAWING
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
SITE 26
SITE 27A
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
F
F
F
F
F
SITE 27C
SITE 27B
SITE 27B
SITE 27A
WETLAND
DENOTES FILL INFF
840
840
8
4
0
840
840
8
4
0
8
4
0
8
4
0
840
8
4
0
8
4
0
8
5
0
850
8
50
850
8
5
0
850
850
850
8
5
0
850
8
5
0
850
8
5
0
8
5
0
8
5
0
8
5
0
850
850
850
8
5
0
8
5
0
8
6
0
860
8
6
0
8
6
0
8
6
0
860
860
860
860
8
6
0
860
8
60
8
6
0
860
8
6
0
860
8
6
0
860
860
860
860
8
6
0
8
6
0
8
6
0
86
0
870
8
7
0
8
7
0
8
7
0
8
7
0
870
870
870
870
8
7
0
8
7
0
870
870
870
8
7
0
8
7
0
8
7
0
8
7
0
870
870
870
8
7
0
870
870
870
87
0
8
7
0
8
7
0
870
870
870
8
7
0
870
870
870
870
870
870
870
870
8
8
0
8
8
0
8
8
0
880
880
880
880
880
880
8
8
0
8
8
0
880
880 880
880
880
8
8
0
8
8
0
880
880
8
8
0
8
8
0
880
8
8
0
880
880
8
8
0
880
880
880
880
880
880
880
880
8
8
0
880
880
880
8
8
0
8
8
0
880880
880
880
880
880
880
880
8
8
0
8
8
0
880
880
8
8
0
890
890
8
9
0
890
8
9
0
890
8
9
0
890
890
8
9
0
8
9
0
8
9
0
890
890
890 8
9
0
890
890
890
8
9
0
890
890
890
890
890
890 890
8
9
0
8
9
0
8
9
0
890
890
890
890
890
8
9
0
890
890
890
890
8
9
0
890
890
890
890
890
890
890
890
890
890
890
890
890
8
9
0
8
9
0
890
89
0
8
9
0
890
890
8
9
0
8
9
0
890
890
890
8
9
0
8
9
0
8
9
0
890
8
9
0
890
8
9
0
890
890
890
8
9
0
9
0
0
900
900
9
0
0
900
9
0
0
9
0
0
900
900
900
900
900
900
900
9
0
0
9
0
0
900
900
9
0
0
900
900
9
0
0
9
0
0
9
0
0
900
900
900
900
900
900 900
9
0
0
900
900
9
0
0
900
900
900
900
900 900
900
9
0
0
9
0
0
900
900
900
900
900
900
900
900
9
0
0
9
0
0
900
900
900
900900
9
0
0
90
0
900
90
0
9
0
0
900
900
900
900
900
900
9
10
910
910
910
9
1
0
910
910
9
1
0
9
1
0
9
10
910
9
1
0
910910
910
9
10
9
10
910
910
910
910
910
9
10
9
10
9
10
9
10
910
910
910
910
910
910
910
910
9
1
0
910
910
910
9
1
0
9
1
0
910
910
910
910
910
9
1
0
9
10
9
1
0
910
910
910
9
1
0
9
10
910
910
910
910
9
10
910
910
910
920
920
920
920
9
20
920
920
920
920
9
2
0
920
920
920
9
2
0
920
920
9
2
0
920
920
920
920
920
920
920
9
2
0
920
920
920
9
2
0
920
920
9
2
0
920
920
920
920
920
920
920
9
2
0
930
930
930
930
930
930
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
8
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
28U-2579B
M
A
T
C
H
LIN
E
-
Y4
-
S
TA
.
10
2
+
9
0
S
H
E
E
T
16
M
A
TC
H
LIN
E
-
Y5
-
S
TA
. 3
8
+
5
0
S
H
EET
16
MATCHLINE -Y4RPB- STA.19+00 SHEET 16
M
A
TC
H
LIN
E
-
Y4
-
S
T
A
.
12
4
+
7
0
S
H
E
E
T
2
9
M
A
T
C
H
LIN
E
-
Y6
-
S
TA
.
2
3
+
9
4
.
15
S
H
E
E
T
2
9
(CO N STRU CTED U N D ER TIP PRO JECT U -2579G)
M
A TCH LINE -Y 5A- STA .62+50 SHEET 29
5
0
5
5
6 0
3
0
3
5
4
0
2
5
3
0
4
0
45
10
5
110
115
12
0
2
5
3
0
3
5
10
15
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
FF
F
C
C
C
C
F
F
F F
C
C
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
NCDOT
(
()
)
NCDOT
(
()
)
P
PLUG
P
RETAIN
2GI
REMOVE
P
P
PLUG
2GI
JB w/MH
JB w/MH
P
PLUG
REMOVE
P
P
PLUG
P PLUG
HW
P
PLUG
2GI
PPLUG
RETAIN Conv. OTCB To 2GI
RETAIN
RETAIN
RETAIN
JBw/ MH
CONVERT TO
REMOVE
TO 2GI
CONVERT2GI
FS
COLLAR
RETAIN AND EXTEND
REMOVE REMOVE
FS
COLLARRETAIN AND EXTEND
FS
FS
MOVERE
2GI
FS
FS
Conv. OTCB To 2GI
REMOVE
REMOVE FES
RETAIN AND EXTEND
COLLAR
COLLAR
2GI
REMOVE
MATERIAL
FILL W/ FLOWABLE
GRADE TO DRAIN
P
P
PLUG
REMOVE
REMOVE
DITCH
TIE TO EXIST.
FS
FS
2GI
REMOVE
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
FS
2GI-A
2GI-A
2GI-A
2 ELBOWS
24" CSP W/
REMOVE FES
REMOVE
REMOVE FES
REMOVE FES
REMOVE FES
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 6 TONS
RIP RAP
CLASS ’B’
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FROM STA 19+90 TO 22+50 -Y4RPB- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA 105+30 TO 107+10 -Y4- LT
FROM STA 22+50 TO 23+90 -Y4RPB- LT
FROM STA. 117+85 TO 118+25 -Y4- LT
4:1 or
Flatter Fill
Slope
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
Natural
Ground 2:
1 D
DETAIL #15
Min. D= 2 Ft.
FROM STA. 25+60 TO 27+85 -Y6- RT
Natural Natural
Ground Ground
2:
1 2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FROM STA. 36+42 TO 36+67 -Y4RPC- LT
SEE DETAIL#15
SPECIAL LATERAL ’V’ DITCH
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#12
W/ 312 SY FF
EST. 27 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
SEE PROFILE FOR GRADE
SPECIAL DITCH GRADE
EST. DDE 5CY
SEE DETAIL#7
HEAD DITCH
SEE DETAIL#12
W/ 247 SY FF
EST. 94 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
DETAIL #32
TAIL DITCH
Natural
Ground
FROM STA.107+50 TO STA.107+61
2:1
REMOVE
EST. 62 SY
EST. 33 TONS
EST. DDE +/- 15 CY
SEE DETAIL#32
(BANKS ONLY)
CLASS ’I’ RIP RAP
EST. 11 SY
EST. 3 TONS
CLASS ’B’ RIP RAP
EST. 11 SY
EST. 3 TONS
RIP RAP W/ FF
CLASS ’B’
RETAIN
REMOVE
COLLAR
REMOVE
EXTEND
RETAIN AND
15" RCP-III
18" RCP-III 18" RCP-III
1
8
"
R
C
P-III
18
"
RC
P
-
III
1
5
" RC
P
-III
T
R
E
N
C
H
LE
S
S
I
N
S
T
A
LLA
T
I
O
N
4
2
"
W
E
L
D
E
D
S
T
E
E
L
30"
RC
P-
V
30" RCP-III
18" RC
P-IV
18"
R
CP-III
18" RCP-IV
18"
RCP-III
18"
30"
R
C
P-III
30" RCP-V
15" RCP-III
54" RCP-III
30" RCP-III
3
0
"
RC
P
-
III
24" R
C
P-III
15"
EL=882.3
INV. IN
SEE DETAIL#6
EST 170 SY FF
EST 63 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
REMOVE FES
EXST 72" CONC DITCH
RETAIN +/-64’ OF
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
SEE DETAIL#12
W/ 318 SY FF
EST. 121 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
FLAT GRATE
2GI W/
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA. 107+20 TO 108+22 -Y4- LT
2GIFS
15" RCP-III
18"
STA 110+91 TO 112+75 -Y4- LT
BERM DITCH
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
18 "
18" RC
P-III 24"24"
STA 118+41 TO 119+20 -Y4- LT
BERM DITCH
STA 122+00 TO 125+90 -Y4- LT
BERM DITCH
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
5’NEGATIVE ACCESS EASEMENT
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
LI
T
Y
E
A
S
E
M
E
N
T
PEGGY
E
. SM
ITH
ROYCE
B
. SM
ITH
P
B
3
3
P
G
11
2
0’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
10’ UTILITY EASEMENT
2
5
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
16
2
1
P
G
2
8
2
5
EIP
EIP
EIP
E
IP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
E
IP
EIP
EIP
EIP
EIPEIPEIPEIPEIPEIP
EIP
WADE SMITH
WADE SMITH
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
5’NEGATIVE ACCESS EASEMENT 5’NEGATIVE ACCESS EASEMENT5’NEGATIVE ACCESS EASEMENT
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
IL
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
IL
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
50.00’
E
XI
S
TI
N
G
R/
W
E
XI
S
T
I
N
G
R/
W
5’ UTILITY EASEMENT
5’ UTILITY EASEMENT
PB 33 PG 44
20’ SANITARY SEWER EASEMENT
P
B
3
3
P
G
4
4
2
0’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
3
P
G
4
4
2
0’
S
ANI
TARY
S
EW
ER
EAS
EM
ENT
50.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EXISTING R/W
5
0.
0
0
’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
I
N
G
R
/
W
50.00’
50.00’
SA
M
U
EL
LA
R
R
Y
STEPH
EN
S
E
X
IS
T
IN
G
R
/
W
60.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
10’ UTILITY EASEMENT
10’ UTILITY EASEMENT
10’ UTILITY EASEMENT
EXISTING R/W
EXISTING R/W
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.0
0
’
WADE SMITH
ANTHONY GURLEY
REBECCA S. GURLEY
TAMMY W. SIMMONS
BRIAN D. SIMMONS
EIP
6
0
.0
0
’
5’ NEGATIVE ACCESS EASEMENT
5’ NEGATIVE ACCESS EASEMENT
10’
UTI
LIT
Y
E
AS
E
ME
NT
10’ UTILITY EASEMENT
10
’ U
T
IL
IT
Y
E
AS
E
ME
N
T
10
’ U
T
IL
IT
Y
E
A
S
E
ME
N
T
WADE WESSLEY SMITH JR.
EIP
EI
P
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’
EXISTING R/W
EIP
EXISTING R/W
SADIE S. WEAVIL
EIP
E
IP
EXISTING R/W
E
X
IS
T
IN
G
R
/
W
EIP
MICHAEL J. ROUTH
NANCY W. GOSSARD
JERRY G. GOSSARD
KAREN FLEMING
MICHAEL FLEMING
BRENDA C. SHELLEY
WILLIAM R. SHELLEY
LAVONDA FAYE GADDY
JOHN AVERY GADDY
CATHERINE WHISMAN MORGAN
JEFFREY DALE MORGAN
ANN FLYNN WATKINS
JAMES ALLAN WATKINS
CAROL M. WESTMORELAND
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
HOMEOWNERS ASSOCIATION
DOE RUN
HOMEOWNERS ASSOCIATION
DOE RUN
DONNA L. HESTER
MICHAEL A. HESTER
KELLY THOMPSON
MICHAEL G. THOMPSON
LEIGH YARBROUGH
ERIC J. YARBROUGH
SHERRI D. BERRIER
STEPHEN PEGG
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
HENRIETTA J. STEWART
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
SHERESE R. ROBBINS
ROBERT W. ROBBINS
RACQUEL INGRAM
CHINNO INGRAM
ALEJANDRO ROCHA
EDWARD GUNTER
JOHN TYSON
TERESA A. TYSON
CHRISTINA R. NEWSOM
DONALD R. NEWSOM
JOHN H. WOOD
TALEONA L. MAYFIELD
KELVIN L. MAYFIELD
CATHY P. RAYLE
RONALD W. RAYLE JR.
CHARISSA FISCHER
MICHAEL J. FISCHER
CARLA DESHAZO HOLT
DONNIE ORLANDO HOLT
DORIS M. DUMAS
BARRY D. HUFF
KIMBERLY J. LYNCH
TIMOTHY D. LYNCHWADE SMITH JR.
WADE SMITH JR.
BERRIER CONSTRUCTION COMPANY, INC.
KAREN MANNING
SOPHIA BLACK
PERRIN BLACK
DANIEL A. MCKENZIE
PEGGY E. SMITH
ROYCE B. SMITH
IRVIN MAURICE JOHNSON
RHONDA FAYE JOHNSON
THOMAS E. JOHNSON
SUSAN P. MILLER
LACY BEN MILLER
C
I
T
Y
O
F
WI
N
S
T
O
N-
S
A
L
E
M
CITY OF W
INSTON-SALEM
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
TOWN OF KERNERSVILLE
TOWN OF KERNERSVILLE
FORSYTH COUNTY
FORSYTH COUNTY
KIP J. MILLER
W
IN
S
T
O
N
-
S
A
L
E
M
C
IT
Y
O
F
F
O
R
S
Y
T
H
C
O
U
N
T
Y
;
;
20’ SAN. SEWER EASEMENT
E
I
P
EI
P
E
XI
S
TI
N
G
R/
W
E
XI
S
TI
N
G
R/
W
LAVONDA FAYE GADDY
JOHN AVERY GADDY
CATHERINE WHISMAN MORGAN
JEFFREY DALE MORGAN
ALYCE W. GRAHAM
TIMOTHY A. GRAHAM
KIM L. CASHWELL-MURRAY
WILLIAM L. MURRAY
PEGGY E. SMITH
ROYCE B. SMITH
JILL WHITE NELSON
SHANNON WILSON NELSON
T
O
WN O
F
KE
R
N
E
R
S
V
IL
L
E
F
O
R
S
Y
T
H C
O
U
NT
Y
29.48’
+22.19
BRIAN J. SIMMONS
RENEE FABINIAK &
JOEL A. TAWNEY
YVONNE L. GONALEZ
JOSEPH GONZALEZ
DONALD J. BROWN
JENNIFER S. SHIELDS
TOD W. SHIELDS
TINA Y. PEGG
GARY D. PEGG
FES
18" RCP
FES
FES
18" RCP
3
0"
R
C
P
F
E
S
F
E
S
F
E
S
2
4
"
R
C
P
F
E
S
DI
1SFD
1SFD
S
POOL
W
W
D
G
G
R
12" RCP
12" RCP
W
36" CONC
CON
C
B
S
WD
48"W
W
15" RCP
12" RCP
GUY
12" RCP
S
R
2
6
3
2
S
E
D
GE
GAR
D
E
N
R
D
2
0
’ B
S
T
SR 2657 HASTINGS HILL RD 22’ BST
AME
R
S
H
AM
C
T
2
1’ B
S
T
16’ CONC
20’ CONC
S
48" IRON
2
S
B
K
D
3
6
"
C
O
N
C
2
S
B
K
D
2SBKD
2SB
K
D
2
S
B
KD
2SBKD
2
S
B
K
D
2
S
B
K
D
1SBKD
2
0
’
C
O
N
C
12
’ CONC
12’ CONC
12’ CONC
12
’
C
O
N
C
4
8
"
C
O
N
C
W
D
48"C
O
N
C
48"C
O
N
C
48"CONC
12"
H
DPE
15" HDPE
15
"
H
D
P
E
1
5
"
H
D
P
E
15"
H
DP
E
LT
LT
18" RCP
FES
48" CONC
15" CMP
15
" R
C
P
LT
AMERSHAM CT 21’ BST
MTL
MTL
60"WW 1SBW
60"WW 1SBW
POOL
W/LT
LT
LT
L
T
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
1
2
’
C
H
L
1
2
’
C
H
L
S
C
O
N
C
72" CHL&1SBW
72" CHL&1SBW
BST
12’ CHL
48"CONC
GERRY RD 20’ BST
B
K
B
K
S
S
S
6
0
" C
H
L
4
8
"
W
W
LT
4
8
"
P
L
A
S
T
I
C
12
" RCP
S
B
C
O
N
C
6
0
"B
K
BK WALL
18
"
C
M
P
GATE
MTL
12" RCP W/LT
15" RCP
LT
4
8
" CONC
15"
R
CP
CONC
18" RCP
18" RCP
18
" R
CP
MTL MTL
MTL
48"CONC
W
D
D
K
W
D
DK
WD DK
W
D
D
K
DKWD
D
K
W
D
4
8
" WW&
1S
B
W
6
0
"
W
D
S
O
I
L
2
S
B
K
DW
D
D
K
18" RCP
18" RCP
18" RCP
DK
WD
W/LT
GAZEBO
WD
D
K
W/LT
12" RCP
36" CONC
1SBKD
APPROX
S
DK
WD CONC
B
S
T
D
K
W
D
DI
DI
I-40 BUS WBL US 42 NBL 23’ BST
10’ BST
I-40 BUS EBL US 42 SBL 24’ BST
11’ BST
4’ BST
4’ BST
48" WW&PLASTIC RAIL
48"
W
W&
WD RAIL
WALL
12’ CONC 48" PLASTIC RAIL
SCRUB
SCRUB
SCRUB
P
OND
WE
.8
8
4
.6
DI
DI
DI
DI
DI
DI
DI
CON
C
48" PLASTIC RAIL
48" PLASTIC RAIL
18"
R
C
P
W/LT
1SBKD
S
S
1
2
’
B
S
T
2
S
B
KD
11’ CONC
12’ CONC
12’ CONC
15"
H
D
P
E
DI
POOL HOUSECONC
L
T
L
T
L
T
L
T
B
K
B
K
W/LT
48" CONC
4
8
"
WW
&
1S
B
W
B
S
T
36" WW&1SBW
10
’ B
S
T
LT
B
S
T
T
E
N
NI
S
C
O
U
R
T
S
48" PLASTIC RAIL
18"
R
C
P
18"
R
CP
2
4
"
R
C
P
F
E
S
CB
C
B
CB
18" RCP
FES
12" PLASTIC OVER FES
DI BUILT
CB
30" RCP
FES
FES
CB
18" RCP 15" RCP
18" CMP
1
5
"
R
C
P
15
"
R
C
P
1
5
"
R
C
P
W
D
S 30" C&G
7
2
"
W
D
10’ CONC
1SBKD
36" CONC
1S
B
K
D
48" CONC
1
4
’
C
O
N
C
48" C
HL
60"
W
D
S
S 3
0
"
W
D
POOL
W
1S
B
K
D
2
S
B
K
D
2S
B
K
D
10’ CONC
15
’
C
O
N
C10
’
C
O
N
C
15" HDPE
15" H D PE 15" R
CP12" HDPE
48" CONC
48" CONC
4
8
" C
ON
C
S
BST
2
S
F
D
L
T
LT
LT
L
T
S
R
4
2
0
8
B
E
N
S
M
IT
H
R
D
2
0
’
B
S
T
MTL
MTL
MTL
60" CHL&1SBW
W/LT
15" RCP
C
O
N
C
BST
1
S
F
D
3
6
"
C
O
N
C
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
CONC
3
6
"
C
O
N
C
2
S
B
K
D
2
S
B
K
D
CONC
2S
B
K
D
C
O
N
C
CONC
B
K WAL
L
2
S
B
K
D
CONC
W/LT
W/LT
W/LT
WD DK
W/LT
MTLMTL
CB
L
T
W
D
D
K
WD DK
LT
1S
B
K
D
DK
WD
D
K
W
D
LT
LT
CONC
CONC
C
O
N
C
CONC
W
D
D
K
W
D
D
K
W
D
D
K
C
O
N
C
DK
WD
MTL
CONC
R
A
I
L
4
8
"
W
D
&
W
W
4
8
" P
L
A
S
T
IC
RA
IL & WW
RIPRAP
BST
BST
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
10’ BST
10’ BST
10’ CONC
24"
R
CP
W/LT
1SF
D
72" CHL
1S
B
K
D
36" CONC
9’
C
O
N
C
S
W
D
2
S
B
K
D 10
’
C
O
N
C
48" CONC
48" CONC
AMERSHAM CT 21’ BST
C
O
N
C
60" CHL 1SBW
SR 2825 GERRY RD 20’ BST
CONC
B
K
L
T
10’ CONC
48" PLASTIC
2
S
B
K
D
MTL
DEER RACK CIR 22’ BST
G
R
RAIL48" WD&WW
LT
S
CONCCONC
CONCCONCCONC
C
O
N
C
2
S
B
K
D
4
8"
S
T
O
N
E
2SBKD
7
2"
W
D
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
1
5
"
R
C
P
15
"
R
C
P
W
D
D
K
LT
1
2
’
C
H
L 12’ CHL
C
O
N
C
P
L
A
N
T
E
R
S
S
OIL
WALL36" WD
2
S
B
K
D
D
O
E
R
U
N
D
R
6.
5
m
B
S
T
8
"
V
C
8
"
V
C
8
"
V
C
CAMERA
T
T
EOI
T
T
W
T
T
W
16" DI
16" DI
16
" D
I
16" DI
6" DI
6"
D
I
6" DI
6" DI
8" DI8" DI8" DI8" DI8" DI
6
"
D
I
6
"
DI
6
"
D
I
6
"
DI
6" DI
4"
P
L
4" PL
4" PL
4" PL
6
" DI
2
"
P
L
2
"
P
L
2
"
P
L
2
"
P
L
2
"
P
L
2" PL
(
A
T
U
R
)
(
A
T
U
R)
(
A
T
U
R)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R)
(
A
T
U
R)
6
" D
I (
A
T
U
R
)
CAT-1GRAU-350
GRAU-350 GRAU-350
GRAU-350
GRAU-350
GRAU-350
CAT-1
AT-1
G
R
A
U 350
GRAU 350 TL-3TYPE B-77
CB
18"
R
C
P
F
E
S
3
0"
R
C
P
F
E
S
18
"
C
M
P
CB
18" R
CP
FES
FES
18"
R
C
P
U
N
K
N
O
WN
S
IZ
E
/
T
Y
P
E
15
"
C
M
P
ELBOW
APPROXCB
CB
CB
CB
CB
CB
CB
CB CB
CB
30"
R
C
P
F
ES
F
E
S
CB
DI
UNKNOWNSIZE/TYPE
1
8
"
R
C
P
18" RCP
18
" RCP
UNKNOWN
SIZE/TYPE
18
"
R
C
P
15
"
R
C
P
18" RCP
U
N
K
N
O
WN
T
Y
P
E
/
S
IZ
E
18"
R
C
P
18"
R
CP
CB
CB
CB
18" RCP
18
"
R
C
P
F
E
S
12" PLASTIC
12" PLASTIC
OVER FES
DI BUILT
18" RCPFES
15" PLASTIC
15" PLA
STIC
FES
15" P
L
A
S
TI
C
LT
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
28-1U-2579B
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
2
8
_
S
I
T
E
2
7
j
h
a
r
v
e
y
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
S S SURFACE WATER
DENOTES IMPACTS IN
P P
(POND)
SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
SHEET 48 OF 64
PERMIT DRAWING
WETLAND
DENOTES FILL INFF
SITE 26
SITE 27A
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
F
F
F
F
F
SITE 27C
SITE 27B
SITE 27B
SITE 27A
M
A
T
C
H
LI
N
E
-
Y
4
-
S
T
A
.
1
0
2
+
9
0
S
H
E
E
T
1
6
3
0
3
5
4
0
2
5
3
0
10
5
110
115
10
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
F
C
NCDOT
(
()
)
P
PLUG
P
RETAIN
2GI
REMOVE
P
P
PLUG
2GI
JB w/MH
JB w/MH
P
PLUG
REMOVE
P
P
PLUG
P PLUG
HW
P
PLUG
2GI
PPLUG
RETAIN Conv. OTCB To 2GI
RETAIN
RETAIN
RETAIN
JBw/ MH
CONVERT TO
REMOVE
TO 2GI
CONVERT2GI
FS
COLLAR
RETAIN AND EXTEND
REMOVE REMOVE
FS
COLLARRETAIN AND EXTEND
FS
FS
MOVERE
2GI
FS
FS
Conv. OTCB To 2GI
REMOVE
FS
FS
2GI
FS
2GI-A
2GI-A
2GI-A
2 ELBOWS
24" CSP W/
REMOVE FES
REMOVE FES
REMOVE FES
REMOVE FES
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
EST. DDE 5CY
SEE DETAIL#7
HEAD DITCH
SEE DETAIL#12
W/ 247 SY FF
EST. 94 TONS
W/ CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
EST. 62 SY
EST. 33 TONS
EST. DDE +/- 15 CY
SEE DETAIL#32
(BANKS ONLY)
CLASS ’I’ RIP RAP
15" RCP-III
18" RCP-III 18" RCP-III
1
8
"
R
C
P-III
1
8
"
R
C
P
-
III
1
5
" R
C
P
-III
T
R
E
N
C
H
L
E
S
S
I
N
S
T
A
L
L
A
T
I
O
N
4
2
"
W
E
L
D
E
D
S
T
E
E
L
30"
R
C
P-
V
30" RCP-III
18" RC
P-IV
18"
R
C
P-III
18" RCP-IV
1
8"
RCP-III
15" RCP-III
54" RCP-III
30" RCP-III
3
0
"
R
C
P
-
III
EL=882.3
INV. IN
SEE DETAIL#6
EST 170 SY FF
EST 63 TONS
CLASS "B" RIPRAP
TOE PROTECTION W/
REMOVE FES
EST 14 SY FF
EST 5 TONS
RIP RAP
CLASS ’B’
SEE DETAIL#12
W/ 318 SY FF
EST. 121 TONS
LATERAL 2’ BASE DITCH W/ CLASS ’B’ RIP RAP
FLAT GRATE
2GI W/
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FROM STA. 107+20 TO 108+22 -Y4- LT
2GIFS
15" RCP-III
18"
STA 110+91 TO 112+75 -Y4- LT
BERM DITCH
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
18 "
18" RC
P-III
CONNECTORS
AND ROD AND LUG
15" CSP W/ 2 ELBOWS
EST 7 SY FF
EST 2 TONS
RIP RAP
CLASS ’B’
5
’
U
T
I
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
10’ UTILITY EASEMENT
EIPEIPEIP
WADE SMITH
EIP
EIP
5’NEGATIVE ACCESS EASEMENT 5’NEGATIVE ACCESS EASEMENT5’NEGATIVE ACCESS EASEMENT
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
50.00’
WADE SMITH
10’
U
TI
LI
T
Y
E
AS
E
M
E
N
T
10’ UTILITY EASEMENT
WADE WESSLEY SMITH JR.
EIP
EI
P
EIP
HOMEOWNERS ASSOCIATION
DOE RUN
HOMEOWNERS ASSOCIATION
DOE RUN
WATSON BROTHERS, INC.
WATSON BROTHERS, INC.
JOHN TYSON
TERESA A. TYSON
CHRISTINA R. NEWSOM
DONALD R. NEWSOM
CATHY P. RAYLE
RONALD W. RAYLE JR.
CHARISSA FISCHER
MICHAEL J. FISCHER
CARLA DESHAZO HOLT
DONNIE ORLANDO HOLT
DORIS M. DUMAS
BARRY D. HUFF
WADE SMITH JR.
SOPHIA BLACK
PERRIN BLACK
TOWN OF KERNERSVILLE
FORSYTH COUNTY
EI
P
T
O
WN
O
F
K
E
R
N
E
R
S
V
IL
L
E
F
O
R
S
Y
T
H
C
O
U
N
T
Y
YVONNE L. GONALEZ
JOSEPH GONZALEZ
TINA Y. PEGG
GARY D. PEGG
FES
18" RCP
FES
FES
18" R
C
P
3
0"
R
C
P
F
E
S
F
E
S
F
E
S
2
4
"
R
C
P
F
E
S
DI
16’ CONC
3
6
"
C
O
N
C
2S
B
K
D
2
S
B
KD
2SBKD
2
S
B
K
D
2
S
B
K
D
1SBKD
12
’ C
ON
C
12’ CONC
12’ CONC
4
8
"
C
O
N
C
W
D
48"C
O
N
C
48"C
O
N
C
48"CONC
12"
H
DP
E
15" HDPE
15
"
H
D
P
E
1
5
"
H
D
P
E
15"
H
DP
E
LT
LT
18" RCP
FES
15
" R
C
P
60"WW 1SBW
60"WW 1SBW
POOL
LT
LT
L
T
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
1
2
’
C
H
L
1
2
’
C
H
L
S
C
O
N
C
72" CHL&1SBW
72" CHL&1SBW
BST
12’ CHL
48"CONC
GERRY RD 20’ BST
B
K
B
K
S
S
S
6
0
" C
H
L
4
8
"
W
W
LT
4
8
"
P
L
A
S
T
I
C
12
" R
C
P
S
B
C
O
N
C
6
0
"B
K
BK WALL
18
"
C
M
P
GATE
MTL
12" RCP
W/LT
15" RCP
LT
4
8
" C
O
N
C
15"
R
C
P
C
ON
C
18" RCP
18" RCP
18
" R
C
P
MTL MTL
MTL
48"CONC
W
D
D
K
W
D
DK
WD DK
DKWD
D
K
W
D
6
0
"
W
D
S
O
I
L
2
S
B
K
DW
D
D
K
18" RCP
18" RCP
18" RCP
W/LT
DI
DI
I-40 BUS WBL US 42 NBL 23’ BST
10’ BST
I-40 BUS EBL US 42 SBL 24’ BST
11’ BST
4’ BST
4’ BST
48" WW&PLASTIC RAIL
48"
W
W&
WD RAIL
WALL
12’ CONC
SCRUB
SCRUB
SCRUB
P
OND
WE
.8
8
4
.6
DI
DI
DI
DI
DI
DI
DI
18"
R
C
P
11’ CONC
12’ CONC
12’ CONC
15"
H
D
P
E
DI
POOL HOUSECONC
L
T
L
T
L
T
B
K
B
K
W/LT
48" CONC
4
8
"
W
W
&
1S
B
W
B
S
T
36" WW&1SBW
10
’ B
S
T
T
E
N
N
I
S
C
O
U
R
T
S
S
CONCCONC
CONCCONCCONC
1
5
"
R
C
P
LT
1
2
’
C
H
L 12’ CHL
P
L
A
N
T
E
R
S
S
OIL
WALL36" WD
T
T
EOI 8" DI8" DI8" DI
6
"
D
I
2
"
P
L
(
A
T
U
R
)
(
A
T
U
R
)
CAT-1GRAU-350
GRAU-350
CAT-1
GRAU 350 TL-3TYPE B-77
CB
18"
R
C
P
F
E
S
3
0"
R
C
P
F
E
S
18
"
C
M
P
CB
18" R
C
P
FES
FES
18"
R
C
P
U
N
K
N
O
W
N
S
IZ
E
/
T
Y
P
E
CB
CB
CB
CB
CB CB
CB
DI
UNKNOWNSIZE/TYPE
1
8
"
R
C
P
18" RCP
18
" R
C
P
UNKNOWN
SIZE/TYPE
1
8
"
R
C
P
18" RCP
18" RCPFES
15" PLASTIC
15" PLA
STIC
FES
15"
P
L
A
S
TI
C
LT
SHEET 49 OF 64
PERMIT DRAWING
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 29
K KK
K
K KKKKK
K
KKKK
K
KK
KK
KKKK
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
13
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
3
0
j
h
a
r
v
e
y
8
/
1
7
/
9
9
30U-2579B
M
A
T
C
H
LIN
E
-
Y
4
-
S
T
A
.
1
3
7
+
3
2
S
H
E
E
T
2
9
NOTE :
1. FOR -Y4EB- PROFILE, SEE SHEET 54
2. FOR -Y4WB- PROFILE, SEE SHEET 59
PAVED SHOULDER
14
0
14
5
15
0
-Y6- POT STA. 10+00.00
-Y5A- POC STA. 77+61.41 =
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
F
F
F
F
F
F
C
FF
F
F
F
65.00’+50.00 -Y5A-
FS
ELBELBOW
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
DAYLIGHT
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 138+00 TO 140+50 -Y4- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 140+48 TO 141+20 -Y4- RT
SEE DETAIL#14
W/ 386 SY FF
EST. 156 TONS
LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
EST. DDE 25CY
SEE DETAIL#8
TAIL DITCH
EST. 3 TONS
CLASS ’B’ RIP RAP
18
"
R
C
P
-III
EXIST. 18" CMP
REMOVE 8ft OF
18" CSP
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/ 15" RCP-IV
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
PSH
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
STA 139+00 TO 140+00 -Y4- LT
W/ROCK PLATING
1.5:1 FILL SLOPES
STA 142+00 TO 142+50 -Y4- LT
W/ ROCK PLATING
1.5:1 FILL SLOPES
142+00 -Y4- LT
STA 140+00 TO
W/ROCK PLATING
1:1 FILL SLOPES
EST 7 SY FF
EST 2 TONS
OF PIPE AND WLB
PLACE BETWEEN END
CLASS ’B’ RIPRAP
30" TYPE UNKNOWN
3
0
"
T
Y
P
E
U
N
K
N
O
W
N
3
0
" T
Y
P
E
U
NKNO
WN
8
"
T
Y
P
E
U
N
K
N
O
W
N
MT
L
S
MTL
MTL
MTL
MTL
I-40 BUS EAST US 421 SOUTH 24’ BST
MTL
MTL
MTL
MTL
DI
FES
DIDI
18" RCP
DI
18" RCP
18" CMP
18
"
C
M
P
18" R
C
P
OL
D
WO
O
D L
A
NE 20’ BST
1SB
K
D
1SB
K
D
1SBKD
1SBKD
CONCG
R
S
S
G
S
S
48" CONC
18’ CONC
B
K
B
K
18’
C
O
N
C
S
6
0
" C
HL
W/
LT
MTL
MTL
MTL
GR
S
S
CURB
W/LT
W/LT
W/LT
W
D
D
K
W
D
D
K
1SB
K
D
C
O
NC
36"
8’ B ST
12
" R
C
P
12
" R
C
P
60" WW&1SBW
BST
BST
BST
4-10’X12’ CONC
S
A
L
E
M
C
R
E
E
K
S
ALE
M
C
R
E
E
K
60" WW&1SBW
60" WW&1SBW
8’ B
ST
I-40 BUS WEST US 421 NORTH 24’ BST
BK
B
K10’
B
S
T
SBST
BST
60" WW&1SBW
GRAU-350
TIE TO EXISTING
PROP. GUARDRAIL
50:1 TRANSITION
30:1 TAPER
TYPE B-77
4
-
10
X
12
B
A
R
R
E
L
S
18
"
C
M
P
18
"
R
C
P
CB CB
18
"
C
M
P
FES
18" R
C
P
CB CB
CUL1CUL2
CUL3CUL4
CUL5CUL7
CUL6
CUL8
CUL9
CUL11 CUL12
CUL13
CUL14
CUL15 CUL16CUL10
CE2
HW2
CE1
CITY OF WINSTON-SALEM
CITY OF WINSTON-SALEM
EIP
EIP
EIP
EIP
EIP
EIP
EIP
2
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60.00’E
XISTIN
G R/
W
6
0.
0
0’
E
XIS
T
ING R
/W
R/W MON
E
XISTIN
G R/
W
LINDA M. MORRELL
NORMAN G. MORRELL
GERALD W. MCGEE
JENNIFER WILLIAMS
MACK D. WILLIAMS
CAROL PERRY
FRANK J. PERRY JR.
PEGGY PAULINE GUNN
TOMMY MILLS GUNN
G.P. S
WISHER HEIRS
THE FORSYTH COUNTY BOARD OF EDUCATION
C
IT
Y
O
F
WIN
S
T
O
N
-S
A
L
E
M
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
CITY OF WINSTON-SALEM
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
TOWN OF KERNERSVILLE
F
O
R
S
Y
T
H
C
O
U
N
T
Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
3
0
’ S
A
NIT
A
R
Y
S
E
WE
R
E
A
S
E
ME
NT
;
;
3
0
’ S
A
NIT
AR
Y S
E
WE
R
E
AS
E
ME
NT
SHEET 50 OF 64
PERMIT DRAWING
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
SITE 29
800
80080
0
8
0
0
8
0
0
800
800
8
0
0
80
0
8
0
0
800
8
0
0
8
0
0
800
8
0
0
800
800
8
0
0
810
8
1
0
810
8
1
0
810
810
810
810
810810810
810810
810
8
1
0
8
1
0
810
810
8
1
0
8
10
8
10
8
10
8
1
0
8
10
810
810 810 810
810 810 810
810
81
0
82
0
8
2
0
820
8
2
0
820
820
820
820
820820820820820
820
820
820
8
2
0
8
2
0
820
8
2
0
8
2
0
8
2
0
8
2
0
8
2
0
820
820
820
82
0
820
820
820
820
820 820
820
820
820 820 820
820
820
820
8
3
0
8
3
0
83
0
830
830
8
3
0
8
3
0
830
830
830
8
3
0
8
3
0
830
830
8
3
0
83
0
8
3
0
8
3
0
830
830
8
30
830
8
4
0
8
4
0
8
4
0
840
840
840
840
840
8
4
0
8
4
0
8
4
0
840
8
4
0
840
8
5
0
8
5
0
8
5
0
85085
0
85
0
85
0
8
6
0
8
6
0
8
60860
8
60
860
K KK
K
K KKKKK
K
KKKK
K
KK
KK
KKKK
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
IS
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
9
/
19
/
2
0
1
3
u
2
5
7
9
b
_
h
y
d
_
p
r
m
_
w
e
t
_
p
s
h
3
0
_
c
o
n
j
h
a
r
v
e
y
8
/
1
7
/
9
9
30U-2579B
M
A
T
C
H
LIN
E
-
Y
4
-
S
T
A
.
1
3
7
+
3
2
S
H
E
E
T
2
9
NOTE :
1. FOR -Y4EB- PROFILE, SEE SHEET 54
2. FOR -Y4WB- PROFILE, SEE SHEET 59
PAVED SHOULDER
14
0
14
5
15
0
-Y6- POT STA. 10+00.00
-Y5A- POC STA. 77+61.41 =
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
F
F
F
F
F
F
C
FF
F
F
F
65.00’+50.00 -Y5A-
FS
ELBELBOW
Conv. OTCB To 2GI
FS
RETAIN AND EXTEND
DAYLIGHT
EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’EST 10 SY FF
EST 3 TONS
RIP RAP
CLASS ’B’
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FROM STA 138+00 TO 140+50 -Y4- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FROM STA. 140+48 TO 141+20 -Y4- RT
SEE DETAIL#14
W/ 386 SY FF
EST. 156 TONS
LATERAL ’V’ DITCH W/ CLASS ’B’ RIP RAP
EST. DDE 25CY
SEE DETAIL#8
TAIL DITCH
EST. 3 TONS
CLASS ’B’ RIP RAP
18
"
RC
P
-III
EXIST. 18" CMP
REMOVE 8ft OF
18" CSP
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/
FLAT GRATE
2GI W/ 15" RCP-IV
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
PSH
CONNECTORS
AND ROD AND LUG
15" CSP W/2 ELBOWS
STA 139+00 TO 140+00 -Y4- LT
W/ROCK PLATING
1.5:1 FILL SLOPES
STA 142+00 TO 142+50 -Y4- LT
W/ ROCK PLATING
1.5:1 FILL SLOPES
142+00 -Y4- LT
STA 140+00 TO
W/ROCK PLATING
1:1 FILL SLOPES
EST 7 SY FF
EST 2 TONS
OF PIPE AND WLB
PLACE BETWEEN END
CLASS ’B’ RIPRAP
30" TYPE UNKNOWN
3
0
"
T
Y
P
E
U
N
K
N
O
W
N
3
0
" T
Y
P
E
UN
K
NO
WN
8
"
T
Y
P
E
U
N
K
N
O
W
N
MT
L
S
MTL
MTL
MTL
MTL
I-40 BUS EAST US 421 SOUTH 24’ BST
MTL
MTL
MTL
MTL
DI
FES
DIDI
18" RCP
DI
18" RCP
18" CMP
18
"
C
M
P
18 " R
C
P
OL
D
WO
O
D L
A
N
E 20’ BST
1SB
KD
1SB
K
D
1SBKD
1SBKD
CO
NCG
R
S
S
G
S
S
48" CONC
18’ CONC
B
K
B
K
18’
C
ON
C
S
6
0
" C
HL
W/
LT
MTL
MTL
MTL
GR
S
S
CURB
W/LT
W/LT
W/LT
W
D
DK
W
D
D
K
1SB
K
D
C
O
N
C
36"
8’ B ST
12
" RC
P
12
" RC
P
60" WW&1SBW
BST
BST
BST
4-10’X12’ CONC
S
A
L
E
M
C
R
E
E
K
S
ALE
M
C
R
E
E
K
60" WW&1SBW
60" WW&1SBW
8’ B
ST
I-40 BUS WEST US 421 NORTH 24’ BST
BK
B
K10’
B
S
T
SBST
BST
60" WW&1SBW
GRAU-350
TIE TO EXISTING
PROP. GUARDRAIL
50:1 TRANSITION
30:1 TAPER
TYPE B-77
4
-
10
X
12
B
A
R
R
E
L
S
18
"
C
M
P
18
"
R
C
P
CB CB
18
"
C
M
P
FES
18" R
C
P
CB CB
CUL1CUL2
CUL3CUL4
CUL5CUL7
CUL6
CUL8
CUL9
CUL11 CUL12
CUL13
CUL14
CUL15 CUL16CUL10
CE2
HW2
CE1
CITY OF WINSTON-SALEM
CITY OF WINSTON-SALEM
EIP
EIP
EIP
EIP
EIP
EIP
EIP
2
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60.00’E
XISTIN
G R/
W
6
0.
00
’
E
XIS
T
ING
R
/W
R/W MON
E
XISTIN
G R/
W
LINDA M. MORRELL
NORMAN G. MORRELL
GERALD W. MCGEE
JENNIFER WILLIAMS
MACK D. WILLIAMS
CAROL PERRY
FRANK J. PERRY JR.
PEGGY PAULINE GUNN
TOMMY MILLS GUNN
G.P. S
WISHER HEIRS
THE FORSYTH COUNTY BOARD OF EDUCATION
C
IT
Y
O
F
WIN
S
T
ON
-S
A
L
E
M
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
CITY OF WINSTON-SALEM
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
TOWN OF KERNERSVILLE
F
O
R
S
Y
T
H
C
O
U
N
T
Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
3
0
’ S
AN
IT
A
R
Y
S
E
WE
R
E
A
S
E
ME
NT
;
;
3
0
’ S
AN
IT
AR
Y S
E
WE
R
E
AS
E
ME
NT
CLEARING
MECHANIZED
FILL IN WETLAND
WATER POND
IMPACTS IN SURFACE
SITE 7
SHEET 51 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
1
_
L
5
2
7
L
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
880 880
890 890
900 900
910 910
870 870
526+50.0000
880 880
890 890
900 900
910 910
870 870527+00.0000
880 880
890 890
900 900
910 910
870 870
527+50.0000
880 880
890 890
900 900
910 910
870 870
528+00.0000
X-180U-2579B
-L-
5 10
881.24
0.021
2:1
S.S. 880.310
D.P. 903.163
6
:1 6:1
877.85
0.021
2:1
S.S. 878.233
D.P. 902.638
6
:1 6:1
877.85
0.021
2:1
S.S. 886.117
D.P. 902.113
6
:1 6:1
2:12:
1
880.10
3.0
880.38
0.021
2:1
S.S. 886.315
D.P. 901.588
6
:1 6:1
2:12:
1
880.22
3.0
WATER POND
IMPACTS IN SURFACE SITE 7
SHEET 52 OF 64
PERMIT DRAWING
00
00
1010
1010
20
20
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
290
290
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
2
_
L
5
2
7
R
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
880 880
890 890
900 900
910 910
870 870525+50.0000
880 880
890 890
900 900
910 910
870 870526+00.0000
880 880
890 890
900 900
910 910
870 870526+50.0000
880 880
890 890
900 900
910 910
870 870527+00.0000
X-30U-2579B
-L-
5 10
887.31
2:
1
S.S. 877.852
0.021
D.P. 904.213
6
:1 6:1
884.84
2:
1
S.S. 877.852
0.021
D.P. 903.688
6
:1 6:1
881.24
2:
1
S.S. 879.631
0.021
D.P. 903.163
6
:1 6:1
877.85
2:
1
S.S. 877.852
0.021
D.P. 902.638
6
:1 6:1
SHEET 53 OF 64
PERMIT DRAWING
FILL IN WETLAND
SITE 13
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
3
_
L
6
2
1
R
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
830 830
840 840
850 850
860 860
870 870
880 880
820 820
620+00.0000
830 830
840 840
850 850
860 860
870 870
880 880
820 820
620+50.0000
830 830
840 840
850 850
860 860
870 870
880 880
820 820
621+00.0000
X-97U-2579B
-L-
5 10
835.13
L
0.021
D.P. 868.507
6
:1 6:1
4
:1
- Y4RPBD -
STA 19+88.3503
ELEV. 856.187
-Y4RPBD- 19+54.0000
-L- 620+00.0000
S.P. 58
836.19
L
0.021
D.P. 868.360
6
:1 6:1
4
:1
- Y4RPBD -
STA 20+41.3720
ELEV. 854.934
-Y4RPBD- 20+00.0000
-L- 620+50.0000
S.P. 59
844.36
L
0.021
D.P. 868.351
6
:1 6:1
4
:1
- Y4RPBD -
STA 20+94.7573
ELEV. 854.175
-Y4RPBD- 20+45.0000
-L- 621+00.0000
S.P. 60
FILL IN WETLAND
SITE 13
SHEET 54 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
4
_
Y
4
R
P
B
D
-
2
1
0
0
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
820 820
830 830
840 840
850 850
860 860
870 870
880 880
810 810
20+89.0000
830 830
840 840
850 850
860 860
870 870
880 880
820 82021+34.0000
X-547U-2579B
-Y4RPBD-
5 10
824.01
0.050 0.050
y4rpbd
ELEV. 853.863
-L- 621+50.0000
-Y4RPBD 20+89.0000
4:1
D.P. 846.692
4
:
1
S.P. 61
S.S. 826.097
2:
1
830.13
2:
1
S.S. 824.953
0.048 0.048
4:1
y4rpbd
S.S. 843.290
IMPACTS TO SURFACE WATER POND
SITE 15
SHEET 55 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
5
_
L
6
3
8
L
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
840 840
850 850
860 860
870 870
880 880
890 890
900 900
910 910
920 920
930 930
830 830
638+00.0000
X-278U-2579B
-L-
5 10
280290300310320330340
860
870
880
890
350360
M
A
T
C
H
LI
N
E
A
M
A
T
C
H
LIN
E
A
847.58
0.021 0.021 0.021
D.P. 906.565
0.091 0.090
9
0
5
.
3
8
4.667:1
- Y4CD -
STA 42+14.890218
6:1
D.P. 906.374
0.030
- Y4LPA -
STA 12+36.0460
6
:1 6:16
:1
IMPACTS TO SURFACE WATER POND
FILL IN WETLAND
SITE 15
SHEET 56 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
6
_
L
6
3
8
R
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
850 850
860 860
870 870
880 880
890 890
900 900
910 910
920 920
930 930
940 940
950 950
840 840
637+50.0000
850 850
860 860
870 870
880 880
890 890
900 900
910 910
920 920
840 840
638+00.0000
X-114U-2579B
-L-
5 10
280 290 300
870
880
890
S.S. 877.459
310 320 330 340
M
A
T
C
H
LI
N
E
A
M
A
T
C
H
LI
N
E
A
847.77
0.021
D.P. 905.280
4
:1
4:1
D.P. 895.634
6
:1 6:1
-L- 637+50.0000
ELEV. 896.628
S.P. 82
-Y4LPB- 13+29.0000
847.58
0.021
D.P. 906.565
9
0
3
.
2
1
5
.967
:1
0.078
0.0764
:1 4:1
D.P. 901.522
- Y4LPB -
STA 13+14.1394
6
:1 6:1
ELEV. 902.013
-L- 638+00.00
-Y4LPB- 13+29.00
SP 155
WATER POND
IMPACTS IN SURFACE
SITE 16
SHEET 57 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
7
_
Y
4
-
8
9
0
0
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
860 860
870 870
880 880
890 890
900 900
910 910
920 920
850 850
88+50.0000
860 860
870 870
880 880
890 890
900 900
910 910
920 920
850 850
89+00.0000
X-417U-2579B
-Y4-
5 10
893.45
0.021 0.021 0.021
D.P. 893.279
4
:
1 5.034:1
- Y4EB -
STA 88+50.0000 STA 88+50.0000
- Y4LPD -
STA 24+59.5689
0.0248
9
5
.
3
8
S.S. 865.342
4:1
893.32
0.021 0.021 0.021
4:1
0.021
D.P. 893.233
4
:
1 5.037:1
- Y4EB -
STA 89+00.0000 STA 89+00.0000
3
:
1
875.122
ELEV. 893.117
-Y4EB- 89+00.00
-L- 644+50.00
S.P. 103
FILL IN WETLAND
SITE 19
SHEET 58 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
8
_
L
6
6
8
5
0
L
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
840 840
850 850
860 860
870 870
880 880
890 890
830 830668+00.0000
840 840
850 850
860 860
870 870
880 880
890 890
830 830668+50.0000
840 840
850 850
860 860
870 870
880 880
830 830
669+00.0000
X-303U-2579B
-L-
5 10
840.18
0.040 0.040
0.050
D.P. 860.431
- Y4CD -
STA 72+40.863283
7
:1 6:1
2:1
D.P. 862.786
7
.62:1
7.62:1
- NWCD2 -
STA 14+57.55
840.71
0.040 0.040
0.050
D.P. 859.084
- Y4CD -
STA 72+92.116637
7
:1 6:1
2:1
D.P. 861.278
6
.51:1 6.51:1
- NWCD2 -
STA 15+15.29
844.28
0.040 0.040
0.050
D.P. 857.872
- Y4CD -
STA 73+43.368547
6:1
D.P. 859.983
7
:1 6:14:1 6:1
S.S. 857.983
4
:1
853.690
- NWCD2 -
STA 16+02.77
FILL IN WETLAND
SITE 19
SHEET 59 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
0
9
_
L
6
6
8
5
0
R
T
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
840 840
850 850
860 860
870 870
830 830
667+00.0000
840 840
850 850
860 860
870 870
830 830
667+50.0000
840 840
850 850
860 860
870 870
830 830
668+00.0000
840 840
850 850
860 860
870 870
830 830
668+50.0000
X-131U-2579B
-L-
5 10
835.35
2:
1
S.S. 840.357
0.050
D.P. 863.532
7
:1 6:1
839.91
2:
1
S.S. 839.614
0.050
D.P. 861.914
7
:1
6:1
840.18
2:
1
S.S. 838.965
0.050
D.P. 860.431
7
:1 6:1
840.71
2:
1
S.S. 840.159
0.050
D.P. 859.084
7
:1 6:1
FILL IN WETLAND
SITE 22
SHEET 60 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
1
0
_
Y
4
-
4
0
5
0
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
870 870
880 880
890 890
900 900
860 86039+50.0000
860 860
870 870
880 880
890 890
900 900
850 850
40+00.0000
860 860
870 870
880 880
890 890
900 900
850 85040+50.0000
X-389U-2579B
-Y4-
5 10
877.41
0.021 0.021 0.021
S.S. 874.635
0.021
D.P. 877.300
4
.
2
1
3
:1
5:1
5:1
- Y4EB -
STA 39+50.0000 STA 39+50.0000
876.11
0.021 0.021 0.021
S.S. 866.974
0.021
D.P. 875.927
4
.
2
1
6
:1
5:1
4:1
- Y4EB -
STA 40+00.0000 STA 40+00.0000
874.63
0.021 0.021 0.021
S.S. 854.844
0.021
D.P. 874.580
4
.
2
0
7
:1
5:1
3:1
- Y4EB -
STA 40+50.0000 STA 40+50.0000
WATER POND
IMPACTS IN SURFACE
SITE 26
SHEET 61 OF 64
PERMIT DRAWING
00
00
1010
1010
2020
2020
30
30
40
40
50
50
60
60
70
70
80
80
90
90
100
100
110
110
120
120
130
130
140
140
150
150
160
160
170
170
180
180
190
190
200
200
210
210
220
220
230
230
240
240
250
250
260
260
270
270
280
280
9
/
19
/
2
0
13
U
2
5
7
9
B
_
H
y
d
_
p
r
m
_
w
e
t
_
x
p
l
_
1
1
_
Y
4
-
1
0
4
0
0
j
h
a
r
v
e
y
8
/
2
3
/
9
9
PROJ. REFERENCE NO.SHEET NO.0
880 880
890 890
900 900
910 910
870 870
103+50.0000
880 880
890 890
900 900
910 910
870 870
104+00.0000
880 880
890 890
900 900
910 910
870 870104+50.0000
860 860
870 870
880 880
890 890
900 900
910 910
850 850
105+00.0000
X-427U-2579B
-Y4-
5 10
883.31
0.021 0.021 0.021
882.242
6:1 0.021
D.P. 883.267
4
:
1 6.196:1
4
:
1
- Y4EB -
STA 103+50.0000 STA 103+50.0000
ELEV. 885.136
-Y4RPC- 29+57.00
-Y4EB- 103+50.00
S.P. 116
883.17
0.021 0.021
881.909
6:1 0.021
D.P. 882.896
4
:
1 6.399:1
4
:
1
- Y4EB -
STA 104+00.0000 STA 104+00.0000
ELEV. 883.452
-Y4RPC- 30+06.00
-Y4EB- 104+00.00
S.P. 117
882.03
0.021 0.021 0.021
D.P. 882.531
4
:
1 6.484:1
- Y4EB -
STA 104+50.0000 STA 104+50.0000
5:15
:
1
ELEV. 882.876
-Y4RPC- 30+55.00
Y4EB- 104+50.00
S.P. 118
882.14
0.021 0.021 0.021
D.P. 882.269
4
:
1 6.437:1
- Y4EB -
STA 105+00.0000 STA 105+00.0000
- Y4RPC -
STA 31+01.1294
0.048 0.048
4
:
1 6:1
4:1
- NWY41 -
STA 11+47.20
Hand Existing Existing
PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural
Site Station Structure Fill InFill Inin Clearingin SW SWImpactsImpactsStream
No.(From/To)Size / Type WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 28+00 -Y1-ROAD FILL 0.03 < 0.010.02 0.02 142
216+00 -Y1RPD-ROAD FILL - INTERMITTENT 0.01 109
ROAD FILL - PERENNIAL 0.02 208
STREAMBANK STABILIZATION < 0.01< 0.011037
321+56-25+22 -Y1-2 @ 7'x6' RCBC 0.06< 0.0143833
3A17+36-21+53 -Y1-DETOUR - ROAD FILL 0.08 545
3B20+55-21+32 -Y1-DETOUR - ROAD FILL 0.03 194
4501+51-503+21 -L-ROAD FILL 0.03< 0.0149318
STREAMBANK STABILIZATION < 0.01< 0.019 31
5503+85-507+80 -L-ROAD FILL 0.05< 0.0174022
5A507+39-509+64 -L-ROAD FILL 0.01 306
6 523+00 -L-ROAD FILL 0.03 < 0.01 0.02< 0.0131242
7 527+00 -L-ROAD FILL 0.52 0.01
ROAD FILL-POND 0.59
8 559+75 -L-2 @ 10'x6' RCBC 0.06< 0.0144253
STREAMBANK STABILIZATION < 0.01< 0.015844
9 560+75 -L-ROAD FILL 0.03 0.01
10560+50-568+74 -L-ROAD FILL 0.01 0.07< 0.0178322
10A566+84-572+75 -L-ROAD FILL 0.05 684
11 615+00 -L-3 @ 10'x9' RCBC 0.430.0280857
11A19+76-21+44 -Y4RPBD-CHANNEL CHANGE 0.080.0122341
1215+84-18+86 -Y4RPBD-CHANNEL CHANGE 0.010.0288205
SUBTOTALS*:0.62 < 0.01 0.05 1.530.1958531344
*Rounded totals are sum of actual impacts
NOTES:
ATN Revised 3/12/13 SHEET 62 OF 64
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
10-29-13
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
U-2579B FORSYTH COUNTY
WINSTON SALEM NORTHERN BELTWAY
(EASTERN SECTION) (FUTURE I-74)
Hand Existing Existing
PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural
Site Station Structure Fill InFill Inin Clearingin SW SWImpactsImpactsStream
No.(From/To)Size / Type WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1320+00-21+40 -Y4RPBD-ROAD FILL 0.33
14629+95-635+90 -L-ROAD FILL 0.04 0.05 688
15636+32-641+55 -L-ROAD FILL 0.18 0.04 332
ROAD FILL-POND 2.38
15A644+00-645+00 -L-ROAD FILL < 0.01 108
16643+56-644+61 -L-ROAD FILL < 0.01 104
ROAD FILL-POND 0.16
17663+65-667+00 -L-ROAD FILL 0.09 < 0.01 0.06 928
18 667+15 -L-3 @ 12'x10' RCBC 0.060.0237767
STREAMBANK STABILIZATION 0.020.018059
19 668+50 -L-ROAD FILL 0.47 0.01
20687+80-691+59 -L-ROAD FILL 0.03 163
ROAD FILL-POND 0.85 450
21 22+50 -Y1-ROAD FILL 0.02
22 40+50 -Y4-OUTLET PAD 0.01
23 45+65 -Y4-CULVERT EXTENSION 0.060.0110032
STREAMBANK STABILIZATION 0.020.015421
23A44+95-45+18 -Y4-ROAD FILL < 0.01 57
23B45+07-46+34 -Y4-ROAD FILL 0.01 135
2480+73-81+57-Y4RPBD-ROAD FILL 0.02 202
24A80+50-81+51-Y4RPBD-ROAD FILL 0.06
2537+31 -Y4RPA-30" RCP < 0.01 73
STREAMBANK STABILIZATION < 0.01< 0.012116
SUBTOTALS*:1.20 0.02 3.770.053422195450
*Rounded totals are sum of actual impacts
NOTES:
ATN Revised 3/12/13 SHEET 63 OF 64
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
10-29-13
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
U-2579B FORSYTH COUNTY
WINSTON SALEM NORTHERN BELTWAY
(EASTERN SECTION) (FUTURE I-74)
Hand Existing Existing
PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural
Site Station Structure Fill InFill Inin Clearingin SW SWImpactsImpactsStream
No.(From/To)Size / Type WetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
2629+16-31+12 -Y4RPC-ROAD FILL-POND 0.38
27A104+62 - 107+53 -Y4-ROAD FILL 0.02 205
27B107+60 -Y4-42" WELDED STEEL0.05 0.01< 0.0113014
27C107+58 - 108+44 -Y4-30" RCP < 0.01 116
28 54+65 -Y4-STREAMBANK STABILIZATION < 0.01 25
29145+62 -Y4-ROAD FILL < 0.01
30 64+34 -Y4-STREAMBANK STABILIZATION < 0.01 28
31 557+28 -L-STREAMBANK STABILIZATION < 0.01 21
SUBTOTALS*:0.05 < 0.01 0.42< 0.0152514
SUBTOTALS FROM PAGE 1*:0.62 < 0.01 0.05 1.530.1958531344
SUBTOTALS FROM PAGE 2*:1.20 0.02 3.770.053422195450
TOTALS*:1.87 < 0.01 0.08 5.720.2498001553450
*Rounded totals are sum of actual impacts
NOTES:
ATN Revised 3/12/13 SHEET 64 OF 64
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
10-29-13
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
U-2579B FORSYTH COUNTY
WINSTON SALEM NORTHERN BELTWAY
(EASTERN SECTION) (FUTURE I-74)
2
5
D
H
V
D T V
======
6
0
1
8
%%M
P
H
A
D
T
A
D
T
2
0
3
0
%
*
0 0 0
P
R
O
F
I
L
E
(
H
O
R
I
Z
O
N
T
A
L
)
34839.2.10 34839.2.5 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTIONPRELIMINARY PLANS
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
STATESTATE PROJECT REFERENCE NO.STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTIONNO.TOTAL SHEETS N.C.SHEET1
D
E
S
I
G
N
D
A
T
A
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA P.E.SIGNATURE:SIGNATURE:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
0
6
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
PROJECT ENGINEER PROJECT DESIGN ENGINEER
G
R
A
P
H
I
C
S
C
A
L
E
S
P
L
A
N
S
P
R
O
F
I
L
E
(
V
E
R
T
I
C
A
L
)
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
0 00
S
e
e
S
h
e
e
t
1
-
A
F
o
r
I
n
d
e
x
o
f
S
h
e
e
t
s
13-DEC-2013 15:05
R:\Roadway\Proj\u2579b_rdy_tsh.dgn
$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CONTRACT: C203484
STATE HIGHWAY DESIGN ENGINEERDEPARTMENTOFTRANSPORTATIONSTATEOFNORTHCAROLINA
F
O
R
S
Y
T
H
C
O
U
N
T
Y
TIP PROJECT: U-2579B
U-2579B
1
0
7
0
LEE ANN MOORE
V
I
C
I
N
I
T
Y
M
A
P
N
orf
olk
S
o
uth
er
n
%
%
(6
6
(6
6
.15
POTSta. 160+23.40
B
E
G
.
P
R
O
J
.
U
-
2
5
7
9
B
E
N
D
.
P
R
O
J
.
U
-
2
5
7
9
B
5
0
5
0
1
0
0
5
0
2
5
5
0
1
0
0
1
0
2
0
1
0
5
-Y2-
-Y1-
-Y2A-
-Y3-
-Y4-SMITH CREEK -L- STA 692+32.98-Y5-TONY HOUSER, PE
T
O
T
A
L
L
E
N
G
T
H
O
F
P
R
O
J
E
C
T
U
-
2
5
7
9
B
=
4
.
0
6
M
i
l
e
s
.
*
T
T
S
T
1
2
%
D
U
A
L
6
%
S
e
e
S
h
e
e
t
1
-
B
F
o
r
C
o
n
v
e
n
t
i
o
n
a
l
S
y
m
b
o
l
US 158
W
A L K E R T O W
N
M
O R R IS R D .
US-421 / I-40 BUS.TO GREENSBORO
W
IL
L
IS
T
O
N R
D.
O
L
D
B
E
L
E
W
S
C
R
E
E
K
R
D
REIDSVILLE RD
O
L
D
B
E
L
E
W
S
C
R
E
E
K
R
D
R
IC
K
A
R
D
R
D
.
LAMOND DR.
W
R
AN
G
LE
R
D
R
.
O LD HOLLOW RD.
HO PKIN S RD
BLUFF SC
H
O
OL R
D
ELLIO T D R
DOE RUN DR.
LIN VILLE RD
K
E
R
N
E
R
S
VI
L
L
E
R
D
S
C
H
O
O
L
R
D
O
L
D
V
A
L
L
E
Y
R
AIL
R
O
A
D
W
E
S
T
M
O
U
N
T
AI
N S
T
O
F
W
A
L
K
E
R
T
O
W
N
A
N
D
K
E
R
N
E
R
S
V
I
L
L
E
A
P
O
R
T
I
O
N
O
F
T
H
I
S
P
R
O
J
E
C
T
I
S
W
I
T
H
I
N
T
H
E
M
U
N
I
C
I
P
A
L
B
O
U
N
D
A
R
I
E
S
CITY
LIMIT
C
I
T
Y
LIMIT
C
ITY
C
I
T
Y
LIMIT
K
E
R
N
E
R
SVILLE
K
E
R
N
E
R
S
V
ILLE
CITY
LIM IT
LIMIT
KE
R
NE
RS
VILLE
KERNERSVILLE
CITY
KERNERSVILLECITY
L
IM
IT
W
AL
KE
R
T
OW
N
CITY
L
IM
IT
W
A
LKE
R
T
O
W
N
WALKERTOWN
C
I
T
Y
LIM
IT
C
I
T
Y
LIMIT
K
E
R
N
E
R
S
VI
L
L
E
LIMIT
KERN ERSVILLE
CITY
K
E
RN
ERS
VI
LLE
CI
T
Y
LI
MI
T
W
A
LK
ERTO
W
N
CI
TY
LI
MI
T
W
A
LK
ERTO
W
N
LIM IT
KERNERSVILLECITYLIMIT
C
ITY
LIM
IT
K
ERN
ERSV
ILLE
A B CD
S
A
L
E
M
T
O
WI
NS
T
O
N
-
L
-
S
T
A
4
7
8
+
0
0
.
0
0
CI
TY
LI
MI
T
A
D
CITY LIMITKERNERSVILLE-Y5- STA. 26+62.28BEGIN BRIDGE -Y5- STA. 30+97.13END BRIDGE 34839.1.1N/APE
R O A D
G U T H R IE
CITYLIMIT
KERNERSVILLE
RAILROAD
SOUTHERN
NORFOLK
RO
A
D
M
O
U
N
TAI
N
W
ES
T
-Y3-
-
Y2
A-
HASTINGS HILL RD
SR 2687
HASTING S HILL RD
SR 2687
P
IS
G
AH C
H
U
R
C
H
R
D
S
R
2
41
0
W
E
S
T
M
O
U
N
T
AI
N
R
D
S
R 2
3
7
7
M O RR IS R O AD
SR 2407
G
UT
H
RIE R
D.W
AL
KERT
O
W
N
SR 2385
-
L
-
S
T
A
.
6
4
1
+
7
0
.
8
2
B
E
G
I
N
B
R
I
D
G
E
-
Y
2
-
S
T
A
.
1
8
+
9
9
.
2
5
B
E
G
I
N
B
R
I
D
G
E
-
Y
2
-
S
T
A
.
2
1
+
4
1
.
1
8
E
N
D
B
R
I
D
G
E
-Y4CD- STA. 45+76.53BEGIN BRIDGE
-
Y
1
-
S
T
A
.
3
2
+
9
3
.
7
7
B
E
G
I
N
B
R
I
D
G
E
-
Y
1
-
S
T
A
.
3
5
+
2
6
.
3
4
E
N
D
B
R
I
D
G
E
CREEK MARTIN MILL
CREEKMILL
CREEK RD.
BELEWS
RO
A
D
C
H
U
RCH
PI
S
G
A
H
HASTINGS HILL RD 3116
23
24 25 17
4
5
20
21
6
7
22
8
9
1
0
1
1
12
13 14 15 191829 30282726
2
0
1
0
5
3
,
5
6
0
7
9
,
8
8
0
-
Y
7
-
-Y5A--Y5A- POT Sta. 45+00.00 LA-Y5- POT Sta. 45+00.00 LB =IDENTITY
%
W
I
N
S
T
O
N
S
A
L
E
M
N
O
R
T
H
E
R
N
B
E
L
T
W
A
Y
(
E
A
S
T
E
R
N
S
E
C
T
I
O
N
)
(
F
U
T
U
R
E
I
-
7
4
)
F
R
O
M
U
S
1
5
8
T
O
I
-
4
0
B
U
S
/
U
S
4
2
1
W
I
D
E
N
I
N
G
,
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
,
S
I
G
N
I
N
G
,
S
I
G
N
A
L
S
,
C
U
L
V
E
R
T
S
A
N
D
S
T
R
U
C
T
U
R
E
S
.
T
O
U
S
3
11
B
E
G
.
P
R
O
J
.
U
-
2
5
7
9
B
R O A D K ER N ER SV ILLE TOEND PROJ. U-2579B ENGINEER HYDRAULICS ENGINEERDESIGNROADWAY
W
I
N
S
T
O
N
-
S
A
LE
M
N
O
RTHERN BELTWAY
-
L
-
(
F
U
T
U
R
E I-
7
4)
W
A
L
K
E
R
T
O
W
N
CI
TY
LIMIT
WALKERTO
WN
CIT
Y
LI
MIT
-
Y
2
-
O
F
F
-
S
I
T
E
D
E
T
O
U
R
R
O
U
T
E
GERRY DR.-Y6-
C
R
E
E
K
M
A
R
T
I
N
M
I
L
L
C
R
E
E
K
M
A
R
T
I
N
M
I
L
L
-
L
-
S
T
A
.
5
5
5
+
7
3
.
0
0
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
5
5
7
+
9
8
.
0
1
E
N
D
B
R
I
D
G
E
-Y4RPA- STA. 15+19.24BEGIN BRIDGE -Y4RPA- STA. 19+00.50END BRIDGE -Y4CD- STA. 31+63.73BEGIN BRIDGE -Y4CD- STA. 34+68.98END BRIDGE
-
L
-
S
T
A
.
6
2
7
+
1
3
.
7
8
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
6
3
0
+
1
8
.
7
4
E
N
D
B
R
I
D
G
E
-
Y
4
R
P
B
D
-
S
T
A
.
2
5
+
4
0
.
0
0
B
E
G
I
N
B
R
I
D
G
E
-
Y
4
R
P
B
D
-
S
T
A
.
2
7
+
8
0
.
0
0
E
N
D
B
R
I
D
G
E
-Y4CD- STA. 47+88.32END BRIDGE
-
L
-
S
T
A
.
6
4
3
+
8
2
.
6
4
E
N
D
B
R
I
D
G
E
F
U
N
C
C
L
A
S
S
=
I
N
T
E
R
S
T
A
T
E
FSTR HPPNHF-0918(46) R\W UTIL R\W -Y5A- STA. 69+53.11END BRIDGE -Y4RPBD- STA. 43+04.00BEGIN BRIDGE -Y5- STA. 24+06.99END BRIDGE -Y5- STA. 22+95.35BEGIN BRIDGE
C
L
E
A
R
I
N
G
O
N
T
H
I
S
P
R
O
J
E
C
T
S
H
A
L
L
B
E
P
E
R
F
O
R
M
E
D
T
O
T
H
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
I
STA. 54+72.30-Y4RPBD-END BRIDGE STA. 51+70.14-Y4RPBD-BRIDGE BEGIN -Y4RPBD- STA. 45+17.13END BRIDGE
O
C
T
O
B
E
R
2
1
,
2
0
1
4
FARM
RD
BIG MILL
-Y5A- STA. 66+78.58BEGIN BRIDGE
-
L
-
S
T
A
.
5
8
2
+
8
5
.
6
7
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
5
8
5
+
6
0
.
7
3
E
N
D
B
R
I
D
G
E
L
E
N
G
T
H
O
F
S
T
R
U
C
T
U
R
E
P
R
O
J
E
C
T
U
-
2
5
7
9
B
=
0
.
1
9
M
i
l
e
s
.
L
E
N
G
T
H
O
F
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
U
-
2
5
7
9
B
=
3
.
8
6
M
i
l
e
s
.
J
U
N
E
1
9
,
2
0
1
2
500
600 605 610 615 620 625 630 635 640 665 670 675 680 685 690
20
60
10 101520253035404510152025303545505560 65 70 75 80 85
90
-Y1-POTSta. 60+02.93
-Y6-POT Sta. 48+48.20-Y5-POT Sta. 10+00.00 -Y5-PC Sta. 55+35.58 -Y5-PT Sta. 60+78.97 -Y5-PC Sta. 74+55.17 -Y5-PT Sta. 80+34.95
-Y5-POT Sta. 90+52.41
-Y6-POT Sta. 10+00.00-Y6-PT Sta. 23+75.83 -Y6-PC Sta. 19+99.43-Y6-PT Sta. 16+38.93 -Y6-PC Sta. 10+55.87-Y4RPD-POTSta. 0+00.00 END TIP PROJECT U-2579BBEGIN TIP PROJECT U-2579AB-L- TS STA. 693+52.98-Y4-POT Sta. 28+00.00 BEGIN CONSTRUCTION
20
2520
-Y1RPA- SC Sta. 14+90.00
-Y1RPA- TS Sta. 12+50.00
-Y1RPA- CS Sta. 19+50.06
-Y1RPD- SC Sta. 25+73.67-Y1RPD- SRS Sta. 23+63.67-Y1RPD- CS Sta. 21+23.67
-Y1RPD- SC Sta. 12+40.00
15
-L- ST Sta. 502+91.34
-Y1RPD- Sta. 33+20.2157-Y1- Sta. 40+26.0000
-Y1LPD- Sta. 22+60.41-Y1- Sta. 40+06.0000
-Y4-POTSta. 143+00.00 END CONSTRUCTION END RESURFACING AND WIDENING 10202530 35 40152025303540152025301525303540456065707580852025303540455055606570758095100105110 115 120 125 130 135 140 145 15020253035404550556065707580951001051101151201251301351401451501015202530-Y4RPA- ST Sta. 10+00.00 -Y4RPA- SC Sta. 12+00.00-Y4RPA- CS Sta. 39+41.74-Y4RPA- ST Sta. 41+41.74 -Y4RPBD- ST Sta. 10+00.00-Y4RPBD- SC Sta. 12+00.00 -Y4RPBD- CS Sta. 21+25.35 -Y4RPBD- ST Sta. 23+25.35 -Y4RPBD- TS Sta. 31+45.35 -Y4RPBD- SC Sta. 33+85.35-Y4RPBD- TS Sta. 74+31.85-Y4RPBD- SC Sta. 76+31.85-Y4RPBD- CS Sta. 84+04.51-Y4RPBD- ST Sta. 86+04.51 -Y4WB- POT Sta. 150+22.89-Y4WB- POTSta. 10+00.00 -Y4EB- POT Sta. 10+00.00 -Y4EB- POT Sta. 150+22.89-Y4RPB- ST Sta. 32+80.81-Y4RPB- CS Sta. 30+40.81-Y4RPB- SC Sta. 16+27.27-Y4RPB- TS Sta. 13+87.27-Y4RPB- POT Sta. 10+00.00 -Y4RPD- SC Sta. 18+25.20 -Y4RPD- TS Sta. 15+85.20 -Y4RPC- POT Sta. 40+03.40-Y4RPC- ST Sta. 32+19.53-Y4RPC- CS Sta. 29+79.53-Y4RPC- SC Sta. 12+40.00 -Y4RPC- ST Sta. 10+00.002025303540455560657075 80 85 90 95 -Y4CD- PT Sta. 95+97.99-Y4CD- SC Sta. 88+45.46-Y4CD- SRS Sta. 87+05.46-Y4CD- CS Sta. 84+25.46-Y4CD- SC Sta. 66+51.14-Y4CD- PCC Sta. 36+33.44-Y4CD- PRC Sta. 17+15.41-Y4CD- PC Sta. 10+00.00 -Y4CD- TS Sta. 63+71.14ST Sta. 10+00.00SC Sta. 12+10.0020 CS Sta. 22+10.62 ST Sta. 24+20.62 ST Sta. 10+00.0010SC Sta. 12+10.001520CS Sta. 22+58.05ST Sta. 24+68.05 1520
-Y1-PCSta. 44+26.47
-Y1-
-Y1-
-Y1-
-Y1-
-Y1-
-Y4RPD- ST Sta. 28+43.54-Y4RPD- POT Sta. 33+19.67-Y4RPBD- CS Sta. 63+71.85-Y4RPD- CS Sta. 26+03.54-Y4RPBD- ST Sta. 66+11.85 -Y5-PT Sta. 32+51.52-Y5-PC Sta. 21+41.22CS Sta. 22+65.27SC Sta. 12+10.00ST Sta. 24+75.27ST Sta. 10+00.00
-Y1-PCSta. 14+00.00
-Y1-PRCSta. 18+38.23
-Y1-POTSta. 10+00.00 -Y7- POT Sta. 13+93.72
-Y1-PTSta. 22+76.47
-Y7- POT Sta. 10+00.00
-Y1- POT Sta. 27+23.47
-Y1RPA- PT Sta. 28+90.37
-Y1-PTSta. 53+02.93
-Y1LPD- SC Sta. 12+10.00
-Y1LPD- CS Sta. 19+27.33
-Y1LPD- ST Sta. 21+37.33
-Y1RPD- PT Sta. 31+53.84
-Y1-PRCSta. 48+64.70
SRS Sta. 21+90.06
-Y1RPA- SC Sta. 24+00.06
-Y1LPD-
-Y1RPD-
-Y1RPA- POT Sta. 31+29.10
30
25
15
25
30
40
35
45
50
15
59’ Rt.-Y1LPD- ST Sta. 10+00.00
-L- ST Sta. 482+93.00
30
20
10 50-Y4RPBD--Y4LPD--Y4CD--Y4CD--Y4RPC--Y4RPD--Y5--Y4EB--Y4WB--Y4RPC-W.E. 843.3FISH HATCHERYW. E. 847.2POND FISH HATCHERYW. E. 843.4PONDFISH HATCHERYW. E. 859.7POND W. E. 855.7PONDW. E. 855.6PONDW. E. 853.1PONDW. E. 854.5POND W. E. 855.7POND PONDW.E. 8420 W.E. 839.1HATCHERY W. E. 852.8PONDPONDW. E. 852.7PONDW.E. 832.9PONDW.E. 843.0 PONDW.E. 843.4
SR 2405 OLD BELEWS CREEK RD 6.2 m BST
IN
T
E
R
S
T
A
T
E
4
0
B
U
S
4
2
1
1
5
8
1
5
8
U
S
U
S
U
S
Existing Edge of Pavem ent
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing M etal G uardrail
Existing Cable G uiderail
Proposed G uardrail
Equality Sym bol
Pavem ent Rem oval
Baseline Control Point
RIGH T OF W AY:
Existing Right of W ay M arker
Existing Right of W ay Line
h
Existing Control of Access
Proposed Control of Access
Proposed Right of W ay Line
C
F
Existing Easem ent Line
Proposed Tem porary Construction Easem ent
Proposed Tem porary Drainage Easem ent
Proposed Perm anent Drainage Easem ent
Proposed Perm anent Utility Easem ent
H YD ROLOGY:
Stream or Body of W ater
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
K
Proposed Lateral, Tail, Head Ditch
False Sum p
Proposed Cable G uiderail
M AJO R:
Bridge, Tunnel or Box Culvert
Bridge W ing W all, Head W all and End W all
M IN O R:
Head and End W all
Pipe Culvert
Footbridge
Paved Ditch G utter
U TILITIES:
ROAD S AND RELATED FEATU RES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power M anhole
Power Line Tower
Power Transform er
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone M anhole
Telephone Booth
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}
T
p
Q
l
e
]
/
b
H-Fram e Pole O O
PO W ER:
TELEPHO N E:
Telephone Cell Tower
Recorded U/G Power Line
Recorded U/G Telephone Cable
Designated U/G Telephone Cable (S.U.E.*)
Recorded U/G Telephone Conduit
Designated U/G Telephone Conduit (S.U.E.*)
Recorded U/G Fiber O ptics Cable
W ATER:
W ater M anhole
W ater M eter
W ater Valve
W ater Hydrant
Recorded U/G W ater Line
4
I
H
a
TV:
TV Satellite Dish
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
Recorded U/G TV Cable
Recorded U/G Fiber O ptic Cable
Designated U/G Fiber O ptic Cable (S.U.E.*)
r
|
I
]
G AS:
G as Valve
G as M eter
Recorded U/G G as Line
n
c
SAN ITARY SEW ER:
Sanitary Sewer M anhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Recorded SS Forced M ain Line
Designated SS Forced M ain Line (S.U.E.*)
d
o
A/G Water
Above G round G as Line
A/G Gas
Above G round W ater Line
Above G round Sanitary Sewer A/G Sanitary Sew er
M ISCELLAN EO US:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located O bject
Utility Traffic Signal Box
Utility Unknown U/G Line
?
CONC
CONC WW
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer M anhole m
U/G Tank; W ater, G as, O il
A/G Tank; W ater, G as, O il
BOU ND ARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property M onum ent
Existing Fence Line
Proposed W oven W ire Fence
Proposed Chain Link Fence
Proposed Barbed W ire Fence
g
F
123
Existing W etland Boundary
Proposed W etland Boundary
Existing Endangered Anim al Boundary
Existing Endangered Plant Boundary
BU ILD INGS AND OTH ER CU LTU RE:
Area O utline
G as Pum p Vent or U/G Tank Cap
Church
School
Dam
Sign
Sm all M ine
W ell
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
W oods Line
O rchard
Vineyard
RAILROAD S:
Standard G auge
RR Signal M ilepost
Switch
RR Abandoned
RR Dism antled
S
FLOW
Designated U/G Power Line (S.U.E.*)
Designated U/G Fiber O ptics Cable (S.U.E.*)
Designated U/G W ater Line (S.U.E.*)
Designated U/G TV Cable (S.U.E.*)
Designated U/G G as Line (S.U.E.*)
U/G Test Hole (S.U.E.*)
*S.U .E. = Subsurface U tility Engineering
WLB
EIP B
ECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cem etery
EXISTING STRU CTU RES:
Parcel / Sequence N um ber
E
AATUR
End of Inform ation E.O .I.
Note: Not to Scale
SHEET NO .PRO JECT REFERENCE NO .
1-BU-2579B
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
0
4
/
1
6
/
1
1
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
W etland
Proposed Perm anent Easem ent with
Iron Pin and Cap M arker
Proposed Tem porary Utility Easem ent TUE
Iron Pin and Cap M arker
Proposed Right of W ay Line with
DUEProposed Perm anent Drainage / Utility Easem ent
AUEProposed Aerial Utility Easem ent
CRProposed Curb Ram p
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CO N VEN TIO N AL PLAN SHEET SYM BO LS
Underground Storage Tank, Approx. Loc.
G eoenvironm ental Boring
UST
Known Soil Contam ination: Area or Site
Potential Soil Contam ination: Area or Site
Concrete or G ranite R/W M arker
Proposed Right of W ay Line with
C
A Concrete C/A M arker
Proposed Control of Access Line with
Proposed Perm anent Access Easem ent PAE
-L-
SR 2385 WALKERTOWN / GUTHRIE RD 20’ BST
S
R 2385 WALKE
RT
OWN / G
UTH
RIE R
D 23’ BST
-Y1-POTSta. 10+00.00
BEGIN CONSTRU CTION
-
L
-
P
O
T
S
T
A
.
4
7
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
U
-
2
5
7
9
C
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
U
-
2
5
7
9
B
-Y1-POT Sta. 54+00.00
END CONSTRU CTION
END CONSTRU CTION
-Y2- POT STA. 29+75.00
BEGIN CONSTRU CTION
-Y2-POTSta. 10+00.00
END CONSTRUCTION
-Y2A- STA. 22+00.00
END CONSTRUCTION
-Y3- STA. 26+25.00
-Y4EB-POT Sta. 143+00.00
-Y4W B-PO T Sta. 143+00.00
END CONSTRU CTION
END CONSTRU CTION
-Y5A- STA. 81+25.00
-Y5A- POT STA. 54+00.00
BEGIN CONSTRU CTION
C
B A
D
-Y4EB-POT Sta. 26+80.00
-Y4W B-POT Sta. 26+80.00
BEGIN CON STRU CTION
BEGIN CONSTRU CTION
-Y5- POT STA. 16+00.00
-Y5- POT STA. 33+30.00
END CONSTRU CTION
END TIP PROJECT U -2579B
-L- POT STA. 692+32.98
A
D
M
A T C H L IN E
M A TCH LINE
-Y2A- STA. 16+00.00
-Y3- STA. 18+25.00
BEGIN CONSTRUCTION
BEGIN CONSTRUCTION
BU S. 40 W BL
BU S. 40 EBL
BU S. 40 W BL
BU S. 40 EBL TO K ERN ERSVILLE
H
AS
TI
N
G S
H I
L
L
R
D .
H ASTINGS H ILL RD.
SR 2337
W EST M OUNTAIN ST.
SR 2385
W ALK ERTOW N/GU TH ERIE RD .
U S 158
U S 158
N AD 83/95
NC G RID
IN DICATES GEODETIC CON TROL M ON U M EN TS U SED OR SET FOR H ORIZON TAL PROJECT CON TROL
BY TH E N CDOT LOCATION AN D SU RVEYS U N IT.
PROJECT CON TROL ESTABLISH ED U SIN G GLOBAL POSITION IN G SYSTEM .
SEE GPS CALIBRATION SH EET FOR H ORIZON TAL AN D VERTICAL COORDIN ATE VALU ES.
N OTES:
1. TH E SITE CALIBRATION SH OW N IS BASED U PON A N ETW ORK TIED TO TH E H ARN
(H IGH ACCU RACY REFEREN CE N ETW ORK) N AD 83/95 ADJU STM EN T. TH IS CALIBRATION
W ILL ALLOW TH E EN D U SER TO W ORKW ITH IN TH E SAM E COORDIN ATE SYSTEM W H EN
U SIN G RTK (REAL TIM E KIN EM ATIC) GPS AN D A LOCAL BASE STATION . IF AN OTH ER
SYSTEM SU CH AS VRS (VIRTU AL REFEREN CE STATION ) IS U SED, ADDITION AL FIELD TIES
M AY BE N EEDED TO REDU CE POSSIBLE ERRORS, OR BIASES.
2. TH E CON TROL DATA FOR TH IS PROJECT CAN BE FOUN D ELECTRON ICALLY BY SELECTIN G
PROJECT CON TROL DATA AT:
TH E FILES TO BE FOUN D ARE AS FOLLOW S:
U 2579B_LS_GPSCALIB_071217.H TM L
U 2579B_LS_W GS84_071217.TXT
U 2579B_LS_LOCAL_071217.TXT
U 2579B_LS_CON TROL_071217.TXT
TH E W GS84 AN D LOCAL FILES ARE COM M A DELIM ITED AN D CAN BE U SED TO REPRODU CE
TH E SITE CALIBRATION FOR TH E EN D U SER’S GPS EQU IPM EN T. IF FU RTH ER IN FORM ATION
IS N EEDED, PLEASE CON TACT TH E LOCATION AN D SU RVEYS U N IT.
N ETW ORK ESTABLISH ED FROM EXISTIN G H ARN M ON U M EN TATION
H TTP://W W W .N CDOT.ORG/DOH /PRECON STRU CT/H IGH W AY/LOCATION /PROJECT/
TO W IN STO N -SALEM
-SRR- STA. 57+26.59
-SRR- STA. 10+00.00
RAILROAD
NORFOLK SOUTHERN
SHEET N O .PRO JECT REFEREN CE NO .
6
/
2
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
l
s
_
1
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
Location and Surveys
N OTE: DRAW IN G N OT TO SCALE
SU RVEY CON TRO L SH EET U -2579B
U-2579B 1C
FORSYTH COUNTY
STOKES COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
G
U
I
L
F
O
R
D
C
O
U
N
T
Y
DAVIDSON COUNTY
FORSYTH COUNTY
RESET
HAW THORNE
ELLER 3
LEW ISVILLE
GREEN
YA
D
K
IN
R
IV
E
R
GPS NETW ORK
NOT TO SCALEGPS NETW ORK
STREET
M ARKET$
$
%
%
%
%
%
158
311
421
311
40
B U S
I-40
52
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"U2579C-1" TO -L- STATION 478+00.00 IS
S 71 38’00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
ELEV. = 919.53
E = 1659876.641
N = 875565.142
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-1
ELEV. = 910.76
E = 1658607.106
N = 874112.277
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-2
ELEV. = 821.23
E = 1660695.161
N = 862298.542
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-9
ELEV. = 836.07
E = 1659454.537
N = 862393.881
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-10
ELEV. = 884.85
E = 1665179.344
N = 861955.185
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-8
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-5
N = 861341.266
E = 1673030.785
ELEV. = 918.90
ELEV. = 891.85
E = 1671817.303
N = 861435.209
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-6
ELEV. = 893.30
E = 1666875.763
N = 861818.742
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-7
ELEV. = 947.62
E = 1666923.175
N = 868184.593
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-3
ELEV. = 946.50
E = 1665981.533
N = 867554.058
LOCALIZED PROJECT COORDINATES
NCDOT GPS STATION U2579B-4
N OTES:
1. TH E SITE CALIBRATION SH OW N IS BASED U PON A N ETW ORK TIED TO TH E H ARN
(H IGH ACCU RACY REFEREN CE N ETW ORK) N AD 83/95 ADJU STM EN T. TH IS CALIBRATION
W ILL ALLOW TH E EN D U SER TO W ORKW ITH IN TH E SAM E COORDIN ATE SYSTEM W H EN
U SIN G RTK (REAL TIM E KIN EM ATIC) GPS AN D A LOCAL BASE STATION . IF AN OTH ER
SYSTEM SU CH AS VRS (VIRTU AL REFEREN CE STATION ) IS U SED, ADDITION AL FIELD TIES
M AY BE N EEDED TO REDU CE POSSIBLE ERRORS, OR BIASES.
2. TH E CON TROL DATA FOR TH IS PROJECT CAN BE FOU N D ELECTRON ICALLY BY SELECTIN G
PROJECT CON TROL DATA AT:
TH E FILES TO BE FOU N D ARE AS FOLLOW S:
U 2579B_LS_GPSCALIB_071217.H TM L
U 2579B_LS_W GS84_071217.TXT
U 2579B_LS_LOCAL_071217.TXT
U 2579B_LS_CON TROL_071217.TXT
TH E W GS84 AN D LOCAL FILES ARE COM M A DELIM ITED AN D CAN BE U SED TO REPRODU CE
TH E SITE CALIBRATION FOR TH E EN D U SER’S GPS EQU IPM EN T. IF FU RTH ER IN FORM ATION
IS N EEDED, PLEASE CON TACT TH E LOCATION AN D SU RVEYS U N IT.
H TTP://W W W .N CDOT.ORG/DOH /PRECON STRU CT/H IGH W AY/LOCATION /PROJECT/
SHEET N O .PRO JECT REFEREN CE NO .
6
/
2
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
l
s
_
1
d
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
Location and SurveysSURVEY CON TRO L SH EET U -2579B
U-2579B 1D
H orizontal Adjustm ent Param eters
N orthing coordinate of rotation center 864170.124sft
Easting coordinate of rotation center 1664837.355sft
R otation about the center point 0?00’00"
Translation north -0.529sft
Translation east 0.589sft
Scale factor 1.00004635
--------------------------------------------------------------------------------
Vertical Adjustm ent Param eters
N orthing coordinate of origin point 875565.201sft
Easting coordinate of origin point 1659876.674sft
Vertical separation at origin 0.158sft
Slope north 1.193ppm
Slope east -0.561ppm
--------------------------------------------------------------------------------
G eoid M odel D efinition
G eoid03 (C onus) N C Sub G rid
R esidual D ifferences Betw een G PS (W G S84) And Local C oordinates
Sum m ary
Point R esiduals
W G S84 C oordinates C alculated point
FO R D ISPLAY O N LY Local C oordinates
Point U 2579B-1 G PS
Latitude 36?09’00.87235"N
Longitude 80?09’07.26064"W
H eight 812.331sft
N orthing 875565.201sft
Easting 1659876.674sft
Elevation 919.540sft
H orz error 0.068sft
Vert error 0.010sft
3D error 0.069sft
Point U 2579B-1 LO C AL
N orthing 875565.142sft
Easting 1659876.641sft
Elevation 919.530sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-2 G PS
Latitude 36?08’46.36004"N
Longitude 80?09’22.53339"W
H eight 803.624sft
N orthing 874112.260sft
Easting 1658607.033sft
Elevation 910.820sft
H orz error 0.075sft
Vert error 0.060sft
3D error 0.096sft
Point U 2579B-2 LO C AL
N orthing 874112.277sft
Easting 1658607.106sft
Elevation 910.760sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-3 G PS
Latitude 36?07’48.69349"N
Longitude 80?07’40.32920"W
H eight 840.897sft
N orthing 868184.488sft
Easting 1666923.146sft
Elevation 947.570sft
H orz error 0.108sft
Vert error 0.050sft
3D error 0.120sft
Point U 2579B-3 LO C AL
N orthing 868184.593sft
Easting 1666923.175sft
Elevation 947.620sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-4 G PS
Latitude 36?07’42.35263"N
Longitude 80?07’51.71822"W
H eight 839.746sft
N orthing 867553.926sft
Easting 1665981.571sft
Elevation 946.428sft
H orz error 0.137sft
Vert error 0.072sft
3D error 0.155sft
Point U 2579B-4 LO C AL
N orthing 867554.058sft
Easting 1665981.533sft
Elevation 946.500sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-5 G PS
Latitude 36?06’41.70853"N
Longitude 80?06’24.95413"W
H eight 812.800sft
N orthing 861341.303sft
Easting 1673030.811sft
Elevation 918.962sft
H orz error 0.045sft
Vert error 0.062sft
3D error 0.077sft
Point U 2579B-5 LO C AL
N orthing 861341.266sft
Easting 1673030.785sft
Elevation 918.900sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-6 G PS
Latitude 36?06’42.50385"N
Longitude 80?06’39.75439"W
H eight 785.713sft
N orthing 861435.294sft
Easting 1671817.327sft
Elevation 891.926sft
H orz error 0.089sft
Vert error 0.076sft
3D error 0.117sft
Point U 2579B-6 LO C AL
N orthing 861435.209sft
Easting 1671817.303sft
Elevation 891.850sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-7 G PS
Latitude 36?06’45.74473"N
Longitude 80?07’40.02458"W
H eight 786.818sft
N orthing 861818.786sft
Easting 1666875.807sft
Elevation 893.236sft
H orz error 0.063sft
Vert error 0.064sft
3D error 0.090sft
Point U 2579B-7 LO C AL
N orthing 861818.742sft
Easting 1666875.763sft
Elevation 893.300sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-8 G PS
Latitude 36?06’46.90138"N
Longitude 80?08’00.71711"W
H eight 778.296sft
N orthing 861955.088sft
Easting 1665179.317sft
Elevation 884.783sft
H orz error 0.101sft
Vert error 0.067sft
3D error 0.122sft
Point U 2579B-8 LO C AL
N orthing 861955.185sft
Easting 1665179.344sft
Elevation 884.850sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-9 G PS
Latitude 36?06’49.78833"N
Longitude 80?08’55.41020"W
H eight 714.479sft
N orthing 862298.609sft
Easting 1660695.139sft
Elevation 821.142sft
H orz error 0.071sft
Vert error 0.088sft
3D error 0.113sft
Point U 2579B-9 LO C AL
N orthing 862298.542sft
Easting 1660695.161sft
Elevation 821.230sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579B-10 G PS
Latitude 36?06’50.58887"N
Longitude 80?09’10.54199"W
H eight 729.478sft
N orthing 862393.955sft
Easting 1659454.533sft
Elevation 836.189sft
H orz error 0.074sft
Vert error 0.119sft
3D error 0.140sft
Point U 2579B-10 LO C AL
N orthing 862393.881sft
Easting 1659454.537sft
Elevation 836.070sft
U tilized H orz and Vert
Q uality Survey quality
Point BL-21 G PS
Latitude 36?06’13.76877"N
Longitude 80?08’00.73239"W
H eight 800.390sft
N orthing 858604.732sft
Easting 1665139.800sft
Elevation 906.741sft
H orz error 0.049sft
Vert error 0.001sft
3D error 0.049sft
Point BL-21
N orthing 858604.777sft
Easting 1665139.780sft
Elevation 906.740sft
U tilized H orz and Vert
Q uality Survey quality
Point U 2579AB-1 G PS
Latitude 36?05’35.79056"N
Longitude 80?08’08.30858"W
H eight 832.735sft
N orthing 854771.500sft
Easting 1664474.164sft
Elevation 938.953sft
H orz error 0.041sft
Vert error 0.013sft
3D error 0.044sft
Point U 2579AB-1 Local
N orthing 854771.471sft
Easting 1664474.194sft
Elevation 938.940sft
U tilized H orz and Vert
Q uality Survey quality
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"U2579C-1" TO -L- STATION 478+00.00 IS
S 71 38’00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
--------------------------------------------------------------------------------
U pdated default projection not requested
U pdated D efault Projection (Transverse M ercator) D efinition
--------------------------------------------------------------------------------
D atum Transform ation com putation not requested
D atum Transform ation Param eters
--------------------------------------------------------------------------------
This file is to aid in the use of R eal Tim e Kinem atic (R TK) G PS during construction layout.
Please take care in utilizing these coordinates to elim inate confusion of the tw o system s.
w hich is very sim ilar to N orth C arolina Zone 3200 from w hich it is derived.
The N orth C arolina D epartm ent of Transportation uses a Localized C oordinate System
--------------------------------------------------------------------------------
H eight 870.594
Site Scale Factor 1.000045472
Longitude 80 10’48.38377" W
Latitude 36 09’08.35562" N
Localized around U 2579C -1
LO C AL SITE IN FO R M ATIO N
--------------------------------------------------------------------------------
H eight U nits U S survey feet
D istance U nits U S survey feet
C oordinate U nits U S survey feet
Vertical D atum G eoid M odel G eoid03 (C onus) N C Sub G rid
H orizontal D atum N AD 1983 (C onus)
C oordinate System U S State Plane 1983 Zone N orth C arolina 3200
U ser nam e tbovender D ate & Tim e 12:41:06 PM 12/11/2007
TIP N um ber
Project : U 2579B FieldC alibration
G PS C alibration R eport
M axim um error R oot M ean Square error Point
H orizontal 0.137sft 0.025 U 2579B-4 G PS
Vertical 0.119sft 0.020 U 2579B-10 G PS
Three-dim ensional 0.155sft 0.032 U 2579B-4 G PS
FIN AL
N OTES:
1. TH E SITE CALIBRATION SH OW N IS BASED U PON A N ETW ORK TIED TO TH E H ARN
(H IGH ACCU RACY REFEREN CE N ETW ORK) N AD 83/95 ADJU STM EN T. TH IS CALIBRATION
W ILL ALLOW TH E EN D U SER TO W ORKW ITH IN TH E SAM E COORDIN ATE SYSTEM W H EN
U SIN G RTK (REAL TIM E KIN EM ATIC) GPS AN D A LOCAL BASE STATION . IF AN OTH ER
SYSTEM SU CH AS VRS (VIRTU AL REFEREN CE STATION ) IS U SED, ADDITION AL FIELD TIES
M AY BE N EEDED TO REDU CE POSSIBLE ERRORS, OR BIASES.
2. TH E CON TROL DATA FOR TH IS PROJECT CAN BE FOU N D ELECTRON ICALLY BY SELECTIN G
PROJECT CON TROL DATA AT:
TH E FILES TO BE FOU N D ARE AS FOLLOW S:
U 2579B_LS_GPSCALIB_071217.H TM L
U 2579B_LS_W GS84_071217.TXT
U 2579B_LS_LOCAL_071217.TXT
U 2579B_LS_CON TROL_071217.TXT
H TTP://W W W .N CDOT.ORG/DOH /PRECON STRU CT/H IGH W AY/LOCATION /PROJECT/
SHEET N O .PRO JECT REFEREN CE NO .
6
/
2
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
l
s
_
1
e
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
Location and Surveys
N OTE: DRAW IN G N OT TO SCALE
SU RVEY CON TRO L SH EET U -2579B
U-2579B 1E
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"U2579C-1" TO -L- STATION 478+00.00 IS
S 71 38’00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
TH E W GS84 AN D LOCAL FILES ARE COM M A DELIM ITED AN D CAN BE U SED TO REPRODU CE
TH E SITE CALIBRATION FOR TH E EN D U SER’S GPS EQU IPM EN T. IF FU RTH ER IN FORM ATION
IS N EEDED, PLEASE CON TACT TH E LOCATION AN D SU RVEYS U N IT.
62 BL-62 857921.3035 1665301.1740 921.71 682+14.73 512.82 LT
61 BL-61 858269.2881 1665453.6752 935.33 678+42.46 444.74 LT
60 BL-60 858773.4176 1665478.8068 892.61 674+24.40 199.39 LT
59 BL-59 859166.6533 1665570.3378 870.59 670+44.95 101.67 LT
58 BL-58 859452.5755 1665636.2271 840.15 667+60.65 50.79 LT
57 BL-57 859696.7794 1665682.7207 865.82 665+16.69 12.37 LT
56 BL-56 860035.6198 1665759.2873 872.09 661+69.99 7.40 RT
55 BL-55 860650.1377 1665903.7797 919.89 655+38.58 5.61 RT
54 BL-54 860906.9530 1666066.1526 934.37 652+51.91 95.07 LT
53 BL-53 861472.3289 1666069.6751 925.28 646+99.70 26.15 RT
52 BL-52 861914.1300 1666379.8520 893.60 642+08.60 192.49 LT
51 BL-51 862578.8310 1666211.5370 858.44 635+81.61 80.30 RT
50 BL-50 862783.5520 1666288.6850 848.29 633+67.62 31.50 RT
49 BL-49 862956.6260 1666344.9590 832.85 631+88.77 3.03 LT
48 BL-48 863420.4650 1666376.6100 824.44 627+23.99 13.57 RT
47 BL-47 863708.7170 1666437.2610 862.94 624+31.87 23.63 LT
46 BL-46 863878.8700 1666470.1900 861.93 622+60.26 45.16 LT
45 BL-45 864099.8880 1666471.0880 839.68 620+40.05 33.98 LT
44 BL-44 864347.1850 1666470.9430 852.86 617+93.39 23.83 LT
43 BL-43 865029.1770 1666467.8690 877.26 611+11.87 1.17 RT
42 BL-42 865540.7110 1666485.1420 899.27 606+00.05 0.35 RT
41 BL-41 866369.2240 1666133.1630 943.06 597+43.94 345.57 RT
40 BL-40 867297.1820 1665946.1350 955.28 587+33.01 376.59 RT
39 BL-39 867741.4220 1666381.6040 945.66 584+21.42 165.32 LT
38 BL-38 868112.2800 1665976.0620 936.79 579+36.90 88.31 RT
37 BL-37 868667.1750 1665805.7370 901.81 573+57.69 3.98 RT
36 BL-36 869135.0940 1665515.9770 887.39 568+06.44 10.89 RT
35 BL-35 869478.4310 1665275.8910 877.45 563+86.90 4.08 RT
34 BL-34 869934.3050 1664880.8090 847.26 557+82.99 3.15 RT
33 BL-33 870126.8150 1664746.5080 869.03 555+52.72 38.69 LT
32 BL-32 870230.7240 1664583.7180 889.05 553+63.34 4.52 LT
31 BL-31 870423.9050 1664375.8020 906.31 550+80.31 16.97 LT
30 BL-30 870579.1130 1664140.9280 925.42 547+99.82 3.22 RT
29 BL-29 870857.4860 1663735.1740 904.58 543+07.62 2.91 LT
28 BL-28 871031.0730 1663445.9460 918.87 539+70.32 0.87 LT
27 BL-27 871119.9440 1663302.1990 924.41 538+01.32 2.18 LT
26 BL-26 871276.9540 1663053.2350 938.30 535+07.03 7.08 LT
25 BL-25 871468.8120 1662719.2670 914.04 531+21.99 2.38 RT
24 BL-24 871634.4530 1662451.8220 881.20 528+07.41 0.30 LT
23 BL-23 871836.8190 1662112.5610 894.62 524+12.40 2.93 RT
22 BL-22 871920.0360 1661978.2870 887.72 522+54.43 1.53 RT
21 BL-21 872068.7040 1661733.8810 917.22 519+68.36 1.40 RT
20 BL-20 872234.7680 1661459.2620 940.28 516+47.44 2.08 RT
19 BL-19 872558.9160 1660922.8630 898.68 510+20.70 3.60 RT
18 BL-18 872875.7590 1660386.8370 896.12 503+98.08 11.17 RT
17 BL-17 873180.1780 1659901.4390 922.50 498+25.18 3.07 RT
16 BL-16 873341.9280 1659648.9150 911.40 495+25.38 4.04 LT
15 BL-15 873595.3100 1659209.9120 943.67 490+18.63 7.39 RT
14 BL-14 873813.1870 1658860.3820 933.23 486+06.78 2.69 RT
2 U2579B-2 874112.2770 1658607.1060 910.76 482+35.02 121.40 LT
13 BL-13 874480.5922 1657767.3061 859.16 473+26.06 0.07 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BL
521 BY8-521 869249.1820 1664996.6180 905.01 563+96.28 365.28 RT
410 BY7-520 867671.0010 1664962.5010 924.54 579+61.51 1193.55 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY8
520 BY7-520 867671.0010 1664962.5010 924.54 OUTSIDE PROJECT LIMITS
519 BY7-519 867593.9210 1665530.1410 937.99 25+24.97 26.99 LT
409 BL-39 867741.4220 1666381.6040 945.66 16+69.77 85.23 LT
408 U2579B-3 868184.5930 1666923.1750 947.62 OUTSIDE PROJECT LIMITS
518 BY7-518 868682.7900 1667450.8110 956.27 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y2A STATION OFFSET
BY7
407 BL-37 868667.1750 1665805.7370 901.81 573+57.69 3.98 RT
517 BY6-517 869299.4550 1665782.3150 904.12 568+17.44 301.88 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY6
516 BY5-516 870477.2190 1664080.7170 917.60 548+11.59 121.00 RT
406 BL-31 870423.9050 1664375.8020 906.31 550+80.31 16.97 LT
515 BY5-515 870261.1110 1664994.0960 859.34 556+34.62 307.43 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY5
514 BY4-514 870723.5810 1663184.3930 925.15 539+06.47 397.73 RT
405 BL-26 871276.9540 1663053.2350 938.30 535+07.03 7.08 LT
513 BY4-513 872140.4100 1663143.4860 925.25 531+35.78 791.86 LT
512 BY4-512 873506.9080 1662409.8550 940.43 517+99.23 1578.72 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY4
429 BY3-509 871757.6910 1660888.5350 943.28 27+57.36 22.97 RT
511 BY3B-511 871524.0940 1660844.5770 941.06 29+86.66 40.20 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET
BY3B
510 BY3-510 870936.2960 1660560.7650 939.83 OUTSIDE PROJECT LIMITS
509 BY3-509 871757.6910 1660888.5350 943.28 27+57.36 22.97 RT
403 BL-20 872234.7680 1661459.2620 940.28 20+17.19 15.98 LT
508 BY3-508 872631.2110 1661856.2270 942.11 14+64.15 37.15 LT
507 BY3-507 873877.6100 1662029.3370 955.77 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y2 STATION OFFSET
BY3
506 BY2-506 872492.7960 1657372.5070 865.09 480+20.88 1903.72 RT
505 BY2-505 872636.6880 1658350.9080 914.30 487+82.31 1272.69 RT
402 BL-15 873595.3100 1659209.9120 943.67 490+18.63 7.39 RT
504 BY2-504 873970.8370 1659904.2090 946.14 494+16.98 674.07 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY2
503 BY1-503 872130.2030 1657007.9340 880.69 58+33.62 20.74 LT
502 BY1-502 873045.7120 1657721.3990 890.65 46+73.25 2.60 LT
401 U2579B-2 874112.2770 1658607.1060 910.76 32+86.76 3.62 LT
501 BY1-501 874918.7040 1659340.2020 893.07 21+97.42 49.83 LT
400 U2589B-1 875565.1420 1659876.6410 919.53 13+57.45 24.24 LT
500 BY1-500 876429.8630 1660600.3490 946.30 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y1 STATION OFFSET
BY1
413 BL-39 867741.4220 1666381.6040 945.66 584+21.42 165.32 LT
528 BY10C-528 867958.2570 1667039.3110 939.95 584+15.47 857.82 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY10C
527 BY10-527 866984.8150 1664726.9800 939.05 39+32.39 18.31 LT
526 BY10-526 867154.5320 1665453.1690 949.64 31+89.63 21.48 LT
412 BL-39 867741.4220 1666381.6040 945.66 20+94.83 52.29 RT
525 BY10-525 868154.3950 1667362.2930 949.30 10+36.29 56.31 LT
524 BY10-524 868746.6600 1668213.0310 950.36 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y3 STATION OFFSET
BY10
523 BY9-523 867069.0160 1664859.5140 942.01 50+18.56 10.60 LT
522 BY9-522 867201.0230 1665364.1180 946.89 44+98.38 11.20 LT
411 BL-39 867741.4220 1666381.6040 945.66 33+47.27 17.73 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION SRR STATION OFFSET
BY9
FIN AL
****************************************
Y1 STATION 58+42 354 RIGHT
N 872364 E 1656715
CREEK RD.
27’ OFF OF WEST EP OF OLD BELEWS
R/R SPIKE SET IN BASE OF 18" OAK,
BM#1 ELEVATION = 884.23
****************************************
****************************************
N 35 38’ 34.2" E Dist 468.59
Y1 STATION 10+00
N 876236 E 1660360
MAPLE 17’ OFF OF NORTH EP OF US-158
R/R SPIKE SET IN ROOT OF 28" FORKED
BM#2 ELEVATION = 942.32
****************************************
****************************************
L STATION 513+19 1433 LEFT
N 873632 E 1661924
WEST EP OF WALKERTOWN-GUTHRIE RD.
LIGHT BAPTIST CHURCH 14’ OFF OF
GUTTER AT ENTRANCE TO GOSPEL
R/R SPIKE SET IN CONC. CURB AND
BM#3 ELEVATION = 953.40
****************************************
****************************************
L STATION 523+22 1235 LEFT
N 872942 E 1662678
12’ OFF OF WEST EP OF MORRIS RD.
R/R SPIKE SET IN BASE OF 24’ OAK
BM#4 ELEVATION = 935.13
****************************************
****************************************
L STATION 557+12 427 LEFT
N 870288 E 1665137
LAKE TRAIL
OAK 19’ OFF OF NORTH EP OF WESTN
R/R SPIKE SET IN BASE OF 42" FORKED
BM#5 ELEVATION = 866.68
****************************************
****************************************
L STATION 564+11 311 RIGHT
N 869271 E 1665048
PERCH TRAIL
38’ OFF OF NORTH EP OF ROBBINS
R/R SPIKE SET IN BASE OF 18" OAK
BM#6 ELEVATION = 900.49
****************************************
****************************************
SRR STATION 22+73 21 RIGHT
N 868295 E 1667303
INTERSECTION W/ WEST MOUNTAIN ST.
ON WEST SIDE OF BAGLEY RD. @
SE PAINTED BOLT IN R/R CROSS BAR
BM#7 ELEVATION = 956.89
****************************************
****************************************
L STATION 616+14 483 LEFT
N 864512 E 1666936
24’ OFF OF NORTH EP OF REGENTS PARK RD.
R/R SPIKE SET IN BASE OF 24" BURCH
BM#8 ELEVATION = 881.42
****************************************
****************************************
L STATION 637+58 702 RIGHT
N 862500 E 1665571
OF GERRY RD.
RACHEL ST. -BY14- @ INTERSECTION
R/R SPIKE SET IN PAVEMENT OF
BM#9 ELEVATION = 899.76
****************************************
****************************************
Y5 STATION 11+66 26 RIGHT
N 860489 E 1667600
HILL RD.
OAK 10’ OFF OF EAST EP OF HASTINS
R/R SPIKE SET IN ROOT OF 30" WILLOW
BM#10 ELEVATION =935.89
****************************************
N OTES:
1. TH E SITE CALIBRATION SH OW N IS BASED U PON A N ETW ORK TIED TO TH E H ARN
(H IGH ACCU RACY REFEREN CE N ETW ORK) N AD 83/95 ADJU STM EN T. TH IS CALIBRATION
W ILL ALLOW TH E EN D U SER TO W ORKW ITH IN TH E SAM E COORDIN ATE SYSTEM W H EN
U SIN G RTK (REAL TIM E KIN EM ATIC) GPS AN D A LOCAL BASE STATION . IF AN OTH ER
SYSTEM SU CH AS VRS (VIRTU AL REFEREN CE STATION ) IS USED, ADDITION AL FIELD TIES
M AY BE N EEDED TO REDU CE POSSIBLE ERRORS, OR BIASES.
2. TH E CON TROL DATA FOR TH IS PROJECT CAN BE FOU N D ELECTRON ICALLY BY SELECTIN G
PROJECT CON TROL DATA AT:
TH E FILES TO BE FOU N D ARE AS FOLLOW S:
U 2579B_LS_GPSCALIB_071217.H TM L
U 2579B_LS_W GS84_071217.TXT
U 2579B_LS_LOCAL_071217.TXT
U 2579B_LS_CON TROL_071217.TXT
H TTP://W W W .N CDOT.ORG/DOH /PRECON STRU CT/H IGH W AY/LOCATION /PROJECT/
SHEET N O .PRO JECT REFEREN CE NO .
6
/
2
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
l
s
_
1
f
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
Location and Surveys
N OTE: DRAW IN G N OT TO SCALE
SU RVEY CON TRO L SH EET U -2579B
U-2579B 1F
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "U2579C-1"
WITH NAD 83/95 STATE PLANE GRID COORDINATES OF
NORTHING: 876419.285(ft) EASTING: 1651591.602(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.99995453
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
"U2579C-1" TO -L- STATION 478+00.00 IS
S 71 38’00" E 6933.9132
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
TH E W GS84 AN D LOCAL FILES ARE COM M A DELIM ITED AN D CAN BE U SED TO REPRODU CE
TH E SITE CALIBRATION FOR TH E EN D U SER’S GPS EQU IPM EN T. IF FU RTH ER IN FORM ATION
IS N EEDED, PLEASE CON TACT TH E LOCATION AN D SU RVEYS U N IT.
561 BY17-561 862879.8960 1662103.3270 855.77 OUTSIDE PROJECT LIMITS
560 BY17-560 862589.5820 1662386.3650 881.81 OUTSIDE PROJECT LIMITS
559 BY17-559 862260.3430 1662528.1310 898.66 OUTSIDE PROJECT LIMITS
558 BY17-558 861624.9800 1662811.0040 899.76 OUTSIDE PROJECT LIMITS
557 BY17-557 861349.1760 1663433.4920 914.70 OUTSIDE PROJECT LIMITS
556 BY17-556 861259.3690 1664179.7680 927.10 OUTSIDE PROJECT LIMITS
555 BY17-555 861000.6910 1665374.5580 923.08 34+51.21 18.22 LT
423 BL-54 860906.9530 1666066.1526 934.37 27+55.06 26.07 RT
554 BY17-554 860684.2984 1666736.5504 941.16 20+50.42 21.21 LT
553 BY17-553 860538.5346 1667421.6769 935.94 13+51.50 25.23 RT
552 BY17-552 860346.5342 1667955.8719 929.51 OUTSIDE PROJECT LIMITS
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y5 STATION OFFSET
BY17
10 U2579B-10 862393.8810 1659454.5370 836.07 OUTSIDE PROJECT LIMITS
9 U2579B-9 862298.5420 1660695.1610 821.23 146+24.87 30.88 LT
551 BY16-551 862249.0870 1661414.2780 832.76 139+04.08 24.55 LT
550 BY16-550 862172.8450 1662390.6940 872.67 129+24.70 25.02 LT
549 BY16-549 862152.4420 1663289.1930 895.45 120+27.31 24.15 RT
548 BY16-548 862036.7340 1664165.1230 889.03 111+45.05 23.44 LT
8 U2579B-8 861955.1850 1665179.3440 884.85 101+27.56 26.28 LT
133 BL-52 861914.1300 1666379.8520 893.60 89+27.48 25.67 RT
7 U2579B-7 861818.7420 1666875.7630 893.30 84+25.67 31.06 LT
547 BY16-547 861728.7350 1668130.4650 875.65 71+67.77 23.73 LT
546 BY16-546 861616.8460 1669575.7410 850.59 57+18.17 23.46 LT
545 BY16-545 861531.5670 1670683.4880 860.50 46+07.14 22.78 LT
6 U2579B-6 861435.2090 1671817.3030 891.85 34+69.27 31.13 LT
5 U2579B-5 861341.2660 1673030.7850 918.90 22+52.16 30.91 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y4WB STATION OFFSET
BY16
544 BY15B-544 862261.7170 1663673.7090 908.06 116+52.40 162.85 RT
422 BY15-542 862274.5570 1662769.5400 895.75 125+54.85 105.70 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y4WB STATION OFFSET
BY15B
543 BY15A-543 862241.0400 1664301.0870 887.99 110+25.30 190.77 RT
421 BY15-540 862136.1110 1664523.5220 872.27 107+95.42 103.37 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y4WB STATION OFFSET
BY15A
420 BY17-559 862260.3430 1662528.1310 898.66 127+94.44 72.85 RT
542 BY15-542 862274.5570 1662769.5400 895.75 125+54.85 105.70 RT
541 BY15-541 862159.9890 1663843.0320 907.62 114+75.72 74.53 RT
540 BY15-540 862136.1110 1664523.5220 872.27 107+95.42 103.37 RT
539 BY15-539 862048.5470 1665285.3270 900.48 100+29.12 75.00 RT
538 BY15-538 862013.4480 1665775.6380 889.41 95+37.57 77.95 RT
419 BY13-537 862847.8980 1665373.6200 905.34 100+02.94 878.79 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y4WB STATION OFFSET
BY15
536 BY14-536 862629.4630 1665760.3960 880.62 635+95.78 534.07 RT
418 BL-51 862578.8310 1666211.5370 858.44 635+81.61 80.30 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY14
537 BY13-537 862847.8980 1665373.6200 905.34 634+24.74 947.15 RT
535 BY13-535 863036.9340 1665764.2920 869.64 631+76.97 583.05 RT
534 BY13-534 863085.9790 1666097.1000 851.98 630+87.91 258.03 RT
417 BL-49 862956.6260 1666344.9590 832.85 631+88.77 3.03 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY13
533 BY12-533 863802.7380 1666255.6600 857.73 623+50.31 164.05 RT
416 BL-46 863878.8700 1666470.1900 861.93 622+60.26 45.16 LT
532 BY12-532 863832.5420 1666898.1940 876.52 622+79.68 475.21 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY12
415 BL-44 864347.1850 1666470.9430 852.86 617+93.39 23.83 LT
530 BY11-530 864318.0230 1666601.0320 862.75 618+18.03 154.83 LT
531 BY11-531 864467.4530 1666904.1690 883.83 616+59.28 452.96 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY11
414 BY10-526 867154.5320 1665453.1690 949.64 587+49.64 889.57 RT
529 BY10D-529 866890.7600 1665115.8010 946.98 589+70.43 1278.65 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY10D
428 BY17-558 861624.9800 1662811.0040 899.76 124+63.26 484.73 LT
568 BY21-568 861499.7550 1662484.6960 868.91 127+78.90 634.82 LT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y4EB STATION OFFSET
BY21
567 BY20-567 861723.0500 1663959.2160 913.19 649+24.02 2141.15 RT
427 BY17-556 861259.3690 1664179.7680 927.10 653+31.29 1822.31 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY20
426 BY17-556 861259.3690 1664179.7680 927.10 653+31.29 1822.31 RT
566 BY19-566 860784.0110 1664251.2450 905.20 657+78.53 1646.10 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION L STATION OFFSET
BY19
565 BY18A-565 861003.7781 1667499.0310 926.65 14+03.85 493.95 RT
425 BY18-562 860885.4838 1667404.8146 937.71 14+62.27 354.46 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y5 STATION OFFSET
BY18A
564 BY18-564 861426.0247 1668207.0326 879.86 OUTSIDE PROJECT LIMITS
563 BY18-563 861414.6149 1667510.7937 898.33 15+04.48 892.44 RT
562 BY18-562 860885.4838 1667404.8146 937.71 14+62.27 354.46 RT
424 BY17-553 860538.5346 1667421.6769 935.94 13+51.50 25.23 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION Y5 STATION OFFSET
BY18
FIN AL
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
CL
4’
FDPS
4’
FDPS
TYPICAL SECTIO N N O . 2
-Y1- (US 158 REIDSVILLE RD)
PO IN T
G RADE
2:
1
6:1
4
:1
6:1
18’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
16’
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-AU-2579 B
W W
W /G RW/G R
.08.02.02.08
13’
10’12’12’10’
13’
G RADE TO THIS LIN E
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
USE TYPICAL SECTIO N N O . 2:VAR.
0’-12’0’-12’
VAR. VAR. 30’
6’
USE 3" O VERLAY O N EXISTIN G RO AD:
-Y1- STA. 52+85.00 TO STA. 54+00.00
-Y1- STA. 49+00.00 TO STA. 52+85.00
18"
.02 .02
.02.02
CL
W /G R
13’
W /G R
12’12’12’12’
4’
FDPS
4’
FDPS
-Y1- (US 158 REIDSVILLE RD)
G RADE TO THIS LIN E
10’
13’
10’
PO IN T
G RADE
2:
1
6:1
4
:1
6:1
18’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
.08 .08
EO P EO P
VAR.
6’
78’
18"
TYPICAL SECTIO N N O . 3
-Y1- STA. 42+25.00 TO STA. 49+00.00
USE TYPICAL SECTIO N N O . 3:
-Y1- STA. 14+32.71 TO STA. 21+71.59
.02 .02
VAR.
0’-15’
VAR.
0’-15’
.02 .02
-Y1- STA. 10+00.00. TO STA. 14+32.71
T E3D5
C3C3
E3 D5U
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
J2
J2
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
T6"6"
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
TT
C3
D5 D5
C3
E3 E3
J2 J2 6"6"
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-BU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
.02.02
CL
USE TYPICAL SECTIO N N O . 5:
W /G R
13’
W /G R
12’12’12’12’
4’
FDPS
4’
FDPS
5A
-Y1- (US 158 REIDSVILLE RD)
G RADE TO THIS LIN E
10’
13’
10’
PO IN T
G RADE
2:
1
6:1
4
:1
6:1
18’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
.08 .08
EO P EO P
.02 .02.02.02
CL
W /G R
13’
W /G R
12’12’12’12’
4’
FDPS
4’
FDPS
TYPICAL SECTIO N N O . 4
-Y1- (US 158 REIDSVILLE RD)
G RADE TO THIS LIN E
10’
13’
10’
PO IN T
G RADE
2:
1
6:1
4
:1
6:1
18’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
.08 .08
EO P EO P
0.75’0.75’
USE TYPICAL SECTIO N N O . 4:
VAR.
VAR.
VARIES 78’-90’
6’
6’
.02.02
PO IN T
G RADE
15’15’
0.75’
0.75’
CL
-Y1- (US 158 REIDSVILLE RD)
.02.02
PO IN T
G RADE
0.75’0.75’
TYPICAL SECTIO N N O . 5
IN SET FO R DUAL LEFTS
15’15’
-Y1- (US 158 REIDSVILLE RD)
IN SET FO R LEFT TURN
CL
4A
78’
15’15’
18’12’
PO IN T
G RADE
.02.02
PO IN T
G RADE
0.75’0.75’
M O NO . CO N C. ISLAND
-Y1- STA. 21+71.59 TO STA. 26+57.71
-Y1- STA. 39+57.26 TO STA. 42+25.00
-Y1- STA. 21+71.59 TO STA. 32+69.50+/- (BEG . APPR. SLAB)
18"18"
18"18"
15’15’
VARIES 4.5’ TO 28.5’
.02
-Y1- STA. 32+69.50+/- (BEG . APPR. SLAB)
.02
VAR.
0’-12’
PARTIAL TYPICAL SECTIO N N O .
PARTIAL TYPICAL SECTIO N N O . 5A:
USE IN CO N JUN TIO N W ITH T.S. N O . 5
-Y1- STA. 34+27.26 TO STA. 39+57.26
VAR.
0’-12’
VAR.
28.5’
TO
6’
VAR.
0’-12’
4.5’
TO STA. 39+57.26
.02 .02
USE IN CO N JUN TIO N W ITH N O . 4
PARTIAL TYPICAL SECTIO N N O .
PARTIAL TYPICAL SECTIO N N O .4A :
TT
C3
E3D5 D5
C3
E3
TT
C3
D5 D5
C3
E3 E3
J2 J2
R1R1
R3
R1R1
R3
6"6"J2J2
6"6"6"6"
6"6"
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-CU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
CL
USE TYPICAL SECTIO N N O . 7:
TYPICAL SECTIO N N O .
G RADE
PO IN T
FDPS FDPS
6:1
6:1
8’ VC
2:
1
6:1
2:
1
VAR.
10’6’18’12’12’30’
15’ W /G R
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
O RIG IN AL
G RO UN D
VARIABLE
SLO PE
THIS LIN E
G RADE TO
4’4’
4’
.02 .08.02.08
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
VAR.
-Y1RPA- STA. 14+53.46 TO 29+63.93
-Y1RPD- STA. 14+53.92 TO 31+70.50
.02
CL
.02.08
G RADE
PO IN T
4’
FDPS
6"
THIS LIN E
G RADE TO
8’
12’14’
C&G
2’
17"
6:1
6:1
8’ VC
18’
4:
1
10’6’
G RO UN D
O RIG IN AL
6:1
4:
1
G RO UN D
O RIG IN AL
.02
-Y1LPA- STA. 12+31.88 TO 20+37.67
-Y1LPD- STA. 12+31.88 TO 21+09.84
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
17’ W /G R
12’-36’
VAR.
LO O P (-Y1LPA-, -Y1LPD-)
VAR.
TYPICAL SECTIO N N O . 6
20’-44’
USE TYPICAL SECTIO N N O . 6:
VAR.
VAR.
16’-40’
12’-36’
RAM P (-Y1RPA-, -Y1RPD-)
7
17"
6"6"
1’
TTD4
C2
J3
T
T
C2
D4
J3
R2
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
.02 .02.08
THIS LIN E
G RADE TO
11’11’
CL
-Y1DET-
G RO UN D
G RO UN D
O RIG IN AL
6:1
2:
1
G RO UN D
O RIG IN AL
8’8’8’
38’
PO IN T
G RADE
10’W /G R 10’W /G R
V
A
R.
(N C 158 DET.)
.08
CL
14’
.02.08
4’
G RADE
PO IN T
FDPS
G RO UN D
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
.02
CL
.02
G RADE
PO IN T
THIS LIN E
G RADE TO
8’
14’
C&G
2’
TYPICAL SECTIO N N O . 8
17"G RO UN D
O RIG IN AL
30’
6:1
4:
1
G RO UN D
O RIG IN AL
.02
17’ W /G R
12’-36’
VAR.
LO O P (-Y1LPA-, -Y1LPD-)
VAR.
6’-10’
.02
VAR.
24’-36’
VAR.
28’-40’
VAR.VAR.
4’4’
THIS LIN E
G RADE TO
-Y1LPA- STA. 20+37.67 TO 21+65.14
-Y1LPD- STA. 21+09.84 TO 22+21.40
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-DU-2579 B
14’-18’20’-44’
4’
USE TYPICAL SECTIO N N O . 8:
-Y1RPA- STA. 29+63.93 TO 30+89.92
-Y1RPD- STA. 31+70.50 TO 32+81.06
USE TYPICAL SECTIO N N O . 9:
O RIG IN AL
6:1
2:
1ORIGINAL
G RO UN D
V
A
R.
VAR.
VAR.
RAM P (-Y1RPA-,-Y1RPD-)
TYPICAL SECTIO N N O . 9
-Y1DET.- STA. 10+00.00 (=Y1 STA. 11+88.83) TO
STA. 49+80.05 (=Y1 STA. 51+09.25, 4.18’ LT )
17"
6"
FDPS
2’
FDPS
2’
6"6"
.02.02
.02 .02
11.5"
1’
4:1
T T
C3
D2 J1
T
C2
J3
T
C2
D4
J3
R2
R3
D4
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
-Y2- STA. 10+00.00 TO 17+40.00
-Y2- STA. 23+20.00 TO 29+75.00
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-EU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
-Y2- STA. 17+40.00 TO 18+99.25+/-(BEG . BR)
-Y2- STA. 21+41.18+/-(EN D BR) TO 23+20.00
CL
TYPICAL SECTIO N N O . 10
-Y2- (W ALKERTO W N -G UTHRIE RD)
2’
FDPS
2’
FDPS
W /G RW/G R
PO IN T
G RADE
G RADE TO THIS LIN E
U
W
.08 .02 .02 .08
12’12’
CL
24’
8’
11’
8’
11’
TYPICAL SECTIO N N O . 11
-Y2- (W ALKERTO W N -G UTHRIE RD)
2’
FDPS
2’
FDPS
W /G RW/G R
PO IN T
G RADE
G RADE TO THIS LIN E
.08 .02 .02 .08
USE TYPICAL SECTIO N N O . 11:
12’12’8’8’
11’11’
24’
2:
1
6:1
4
:1
6:1
18’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
6’
2:
1
6:1
4
:1
6:1
18’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
6’
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
VAR.
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
VAR.
9.5"
9.5"
USE TYPICAL SECTIO N N O . 10:
C2 D1D1
E2E2
T T
C2 D1
E2
T T
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
CL
TYPICAL SECTIO N N O .
W /G RW/G R
U
.08 .08
12’12’
24’
2:
1
6:1
4:1
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
VAR.
EXIST.EXIST.
THIS LIN E
G RADE TO
-Y2A- (PISG AH CHURCH RD)
-Y2A- STA. 16+00.00 TO 22+00.00
8’
CL
TYPICAL SECTIO N N O .
W /G RW/G R
U
.08 .08
12’12’8’8’
11’11’
24’
6:1
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL2:
1
30’
VAR.
EXIST.EXIST.
THIS LIN E
G RADE TO
-Y3- (W EST M O UN TAIN RD)
FDPS FDPS
-Y3- STA. 18+25.00 TO 26+25.00
12’1.5’
EXIST.
THIS LIN E
G RADE TO
EXIST.
W ALL
M SE
U
12’
LAN E.
FUTURE
CL
-Y3- STA. 21+03.71+/- TO 24+32.43+/- LT.
CL
12’8’1.5’
EXIST.
THIS LIN E
G RADE TO
U
BRIDG E PIER
-Y3- STA. 21+84.89 +/- TO 23+54.38 +/- RT.
-Y3--Y3-
0’-4’
VAR.
0’-4’
VAR.
2:
1
6:1
4
:1
6:1
12’
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
6’
M IN .
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-EAU-2579 B
9.5"
9.5"
9.5"
9.5"
45.5’
20’
12’1.5’
EXIST.
THIS LIN E
G RADE TO
U
BRIDG E PIER
9.5"
4’
17.5’
-Y2A- STA. 17+47.09 +/- TO 19+13.54 +/- RT.
CL-Y2A-
6’
9’
6’
9’
30
USE TYPICAL SECTIO N N O . 30:
PARTIAL TYPICAL SECTIO N N O . 30A
TYPICAL SECTIO N N O . 30:
USE IN CO N JUCTIO N W ITH
PARTIAL TYPICAL SECTIO N N O . 30B
TYPICAL SECTIO N N O . 30:
USE IN CO N JUCTIO N W ITH
31
USE TYPICAL SECTIO N N O . 31:
PARTIAL TYPICAL SECTIO N N O . 31A
TYPICAL SECTIO N N O . 31:
USE IN CO N JUCTIO N W ITH
C2 D1D1
E2E2
T T
C2 D1D1
E2E2
T T
D1
E2
C2
D1E2
C2
POINT
CROWN
POINT
CROWN
POINT
CROWN
POINT
CROWN
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
D1
E2
C2 POINT
CROWN
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-FU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
12’12’12’12’11’11’
30’
G RADE TO THIS LIN E G RADE TO THIS LIN E
10’
12’
15’ W /G R
10’
CL-Y4- (I-40 / US 421 BUSIN ESS)
-Y4- STA. 26+80.00 TO STA. 143+00.00
FDPS FDPSFDPS FDPS
12’
15’ W /G R
4’4’
6:1
6:1
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
8’ VC
18’
O RIG IN AL
G RO UN D
2:
1
10’6’
G RO UN D
O RIG IN AL
30’
6:1
2:
1
G RO UN D
O RIG IN AL
22"22"
SLO PE
VARIABLE
.04 .02 .02
.04
9’6’9’6’
SHLDR SHLDR
.02 .02 .02 .02.02.02.04.04
PO IN T
G RADE
PO IN T
G RADE
CL CL
-Y4EB- -Y4W B-
TYPICAL SECTIO N N O . 12
0’-12’0’-12’
VAR.VAR.
VAR.
0’-12’0’-12’
VAR.VAR.
24’-48’
VAR.
24’-48’
VAR.
USE TYPICAL SECTIO N N O . 12:
H
I
N
G
E
P
O
I
N
T
(-Y4EB- & -Y4W B-)
F
O
R
F
I
L
L
S
6"6"
VAR
.VAR.
.04
G RO UN D
O RIG IN AL
30’
6:1
2:
1
G RO UN D
O RIG IN AL
VAR.
6"
W ALL
N O ISE
PRO P
G RADE TO THIS LIN EGROUND
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
.04
VAR.
6"
W ALL
N O ISE
PRO P
G RADE TO THIS LIN E
TYPICAL SECTIO N N O . 12B
USE TYPICAL SECTIO N N O . 12B:
TYPICAL SECTIO N N O . 12A
USE TYPICAL SECTIO N N O . 12B:
20’4"
12’-3"
20’-4"
12’-3"
m in.
13’-9"
m in
FDPS
m in
13’-9"
m in
FDPS
(N O ISEW ALL -N W Y42-)
-Y4EB- STA. 130+26.37 TO 143+00.00 LT
-Y4- STA 129+53.10 (BEG IN W ALL) TO STA 131+63.57 (EN D W ALL) RT.
-Y4- STA 127+93.50 (BEG IN W ALL) TO STA 130+26.37 (EN D W ALL) LT.
RESURFACE EXISTIN G (CO N STRUCTED UN DER TIP PRO JECT U-2579G )
N O TE: SEE TIP PRO JECT U-2579G
(N O ISEW ALL -N W Y4RPBD2-)
-Y4EB- STA. 63+43.06 TO 64+91.92 LT. (81+62.11 -Y4RPBD-)
C3D5
E5
U
J2
W W
U
C3 D5
T
J2
T
E5
WW
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
J2 J2E5 E5D5 D5
E5
TJ2
C3
D5
E5
T J2
C3
D5
C3C3
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-IU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6:1
12’
15’ W /G R
.02 .02.02.04
CL
6:1
-Y4CD-
12’12’11’
36’
FDPS
12’
PO IN T
G RADE
CL
6:1
6:1
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
8’ VC
15’
O RIG IN AL
G RO UN D
2:
1
10’6’
SLO PE
VARIABLE
95’
FO R PAYM EN T DESIG N
SEE TYPICAL SECTIO N N O . 1
FDPS
12’
0’-12’
TYPICAL SECTIO N N O .
CL
G RADE
PO IN T
FDPSFDPS
6:1
6:1
8’ VC
2:1
6:1
2:1
10’6’15’12’12’30’
O RIG IN AL
G RO UN D
VARIABLE
SLO PE
G RADE TO
THIS LIN E
4’4’
.02.08 .02 .08
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
RAM P (-Y4RPC-)
16’
12’
J3
VAR.
VAR.
4’
10’
FDPS
12’12’12’
FDPS
4’
46’
12’
14’ 10’
G RADE TO THIS LIN E
15’ W /G R
PO IN T
G RADE
-L- (W IN STO N -SALEM
N O RTHERN BELTW AY)
-Y4RPC- STA. 13+88.00 - 35+56.52
-Y4CD- STA. 33+92.90+/- (EN D BR.) TO STA. 45+76.53+/- (BEG . BR.)
-Y4CD- STA. 47+84.70+/- (EN D BR.) TO STA. 85+65.67
* PAVE TO FACE O F G UARDRAIL
-Y4CD- STA. 19+22.07 TO STA. 32+49.05+/- (BEG . BR.)
.02
12’
12’*
6:1
C3
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
10’
10’
.02
14’
FDPS
6:1
10’
12’
17"6"6"
6"
FDPS
20.5"
D5
.04 .08
.02
G RO UN D
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
.04
VAR.
6"
W ALL
N O ISE
PRO P
G RADE TO THIS LIN E
TYPICAL SECTIO N N O . 21A
USE TYPICAL SECTIO N N O . 21A:
20’-4"
12’-3"
m in.
13’-9"
m in.
FDPS
-Y4RPC- STA. 31+09.32 TO 33+89.86 LT (N O ISEW ALL -N W Y41-)21
USE TYPICAL SECTIO N N O . 21:
TYPICAL SECTIO N N O . 22
USE TYPICAL SECTIO N N O . 22:
FO R -Y4CD- M EDIAN G UARDRAIL LO CATIO N S
USE IN CO N JUN CTIO N W ITH T.S. N O . 22
G RO UN D
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
.04
VAR.
6"
W ALL
N O ISE
PRO P
G RADE TO THIS LIN E
22’-4"
14’-3"
m in
FDPS
TYPICAL SECTIO N N O . 22A
USE TYPICAL SECTIO N N O . 22A:
m in
15’-9"
G RO UN D
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
.04
VAR.
6"
W ALL
N O ISE
PRO P
G RADE TO THIS LIN E
20’-4"
12’-3"
m in
FDPS
TYPICAL SECTIO N N O . 22B
USE TYPICAL SECTIO N N O . 22B:
m in
13’-9"
-Y4CD- STA. 67+87.59 TO 72+82.89 LT (N O ISEW ALL -N W CD2-)
-Y4CD- STA. 19+22.07 TO 30+55.29 LT (13+73.64 -Y4RPA-)
(N O ISEW ALL -N W L3-)
C3
D5E4J2
TT
T T
C2D4
6"
TJ2
6"
T
6"
E4
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
E5
T J2
C3
D5
T J2
C3
D5
E4
T J2
C3
D5
E4
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-JU-2579 B
.02 .02
G RADE TO
THIS LIN E
11’11’
11"
.08
3:1
O RIG IN AL
G RO UN D
G RO UN D
O RIG IN AL
6:1
2:
1
G RO UN D
O RIG IN AL
8’8’3’
2’PS 2’PS
38’
PO IN T
G RADE
10’W /G R 10’W /G R
V
A
R.
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
8’
11’
8’
11’
FDPS
4’
FDPS
4’
W /G RW/G R
PO IN T
G RADE
18’
6:1
2:
1
2:
1
6:1
4:1
U
W
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
.08 .02 .02 .08
2:
1
6:1
4
:1
6:1
18’
.02.08 .02 .08
CL
8’
11’
8’
11’
FDPS
4’
FDPS
4’
W /G RW/G R
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
G RADE
PO IN T
G RADE TO THIS LIN E
6:1
2:
1
30’16’
14"
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
-Y5DET.- STA. 10+00.00 TO 32+32.54
VAR.
VAR.
2:
1
6:1
V
A
R.
O RIG IN AL
G RO UN D
6’
-Y5- & -Y5A- (HASTIN G S HILL RD)
-Y5- & -Y5A- (HASTIN G S HILL RD)
VARIES VARIES
12’ - 18’12’ - 18’
VARIES 24’ - 36’
CL
VARIES VARIES
12’ - 18’12’ - 18’
VARIES 24’ - 36’
-Y5A- STA. 54+00.00 TO 61+50.00
-Y5A- STA. 79+75.00 TO 81+25.00
-Y5- STA. 32+00.00 TO 33+30.00
-Y5- STA. 16+00.00 TO 17+50.00
-Y5- STA. 17+50.00 TO 22+95.35+/- (BEG . BR.)
-Y5- STA. 30+97.13+/- (EN D BR.) TO 32+00.00
-Y5A- STA 69+53.11+/- (EN D BR.) TO 79+75.00
-Y5A- STA. 61+50.00 TO 66+78.58+/- (BEG . BR.)
CL-Y5DET- (HASTIN G S HILL RD DETO UR)
THIS LIN E
G RADE TO 6"6"
6"6"
.08
6"6"
14"
-Y5- STA 24+06.99+/- (EN D BR.) TO 26+62.28+/- ( BR.)
FDPS
4’
3:1 .06 .06
O RIG IN AL
G RO UN D
.00
CL-Y5A-
PARTIAL TYPICAL
USE IN CO N JUN CTIO N W ITH T.S. N O . 22
-Y5- STA. 59+25.00 TO 60+25.00
11’
35’
18’
RETAIN IN G
W ALL
.02 .02
.02 .02
.02 .02
USE TYPICAL SECTIO N N O . 23:
SECTIO N N O . 23A
TYPICAL SECTIO N N O . 25
USE TYPICAL SECTIO N N O . 25:
TYPICAL SECTIO N N O . 24
TYPICAL SECTIO N N O . 23
USE TYPICAL SECTIO N N O . 24:
T T
C2
J2
C2 D3D3
J2
T T
C2 D3
J2
T T
J2
P
C2 W
J2 D3
U
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
T
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-KU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
2:
1
6:1
4:1
11’11’12’
.02 .02 .08
CL
22’
6’6’
W /G RW/G R
PO IN T
G RADE
G RADE TO THIS LIN E
6:1
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
2:
1
-Y6- (G ERRY DR.)
9’9’
.08GROUND
O RIG IN AL
G RO UN D
O RIG IN AL
2:
1
6:1
4:1 .02 .02 .08
CL
18’
2’2’
W /G RW/G R
C2
PO IN T
G RADE
G RADE TO THIS LIN E
6:1
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
2:
1
7’7’
.08GROUND
O RIG IN AL
G RO UN D
O RIG IN AL
9’9’8’
-Y7- (ESTHER LN .)
9"
-Y7- STA. 10+00.00 TO STA. 13+54.72
USE TYPICAL SECTIO N N O . 25:
VAR.
VAR.
2:
1
6:1
4:1
11’11’12’
.02 .02 .08
CL
22’
6’6’
W /G RW/G R
PO IN T
G RADE
G RADE TO THIS LIN E
6:1
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
2:
1
-Y6- (G ERRY DR.)
9’9’
7"
.08GROUND
O RIG IN AL
G RO UN D
O RIG IN AL
USE TYPICAL SECTIO N N O . 26:
VAR.
-Y6- STA. 10+12.91 TO 12+00.00
-Y6- STA. 15+50.00 TO 38+21.23
-Y6- STA. 12+00.00 TO 15+50.00
11"6"6"
6"6"
2:
1
6:1
4:1 .02 .02 .08
CL
24’
8’8’
PO IN T
G RADE
G RADE TO THIS LIN E
6:1
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
2:
1
.08
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
-Y9- STA. 10+16.20 TO STA. 13+00.00
VAR. 6"6"
-Y9- (O LD BELEW S CREEK RD.)
12’12’12’
18"
TYPICAL SECTIO N N O . 26
TYPICAL SECTIO N N O . 27
TYPICAL SECTIO N N O . 28
USE TYPICAL SECTIO N N O . 28:
TYPICAL SECTIO N N O . 29
USE TYPICAL SECTIO N N O . 29:
C2 J2
TT
TT
J1
C2
TT
W
E2E2
P
P TT
D5E3
J2
C3
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
12’
G RADE TO THIS LIN E
12’
10’
FDPS
G RO UN D
O RIG IN AL
22"
.02
.04
.02
PO IN T
G RADE
CL
-Y4W B-
0’-12’
VAR.
RETAIN IN G W ALL
STREAM
-Y4W B- FRO M STA. 50+50.00 TO STA. 55+50.00 -Y4W B- FRO M EN D O F RCBC (46+59.65) TO 47+75.00
12’
G RADE TO THIS LIN E
FDPS
G RO UN D
O RIG IN AL
2:
1
22"
.02 .04.02
PO IN T
G RADE
CL
-Y4W B-
RETAIN IN G W ALL
STREAM
CL
STREAM
STREAM
CL
3’
-Y1- FRO M STA. 35+57.53 TO STA. 45+00.41 RT
-Y1- FRO M STA. 22+74.55 TO STA. 28+10.00 RT
-Y1- FRO M STA. 41+29.69 TO STA. 42+50.00 LT
-Y1- FRO M STA. 18+49.91 TO STA. 24+00.00 LT
-L- FRO M STA. 522+00.00 TO STA. 528+46.90 RT
-L- FRO M STA. 554+22.53 TO STA. 555+49.01 RT
-L- FRO M STA. 626+34.75 TO STA. 626+87.06 RT
-L- FRO M STA. 666+25.45 TO STA. 668+99.96 RT
-L- FRO M STA. 686+49.89 TO STA. 692+33.01 RT
-Y4CD- FRO M STA. 44+66.31 TO STA. 45+49.34 LT
-Y4CD- FRO M STA. 92+56.00 TO STA. 95+50.15 LT
-Y3- FRO M STA. 20+70.00 TO STA. 21+04.07 LT
-Y4RPA- FRO M STA. 10+00.00 TO STA. 15+34.38 LT
-Y4RPA- FRO M STA. 19+26.35 TO STA. 24+49.37 LT
-Y4RPBD- FRO M STA. 10+00.00 TO STA. 24+82.31 RT
-Y4RPBD- FRO M STA. 42+25.35 TO STA. 42+86.34 LT
-Y4RPBD- FRO M STA. 54+90.96 TO STA. 55+20.43 LT
-Y4- FRO M STA. 39+50.02 TO STA. 55+50.18 RT
-Y4- FRO M STA. 40+99.99 TO STA. 45+99.99 LT
-Y5- FRO M STA. 31+30.17 TO STA. 31+60.01 RT
-Y5- FRO M STA. 31+14.48 TO STA. 31+59.81 LT
-Y5A- FRO M STA. 69+54.66 TO STA. 69+79.94
-Y5A- FRO M STA. 70+07.94 TO STA. 70+16.97
RETAIN IN G W ALL DETAIL 1:RETAIN IN G W ALL DETAIL 2:
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-KAU-2579 B
VAR. 24’ - 36’
12’
* VAR.
16.075 to
* -Y4W B- FRO M STA. 64+11.04 TO STA. 64+58.33
12’12’
10’
14.214’
50.214’
28.446
4:
1 4:1 .02 .02 .08
CL
12’
2’2’
PO IN T
G RADE
G RADE TO THIS LIN E
4:1
G RO UN D
O RIG IN AL
.08GROUND
O RIG IN AL
6’6’8’
8"
-DR5- STA. 10+00.00 TO STA. 22+96.07
-DR5- (W ILSO N PRO P.DRIVEW AY)
-L- FRO M STA. 521+50.91 TO STA. 528+74.91 LT
-L- FRO M STA. 500+99.79 TO STA. 509+49.88 LT
-L- FRO M STA. 501+50.00 TO STA. 510+35.00 RT
SHO ULDER BERM G UTTER DETAIL
SHO ULDER BERM G UTTER LO CATIO N S:
6:1
G RO UN D
O RIG IN AL
2:
1
VAR
VAR.
EO P
VAR
PAVEM EN T DESIG N
FO R FDPS
SEE TYPICALS
VAR
FDPS
VAR
-Y1- FRO M STA. 35+41.68 TO STA. 35+76.19 LT
-L- FRO M STA. 604+99.94 TO STA. 607+18.45 LT
-L- FRO M STA. 609+68.44 TO STA. 610+30.00 RT
-L- FRO M STA. 640+49.58 TO STA. 641+32.08 LT
-L- FRO M STA. 640+50.42 TO STA. 641+54.76 RT
-L- FRO M STA. 687+89.99 TO STA. 690+83.52 LT
-Y2- FRO M STA. 18+60.62 TO STA. 18+99.02 RT
-Y2- FRO M STA. 18+60.91 TO STA. 18+99.05 LT
-Y4RPBD- FRO M STA. 23+99.96 TO STA. 25+43.04 LT
TYPICAL SECTIO N N O . 32
USE TYPICAL SECTIO N N O . 32:
E5J2
C3
D5
E5 E7
C3 D5
T
T
R4
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
E7
R4
J2
T
R4
J5
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-KBU-2579 B
6
:1
.02
.02
CL
-L-
.02
.04
.02
.04
.02
.04
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
EXISTING PAVEMENT.
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
STA. 478+20 TO 484+35 (RT, OUTSIDE)
OUTLETS: 478+20 (2GI), 483+00 (2GI)
RECOMMENDED LOCATIONS:
OUTLETS: 620+78 +/- 623+00
STA. 617+00 TO 626+00 (RT, OUTSIDE)
STA. 486+55 TO 498+42 (RT, OUTSIDE)
STA. 512+00 TO 522+00 (RT, OUTSIDE)
OUTLETS: 515+30 (2GI), 520+50 (2GI)
RECOMMENDED LOCATIONS:
OUTLETS: 478+20 (2GI), 483+39 (2GI)
OUTLETS: 487+50 (2GI), 490+75 (2GI)
STA. 478+20 TO 485+60 (LT, OUTSIDE)
STA. 487+50 TO 495+00 (LT, OUTSIDE)
STA. 510+37 TO 521+50 (LT, OUTSIDE)
STA. 528+75 TO 542+70 (LT, OUTSIDE)
RECOMMENDED LOCATIONS:
STA. 501+50 TO 510+00 (RT, OUTSIDE)
OUTLETS: 501+50 (2GI), 504+85 (2GI), 507+00 (2GI)
OUTLETS: 558+30 (2GI), 560+50 (2GI)
OUTLETS: 671+00, 673+22 +/-(2GI), 676+00 (2GI)
OUTLETS: 504+85 (2GI), 507+00 (2GI)
OUTLETS: 620+75 +/- (3GI), 623+47 (2GI)
STA. 558+30 TO 564+00 (RT, OUTSIDE)
STA. 667+00 TO 679+00 (RT, OUTSIDE)
STA. 504+85 TO 510+37 (LT, OUTSIDE)
STA. 617+00 TO 626+80 (LT, OUTSIDE)
STA. 521+50 TO 528+75 (LT, OUTSIDE)
OUTLETS: 521+50, 525+50 (2GI), 528+75 (2GI)
STA. 522+00 TO 528+49 (RT, OUTSIDE)
RECOMMENDED LOCATIONS:
T
1’-0"
3’-6"
STONE
#57
STA. 542+00 TO 555+45 (LT, MEDIAN)
OUTLETS: 545+65 (2GI), 548+53 +/- (2GI),
551+00 (2GI), 554+22 (2GI)
STA. 558+30 TO 564+00 (LT, MEDIAN)
OUTLETS: 558+30 (2GI), 560+50 (2GI)
STA. 667+00 TO 679+00 (LT, MEDIAN)
OUTLETS: 669+65 (2GI), 672+00 (2GI),
673+22 +/- (2GI), 676+00 (2GI)
A1
E1
C1
3’-0"
OUTLETS: 525+50 (2GI), 528+45, (2GI)
STA. 554+20 TO 555+45 (RT, OUTSIDE)
548+53+/- (2GI), 551+00 (2GI)
539+72 (2GI), 542+70 (2GI)
OUTLETS: 486+55 (2GI), 490+75 (2GI),
494+75 (2GI)
OUTLETS: 528+75 (2GI), 534+50 (2GI),
OUTLETS: 534+22 (2GI), 534+50 (2GI),
545+63 (2GI), 542+70 (2GI)
538+00 (2GI),
539+72 (2GI),
2’-0"
12’-0"
4" PERFORATED PIPE
FABRIC
TRAVEL LANE
POINT
GRADE
GRADE TO THIS LINE3
17.75"
1’-0"
MEDIAN SHOULDER DRAIN WITH GUARDRAIL
SHOULDER DRAIN DETAIL
SHOULDER DRAIN WITH GUARDRAIL DETAIL
STA. 552+62. TO 554+20 (RT, OUTSIDE)
STA. 528+49 TO 552+62 (RT, OUTSIDE)520+00 (2GI), 521+50
OUTLETS: 513+00 , 516+00 (2GI),
OUTLETS: 554+22 (2GI)
MEDIAN SHOULDER
SHOULDER DRAIN WITH SHOULDER BERM GUTTER & GUARDRAIL DETAIL
11’-0"
J5
T
R4
2’-4"3’-0"TRAVEL LANE
OUTSIDE SHOULDER
1’-0"
12’-0"
3’-6"
3’-0"
1’-0"
1’-0"
FABRIC
4" PERFORATED PIPE
#57
STONE
A1 A2
E1
C1
2’-0"
J4
STABILIZED
SUBGRADE
1’-0"
12’-0"
OUTSIDE SHOULDER
TRAVEL LANE 2’-0"3’-0"
T
#57
STONE
A1 A2
E1
C1 J4
STABILIZED
SUBGRADE
1’-0"
1’-0"
3’-6"
3’-0"
1’-0"
1’-0"
FABRIC
4" PERFORATED PIPE
2’-0"
12’-0"
OUTSIDE SHOULDER
TRAVEL LANE 2’-0"
#57
STONE
A1 A2
E1
C1
T
J4
STABILIZED
SUBGRADE
1’-0"
3’-6"
3’-0"
1’-0"
1’-0"
FABRIC
4" PERFORATED PIPE
2’-0"
USE TYPICAL SECTIO N N O . 1:
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2 U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
6:1
6:1
8’ VC
.02.02 .02 .02 .02
12’12’12’12’12’12’11’11’
36’36’46’
.02 .02.04 .04
18’
G RADE TO THIS LIN E
17’ W /G R
14’
12’12’
17’ W /G R
14’
G RO UN D
O RIG IN AL
O RIG IN AL
G RO UN D
2:
1
TYPICAL SECTIO N N O . 1
CL
6:1
CL
/// /// /// ///
U
Detail Showing M ethod of W edging
SURVEY
C5 D6
G RADE TO THIS LIN E
6
:1
30’10’6’
6
:1
2:
1
G RO UN D
O RIG IN AL
SLO PE
VARIABLE
.02
W edging Detail For Resurfacing
C4 D7
C4C5
D6 D7
M IN .
2.25"
M IN .
3"
M IN .
3"M IN .
2 1/2"
M IN .
3"
E8
E9
VAR.
-L- (W IN STO N -SALEM N O RTHERN BELTW AY)
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
F
O
R
F
I
L
L
S
-L- STA. 478+00.00 TO STA. 555+73.00+/- (BEG . BR.)
17.75"17.75"
M IN .
2 1/2"
E6 E7
-L- STA. 643+82.64+/- (EN D BR.) TO STA. 692+32.98
-L- STA. 630+18.74+/- (EN D BR.) TO STA. 641+70.82+/- (BEG . BR.)
1’
E7 E6 E6 E7
U
PO IN T
G RADE
FDPS FDPS
PO IN T
G RADE
(FUT. LAN E)(FUT. LAN E)
2’
*USE 4:1 CUT SLO PES
*
-L- STA. 513+50.00 TO STA. 520+50.00 RT
-L- STA. 514+00.00 TO STA. 519+50.00 LT
-L- STA. 530+50.00 TO STA. 538+50.00 LT
-L- STA. 542+00.00 TO STA. 554+00.00 RT
-L- STA. 547+00.00 TO STA. 552+50.00 LT
-L- STA. 670+50.00 TO STA. 685+50.00 RT
.04
G RO UN D
O RIG IN AL
30’
6
:1
2:
1
G RO UN D
O RIG IN AL
VAR.
1’
2’
W ALL
N O ISE
PRO P
PDPS
12’
PDPS
12’
G RADE TO THIS LIN E
TYPICAL SECTIO N N O . 1A
USE TYPICAL SECTIO N N O . 1A:
-L- STA. 557+98.01+/- (EN D BR.) TO STA. 582+85.67+/- (BEG . BR.)
-L- STA. 585+60.73+/- (EN D BR.) TO STA. 627+13.78+/- (BEG . BR.)
22’-4"
m in
PDPS
14’-3"
6’-7"
-L- STA. 885+81.40 TO STA. 609+68.44 RT (N O ISE W ALL - N W L2)
-Y4CD- STA. 11+18.96 TO STA. 19+22.07 LT (N O ISE W ALL - N W L3)
-L- STA. 557+97.95 TO STA. 582+84.39 RT (N O ISE W ALL - N W L1)
m in.
15’-9"
T T T T
A1
E1
K
PAVEMENT SCHEDULE
NOTE: PAV. EDGES ARE 1:1 UNLESS SHOW OTHERWISE.
E3
W
EARTH MATERIAL.
EXISTING PAVEMENT.
J1
J2
J3
PROP. 8" AGGREGATE BASE COURSE.
PROP. 10" AGGREGATE BASE COURSE.
VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAIL)
T
U
K
OR
OR
A RATE OF 21 LBS PER SQ YD AS DIRECTED BY THE ENGINEER.
SUBBASE TO BE TREATED WITH LIME TO A DEPTH OF 6.5", AT
A RATE OF 56 LBS PER SQYD AS DIRECTED BY THE ENGINEER.
SUBBASE TO BE TREATED WITH CEMENT TO A DEPTH OF 6", AT
SUBBASE TO BE TREATED WITH AGGREGATE AT A RATE OF 250
A DEPTH OF 6" AS DIRECTED BY THE ENGINEER.
LBS PER SQYD AND CEMENT AT A RATE OF 56 LBS PER SQYD TO
D5
D1
D6
D7
D4
E1
E4
E2
TYPE I19.0B, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
PROP. APPROX. 2.5"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.0C, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
PROP. APPROX. 4"ASPHALT CONCRETE INTERMEDIATE COURSE,
TYPE I19.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
PROP. APPROX. 4"ASPHALT CONCRETE INTERMEDIATE COURSE,
PROP. APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE
B25.OC AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
PROP. APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE
B25.OB AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
B25.OB AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE
C2
C3
C4
EACH OF TWO LAYERS.
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE
S9.5B AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE
S9.5C AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN
EACH OF TWO LAYERS.
PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED
2" IN DEPTH.
TYPE S9.5B, AT AN AVERAGE RATE OF 112 LBS. PER SQ.YD.
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE,
PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED
PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,
2 1/2" IN DEPTH OR GREATER THAN 4" IN DEPTH.
TYPE I19.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,
2 1/2" IN DEPTH OR GREATER THAN 4" IN DEPTH.
TYPE I19.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN
PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN
B25.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE
3" IN DEPTH OR GREATER THAN 5 1/2 " IN DEPTH.
PER 1" DEPTH TO BE PLACED IN LAYERS NOT LESS THAN
B25.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD.
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE
3" IN DEPTH OR GREATER THAN 5 1/2 " IN DEPTH.
PER 1" DEPTH TO BE PLACED IN LAYERS NOT LESS THAN
R2
R4
2’-6"CONCRETE CURB AND GUTTER.
J4
C1
A1
PROP. APPROX. 1.25" ASPHALT CONCRETE SURFACE COURSE,
D3
TYPE I19.0B, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
PROP. APPROX. 3.0"ASPHALT CONCRETE INTERMEDIATE COURSE,
B25.OC AT AN AVERAGE RATE OF 399 LBS. PER SQ. YD.
E6
E5
B25.OC, AT AN AVERAGE RATE OF 627 LBS. PER SQ. YD.
PROP. APPROX. 5.5" ASPHALT CONCRETE BASE COURSE, TYPE
IN EACH OF TWO LAYERS.
PROP. APPROX. 7" ASPHALT CONCRETE BASE COURSE, TYPE
E7
C1 KC1E1
A1
13.5" DOWELED JOINTED PORTLAND CEMENT CONCRETE PAVEMENT
TYPE SF9.5A AT AN AVERAGE RATE OF 137.5 LBS.PER SQ.YD.
PROP. 6" AGGREGATE BASE COURSE.
R1 1’-6"CONCRETE CURB AND GUTTER.
P PRIME COAT
C5
PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED
2" IN DEPTH.
TYPE S9.5C, AT AN AVERAGE RATE OF 112 LBS. PER SQ.YD.
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE,
PER 1" DEPTH. TO BE PLACED IN LAYERS NOT TO EXCEED
D2 TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.
PROP. APPROX. 2.5"ASPHALT CONCRETE INTERMEDIATE COURSE,
R3 5" MONOLITHIC CONCRETE ISLAND.
SHOULDER BERM GUTTER
1’2’2’
A2 A2
A2
J4
2’
J4
PROP. VAR. DEPTH AGGREGATE BASE COURSE.J5
PROP. 4.25" AGGREGATE BASE COURSE.
PAVEMENT WITHOUT DOWELS AND A MINIMUM DEPTH OF 10.5"
VAR. DEPTH DOWELED JOINTED PORTLAND CEMENT CONCRETE
T
A2
J4K
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
.02
CL
.02.08
G RADE
PO IN T
4’
FDPS
6"
G RADE TO
THIS LIN E
8’
12’14’
C&G
2’
17"
6:1
6:1
8’ VC
15’
4:
1
10’6’
G RO UN D
O RIG IN AL
6:1
4:
1
G RO UN D
O RIG IN AL
.02
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
20’
12’
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
VAR.
-Y4LPB- STA. 12+27.92 TO 22+20.19
-Y4LPA- STA. 12+44.36 TO 21+98.27
.02
CL
.02.08
G RADE
PO IN T
4’
FDPS
6"6"
G RADE TO
THIS LIN E
8’
12’14’
C&G
2’
18"
6:1
6:1
8’ VC
15’
4:
1
10’6’
G RO UN D
O RIG IN AL
6:1
4:
1
G RO UN D
O RIG IN AL
.02
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
20’
12’
VARIABLE
SLO PE
G RO UN D
O RIG IN AL
VAR.
LO O P (-Y4LPD-)
LO O P (-Y4LPA-, -Y4LPB-)
-Y4LPD- STA. 12+19.08 TO 22+66.21
6"1’
CL-Y4- (I-40 / US 421 BUSIN ESS)
FDPS FDPS FDPS
EXEX
6:1
6’EX
SHLDR SHLDR
CL CL
-Y4EB- -Y4W B-
(-Y4EB- & -Y4W B-)
-Y4- STA. 143+00.00 TO STA. 148+00.00
EXEXEXEX
EX EX
EX EX
EX
EX
EX EX
EXEX EX EX
FDPS
G RO UN D
O RIG IN AL 6:1
2:1
G RO UN D
O RIG IN AL
VAR.
6"
W ALL
N O ISE
PRO P
12’-3"
13’-9"
20’
TYPICAL SECTIO N N O . 13
TYPICAL SECTIO N N O . 14
TYPICAL SECTIO N N O . 15
USE TYPICAL SECTIO N N O . 13:
USE TYPICAL SECTIO N N O . 14:
USE TYPICAL SECTIO N N O . 15:
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-FAU-2579 B
-Y4- STA. 143+00.00 TO STA. 146+76.25 (N O ISE W ALL -N W Y42-)*
*
T T
C2
D4
J3
R2
T T
C2 D4
J2
R2
E1
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
U U
C3C3
E5
T J2
C3
D5
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-GU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
CL
6:1
6:1
2:
1
6:1
2:
1
10’6’15’12’30’
15’ W /G R
PO IN T
G RADE
FDPS
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
O RIG IN AL
G RO UN D
VARIABLE
SLO PE
8’ VC
.08 .02 .02
G RADE TO
THIS LIN E
O RIG IN AL
G RO UN D
O RIG IN AL
G RO UN D
15’W /G R
12’
RAM P (-Y4RPBD-)
VAR.
0’-12’
VAR.
H
I
N
G
E
P
O
I
N
T
4’
**VAR 12’-24’
12’
FDPS
.04.02
-Y4RPA- STA. 17+79.22+/- (EN D BR.) TO 36+24.33
-Y4RPA- STA. 13+73.64 TO 16+44.34+/- (BEG . BR.)
* PAVE TO FACE O F G UARDRAIL
F
O
R
F
I
L
L
S
-Y4RPBD- STA. 15+65.91 TO 25+15.01+/- (BEG . BR.)
-Y4RPBD- STA. 27+80.00+/- (EN D. BR.) TO STA. 30+60.00
-Y4RPBD- STA. 66+11.85 TO STA. 81+62.11
10’*
20.5"
* PAVE TO FACE O F G UARDRAIL
.04
6
:1
6:1
2:1
6:1
PO IN T
G RADE
4’
FDPS
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
O RIG IN AL
G RO UN D
VARIABLE
SLO PE
8’ VC
.08.02.02
THIS LIN E
G RADE TO
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
VAR.
FDPS
.04
10’*
.04
20.5"
.02
CL RAM P (-Y4RPA-)
10’6’15’12’12’
VAR.
0’-12’12’30’
15’W /G R15’ W /G R
2:1
H
I
N
G
E
P
O
I
N
T
F
O
R
F
I
L
L
S
G RO UN D
O RIG IN AL
30’
6:1
2:
1
G RO UN D
O RIG IN AL
.04
VAR.
6"
W ALL
N O ISE
PRO P
12’-3"
G RADE TO THIS LIN E
USE TYPICAL SECTIO N N O . 17A:
TYPICAL SECTIO N N O . 17A
20’-4"
m in
13’-9"
m in
FDPS
-Y4RPBD- STA. 70+23.32 TO 81+62.11 (N O ISEW ALL -N W Y4RPBD2-)
G RO UN D
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
.04
VAR.
6"
W ALL
N O ISE
PRO P
G RADE TO THIS LIN E
-Y4RPA- STA. 19+26.04 TO 22+72.70 LT (N O ISEW ALL -N W Y4RPA-)
20’-4"
12’-3"
m in
FDPS
TYPICAL SECTIO N N O . 16A
USE TYPICAL SECTIO N N O . 16A:
m in
13’-9"
TYPICAL SECTIO N N O . 16
USE TYPICAL SECTIO N N O . 16:
TYPICAL SECTIO N N O . 17
USE TYPICAL SECTIO N N O . 17:
-Y4RPA- STA. 13+73.64 (30+55.29 -Y4CD-) TO 15+36.20 LT (N O ISEW ALL -N W L3-)
D5
T
C3
J2 E4T
6"
6"
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
D5
C3
J2E4
6"
6"
E4
TJ2
C3
D5
T J2
C3
D5
E4
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-HU-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
CL
TYPICAL SECTIO N N O .
G RADE
PO IN T
FDPS FDPS
18.0"
6:1
6:1
8’ VC
2:
1
6:1
2:
1
10’6’15’12’12’30’
15’ W /G R
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
O RIG IN AL
G RO UN D
VARIABLE
SLO PE
THIS LIN E
G RADE TO
4’
.02 .08.02.08
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
12’
J2
.02.02 .08
12’
.02
12’
G RADE TO
THIS LIN E
12’12’
CL
.04
6:1
6:1
8’ VC
15’
O RIG IN AL
G RO UN D
2:1
10’6’
G RO UN D
O RIG IN AL
30’
6:1
2:1
G RO UN D
O RIG IN AL
SLO PE
VARIABLE
RAM P (-Y4RPBD-)
VAR.
VAR.
H
I
N
G
E
P
O
I
N
T
H
I
N
G
E
P
O
I
N
T
F
O
R
C
U
T
S
15’W /G R
FDPS
PO IN T
G RADE
15’W /G R
10’*
* PAVE TO FACE O F G UARDRAIL
H
I
N
G
E
P
O
I
N
T
4’
4’
4’
FDPS
F
O
R
F
I
L
L
S
F
O
R
F
I
L
L
S
-Y4RPB- STA. 13+78.61 TO STA. 28+66.16
-Y4RPD- STA. 13+97.64 TO STA. 29+56.27
-Y4RPBD- STA. 54+72.30+/- (EN D BR.) TO STA. 66+11.85
-Y4RPBD- STA. 30+60.00 TO STA. 43+04.00+/- (BEG . BR.)
20.5"
RAM P (-Y4RPB-)
CL
TYPICAL SECTIO N N O .
G RADE
PO IN T
FDPS FDPS
17.0"
6:1
6:1
8’ VC
2:
1
6:1
2:
1
10’6’15’12’12’30’
15’ W /G R
F
O
R
C
U
T
S
H
I
N
G
E
P
O
I
N
T
O RIG IN AL
G RO UN D
VARIABLE
SLO PE
THIS LIN E
G RADE TO
4’
.02 .08.02.08
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
16’
12’
J3
VAR.
H
I
N
G
E
P
O
I
N
T
4’
4’
F
O
R
F
I
L
L
S
RAM P (-Y4RPD-)
6"6"
6"6"
.04
-Y4RPBD- STA. 45+17.13+/- (EN D BR.) TO STA. 51+70.14 +/- (BEG . BR.)
.02
.02
6:1
2:
1
30’
.08
VAR.
6"
.02
G RO UN D
O RIG IN AL
G RO UN D
O RIG IN AL
6’-3"
G RADE TO THIS LIN E
W ALL
N O ISE
PRO P
USE TYPICAL SECTIO N N O . 20A:
TYPICAL SECTIO N N O . 20A
J3
14’-4"
7’-9"
m in.
FDPS
m in.
-Y4RPD- STA. 26+02.53 TO 29+44.53 RT (N O ISEW ALL -N W Y4RPBD1-)
TYPICAL SECTIO N N O . 18
USE TYPICAL SECTIO N N O . 18:
19
USE TYPICAL SECTIO N N O . 19:
20
USE TYPICAL SECTIO N N O . 20:
TTE1
C2 D4
D5 T
T
C3
J2 E4J2
6"6"
TT
C2 D4
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
W
EXISTING PAVEMENT.U
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
T
D4
C2
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
2
:
1
N O ISE W ALL
.02
.04
SIN G LE FACED
BARRIER
1
6
-
D
E
C
-
2
0
1
3
1
0
:
0
1
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
t
y
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2-KCU-2579 B
C2
D1
D4
D3
E1
E4
R1
E2
EARTH MATERIAL.
J2
J3
J4
C3
T
R4
P
3" S9.5B
3" S9.5C
2.5"
4"
4"
3" B25.OB
B25.OC
B25.OB
8" ABC
10" ABC
I19.0B
I19.0C
I19.0B
3"
4"
1’-6"CONC. C&G
C4
D5
D6
VAR.S9.5B
VAR.
VAR.
VAR.
VAR.
I19.0B
I19.0C
B25.OB
B25.OC
EXISTING PAVEMENT.
WEDGING
R2 2’-6"CONC. C&G
E6
E7
E3
E5
B25.OC5.5"
7" B25.OC
D2
I19.0B 3.0"
C1
A2
1.25"SF9.5A
J1 6" ABC
13.5" JOINT CONC.
C5 VAR.S9.5C
K SUBGRADE STAB.
PRIME COAT
2.5"I19.0C
D7
R3 5"MONO.CONC.ISLAND
SHOULDER BERM GUTTER
A1
VAR. JOINT CONC.
VAR. ABCJ5
4.25" ABC
T
SHOULDER DRAIN OUTLETS: -L- STA. 558+30 (2GI)
-L- STA. 558+50 TO 564+00 (RT, OUTSIDE)
J5
T
TRAVEL LANE
OUTSIDE SHOULDER
1’-0"
3’-6"
3’-0"
1’-0"
1’-0"
FABRIC
4" PERFORATED PIPE
#57
STONE
A1 A2
E1
C1
2’-0"
J4
STABILIZED
SUBGRADE
-L- STA. 560+50 (2GI)
1’-6"1’-0"5’-7"
DETAIL OF NOISE WALL NWL1 WITH SHOULDER DRAIN
14’-3"
22’-4"
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
REM O VE
SEE PRO FILE FO R GRADE
STA. 20+00 TO 20+50 -Y1-DET LT
SPECIAL DITCH GRADE
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
SEE DETAIL#22
379 SYD FF
EST. 29 TO NS
STA. 19+50 TO 20+00 -Y1-DET LT
W / CLASS ’B’ RIP RAP
SPECIAL CUT ’V’ DITCH
SEE DETAIL#20
880 SYD FF
EST. 66 TO NS
STA. 26+34 TO 27+50 -Y1-DET LT
W / CLASS ’B’ RIP RAP
SPECIAL LATERAL ’V’ DITCH
SEE DETAIL#20
956 SYD FF
EST. 72 TO NS
STA. 26+24 TO 27+50 -Y1-DET RT
W / CLASS ’B’ RIP RAP
SPECIAL LATERAL ’V’ DITCH
EST 47 SY FF
EST 21 TO NS
RIP RAP
CLASS ’I’
EST 62 SY FF
EST 33 TO NS
RIP RAP
CLASS ’I’
EST 14 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
r
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
y
1
d
e
t
_
p
l
n
s
h
t
_
2
l
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
U-2579B
M
A
T
C
H
L
I
N
E
S
T
A
.
3
4
+
4
8
.
0
0
S
H
E
E
T
2
M
NOTE :
-Y1- D ETO U R
FOR -Y1DET- PROFILE, SEE SHEET 86
D
0 50’ 50’ 100’ 25’
PI Sta 12+30.02
D
L = 452.17’
T = 230.02’
R = 1,000.00’
PI Sta 16+82.19
D
L = 452.17’
T = 230.02’
R = 1,000.00’
-Y1DET-
-Y1LP
D
-
2-L
HW
HW
5
4
"
C
S
P
2
4
"
C
S
P
HW
54"
C
SP
443
444 445
Front
Ditch
SlopeNatural
Ground 2:
1 D Flatter4:1 or
d
Filter Fabric
( Not to Scale)
SPECIAL CUT DITCH
DETAIL #22
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA. 19+50 TO 20+00 -Y1-DET LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA. 26+24 TO 27+50 -Y1-DET LT & RT
T
T
T
T
12" DI
8" DI
8" DI
8" DI
12
"
S
T
12
"
S
T
12
"
S
T
12" ST
6
"
D
I
6
"
D
I
(
A
T
U
R
)
CUL1
CUL2
CUL3CUL4
1-5
X5
B
A
R
R
E
L
CE1
HW1
HW2
CE2
DI
4
2
"
R
C
P
18
" R
C
P
18
"
R
C
P
18
"
R
C
P
15" R
C
P
CONC HW
+
2
5.
9
0
-
L-
2
0
0.
0
0
’
+
7
2
.
8
8
-
Y
1
R
P
A
-
3
2
6
.
8
4
’
93.63’+37.00 -Y1-
+53.00 -Y1-
135.00’
+00.00 -Y7-
133.72’
+76.47 -Y1-
125.00’
+00.00 -Y1-
125.00’
53.93’
1
6
0
.
0
0
’
+
2
3
.
7
4
-
Y
1
-
1
0
6.
0
9
’
+
0
0
.
0
0
-
L-
2
0
0.
0
0
’
49.16’+00.00 -Y1-
+
4
8
.
0
0
-
Y
1
-
31.03’+00.00 -Y7-
1
3
4
.
1
5
’
1
4
5
’
+
2
0
1
3
6
.
5
8
’
1
4
5
’
+
8
5
5B
6
8
9
10
7
4
1
1
1
1
+55
75’49.23’
10+00.00
75.00 85.00’
+93.00 -Y1-
+62.00 -Y1-
125.00’
+
3
5
-
Y
1
-
2
0
0
.
0
0
’
1
7
2
.
0
0
’
236.00’261.00’
300.00’325.00’
-Y1-
+54.00 -
+30.00 -Y1-
1
6
2
.
0
0
’
&
1
3
2
.
0
6
’
+
5
0
.
0
0
-
Y
1
-
1
7
1.
0
0
’
+
2
0
.
0
0
-
Y
1
-
1
4
1.
1
0
’
44.00’28.97’
+40.00 -Y1-
149.00’
+37.00 -Y1-
109.00’
+00.00 -Y1-
116.00’100.84’
1
5
6.
0
0
’
30.58’
50.00’
+00.00 -Y7-
+
0
0
.
0
6
-
Y
1
R
P
A
-
1
5
0
.
0
0
’
+
9
3
.
2
7
-
Y
1
R
P
A
-
1
7
4
.
0
5
’
+
0
0
.
0
0
-
Y
1
R
P
A
-
1
5
0
.
0
0
’
7
C
H
O
RD
+70.00 -Y1-BEG . C/A
+62.22 -Y1-BEG . C/A
1
1A
2
3
3A 4A
4
B
4
B
5C
5A
5
9
-
B
L
-
1
4
-
B
L
-
1
3
-
T
1-
1
0
2
-
T
1-
1
0
3
-
T
1-
1
0
4
-
B
Y
1-
4
0
1
-BY1-501
00
+
9
2.
9
2
2
’
P
.
S
.
475
2
0
490
1
0
15
2
0
2
5
3
0
-Y1DET-
-Y1DET-
S 39 49’ 20.3" W
-Y1-
-Y1-
-Y1-
-Y1-
-Y1LPA-
2’ P.S.
2
’
P
.S
.
2
’
P
.
S
.
GRAU-350
GRAU-350
24’ INC
24’ INC
24’ INC
2
2
’
2
’
P
.
S
.
2
2
’
0
2
0
2
0
1
0
2
0
2
0
0
0
1
0
2
0
2
0
3
0
4
0
5
0
6
0
6
0
5
0
4
0
3
0
2
01
0
1
0
2
0
3
0
4
0
5
0
6
0
6
0
5
0
4
0
3
2
2
’
0
2
2
’
P.
S.
BEGIN CONSTRU CTION
-Y1D ET- PC Sta. 10+00.00
-Y1- POT Sta.11+88.83
-Y1DET- PRC Sta. 14+52.17
-Y1-PCSta. 14+00.00
-Y1-PRCSta. 18+38.23
-Y1-POTSta. 10+00.00
-Y7- POT Sta. 13+93.72
-Y1-PTSta. 22+76.47
-Y7- POT Sta. 10+00.00
-Y1LPA- POT Sta. 22+03.90
-Y1- POT Sta. 27+43.00
-Y1- POT Sta. 27+23.47
A-Y1RPA- PT Sta. 28+90.37
-Y1DET- PT Sta. 19+04.35
-Y1LPD- SC Sta. 12+10.00
-L- ST Sta. 484+24.00
59’ Lt.
-Y1LPA- ST Sta. 10+00.00-Y1LPA- ST Sta. 20+56.66
-Y1LPA- CS Sta. 18+46.66
-Y1LPA- SC Sta. 12+10.00
SRS Sta. 21+90.06
-Y1RPA- SC Sta. 24+00.06
-
L
-
-Y1RPA- POT Sta. 31+29.10
30
25
20
1
5
10
2
5
3
0
3
5
1
5
59’ Rt.
-Y1LPD- ST Sta. 10+00.00
-L- ST Sta. 482+93.00
480
-Y1- POT Sta. 34+10.0546
-L- POT Sta. 482+13.1365
F F
C
C
C
C
C
F
C
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
TIE TO EXISTING DITCH
REM O VE
SEE DETAIL #28
STA. 34+50 TO 35+75 -Y1-DET LT
SPECIAL CUT DITCH
SEE DETAIL#29
539 SYD FF
EST. 29 TO NS
STA. 35+75 TO 36+50 -Y1-DET LT
LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP
SEE DETAIL#23
2585 SYD FF
EST. 192 TO NS
STA. 36+50 TO 39+92 -Y1-DET LT
W / CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
EST 21 SY FF
EST 8 TO NS
RIP RAP
CLASS ’B’
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIG N
ENG IN EER EN GIN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFERENCE N O .
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
r
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
y
1
d
e
t
_
p
l
n
s
h
t
_
2
m
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
U-2579B
-
Y
1D
E
T
-
M
A
T
C
H
L
I
N
E
S
T
A
.
3
4
+
4
8
.
0
0
S
H
E
E
T
2
L
NOTE :
5
5
PI Sta 47+59.46
D
L = 448.86’
T = 228.28’
R = 1,000.00’
PI Sta 43+10.02
D
L = 450.07’
T = 228.91’
R = 1,000.00’
-Y1DET-
-Y1- D ETO U R
0 50’ 50’ 100’ 25’
FOR -Y1DET- PROFILE, SEE SHEET 87
2-M
0
2
0
3
0
4
0
5
0
6
0
2
0
0
0
2
0
5
0
2
6
0
-
Y1-
P
O
T
S
t
a
.
6
0
+
0
2
.
9
3
25 -Y1RPD- SC Sta. 25+73.67
-Y1RPD- SRS Sta. 23+63.67
-Y1RPD- Sta. 33+20.2157
-Y1- Sta. 40+26.0000
-Y1LPD- Sta. 22+60.41
-Y1- Sta. 40+06.0000
3
5
4
0
4
5
0
4
-Y1-PCSta. 44+26.47
-Y1DET-
-Y1-
2
’
P
.
S
.
2
’
P
.
S
.
2
2
’
2
4
’ IN
C
2
’ P
.S
.
GRAU-350
GRAU-350
GRAU-350
GRAU-350
2
2
’
0
3
0
6
0
5
0
4
0
3
0
2
0
1
00
0
1
0
2
0
3
0
4
2
2
’
2
’ P
.S
.
2
’ P
.S
.
0
6
0
5
0
1
0
2
0
2
0
1
0
2
2
2
’
2
’
P
.
S
.
2
’
P
.S
.2
2
’
24’ INC
END CONSTRU CTION
-Y1D ET- PT Sta. 49+80.05
-Y1- POC Sta.51+09.25(4.18LT)
-Y1DET- PRC Sta. 45+31.18
-Y1-PTSta. 53+02.93
D
-Y1LPD- CS Sta. 19+27.33
-Y1LPD- ST Sta. 21+37.33
-Y1RPD- PT Sta. 31+53.84
-Y1-PRCSta. 48+64.70
-Y1DET- PC Sta. 40+81.11
-Y1LPD-
-
Y
1
R
P
D
-
1
5
4
0
4
5
5
0
S 39 49’ 20.3" W
30
20C
C
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
ELEV. = 884.23 E = 1656715 N = 872364 -BY1- STA 61+00 374’ RT BM #1
2002720029
2003320034
-
T
1-
1
0
5
-
T
1-
1
0
6
-
T
1-
1
0
7
-
T
1-
1
0
8
-
T
1- 10
9
-
T
1-
110
-T1- 111
-T1- 112
-T1- 113
-T1- 114
-T1- 115
-BY1- POT 57+13.85 =
-BY10-503
-T1- 116
-BY2-506
-BY10-502
-
B
Y
2
-
5
0
5
(NOT SET)
-T1- POT 32+85.96
3
0
"
C
S
P
GRADE TO DRAIN
446
Flatter4:1 or
Slope
Ditch
Front
Natural
Ground
D
2:
1
( Not to Scale)
SPECIAL CUT DITCH
DETAIL #28
Min. D= 2 Ft.
FRO M STA. 34+50 TO 35+75 -Y1-DET LT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #29
Type of Liner= Class B Rip-Rap
b= 2.0 Ft.
Max. d= 1.0 Ft.
Min. D= 1.2 Ft.
FRO M STA. 35+75 TO 36+50 -Y1-DET LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL#23
*When B is < 6.0’b= 2.0 Ft.
B= 2.0 Ft.
Max. d= 1.0 Ft.
Min. D= 1.5 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA. 36+50 TO 39+92 -Y1-DET LT
1
4
1.
3
9
’
+
2
5
.
0
0
-
Y
1
R
P
D
-
1
4
1.
0
0
’
+
8
1.
4
5
-
Y
1
R
P
D
-
3
3
5
.
8
8
’
+
7
1.
0
0
-
Y
1
R
P
D
-
+
6
3
.
4
0
-
L-
2
0
0.
0
0
’
94.94’
55.15’
+
7
0
.
0
0
-
Y
1
-
1
5
0
.
0
0
’
+
2
7
.
3
1
-
Y
1
-
1
0
0
.
0
0
’
+
0
0
.
0
0
-
L-
2
0
0
.
0
0
’
2
8
7
+
6
5
2
5
3
+
0
5
2
2
3
+
0
5
4
+
2
9
.
9
5
-
L-
2
0
0
.
0
0
’
2
0
0
’
2
4
5
’
+
3
0
4
1
2
12
4
+
2
5
.
0
0
-
Y
1
R
P
D
-
2
0
8.
0
0
’
+00.00 -Y1-
245.00’
+13.00 -Y1-
120.00’
78.00’
+30.00 -Y1-
+
7
0
.
0
0
-
Y
1
R
P
D
-
1
4
1.
0
0
’
+
0
9
.
0
0
-
Y
1
R
P
D
-
+
8
2
.
6
6
-
Y
1
R
P
D
-
2
3
5
.
0
0
’
2
5
2
.
3
6
’
50.00’
30.00’
30.00’
60.00’
+20.00 -Y9-
+20.00 -Y9-
+90.00- Y9-
64.01’
60.00’
+50.00 -Y9-
99.38’
+85.00 -Y9-
53.36’
+80.00 -Y1-
30.00’
74.49’
+95.21 -Y1-
+00.00 -Y9-
1
7
5.
0
0
’
1
5
0
.
0
0
’
1
7
5
.
0
0
’
1
5
0
.
0
0
’
+
9
0
.
0
0
-
Y
1
-
+
1
0.
0
0
-
Y
1
-
+
8
3
.
7
9
-
Y
1
R
P
D
-
1
6
2
.
9
0
’
CHORD
+23.00 -Y1-
END C/A
+23.00 -Y1-
END C/A
226
TOP=898.30
TOP=916.05
T
T
T
T
T
T
12" DI
12" DI
12" DI
12"
D
I
12" DI
12
"
D
I
12
"
D
I
(
A
T
U
R
)
(
A
T
U
R
)
SEE PRO FILE FO R GRADE
STA. 20+50 TO 22+50 -Y5-DET RT
SPECIAL DITCH GRADE
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
EST. 7 SYFF
EST. 2 TO NS
CLASS ’B’ RIP RAP
SEE PRO FILE FO R GRADE
STA. 27+50 TO 29+50 -Y5-DET LT
SPECIAL DITCH GRADE
SEE DETAIL#28
STA. 29+00 TO 30+00 -Y5-DET RT
SPECIAL CUT DITCH
CO LLAR AND EXTEND
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
r
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
U
-
2
5
7
9
B
_
R
D
Y
_
y
5
d
e
t
_
p
l
n
s
h
t
_
2
N
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
U-2579B
NOTE :
D C
FOR -Y5DET- PROFILE, SEE SHEET 88
PI Sta 11+39.44
L = 277.37’
T = 139.44’
R = 1,090.00’R = 2,840.00’
T = 868.79’
L = 1,686.23’
PI Sta 21+46.16
DD
-Y5DET-
-Y5- D ETO U R
0 50’ 50’ 100’ 25’
2-N
18
" C
SP
24"
C
SP
18"
CS
P
1
8
"
447 448
449
450
Flatter4:1 or
Slope
Ditch
Front
Natural
Ground
D
2:
1
( Not to Scale)
SPECIAL CUT DITCH
DETAIL #28
Min. D= 2 Ft.
FRO M STA. 29+00 TO 30+00 -Y5-DET RT
-
B
L
-
5
3
-
B
L
-
5
4
-
B
L
-
5
5
-
B
L
-
5
6
-
B
Y
16
-
-BY18-563
-BY18-562
-
B
Y
17
-
5
5
4
-
B
Y
17
-
5
5
5
0
2
0
1
0
1
0
0
0
0
0
1
0
1
0
2
0
2
0
3
0
3
0
3
0
3
0
2
0
2
0
2
0
2
0
1
0
1 0
1
0
1
0
0
0
0
0
2
0
2
0
2
2
2
’
2
’
P.
S.
2
’
P.
S.
2
2
’
2
’ P
.S
.
2
’ P
.S
.
650
655
660
1
5
2
0
2
5
3
0
3
5
4
0
-L-SCSta. 662+50.30
-L-TSSta. 659+50.30
1
0
15
2
0
2
5
3
0
-L- PT Sta. 649+60.9565
10
15
20
2
5
3
0
15
2
0
25
30
45
6
0
65
9
5
1
0
0
9
5
-Y4RPD
-
SC
S
ta
. 18+25
.20
-Y4RPD- TS Sta. 15+85.20
-
Y4
R
P
C
-
C
S
S
t
a
. 2
9
+
7
9
.5
3
-Y4RPC- SC Sta. 12+40.00
-Y4RPC- ST Sta. 10+00.00
PT Sta. 53+84.13
55
60
65
-Y4CD- SC Sta. 66+51.14
-Y4CD- TS Sta. 63+71.14
1
5
20
25
’ INC
.
25’ INC.
BEGIN CONSTRU CTION
-Y5D ET- STA. 10+00.00
-Y5- STA. 15+00.00
-Y5D ET- STA. 32+32.54
-Y5- STA. 37+00.00
END CONSTRU CTION
-Y5DET- PRC Sta. 12+77.37
-Y4RPD- ST Sta. 28+43.54
-Y4RPD- POT Sta. 33+19.67
-Y4RPBD- CS Sta. 63+71.85
-Y4RPD- CS Sta. 26+03.54
-Y4RPBD- ST Sta. 66+11.85
-Y5-PT Sta. 32+51.52
-Y5-PC Sta. 21+41.22
CS Sta. 22+65.27
SC Sta. 12+10.00
ST Sta. 24+75.27
ST Sta. 10+00.00
-Y5DET- PRC Sta. 29+63.61
-Y5DET- PT Sta. 32+32.54
10
50
645
-Y4RPBD-
-Y4LPD-
-
Y
4
C
D
-
-
L
-
-
Y
4
C
D
-
-
L
-
-
Y
4
R
P
C
-
-
Y4
R
P
D
-
-Y5-
-Y5DET-
-Y4EB-
-Y4WB-
-Y
4
R
P
C
-
+
5
0
.3
0
-
L-
+
4
0
.0
0
-
Y4
RPC
-
14
1.0
0
’
2
0
0
.0
0
’
+
19
.18
-
Y4
C
D
-
18
6
.19
’
+
2
5
.2
0
-
Y4
RP
D
-
12
9
.0
0
’
+11.85 -Y4RPBD-
141.00’
+48.49 -Y4RPBD-
141.00’
+
5
0
.
0
0
-
Y
5
-
4
2
.
0
0
’
3
0
.
0
0
’
+
5
0
.
0
0
-
Y
5
-
4
2
.
0
0
’
3
0
.
0
0
’
4
2
.
1
2
’
+
9
8
.
2
8
-
Y
5
-
4
2
.
0
0
’
+
5
1.
5
2
-
Y
5
-
4
2
.
0
0
’
4
2
.
0
0
’
4
2
.
0
0
’
+
2
5
.
8
2
-
Y
5
-
+
4
1.
2
2
-
Y
5
-
4
2
.
0
0
’
+
4
1.
2
2
-
Y
5
-
1
2
9
.
0
0
’
+
8
5
.2
0
-
Y4
RPD
-
14
2
.4
0
’
+
5
0
.3
0
-
L-
14
6
.6
4
’
2
0
5
.3
0
’
+
5
1.14
-
Y4
C
D
-
19
2
.7
5
’
+
4
3
.
5
4
-
Y
4
R
P
D
-
+
0
0
.0
0
-
Y4
RPC
-
7
4
.
0
9
’
+
5
2
.
8
2
-
Y
5
-
+
5
7
.
2
6
-
Y
5
-
5
7
.
0
0
’
+
5
1.
0
2
-
Y
5
-
+
4
7
.
5
0
-
Y
5
-
1
2
4
.
1
4
’
42.00’
+64.00 -Y5-
987
145
146
928
983
990
949
152
153
155
155
1
5
5
9
2
1
9
2
1
1
5
5
1
4
7
9
7
2
1
6
5
1
6
6
1
6
7
1
6
8
1
6
9
9
6
8
1
6
2
1
7
2
1
7
1
1
7
3
1
7
4
162
2
0
7
16
6
16
5
42.00’+10.81 -Y5-
+32.86 -Y5-
42.00’30.00’
+
0
0
.
0
0
-
Y
5
-
+
0
0
.
0
0
-
Y
5
-
5
0
.
0
0
’
3
0
.
0
0
’
5
7
.
0
0
’
3
0
.
0
0
’
+
6
3
.
6
1
-
Y
5
D
E
T
-
5
0
.
0
0
’
+
5
1.
5
2
-
Y
5
-
5
7
.
0
0
’
+
0
0
.
0
0
-
Y
5
-
6
0
.
0
0
’
+40.00 -Y5-
60.00’
7
3
.
0
0
’
-
Y
5
D
E
T
-
+
5
0
.
0
0
+75.00 -Y4RPC-
141.00’
+10.00 -Y4RPC-+10.00 -Y4RPC-
245.00’
245.00’
4
2
.
0
0
’
4
2
.
0
0
’
+
0
0
.
0
0
-
Y
5
-
-
Y
5
-
+
0
0
.
0
0
C
H
O
R
D
C
H
O
R
D
C
H
O
RD
977
1
6
4
1
5
5
A
146A
155A
1
5
5
16
7
4
2
"
R
C
P
CB
INV INACCESSIBLE
TOP=903.48
4
"
H
D
P
E
I
N
V
=
8
6
6
.
2
3
I
N
V
=
8
5
8
.
11
2
4
" R
C
P
F
E
S
CB
INV INACCESSIBLE
TOP=890.64
INV INACCESSIBLE
TOP=883.88
INV INACCESSIBLE
TOP=880.58 CB
CB
CB
CB
INV INACCESSIBLE
TOP=887.67
INV INACCESSIBLE
TOP=887.66
18" R
CP
UNKNOWNSIZE/TYPE
18" RCP
18
"
R
C
P
SIZE/TYPE UNKNOWN
1
8
"
R
C
P
18
"
R
C
P
15
"
R
C
P
CONC HW
W
T
T
W
16" DI
16" DI
16" DI
16" DI
16" DI
6" DI
6" DI
6" DI
6" DI
6" DI
4" PL
4" PL
4" PL
4" PL
6" DI
6
"
D
I
(
A
T
U
R
)
(
A
T
U
R
)
(ATUR)
6
"
D
I
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
p
d
_
y
1
_
2
o
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
_U-2579B
SHEAR PO IN T LO CATIO N
SP #SP #
LEG EN D
-L- AN D -Y1- IN TERCHAN G E
SHEAR PO IN T DIAG RAM
2-O
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
p
d
_
y
1
_
2
o
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
SP 1
SP 2
SP 4
SP 34
SP 35
SP 36
SP 37
SP 38
SP 39
SP 40
SP 41
SP 42
SP 29
SP 30
SP 31
SP 32
SP 33
SP 43
SP 44
SP 45
SP 46
SP 47
SP 48
SP 49
SP 50
SP 51
SP 52
SP 53
SP 17
SP 18
SP 19
SP 20
SP 21
SP 22
SP 23
SP 24
SP 25
SP 26
SP 27 SP 28
SP 6
SP 7
SP 8
SP 9
SP 10
SP 11
SP 12
SP 13
SP 14
SP 15
SP 16
SP 3
-Y1RPD-
D
-Y1RPD
-
-Y1LPD-
-Y1LPD-
-Y1LPA-
A
-Y1RPA-
-Y1LPA-
-Y1RPA-
-Y1RPD-
-L-
SP 11A
SP 175
SP 166
SP 167
SP 168
SP 163
SP 164
SP 165
SP 176
SP 177
SP 171
SP 170
SP 169
SP 172
SP 173
SP 174
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
F
F
F
C
C
S R S S t a . 2 1 +9 0 .0 6
-
Y
1
L
P
A-
S
C
Sta. 1
2
+
1
0.0
0
-
Y1LP
A
-
S
T
S
ta
. 2
0
+
5
6
.6
6
-
Y1R
P
A
-
P
T
S
ta
. 2
8
+
9
0
.3
7
-
Y1R
P
A-
S
C
S
ta
. 14
+
9
0
.0
0
-
Y1R
P
A-
T
S
S
ta
. 12
+
5
0
.0
0
-Y
1R
PA
- SC Sta. 24+00.06
-Y
1R
PA
- CS Sta. 19+50.06
-Y1LPA
- C
S Sta. 18+46.66
-Y1LP
D
- S
C
S
ta. 12
+
10
.0
0
-
Y1LP
D
-
S
T
S
ta
. 2
1+
3
7
.3
3
-
Y
1
L
P
D
-
C
S
S
t
a
.
1
9
+
2
7.
3
3
-
Y1
R
P
D-
S
C
Sta. 2
5
+
73.67
-
Y1RP
D- SRS Sta. 23+63.67
-
Y1RP
D-
CS Sta. 21+23.67
-
Y1R
P
D
-
S
C
S
t
a
.
12
+
4
0
.
0
0
-
Y1R
P
D
-
P
T
S
ta
. 3
1+
5
3
.8
4
-
Y
1
L
P
D
-
T
S
S
t
a
.
1
0
+
0
0
.
0
0
-
Y
1
L
P
A
-
T
S
S
t
a
.
1
0
+
0
0
.
0
0
-Y1LPD- Sta. 22+60.41
-Y1- Sta. 40+06.00
-Y1- Sta. 40+25.53
SKEW = 98.5386
-Y1- POT Sta. 34+10.05
-L- POT Sta. 482+13.14
-Y1LPA- POT Sta. 22+03.90
-Y1- POT Sta. 27+43.00
-Y1RPA- POT Sta. 31+29.10
-Y1- POT Sta. 27+23.00
-Y1RPD- TS Sta. 10+00.00
-L- POT Sta. 503+00.00
-Y1RPA- POT Sta. 10+00.00
P
C
S
t
a
. 10
+
0
0
.0
0
-
Y1-
P
C
S
ta
. 4
4
+
2
6
.4
7
BEGIN APPROACH SLAB
-Y1- STA. 32+69.50
-Y1- STA. 32+93.77
BEGIN BRIDGE
-Y1- STA. 35+26.34
END BRIDGE
-Y1- STA. 35+50.61
END APPROACH SLAB
-
L
-
P
O
T
S
t
a
.
4
8
4
+
2
4
.
0
0
(
5
9
’
L
t
.
)
-
L
-
P
O
T
S
t
a
.
4
8
2
+
9
3
.
0
0
-L- POT Sta. 502+91.34 (59’ Rt.)
END GRASS MEDIAN
BEGIN 5" MONOLITHIC CONCRETE ISLAND
-
Y1D
E
T
-
P
C
S
ta
. 4
0
+
8
1.11
-
Y1D
E
T
-
-Y1RPD- Sta. 33+20.22
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
U-2579B
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
p
d
_
y
4
_
2
p
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
MATCHLINE INSET 1
M
A
T
C
H
L
I
N
E
I
N
S
E
T
1
IN SET 1
SHEAR PO INT LO CATIO N
SP #SP #
LEG EN D
-L- AN D -Y4- IN TERCHAN G E
SHEAR PO IN T DIAG RAM
2-P
SP 54 SP 55 SP 56 SP 57 SP 58 SP 59 SP 60 SP 61
SP 85
SP 84
SP 83
SP 82
SP 86
SP 87
SP 88
SP 98
SP 99
SP 89
SP 90
SP 91
SP 92
SP 77
SP 78
SP 79
SP 80
SP 81
SP 62
SP 68
SP 69 SP 70
SP 71
SP 72
SP 73
SP 74
SP 75
SP 76
SP 93
SP 94
SP 95
SP 100
SP 118
SP 117
SP 116
SP 115
SP 114
SP 113
SP 112
SP 111
SP 110
SP 109
SP 108
SP 107
SP 106
SP 126
SP 127 SP 128
SP 129
SP 119
SP 120
SP 121
SP 125
SP 124
SP 123
SP 122
SP 105
SP 103
SP 104
SP 130
A
D
B C
SP 101
SP 102
ST Sta. 24+75.27
-Y4RPA- TS Sta. 10+00.00
-Y4CD- POC Sta. 26+81.24
(24.00’ LT.)
-Y4RPA- SC Sta. 12+00.00
-L-PCSta. 617+80.74
TS Sta. 31+45.35
-Y4CD- PCC Sta. 36+33.44
SC Sta. 12+10.00
-Y4CD- POT Sta. 44+44.26 (12’ Lt.)
TS Sta. 10+00.00
CS Sta. 22+10.62
CS Sta. 22+65.27
SC Sta. 12+10.00
TS Sta. 10+00.00
TS Sta. 10+00.00
ST Sta. 24+68.05
CS Sta. 22+58.05
SC Sta. 12+10.00
PT Sta. 53+84.13
-L- PT Sta. 649+60.9565
-Y5-PT Sta. 32+51.52
ST Sta. 28+43.54
CS Sta. 26+03.54
-Y5-PC Sta. 21+41.22
ST Sta. 24+20.62
-Y4CD- POC STA. 46+87.16
-Y4- POT STA. 90+08.91
-Y4CD- POC STA. 46+60.01
-Y4WB- POT STA. 90+06.05
-Y4CD- POC STA. 47+14.31
-Y4EB- POT STA. 90+11.82
-Y4EB- POT STA. 91+29.51
-L- POC STA. 643+08.58
-L- POC STA. 642+81.42
-Y4WB- POT STA. 91+23.70
-L- POC STA. 642+54.27
-Y4- POT STA. 91+26.60
-L- POC STA. 649+19.78
-Y4RPBD- POC STA. 52+94.28
-Y5DET- POC STA. 22+50.51-Y4CD- POT STA. 53+77.69
-Y4CD- POT STA. 57+01.14
-Y5- POC STA. 27+33.16
-Y5DET- POC STA. 23+67.72
-L- POT STA. 651+54.57
-Y5- POC STA. 28+50.16
-L- POT STA. 652+78.47
-Y4EB- POT STA. 97+90.41
-Y4WB- POT STA. 98+14.65
-Y4- POT STA. 98+02.89
-Y4RPBD- POC STA. 43+79.19
-Y4RPBD- POC STA. 44+08.64
-Y4RPBD- POC STA. 44+38.39
-Y4RPC- SC Sta. 12+40.00-Y4RPC-
TS
Sta. 10+00.00
-L-TSSta. 659+50.30
I
D
E
N
T
I
T
Y
-
Y5
-
P
O
T
S
t
a
. 4
5
+
0
0
.0
0
LB
=
-
Y5
A
-
P
O
T
S
t
a
. 4
5
+
0
0
.0
0
L
A
-Y4CD- POT STA. 53+77.69
-Y4RPBD- POC STA. 54+16.42
-
Y
4
R
P
B
D
-
-
Y
4R
P
B--Y4RPBD-
-
Y4
WB
-
-
Y
4
-
-
Y4
E
B
-
-Y4RPC-
-L-
-L-
-Y4CD-
-
Y4
R
P
B
D
-
-
Y5
D
E
T
-
-
Y
4L
P
A-
-Y4CD-
-Y4RPA-
-Y4CD-
-L-
-Y4LPD-
-
Y4
WB
-
-
Y
4
-
-
Y4
E
B
-
-
Y4
WB
-
-
Y
4
-
-
Y4
E
B
-
-
Y4
R
P
C
-
-
Y4
R
P
B-
-Y4RPA-
-
Y5
-
-
Y4
LP
D
-
-Y4RPBD- ST Sta. 66+11.85 POT Sta. 33+19.67
-Y4RPBD- CS Sta. 63+71.85
-Y5DET- PRC Sta. 12+77.37
-Y4RPD- TS Sta. 15+85.20
-Y4CD- TS Sta. 63+71.14
SC Sta. 18+25.20
-Y4RPBD- CS Sta. 21+25.35
-Y4RPBD- ST Sta. 23+25.35
-Y4RPB- POT Sta. 10+00.00
-Y4RPBD- POT Sta. 30+50.00
12.00’ RT
-Y4RPBD-
-Y4RPBD- SC Sta. 33+85.35
-Y4RPB- SC Sta. 16+27.27
-Y4RPC- CS Sta. 29+79.53
-Y5DET- PRC Sta. 29+63.61
-Y5DET- PT Sta. 32+32.54
SP 131
SP 132
SP 133
SP 145
SP 146
SP 147
SP 148
SP 149
SP 150
SP 151
SP 152
SP 153
SP 154
SP 155
SP 156
SP 157
SP 158
SP 159
SP 137
SP 138
SP 139
SP 136
SP 162
SP 161
SP 160
SP 134
SP 144
SP 143
SP 140
SP 141
SP 142
SP 137
SP 135
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
C
F
C
C
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
CF
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
C
C
C
F
F
F
F
F
F
F
C
C
C
-
Y4
R
P
A-
C
S
S
t
a
. 3
9
+
4
1.7
4
-
Y4
R
P
A-
S
T
S
t
a
. 4
1+
4
1.7
4
-
Y
4
R
P
B
D-
T
S
Sta. 7
4
+
3
1.8
5
-
Y
4
R
P
B
D-
S
C
Sta. 7
6
+
3
1.8
5
-Y4WB-
-Y4-
-Y4EB-
-Y4RPA-
-Y4RPBD-
SP 131
F
F
F
F
F
F
F
F
F
F
FF
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
-
Y4
R
P
A
-
C
S
S
t
a
. 3
9
+
4
1.7
4
-
Y4
R
P
A
-
S
T
S
t
a
. 4
1+
4
1.7
4
-
Y
4
R
P
B
D-
T
S
Sta. 7
4
+
3
1.8
5
-
Y
4
R
P
B
D-
S
C
Sta. 7
6
+
3
1.8
5
-
Y4
WB
-
P
O
T
S
t
a
. 6
8
+
8
7
.7
3
2
4
.0
0
’
R
T
.
1
2
’
1
2
’
.
0
2
.
0
2
3
’
R
E
V
I
S
I
O
N
S
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
-
Y
2
-
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
R
O
A
D
W
A
Y
U
N
D
E
R
S
T
R
U
C
T
U
R
E
CL
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
CL
1
1
’
4
8
’
4
6
’
G
R
A
D
E
P
O
I
N
T
1
1
’
4
8
’
1
2
’
1
2
’
G
R
A
D
E
P
O
I
N
T
.
0
2
.
0
2
6
:
1
.
0
2
.
0
2
6
:1
.0
4
.
0
4
CL
1
5
’
3
6
’
.
0
2
.
0
2
1
5
’
2
4
’
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
G
R
A
D
E
P
O
I
N
T
1
3
.
5
’
1
1
’
3
6
’
1
2
’
G
R
A
D
E
P
O
I
N
T
.
0
2
.
0
2
6
:
1
.0
4
4
6
’
1
9
.
5
’
CL
1
1
’
3
6
’
1
2
’
G
R
A
D
E
P
O
I
N
T
.
0
2
.
0
2
6
:1
.
0
4
1
9
.
5
’
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
R
O
A
D
W
A
Y
U
N
D
E
R
S
T
R
U
C
T
U
R
E
1
0
4
’
@
@
@
@
-
Y
1
-
S
T
R
U
C
T
U
R
E
-
L-
(
W
I
N
S
T
O
N
-
S
A
LE
M
-
N
O
R
T
H
E
R
N
B
E
LT
W
A
Y
)
-
Y
1
-
(
U
S
1
5
8
R
E
I
D
S
V
I
LLE
R
O
A
D
)
O
V
E
R
-
L-
(
W
I
N
S
T
O
N
-
S
A
LE
M
-
N
O
R
T
H
E
R
N
B
E
LT
W
A
Y
)
1
3
.
5
’
8
4
.
5
’
8
4
.
5
’
7
8
.
5
’
7
8
.
5
’
2
2
2 2
2
0
1
0
A
D
T
1
7
,
4
8
0
2
0
3
0
A
D
T
2
6
,
4
4
0
D
H
V
=
1
0
D
=
6
0
D
U
A
L
=
3
T
T
S
T
=
5
D
E
S
I
G
N
D
A
T
A
-
Y
1
-
V
=
5
0
M
P
H
F
U
N
C
C
L
A
S
S
-
A
R
T
E
R
I
A
L
S
E
E
S
T
D
.
6
1
0
.
0
3
@ 2
S
L
O
P
E
S
D
E
T
E
R
M
I
N
E
D
B
Y
G
E
O
T
E
C
T
N
I
C
A
L
E
N
G
I
N
E
E
R
I
N
G
U
N
I
T
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
D
=
6
0
D
U
A
L
=
2
T
T
S
T
=
1
D
E
S
I
G
N
D
A
T
A
-
Y
2
-
V
=
5
0
M
P
H
S
E
E
S
T
D
.
6
1
0
.
0
3
@ 2
S
L
O
P
E
S
D
E
T
E
R
M
I
N
E
D
B
Y
G
E
O
T
E
C
T
N
I
C
A
L
E
N
G
I
N
E
E
R
I
N
G
U
N
I
T
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
4
9
6
0
6
8
8
0
6
’
8
’
X
X
X
X
X
X
-
Y
1
-
-
L
-
-
Y
2
-
-
L
-
0
.
7
5
’
0
.
7
5
’
M
I
N
I
M
U
M
V
E
R
T
I
C
A
L
C
L
E
A
R
A
N
C
E
=
1
6
’
-
6
"
M
I
N
I
M
U
M
V
E
R
T
I
C
A
L
C
L
E
A
R
A
N
C
E
=
1
6
’
-
6
"
1
2
.
5
T
O
2
8
.
5
’
5
"
M
O
N
O
L
I
T
H
I
C
C
O
N
C
R
E
T
E
I
S
L
A
N
D
-
Y
2
-
(
W
A
L
K
E
R
T
O
W
N
-
G
U
T
H
R
I
E
R
D
)
O
V
E
R
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
EN GINEER EN G INEER
R/W SHEET N O .
SHEET NO .PRO JECT REFERENCE N O .
U-2579B
G
R
A
D
E
P
O
I
N
T
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
S
L
A
N
E
A
U
X
.
L
A
N
E
A
U
X
.
4
.
S
E
E
S
H
E
E
T
2
-
A
F
O
R
-
Y
1
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
W
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
2
.
S
E
E
S
H
E
E
T
5
F
O
R
P
L
A
N
V
I
E
W
3
.
S
E
E
S
H
E
E
T
2
F
O
R
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
*
I
-
7
3
/
I
-
7
4
C
O
N
N
E
C
T
O
R
P
R
O
J
E
C
T
F
U
T
U
R
E
A
U
X
.
L
A
N
E
F
O
R
F
U
T
U
R
E
*
*
1 2
4
.
S
E
E
S
H
E
E
T
2
-
E
F
O
R
-
Y
2
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
W
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
2
.
S
E
E
S
H
E
E
T
7
F
O
R
P
L
A
N
V
I
E
W
3
.
S
E
E
S
H
E
E
T
2
F
O
R
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2-Q
L
A
N
E
A
U
X
7
.
5
’
3
4
.
5
’
F
U
N
C
C
L
A
S
S
-
M
I
N
O
R
R
U
R
A
L
C
O
L
L
E
C
T
O
R
.
0
2
.
0
2
.
0
2
.
0
2
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
.
0
4
G
R
A
D
E
P
O
I
N
T
.
0
4
G
R
A
D
E
P
O
I
N
T
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
CL
7
2
’
4
8
’
4
8
’
2
3
’
2
3
’
7
2
’
1
2
’
1
2
’
1
2
’
1
2
’
-
L-
(
W
I
N
S
T
O
N
-
S
A
LE
M
-
N
O
R
T
H
E
R
N
B
E
LT
W
A
Y
)
L
C
.
0
4
G
R
A
D
E
P
O
I
N
T
.
0
4
G
R
A
D
E
P
O
I
N
T
2
3
’
2
3
’
1
2
’
1
2
’
1
2
’
1
2
’
O
V
E
R
M
A
R
T
I
N
M
I
LL
C
R
E
E
K
6
0
’
3
6
’
6
0
’
3
6
’
C
-
Y
3
-
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
D
=
6
0
V
=
7
0
M
P
H
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
5
3
,
5
6
0
7
9
,
8
8
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
D
=
6
0
D
U
A
L
=
6
V
=
7
0
M
P
H
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
5
3
,
5
6
0
7
9
,
8
8
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
X
X
X
X
X
X
X
X
X
X
S
O
U
T
H
E
R
N
R
A
I
L
R
O
A
D
W
E
S
T
M
O
U
N
T
A
I
N
R
O
A
D
-
L
-
-
L
-
D
E
S
I
G
N
D
A
T
A
-
L
-
D
E
S
I
G
N
D
A
T
A
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
L
1
4
’
CL
C
1
4
’
1
2
’
1
2
’
P
O
I
N
T
L
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
EN GINEER EN G INEER
R/W SHEET N O .
SHEET NO .PRO JECT REFERENCE N O .
U-2579B
R
E
V
I
S
I
O
N
S
1
1
’
1
1
’
1
1
’
1
1
’
W
A
L
L
M
S
E
F
U
T
U
R
E
W
I
D
E
N
I
N
G
E
X
I
S
T
.
L
A
N
E
S
U
S
E
W
I
T
H
B
A
R
R
I
E
R
C
O
N
C
R
E
T
E
LC
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
S
-
S
R
R
-
(
S
O
U
T
H
E
R
N
R
A
I
LR
O
A
D
)
,
&
-
Y
3
-
(
W
E
S
T
M
O
U
N
T
A
I
N
R
O
A
D
)
-
L-
(
W
I
N
S
T
O
N
-
S
A
LE
M
-
N
O
R
T
H
E
R
N
B
E
LT
W
A
Y
)
O
V
E
R
-
Y
2
A
-
(
P
I
S
G
A
H
C
H
U
R
C
H
R
O
A
D
)
,
D
U
A
L
=
6
T
T
S
T
=
1
2
T
T
S
T
=
1
2
-
L
-
D
U
A
L
S
T
R
U
C
T
U
R
E
S
3 4
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
W
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
3
.
S
E
E
S
H
E
E
T
2
F
O
R
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
X
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
3
.
S
E
E
S
H
E
E
T
2
F
O
R
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2
.
S
E
E
S
H
E
E
T
1
0
F
O
R
P
L
A
N
V
I
E
W
2
.
S
E
E
S
H
E
E
T
1
2
F
O
R
P
L
A
N
V
I
E
W
2-R
4
.
B
R
I
D
G
E
L
E
N
G
T
H
D
E
T
E
R
M
I
N
E
D
B
Y
T
H
E
H
Y
D
R
A
U
L
I
C
S
U
N
I
T
.
1
.
5
’
-
L
-
D
U
A
L
S
T
R
U
C
T
U
R
E
S
6
7
’
*
*
G
E
O
T
E
C
H
N
I
C
A
L
U
N
I
T
M
S
E
W
A
L
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
CL
-
S
R
R
-
E
X
I
S
T
I
N
G
T
R
A
C
K
C
L
E
A
R
A
N
C
E
V
E
R
T
I
C
A
L
2
3
’
-
0
"
M
I
N
.
T
O
P
O
F
R
A
I
L
1
2
’
6
’
6
’
1
4
’
1
2
’
1
.
5
’
W
/
C
&
G
S
I
D
E
W
A
L
K
F
U
T
U
R
E
W
/
C
&
G
S
I
D
E
W
A
L
K
F
U
T
U
R
E
C
R
O
W
N
B
A
R
R
I
E
R
C
O
N
C
R
E
T
E
.
0
4
.
0
4
.
0
4
.
0
4
-
Y
3
-
=
1
5
’
-
0
"
-
Y
2
A
-
=
1
5
’
-
0
"
-
S
R
R
-
=
2
3
’
-
0
"
M
I
N
I
M
U
M
V
E
R
T
I
C
A
L
C
L
E
A
R
A
N
C
E
.
0
4
.
0
4
.
0
4
.
0
4
(
3
L
A
N
E
W
I
T
H
C
U
R
B
A
N
D
G
U
T
T
E
R
)
F
U
T
U
R
E
W
E
S
T
M
O
U
N
T
A
I
N
R
O
A
D
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
R
O
A
D
W
A
Y
U
N
D
E
R
S
T
R
U
C
T
U
R
E
4
5
.
8
7
’
4
5
.
9
4
’
E
X
I
S
T
.
-
S
R
R
-
R
/
W
E
X
I
S
T
.
-
S
R
R
-
R
/
W
C
-
Y
2
A
-
P
I
S
G
A
H
C
H
U
R
C
H
L
9
’
9
’
1
2
’
1
2
’
E
X
I
S
T
.
@
2
7
.
5
’
4
’
1
.
5
’
3
7
’
1
2
’
8
’
C
R
O
W
N
P
O
I
N
T
E
X
E
X
E
X
E
X
E
X
E
X
E
X
E
X
2
6
’
1
5
’
LC
T
R
A
C
K
N
.
S
.
F
U
T
U
R
E
T
R
A
C
K
P
A
R
T
F
U
T
U
R
E
T
R
A
C
K
P
A
R
T
F
U
T
U
R
E
7
0
.
7
5
’
8
6
.
6
3
’
2
2
3
.
4
7
’
N
O
T
E
:
D
I
M
E
N
S
I
O
N
S
A
R
E
M
E
A
S
U
R
E
D
A
L
O
N
G
-
L
-
H
O
R
I
Z
O
N
T
A
L
A
L
I
G
N
M
E
N
T
*
*
*
*
*
4
6
.
5
4
’
1
9
.
5
5
’
*
S
E
E
S
T
D
.
6
1
0
.
0
3
@ 2
S
L
O
P
E
S
D
E
T
E
R
M
I
N
E
D
B
Y
G
E
O
T
E
C
T
N
I
C
A
L
E
N
G
I
N
E
E
R
I
N
G
U
N
I
T
W
A
L
L
N
O
I
S
E
R
E
V
I
S
I
O
N
S
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
4
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
.
0
2
3
6
’
2
3
’
6
0
’
.
0
2
3
6
’
2
3
’
6
0
’
G
R
A
D
E
P
O
I
N
T
1
2
’
.
0
6
1
2
’
4
’
G
R
A
D
E
P
O
I
N
T
1
2
’
4
’
1
6
’
3
0
’
.
0
2
1
0
’
-
Y
4
C
D
-
CL
CL
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
P
O
I
N
T
1
2
’
1
2
’
1
2
’
G
R
A
D
E
P
O
I
N
T
1
2
’
1
0
’
1
2
’
4
’
-
Y
4
C
D
-
S
T
R
U
C
T
U
R
E
1
2
’
3
8
’
-
Y
4
R
P
A
-
-
Y
4
C
D
-
O
V
E
R
S
M
I
T
H
C
R
E
E
K
-
Y
4
R
P
B
D
-
S
T
R
U
C
T
U
R
E
C
.
0
6
-
Y
4
R
P
B
D
-
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
D
U
A
L
=
5
V
=
6
0
M
P
H
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
3
2
,
6
0
0
4
3
,
8
0
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
V
=
6
0
M
P
H
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
6
,
6
0
0
1
1
,
8
0
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
T
T
S
T
=
1
2
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
V
=
7
0
M
P
H
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
5
3
,
5
6
0
7
9
,
8
8
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
D
E
S
I
G
N
D
A
T
A
-
Y
4
C
D
-
D
E
S
I
G
N
D
A
T
A
-
L
-
L
2
0
1
0
A
D
T
2
0
3
0
A
D
T
D
H
V
=
1
0
V
=
7
0
M
P
H
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
3
2
,
6
0
0
4
3
,
8
0
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
1
0
’
4
’
X
X
X
X
X
X
X
X
X
X
X
X
X
-
L-
(
W
I
N
S
T
O
N
-
S
A
LE
M
N
O
R
T
H
E
R
N
B
E
LT
W
A
Y
)
O
V
E
R
S
M
I
T
H
C
R
E
E
K
-
L
-
D
E
S
I
G
N
D
A
T
A
-
Y
4
R
P
B
D
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
X
3
8
’
LC
D
E
S
I
G
N
D
A
T
A
-
Y
4
R
P
A
-
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIG N
ENG IN EER ENGIN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFEREN CE N O .
U-2579B
-
Y
4
R
P
A
-
S
T
R
U
C
T
U
R
E
-
Y
4
R
P
A
-
O
V
E
R
S
M
I
T
H
C
R
E
E
K
1
1
’
1
1
’
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
S
-
Y
4
R
P
B
D
-
O
V
E
R
S
M
I
T
H
C
R
E
E
K
T
T
S
T
=
6
D
U
A
L
=
6
D
U
A
L
=
6
T
T
S
T
=
1
2
D
U
A
L
=
6
T
T
S
T
=
1
2
5
6
7
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
X
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
X
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
3
.
S
E
E
S
H
E
E
T
2
F
O
R
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
Y
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
2
.
S
E
E
S
H
E
E
T
1
5
F
O
R
P
L
A
N
V
I
E
W
3
.
S
E
E
S
H
E
E
T
2
-
G
F
O
R
-
Y
4
R
P
A
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2
.
S
E
E
S
H
E
E
T
1
5
F
O
R
P
L
A
N
V
I
E
W
4
.
S
E
E
S
H
E
E
T
2
-
I
F
O
R
-
Y
4
C
D
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2
.
S
E
E
S
H
E
E
T
1
5
F
O
R
P
L
A
N
V
I
E
W
3
.
S
E
E
S
H
E
E
T
2
-
G
F
O
R
-
Y
4
R
P
B
D
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2-S
4
.
B
R
I
D
G
E
L
E
N
G
T
H
D
E
T
E
R
M
I
N
E
D
B
Y
T
H
E
H
Y
D
R
A
U
L
I
C
S
U
N
I
T
.
5
.
B
R
I
D
G
E
L
E
N
G
T
H
D
E
T
E
R
M
I
N
E
D
B
Y
T
H
E
H
Y
D
R
A
U
L
I
C
S
U
N
I
T
.
4
.
B
R
I
D
G
E
L
E
N
G
T
H
D
E
T
E
R
M
I
N
E
D
B
Y
T
H
E
H
Y
D
R
A
U
L
I
C
S
U
N
I
T
.
-
L
-
D
U
A
L
S
T
R
U
C
T
U
R
E
S
D
=
6
0
D
=
6
0
D
=
6
0
D
=
6
0
.
0
6
.
0
6
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
W
A
L
L
N
O
I
S
E
R
E
V
I
S
I
O
N
S
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
.
0
2
3
6
’
2
3
’
.
0
2
4
8
’
2
3
’
CL
6
0
’
7
2
’
.
0
4
5
:1
9
’
6
’
.
0
2
.
0
2
5
:
1
1
2
’
.
0
2
.
0
2
3
6
’
.0
4
1
1
’
1
1
’
1
2
’
1
2
’
1
2
’
1
2
’
@
-
Y
4
-
(
U
S
4
2
1
/ I
-
4
0
B
U
S
I
N
E
S
S
)
C
C
@
3
3
2
0
1
0
A
D
T
2
0
3
0
D
H
V
=
1
0
V
=
6
0
M
P
H
S
E
E
S
T
D
.
6
1
0
.
0
2
@ 3
S
L
O
P
E
S
D
E
T
E
R
M
I
N
E
D
B
Y
G
E
O
T
E
C
T
N
I
C
A
L
E
N
G
I
N
E
E
R
I
N
G
U
N
I
T
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
1
1
,
8
0
0
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
T
T
S
T
=
1
2
2
0
1
0
2
0
3
0
D
H
V
=
1
0
V
=
7
0
M
P
H
S
E
E
S
T
D
.
6
1
0
.
0
2
@ 3
S
L
O
P
E
S
D
E
T
E
R
M
I
N
E
D
B
Y
G
E
O
T
E
C
T
N
I
C
A
L
E
N
G
I
N
E
E
R
I
N
G
U
N
I
T
B
R
I
D
G
E
R
A
I
L
T
O
B
E
D
E
T
E
R
M
I
N
E
D
B
Y
S
T
R
U
C
T
U
R
E
D
E
S
I
G
N
U
N
I
T
F
U
N
C
C
L
A
S
S
-
I
N
T
E
R
S
T
A
T
E
X
X
X
X
X
X
X
X
L
-
L-
(
W
I
N
S
T
O
N
-
S
A
LE
M
N
O
R
T
H
E
R
N
B
E
LT
W
A
Y
)
O
V
E
R
7
0
.
5
’
8
2
.
5
’
LC
-
Y
4
C
D
-
G
R
A
D
E
P
O
I
N
T
.
0
2
1
2
’
2
4
’
1
0
’
5
0
’
4
’
A
D
T
6
,
6
0
0
D
E
S
I
G
N
D
A
T
A
-
Y
4
C
D
-
-
Y
4
C
D
-
O
V
E
R
-
Y
4
-
(
U
S
4
2
1
/
I
-
4
0
B
U
S
I
N
E
S
S
)
-
Y
4
C
D
-
S
T
R
U
C
T
U
R
E
-
Y
4
W
B
-
C
L
-
Y
4
E
B
-
L
1
2
’
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
P
O
I
N
T
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
R
O
A
D
W
A
Y
U
N
D
E
R
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
S
T
R
U
C
T
U
R
E
P
O
I
N
T
G
R
A
D
E
-
L
-
D
E
S
I
G
N
D
A
T
A
-
L
-
5
3
,
5
6
0
7
9
,
8
8
0
A
D
T
A
D
T
.
0
2
M
I
N
I
M
U
M
V
E
R
T
I
C
A
L
C
L
E
A
R
A
N
C
E
=
1
6
’
-
6
"
2
4
’
1
5
’
1
5
’
9
’
6
’
M
I
N
I
M
U
M
V
E
R
T
I
C
A
L
C
L
E
A
R
A
N
C
E
=
1
6
’
-
6
"
-
Y
4
-
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIG N
ENGIN EER EN GIN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFEREN CE NO .
U-2579B
S
T
R
U
C
T
U
R
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
S
D
U
A
L
=
6
D
U
A
L
=
6
T
T
S
T
=
1
2
1
9
.
5
’
P
S
4
’
P
S
4
’
L
A
N
E
A
U
X
L
A
N
E
A
U
X
L
A
N
E
A
U
X
*
*
T
O
M
I
T
I
G
A
T
E
W
E
A
V
E
A
R
E
A
B
E
T
W
E
E
N
L
O
O
P
S
T
H
I
S
A
U
X
.
L
A
N
E
P
R
O
V
I
D
E
S
S
E
P
A
R
A
T
I
O
N
-
L
-
D
U
A
L
S
T
R
U
C
T
U
R
E
S
*
M
I
T
I
G
A
T
E
W
E
A
V
E
A
R
E
A
B
E
T
W
E
E
N
L
O
O
P
S
.
T
H
I
S
A
U
X
.
L
A
N
E
P
R
O
V
I
D
E
S
S
E
P
A
R
A
T
I
O
N
T
O
8 9
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
Y
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
4
.
S
E
E
S
H
E
E
T
2
-
F
F
O
R
-
Y
4
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
T
E
S
:
1
.
S
E
E
S
H
E
E
T
2
-
Y
F
O
R
B
R
I
D
G
E
S
K
E
T
C
H
3
.
S
E
E
S
H
E
E
T
2
F
O
R
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2
.
S
E
E
S
H
E
E
T
1
6
F
O
R
P
L
A
N
V
I
E
W
3
.
S
E
E
S
H
E
E
T
2
-
I
F
O
R
-
Y
4
C
D
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
4
.
S
E
E
S
H
E
E
T
2
-
F
F
O
R
-
Y
4
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
2
.
S
E
E
S
H
E
E
T
1
6
F
O
R
P
L
A
N
V
I
E
W
A
F
U
T
U
R
E
6
-
L
A
N
E
F
A
C
I
L
I
T
Y
.
5
.
-
Y
4
E
B
-
W
A
S
S
E
T
U
P
W
I
T
H
A
1
9
.
5
’
O
F
F
S
E
T
F
O
R
A
F
U
T
U
R
E
6
-
L
A
N
E
F
A
C
I
L
I
T
Y
.
5
.
-
Y
4
E
B
-
W
A
S
S
E
T
U
P
W
I
T
H
A
1
9
.
5
’
O
F
F
S
E
T
F
O
R
2-T
P
O
I
N
T
G
R
A
D
E
1
9
.
5
’
D
=
6
0
.
0
4
5
:1
9
’
6
’
.
0
2
.
0
2
5
:
1
1
2
’
.
0
2
.
0
2
3
6
’
.0
4
@
C
C
@
3
3
L
7
0
.
5
’
8
2
.
5
’
-
Y
4
W
B
-
C
L
-
Y
4
E
B
-
L
1
2
’
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
P
O
I
N
T
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
O
N
R
O
A
D
W
A
Y
U
N
D
E
R
S
T
R
U
C
T
U
R
E
2
4
’
1
5
’
1
5
’
9
’
6
’
-
Y
4
-
1
9
.
5
’
P
S
4
’
P
S
4
’
L
A
N
E
A
U
X
L
A
N
E
A
U
X
L
A
N
E
A
U
X
*
1
9
.
5
’
D
=
6
0
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2
TYPICAL SECTIO N O N STRUCTURE
G RADE
PO IN T
12’
40’
.06
12’
CL
-Y4RPBD-
5:1 .02
5:1
.02 .02
24’
@
.02 .02.02.02.02 .02 .04
36’
23’
48’
23’
11’14’12’12’
.04
11’24’6’9’
4’
G RADE
PO IN T
G RADE
PO IN T
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
G RADE
PO IN T
G RADE
PO IN T
G RADE
PO IN T
CC
CC C
11.5’
6:1 6:1
2
-Y4RPBD- STRUCTURE
4’12’
L
6:1
6’9’12’12’
15’
4’
83’
6:1
2010 ADT
2030 ADT
DHV = 11
SEE STD. 610.03
@
2
SLO PES DETERM IN ED BY
G EO TECTN ICAL EN G IN EERIN G UN IT
BRIDG E RAIL TO BE DETERM IN ED
BY STRUCTURE DESIG N UN IT
32,600
43,800
DUAL = 6
D = 60
X
X X
-Y4EB--Y4W B-
LL L
-Y4CD-
L
70.5’
10’
TYPICAL SECTIO N O N RO ADW AY UN DER STRUCTURE
DESIG N DATA -Y4RPBD-
.06
M IN IM UM VERTICAL CLEARAN CE = 16’-6"
15’
.04
2
19.5’
@
24’22’
24’
57.5’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIG N
EN G INEER ENG IN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFERENCE N O .
U-2579B
R
E
V
I
S
I
O
N
S
STRUCTURE TYPICAL SECTIO N S
-L-
-Y4-
TTST = 12
12’
PS
4’
10’
PS
12’
N O TES:
2. SEE SHEET 16 FO R PLAN VIEW
4. SEE SHEET 2-H FO R -Y4RPBD- TYPICAL SECTIO N
5. SEE SHEET 2-I FO R -Y4CD- TYPICAL SECTIO N
2-U
LAN E
AUX
FUN C CLASS - IN TERSTATE
LAN E
AUX
LAN E
AUX*
*
V = 50 M PH (SEE N O TE 6)
W IDTH O F BRIDG E
DISTAN CE M EETS 50 M PH DUE TO THE
ALIG N M EN T M EETS 60 M PH. STO PPIN G SIG HT
6. DESIG N SPEED O F HO RIZO N TAL & VERTICAL
3. SEE SHEET 2 FO R -L- TYPICAL SECTIO N
1. SEE SHEET 2-Y FO R BRIDG E SKETCH
M ITIG ATE W EAVE AREA BETW EEN LO O PS.
THIS AUX. LAN E PRO VIDES SEPARATIO N TO
.04
2
19.5’
@
70.5’
.04
@
13.5’
2
84.5’
TYPICAL SECTIO N O N RO ADW AY UN DER STRUCTURE
TYPICAL SECTIO N O N STRUCTURE
G RADE
PO IN T
12’
40’
.06
12’
CL
-Y4RPBD-
4’12’
2010 ADT
2030 ADT
DHV = 11
SEE STD. 610.03
@
2
SLO PES DETERM IN ED BY
G EO TECTN ICAL EN G IN EERIN G UN IT
BRIDG E RAIL TO BE DETERM IN ED
BY STRUCTURE DESIG N UN IT
32,600
43,800
DUAL = 6
D = 60
X
X X
DESIG N DATA -Y4RPBD-
.06
M IN IM UM VERTICAL CLEARAN CE = 16’-6"
TTST = 12
10
N O TES:
2. SEE SHEET 16 FO R PLAN VIEW
4. SEE SHEET 2-H FO R -Y4RPBD- TYPICAL SECTIO N
5. SEE SHEET 2-I FO R -Y4CD- TYPICAL SECTIO N
FUN C CLASS - IN TERSTATE
*
V = 50 M PH (SEE N O TE 6)
W IDTH O F BRIDG E
DISTAN CE M EETS 50 M PH DUE TO THE
ALIG N M EN T M EETS 60 M PH. STO PPIN G SIG HT
6. DESIG N SPEED O F HO RIZO N TAL & VERTICAL
3. SEE SHEET 2 FO R -L- TYPICAL SECTIO N
1. SEE SHEET 2-Y FO R BRIDG E SKETCH
M ITIG ATE W EAVE AREA BETW EEN LO O PS.
THIS AUX. LAN E PRO VIDES SEPARATIO N TO
10A
-Y4RPBD- STRUCTURE
-Y4RPBD- O VER -L- (W IN STO N -SALEM N O RTHERN BELTW AY) -Y4EB- & -Y4W B- (US 421 / I-40 BUSIN ESS)-Y4RPBD- O VER -L- (W IN STO N -SALEM N O RTHERN BELTW AY) -L-, AN D -Y4CD-
.06 .06
.02 .02.02
.06 .06
.02
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
G RADE
PO IN T
12’
0.08
4’
0.04
31’
.02 .02
12’12’
4’
16’
.02
TYPICAL SECTIO N O N STRUCTURE
TYPICAL SECTIO N O N RO ADW AY UN DER STRUCTURE
.02 .02
12’12’
4’
.08 .08
.02.02 .02 .02 .02 .02.02.04 .04
36’23’23’
11’11’
12’
12’12’12’
.04
12’12’
G RADE
PO IN T
10’
12’4’4’
16’12’15’
G RADE
PO IN T
6:1
6:1
-Y5- STRUCTURE
-Y5- (HASTIN G HILL RO AD) O VER
C
CC
C
12’
G RADE
PO IN T
G RADE
PO IN T
TYPICAL SECTIO N O N STRUCTURE
TYPICAL SECTIO N UN DER STRUCTURE
6:1
2 2
2
2
11.5’
C
C
.02.06
6:1
57.5’23.5’
6:1
2010 ADT
2030 ADT
DHV = 11
V = 50 M PH
SEE STD. 610.03
@
2
SLO PES DETERM IN ED BY
G EO TECTN ICAL EN G IN EERIN G UN IT
BRIDG E RAIL TO BE DETERM IN ED
BY STRUCTURE DESIG N UN IT
7,600
13,600
TTST = 1
DUAL = 2
D = 60
FUN C CLASS - URBAN CO LLECTO R
10’
83’
X X
X X
X
@@
@
@
7.5’7.5’
7.5’
-Y5-
L
-Y4RPD-
L
-Y5-
L
-L-
L
-Y4CD-L
-Y4RPC-L
DESIG N DATA -Y5-
M IN IM UM VERTICAL CLEARAN CE = 16’-6"
14’
22’24’
14’
18’
6:1
2010 ADT
2030 ADT
DHV = 11
V = 50 M PH
SEE STD. 610.03
@
2
SLO PES DETERM IN ED BY
G EO TECTN ICAL EN G IN EERIN G UN IT
BRIDG E RAIL TO BE DETERM IN ED
BY STRUCTURE DESIG N UN IT
7,600
13,600
TTST = 1
DUAL = 2
D = 60
FUN C CLASS - URBAN CO LLECTO R
X
DESIG N DATA -Y5-
M IN IM UM VERTICAL CLEARAN CE = 16’-6"
36’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIG N
ENGIN EER EN GIN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFEREN CE NO .
U-2579B
R
E
V
I
S
I
O
N
S
-Y5- STRUCTURE
-Y5- (HASTIN G HILLS RO AD) O VER -Y4RPD-
STRUCTURE TYPICAL SECTIO N S
-Y4CD-, -L- (W IN STO N -SALEM N O RTHERN BELTW AY) , & -Y4RPC-
.08
4’ PS
30’ M IN IM UM 30’ M IN IM UM
12
13
N O TES:
1. SEE SHEET 2-Z FO R BRIDG E SKETCH
N O TES:
1. SEE SHEET 2-Z FO R BRIDG E SKETCH
2. SEE SHEET 16 FO R PLAN VIEW
3. SEE SHEET 2-J FO R -Y5- TYPICAL SECTIO N
4. SEE SHEET 2-H FO R -Y4RPD- TYPICAL SECTIO N
N O TES:
1. SEE SHEET 2-Z FO R BRIDG E SKETCH
2. SEE SHEET 29 FO R PLAN VIEW
3. SEE SHEET 2-J FO R -Y5- TYPICAL SECTIO N
2. SEE SHEET 16 FO R PLAN VIEW
3. SEE SHEET 2-J FO R -Y5- TYPICAL SECTIO N
4. SEE SHEET 2-I FO R -Y4CD- & Y4RPC TYPICAL SECTIO N
5. SEE SHEET 2 FO R -L- TYPICAL SECTIO N
2-V
7.5’
7.5’
35.5’
35.5’
63.60’
4.60’
TAPER
LAN E
.02 .02
.02 .02
CL
FDPS FDPS
SHLDR SHLDR
CL CL
12’12’12’12’11’11’
30’
TO FACE
-Y4- (I-40 / US 421 BUSIN ESS)
4’4’
9’6’9’6’
12’
24’19’-11"36’19’-11"
TO FACE
BARRIER
CO N CRETE
M SE W ALLMSE W ALL
BARRIER
CO N CRETE
@@
*
LAN E
AUX.
FUTURE
2010 ADT
2030 ADT
DHV = 11
V = 40 M PH
@
G EO TECTN ICAL EN G IN EERIN G UN IT
BRIDG E RAIL TO BE DETERM IN ED
BY STRUCTURE DESIG N UN IT
5,260
8,300
TTST = 1
DUAL = 2
D = 60
X
DESIG N DATA -Y5A-
FUN C CLASS - RURAL LO CAL
M IN IM UM VERTICAL CLEARAN CE=16’-6"
11
*M ITIG ATE W EAVE AREA BETW EEN LO O PS.
THIS AUX. LAN E PRO VIDES SEPARATIO N TO
M SE W ALLS DETERM IN ED BY .02 .02
C
-Y5A- STRUCTURE
X X
12’12’
4’
-Y5A-L
7.5’
35.5’
.02.02
O VER -Y4- (US 421 / I-40 BUSIN ESS)
-Y5A- (HASTIN G HILLS RO AD)
4. SEE SHEET 2-F, 2-FA FO R -Y4- TYPICAL SECTIO N
(SEE TIP PRO JECT U -2579G)
TYPICAL SECTIO N O N ROADW AY U N DER STRU CTU RE
(SEE TIP PROJECT U -2579G )
TYPICAL SECTIO N O N STRU CTU RE
.02.02.04
G RADE
PO IN T
.02.02.04
G RADE
PO IN T
.04.04
W
U
W
U
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
EN GIN EER EN G INEER
R/W SHEET N O .
SHEET NO .PRO JECT REFEREN CE NO .
U-2579B
8
/
1
7
/
9
9
48’
-
L
-
-Y1- Sta. 34+10.05
-L- Sta. 482+13.14
30’
24’
30’
36’
104’15’57’
47’
B-77
B-77B-77
2
22
2
36’36’
END BRIDGE -Y1-
END APPROACH SLAB -Y1-
BEGIN BRIDGE -Y1-
BEGIN APPROACH SLAB -Y1-
8’
4’
-Y2-
-
L-
B-77B-77
2
2
2
2
24’
3’
24’
END BRIDGE
END APPROACH SLAB-Y2-
-Y2-
M
I
L
LCREEKM
ARTIN
46’
36’
36’
12’
12’
B-77
B-77
B-77
12’
END APPROACH SLABS
BEGIN APPROACH SLABS
22’
-L-
-L-
-L-
-L-
B-77
22’
12’
-Y1-
12’
BEGIN APPROACH SLAB
BEGIN BRIDGE-Y2-
-Y2- Sta. 20+20.21
-L- Sta. 516+31.30
-Y2-
-L-
-L-
FOR -Y1- OVER -L-FO R -Y2- O VER -L-
6’
2 SEE NCDOT STD. 610.03
-
Y
1
L
P
D
-
2’
24’
2’
2 SEE NCDOT STD. 610.03
46’
36’
36’
12’
12’
NOTE:NOTE:
12’
22’
12’
12’
36’
36’
24’
CONCRETE ISLAND
BEGIN 5" MONOLITHIC
BEGIN BRIDGES
END BRIDGES
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
13.5’13.5’
25:1
1’-6" C&G
1’-6" C&G
13.5’
13.5’VAR. PS VAR. PS
VAR. PS
8:1
DETAIL SH OW IN G PAVEM EN T & BRIDGE RELATION SH IP
DETAIL SH O W IN G PAVEM EN T & BRIDG E RELATIO N SH IP FO R -L- (DU AL BRIDG ES) OVER M ARTIN M ILL CREEK
D ETAIL SH O W IN G PAVEM EN T & BRID G E RELATIO N SH IP
BRIDG E SKETCHES
VAR. PS
VAR. PS
19.5’
19.5’19.5’
19.5’
12’
1 2
3
2-W
N O TES:
0
2
0
2
0
2
0
2
SEE SHEET 2-Q FO R STRUCTURE 1 TYPICAL SECTIO N
SEE SHEET 2-Q FO R STRUCTURE 2 TYPICAL SECTIO N
SEE SHEET 2-R FO R STRUCTURE 3 TYPICAL SECTIO N
34.5’
7.5’
3
3
+
9
1
.
8
8
200’
TAPER
TYPE III TYPE III
BEGIN NOISE WALL -NWL1-
-NWL1-
B-77 B-77
0
4
0
4
0
4
0
4
B-77CAT-1
GRAU-350
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
EN G INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFEREN CE NO .
U-2579B
SMITH CREEK
10’
4’
24’
B-77
BEGIN BRIDGE
BEGIN APPROACH SLAB
B-77
-Y4RPA-
-Y4RPA-
S
M
IT
H
C
R
E
E
K
-L-
B-77
B-77
B-77
BEGIN APPROACH SLABS
END APPROACH SLABS
12’
46’12’
10’
30’
-Y4CD-
BEGIN APPROACH SLAB BEGIN BRIDGE END APPROACH SLAB
END BRIDGE
-Y4CD- -Y4CD--Y4CD-
-Y4CD-
-L- -L-
-L-
-L-
-Y4RPA-
B-77
38’
END APPROACH SLAB-Y4RPA-
END BRIDGE-Y4RPA-
12’
12’
36’
12’
FOR -Y4RPA- O VER SM ITH CREEK
12’
36’60’
60’36’
36’
10’12’
4’12’
36’
36’
B-77
22’
12’
46’
4’
12’
12’
B-77
-L-
-Y4CD-
22’
FO R -Y4CD- AN D -L- (DU AL BRIDG ES) O VER SM ITH CREEK
BEGIN BRIDGES
END BRIDGES
FO R -L- ( DU AL BRIDG ES) OVER -Y2A-, -SRR-, AN D -Y3-
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
DETAIL SH OW IN G PAVEM EN T & BRIDG E RELATIO N SH IP DETAIL SH OW IN G PAVEM EN T & BRIDG E RELATIO N SH IP
DETAIL SH O W IN G PAVEM EN T & BRIDG E RELATIO N SH IP
BRIDG E SKETCHES
VAR. PS VAR. PS
4’
5
6
2-X
N O TES:
SEE SHEET 2-R FO R STRUCTURE 4 TYPICAL SECTIO N
SEE SHEET 2-S FO R STRUCTURE 5 TYPICAL SECTIO N
SEE SHEET 2-S FO R STRUCTURE 6 TYPICAL SECTIO N
0
2
0
2
0
2
0
2
0
6
0
6
4
-L-
N
O
R
F
O
R
K
S
O
U
T
H
E
R
N
R
A
I
L
R
O
A
D
-
Y
3
-
12’P.S.
12’P.S.
12’ P.S.B-77
B-77
B-77
B-77
BEGIN CONSTRUCTION
BEGIN 3" RESURFACING
-Y2A- STA. 16+00.00
END BRIDGE
END APPROACH SLAB
BEGIN BRIDGE
BEGIN APPROACH SLAB
BEGIN ABUTMENT WALL
& SINGLE FACE BARRIER
END ABUTMENT WALL
& SINGLE FACE BARRIER
S
R
2
3
7
7
W
E
S
T
M
O
U
N
T
A
I
N
R
D
WALL
ABUTMENT
PROPOSED
S
R
2
4
10
P
I
S
G
A
H
C
H
U
R
C
H
R
D
48’72’
12’
48’
12’
72’
04
12’
48’
48’
46’
12’
48’
46’
12’
VAR.
48’04
-L-
-L-
-L-
-L-
BEGIN APPROACH SLAB-L- END APPROACH SLAB-L-
-L-
END APPROACH SLABS
-L-
-SRR- Sta. 35+12.32
-L- Sta. 584+36.24
-Y2A- Sta. 18+29.06
-L- Sta. 583+49.61
-L- Sta. 585+06.99
-Y3- Sta. 22+74.08
5
8
5
20
20
25
35
-
S
R
R
-
-
Y
2
A
-
5
8
0
G
R
A
U
3
5
0
G
R
A
U
3
5
0
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
T
Y
P
E
B
-
7
7
T
Y
P
E
B
-
7
7
-Y2A- STA. 24+32.11 (45.5’ LT.)
B-77
-Y3- STA. 21+03.39 (45.5’ LT.)
B-77
2
2
2 SEE NCDOT STD. 610.03
NOTE:
VAR.
15
3
0
NOISE WALL ON BRIDGE
BEGIN NOISE WALL -NWY4RPA-
END NOISE WALL ON BRIDGE
BEGIN NOISE WALL ON BRIDGE
END NOISE WALL -NWL3-
BEGIN NOISE WALL ON BRIDGE
END NOISE WALL -NWL1-
BEGIN NOISE WALL -NWL2-
END NOISE WALL ON BRIDGE
CAT-14’
24’24’
B-77
B-77
B-77
TYPE M3504’4’
VAR. PS12’
4’12’
12’
APPROACH SLABS
BEGIN
VAR.
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
U-2579B
S
MIT
H
C
R
E
E
K
38’-Y4RPBD-
B-77
B-77
B-77
B-77
BEGIN BRIDGE
BEGIN APPROACH SLAB
END BRIDGE
END APPROACH SLAB
24’
PS4’
10’PS
-Y4RPBD-
-Y4RPBD-
-Y4RPBD-
-Y4RPBD-
B-77
12’
12’
48’
12’
B-77
36’
10’
4’
36’
12’
48’
12’
-L-
-Y4CD-
-Y4LPA-
-Y4CD-
-Y4LPD-
-L-
-Y4LPB-
B-77 B-77
B-77
B-77B-77
3
3
3
3
-Y4CD-
BEGIN BRIDGE-Y4CD-
-Y4CD- POC STA. 46+60.01
-Y4WB- POT STA. 90+06.05
-Y4CD- POC STA. 47+14.31
-Y4EB- POT STA. 90+11.82
END BRIDGE-Y4CD-
-Y4CD-
-L-
-L-
-L- POC STA. 643+08.58
-Y4EB- POT STA. 91+29.51
-L-
-L-
-Y4WB- POT STA. 91+23.70
-L- POC STA. 642+54.27
50’
60’
72’
-
Y
4
R
P
B
D-
-L--
Y4C
D-
B
-
7
7
B-
77
-Y4-
2
22
2
-Y4WB--Y4EB-
-Y4RPBD-40’
12’
24’
4’
2
4’
4
7
+
0
0
5
0
+
0
0
BEGIN BRIDGE -Y4RPBD-
-Y4RPBD-
BEGIN APPROACH SLAB
END APPROACH SLAB-Y4RPBD-
END BRIDGE-Y4RPBD-
22’
FO R -Y4RPBD - O VER SM ITH CREEK
-
Y
4
E
B
-
-
Y
4
-
-
Y
4
W
B
-
24’24’
-Y4CD- POC STA. 46+87.16
-Y4- POT STA. 90+08.91
36’
12’
36’
22’
48’
12’
36’
36’
-L- POC STA. 642+81.42
3 SEE NCDOT STD. 610.02
2 SEE NCDOT STD. 610.03
10’
24’
4’
NOTE:
NOTE:
BEGIN APPROACH SLAB
END APPROACH SLAB
BEGIN APPROACH SLABS
BEGIN BRIDGES
END APPROACH SLABS
END BRIDGES
-Y4- POT STA. 91+26.60
-
Y
4
E
B
-
-
Y
4
-
-
Y
4
W
B
-
-Y4RPBD-
FOR -Y4CD- & -L- (DU AL BRIDG ES) O VER -Y4-
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
DETAIL SH OW IN G PAVEM EN T & BRIDG E RELATIO N SH IP DETAIL SH O W IN G PAVEM EN T & BRIDG E RELATIO N SH IP
BRIDG E SKETCHES
VAR. PS
VAR. PS VAR. PS
VAR. PS
10’
19.5’
19.5’
10’CDAUX 11.5’
10’
11.5’
10’
6’
19.5’
A
U
XC
D
A
U
X
6’
19.5’
7
8
10
9
2-Y
N O TES:
SEE SHEET 2-S FO R STRUCTURE 7 TYPICAL SECTIO N
SEE SHEET 2-T FO R STRUCTURE 8 TYPICAL SECTIO N
SEE SHEET 2-T FO R STRUCTURE 9 TYPICAL SECTIO N
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
6
0
6
06
06
19.5’
19.5’
SEE SHEET 2-U FO R STRUCTURE 10 TYPICAL SECTIO N
BEGIN APPROACH SLABS-L-
END APPROACH SLABS
13.5’ P.S.
13.5’ P.S.
BEGIN APPROACH
BEGIN BRIDGE
12’ P.S.
12’ P.S.
10’P.S.
19.5’P.S.END APPROACH
END BRIDGE
10A
B
-7
7
B
-7
7
2
2
2
2
B-77
B-77
2 SEE NCDOT STD. 610.03
NOTE:
DETAIL SH O W IN G PAVEM EN T & BRIDG E RELATIO N SH IP
FO R -Y4RPBD - O VER -L-
DETAIL SH O W IN G PAVEM EN T & BRIDG E RELATIO N SH IP
FOR -Y4RPBD- O VER -Y4EB- & -Y4W B-
19.5’P.S.
10’P.S.
-Y4RPBD- STA. 43+79.19
-Y4WB- STA. 98+14.65
-Y4RPBD- STA. 44+08.64
-Y4- STA. 98+02.89
STA. 45+17.13
-Y4RPBD-
-Y4RPBD- STA. 45+44.69
-Y4EB- STA. 97+90.41
-Y4RPBD- STA. 44+38.39
-Y4RPBD- STA. 52+94.28
-L- STA. 649+19.78
-Y4RPBD- STA. 54+16.42
-Y4CD- STA. 53+77.69
-Y4RPBD- STA. 51+70.14
-Y4RPBD- STA. 51+43.58
B-77
B-77
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
U-2579B
-Y
4R
PD
-
24’
-Y5-
24’
-
Y
4
R
P
C-
-Y5-
-
Y
4
C
D
-
B-77
B-772
-
L
-
2
-Y5-
-Y5- STA. 28+50.16
-L- STA. 652+78.47
END APPROACH SLAB
END BRIDGE-Y5-
-Y5- STA 30+21.54
-Y4RPC- STA 16+38.67
4’
24’
B-77
B-77 2
BEGIN APPROACH SLAB
-Y5-
-Y4CD- STA. 57+01.14
BEGIN BRIDGE
-Y5-
-Y4RPD- STA. 23+71.54
-Y5- STA. 23+59.12
END APPROACH SLAB
END BRIDGE
-Y5-
-Y5-
2 4’
B-77
B-77
24’
2B-77
B-77
BEGIN BRIDGE-Y5-
BEGIN APPROACH SLAB-Y5-
2 SEE NOTE STD. 610.03
24’
NOTE:
2 SEE NOTE STD. 610.03
NOTE:
FOR -Y5- OVER -Y4RPD-
FOR -Y5- OVER -L-, -Y4CD-, & -Y4RPC-
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
s
t
r
u
c
t
r
e
c
s
\
u
2
5
7
9
_
r
d
y
_
s
t
r
_
r
e
c
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
DETAIL SH O W IN G PAVEM EN T & BRIDGE RELATION SH IP
DETAIL SH OW IN G PAVEM EN T & BRIDG E RELATIO N SH IP
DETAIL SH O W IN G PAVEM EN T & BRID G E RELATION SH IP
BRIDG E SKETCHES
VAR. PS
VAR. PS VAR. PS
VAR. PS
4’
4’
7.5’
7.5’
7.5’
7.5’
4’
4’
VAR. PS
VAR. PS
VAR. PS
VAR. PS
10’
11.5’
11.5’
10’
4’
7.5’
4’
7.5’
13
12
2-Z
N O TES:
0
2
0
2
0
2
0
2
0
2
0
2
SEE SHEET 2-V FO R STRUCTURE TYPICAL 11 SECTIO N
SEE SHEET 2-V FO R STRUCTURE TYPICAL 12 SECTIO N
SEE SHEET 2-V FO R STRUCTURE TYPICAL 13 SECTIO N
24’
7.5’
35.5’
2
2
35.5’
7.5’2
-Y5- STA. 27+33.16
0
2
-Y4WB--Y4EB--Y4-
-Y5A-
24’
4’ PS
4’ PS
B-77
B-77
24’
END APPROACH SLAB
END BRIDGE
B-77
B-77
BEGIN BRIDGE
24’-Y5A-
4’
7.5’
35.5’
-Y4- STA. 129+64.57
-Y5A- STA. 68+06.51
-Y5A- STA. 68+47.29
-Y4WB- STA. 129+95.14
-Y5A- STA. 67+55.72
-Y4EB- STA. 129+34.00
MSE WALL MSE WALL58.9’24’15’TO FACE
TO FACE
70.9’15’36’
0
2
-Y5A- STA. 67+07.01
BEGIN APPROACH SLAB
-Y5A- STA. 66+83.52
-Y5A- STA. 69+24.26
-Y5A- STA. 69+47.75
(TIP PRO JECT U -2579G )
FO R -Y5A- O VER -Y4-
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
1
2
’
3
6
’
0
2
0
2
0
2
0
2
0
2
0
2
0
8
0
8
0
8
0
8
0
8
0
8
0
8
-Y1RPA-
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
-
G
O
R
E
W
I
D
T
H
=
9
.
9
7
5
6
-L-
-Y1RPD-
1
6
’
8:1 TAPER
8:1 TAPER
0
816
’
12’P.S.
0
2
3
6
’
0
2
0
2
-
G
O
R
E
W
I
D
T
H
=
2
.
9
8
2
9
-
G
O
R
E
W
I
D
T
H
=
6
.
4
7
9
3
(SEE PLAN SHEET 5 FOR PLAN VIEW)
0
2
0
2
0
2
1
2
’
P
.
S
.
1
2
’
P
.
S
.
12
’
12’P.S.
3
6
’
1
6
’
4’P.S.
12’P.S.
12’P.S.
4’P.S.
3
6
’
-L-
-
G
O
R
E
W
I
D
T
H
=
2
5
.
9
4
1
1
-
G
O
R
E
W
I
D
T
H
=
2
1
.
9
1
5
7
-
G
O
R
E
W
I
D
T
H
=
2
1
.
0
5
2
5
-
G
O
R
E
W
I
D
T
H
=
1
7
.
0
4
2
5
-
G
O
R
E
W
I
D
T
H
=
1
3
.
4
7
1
9
-
Y
1
R
P
A
-
1
0
+
0
0
.
0
0
-
L
-
5
0
3
+
0
0
.
0
0
(
5
9
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
0
+
4
9
.
8
8
-
L
-
5
0
2
+
5
0
.
0
0
(
5
9
.
0
0
’
L
T
)
-
L
-
5
0
2
+
0
0
.
0
0
(
5
9
.
0
0
’
L
T
)
-
L
-
5
0
1
+
5
0
.
0
0
(
5
9
.
0
0
’
L
T
)
-
L
-
5
0
1
+
0
0
.
0
0
(
5
9
.
0
0
’
L
T
)
-
L
-
5
0
0
+
5
0
.
0
0
(
5
9
.
0
0
’
L
T
)
-
L
-
5
0
0
+
0
0
.
0
0
(
5
9
.
0
0
’
L
T
)
1
2
’
-L- AN D -Y1RPA- G O RE DETAIL
(SEE PLAN SHEET 5 & 6 FOR PLAN VIEW)
1
1
’
.0207.0210.0211
.
0
2
0
6
.
0
1
8
5
.
0
2
1
4
.
0
2
6
5
.
0
2
6
5
.
0
3
3
6
.0
7
0
3
.0
5
7
7
.0
4
7
6
.0
4
5
1
.0
3
2
6
.0
2
14
12
’P
.S
.
.0609.0651.0613.0580
.
0
5
1
5
.
0
4
6
1
11’
12’P.S.
-L- AN D -Y1RPD- G O RE DETAIL
-Y1RPA- SC Sta. 14+90.00
-Y1RPA- POT Sta. 10+00.00
-Y1RPD- SC Sta. 12+40.00
-
Y
1
R
P
A
-
1
4
+
5
1
.
0
6
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
4
+
0
0
.
7
3
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
3
+
6
0
.
2
5
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
3
+
5
0
.
5
6
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
3
+
0
0
.
4
4
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
2
+
5
0
.
3
3
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
2
+
0
0
.
2
1
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
1
+
5
0
.
0
9
,
(
4
.
0
0
’
L
T
)
-
Y
1
R
P
A
-
1
0
+
9
9
.
9
6
,
(
4
.
0
0
’
L
T
)
-
L
-
4
9
8
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
4
9
9
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
4
9
9
+
4
0
.
3
3
,
(
5
9
.
0
0
’
L
T
)
-
L
-
4
9
9
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
G
O
R
E
W
I
D
T
H
=
3
2
.
1
5
4
4
-
Y
1
R
P
D
-
1
4
+
4
6
.
0
5
,
(
4
.
0
0
’
R
T
)
-
G
O
R
E
W
I
D
T
H
=
2
6
.
5
1
’
-
Y
1
R
P
D
-
1
3
+
9
5
.
4
7
,
(
4
.
0
0
’
R
T
)
-
G
O
R
E
W
I
D
T
H
=
1
8
.
1
7
’
-
G
O
R
E
W
I
D
T
H
=
1
1
.
2
5
’
-
Y
1
R
P
D
-
1
3
+
4
5
.
1
0
,
(
4
.
0
0
’
R
T
)
-
Y
1
R
P
D
-
1
3
+
2
2
.
2
8
,
(
4
.
0
0
’
R
T
)
-
G
O
R
E
W
I
D
T
H
=
8
.
5
7
’
-
Y
1
R
P
D
-
1
2
+
9
4
.
9
0
,
(
4
.
0
0
’
R
T
)
-
G
O
R
E
W
I
D
T
H
=
5
.
7
3
’
-
Y
1
R
P
D
-
1
2
+
4
4
.
8
4
,
(
4
.
0
0
’
R
T
)
-
G
O
R
E
W
I
D
T
H
=
1
.
6
1
’
-L- POT Sta. 503+00.00 (59’ Lt)
-
L
-
4
9
8
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
4
9
9
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
4
9
9
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
4
9
9
+
7
2
.
7
1
,
(
5
9
.
0
0
’
R
T
)
-
L
-
5
0
0
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
5
0
0
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-Y1RPD- TS Sta. 10+00.00
-L- POT Sta. 502+91.34
0
2
0
2
0
3
0
4
0
5
0
6
3
6
’
1
2
’
-Y1RPD-
(59’ Rt.)
2-AA
0’30’60’
15’
30’
BAR SCALE
-Y4WB-
-Y4-
2
4
’
3
6
’
-Y4RPA-
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
-Y4RPA-
-Y4CD-
2
4
’
0
2
0
3
1
6
’
0
5
0
6
0
6
0
3
3
8
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
5
2
4
0
5
1
7
0
5
3
8
047502780362
G
O
R
E
W
I
D
T
H
=
4
5
.
2
9
5
0
G
O
R
E
W
I
D
T
H
=
3
4
.
6
4
5
9
G
O
R
E
W
I
D
T
H
=
2
3
.
3
2
4
9
G
O
R
E
W
I
D
T
H
=
1
4
.
4
1
1
6
G
O
R
E
W
I
D
T
H
=
6
.
8
5
2
5
G
O
R
E
W
I
D
T
H
=
0
.
6
3
1
6
10’ P.S.
4’ P.S.
10’ P.S.
0
6
0
6
0
6
0
6
0
6
-Y4W B- & -Y4RPA- G O RE DETAIL
0
6
1
2
’
0
6
0
6
-Y4CD- & -Y4RPA- G O RE DETAIL
15’ P.S.
15’ P.S.
(SEE PLAN SHEET 27 FOR PLAN VIEW)
(SEE PLAN SHEET 15 FOR PLAN VIEW)
4’ P.S.
2
4
’
4’ P.S.
1
2
’
12’ P.S.
2
4
’
0
6
-
Y
4
W
B
-
7
4
+
5
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
7
4
+
0
4
.
6
8
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
7
3
+
5
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
7
3
+
0
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
7
2
+
5
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
7
2
+
0
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
.2354.0388
.
0
2
9
4
.
0
2
8
8
.
0
2
9
4
-
Y
4
R
P
A
-
3
5
+
7
7
.
8
0
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
A
-
3
6
+
2
4
.
0
6
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
A
-
3
6
+
7
9
.
5
6
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
A
-
3
7
+
8
0
.
2
8
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
A
-
3
8
+
3
0
.
3
6
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
A
-
3
7
+
3
0
.
0
3
,
(
1
2
.
0
0
’
R
T
)
.
0
3
0
6
-Y4RPA- SC Sta. 12+00.00
4’
4’
0
4
4’P.S.
50’ INC.
50’ INC.
NOTE:
* Paved To Face Of Guardrail
G
O
R
E
W
I
D
T
H
=
.
0
1
6
4
’
G
O
R
E
W
I
D
T
H
=
.
3
2
4
1
’
G
O
R
E
W
I
D
T
H
=
1
.
2
7
4
2
’
G
O
R
E
W
I
D
T
H
=
3
.
1
9
3
4
’
G
O
R
E
W
I
D
T
H
=
6
.
4
0
7
8
’
G
O
R
E
W
I
D
T
H
=
1
1
.
1
2
0
6
’
G
O
R
E
W
I
D
T
H
=
1
7
.
3
5
9
9
’
G
O
R
E
W
I
D
T
H
=
2
8
.
0
6
5
0
’
0
6
-Y4RPA- Sta. 36+24.33
-Y4RPA- CS Sta. 39+41.74
-Y4RPA- ST Sta. 41+41.74
-Y4RPA-
50’ INC.
0
6
0
5
0
4
0
3
0
2
3
6
’
-Y4W B- POT Sta. 68+87.73
24.00’ RT
.0412
.0513
.0212
.0312
-
Y
4
R
P
A
-
1
3
+
8
5
.
7
2
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
6
+
8
1
.
2
4
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
0
+
0
0
.
0
0
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
7
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
0
+
1
8
.
7
8
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
7
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
0
+
6
8
.
7
6
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
8
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
1
+
1
8
.
6
7
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
8
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
1
+
6
8
.
5
3
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
9
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
2
+
1
8
.
4
1
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
2
9
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
2
+
6
8
.
3
9
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
3
0
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
A
-
1
3
+
1
8
.
5
7
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
C
D
-
3
0
+
6
6
.
5
4
,
(
1
2
.
0
0
’
L
T
)
-Y4RPA- TS Sta. 10+00.00
-Y4CD- POC Sta. 26+81.24
24.00’ LT
0
2
3
8
0
5
3
7
0
4
3
7
0111
*
*
0
6
0
6
0
6
0
6
0
5
0
4
0
3
0
2
2-BB
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
0
2
0
2
0
2
0
2
8:1 TAPER
0
2
0
3
12
’
0
3
0
3
0
4
0
5
0
4
0
5
0
1
0
2
-Y4RPB-
0
2
0
6
0
6
2
4
’
0
2
0
1
0
0
0
2
0
2
0
2
0
2
0
2
0
2
0
2
-
G
O
R
E
W
ID
T
H
=
1.
2
3
5
4
0
0
1
2
0
1
3
7
0
2
6
2
0
3
8
7
0
5
12 0
6
-
G
O
R
E
W
I
D
T
H
=
3
.
9
4
5
0
-
G
O
R
E
W
ID
T
H
=
7
.
0
9
4
2
-
G
O
R
E
W
ID
T
H
=
11.
0
8
7
8
-
G
O
R
E
W
I
D
T
H
=
16
.
3
4
4
3
-
G
O
R
E
W
I
D
T
H
=
2
3
.
3
0
5
1
8:1 TAPER
0205 0110
0
0
0
3
0187
0
1
1
3
0
8
0
3
0
2
0
7
0
5
4’ P.S.
0
6
-
G
O
R
E
W
I
D
T
H
=
1
8
.
9
8
8
1
-
G
O
R
E
W
I
D
T
H
=
1
1
.
3
8
9
3
-
G
O
R
E
W
I
D
T
H
=
5
.
4
6
5
5
-
G
O
R
E
W
I
D
T
H
=
1
.
1
9
5
9
0
2
0
2
0
2
0
2
0
3
3
3
0474 0401
0
8
0
8
0
8
0
7
6
3
14’ P.S.
10’ P.S.
4’ P.S.
12’ P.S.
4’ P.S.
1
6
’
2
4
’
-Y4W B- & -Y4RPB- G O RE DETAIL
-Y4RPBD- & -Y4RPB- G O RE DETAIL
(SEE PLAN SHEET 15 & 16 FOR PLAN VIEW)
1
2
’
3
6
’
3
6
’
1
6
’
1
2
’
(SEE PLAN SHEET 28 FOR PLAN VIEW)
-Y4RPB-
4’ P.S.
4’ P.S.
-Y4-
-Y4RPBD-
TS 31+45.35
-Y4RPBD-
SC Sta. 33+85.35
-Y4RPB- POT Sta. 10+00.00
-Y4RPBD- POT Sta. 30+50.00
-
Y
4
R
P
B
D
-
3
1+
5
0
.
0
0
,
(
12
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
3
2
+
0
0
.
0
0
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
3
2
+
5
0
.
0
0
,
(
12
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
3
3
+
0
0
.
0
0
,
(
12
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
3
3
+
5
0
.
0
0
,
(
12
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
3
4
+
0
0
.
0
0
,
(
12
.
0
0
’
R
T
)
-
Y
4
R
P
B
-
10
+
9
9
.
9
2
8
1,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
11+
5
0
.
0
7
0
8
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
12
+
0
0
.
3
8
9
7
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
12
+
5
0
.
9
7
7
6
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
13
+
0
1.
9
7
4
6
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
13
+
5
3
.
5
8
0
9
,
(
4
.
0
0
’
L
T
)
0
6
0
5
12
0
3
8
7
0
2
6
2
0
2
0
2
0
0
8
6
0
0
8
6
0
1
0
2
0
1
0
2
-Y4RPB- CS Sta. 30+40.81 -Y4RPB- ST Sta. 32+80.01
-
Y
4
W
B
-
1
1
0
+
5
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
1
1
1
+
0
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
1
1
1
+
5
0
.
0
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
W
B
-
1
1
2
+
0
0
.
0
0
0
0
,
(
2
4
.
0
0
’
R
T
)
0
4
0528
0
3
3
3
0
3
3
3
-Y4RPBD-
-Y4WB-
40’ INC.
40’INC.
-
Y
4
R
P
B
-
2
9
+
0
4
.
8
2
9
2
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
C
B
-
2
9
+
5
5
.
2
7
3
8
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
3
0
+
0
5
.
4
9
4
4
,
(
2
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
-
3
0
+
5
5
.
5
4
8
9
,
(
4
.
0
0
’
L
T
)
10’ P.S.
4’ P.S.
2-CC
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
2
4
’
0
50
40
30
2
+
2
8
.8
2
0
2
0
2
0
2
0
2
0
2
0
3
0
1
0
4
2
6
-
G
O
R
E
W
I
D
T
H
=
4
.
3
3
1
7
-
G
O
R
E
W
I
D
T
H
=
1
0
.
6
8
0
8
-
G
O
R
E
W
I
D
T
H
=
1
8
.
1
2
8
1
-
G
O
R
E
W
I
D
T
H
=
2
6
.
6
8
4
3
-
G
O
R
E
W
I
D
T
H
=
3
6
.
3
6
1
7
0
2
-Y4RPBD-
2
4
’
0
4
0
5
0
2
0
4
0
5
0
3
0
3
2
4
’
-Y4EB-
-
G
O
R
E
W
I
D
T
H
=
1
.
1
1
0
4
-
G
O
R
E
W
I
D
T
H
=
2
.
6
8
4
4
-
G
O
R
E
W
I
D
T
H
=
5
.
2
7
1
9
-
G
O
R
E
W
I
D
T
H
=
8
.
9
3
3
1
0
2005801900215
0
1
7
9
0
0
9
7
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
4
1
9
0
5
0
0
0
4
9
3
0
5
0
0
0
5
0
0
0
5
0
0
0
5
0
0
0116
0
1
7
6
0
1
6
5
0
1
2
1
00630064
-
G
O
R
E
W
I
D
T
H
=
2
6
.
4
1
8
1
-
G
O
R
E
W
I
D
T
H
=
1
9
.
4
9
8
8
-
G
O
R
E
W
I
D
T
H
=
1
3
.
6
7
3
2
12’ P.S.
12’ P.S.
0
5
0
5
0
5
0
5
4’ P.S.
10’ P.S.
3
6
’
-L- & -Y4RPBD- G O RE DETAIL
-Y4EB- & -Y4RPBD- G O RE DETAIL
2
4
’
2
4
’
4’ P.S.
10’ P.S.
2
4
’
2
4
’
10’ P.S.
4’ P.S.
(SEE PLAN SHEET 15 FOR PLAN VIEW)
(SEE PLAN SHEET 27 FOR PLAN VIEW)
-Y4-
-L-
-Y4RPBD-
-
L
-
S
T
A
.
6
1
4
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
S
T
A
.
6
1
4
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
S
T
A
.
6
1
5
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
S
T
A
.
6
1
5
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
S
T
A
.
6
1
6
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
S
T
A
.
1
3
+
6
9
.
2
2
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
S
T
A
.
1
4
+
1
9
.
3
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
S
T
A
.
1
4
+
6
9
.
6
6
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
S
T
A
.
1
5
+
2
0
.
1
3
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
S
T
A
.
1
5
+
7
0
.
8
0
,
(
1
2
.
0
0
’
L
T
)
4’ P.S.
0
1
2
1
-
Y
4
E
B
-
6
5
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
6
4
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
6
4
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
6
3
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
6
3
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
6
2
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
6
2
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
1
+
5
8
.
9
9
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
2
+
0
9
.
2
1
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
2
+
5
9
.
2
9
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
3
+
0
9
.
2
6
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
3
+
5
9
.
1
4
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
4
+
0
8
.
9
5
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
8
4
+
5
8
.
7
6
,
(
1
2
.
0
0
’
L
T
)
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
6
-Y4RPBD- SC Sta. 84+04.51
-Y4EB- POT Sta. 60+53.98
66.67’ INC.
40’ INC.
3
6
’
-L-
-Y4RPBD-
66.67’ INC.
1
2
’
0
2
0
3
0
4
0
5
-Y4RPBD- TS Sta. 10+00.00
-L- POT Sta. 610+30.00 59.00’ RT
-Y4RPBD- ST Sta. 86+04.51 (24’ RT)
2-DD
0’30’60’
15’
30’
BAR SCALE
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
0
8
0
5
0
6
0
7
12’P.S.
12’ P.S.
40’ INC.
8:1 TAPER
-Y4EB- & -Y4RPC- G O RE DETAIL
(SEE PLAN SHEET 28 FOR PLAN VIEW)
-L-
3
6
’
2
4
’
2
4
’
10’ P.S.
8:1 TAPER
-
G
O
R
E
W
I
D
T
H
=
6
.
4
7
9
3
-
G
O
R
E
W
I
D
T
H
=
9
.
9
7
5
6
-
G
O
R
E
W
I
D
T
H
=
2
.
9
8
2
9
-
G
O
R
E
W
I
D
T
H
=
1
3
.
4
7
1
9
-
G
O
R
E
W
I
D
T
H
=
1
6
.
9
6
8
3
-
G
O
R
E
W
I
D
T
H
=
2
0
.
4
6
4
6
-
G
O
R
E
W
I
D
T
H
=
2
3
.
9
6
1
0
-
G
O
R
E
W
I
D
T
H
=
2
7
.
4
5
7
3
-Y4-
-Y4EB-
-Y4RPC-
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
1
4
0
2
1
4
0
2
1
5
0
2
1
4
0
2
1
4
02140213
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
16
’
0
2
10’ P.S.
4’ P.S.
4’ P.S.
0210
12
’
Y4RPC
1
6
’
0
8
0
8
0
8
0
2
0
2
0
2
0
2
-
G
O
R
E
W
I
D
T
H
=
2
8
.
1
0
2
2
-
G
O
R
E
W
I
D
T
H
=
2
0
.
9
4
4
8
-
G
O
R
E
W
I
D
T
H
=
1
2
.
1
3
2
4
-
G
O
R
E
W
I
D
T
H
=
5
.
4
7
2
2
-
G
O
R
E
W
I
D
T
H
=
0
.
9
0
1
0
0
5
3
4
0
5
5
8
0
2
0
5
9
6
0611
12’P.S.
1
2
’
4’ P.S.
10’ P.S.
-
Y
4
E
B
-
1
1
3
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
1
2
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
1
2
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
1
1
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
1
1
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
1
0
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
1
0
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
1
0
9
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
C
-
3
9
+
0
3
.
4
4
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
3
8
+
5
3
.
3
2
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
3
8
+
0
3
.
1
9
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
3
7
+
0
2
.
9
5
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
3
6
+
5
2
.
8
3
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
3
6
+
0
2
.
7
0
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
3
5
+
5
2
.
5
8
,
(
4
.
0
0
’
R
T
)
-Y4RPC- POT Sta. 40+03.40
0
2
1
4
0
2
1
4
0
2
1
4
0
2
1
4
0
2
1
4
-Y4EB- POT Sta. 114+00.00
-Y4RPC- SC Sta. 12+40.00
(SEE PLAN SHEET 16 & 17 FOR PLAN VIEW)
0
7
0
9
-
L
-
6
5
5
+
1
6
.
3
9
,
(
5
9
.
0
0
’
R
T
)
-
L
-
6
5
5
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
6
5
6
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
6
5
6
+
0
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
6
5
7
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
1
3
+
8
8
.
9
0
3
5
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
1
3
+
5
4
.
6
5
2
1
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
1
3
+
0
4
.
0
4
6
3
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
1
2
+
5
3
.
7
6
8
6
,
(
4
.
0
0
’
R
T
)
-
Y
4
R
P
C
-
1
2
+
0
3
.
7
1
4
5
,
(
4
.
0
0
’
R
T
)
0448
0
8
11’
-L- & -Y4RPC- G O RE DETAIL
11’
3
6
’
12’P.S.
12’P.S.
0
4
(12.00’ RT)
3
6
’
-Y4RPC-
0
2
0
3
-Y4RPC- TS Sta. 10+00.00
-L- POT Sta. 659+03.90 59.00’ RT
-
Y
4
R
P
C
-
3
7
+
5
3
.
0
7
,
(
4
.
0
0
’
R
T
)
2-EE
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
-Y4CD- & -Y4RPD- G O RE DETAIL
(SEE PLAN SHEET 27 FOR PLAN VIEW)
(SEE PLAN SHEET 27 FOR PLAN VIEW)
-Y4RPBD- & -Y4RPD- G O RE DETAIL
0
4
0
3
16
’
-Y4RPD-
8:1 TAPER
-Y4CD-
2
4
’
12
’
0
4
0
4
0
4
-
G
O
R
E
W
I
D
T
H
=
3
4
.
2
4
9
2
-
G
O
R
E
W
I
D
T
H
=
2
7
.
5
7
6
5
-
G
O
R
E
W
I
D
T
H
=
2
1
.
4
3
2
3
-
G
O
R
E
W
I
D
T
H
=
1
5
.
8
3
7
3
-
G
O
R
E
W
I
D
T
H
=
1
0
.
7
8
8
0
-
G
O
R
E
W
I
D
T
H
=
6
.
2
8
1
4
-
G
O
R
E
W
I
D
T
H
=
2
.
3
1
5
1
0
4
0
4
0
4
0
4
0
4
0
40
4
0
4
0
4
0
4
0
4
12’ PS.
4’ PS.
0
4
2
40
4
0
5
0
4
0
5
-Y4RPD-1
6
’
100’ P.S. TAPER
0
60
5
0
0
0
2
0
4
0
3
0
1
0
2
0
2
Y4RPBD
-
G
O
R
E
W
I
D
T
H
=
1
.
5
0
7
5
-
G
O
R
E
W
I
D
T
H
=
6
.
1
7
9
4
-
G
O
R
E
W
I
D
T
H
=
1
2
.
7
4
5
3
-
G
O
R
E
W
I
D
T
H
=
2
1
.
2
3
8
5
0
2
0
2
0
2
0
2
0
2
2
4
’
0
6
40’ INC.
10 PS.’
4 PS.’
4 PS.’
0
6
1
2
’
2
4
’
10, PS.
-Y4RPD- POT Sta. 10+00.00
-Y4CD- SC Sta. 66+51.14
-
Y
4
C
D
-
6
9
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
6
8
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
6
8
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
6
7
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
6
7
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
6
6
+
5
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
6
6
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
1
+
0
0
.
2
2
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
1
+
5
0
.
5
5
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
2
+
0
0
.
9
7
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
2
+
5
1
.
4
9
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
3
+
0
2
.
1
3
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
3
+
5
2
.
8
9
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
1
4
+
0
3
.
7
4
,
(
4
.
0
0
’
L
T
)
0322 0389
0036
0
4
0
5
0
4
0
5
0
4
0
0
2
4
’
0
5
4
7
0304 0179 0134
-Y4RPBD- ST Sta. 66+11.85
-Y4RPBD- CS Sta. 63+71.85
0
6
-
Y
4
R
P
D
-
3
3
+
1
9
.
6
7
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
6
6
+
1
1
.
8
5
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
D
-
3
0
+
5
0
.
0
0
,
(
4
.
O
O
’
L
T
)
-
Y
4
R
P
D
-
3
1
+
0
0
.
0
0
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
3
0
+
0
0
.
0
0
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
D
-
2
9
+
5
0
.
0
0
,
(
4
.
0
0
’
L
T
)
-
Y
4
R
P
B
D
-
6
3
+
9
2
.
9
6
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
6
3
+
4
3
.
1
8
,
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
6
2
+
9
3
.
2
0
,
(
1
2
.
0
0
’
R
T
)
-
Y
4
R
P
B
D
-
6
2
+
4
3
.
9
3
,
(
1
2
.
0
0
’
R
T
)
NOTE:
*Paved To Face Of Guardrail
8:1 TAPER
*
-Y4CD- POC Sta. 70+00.00
(12’ LT)
-Y4RPD- POT Sta. 33+19.67 =
(12.00’ LT)
2-FF
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
0
50
6
3
5
’
IN
C
0
8
0
7
0
6
0
5
0
8
0
3
0
2
0
6
0
8
3
5
’
IN
C
0
7
35’ INC.-Y1LPA-
-L-
-
L
-
4
8
5
+
6
5
.
6
9
,
(
5
9
.
0
0
’
L
T
)
-
L
-
4
8
6
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
1
L
P
A
-
1
1
+
7
5
.
1
2
,
(
8
.
0
0
’
R
T
)
G
O
R
E
W
I
D
T
H
7
.
4
2
0
1
’
-
L
-
4
8
6
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
1
L
P
A
-
1
1
+
2
6
.
9
3
,
(
8
.
0
0
’
R
T
)
-
L
-
4
8
6
+
5
6
.
3
5
,
(
5
9
.
0
0
’
L
T
)
-
Y
1
L
P
A
-
1
2
+
3
3
.
7
8
,
(
8
.
0
0
’
R
T
)
-
L
-
4
8
6
+
0
9
.
1
5
,
(
5
9
.
0
0
’
L
T
)
-
Y
1
L
P
A
-
1
1
+
8
4
.
4
0
,
(
8
.
0
0
’
R
T
)
G
O
R
E
W
I
D
T
H
2
5
.
4
0
8
8
’
G
O
R
E
W
I
D
T
H
1
0
.
0
0
0
0
’
G
O
R
E
W
I
D
T
H
2
8
.
4
5
6
4
’
11’
12’ P.S.
0
2
0
2
0
2
-
Y
1
L
P
A
-
1
1
+
4
0
.
7
5
,
(
8
.
0
0
’
R
T
)
08
08
0
7
1
2
’
(SEE PLAN SHEET 5 FOR PLAN VIEW)
(SEE PLAN SHEET 5 FOR PLAN VIEW)
-Y1LPD- 12+10.00
0474 0467
0
4
4
5
0
4
3
9
8’12’P.S.
12’ P.S.
4’ P.S.
-L-
-Y1LPD-
12’ P.S.
12’ P.S.
4’ P.S.
12’
0
2
0
2
0
2
0
2
0
2
08
8
’
-
L
-
4
8
4
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
L
-
4
8
4
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
Y
1
L
P
D
-
1
1
+
0
6
.
8
0
,
(
8
.
0
0
’
L
T
)
-
Y
1
L
P
D
-
1
1
+
5
6
.
0
2
,
(
8
.
0
0
’
L
T
)
G
O
R
E
W
I
D
T
H
2
.
9
0
3
4
’
-
Y
1
L
P
D
-
1
1
+
8
4
.
3
7
,
(
8
.
0
0
’
L
T
)
-
L
-
4
8
5
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
Y
1
L
P
D
-
1
2
+
0
6
.
8
9
,
(
8
.
0
0
’
L
T
)
-
L
-
4
8
5
+
2
5
.
3
5
,
(
5
9
.
0
0
’
R
T
)
-
Y
1
L
P
D
-
1
2
+
3
3
.
7
8
,
(
8
.
0
0
’
L
T
)
-
L
-
4
8
4
+
7
8
.
1
5
,
(
5
9
.
0
0
’
R
T
)
G
O
R
E
W
I
D
T
H
1
0
.
0
0
0
0
’
G
O
R
E
W
I
D
T
H
1
7
.
3
8
1
8
’
G
O
R
E
W
I
D
T
H
2
8
.
4
5
6
4
’
0
4
2
0
0
3
9
7
03720234
-Y4LPA- SC Sta. 12+10.00 (12’00 LT)
-Y4LPA- & -Y4CD- G O RE DETAIL -Y4LPA- & -Y4W B- G O RE DETAIL
(SEE PLAN SHEET 16 FOR PLAN VIEW)(SEE PLAN SHEET 16 FOR PLAN VIEW)
0
3
9
7
0
4
2
0
0
4
2
0
35’ INC
08
0
2
0
2
0
2
0
3
9
7
0
4
0
5
0
4
0
6
20’
2
4
’
12’P.S.
1
2
’
4’P.S.
-Y4LPA-
4’P.S.
10’P.S.
0
2
0316 0
6
10
0
4
0
5
0
4
0
6
0
3
9
7
0
7
5
5
0
7
-Y4LPA- CS Sta. 22+10.62
-Y4WB-
0
4
8:1 TAPE R
0
2
0
6
2
6
0
7
1
5
0
7
7
1
0
8
3
6
’
1
2
’
6’P.S.
0
2
0
2
0
2
0
2
4’P.S.
4’P.S.
10’P.S.
G
O
R
E
W
I
D
T
H
4
2
.
2
2
5
3
’
G
O
R
E
W
I
D
T
H
2
2
.
5
5
8
8
’
G
O
R
E
W
I
D
T
H
1
5
.
6
7
9
0
’
G
O
R
E
W
I
D
T
H
1
.
7
2
3
0
’
-
G
O
R
E
W
I
D
T
H
1
0
.
0
0
0
0
’
0563
-
G
O
R
E
W
I
D
T
H
1
6
.
4
3
3
0
’
0
5
0
2
-
G
O
R
E
W
I
D
T
H
2
6
.
4
4
5
8
’
0
4
4
8
-
G
O
R
E
W
I
D
T
H
2
.
1
4
7
1
’
2
0
’
3
6
’
0
2
0
7
2
7
0
6
0
2
08
-Y1LPA- SC 12+31.88
3
6
’
2
0
’
0
6
4
6
0
7
2
7
0
7
9
1
0
5
0
5
-Y4CD-
0704
-
Y
4
W
B
-
8
6
+
5
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
A
-
2
2
+
7
1
.
6
5
,
(
8
.
0
0
’
L
T
)
-
Y
4
W
B
-
8
6
+
1
8
.
8
8
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
A
-
2
2
+
4
0
.
2
8
,
(
8
.
0
0
’
L
T
)
-
Y
4
W
B
-
8
6
+
0
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
A
-
2
2
+
2
0
.
8
8
,
(
8
.
0
0
’
L
T
)
-
Y
4
W
B
-
8
5
+
7
6
.
8
7
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
A
-
2
1
+
9
6
.
4
0
,
(
8
.
0
0
’
L
T
)
-Y4LPA-
-Y1LPA- & -L- G O RE DETAIL
0
2
1
2
’
0
3
0
4 0
5
3
6
’
-L- POT Sta. 484+24.00
(59’ Lt.)
-Y1LPA- TS Sta. 10+00.00
0
2
(59’ Rt.)
-L- POT Sta. 482+93.00
-Y1LPD- TS Sta. 10+00.00
0
2
3
6
’
1
2
’
0
3
0
4
-Y1LPD & -L- G O RE DETAIL
-Y4CD- POT Sta. 44+44.26
(12’ Lt.)
-Y4LPA- TS Sta. 10+00.00
-
Y
4
C
D
-
4
1
+
9
6
.
9
5
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
A
-
1
2
+
5
2
.
0
0
,
(
8
.
0
0
’
L
T
)
-
Y
4
C
D
-
4
2
+
3
2
.
9
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
A
-
1
2
+
1
2
.
0
6
,
(
8
.
0
0
’
L
T
)
-
Y
4
C
D
-
4
2
+
4
9
.
7
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
A
-
1
1
+
9
4
.
3
9
,
(
8
.
0
0
’
L
T
)
-
Y
4
C
D
-
4
2
+
9
9
.
7
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
A
-
1
1
+
4
3
.
6
2
,
(
8
.
0
0
’
L
T
)
-Y4W B- ST Sta. 87+99.97
-Y4LPA- ST Sta. 24+20.62
(12’ Lt.)
2-GG
0
6
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
0
3
0
4
0
50
60
7
0
8 35’ INC
0
5
0
6
0
7
0
8
0
2
0
3
0
4
35’ INC
-Y4LPB- & -Y4W B- G O RE DETAIL
(SEE PLAN SHEET 16 FOR PLAN VIEW)
0
4
0
7
0
8
3
6
’
0
2
0
2
0
3
0
5
0
6
35’ INC
(SEE PLAN SHEET 16 FOR PLAN VIEW)
-Y4LPB- & -L- G O RE DETAIL
-Y4LPB- SC Sta. 12+10.00
-
G
O
R
E
W
I
D
T
H
=
2
8
.
4
7
5
8
’
-
G
O
R
E
W
I
D
T
H
=
1
3
.
6
5
9
7
’
-
G
O
R
E
W
I
D
T
H
=
.
7
5
6
7
’
-
G
O
R
E
W
I
D
T
H
=
1
0
.
0
0
0
0
’
0
8
0
7
5
1
0
7
1
8
0
6
0
7
0
2
0
2
0
2
0
2
0584
0
5
0
1
0
4
9
6
-L-
1
2
’
14’ P.S.
12’ P.S.
0
4
9
6
0
5
0
1
12’ P.S.
4’ P.S.
GRAU-350
-Y4LPB- CS Sta. 22+58.05
8
:1
TA
P
E
R
08
0
8
0
2
0
2
0
2
0
7
12
-Y4WB-
-Y4LPB-
0
3
1
5
0
2
9
7
0
4
7
9
-
G
O
R
E
W
I
D
T
H
=
4
0
.
0
6
5
2
’
-
G
O
R
E
W
I
D
T
H
=
2
2
.
5
6
0
9
’
-
G
O
R
E
W
I
D
T
H
=
9
.
6
6
1
1
’
0
8
0
7
0
6
0
5
0
4
0
3
0
2
3
6
’
35’ INC
8:1 TAPER
-Y4LPD- SC Sta. 12+10.00
0
2
0
2
0
2
0
2
0
2
-
G
O
R
E
W
I
D
T
H
=
.
8
6
9
4
’
-
G
O
R
E
W
I
D
T
H
=
1
0
.
0
0
0
’
-
G
O
R
E
W
I
D
T
H
=
1
4
.
0
7
5
7
’
-
G
O
R
E
W
I
D
T
H
=
2
8
.
4
8
5
4
’
0
5
9
8
0
7
0
6
0
7
4
2
0
8
0521 0418
0
4
2
9
0
4
6
1
3
6
’
1
2
’
4’ P.S.
4’ P.S.
10’ P.S.
4’ P.S.
0
3
3
2
0
2
9
7
0
2
9
7
-Y4LPD- & -Y4CD- G O RE DETAIL
(SEE PLAN SHEET 16 FOR PLAN VIEW)
8
:1
TA
P
E
R
-Y4LPD- CS Sta. 22+65.27
-Y4EB-
-Y4LPD- & -Y4EB- G O RE DETAIL
(SEE PLAN SHEET 16 FOR PLAN VIEW)
08
0
8
0
2
0
2
0
2
0
2
0
6
7
1
0
3
1
9
0254
-
G
O
R
E
W
I
D
T
H
=
5
.
7
2
7
6
’
-
G
O
R
E
W
I
D
T
H
=
2
2
.
5
6
0
0
’
-
G
O
R
E
W
I
D
T
H
=
4
0
.
0
6
3
7
’
2
4
’
1
2
’
4’ PS
6’PS
0
3
1
9
0
3
0
4
0
3
0
4
10’ PS
4’ PS20’
2
4
’
2
0’
-Y4CD-
-Y4LPD-
4’ PS
10’ PS
12’ PS
10’ PS
-
L
-
6
3
8
+
6
4
.
7
8
,
(
5
9
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
1
2
+
2
9
.
8
5
,
(
8
.
0
0
’
R
T
)
-
L
-
6
3
9
+
0
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
1
1
+
9
2
.
8
7
,
(
8
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
1
1
+
8
1
.
3
0
,
(
8
.
0
0
’
R
T
)
-
L
-
6
3
9
+
1
1
.
3
6
,
(
5
9
.
0
0
’
R
T
)
-
L
-
6
3
9
+
5
0
.
0
0
,
(
5
9
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
1
1
+
4
2
.
6
1
,
(
8
.
0
0
’
R
T
)
NOTE:
* Paved To Face Of Guardrail
*
0
2
0
2
0
2
-
Y
4
W
B
-
9
5
+
6
7
.
6
5
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
2
2
+
1
6
.
6
1
,
(
8
.
0
0
’
R
T
)
-
Y
4
W
B
-
9
5
+
3
4
.
8
3
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
2
2
+
5
2
.
7
3
,
(
8
.
0
0
’
R
T
)
-
Y
4
W
B
-
9
5
+
0
0
.
0
0
,
(
2
4
.
0
0
’
R
T
)
-
Y
4
L
P
B
-
2
2
+
8
8
.
4
0
,
(
8
.
0
0
’
R
T
)
-
Y
4
L
P
D
-
1
2
+
2
5
.
3
6
,
(
8
.
0
0
’
R
T
)
-
Y
4
L
P
D
-
1
1
+
8
9
.
8
1
,
(
8
.
0
0
’
R
T
)
-
Y
4
C
D
-
5
0
+
8
3
.
3
3
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
C
D
-
5
0
+
4
9
.
7
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
D
-
1
1
+
7
7
.
0
7
,
(
8
.
0
0
’
R
T
)
-
Y
4
C
D
-
5
0
+
3
7
.
3
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
D
-
1
1
+
3
9
.
2
0
,
(
8
.
0
0
’
R
T
)
-
Y
4
C
D
-
4
9
+
9
9
.
7
7
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
E
B
-
8
7
+
0
0
.
0
0
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
D
-
2
3
+
1
0
.
5
2
(
8
.
0
0
’
R
T
)
-
Y
4
E
B
-
8
6
+
5
0
.
8
9
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
D
-
2
2
+
5
9
.
9
4
(
8
.
0
0
’
R
T
)
-
Y
4
E
B
-
8
6
+
1
8
.
0
8
,
(
1
2
.
0
0
’
L
T
)
-
Y
4
L
P
D
-
2
2
+
2
3
.
8
2
(
8
.
0
0
’
R
T
)
-Y4LPB-
-Y4LPD-
-Y4LPB- Sta. 10+00.00
-L- Sta. 640+94.12
-Y4W B- Sta. 93+20.03
-Y4LPB- Sta. 24+68.05
-Y4LPD- Sta. 10+10.00
-Y4CD- Sta. 48+59.71
-Y4EB- Sta. 88+65.70
-Y4LPD- Sta. 24+75.27
2-HH
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
0
2
0
2
0
2
70’ INC.
0
1
0
1
0
0
0
2
0
0
3
6
’
2
4
’
0
1
0
1
(SEE PLAN SHEET 19 FOR PLAN VIEW)
-Y4CD- SC Sta. 88+45.46
-Y4CD-
-L-
-
G
O
R
E
W
I
D
T
H
=
3
0
.
1
1
6
4
’
-
G
O
R
E
W
I
D
T
H
=
2
6
.
9
3
5
3
’
-
G
O
R
E
W
I
D
T
H
=
2
2
.
0
1
4
3
’
-
G
O
R
E
W
I
D
T
H
=
1
6
.
7
4
9
7
’
-
G
O
R
E
W
I
D
T
H
=
1
3
.
4
3
2
0
’
-
G
O
R
E
W
I
D
T
H
=
1
0
.
2
8
0
1
’
-
G
O
R
E
W
I
D
T
H
=
7
.
3
3
5
1
’
-
G
O
R
E
W
I
D
T
H
=
4
.
5
9
9
3
’
-
G
O
R
E
W
I
D
T
H
=
2
.
0
7
2
4
’
-
Y
4
C
D
-
9
0
+
6
6
.
5
4
,
(
1
1
.
7
5
’
R
T
)
0
19
9
0
12
7
0
0
2
3
0
0
8
9
0
15
9
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
0
5
1
0
10
6
0
17
8
0
19
1
0
17
2
0136 0147 0165 0215
4’PS
10’PS
12’PS
8:1 TAPER
1
1
’
12’PS
12’PS
-
L
-
6
8
1
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
5
+
6
6
.
3
4
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
1
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
6
+
1
6
.
5
0
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
2
+
2
2
.
9
7
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
6
+
8
9
.
6
7
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
3
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
7
+
6
7
.
8
7
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
3
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
8
+
1
6
.
9
4
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
4
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
8
+
6
7
.
0
0
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
4
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
9
+
1
7
.
0
3
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
5
+
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
8
9
+
6
7
.
0
6
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
5
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
9
0
+
1
7
.
0
7
,
(
1
2
.
0
0
’
R
T
)
-
L
-
6
8
6
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-Y4CD- & -L- EN D G O RE DETAIL
2-II
0’30’60’
15’
30’
BAR SCALE
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
5
r
:
\
r
o
a
d
w
a
y
\
p
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
g
o
r
e
_
d
e
t
a
i
l
s
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579 B
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
3
6
’
3
6
’
-L-
-Y4CD-
12’ P.S.
12’ P.S.
0
2
0
1
3
6
’
-Y4CD-
0
2
3
6
’
-
Y
4
C
D
-
S
T
A
.
1
4
+
9
9
.
9
8
,
(
4
.
0
0
R
T
)
-
Y
4
C
D
-
S
T
A
.
1
5
+
5
0
.
0
1
,
(
4
.
0
0
R
T
)
-
Y
4
C
D
-
S
T
A
.
1
6
+
0
0
.
0
5
,
(
4
.
0
0
R
T
)
-
Y
4
C
D
-
S
T
A
.
1
7
+
0
0
.
1
6
,
(
4
.
0
0
R
T
)
-
Y
4
C
D
-
S
T
A
.
1
8
+
0
0
.
3
5
,
(
4
.
0
0
R
T
)
G
O
R
E
W
I
D
T
H
=
1
.
1
0
3
6
’
G
O
R
E
W
I
D
T
H
=
2
.
6
6
6
3
’
G
O
R
E
W
I
D
T
H
=
4
.
4
3
7
7
’
G
O
R
E
W
I
D
T
H
=
6
.
4
1
7
8
’
G
O
R
E
W
I
D
T
H
=
8
.
6
0
6
6
’
G
O
R
E
W
I
D
T
H
=
1
1
.
0
0
4
4
’
G
O
R
E
W
I
D
T
H
=
1
6
.
4
2
7
3
’
G
O
R
E
W
I
D
T
H
=
2
2
.
4
7
3
2
’
(SEE PLAN SHEET 19 FOR PLAN VIEW)
-Y4CD- PC Sta. 10+00.00
-Y4CD- PRC Sta. 17+15.41
-
Y
4
C
D
-
S
T
A
.
1
3
+
4
9
.
9
4
,
(
4
.
0
0
R
T
)
-
Y
4
C
D
-
S
T
A
.
1
3
+
9
9
.
9
4
,
(
4
.
0
0
R
T
)
-
Y
4
C
D
-
S
T
A
.
1
4
+
4
9
.
9
6
,
(
4
.
0
0
R
T
)
-Y4CD- & -L- BEG IN G O RE DETAIL
0180 01860173
0122 0158 0167
0147
0002
-
L
-
S
T
A
.
6
0
9
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
0
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
0
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
1
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
1
+
5
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
2
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
3
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
4
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
0
2
-Y4CD-
-L-
M
A
T
C
H
L
I
N
E
A
M
A
T
C
H
L
I
N
E
A
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2 0
2 0
2
0
2
-
L
-
S
T
A
.
6
1
5
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
6
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
7
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
L
-
S
T
A
.
6
1
8
+
0
0
.
0
0
,
(
5
9
.
0
0
’
L
T
)
-
Y
4
C
D
-
S
T
A
.
1
9
+
0
0
.
4
9
8
8
,
(
4
.
0
0
R
T
)
G
O
R
E
W
I
D
T
H
=
2
7
.
8
8
6
0
’
-
Y
4
C
D
-
S
T
A
.
2
0
+
0
0
.
6
1
6
2
,
(
4
.
0
0
R
T
)
G
O
R
E
W
I
D
T
H
=
3
2
.
4
6
2
1
’
-
Y
4
C
D
-
S
T
A
.
2
1
+
0
0
.
7
0
4
5
,
(
4
.
0
0
R
T
)
G
O
R
E
W
I
D
T
H
=
3
6
.
2
0
2
4
’
-
Y
4
C
D
-
S
T
A
.
2
0
+
0
0
.
8
8
2
7
,
(
4
.
0
0
R
T
)
G
O
R
E
W
I
D
T
H
=
3
9
.
1
2
1
8
’
3
6
’
3
6
’
12’ P.S.
12’ P.S.
4’
3
6
’
3
6
’
0184
0
1
5
2
0
1
7
1
0
1
9
0
4’
3
6
’
3
6
’
-L- Sta. 606+00.00
2-JJ
0’30’60’
15’
30’
BAR SCALE
-
Y
3
-
-
Y2
A-
10
11
12
13
1
4
15
-L-
B
E
GI
N
N
OIS
E
W
A
L
L -
N
W
L1-
-
N
W
L1-
P
O
T
Sta. 10
+
0
0.0
0
=
-
L-
P
O
C
S
T
A
5
5
7
+
9
7.9
5 (7
2.5
0’
R
T)
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
L
1
-
-
N
W
L
1
-
P
O
T
S
t
a
.
3
4
+
5
3
.
9
0
-
L
-
P
O
C
S
t
a
.
5
8
2
+
8
4
.
3
9
(
8
4
.
5
0
’
R
T
)
B
E
G
IN
N
O
IS
E
W
A
LL
-
N
W
L2
-
-
N
W
L2
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
L-
P
O
C
S
t
a
.
5
8
5
+
8
1
.
4
0
(
8
4
.
5
0
’
R
T
)
EN
D
N
O
IS
E W
A
LL -N
W
L2
-
-N
W
L2
- P
O
T S
ta
. 3
3
+
6
0
.0
0
-L- P
O
T S
ta
. 6
0
9
+
6
8
.4
4
(8
6
.7
5
’ RT)
BEG
IN
N
O
IS
E W
A
LL -N
W
L3
-
-N
W
L3
- P
O
T S
ta
. 10
+
0
0
.0
0
-Y4
C
D
- P
O
C
S
ta
. 11+
18
.9
6
(5
1.7
5
’ LT)
-
Y4
RP
A
-
P
O
C
S
ta
. 15
+
3
6
.2
0
EN
D
N
O
IS
EW
A
LL
-
N
W
L3
-
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
R
P
A
-
-
Y
4
R
P
A
-
P
O
C
S
t
a
1
9
+
2
6
.
0
4
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
R
P
A-
-
N
W
Y
4
R
P
A-
P
O
T
St
a.
1
3
+
4
2.
2
1
-
Y
4
R
P
A-
P
O
C
St
a.
2
2
+
7
2.
7
0
(
2
5.
7
5
’
L
T)
B
E
G
I
N
N
O
I
S
E
W
A
L
L
O
N
B
R
I
D
G
E
E
N
D
N
O
IS
E
W
A
LL
O
N
B
R
ID
G
E
BEG
IN
N
O
IS
E
W
A
LL
O
N
B
RID
G
E
E
N
D
N
O
I
S
E
W
A
L
L
O
N
B
R
I
D
G
E
-NW L3
--Y4RPBD-
-Y4RPB-
-Y4RPA-
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
n
o
i
s
e
w
a
l
l
_
l
o
c
a
t
i
o
n
_
d
e
t
a
i
l
_
2
J
J
A
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2JJAU-2579B
-NW L2-
-N W L1-
LO CATIO N DETAIL
-N W L1-, -N W L2-, -N W L3-, -N W Y4RPA-
N O ISE W ALL
-
N
W
Y
4
R
P
A
-
N O ISE W ALL LO CATIO N
LEG EN D
-
N
W
L3
-
P
O
T
S
ta
. 3
0
+
9
3
.8
6
=
-
N
W
Y
4
R
P
A
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
1
6
17
18
29 30
28
27
-Y5A-C
D
A
B
-Y5-
-Y4-
-Y6--
Y
4
R
PA--Y4RPB-
-Y4RPBD -
-Y4RPC-
-Y 4 R PD -
-Y
4C
D
-
-L-
-Y4LPD-
-Y4LPA--Y4LPB-
LO CATIO N DETAIL
-N W Y41-, -N W Y42-, -N W Y4RPBD1-, -N W Y4RPBD2-, -N W CD2-
N O ISE W ALL
-N
W
C
D
2
-
-N W Y4RPBD 2-
-N W Y4RPBD 1-
-N W Y41-
-N W Y42-
-
N
W
Y
4
P
R
B
D
1-
P
O
T
Sta. 2
1
+
9
0.0
0
=
-
Y
4
R
P
B
D-
P
O
T
Sta. 7
0
+
0
7.0
9 (7
9.5
9’
R
T)
E
N
D
N
OI
S
E
W
A
L
L -
N
W
Y
4
R
P
B
D
1-
-
Y4
R
P
D-
P
O
C
Sta. 26
+
02.53
R
T
B
E
GI
N
N
OIS
E
W
A
L
L -
N
W
Y4
R
P
B
D
1-
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
1
-
-
N
W
Y
4
1
-
P
O
T
S
t
a
.
3
3
+
2
0
.
0
0
=
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
2
6
+
4
0
.
7
7
(
9
3
.
3
1
’
L
T
)
E
N
D
M
S
E
W
A
L
L
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
2
-
-
N
W
Y
4
2
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
3
0
+
2
6
.
3
7
(
3
1
.
9
2
’
L
T
)
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
2
-
-
N
W
Y
4
2
-
P
O
T
S
t
a
.
2
6
+
5
0
.
0
0
=
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
4
6
+
7
6
.
2
6
(
2
5
.
7
5
’
L
T
)
-Y 4RPC - PO
C Sta. 2 9+6 0.8 6 (9 9.5 3’ LT)
BEG
IN
N
O
ISE W
ALL -N
W
Y 4 1-
-N
W
Y 4 1- PO
T Sta. 10+0 0.0 0=
E
N
D
N
O
I
S
E W
A
L
L
-
N
W
C
D
2
-
-
N
W
C
D
2
-
P
O
T
S
t
a.
2
3
+
0
0.
0
0
=
-
Y
4
C
D
-
P
O
C
S
t
a.
8
0
+
0
3.
2
2
(
1
6
5.
5
1
’
L
T
)
B
EG
IN
N
O
ISE
W
A
LL
-NW
CD
2
-
-NW
CD
2
-
PO
T
S
ta
.
1
0
+
0
0
.
0
0
=
-Y
4R
PD
-
PO
T
S
ta
.
1
2
+
1
6
.
2
7
(2
5
.
7
5
’ RT
)
-
N
W
Y4
R
P
B
D
1-
P
O
T
Sta. 10
+
00.00
=
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
R
P
B
D
2
-
-
Y
4
R
P
B
D
-
P
O
C
S
t
a
.
8
3
+
4
8
.
6
7
(
7
4
.
9
5
’
R
T
)
-
N
W
Y
4
R
P
B
D
2
-
P
O
T
S
t
a
.
2
4
+
0
0
.
0
0
=
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
R
P
B
D
2
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
-
Y
4
R
P
B
D
-
P
O
T
S
t
a
.
6
9
+
8
7
.
4
5
(
8
5
.
8
5
’
R
T
)
N O ISE W ALL LO CATIO N
LEG EN D
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
n
o
i
s
e
w
a
l
l
_
l
o
c
a
t
i
o
n
_
d
e
t
a
i
l
_
2
J
J
B
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
2JJBU-2579B
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
4645 47 48
820
830
840
850
860
49 50 51 52 53 54 55 56 57 58 59
820
830
840
850
860
RETAIN IN G W ALL 1 RETAIN IN G W ALL 2
-W ALL1-
-W ALL2-
(-W ALL1-)(-W ALL1-)
(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)
(-W ALL2-)(-W ALL2-)(-W ALL2-)(-W ALL2-)(-W ALL2-)(-W ALL2-)
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-XXU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
p
f
l
_
s
h
t
_
r
e
t
a
i
n
i
n
g
w
a
l
l
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
10 11
B
E
G
I
N
R
E
T
A
I
N
I
N
G
W
A
L
L
EXIST GRO UN D
E
N
D
R
E
T
A
I
N
I
N
G
W
A
L
L
8
4
5
.
2
3
’
8
4
9
.
1
1
’
8
5
2
.
1
0
’
8
5
5
.
2
3
’
E
L
.
=
8
5
4
.
1
6
’
TO P O F W ALL
-
Y
4
W
B
-
S
T
A
.
4
6
+
5
9
.
6
5
=
-
W
A
L
L
1
-
S
T
A
.
1
0
0
+
0
0
.
0
0
(
5
0
.
2
1
4
’
R
T
.
)
E
L
.
=
8
5
2
.
5
3
’
(
E
N
D
O
F
R
C
B
C
)
-
Y
4
W
B
-
S
T
A
.
4
7
+
7
5
.
0
0
=
-
W
A
L
L
1
-
S
T
A
.
1
1
+
1
5
.
3
5
(
5
0
.
2
1
4
R
T
)
-
Y
4
W
B
-
S
T
A
.
4
7
+
0
0
.
0
0
=
E
L
.
=
8
5
3
.
1
0
’
-
Y
4
W
B
-
S
T
A
.
4
7
+
5
0
.
0
0
=
E
L
.
=
8
5
3
.
8
1
’
-
W
A
L
L
1
S
T
A
.
1
0
+
9
0
.
3
5
(
5
0
.
2
1
4
’
R
T
.
)
-
W
A
L
L
1
-
S
T
A
.
1
0
+
4
0
.
3
5
(
5
0
.
2
1
4
’
R
T
.
)
300’ TAPER
300’ TAPER
1300’ FULL LANE
4’ P.S.
10’ P.S.
4’ P.S.4’ P.S.
1300’ FULL LANE
4’ P.S.
-Y4WB-
-Y4EB-
-Y4WB-
-Y4EB-
-Y4WB-
-Y4EB-
-Y4--Y4-
10’ P.S.
-Y4-
30’
4
8
’
3
6
’
4
8
’
4
8
’
4
8
’
10’ P.S.
4’ P.S.
10’ P.S.
10’ P.S.
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
123.00’
+11.00 -Y4EB-
BEGIN W.W. FENCE
F
F F
C
C C
C
C
F
C
B
E
G
I
N
R
E
T
A
I
N
I
N
G
W
A
L
L
TO P O F W ALL
EXISTIN G GRO UN D
E
N
D
R
E
T
A
I
N
I
N
G
W
A
L
L
E
L
.
=
8
5
2
.
3
4
’
E
L
.
=
8
4
9
.
6
2
E
L
.
=
8
4
8
.
8
9
’
E
L
.
=
8
4
7
.
3
6
’
E
L
.
=
8
4
7
.
7
9
’
E
L
.
=
8
4
7
.
6
8
’
E
L
.
=
8
4
7
.
1
6
’
E
L
.
=
8
4
3
.
1
2
’
E
L
.
=
8
4
5
.
6
9
’
E
L
.
=
8
4
3
.
8
0
’
E
L
.
=
8
4
1
.
8
1
’
E
L
.
=
8
4
4
.
0
7
’
E
L
.
=
8
4
6
.
3
5
’
-
Y
4
W
B
-
S
T
A
.
5
0
+
5
0
.
0
0
=
-
Y
4
W
B
-
S
T
A
.
5
1
+
0
0
.
0
0
=
E
L
.
=
8
5
1
.
6
5
’
-
Y
4
W
B
-
S
T
A
.
5
1
+
5
0
.
0
0
=
E
L
.
=
8
5
1
.
0
9
’
-
Y
4
W
B
-
S
T
A
.
5
2
+
0
0
.
0
0
=
E
L
.
=
8
5
0
.
6
3
-
Y
4
W
B
-
S
T
A
.
5
2
+
5
0
.
0
0
=
E
L
.
=
8
5
0
.
2
1
’
-
Y
4
W
B
-
S
T
A
.
5
3
+
0
0
.
0
0
=
E
L
.
=
8
5
0
.
0
2
’
-
Y
4
W
B
-
S
T
A
.
5
3
+
5
0
.
0
0
=
E
L
.
=
8
4
9
.
7
1
’
-
Y
4
W
B
-
S
T
A
.
5
4
+
0
0
.
0
0
=
E
L
.
=
8
4
9
.
4
7
’
-
Y
4
W
B
-
S
T
A
.
5
4
+
5
0
.
0
0
=
E
L
.
=
8
4
9
.
4
3
’
-
Y
4
W
B
-
S
T
A
.
5
5
+
0
0
.
0
0
=
E
L
.
=
8
4
9
.
4
7
’
-
Y
4
W
B
-
S
T
A
.
5
5
+
5
0
.
0
0
=
-
W
A
L
L
2
-
S
T
A
.
1
0
+
0
0
.
0
0
(
3
9
.
0
0
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
0
+
5
0
.
0
0
(
3
9
.
0
0
’
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
1
+
0
0
.
0
0
(
3
9
.
0
0
’
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
1
+
5
0
.
0
0
(
3
9
.
0
0
’
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
2
+
0
0
.
0
0
(
3
9
.
0
0
’
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
5
+
0
0
.
2
1
(
4
9
.
4
6
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
4
+
5
0
.
1
7
(
4
7
.
4
7
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
4
+
0
0
.
1
3
(
4
5
.
4
7
’
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
3
+
5
0
.
0
9
(
4
3
.
4
7
’
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
3
+
0
0
.
0
5
(
4
1
.
4
7
R
T
)
-
W
A
L
L
2
-
S
T
A
.
1
2
+
5
0
.
0
1
(
3
9
.
4
7
’
R
T
)
10 11 12 13 14 15
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
62
820
830
840
850
860
63 64 65 66 67 68
820
830
840
850
860
RETAIN IN G W ALL 3
6
0
-W ALL3-
-Y4W B- STA. 64+11.04 TO 64+58.33
(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)(-Y4W B-)
(-W ALL3-)(-W ALL3-)
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-YYU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
p
f
l
_
s
h
t
_
r
e
t
a
i
n
i
n
g
w
a
l
l
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
10
B
E
G
I
N
R
E
T
A
I
N
I
N
G
W
A
L
L
E
N
D
R
E
T
A
I
N
I
N
G
W
A
L
L
EXISTING GRO UN D
E
L
.
=
8
4
5
.
9
1
8
5
0
.
0
0
’
8
4
6
.
6
7
’
8
4
9
.
0
9
’
E
L
.
=
8
5
3
.
8
1
-
Y
4
W
B
-
S
T
A
.
6
4
+
1
1
.
0
4
=
-
W
A
L
L
3
-
S
T
A
.
1
0
+
0
0
.
0
0
(
6
4
.
0
7
5
R
T
)
-
Y
4
W
B
-
S
T
A
.
6
4
+
5
8
.
3
3
=
-
W
A
L
L
3
-
S
T
A
.
1
0
+
4
8
.
8
9
(
7
6
.
4
4
6
R
T
)
-
Y
4
W
B
-
S
T
A
.
6
4
+
5
0
.
0
0
=
E
L
.
=
8
4
7
.
3
0
’
T
OP
OF
W
ALL
11
-
W
A
L
L
3
-
S
T
A
.
1
0
+
4
0
.
2
7
(
7
4
.
2
6
6
’
R
T
.
)
2SFD
S
2SFD
S
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
0
5
0
2
0
2
2
4
’
-Y4RPA-
-Y4RPBD-
-Y4RPBD-
10’ P.S.
7
5
8
0
8
5
50’ INC.
10’ P.S.
4’ P.S.
0
4
0
4
0
5
0
5
0
3
0
3
66.67’ INC.
-
Y4
R
P
A
-
C
S
S
t
a
. 3
9
+
4
1.7
4
-
Y
4
R
P
A
-
S
T
S
t
a
.
4
1
+
4
1
.
7
4
-
Y
4
R
P
B
D
-
C
S
Sta. 84+04.51
50’ INC.
30’
1300’ FULL LANE
3
6
’
0
2 0
3
0
4
0
6
0
2
0
3
0
4
2
4
’
2
4
’
3
6
’
-Y4RPA- STA. 36+24.33
END -Y4RPA- PAVEMENT
-Y4RPBD- STA. 81+62.11
END -Y4RPBD- PAVEMENT
BEGIN -Y4EB- PAVEMENT
BEGIN -Y4WB- PAVEMENT
-
Y
4
W
B
-
P
O
T
S
t
a
.
6
8
+
8
7
.
7
3
2
4
.
0
0
’
R
T
.
1300’ FULL LANE
BEGIN W.W. FENCE
8:1 TAPER
-NWY4RPBD2-END NOISE WALL
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-QQU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWCD2-
-L- WINSTON SALEM OUTER LOOP
-Y4CD-
-Y4RPD-
6
7
0
6
7
5
6
6
5
7
5
8
0
7
0
1
0
10 11 12 13 14 15 16 17 18 19 20 21 22 23
840
850
860
870
880
890
900
910
840
850
860
870
880
890
900
910
-NWCD2-
1
0
P
I
S
t
a
.
12
+
0
0
.
0
0
P
I
S
t
a
.
12
+
6
0
.
0
0
P
I
S
t
a
.
13
+
2
0
.
0
0
P
I
S
t
a
.
13
+
8
0
.
0
0
P
I
S
t
a
.
14
+
4
0
.
0
0
1
5
P
I
S
t
a
.
15
+
0
0
.
0
0
PI
Sta. 16
+
4
0.0
0 P
I
S
t
a
.
17
+
8
0
.
0
0
2
0
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
C
D
2
-
E
N
D
N
O
IS
E
WA
L
L
-
N
WC
D
2
-
-NWCD2-
-NWCD2-
-
N
W
C
D
2
-
P
O
T
S
t
a
.
10
+
0
0
.
0
0
=
-
Y
4
R
P
D
-
P
O
T
S
t
a
.
12
+
16
.
2
7
(
2
5
.
7
5
’
R
T
)
-
N
WC
D
2
-
P
O
T
S
t
a
. 2
3
+
0
0
.0
0
=
-
Y4
C
D
-
P
O
C
S
t
a
. 8
0
+
0
3
.2
2
(
16
5
.5
1’
L
T
)
6
6
5
6
7
0
6
7
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
16
17
18 19 2
0
2
1
2
2
2
3
2
4
2
5
2
6
2
7 28 29 30 31 32 33 34 35 36 37
38
39
40
41
42
43
44
45 46 47 48
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
-NWCD2- DESIGN DATA
20 2020’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’100’100’100’100’100’10’10’10’10’40’40’40’10’10’10’10’10’10’10’10’
891.00’891.00’891.00’891.00’891.00’889.46’888.46’889.46’890.68’892.45’894.50’895.87’897.36’898.34’899.51’900.68’901.85’903.10’903.84’904.57’905.31’906.04’906.71’907.38’908.05’908.72’909.39’910.03’910.70’911.36’910.70’909.72’910.66’911.44’912.92’914.00’914.00’914.00’914.01’914.35’914.68’915.00’915.00’915.00’915.01’915.35’915.68’916.01’
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
R/W SHEET N O .8
/
1
7
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
N
O
I
S
E
W
A
L
L
\
u
2
5
7
9
b
_
r
d
y
_
p
f
l
s
h
t
_
n
w
l
1
_
2
k
k
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
880
890
900
910
920
930
940
950
960
970
-L- WINSTON SALEM OUTER LOOP
NOISE BARRIER -NWL1-
MINIMUM WALL HEIGHT
-NWL1-
U-2579B 2-KK
M
A
T
C
H
LIN
E
-
N
WL1-
S
T
A
. 2
4
+
0
0
.0
0
5
7
0
5
6
5
5
6
0
FACE OF NOISE WALL
PROPOSED GROUND AT
-NWL1-
-NW L1-1
0
P
I
S
t
a
.
11+
0
0
.
0
0
P
I
S
t
a
.
12
+
0
0
.
0
0
P
I
S
t
a
.
13
+
0
0
.
0
0
P
I
S
t
a
.
14
+
0
0
.
0
0
1
5
P
I
S
t
a
.
15
+
0
0
.
0
0
P
I
S
t
a
.
16
+
0
0
.0
0
P
I
S
t
a
. 17
+
0
0
.0
0
P
I
S
t
a
. 18
+
0
0
.0
0
P
I S
t
a
. 19
+
0
0
.0
0
2
0
P
I S
ta
. 2
0
+
0
0
.0
0
P
I S
ta
. 2
1+
0
0
.0
0
P
I S
ta
. 2
2
+
0
0
.0
0
P
I S
ta
. 2
3
+
0
0
.0
0
P
I S
ta
. 2
4
+
0
0
.0
0
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
L
1-
-
N
W
L
1-
P
O
T
S
t
a
.
10
+
0
0
.
0
0
=
-
L
-
P
O
C
S
T
A
5
5
7
+
9
7
.
9
5
(
7
2
.
5
0
’
R
T
)
P
I S
ta
. 2
4
+
0
0
.0
0
1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
LENGTH
TOP ELEV.
PANEL NO.
-NWL1- DESIGN DATA
-NWL1- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
912.34’913.01’913.67’914.34’915.00’915.67’916.34’917.00’917.67’918.34’919.00’919.67’920.51’921.51’922.51’923.34’924.00’924.67’925.34’926.00’926.67’927.51’928.51’929.51’930.34’931.00’931.67’932.34’933.00’933.67’934.51’935.51’936.51’937.34’938.00’
938.67’939.34’940.00’940.67’941.51’942.51’943.51’944.34’945.00’945.67’946.34’947.00’947.67’948.51’949.51’950.51’951.34’952.01’952.67’953.34’954.01’954.67’955.51’956.51’957.51’958.34’959.01’959.67’960.34’961.01’961.67’962.51’963.51’964.51’965.34’
-L- WINSTON SALEM OUTER LOOP
NOISE BARRIER -NWL1-
MINIMUM WALL HEIGHT
M
A
T
C
H
L
I
N
E
-
N
W
L
1-
S
T
A
.
2
4
+
0
0
.
0
0
24 25 26 27 28 29 30 31 32 33 34
940
950
960
970
980
940
950
960
970
980
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2LLU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
N
O
I
S
E
W
A
L
L
\
u
2
5
7
9
b
_
r
d
y
_
p
f
l
s
h
t
_
n
w
l
1
_
2
L
L
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
-
Y2
A
-
-
S
R
R
-
-
Y
3
-
FACE OF NOISE WALL
PROPOSED GROUND AT
-NWL1-
SEE STRUCTURE PLANS)
(STRUCTURE PAY ITEM
-NWL1-
P
I
S
t
a
.
2
4
+
0
0
.
0
0
2
5
P
I
S
t
a
.
2
5
+
0
0
.
0
0
P
I
S
t
a
.
2
6
+
0
0
.
0
0
P
I
S
t
a
.
2
7
+
0
0
.
0
0
P
I
S
t
a
.
2
8
+
0
0
.
0
0
P
I
S
t
a
.
2
9
+
0
0
.
0
0
3
0
P
I
S
t
a
.
3
0
+
0
0
.
0
0
P
I
S
t
a
. 3
1+
0
0
.0
0
P
I S
ta
. 3
2
+
0
0
.0
0
P
I S
ta
. 3
3
+
0
0
.0
0
P
I S
ta
. 3
4
+
0
0
.0
0
10
B
E
G
IN
N
OIS
E
WA
LL
-
N
WL2
-
E
N
D
N
O
IS
E
WA
LL
-
N
WL
1-
NOISE WALL ON BRIDGE
-NWL1-
-NWL2-
P
I
S
t
a
.
2
4
+
0
0
.
0
0
-
N
WL1-
P
O
T
S
ta
. 3
4
+
5
3
.9
0
-
L-
P
O
C
S
ta
. 5
8
2
+
8
4
.3
9
(8
4
.5
0
’ R
T
)
-
N
WL2
-
P
OT
S
ta
. 10
+
0
0
.0
0
-
L-
P
O
C
S
ta
. 5
8
5
+
8
1.4
0
(8
4
.5
0
’ R
T
)
71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96
97 98 99 100 101 102 103
71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99
LENGTH
TOP ELEV.
PANEL NO.100 101 102 103
-NWL1- DESIGN DATA
20’20’20’20’20’40’60’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’60’60’60’60’60’60’60’80’
966.00’966.67’967.34’968.01’968.67’969.51’970.51’971.51’972.34’973.01’973.67’974.34’975.01’975.67’976.34’977.01’977.67’978.34’979.01’979.67’980.34’981.01’981.67’982.50’983.50’984.50’985.50’986.50’987.50’988.50’989.50’990.48’991.06’
-L- WINSTON SALEM OUTER LOOP
NOISE BARRIER -NWL2-
MINIMUM WALL HEIGHT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2MMU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
N
O
I
S
E
W
A
L
L
\
u
2
5
7
9
b
_
r
d
y
_
p
f
l
s
h
t
_
n
w
l
2
_
2
M
M
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
M
A
T
C
H
LIN
E
-
N
WL
2
-
S
T
A
. 2
0
+
0
0
.0
0
5
9
5
5
9
0
5
8
5
10 11 12 13 14 15 16 17 18 19 20
930
940
950
960
970
980
930
940
950
960
970
980
33 34
-
Y
3
-
-
S
R
R
-
-
Y
2
A
-
FACE OF NOISE WALL
PROPOSED GROUND AT
NOISE WALL ON BRIDGE
-NWL2--NWL1-
SEE STRUCTURE PLANS)(STRUCTURE PAY ITEM
P
I
S
t
a
.
3
3
+
0
0
.
0
0
P
I
S
t
a
.
3
4
+
0
0
.
0
0
1
0
P
I
S
t
a
.
11+
0
0
.
0
0
P
I
S
t
a
.
12
+
0
0
.
0
0
P
I
S
t
a
. 13
+
0
0
.0
0
P
I
S
t
a
.
1
4
+
0
0
.
0
0
P
I
S
t
a
. 15
+
0
0
.0
0
1
5
P
I
S
t
a
. 16
+
0
0
.0
0
P
I S
t
a
. 17
+
0
0
.0
0
P
I S
ta
. 18
+
0
0
.0
0
P
I S
ta
. 19
+
0
0
.0
0
P
I S
ta
. 2
0
+
0
0
.0
0
2
0
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
L
2
-
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
L
1
-
-NWL2-
NOISE W ALL ON BRIDGE
-NW L1-
-NWL2-
-
N
W
L
1-
P
O
T
S
t
a
.
3
4
+
5
3
.
9
0
-
L
-
P
O
C
S
t
a
.
5
8
2
+
8
4
.
3
9
(
8
4
.
5
0
’
R
T
)
-
N
W
L
2
-
P
O
T
S
t
a
.
10
+
0
0
.
0
0
-
L
-
P
O
C
S
t
a
.
5
8
5
+
8
1.
4
0
(
8
4
.
5
0
’
R
T
)
P
I S
ta
. 2
0
+
0
0
.0
0
2
0
1 2 3 4 5
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
-NWL2- DESIGN DATA
36
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’100’100’60’60’60’
992.00’992.00’992.00’992.00’992.00’991.05’990.44’989.77’989.10’988.44’987.77’987.10’986.44’985.77’985.10’984.44’983.77’983.10’982.44’981.77’981.10’980.44’979.77’979.10’978.44’977.77’977.10’976.44’975.77’975.10’974.43’973.77’973.10’972.43’971.77’971.10’
102 103
-L- WINSTON SALEM OUTER LOOP
NOISE BARRIER -NWL2-
MINIMUM WALL HEIGHT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2NNU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
6
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
N
O
I
S
E
W
A
L
L
\
u
2
5
7
9
b
_
r
d
y
_
p
f
l
s
h
t
_
n
w
l
2
_
2
N
N
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
M
A
T
C
H
L
I
N
E
-
N
W
L
2
-
S
T
A
.
2
0
+
0
0
.
0
0
6
0
0
6
0
5
6
10
20 21 22 23 24 25 26 27 28 29 30 31 32 33
890
900
910
920
930
940
950
960
970
890
900
910
920
930
940
950
960
970
FACE OF NOISE WALL
PROPOSED GROUND AT
-NWL2-
P
I
S
t
a
.
2
0
+
0
0
.
0
0
2
0
P
I
S
t
a
.
2
1+
0
0
.
0
0
P
I
S
t
a
.
2
2
+
0
0
.
0
0
P
I
S
t
a
.
2
3
+
0
0
.
0
0
P
I
S
t
a
.
2
4
+
0
0
.
0
0
P
I
S
t
a
.
2
5
+
0
0
.
0
0
2
5
P
I
S
t
a
.
2
6
+
0
0
.
0
0
P
I
S
t
a
.
2
7
+
0
0
.
0
0
P
I
S
t
a
. 2
8
+
0
0
.0
0
P
I
S
t
a
. 2
9
+
0
0
.0
0
3
0
E
N
D
N
O
IS
E
WA
L
L
-
N
WL
2
-
-NWL2-
-NWL2-
-
N
W
L
2
-
P
O
T
S
t
a
. 3
3
+
6
0
.0
0
-
L
-
P
O
T
S
t
a
. 6
0
9
+
6
8
.4
4
(
8
6
.7
5
’
R
T
)
P
I
S
t
a
.
2
0
+
0
0
.
0
0
-
L
-
C
S
S
t
a
.
6
0
2
+
5
7
.
2
0
-
L
-
S
T
S
t
a
. 6
0
4
+
9
7
.2
0
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54
55 56
57 58
59 60
61 62 63 64 65
66 67 68 69
70 71 72 73
74
75 76
77 78
79
80
81
82 83 84 85 86
87 88 89
90
91 92
93 94 95
9
6
9
7
9
8
9
9
1
0
0
1
0
1
1
0
2
1
0
3
1
0
4
1
0
5
1
0
6
1
0
7
1
0
8
1
0
9
1
1
0
1
1
1
1
1
2
1
1
3
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
LENGTH
TOP ELEV.
PANEL NO.
-NWL2- DESIGN DATA
71 72 73 74 75 76 77 78 79 80 81 82 83
84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 111 112 113
LENGTH
TOP ELEV.
PANEL NO.
-NWL2- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
101
20’
20’20’20’20’20’20’20’20’20’20’20’20’10’10’10’10’10’10’10’10’10’10’10’10’10’10’10’10’10’10’
970.43’969.77’969.10’968.43’967.77’967.10’966.43’965.77’965.10’964.43’963.77’963.10’962.43’961.77’961.10’960.43’959.77’959.10’958.43’957.77’957.10’956.43’955.77’955.10’954.43’953.77’953.10’952.15’951.15’950.15’949.15’948.15’947.15’946.15’945.15’944.15’943.15’942.15’941.15’940.15’939.15’938.15’937.15’936.15’935.15’934.15’933.15’
932.15’931.15’930.15’929.15’928.15’927.15’926.15’925.15’924.15’923.15’922.15’921.15’920.15’919.53’918.87’918.20’917.53’916.87’916.20’915.53’914.87’914.20’913.53’912.87’912.20’911.53’910.87’910.20’909.53’908.87’
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-OOU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
-L- WINSTON SALEM OUTER LOOP
-Y4CD-
1
5
2
0
2
5
6
2
06
156
10
M
A
T
C
H
L
IN
E
-
N
W
Y4
R
P
A
-
S
T
A
. 2
4
+
0
0
.0
0
NOISE BARRIER -NWL3-
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
850
860
870
880
890
900
910
850
860
870
880
890
900
910
-NWL3-
1
0
P
I
S
t
a
. 11+
0
0
.0
0
P
I
S
t
a
.
1
2
+
0
0
.
0
0
P
I
S
t
a
. 13
+
0
0
.0
0
P
I
S
t
a
.
14
+
0
0
.
0
0
1
5
P
I
S
t
a
.
15
+
0
0
.
0
0
P
I
S
t
a
.
16
+
0
0
.
0
0
P
I
S
t
a
.
17
+
0
0
.
0
0
P
I
S
t
a
.
18
+
0
0
.
0
0
P
I
S
t
a
.
19
+
0
0
.
0
0
2
0
P
I
S
t
a
. 2
0
+
0
0
.0
0
P
I
S
t
a
.
2
1
+
0
0
.
0
0
P
I
S
t
a
. 2
2
+
0
0
.0
0
P
I
S
t
a
. 2
3
+
0
0
.0
0
P
I
S
t
a
. 2
4
+
0
0
.0
0
B
E
G
IN
N
O
IS
E
WA
L
L
-
N
WL
3
-
-NWL3-
-NWL3-
-
N
WL
3
-
P
O
T
S
t
a
. 10
+
0
0
.0
0
-
Y4
C
D
-
P
O
C
S
t
a
. 11+
18
.9
6
(
5
1.7
5
’
L
T
)
1 2 3 4 5 6 7 8 9 10
11 12
13 14 15 16 17 18 19 20 21 22
23 24 25 26 27 28
29
30 31 32
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
36 37 38 39 40
0
41 42 43 44 45 46 47 48 49 50
LENGTH
TOP ELEV.
PANEL NO.
-NWL3- DESIGN DATA
-NWL3- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
100’80’100’100’100’20’20’20’20’20’20’20’20’20’
918.00’918.00’918.00’918.00’918.00’918.00’918.00’917.33’916.66’916.00’915.33’914.66’914.00’913.33’912.66’912.00’911.33’910.66’910.00’909.33’908.66’908.00’907.33’906.66’906.00’905.33’904.66’904.00’903.33’902.66’902.00’901.29’900.59’899.90’899.27’
898.63’898.00’897.33’896.66’896.00’895.33’894.66’894.00’893.33’892.66’892.00’892.00’892.00’892.00’892.00’
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-PPU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
MA
T
C
H
LIN
E
-
N
WY4
R
P
A-
S
T
A. 2
4
+
0
0
.0
0
-NWL3- & -NWY4RPA-
NOISE BARRIER
-L
-
W
INSTON
SALEM
OUTER
LOOP
3
0
-Y4CD
-
-Y4RPA
-
10
1
5
2
0
24 25 26 27 28 29 30
850
860
870
880
890
900
910
850
860
870
880
890
900
910
10 11 12 13
-NWL3--NWY4RPA-
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
SEE STRUCTURE PLANS)(STRUCTURE PAY ITEM
P
I S
ta
. 2
4
+
0
0
.0
0
2
5
P
I S
ta
. 2
5
+
0
0
.0
0
P
I S
ta
. 2
6
+
0
0
.0
0
P
I S
ta
. 2
7
+
0
0
.0
0
P
I S
ta
. 2
8
+
0
0
.0
0
P
I S
ta
. 2
9
+
0
0
.0
0
3
0
P
I S
ta
. 3
0
+
0
0
.0
0
P
I S
ta
. 3
0
+
2
0
.0
0
P
I S
ta
. 3
0
+
4
0
.0
0
P
I S
t
a
. 3
0
+
6
0
.0
0
P
I S
t
a
. 3
0
+
8
0
.0
0
1
0
P
I
S
t
a
.
1
0
+
0
2
.
2
1
P
I
S
t
a
.
1
0
+
2
2
.
2
1
P
I
S
t
a
.
1
0
+
4
2
.
2
1
P
I
S
t
a
.
1
0
+
6
2
.
2
1
P
I
S
t
a
.
1
0
+
8
2
.
2
1
P
I
S
t
a.
1
1
+
4
2
.
2
1
P
I
St
a.
1
2
+
4
2.
2
1
E
N
D
N
OI
S
E
W
A
L
L -
N
W
Y
4
R
P
A-
-NWL3
-
-NW Y4R PA-
NOISE W ALL ON BRIDGE
-
N
W
Y
4
R
P
A-
P
O
T
St
a.
1
3
+
4
2.
2
1
-
Y
4
R
P
A-
P
O
C
St
a.
2
2
+
7
2.
7
0
(
2
5.
7
5
’
L
T)
E
N
D
N
O
IS
E
WA
L
L
-
N
WL
3
-
P
O
T
S
t
a
. 3
0
+
9
3
.8
6
=
B
E
G
I
N
N
O
I
S
E
W
A
Ll
-
N
W
Y
4
R
P
A
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
=
-
Y
4
R
P
A
-
P
O
C
S
t
a
1
9
+
2
6
.
0
4
-
Y4
R
P
A
-
P
O
C
S
t
a
. 15
+
3
6
.2
0
6
2
5
6
3
0
51 52 53 54 55 56 57 58 59 60
51 52 53 54 55 56 57 58 59 60
LENGTH
TOP ELEV.
PANEL NO.
-NWL3- DESIGN DATA
20’60’60’60’60’60’100’100’100’100’
892.00’892.00’892.00’892.00’892.00’892.00’892.00’892.66’893.83’893.83’
1 2 3 4 5 6 7 8 9 10
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10
-NWY4RPA- DESIGN DATA
20’20’20’20’20’20’40’60’60’60’
896.00’895.00’894.00’893.00’892.35’891.68’891.01’890.35’889.68’889.01’
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2RRU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWY41-
-NWY41-
7
5
10 11 12 13 14 15 16 17 18 19 20 21 22 23
M
A
T
C
H
L
I
N
E
-
N
W
Y
4
1
-
S
T
A
.
2
4
+
0
0
.
0
0
24
1
1
5
1
1
5
1
1
5
1
1
0
1
1
0
1
1
0
1
0
5
1
0
5
1
0
5
-Y4-
-Y4EB-
-Y4WB-
3
5
-Y4RPC-
4
0
3
0
-NWY41-
10
P I Sta. 11+6 0.0 0
P
I S
ta
. 12
+
7
0
.0
0
P
I S
ta
. 14
+
4
0
.0
0
15
PI Sta. 15+80.00
P
I S
ta
. 17
+
3
0
.0
0
2
0
P
I S
ta
. 2
2
+
3
0
.0
0
-Y4RPC- POC Sta. 29+60.86 (99.53’ LT)
-NWY41- POT Sta. 10+00.00=
BEGIN NOISE WALL -NWY41-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
27
28
29
30
31
32
33
34
35
36 37
38
39 40
41
42
43
44
45
46
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
-NWY41- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’40’40’40’40’100’40’40’20’20’20’20’20’20’20’60’60’60’60’60’80’40’
904.81’905.15’905.48’905.82’906.15’906.48’906.82’907.82’908.82’909.82’910.82’911.17’911.17’911.53’912.28’912.66’913.02’913.21’913.39’914.00’914.00’914.00’914.28’914.63’915.00’915.00’915.00’915.00’915.00’915.00’915.32’915.66’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-SSU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWY41-
-NWY41-
M
A
T
C
H
L
I
N
E
-
N
W
Y
4
1
-
S
T
A
.
2
4
+
0
0
.
0
0
1
2
5
1
2
5
1
2
5
1
2
0
1
2
0
1
2
0
-Y4-
-Y4EB-
-Y4WB-
24 25 26 27 28 29 30 31 32 33
850
860
870
880
890
900
910
920
850
860
870
880
890
900
910
920
-
Y5
A-
2
5
3
0
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
1
-
-
N
W
Y
4
1
-
P
O
T
S
t
a
.
3
3
+
2
0
.
0
0
=
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
2
6
+
4
0
.
7
7
(
9
3
.
3
1
’
L
T
)
47 48 49 50 51
52
53
54
55
56
57 58 59 60 61 62 63 64
65 66
67 68
47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
LENGTH
TOP ELEV.
PANEL NO.
-NWY41- DESIGN DATA
20’20’100’20’20’20’20’20’20’20’20’20’80’100’100’120’100’20’20’20’20’20’
916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’916.00’915.31’914.64’913.97’913.31’912.64’
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2-TTU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWY42-
-NWY42-
M
A
T
C
H
L
I
N
E
-
N
W
Y
4
2
-
S
T
A
.
2
0
+
0
0
.
0
0
1
3
5
1
3
5
1
3
5
1
3
0
1
3
0
1
3
0
-Y4-
-Y4EB-
-Y4WB-
-
Y5
A-
1
4
0
1
4
0
1
4
0
10 11 12 13 14 15 16 17 18 19 20
810
820
830
840
850
860
870
810
820
830
840
850
860
870
1
0
P
I
S
t
a
.
1
0
+
8
0
.
0
0
P
I
S
t
a
. 12
+
5
0
.0
0
1
5
2
0
-NWY42-
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
2
-
E
N
D
M
S
E
W
A
L
L
-
N
W
Y
4
2
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
3
0
+
2
6
.
3
7
(
3
1
.
9
2
’
L
T
)
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
-NWY42- DESIGN DATA
23 24
47 48
LENGTH
TOP ELEV.
PANEL NO.
-NWY42- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
40’40’
876.00’876.00’876.00’875.79’875.12’874.45’873.79’873.12’872.45’871.79’871.12’870.45’869.79’869.12’868.45’867.79’867.12’866.45’865.79’865.12’864.45’863.79’863.12’862.45’
861.79’861.12’860.45’859.79’859.12’858.45’857.79’857.12’856.45’855.79’855.12’854.45’853.79’853.12’852.45’851.79’851.12’850.45’849.79’849.12’848.45’847.79’847.12’846.45’
MINIMUM WALL HEIGHT
FACE OF NOISE WALL
PROPOSED GROUND AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2UUU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWY42-
-NWY42-
M
A
T
C
H
L
I
N
E
-
N
W
Y
4
2
-
S
T
A
.
2
0
+
0
0
.
0
0
1
4
5
-Y4-
-Y4EB-
-Y4WB-
810
820
830
840
850
860
870
810
820
830
840
850
860
870
1
4
5
1
4
5
20 21 22 23 24 25
2
0
2
5
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
2
-
-
N
W
Y
4
2
-
P
O
T
S
t
a
.
2
6
+
5
0
.
0
0
=
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
4
6
+
7
6
.
2
6
(
2
5
.
7
5
’
L
T
)
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65
66 67 68 69 70 71
49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71
LENGTH
TOP ELEV.
PANEL NO.
-NWY42- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’60’60’60’60’60’10’
845.79’845.12’844.45’843.79’843.12’842.45’841.79’841.12’840.45’839.79’839.12’838.45’837.79’837.12’836.45’835.79’835.12’834.45’833.23’832.23’831.23’830.23’830.23’
MINIMUM WALL HEIGHT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2VVU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWY4RPBD1-
-NWY4RPBD1-
10 11 12 13 14 15 16 17 18 19 20 21
890
900
910
920
930
940
890
900
910
920
930
940
FACE OF NOISE WALL
PROPOSED GROUND AT
-Y4RPD-
-
Y
4R
P
B
D
-
6
0
65 70
30
25
-
Y5
D
E
T-
-
Y5-
20
15
-NWY4RPBD1-
-NWY4RPBD1-
1
0
P
I
S
t
a
.
10
+
6
0
.
0
0
P
I
S
t
a
.
11+
2
0
.
0
0
P
I
S
t
a
.
11+
8
0
.
0
0
P
I
S
t
a
. 12
+
3
8
.0
3
P
I
S
t
a
. 13
+
4
0
.0
0
PI Sta. 14+80.00
1
5
P
I
S
t
a
. 17
+
9
0
.0
0
P
I S
ta
. 18
+
7
0
.0
0
2
0
P
I
S
t
a
.
2
1+
10
.
0
0
10
B
E
G
I
N
N
O
I
S
E
W
A
L
L
-
N
W
Y
4
R
P
B
D
1-
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y4
R
P
B
D
1-
P
OT
Sta. 10
+00.00
=
-
N
W
Y4
R
P
B
D2-
B
E
GI
N
N
OI
S
E
W
AL
L(85.85’
R
T)
P
OT
Sta. 69
+87.45
-
Y4
R
P
B
D-
-
N
W
Y4
P
R
B
D
1-
P
O
T
S
t
a
.
2
1+
9
0
.
0
0
=
-
Y4
R
P
B
D
-
P
O
T
S
t
a
.
7
0
+
0
7
.
0
9
(
7
9
.
5
9
’
R
T
)
P
O
T
S
t
a
.
10
+
0
0
.
0
0
=
-
Y
4
R
P
D
-
P
O
C
S
t
a
.
2
6
+
0
2
.
5
3
R
T
6
5
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
-NWY4RPBD1- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’60’60’120’80’40’40’40’40’
954.01’955.01’956.00’957.00’957.00’957.00’957.00’956.49’955.64’954.52’953.76’953.00’952.00’950.99’949.99’949.32’948.65’947.98’946.98’945.98’944.99’944.32’943.65’942.97’941.83’940.69’939.77’939.19’938.62’938.04’937.07’936.07’935.07’934.38’933.71’933.04’932.06’931.05’930.05’929.05’928.05’927.04’926.04’
MINIMUM WALL HEIGHT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SHEET N O .PRO JECT REFERENCE N O .
HYDRAULICSROADWAY DESIG N
ENG INEER EN GIN EER
2WWU-2579B
R/W SHEET N O .8
/
1
7
/
9
9
NOISE BARRIER -NWY4RPBD2-
-NWY4RPBD2-
10 11 12 13 14 15 16 17 18 19 20 21
850
860
870
880
890
900
910
850
860
870
880
890
900
910
-Y4RPBD-
-
Y
4
E
B
-
-
Y
4
-
-
Y
4W
B
-
6
5
6
5
6
5
70
70
70
-
Y
4
R
P
A
-
7
5
8
0
7
0
-NWY4RPBD2-
FACE OF NOISE WALL
PROPOSED GROUND AT
-NWY4RPBD2-
P
I
S
t
a
.
2
1+
10
.
0
0
10
PI Sta. 10
+
60.00
P
I
S
t
a
. 14
+
8
0
.0
0
1
5
P
I
S
t
a
.
1
5
+
8
0
.
0
0
P
I
S
t
a
. 16
+
8
0
.0
0
P
I
S
t
a
. 17
+
8
0
.0
0
P
I S
ta
. 18
+
8
0
.0
0
P
I S
ta
. 19
+
8
0
.0
0
2
0
P
I S
ta
. 2
0
+
8
0
.0
0
P
I S
ta
. 2
1+
8
0
.0
0
P
I S
ta
. 2
2
+
8
0
.0
0
P
I S
ta
. 2
3
+
4
0
.0
0
-NW Y4RPBD2-
END NOISE W ALL
E
N
D
N
O
I
S
E
W
A
L
L
-
N
W
Y4
R
P
B
D
1-
P
OT
Sta. 10
+00.00
=
-
NW
Y4
R
P
B
D2-
B
E
GI
N
NOIS
E
W
AL
L(85.85’
R
T)
P
OT
Sta. 69
+
87.45
-
Y4
R
P
B
D-
-
N
W
Y4
P
R
B
D
1-
P
O
T
S
t
a
.
2
1+
9
0
.
0
0
=
-
Y4
R
P
B
D
-
P
O
T
S
t
a
.
7
0
+
0
7
.
0
9
(
7
9
.
5
9
’
R
T
)
POT Sta. 24+00.00=
(74.95’ RT)
-Y4RPBD- POC Sta. 83+48.67
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
36 37 38 39 40 41 42 43 44 45
46 47 48 49 50 51 52 53 54 55 56
57 58 59 60 61 62 63 64 65 66 67 68 69 70
LENGTH
TOP ELEV.
PANEL NO.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
LENGTH
TOP ELEV.
PANEL NO.
-NWY4RPBD2- DESIGN DATA
-NWY4RPBD2- DESIGN DATA
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’20’
927.81’927.13’926.46’925.78’925.10’924.42’923.75’923.07’922.10’921.10’920.10’919.40’918.73’918.07’917.10’916.10’915.10’914.40’913.73’913.07’912.10’911.10’910.10’909.40’908.73’908.07’907.10’906.10’905.10’904.40’903.73’903.07’902.40’901.73’901.07’
900.40’899.73’899.07’898.40’897.73’897.07’896.40’895.73’895.07’894.40’893.73’893.07’892.40’891.73’891.06’890.40’889.73’889.06’888.40’887.73’887.06’886.40’885.73’885.06’884.40’883.73’883.06’882.09’881.09’880.09’878.77’877.42’876.06’875.06’874.06’
B
GRO UND
NATURAL
FILTER FABRIC
NO TE A
NATURAL GRO UND
TO P O F RIP-RAP
TO P O F BERM
HO RIZO NTAL
FILTER FABRIC
NO TE B
CHANNEL
TO P O F NATURAL
TO P O F RIP-RAP
FILTER FABRIC
FILTER FABRIC BACKFILL w/CLASS I RIP-RAP
EXCAVATE TO THIS LINE
TO SUPPO RT RIP-RAP
BERM AS REQ UIRED
TO SUPPO RT RIP-RAP
BERM AS REQ UIRED
BACKFILL w/CLASS I RIP-RAP
EXCAVATE TO THIS LINE
FILTER FABRIC
TO SUPPO RT RIP-RAP
BERM AS REQ UIRED
FILTER FABRIC
O utlet
Pipe or Ditch
Scour Hole (PSH)
Square Preform ed
W ITH FILTER FABRIC
LINER: CLASS B RIPRAP
D
PSRM
M IN. 1’ TUCK
W ITH NATURAL G RO UND
INSTALL LEVEL AND FLUSH
FRO M STA. TO STA.
PLAN
F
C
7/08
RIP-RAPPED EN ERG Y DISSIPATO R BASIN
DETAIL ?
C SECTIO N
2:1
2:
1
Wo
CULVERT
2:1+
RIP RAP NO T SHO W N
APRO N
2:1
CL
2
:1
2
:
1
+
RIP RAP NO T SHO W N
G
DISSIPATO R PO O L APRO N
2:
1
E
2:1
CULVERT
A
W o
D
FI
LL
S
LO
P
E
L
A
B
C
D
E
F
G
RIP RAP BASIN #
1 ??
ALL DIM ENSIO NS APPRO XIM ATE
BASIN #LO CATIO N (AT O UTLET)
1
?
?
(ft)
DIM .
3 ??
2 ??
2 ??
3 ??
6 ??
37 ??
??28
477+00 -L- RT
?
?
CL
1
6
-
D
E
C
-
2
0
1
3
1
0
:
1
7
R
:
\
D
r
a
i
n
a
g
e
\
u
2
5
7
9
b
_
h
y
d
_
d
r
n
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
EN GINEER ENG IN EER
R/W SHEET N O .5
/
1
4
/
9
9
SHEET NO .PRO JECT REFEREN CE NO .
U-2579B 2-ZZ
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SEC. B-B
SEC. C-C
D
B
SEC. D-D
2
oW
A
B B B
C
2:
1
C SECTIO NL
D
HO RIZO NTAL
2:1
2:1
2
:1
2:
1
2:
1
Wo2CULVERT
BERM
C
C
RIP RAP NO T SHO W N
B
B
A
AD
D
HALF PLAN
SYM M . ABO UT
CL
DIM .
A
B
C
D
E
F
G
H
RIP RAP BASIN #
1 2 3 4
BASIN #LO CATIO N (AT O UTLET)
1
2
3
4
5
5
6
6
7
7
8
8
SEC. A-A
B
C
F
FRO M STA. TO STA.
DISSIPATO R PO O L
G
N O TE A
APRO N
H
E
3:1+/-
3
:
1
+
/-O F W ATER
APPRO X. EDGE
*ALL DIM ENSIO NS APPRO XIM ATE IN ?
CULVERTS
SPAN O F PIPE-ARCH
W IDTH O F BO X O R
W o= DIAM ETER O F PIPE,
NO TE:
2:12:1
B 2:1
B
SEC. C-C
2:1
B
2:1 END O F APRO N TO N ATURAL CHANN EL W IDTH.
NATURAL CHANN EL BO TTO M AT SEC. A-A. PRO VIDE SM O O TH TRAN SITIO N FRO M
IN FLO O R O F BASIN SHO ULD BE AT SAM E ELEVATIO N O R LO W ER THAN
*N O TE B: W ARP BASIN TO CO N FO RM TO N ATURAL STREAM CHAN NEL. TO P O F RIP-RAP
des/(CRO SS SECTIO N AREA AT SEC. A-A)= SPECIFIED VELO CITY.
CRO SS SECTIO N AL AREA AT SECTIO N A-A SUCH THAT Q O BTAIN SUFFICIEN T
*N O TE A: IF EXIT VELO CITY O F BASIN IS SPECIFIED, EXTEN D BASIN AS REQ UIRED TO
RIP-RAPPED EN ERG Y DISSIPATO R BASIN
DETAIL ?
5/05
3
2
2
3
5
25
6
20
556+00 -L- RT
AA
W
PLAN VIEW
SECTIO N A-A
(4’m in typ.)
Perm anent Soil Reinforcem ent
m atting (PSRM )
Seed with native
grasses at installation.
PREFO RM ED SCO UR HO LE
FRO M STA. TO STA.
*NO T TO SCALE
B
FI
LL
SLO
PE
2:1
2:
1
PIPE (d = 15" O R 18")
INFLO W
3/08
W = 4 FT
D= 1 FT
B= 4 FT
not shown for clarity)
(Rip Rap in basin
G RO UND
N ATURAL
EST. FF +/- 22 SY
EST. DDE +/- 3.0 CY
EST. CLASS ’B’ RIPRAP +/- 3 TO N S
I
N
C
U
B
I
C
Y
A
R
D
S
W
A
S
T
E
B
O
R
R
O
W
U
N
D
E
R
C
U
T
L
O
C
A
T
I
O
N
E
M
B
T
+
%
S
U
M
M
A
R
Y
O
F
E
A
R
T
H
W
O
R
K
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
SHEET NO .PRO JECT REFEREN CE NO .
3CCU-2579B
CO M PUTED BY:
CHECKED BY:DATE:
DATE:
5
/
9
/
0
6
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
2
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
u
m
_
e
a
r
t
h
w
o
r
k
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
provided by the G eotechnical Engineering Unit.
These earthwork quantities are based in part on subsurface data
Earthwork quantities are calculated by the Roadway Design Unit. NO TE:
E
X
C
A
V
A
T
I
O
N
U
N
C
L
A
S
S
I
F
I
E
D
S
U
M
M
A
R
Y
N
O
.
1
-
0
-
0
-
0
0
-
0
0
-
0
--
0
0
-
0
-
0
-
0
--
0
-
5
2
0
-
0
-
0
--
0
-
0
-
0
-
0
-
0
--
0
-
0
-
0
0
-
0
-
0
--
0
-
0
-
0
-
0
--
-
L
-
4
7
8
+
0
0
.
0
0
T
O
5
0
8
+
0
0
.
0
0
-
L
-
5
0
8
+
0
0
.
0
0
T
O
5
3
8
+
0
0
.
0
0
-
L
-
5
3
8
+
0
0
.
0
0
T
O
5
5
5
+
7
3
.
0
0
-
L
-
5
5
7
+
9
8
.
0
1
T
O
5
8
3
+
2
8
.
0
6
-
L
-
5
8
5
+
5
0
.
5
4
T
O
6
1
6
+
0
0
.
0
0
S
U
B
T
O
T
A
L
7
0
0
,
9
3
8
3
9
1
,
0
1
9
4
3
3
,
3
4
5
1
,
5
2
5
,
3
0
2
2
3
1
,
5
8
6
1
8
0
,
4
5
1
1
6
,
3
1
7
1
,
4
0
5
,
3
3
3
9
1
1
,
4
2
9
1
,
4
0
5
,
3
3
3
9
1
1
,
4
2
9
2
,
7
4
5
,
1
1
6
2
,
3
1
6
,
7
6
2
4
6
9
,
3
5
2
2
1
0
,
5
6
8
4
1
7
,
0
2
8
1
,
0
9
6
,
9
4
8
S
U
M
M
A
R
Y
N
O
.
2
-
L
-
6
1
6
+
0
0
.
0
0
T
O
6
2
7
+
5
0
.
0
0
-
L
-
6
2
9
+
5
0
.
0
0
T
O
6
4
1
+
7
0
.
8
2
-
L
-
6
4
3
+
8
2
.
6
4
T
O
6
6
7
+
1
5
.
0
0
-
L
-
6
6
7
+
1
5
.
0
0
T
O
6
9
2
+
3
2
.
9
8
S
U
B
T
O
T
A
L
1
4
3
1
4
6
,
5
6
4
7
5
9
,
3
0
1
3
8
7
,
6
2
6
1
,
1
4
9
,
6
8
3
2
6
8
,
2
2
3
9
0
6
,
0
0
8
1
,
9
0
2
,
7
7
3
3
8
7
,
4
8
3
1
,
1
4
9
,
6
8
3
1
2
1
,
6
5
9
1
,
6
5
8
,
8
2
5
6
6
2
,
0
6
0
6
6
2
,
0
6
0
S
U
M
M
A
R
Y
N
O
.
3
-
Y
1
-
L
T
1
0
+
0
0
.
0
0
T
O
1
6
+
0
0
.
0
0
-
Y
1
-
L
T
4
7
+
0
0
.
0
0
T
O
5
4
+
0
0
.
0
0
-
Y
1
-
R
T
1
0
+
0
0
.
0
0
T
O
1
6
+
0
0
.
0
0
-
Y
1
-
R
T
4
7
+
0
0
.
0
0
T
O
5
4
+
0
0
.
0
0
4
6
8
9
0
4
1
9
2
1
,
8
6
2
4
3
6
1
,
1
8
5
1
,
4
8
9
1
,
5
2
1
S
U
B
T
O
T
A
L
1
,
5
4
1
1
,
7
1
3
6
7
7
3
,
0
1
0
1
,
6
2
1
3
,
0
1
0
S
U
M
M
A
R
Y
N
O
.
4
-
Y
1
-
1
6
+
0
0
.
0
0
T
O
2
3
+
1
0
.
0
0
-
Y
1
-
2
3
+
1
0
.
0
0
T
O
3
2
.
+
9
3
.
7
7
-
Y
1
-
3
5
+
2
6
.
3
4
T
O
4
7
+
0
0
.
0
0
-
Y
1
D
E
T
-
1
2
+
0
0
.
0
0
T
O
3
2
+
0
0
.
0
0
-
Y
1
D
E
T
-
3
2
+
0
0
.
0
0
T
O
4
8
+
0
0
.
0
0
6
1
0
7
,
9
3
3
5
,
0
3
4
3
7
,
2
7
3
1
7
,
0
2
5
6
7
,
8
7
5
4
8
,
4
7
6
8
6
,
8
5
6
1
1
2
,
1
1
2
1
1
,
2
3
2
4
0
,
2
0
2
2
9
8
,
8
8
0
4
7
,
8
6
6
7
8
,
9
2
3
1
0
7
,
0
7
8
2
3
,
1
7
7
2
6
,
0
4
1
2
5
7
,
0
4
4
2
6
,
0
4
1
S
U
B
T
O
T
A
L
S
U
M
M
A
R
Y
N
O
.
5
-
Y
1
D
E
T
-
R
E
M
O
V
A
L
-
Y
1
L
P
A
-
1
3
+
1
8
.
0
0
T
O
1
8
+
5
0
.
0
0
-
Y
1
L
P
D
-
1
3
+
4
5
.
0
0
T
O
1
8
+
6
0
.
0
0
-
Y
1
R
P
A
-
1
6
+
9
4
.
0
0
T
O
3
0
+
5
0
.
0
0
-
Y
1
R
P
D
-
1
7
+
8
8
.
0
0
T
O
3
1
+
9
9
.
0
0
4
4
,
1
9
6
9
3
,
9
5
7
1
0
2
,
2
5
1
2
1
2
,
2
3
1
1
8
5
,
8
0
2
6
3
8
,
4
3
7
6
5
,
1
5
8
1
7
6
1
9
,
3
9
6
2
1
,
2
6
3
1
0
5
,
9
9
3
2
0
,
9
6
2
2
0
,
9
6
2
9
3
,
7
8
1
1
0
2
,
2
5
1
1
9
2
,
8
3
5
1
6
4
,
5
3
9
5
5
3
,
4
0
6
S
U
B
T
O
T
A
L
S
U
M
M
A
R
Y
N
O
.
6
-
Y
2
-
L
T
1
0
+
0
0
.
0
0
T
O
1
8
+
9
9
.
2
5
-
Y
2
-
L
T
2
1
+
4
1
.
1
8
T
O
2
9
+
7
5
.
0
0
-
Y
2
-
R
T
1
0
+
0
0
.
0
0
T
O
1
8
+
9
9
.
2
5
-
Y
2
-
R
T
2
1
+
4
1
.
1
8
T
O
2
9
+
7
5
.
0
0
3
0
8
1
,
0
8
6
2
,
7
7
9
3
4
9
4
,
5
2
2
1
,
2
2
2
4
9
4
2
9
8
1
,
2
3
2
3
,
2
4
6
9
1
4
8
8
3
5
9
2
2
,
4
8
1
1
,
7
9
7
3
,
0
7
3
S
U
B
T
O
T
A
L
S
H
E
E
T
T
O
T
A
L
3
,
1
4
6
,
5
4
3
5
,
0
5
9
,
0
1
8
4
,
2
5
7
,
0
1
1
*
*Q uantity includes m aterial used in shoulder construction.
9
7
,
2
4
1
2
,
3
4
4
,
5
3
8
4
,
3
9
9
Casey Harris 11-8-10
I
N
C
U
B
I
C
Y
A
R
D
S
W
A
S
T
E
B
O
R
R
O
W
U
N
D
E
R
C
U
T
L
O
C
A
T
I
O
N
E
M
B
T
+
%
S
U
M
M
A
R
Y
O
F
E
A
R
T
H
W
O
R
K
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
SHEET NO .PRO JECT REFEREN CE NO .
3DDU-2579B
CO M PUTED BY:
CHECKED BY:DATE:
DATE:
5
/
9
/
0
6
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
u
m
_
e
a
r
t
h
w
o
r
k
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
provided by the G eotechnical Engineering Unit.
These earthwork quantities are based in part on subsurface data
Earthwork quantities are calculated by the Roadway Design Unit. NO TE:
E
X
C
A
V
A
T
I
O
N
U
N
C
L
A
S
S
I
F
I
E
D
S
U
M
M
A
R
Y
N
O
.
7
-
0
4
3
-
5
2
0
7
2
-
0
-
7
0
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
3
2
0
-
0
-
5
2
0
-
0
-
5
0
-
0
-
0
-
0
-
0
-
0
-
0
--
0
-
0
-
0
0
-
0
-
0
--
0
-
0
-
0
-
0
-
-
Y
2
A
-
L
T
1
6
+
0
0
.
0
0
T
O
2
2
+
0
0
.
0
0
-
Y
2
A
-
R
T
1
6
+
0
0
.
0
0
T
O
2
2
+
0
0
.
0
0
-
Y
3
-
L
T
1
8
+
2
5
.
0
0
T
O
2
6
+
2
5
.
0
0
-
Y
3
-
R
T
1
8
+
2
5
.
0
0
T
O
2
6
+
2
5
.
0
0
S
U
B
T
O
T
A
L
5
9
8
1
2
4
1
,
1
9
7
5
2
9
2
,
4
4
8
1
5
7
3
2
2
5
5
5
1
,
0
4
0
4
5
9
2
,
1
2
6
S
U
M
M
A
R
Y
N
O
.
8
-
Y
4
-
L
T
2
6
+
8
0
.
0
0
T
O
4
5
+
6
5
.
0
0
-
Y
4
-
L
T
4
5
+
6
5
.
0
0
T
O
7
5
+
5
0
.
0
0
-
Y
4
-
L
T
7
5
+
5
0
.
0
0
T
O
1
0
5
+
5
0
.
0
0
-
Y
4
-
L
T
1
0
5
+
5
0
.
0
0
T
O
1
3
5
+
5
0
.
0
0
-
Y
4
-
L
T
1
3
5
+
5
0
.
0
0
T
O
1
4
3
+
0
0
.
0
0
S
U
B
T
O
T
A
L
1
3
,
3
2
4
2
2
,
8
4
0
6
2
,
9
9
8
1
6
,
6
9
8
4
2
9
1
1
6
,
2
8
9
8
,
3
7
5
1
4
,
1
4
1
3
6
,
0
9
5
1
2
,
0
8
2
2
1
1
7
0
,
9
0
4
4
,
9
4
9
8
,
6
9
9
2
6
,
9
0
3
4
,
6
1
6
2
1
8
4
5
,
3
8
5
S
U
M
M
A
R
Y
N
O
.
9
-
Y
4
-
M
I
D
2
6
+
8
0
.
0
0
T
O
4
5
+
6
5
.
0
0
-
Y
4
-
M
I
D
4
5
+
6
5
.
0
0
T
O
7
5
+
5
0
.
0
0
-
Y
4
-
M
I
D
7
5
+
5
0
.
0
0
T
O
1
0
5
+
5
0
.
0
0
-
Y
4
-
M
I
D
1
0
5
+
5
0
.
0
0
T
O
1
3
5
+
5
0
.
0
0
-
Y
4
-
M
I
D
1
3
5
+
5
0
.
0
0
T
O
1
4
3
+
0
0
.
0
0
S
U
B
T
O
T
A
L
1
,
4
5
7
2
,
1
7
1
2
,
1
5
9
2
,
1
9
0
6
0
9
8
,
5
8
6
1
0
7
1
1
3
3
0
9
1
,
4
2
5
2
,
0
6
4
2
,
1
0
7
2
,
0
7
7
6
0
4
8
,
2
7
7
S
U
M
M
A
R
Y
N
O
.
1
0
-
Y
4
-
R
T
2
6
+
8
0
.
0
0
T
O
4
5
+
6
5
.
0
0
-
Y
4
-
R
T
4
5
+
6
5
.
0
0
T
O
7
5
+
5
0
.
0
0
-
Y
4
-
R
T
7
5
+
5
0
.
0
0
T
O
1
0
5
+
5
0
.
0
0
-
Y
4
-
R
T
1
0
5
+
5
0
.
0
0
T
O
1
3
5
+
5
0
.
0
0
-
Y
4
-
R
T
1
3
5
+
5
0
.
0
0
T
O
1
4
3
+
0
0
.
0
0
S
U
B
T
O
T
A
L
1
1
,
1
5
1
1
,
7
7
9
3
6
,
6
4
7
6
7
,
5
7
7
1
,
3
4
7
1
1
8
,
5
0
1
4
,
6
3
1
1
8
,
5
1
6
3
5
,
9
0
4
4
0
,
3
5
6
1
,
0
6
0
1
6
,
7
3
7
1
6
,
7
3
7
6
,
5
2
0
2
7
,
2
2
1
2
8
7
3
4
,
7
7
1
S
U
M
M
A
R
Y
N
O
.
1
1
-
Y
4
L
P
A
-
1
3
+
1
2
.
0
0
T
O
2
1
+
3
4
.
0
0
-
Y
4
L
P
B
-
1
3
+
2
9
.
0
0
T
O
1
8
+
8
5
.
0
0
-
Y
4
L
P
D
-
1
6
+
2
1
.
3
8
T
O
2
1
+
7
7
.
0
0
-
Y
4
R
P
A
-
1
4
+
8
1
.
8
0
T
O
1
5
+
1
9
.
2
4
-
Y
4
R
P
A
-
1
9
+
0
0
.
5
0
T
O
3
4
+
3
6
.
0
0
S
U
B
T
O
T
A
L
1
7
,
5
2
9
2
,
1
5
8
1
3
,
0
4
7
1
9
,
8
9
8
5
2
,
6
3
2
7
6
,
0
8
4
7
1
,
2
1
0
1
0
,
7
0
6
5
,
8
8
0
2
0
9
,
2
1
9
3
7
3
,
0
9
9
5
8
,
5
5
5
6
9
,
0
5
2
5
,
8
8
0
1
8
9
,
3
2
1
3
2
2
,
8
0
8
2
,
3
4
1
2
,
3
4
1
S
U
M
M
A
R
Y
N
O
.
1
2
-
Y
4
R
P
B
-
1
5
+
0
4
.
0
0
T
O
2
6
+
6
3
.
0
0
-
Y
4
R
P
C
-
1
5
+
9
8
.
0
0
T
O
3
0
+
5
5
.
0
0
-
Y
4
R
P
D
-
1
6
+
7
8
.
0
0
T
O
2
8
+
0
2
.
0
0
S
U
B
T
O
T
A
L
5
,
3
2
3
1
1
1
,
7
9
3
1
2
,
0
5
8
1
2
9
,
1
7
4
7
0
,
3
5
2
1
3
3
,
5
5
2
2
5
,
7
5
6
6
5
,
0
2
9
2
1
,
7
5
9
1
3
,
6
9
8
2
2
9
,
6
6
0
S
H
E
E
T
T
O
T
A
L
4
2
7
,
6
3
0
7
7
4
,
7
6
1
4
4
0
,
0
3
1
1
0
0
,
4
6
7
7
4
3
1
0
0
,
4
8
6
9
2
,
9
0
0
Casey Harris 11-8-10
I
N
C
U
B
I
C
Y
A
R
D
S
W
A
S
T
E
B
O
R
R
O
W
U
N
D
E
R
C
U
T
L
O
C
A
T
I
O
N
E
M
B
T
+
%
S
U
M
M
A
R
Y
O
F
E
A
R
T
H
W
O
R
K
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
SHEET NO .PRO JECT REFEREN CE NO .
3EEU-2579B
CO M PUTED BY:
CHECKED BY:DATE:
DATE:
5
/
9
/
0
6
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
u
m
_
e
a
r
t
h
w
o
r
k
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
provided by the G eotechnical Engineering Unit.
These earthwork quantities are based in part on subsurface data
Earthwork quantities are calculated by the Roadway Design Unit. NO TE:
E
X
C
A
V
A
T
I
O
N
U
N
C
L
A
S
S
I
F
I
E
D
-
0
0
-
0
-
0
-
0
-
0
3
-
8
2
0
-
0
0
-
0
-
0
--
0
-
0
--
0
-
0
-
0
-
0
--
0
2
8
-
0
2
6
-
0
-
9
5
0
-
S
U
M
M
A
R
Y
N
O
.
1
3
-
Y
4
R
P
B
D
-
1
7
+
6
6
.
0
0
T
O
2
5
+
4
0
.
0
0
-
Y
4
R
P
B
D
-
2
7
+
8
0
.
0
0
T
O
4
3
+
0
4
.
0
0
-
Y
4
R
P
B
D
-
5
4
+
7
2
.
3
0
T
O
7
9
+
6
3
.
0
0
1
7
4
,
9
4
0
1
7
4
,
9
4
0
1
6
,
4
3
2
1
6
9
,
5
9
5
1
5
3
,
1
6
3
2
9
,
5
2
8
1
3
3
,
3
9
0
S
U
B
T
O
T
A
L
4
5
,
9
6
0
4
7
7
,
9
2
5
4
3
1
,
9
6
5
S
U
M
M
A
R
Y
N
O
.
1
4
-
Y
5
-
L
T
1
6
+
0
0
.
0
0
T
O
1
7
+
9
2
.
0
0
-
Y
5
-
R
T
1
6
+
0
0
.
0
0
T
O
1
7
+
9
2
.
0
0
-
Y
5
-
1
7
+
9
2
.
0
0
T
O
2
2
+
9
5
.
3
5
-
Y
5
-
2
4
+
0
6
.
9
9
T
O
2
6
+
6
2
.
2
8
-
Y
5
-
3
0
+
9
7
.
1
3
T
O
3
3
+
3
0
.
0
0
S
U
B
T
O
T
A
L
1
3
0
3
3
4
1
1
4
8
6
6
1
2
7
2
0
,
3
6
5
2
2
,
6
9
7
4
4
4
2
0
,
2
5
1
2
2
,
6
9
7
2
5
2
4
2
2
1
,
4
4
4
4
3
,
7
1
5
4
2
,
9
4
8
6
7
7
S
U
M
M
A
R
Y
N
O
.
1
5
-
Y
5
D
E
T
-
1
1
+
0
0
.
0
0
T
O
3
1
+
5
0
.
0
0
-
Y
5
D
E
T
-
R
E
M
O
V
A
L
4
,
1
2
3
1
7
,
0
6
0
1
9
,
7
1
0
4
,
9
4
8
1
5
,
5
8
7
1
2
,
1
1
2
S
U
B
T
O
T
A
L
2
1
,
1
8
3
2
4
,
6
5
8
1
5
,
5
8
7
1
2
,
1
1
2
S
U
M
M
A
R
Y
N
O
.
1
6
-
Y
5
A
-
L
T
5
4
+
0
0
.
0
0
T
O
6
6
+
7
8
.
5
8
-
Y
5
A
-
L
T
6
9
+
5
3
.
1
1
T
O
8
1
+
2
5
.
0
0
-
Y
5
A
-
R
T
5
4
+
0
0
.
0
0
T
O
6
6
+
7
8
.
5
8
-
Y
5
A
-
R
T
6
9
+
5
3
.
1
1
T
O
8
1
+
2
5
.
0
0
S
U
B
T
O
T
A
L
S
U
M
M
A
R
Y
N
O
.
1
7
2
,
6
2
5
3
3
,
4
3
9
2
,
0
8
3
4
2
,
2
1
7
8
,
1
9
6
3
,
4
3
4
7
,
1
9
9
2
,
0
2
6
5
,
5
7
1
5
,
1
1
6
3
0
,
0
0
5
4
0
,
1
9
1
8
0
,
3
6
4
2
0
,
8
5
5
1
0
,
6
8
7
7
0
,
1
9
6
-
Y
6
-
L
T
1
0
+
7
5
.
0
0
T
O
2
2
+
2
5
.
0
0
-
Y
6
-
R
T
1
0
+
7
5
.
0
0
T
O
2
2
+
2
5
.
0
0
-
Y
7
-
1
0
+
0
0
.
0
0
T
O
1
3
+
5
0
.
0
0
-
Y
9
-
1
0
+
5
0
.
0
0
T
O
1
3
+
0
0
.
0
0
S
U
B
T
O
T
A
L
8
1
2
5
,
7
1
0
1
,
1
0
5
7
8
4
8
9
2
7
,
0
1
0
6
,
9
8
4
4
,
8
1
8
1
,
0
1
0
7
,
6
5
3
8
,
7
8
1
6
,
9
8
4
5
,
8
5
6
S
H
E
E
T
T
O
T
A
L
-
8
8
,
8
4
1
1
5
6
,
6
0
4
5
7
5
,
9
3
4
5
0
8
,
1
7
1
*Q uantity includes m aterial used in shoulder construction.
*
1
0
3
,
8
6
2
Casey Harris 11-8-10
I
N
C
U
B
I
C
Y
A
R
D
S
W
A
S
T
E
B
O
R
R
O
W
U
N
D
E
R
C
U
T
L
O
C
A
T
I
O
N
E
M
B
T
+
%
S
U
M
M
A
R
Y
O
F
E
A
R
T
H
W
O
R
K
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
SHEET NO .PRO JECT REFEREN CE NO .
3FFU-2579B
CO M PUTED BY:
CHECKED BY:DATE:
DATE:
5
/
9
/
0
6
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
s
u
m
_
e
a
r
t
h
w
o
r
k
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
provided by the G eotechnical Engineering Unit.
These earthwork quantities are based in part on subsurface data
Earthwork quantities are calculated by the Roadway Design Unit. NO TE:
E
X
C
A
V
A
T
I
O
N
U
N
C
L
A
S
S
I
F
I
E
D
-
T
O
T
A
L
F
R
O
M
S
H
E
E
T
1
T
O
T
A
L
F
R
O
M
S
H
E
E
T
2
-
T
O
T
A
L
F
R
O
M
S
H
E
E
T
3
-
3
,
1
4
6
,
5
4
3
4
2
7
,
6
3
0
1
5
6
,
6
0
4
5
,
0
5
9
,
0
1
8
7
7
4
,
7
6
1
5
7
5
,
9
3
4
4
,
2
5
7
,
0
1
1
4
4
0
,
0
3
1
5
0
8
,
1
7
1
2
,
3
4
4
,
5
3
8
8
8
,
8
4
1
T
O
T
A
L
-
3
,
7
3
0
,
7
7
7
6
,
4
0
9
,
7
1
3
5
,
2
0
5
,
2
1
3
2
,
5
2
6
,
2
7
9
M
A
T
E
R
I
A
L
F
O
R
S
H
O
U
L
D
E
R
C
O
N
S
T
R
U
C
T
I
O
N
L
O
S
S
D
U
E
T
O
C
L
E
A
R
I
N
G
A
N
D
G
R
U
B
B
I
N
G
A
D
D
I
T
I
O
N
A
L
U
N
D
E
R
C
U
T
R
O
C
K
W
A
S
T
E
T
O
R
E
P
L
A
C
E
B
O
R
R
O
W
A
D
J
U
S
T
F
O
R
R
O
C
K
W
A
S
T
E
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
W
A
S
T
E
I
N
L
I
E
U
O
F
B
O
R
R
O
W
-
-
-
-
2
,
4
3
4
,
4
8
5
-
2
,
4
3
4
,
4
8
5
3
,
6
2
1
,
8
7
7
-
6
,
4
6
1
,
1
9
4
2
,
8
3
9
,
3
1
5
P
R
O
J
E
C
T
T
O
T
A
L
0
E
S
T
.
5
%
T
O
R
E
P
L
A
C
E
T
O
P
S
O
I
L
O
N
B
O
R
R
O
W
P
I
T
-
-
-
-
1
4
1
,
9
6
6
G
R
A
N
D
T
O
T
A
L
3
,
6
2
1
,
8
7
7
2
,
9
8
1
,
2
7
7
-
-
-
3
,
6
2
2
,
0
0
0
2
,
9
8
1
,
5
0
0
-
-
-
S
A
Y
G
e
o
t
e
c
h
.
R
e
c
s
h
a
v
e
n
o
t
b
e
e
n
c
o
m
p
l
e
t
e
d
a
s
o
f
2
/
2
/
1
0
6
9
,
8
4
0
9
2
,
9
0
0
-
1
0
8
,
9
0
0
1
0
8
,
9
0
0
-
9
1
,
7
9
4
-
1
8
,
3
5
9
-
1
8
,
3
5
9
6
9
,
8
4
0
-
9
1
,
7
9
4
Casey Harris 11-8-10
1
2
/
0
6
/
0
7
CO M PUTED BY:
CHECKED BY:DATE:
DATE:SHEET NO .PRO JECT REFEREN CE NO .
1
6
-
D
E
C
-
2
0
1
3
1
1
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
2
5
7
9
b
_
r
d
y
_
s
u
m
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
U-2579B 3-G G
LIN E
SURVEY STATIO N STATIO N
LT/ RT
LO CATIO N
2
YD
-L-
-L-
-L-
623+50.00 LT&RT
LT&RT
TO TAL SY:
SAY:14,600
-L-
-L-
567+00.00
570+00.00 583+00.00 LT&RT
RT
47+00.00
BREAKIN G O F EXISTIN G
ASPHALT PAVEM EN T
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
LIN E
SURVEY STATIO N STATIO N
2
YD
-Y1-
-L-
-L-
-L-
-L-
-L-
-L-
-L-
-L-
-Y4-
-Y4-
-Y1DET-
536+66.32 537+27.37
553+20.16 554+87.90
565+02.96 565+98.69
622+66.83 623+04.11
623+66.77 624+82.90
630+91.75 632+50.68
635+68.51 638+83.77
102+50.00 106+64.27
127+79.54 128+82.85
122+00.00 123+50.00
208.28
155.41
87.89
123.95
361.37
261.98
189.45
716.37
911.03
301.60
740.02
305.15
353.53
TO TAL SY:
SAY:
REM O VAL O F EXISTIN G
ASPHALT PAVEM EN T
-Y4-
-Y4-
-L-
-Y5DET-
1300.45
1428.23
91.49
125+76.28 127+12.62 197.61
385.71
649+78.32 650+87.26 204.49
11+74.27 48+13.76 10,514.08
11+59.72 30+81.71 5,552.42
24,422.22
24,500 CY
LT.&RT.
LT.&RT.
SUM M ARY O F SHO ULDER DRAIN
LIN E
(FT)
DRAIN PIPE
SHO ULDER
(FT)
DRAIN
SHO ULDER
(FT)
PIPE
O UTLET
(EA)
PADS
CO NCRETE
BO X #STATIO N TO STATIO N
-L- 542+00 TO 555+45 LT. M ED. 1345 1345
9.5’ 2GI-A,#109
-L- 548+53 LT. M ED. 9.5’
-L- 545+65, LT. M ED.
-L- 554+22 LT. M ED 9.5 2GI, #117
570 -L- 558+30 TO 564+00 LT M ED 570
9.5 2G I, #119 -L- 558+30 LT. M ED.
-L- 560+50 LT. M ED. 9.5 2G I, #121
-L- 667+00 TO 679+00 LT. M ED. 1200 1200
-L- 669+65 LT. M ED. 9.5 2G I-A,#278
-L- 672+00 LT. M ED. 9.5 2G I-A,#283
-L- 673+22 LT. M ED. 9.5 2GI-A,#285
-L- 676+00 LT. M ED. 9.5 2GI-A,#289
-L- 478+20 TO 484+35 RT. 615 615
-L- 478+20 RT. 19.5 2G I-A,#3
-L- 483+00 RT. 15.5 2GI,#10
-L- 900 900
-L- 620+78 RT. 48’ 1
-L- 623+00 RT. 48’ 1
-L- 1187 1187
-L- 486+55 RT. 18’ 2G I,#36
-L- 490+75 RT. 18’ 2G I,#39
-L- 494+75 RT. 53’ 2G I,#48
-L- 512+00 TO 522+00 RT. 1000 1000
-L- 515+30 RT. 21.5’ 2G I,#83
-L- 520+50 RT. 23’ 2GI,#86
-L- 478+20 TO 485+60 LT. 740 740
-L- 478+20 LT. 20’ 2G I,#IA
-L- 483+39 LT. 20’ 2GI,#6
-L- 478+50 TO 495+00 LT. 750 750
-L- 487+50 LT. 29’ 2GI,#20
17’ 2G I,#38 -L- 90+75 LT.
-L- 510+37 TO 521+50 LT. 1113 1113
-L- 513+00 LT. 34’ 1
-L- 516+00 LT. 18’ 2G I,#79
TO TAL: 9420 9420 488 3
486+00 TO 498+42 RT.
617+00 TO 626+00 RT.
2G I, #112
SUM M ARY O F SHO ULDER DRAIN
LIN E
(FT)
DRAIN PIPE
SHO ULDER
(FT)
DRAIN
SHO ULDER
(FT)
PIPE
O UTLET
(EA)
PADS
CO NCRETE
BO X #STATIO N TO STATIO N
-L- 520+00 LT. 18’ 2G I,#85
-L- 521+50 LT. 40’ 1
1395 1395 -L- 528+75 TO 542+70 LT.
-L- 528+75 LT. 2GI,#93
-L- 534+50 LT. 18’ 2GI,#96
-L- 542+70 LT. 18’ 2GI,#104
-L- 539+72 LT. 18’ 2GI,#101
-L- 501+50 TO 510+00 RT. 850 850
-L- 501+50 RT. 2GI,#67
-L- 504+85 RT. 2GI,#73
-L- 507+00 RT. 2GI,#75
-L- 558+30 TO 564+00 RT. 570 570
-L- 558+30 RT. 2GI,#120
-L- 560+50 RT. 2G I,#122
-L- 667+00 TO 679+00 RT. 1200 1200
-L- 671+00 RT. 32’ 1
-L- 673+22 RT. 21’ 2G I,#286
-L- 676+00 RT. 19’ 2G I,#290
-L- 522+00 TO 528+49 RT. 649 649
-L- 525+50 RT. 2G I,#88
-L- 528+45 RT. 2G I,#91
-L- 528+49 TO 552+62 RT. 2413 2413
-L- 534+22 RT. 18’ 1
-L- 534+50 RT. 18’ 2G I,#95
-L- 538+00 RT. 18’ 2GI,#98
-L- 539+72 RT. 18’ 2G I,#99
-L- 542+70 RT. 18’ 2GI,#105
-L- 545+63 RT. 18’ 2G I-A,#110
-L- 548+53 RT. 18’ 2G I-A,#113
-L- 551+00 RT. 28’
-L- 552+62 TO 554+20 RT. 158 158
-L- 554+20 TO 555+45 RT. 125 125
-L- 554+22 RT. 2GI,#117A
TO TAL: 7360 7360 338 3
SUM M ARY O F SHO ULDER DRAIN
LINE
(FT)
DRAIN PIPE
SHO ULDER
(FT)
DRAIN
SHO ULDER
(FT)
PIPE
O UTLET
(EA)
PADS
CO NCRETE
BO X #STATIO N TO STATIO N
-L- 504+85 TO 510+37 LT. 552 552
-L- 504+85 LT. 2G I,#71
-L- 507+00 LT. 2G I,#74
-L- 617+00 TO 626+80 LT. 980 980
-L- 620+75 LT. 12’ 3G I-A,#174
-L- 623+47 LT. 12’ 2G I,#176
-L- 521+50 TO 528+75 LT. 725 725
-L- 521+50 LT. 40’ 1
-L- 525+50 LT. 2G I,#89
-L- 528+75 LT. 2G I,#93
TO TAL: 2257 2257 64 1
3-SHEET TO TALS: 19,037 19,037 890 7
SAY: 19,050 19,050 900 7
LO CATIO N
LT.
LT.
RT.
LT.
RT.
LT.
RT.
LT.
RT.
RT.
RT.
RT.
RT.
RT.
LT.
RT.
RT.
RT.
RT.
RT.
-Y1RPD-
-Y1RPA-
52+58.40 53+56.83
25+80.81 26+31.33
21+53.46 21+72.84
-Y5A-77+45.00 78+94.81
-Y4RPBD-74+70.70 75+34.04
-Y4RPBD-67+09.76 71+70.03
-Y5A-63+17.00 65+22.39
T. CAO
J. BRAXTO N
5-11-09
5-12-09
-Y1-
74+50.00
LT&RT
-Y1-LT&RT
16+50.00
-Y4RPBD-
32+93.77
2,889
431
667
756
14,574
2
YD
630+30.00
636+00.00
35+26.34
71+10 LT&RT
RT
471
596
5,114
3,651
31.71533+84.85 534+10.29
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIG N
ENG IN EER EN GIN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
2
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
4
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
4U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
4
7
5
+
0
0
S
H
E
E
T
5
R = 2,870.00’
T = 547.06’
L = 1,081.14’
PI Sta 458+53.53
D
PIs Sta 465+27.69
LT = 280.08’
Ls = 420.00’
ST = 140.07’
F
-L-
SE = .07
NOTE :
FOR -L- PROFILE, SEE SHEET 32
PIs Sta 451+66.55
F
Ls = 420.00’
LT = 280.08’
ST = 140.07’
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
A
R
C
E
L
N
U
M
B
E
R
1
,
2
,
3
R
E
M
O
V
E
D
4
6
5
4
7
0
4
7
5
C
S
S
t
a
.
4
6
3
+
8
7
.
6
2
-
L
-
S
T
S
t
a
. 4
6
8
+
0
7
.6
2
0
2
0
2
0
2
300’ TAPER
300’ TAPER
4
8
’
3
6
’
4
6
’
4
8
’
4
6
’
-L-
-L-
0
0
0
1
0
2
60’ INC.
12’P.S.
12’P.S.
FU TU RE CONSTRU CTION
3
6
’
12’P.S.
TIP PROJECT U -2579C
12’P.S.
1284’ FULL LANE
1153’ FULL LANE
1
2
’
1
2
’
1
2
’
1
2
’
1
2
’
13859.16
-BL- 13
TOP=860.16
INV=847.66
TOP=858.78
INV=846.48
TOP=861.33
INV=848.13
1
2
"
D
I
12"
DI
1
2
"
D
I
KIM C. STREETM AN
W ENDY C. SLOAN
DB 1891 PG 1253
25’ ACCESS EASEM ENT
M ICHAEL W ADE W ESTM ORELAND
49.19’
97.65’
9
7.6
5’
18
8.5
4’
337.14’
80.33’
118.41’
2
6
8.7
3’
159.88’
200.51’139.98’
179.75’
148.20’
6
7.4
1’
99.72’
13
5
.
18
’
EIP
EIP
E
I
P
EIP
371.29’
SUSAN K. M ORETZ
FREDERICO B. M ORETZ
DAN W ESTMORELAND
JANE WHICKER
LOUISE FRANKLIN
115.00’
93.63’
18
3
.
0
5
’
2
5
1.
0
3
’
230.24’
BETH C. DELFOSSE
DB 1891 PG 1253
DB 1891 PG 1249
DB 1891 PG 1257
DB 2302 PG 3132
DB 573 PG 367
DB 107 PG 246
DB 2124 PG 2239
DB 2226 PG 1302
DB 1655 PG 1225
TOW N OF W ALKERTOW N
TOW N OF W ALKERTOW N
FORSYTH COUNTY
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
W
A
L
K
E
R
T
O
W
N
T
O
W
N
O
F
2
0
’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
238.98’
+66.39
111.11’
+
5
5.6
9
162.67’+38.34
BETH C. DELFOSSE
DB 2633 PG 276
DB 843 PG 125
DB 2686 PG 2459
+63.40 -L-
+25.90 -L-
200.00’
200.00’
4
4B
3SBW
M
T
L
M
T
L
M
T
L
M
T
L
48" W W
S
S
12" RCP
48" CONC
C
O
N
C2
S
B
K
D
48" CHL
W D DK
SUDSBEE LN 20’ BST
W
/
L
T
SOIL
AT END BRIDGE
BEGIN SHO ULDER BERM GUTTER
STA 478+20 TO 480+50 -L- LT
BERM DITCH
STA 23+90 TO 25+20 -Y1RPA- RT
BERM DITCH
AND RETAIN EXISTING 15" RCP
ADJUST SLO PE STAKES
W / ELBO W
18" CSP
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
W / ELBO W
15" CSP
W / ELBO W
18" CSP
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
2@ 7’x6’ RCBC
RIP RAP
CLASS ’I’
CO LLAR
SLO T FLAT GRATE
2GI W / NARRO W
CO LLAR
SLO T FLAT GRATE
2GI W / NARRO W
REM O VE
SLO T FLAT GRATE
2GI W / NARRO W
2 ELBO W S
15" CSP W /
2 ELBO W S
15" CSP W /
SLO T FLAT GRATE
2GI W / NARRO W
CO LLAR
EXTEND
RETAIN AND REM O VE HWEST 37 SY FF
EST 15 TO NS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#2
SW ALE BEHIND C&G
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#2
SW ALE BEHIND C&G
SEE DETAIL #1
FALSE CUT
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
EST. DDE 25 CY
SEE DETAIL#8
HEAD DITCH
EST. DDE 9 CY
SEE DETAIL #7
TAIL DITCH
EST. DDE 20 CY
SEE DETAIL #8
TAIL DITCH
STA. 42+50 -Y1- LT
BERM GUTTER
END SHO ULDER
EXTEND
RETAIN AND
-Y1- LT
STA. 41+30
BERM GUTTER
BEGIN SHO ULDER
GUTTER STA 28+10 -Y1- RT
END SHO ULDER BERM
23+90 -Y1RPA- RT
STA 22+75 TO
BERM DITCH
EST 16 SY FF
EST 5 TO NS
SEE DETAIL #33
(BANKS O NLY)
CLASS ’B’ RIP RAP
SEE DETAIL#
EST 463 SY FF
EST 172 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
15" RCP-III
15" RCP-III
15" RCP-III
15" RCP-III
15" RCP-III
STA 35+76 -Y1- LT
END O F BRIDGE TO
SHO ULDER BERM GUTTER
SEE SHEET 2-TT
PSH
STA 24+00 -Y1- LT
END SHO ULDER BERM GUTTER
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER EN GIN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
2
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
5
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
5U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
0
0
+
8
3
S
H
E
E
T
6
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
4
7
5
+
0
0
S
H
E
E
T
4
MATCHLINE - Y1 - STA. 23+65 SHEET 20
MATCHLINE - Y1 - STA. 44+00 SHEET 21
FF
F
F F
T = 604.30’
R = 280.00’
L = 636.66’
PI Sta 18+14.30
D
Ls = 210.00’
PIs Sta 11+41.05
LT = 141.05’
ST = 70.95’ST = 70.95’
LT = 141.05’
Ls = 210.00’
PIs Sta 19+17.61
PI Sta 21+48.83
T = 938.83’
L = 717.33’
R = 280.00’
D
Ls = 210.00’
PIs Sta 19+98.29
LT = 141.05’
ST = 70.95’ST = 70.95’
Ls = 210.00’
PIs Sta 11+41.05
LT = 141.05’
R = 1,000.00’
T = 250.19’
L = 490.31’
D
PI Sta 28+77.17
L = 580.17’
T = 303.51’
R = 800.00’
D
PIs Sta 25+03.79
Ls = 210.00’
ST = 70.12’
LT = 140.13’
F
ST = 80.03’
LT = 160.04’
Ls = 240.00’
PIs Sta 22+03.70PI Sta 16+90.72
L = 883.67’
T = 450.72’
R = 1,820.00’
D
PIs Sta 11+60.04
Ls = 240.00’
LT = 160.04’
ST = 80.03’
F
LT = 160.08’
ST = 80.08’
PIs Sta 14+10.08
Ls = 240.00’
F
L = 460.06’
R = 1,205.00’
T = 232.87’
D
PI Sta 17+22.87 PIs Sta 20+30.14
Ls = 240.00’
ST = 80.08’
LT = 160.08’
F
ST = 70.07’
LT = 140.08’
PIs Sta 23+30.14
Ls = 210.00’
F
PI Sta 26+50.25
SE = .08
-Y1RPD-
SE = .06
-Y1LPD-
SE = .08
RO = SEE PLANS
-Y1LPA-
-Y1RPA-SE = .08
SE = .08 SE = .06
RO = SEE PLANS
0 50’ 50’ 100’ 25’
NOTE:
PI Sta 43+10.02
D
L = 450.07’
T = 228.91’
R = 1,000.00’
-Y1DET-
FOR -Y1- PROFILE, SEE SHEET 43-44
FOR -Y1RPA- PROFILE, SEE SHEET 47
FOR -L- PROFILE, SEE SHEET 32-33
FOR -Y1RPD- PROFILE, SEE SHEET 48
FOR -Y1LPA- PROFILE, SEE SHEET 45
FOR -Y1LPD- PROFILE, SEE SHEET 46
S
R
2
4
0
5
OLD
B
E
LE
WS
R
D
19
’ B
S
T
PAVED SHOULDER
PAVEMENT TO BE OBLITERATED
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
A
R
C
E
L
N
U
M
B
E
R
3
R
E
M
O
V
E
D
4
7
5
4
8
0
4
8
5
5
0
0
25
4
6
’
3
6
’
3
6
’
-L-
-Y1RPA-
4
9
0
4
9
5
2
0
25
3
0
20
S R S S t a . 2 1 +9 0 .0 6
25
15
2
0
15
600’ TRANSITION
08
07
06
0 5
0 4
0 3
0 2
0 1
0 0
0 1
0 2
0 3
04
05
06
0
2
35’ I
NC
30’ I
N
C
08
07
06
05
04
03
02
01
00
01
02
03
04
05
06
35’ INC 30’ INC
0
3
0
4
0
5
0
6
0
7
0
8
0
8
-
Y
1
L
P
A-
S
C
Sta. 1
2
+
1
0.0
0
-
Y1LP
A-
S
T
S
ta
. 2
0
+
5
6
.6
6
-
Y1R
P
A-
P
T
S
ta
. 2
8
+
9
0
.3
7
-
Y1R
P
A-
S
C
S
ta
. 14
+
9
0
.0
0
-
Y1R
P
A-
T
S
S
ta
. 12
+
5
0
.0
0
-Y
1R
PA
- SC Sta. 24+00.06
-Y1R
PA
- CS Sta. 19+50.06
-Y1LPA
- C
S Sta. 18+46.66
-Y1LP
D
- S
C
S
ta. 12
+
10
.0
0
-
Y1LP
D
-
S
T
S
ta
. 2
1+
3
7
.3
3
-
Y
1
L
P
D
-
C
S
S
t
a
.
1
9
+
2
7.
3
3
-
Y1
R
P
D-
S
C
Sta. 2
5
+
73.67
-
Y1RP
D- S
RS Sta. 23+63.67
-
Y1RP
D-
CS Sta. 21+23.67
-
Y
1R
P
D
-
S
C
S
t
a
.
12
+
4
0
.
0
0
2
0
1
5
-
Y1R
P
D
-
P
T
S
ta
. 3
1+
5
3
.8
4
-
Y
1
L
P
D
-
T
S
S
t
a
.
1
0
+
0
0
.
0
0
-
Y
1
L
P
A
-
T
S
S
t
a
.
1
0
+
0
0
.
0
0
12’P.S.
15
-Y1LPD- Sta. 22+60.41
-Y1- Sta. 40+06.00
-Y1- Sta. 40+25.53
SKEW = 98.5386
-Y1- POT Sta. 34+10.05
-L- POT Sta. 482+13.14
24’
4’
4’ P.S.
4’ P.S.
1
5
-Y1LPA- POT Sta. 22+03.90
-Y1- POT Sta. 27+43.00
-Y1RPA- POT Sta. 31+29.10
-Y1- POT Sta. 27+23.00
P
C
S
ta
. 10
+
0
0
.0
0
OBLITEREATE AND GRADE TO DRAIN
BEGIN APPROACH SLAB
-Y1- STA. 32+69.50
-Y1- STA. 32+93.77
BEGIN BRIDGE
-Y1- STA. 35+26.34
END BRIDGE
-Y1- STA. 35+50.61
END APPROACH SLAB
12’ P.S.
-
L
-
P
O
T
S
t
a
.
4
8
4
+
2
4
.
0
0
(
5
9
’
L
t
.
)
-
L
-
P
O
T
S
t
a
.
4
8
2
+
9
3
.
0
0
END GRASS MEDIAN
30
35
40
BEGIN 5" MONOLITHIC CONCRETE ISLAND
02
02
02
02
0
2
0
2
0
2
0
2
24’
36’
1284’ FULL LANE
4
8
’
3
6
’
3
6
’
D
4
8
’
36’
4
8
’
4
8
’
4
6
’
48’
36’
-L--L-
-Y1RPA-
-Y1LPA-
-Y1RPD
-
-Y1LPD--Y1RPD-
-Y1LPD-
-
Y1-
-
Y1-
-
Y1-
-
Y1-
2
0
0
’ T
A
P
E
R
R
E
P
A
T
’
0
0
2
0
2
0
3
0
4 0
5
0
7
08
0
6
0
3 0
4 0
5
0
6
0
7
0
8
08
0
1
0
1
0
0
0
6
0
5
0
4
0
3
0
2
0
1
0
8
0
7
0
6
0
50
4
0
3
0
2
0
1
0
0
0
1
35’ INC
30 ’ INC
44
’
20’
2
0
’
0
7
0
6
0
5
0
4
0
3
0
2
0
6
0
5
0
3
0
2
0
4
0
1
35’ INC.
30’ I
N
C.
3
5
’
INC
30 ’ INC +
9
0
.0
0
A
3
6
’
3
6
’
16’
4
’ P
. S
.
4
’ P
. S
.
4’ P
. S
.
2
0
0
’ T
AP
E
R
3
3
0
’ F
ULL
LAN
E
12’P.S.
4
0
’
BEGIN TIP PROJECT U -2579B
END TIP PROJECT U -2579C
-L- POT STA. 478+00.00
1153’ FULL LANE
FUTURE CONSTRUCTION
TIP PROJECT U-2579C
5’ R
3
’ R 8
’
2
0
’
1
2
’
1
2
’
2
0
’
PROP. 2’-6"
CURB & GUTTER
PROP. 2’-6"
CURB & GUTTER
CONCRETE ISLAND
PROP. 5" MONOLITHIC
CONCRETE ISLAND
PROP. 5" MONOLITHIC
C
ONC
R
E
T
E
IS
LAN
D
P
R
OP
. 5
" MON
OLIT
H
IC
4
’ P
.S
.
4
’ P
.S
.
4
’
4
’
1’-
6
" C
U
R
B
&
GU
T
T
E
R
P
R
OP
. GR
AS
S
ME
D
IAN
W/
1’-
6
" C
U
R
B
&
GUT
T
E
R
P
R
OP
. GR
AS
S
ME
D
IAN
W/
P
R
OP
. GR
AS
S
ME
D
IAN
W/
1’-
6
" CUR
B
&
GUT
T
E
R
5’ R
3’ R
4
’
8
’
4’ PS
4’ PS
4’
US
15
8
B
S
T
US
15
8
2
8
’ B
S
T
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
6’
8:1 TAPER
24’
30’
2
4
0
’ F
ULL
LANE
3
’ R
7
5
’ R
5
5
0
’ LE
F
T
T
U
R
N
F
ULL
LAN
E
GU
AR
D
R
AIL
F
ACE
OF
P
AVE
T
O
10
0
’ T
AP
E
R
10
’
+75.04
END C&G
TAPER
8:1
30’ R
7
5
’ R
+97.40
+
4
8
.7
5
3
6
’
+
8
0
.5
6
7
5
’ R
8
:1 T
AP
E
R
10
’
26.11+
+46.98
END C&G
36’
8
4
7
.4
4
’ F
ULL
LAN
E
4
’P
.S
.
24’
30’
GUAR
D
R
AIL
F
AC
E
OF
P
AVE
T
O
24’
3
’ R
10
0
’ R
36’
+36.78
2
4
’
3
’ R
10
0
’ R +
8
4
.7
7
7
5
’ R
24’
48’
6’
3
’ R
24’
24’
4
0
’
60’ TAPER
3
6
’
6
0
’ T
AP
E
R
28’
+96.42
+
9
9
.7
9
7
5
’ R
319.90’ FULL LANE+57.71
END
+00.51
BEGIN
+52.61
OF
GU
AR
D
R
AIL
P
AVE
T
O
F
AC
E
+57.26
END
OF
GU
AR
D
R
AIL
P
AVE
T
O
F
AC
E
9’
+48.96
BEGIN
+15.83
ENAL LLUF ’35.525
-
Y1-
S
T
A. 4
2
+
4
0
.0
0
B
E
GIN
P
AVE
ME
N
T
MAR
KIN
GS
E
ND
GR
AS
S
ME
D
IAN
25
30
35
40
-
Y1D
E
T
-
P
C
S
ta
. 4
0
+
8
1.11
-
Y1D
E
T
-
15
’
15
’
15
’
12’P.S.
-Y1RPD- Sta. 33+20.22
30’R
8:1 TAPER
1
6
’
12
’
P
.
S
.
16
’
8:1 TAPER
8:1 TAPER
8:1 TAPER
8:1 TAPER
-Y1RPA- STA 14+53.46
BEG. RAMP PAVEMENT
-Y1RPD- STA 14+53.92
BEGIN -Y1RPD- PAVEMENT
END -L- PAVEMENT
-Y1LPD- STA 12+31.88
BEGIN -Y1LPD- PAVEMENT
END -L- PAVEMENT
10
0
’ R
B
E
GI
N
C
&
G
+
4
8.
3
4
10
0
’ R
B
E
GIN
C&G
+
4
8
.3
4
-Y1LPA- STA 12+31.88
BEGIN -Y1LPA- PAVEMENT
END -L- PAVEMENT
1
2
’
1
2
’
1
2
’
1
2
’
104’
8’
6’
90’
12’P.S.12’P.S.
13.5’P.S.13.5’P.S.
12’P.S.
12’P.S.
13.5’P.S.13.5’P.S.
12’P.S.
BEGIN W.W. FENCE
BEGIN
W.W. FENCE
R
2
0
’
30’
R= 20’
2
0
’
30’
2
5
’
R
2
0’
2 0 ’2 5 ’R 20’
GRADE TO DRAIN
OBLITEREATE AND
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
F
F
F
C
C
141.00’
141.00’
141.39’
+25.00 -Y1RPD-
141.00’
+81.45 -Y1RPD-
335.88’
+71.00 -Y1RPD-
+63.67 -Y1RPD-
+40.00 -Y1RPD-
+50.00 -Y1RPA-
141.00’
+90.00 -Y1RPA-
141.00’
+72.88 -Y1RPA-
326.84’
+70.00 -Y1-
150.00’
+27.31 -Y1-
100.00’
+00.00 -L-
200.00’
160.00’
+23.74 -Y1-
106.09’
+00.00 -L-
200.00’
+23.67 -Y1RPD-
141.00’
287
+65
253
+05
223
+05
+80-Y1RPD-
+29.95 -L-
200.00’
141.00’
+48.00-Y1-
134.15’
145’
+20
136.58’
145’
+85
200’
245’
+30
4
11
4
4
15
15
15
14
14
12
13
11
15
+25.00 -Y1RPD-
208.00’
+35-Y1-
200.00’
172.00’
+70.00 -Y1RPD-
141.00’
+09.00 -Y1RPD-
+82.66 -Y1RPD-
235.00’
252.36’
162.00’ &132.06’
+50.00 -Y1-
171.00’
+20.00 -Y1-
141.10’
175.00’
150.00’
175.00’
150.00’
+90.00 -Y1-
+10.00 -Y1-
150.00’
+30-Y1RPD-
141.00’
150’
175.00
175.00
+50.00 -Y1RPD-
+40.00 -Y1RPD-
141.00’
141.00’
156.00’
+90.00 -Y1RPA-
+88.00 -Y1RPA-
+30.48 -Y1RPA-
269.85’
269.00’
188.00’
200.00’
+50.06 -Y1RPA-
+00.06 -Y1RPA-
150.00’
+93.27 -Y1RPA-
174.05’
+00.00 -Y1RPA-
150.00’
+89.51 -Y1RPA-
208.23’
+51.15 -Y1RPA-
219.98’
+83.79 -Y1RPD-
162.90’
+77.40 -Y1RPD-
161.00’
7
C
H
O
R
D
C
H
O
R
D
CHO RD
CHO RD
CHO RD
4B
2GI
JB w/M H
2GI
2GI
2GI
2GI
2GI
2GI
CB
2GI
CB
2GI
2GI
CB
CB
2GI
CB
2GI
CB
2GI
BDO
2GI
BDO
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
JB w/Slab Lid
2GI
2GI
2GI
2GI
BDO
2GI
2GI-A 2GI-A 2GI-A
2GI-A
2GI-A
3GI-A
3GI-A
2GI-A
2GI-A
2GI-A
FS
FSFS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
HW
JB w/M H
FS
FS
FS
FS
FS
FS
FS
D
Min. D=1.5 Ft.
6:
1
Fill
Slope
2:1
W
( Not to Scale)
FALSE CUT
DETAIL #1
N.G.
6:1
D
Min. D = 2 ’
W = 5’ Min.
AND FLAT GRATE
2GI W / NARRO W SLO TS
SLO T
2GI W / NARRO W
DI
2GI-A
SLO T FLAT GRATE
2GI W / NARRO W
2GI
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FRO M STA 18+30 TO 20+65 -Y1LPA- LT
1
2
3
4
5
6
7 8
9
10
11
12
13 14
15
16
17
18
19
20
21
22
23
24
25
26
27
30
31
32
33
34 35
29
36
37
38
40
39
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
59
60
61
62
63
64
63A
3:14:
1
GROUND
NATURAL
DETAIL #2
SPECIAL BACK OF CURB CUT DITCH
(NOT TO SCALE)
FRO M STA 12+00 TO 18+00 -Y1LPD- RT
FRO M STA 12+00 TO 16+50 -Y1LPA- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 22+90 TO 24+60 -Y1- RT
FRO M STA 478+10 TO 479+00 -L- RT
Natural Natural
Ground Ground
2:
1 2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FRO M FRO M STA. 41+25 TO 41+56 -Y1- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FRO M STA. 41+58 TO 42+02 -Y1- LT
FRO M STA. 27+62 TO 27+97 -Y1- RT
1A
2:1Natural
Ground
Filter Fabric
d
2:
1
( Not to Scale)
Type of Liner= Class B Rip-Rap
DETAIL #33
TAIL DITCH
Natural
Ground
d= 1.5Ft.
65
42" RCP-III
4
2
"
R
C
P
-
I
I
I
42" RCP-III 42" RCP-III
2
4
"
R
C
P
-
I
I
I
18
" RC
P-III
2
4
"
R
C
P
-
I
I
I
15" RCP-IV
42" RCP-III 42" RCP-III 42" RCP-III
1
5
"
R
C
P
-
I
I
I
18"
RCP-IV
3
0
" RC
P-IV
2 4 " R C P -I I I
24" RCP-IV15" RCP-III
24" RCP-III
24" RCP-III
18" RC
P-III
1
5"
RC
P-III
3
6
"
R
C
P
-
I
I
I
3
6
"
R
C
P
-
I
I
I
15" RCP-IV
2
4
"
R
C
P-III
24" RCP-III
24" RCP-III
15" RC
P-III
15" RCP-IV
15" RCP-III
18" RCP-III
15" RCP-III
18" R
C
P-III
18" R
C
P-III
15" RCP-IV
15
" RC
P-IV
15
" RC
P-
IV
30" RCP-V
30" RCP-IV
15" RCP-IV
15
" RC
P-
IV
42" RCP-III
42"
RCP-IV
15" RC
P-IV
15" RC
P-III
18" RCP-III 18" RCP-III
1
8
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
18" RC
P-III
24"
R
C
P-III
15" RC
P-III
3
0
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
15" RCP-III
3
0
"
R
C
P
-
I
I
I
3
0
"
R
C
P-III
3
0
"
R
C
P-III
1
5
"
R
C
P
-
I
V
SEE SHEET 2-TT
EST. FF +/- 106 SY
EST. DDE +/- 125 CY
EST. CLASS I RIPRAP +/- 105 TO NS
ENERGY DISSIPATO R BASIN
TOP=857.95
INV=844.95
TOP=855.76
INV=843.66
C
H
A
N
G
E I
N
M
A
T
E
RI
A
L
A
P
P
R
O
X. L
O
C
A
TI
O
N
O
F
12"
V
C
12"
DI
TOP=861.71’
INV=854.71’
TOP=877.37’
TOP=877.37’
INV=870.87’
INV=864.17’
TOP=878.83’
TOP=880.42’
TOP=878.83’
INV=872.83’
INV=862.92’
TOP=885.46’
TOP=885.46’
TOP=876.56’
TOP=898.16’
TOP=894.36’
TOP=898.16’
TOP=894.36’
INV=874.36’
INV=878.56’
2910.76
14
15943.67
16911.40
17922.50
504
946.14
55
32+86.6043
3.6201
504
946.14504
946.14
-BL-14
-BL-15
-BY2-
-BL-16
-BL-17
-BY1- 401
-BY2-504
DAN T. WESTMORELAND
LARRY W. WHICKER
JANE W. WHICKER
207.51’
1100.13’
110.62’
E
IP
150.00’
E
X
IS
T
ING
R
/
W
E
XIS
T
IN
G
R
/
W
390.00’
623.00’
913.00’
11.50’
6
8
1.
2
8
’
EIP
EIP
EIP
EIP
153.90’ EIP
T
O
C
O
R
153.19’ R/
W
T
O
C
O
R
DAN WESTMORELAND
JANE WHICKER &
KAREN WESTMORELAND
DAN WESTMORELAND
KAREN WESTMORELAND
DAN WESTMORELAND
618.23’
137.94’
454.79’ EIP TO COR
455.21’ R/W TO COR
3
15
.3
7
’
8
2
.12
’
2
0
6.
6
8
’
126.65’
36.68’
3
8
9.
4
9’
EI
P
TO
C
O
R
3
8
3.
6
0’
R/
W
TO
C
O
R
DAN T. WESTMORELAND
DAN T. WESTMORELAND
60.00’
E
XIS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EIP
206.28’
E
IP
SUSAN K. MORETZ
FREDERICO B. MORETZ
DAN T. WESTMORELAND
DAN T. WESTMORELAND
DB 2226 PG 1297
DB 1965 PG 1847
DB 573 PG 367
DB 107 PG 246
DB 2124 PG 2239
DB 2226 PG 1302
DB 573 PG 367
DB 107 PG 246
DB 2124 PG 2239
DB 2226 PG 1302
DB 1712 PG 2294
DB 1712 PG 2297
DB 949 PG 120
DB 1712 PG 2294
DB 1712 PG 2297
DB 949 PG 120
DB 2226 PG 1297
DB 2226 PG 1297
DB 1655 PG 1225
DB 2226 PG 1297
DB 2226 PG 1297
D
B
18
0
9
P
G
3
7
12
D
B
9
8
3
P
G
5
2
6
D
B
2
10
5
P
G
4
14
4
DAN WESTMORELAND
JANE WHICKER &
DB 573 PG 367
DB 107 PG 246
DB 2124 PG 2239
DB 2226 PG 1302
DAN WESTMORELAND
JANE WHICKER &
C
A
R
O
L
WE
S
T
M
O
R
E
L
A
N
D
T
O
WN
O
F
WA
L
KE
R
T
O
WN
TOWN OF WALKERTOWN
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
20’ S
A
NIT
A
R
Y S
E
WE
R
E
AS
E
M
E
N
T
41.28’+94.33
704.83’
+
30.50
7
5.
8
2
’
+
8
0.
5
6
95.31’+88.62
DB 2639 PG 683
STEPHANIE C WESTMORELAND (TRUSTEE)
DARRELL T. WESTMORELAND (TRUSTEE) &
STEPHANIE C WESTMORELAND (TRUSTEE)
DARRELL T. WESTMORELAND (TRUSTEE) &
DB 2639 PG 683
CAROL WESTMORELAND
DB 1809 PG 3712
DB 983 PG 526
DB 2105 PG 4144
DB 3033 PG 1533
HOMEOWNERS ASSOCIATION INC.
ROBINS WALK SUBDIVISION
SO
IL
B
S R 2 4 0 5 O LD B E L E W S C R E E K R D 1 7 ’ B S T
S
10’ C
O
NC
S
1S B K D
B
B
C
SS
S
S
S
OIL
G
A
T
E
M
T
L
GATEMTL
S
S
S
O
I
L
15
" R
C
P
B
G
A
T
E
M
T
L
4
8
" C
O
N
C
2
S
B
KD
15
’ BST
C
ONC
W
WD
DK
BK W ALL
G
R
G
R
SOIL
B
B
GR
BLK WALL
SOIL
15 " RCP
3
S
B
W
4
S
B
W
4SBW
4 S B W
4SB
W
4
S
B
W
3SBW
4SB W
3SBW
60" CM P
18
" C
L
A
Y
C
O
N
C
HW
3
0
" R
C
P
42" RCP
48" CONC
5SB
W
12
" R
C
P
12
" R
C
P
12
" R
C
P
GR
GR
GR
48" CONC2
S
B
K
D
W
60" WW
W/
L
T
M TL
B
SOIL
B
S
O
IL
15
" R
C
P
15
" R
C
P
(
A
B
A
N
D
)
17’ CONC
D
I
C
O
N
C
HW
W
CONC
GR
4
S
B
W
2
4
" R
O
C
K
W
A
L
L
WD
D
K
1S
B
KD
3
6
" C
O
N
C
15
" R
C
P
RUINS
S
OIL
B
T
T
T
12
" D
I
12
" D
I
1 2 " D I
68
165
GR
AU
-
3
5
0
AT-1
GRAU-350GRAU-350
CAT-1
CAT-1
B
-
7
7
B
-
7
7
B
-
7
7
CAT-1
GRAU-350
CAT-1
GR
AU-
3
5
0
CAT-1
GRAU-350
GRAU-350
CAT-1
TES
TES
T
ES
T
ES
C
O
N
C
H
W
30" RCP
INV=867.69
INV=872.30
42" RCP
60" CM P
18" CLAY
15"
R
CP
C
O
N
C
HW
DI
17,480
55,960
15,520
53,560
26,440
83,480
22,160
79,880
BELTWAY
US 158 (REIDSVILLE ROAD)
DUAL = 3%
TTST = 5%
DIR = 60%
DHV = 10%
-Y1-
-L-
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
3,460
6,580
3,400
5,800
3,680
6,240
1,220
1,860
2010 ADT
2030 ADT
TRAFFIC DIAGRAM
STA 510+35 -L- RT
EN D SHO ULDER BERM G UTTER
STA 509+50 -L- LT
EN D SHO ULDER BERM GUTTER
REM O VE
CO N NECTO RS
AN D RO D AND LUG
30" CSP W / 2 ELBO W S
CO NN ECTO RS
AND RO D AN D LUG
18" CSP W / 2 ELBO W S
STA. 501+50 -L- RT
BERM GUTTER
BEG IN SHO ULDER
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 8 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#14
W / 316 SY FF
EST. 117 TO NS
LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP
EST. DDE 10CY
SEE DETAIL#7
TAIL DITCH
EST. DDE 10CY
SEE DETAIL#9
TAIL DITCH
SEE XSC STA 510+50 TO 512+00 -L- RT
FILL SLO PE SHO ULD BE 4:1 O R FLATTERSEE DETAIL#12
W / 883 SY FF
EST. 336 TO NS
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
FLAT G RATE
2GI W /
EST. 47 FF
EST. 21 TO NS
SEE DETAIL #32
(BAN KS O N LY)
CLASS ’I’ RIP RAP
SEE DETAIL#6
EST. 231 SY FF
EST. 86 TO N S
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
EST. DDE 20CY
SEE DETAIL#9
TAIL DITCH EST. 47 FF
EST. 21 TO NS
SEE DETAIL #32
(BAN KS O N LY)
CLASS ’I’ RIP RAP
54" RCP-III
54" RCP-III
STA 500+99.79 -L- LT
BEG IN SHO ULDER BERM G UTTER
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
2
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
6
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
6U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
TA
.
5
0
0
+
8
3
S
H
E
E
T
5
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
1
2
+
0
0
S
H
E
E
T
7
PIs Sta 11+60.04
Ls = 240.00’
LT = 160.04’
ST = 80.03’
F
-Y1RPD-
FOR -Y1RPA- PROFILE, SEE SHEET 47
FOR -Y1RPD- PROFILE, SEE SHEET 48
FOR -L- PROFILE, SEE SHEET 33
NOTE:
PIs Sta 22+03.70
F
Ls = 240.00’
LT = 160.04’
ST = 80.03’
R = 1,820.00’
T = 450.72’
L = 883.67’
PI Sta 16+90.72
D
SE = 08
PAVED SHOULDER
5
0
5
5
1
0
0
2
0
2
0
2
900’ FULL LANE
3
6
’
4
8
’
4
6
’
3
6
’
3
6
’
4
8
’
3
6
’
4
6
’
-L-
-L-
-Y1RPD-
0
2
0
2
40’ INC.
0
3
0
4
0
5
0
6
0
7
-
Y1R
P
A
-
T
S
S
t
a
. 12
+
5
0
.0
0
-
Y
1R
P
D
-
S
C
S
t
a
.
12
+
4
0
.
0
0
12’P.S.
12’P.S.
12’P.S.
3
6
’
1
2
’
-Y1RPD- TS Sta. 10+00.00
-L- POT Sta. 503+00.00
-Y1RPA- POT Sta. 10+00.00
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
(59’ Lt.)
-L- POT Sta. 502+91.34 (59’ Rt.)
12’P.S.12’P.S.
12’P.S.
12’P.S.
12’P.S.
-Y1RPA-
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
F
F
F
F
F
F
190.00’
+40.00 -L-
+09.84 -Y1RPA-
140.66’
200.00’+00.00 -Y1RPD-
270’
+20 +21.87 -L-
+10.58 -L-
246.79’
230.98’
15 17
18
CHO RD
15
2G I
2G I-A
2GI-A
FS
FS
FS
HW
HW
JB w/M H
JB w/M H
SPRIN G BO X
2GI W / FLAT GRATE
2G I W / FLAT G RATE
2G I W / FLAT G RATE 2GI W / FLAT G RATE
2G I W / FLAT G RATE
66
67
68
69
70
71
72
73 75
76
74
68A
69A
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 507+60 TO 509+10 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*W hen B is < 6.0’b= 5 Ft.
B= 2 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 507+00 TO 512+00 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA 505+50 TO 507+55 -L- LT
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
M in. D= 2 Ft.
FRO M STA. 11+48 TO 11+52 -Y1RPD- LT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
M in. D= 2 Ft.
FRO M STA. 504+03 TO 504+38 -L- RT
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
M ax. d= 2.0Ft.
M in. D= 2.0Ft.
DETAIL #32
TAIL DITCH
Natural
Ground
FRO M STA. TO STA.
2:1
65
65A
18"
R
C
P-I
V
1
5
"
R
C
P
-
I
V
15" RCP-IV
4
8"
R
C
P-
C
D
4
8"
R
C
P-
C
D
48" RCP-CD
48" RCP-CD
1
5
"
R
C
P
-
I
V
3
0
"
R
C
P
-
I
V
30" RCP-III 30" RCP-III30" RCP-III
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
8" DIP
DAN T. W ESTM ORELAND
EIP
STONE
469.76’
209.77’
63.06’
119 5 .11’
13
1.9
0
’
28.65’
5
8
.8
4
’
4
2
.2
6
’
103.10’
72.35’
34.57’
3
9
.3
9
’
31.82’
29.75’
52.21’
4
2
.9
9
’
51.35’
24.49’
11.58’
29.20’
31.48’
30.17’
28.83’
13.83’
KAREN W ESTM ORELAND
DAN W ESTM ORELAND
BAPTIST CHURCH
GOSPEL LIGHT
677.32’
DB 2150 PG 3181
DB 2226 PG 1297
DB 2044 PG 3201
DB 1948 PG 290
DB 1948 PG 287
DB 1872 PG 3238
DB 1684 PG 3098
DB 1684 PG 2508
DB 1560 PG 1136
DB 1342 PG 115
DB 1244 PG 471
ILENA B. DILLON
ROBERT J. DILLON
FO RSY TH CO U N TY
TO W N O F W A LKERTO W N
FO RSY TH CO U NTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
8 9 .2 1’
+4 4 .7 8
128.85’
+46.40
T O W N O F W A LKERT O W N
3
0
"
C
M
P
1
S
B
K
D
S
W . E. 897.3
POND
166
GRAU-350
-BL-18
-BL-19
3
0
"
C
M
P
I
N
V
=
8
6
0.15
I
N
V
=
8
6
0.3
8
STA 522+00 -L- RT
BEGIN SHO ULDER BERM G UTTER
STA 521+50 -L- LT
BEGIN SHO ULDER BERM G UTTER
2 ELBO W S
15" CSP W /
EST 38 SY FF
EST 17 TO N S
RIP RAP
CLASS ’I’
SEE DETAIL#4
LATERAL ’V’ DITCH
SEE DETAIL#4
LATERAL ’V’ DITCH
S
E
E
P
R
O
F
I
LE
F
O
R
G
R
A
D
E
S
P
E
C
I
A
L
D
I
T
C
H
G
R
A
D
E
SEE PRO FILE FO R G RADE
SPECIAL DITCH G RADE
EST. DDE 6CY
SEE DETAIL #9
HEAD DITCH
-BEGIN BRIDG E
STA 18+60 -Y2- LT&RT
SBG
SEE DETAIL#6
EST. 139 SY FF
EST. 51 TO N S
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 185 SY FF
EST 69 TO N S
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
2 ELBO W S
15" CSP W /
15" RCP-IV
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
7
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
7U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
TA
.
5
12
+
0
0
S
H
E
E
T
6
M
A
T
C
H
LIN
E
-
L
-
S
TA
.
5
2
4
+
6
2
S
H
E
E
T
8
M ATCHLINE - Y2 - STA. 15+61 SHEET 22
M
A
TC
H
L
IN
E
- Y
2
-
S
TA
.
2
4
+
8
1
SH
E
E
T
2
3
D
L = 587.59’
T = 309.45’
R = 758.00’
PI Sta 14+90.64 PI Sta 27+32.39
L = 358.58’
T = 182.71’
R = 758.00’
D
-Y2-
SE = .08
RO = SEE PLANS
SE = .08
RO = SEE PLANS
FOR -Y2- PROFILE, SEE SHEET 49
FOR -L- PROFILE, SEE SHEET 33 - 34
NOTE:
PAVED SHOULDER
5
1
5
5
2
0
2
0
0
2
0
2
08
07
06
05
04
03
0
2
0
2
0
2
0
2
0
2
0
2
0
1
0
1
0
0
0
2
0
2
0
2
0
2
0
2
0
1
0
1
0
0
0
2
300’ TAPER
3
6
’
4
6
’
3
6
’
3
6
’
3
6
’
3
6
’
4
6
’
3
6
’
24’
2
4
’
2
4
’
4
6
’
-L--L-
7
3
.6
8
+
+10.00
-
Y2
-
-
Y2
-
12’P.S.
12’P.S.12’P.S.
12’P.S.
3
6
’
END BRIDGE
BEGIN APPROACH SLAB
8
:1 T
AP
E
R
8
:1 T
AP
E
R
8
:1 T
A
P
E
R
8
:1 T
A
P
E
R
S
R
2
3
8
5
WALK
E
R
T
OWN
/ GU
T
H
R
IE
R
D
2
0
’ B
S
T
-Y2-PTSta. 17+68.78
BEGIN APPROACH SLAB
BEGIN BRIDGE
2
’ P
.S
.
2
’ P
.S
.
2
4
’
12’ P.S.
2
’
P
.S
.
2
’
P
.
S
.
2
4
’ IN
C
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.12’P.S.
12’P.S.
SKEW = 108.0666
2
4
’ IN
C
2
4
’
3
’
-Y2- POT STA. 18+74.00
-Y2- POT STA. 18+99.25
-Y2- POT STA. 21+41.18
-Y2- POT STA.21+66.42
-L- POT STA. 516+31.30
-Y2- POT STA. 20+20.21
7
.
5
’
3
4
.
5
’
END W.W. FENCE
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
END W.W. FENCE
BEGIN
W.W. FENCE
BEGIN
W.W. FENCE
F
F
FF
F
C
C
C
C
C
C
C
C
C
C
C
F
42.00’
42.00’
+16.88 -Y2-
+44.28 -Y2-
42.00’
42.00’42.00’
42.00’
72.00’
65.00’
+68.78 -Y2-
+96.14 -Y2-
+88.64 -Y2-
+68.78 -Y2-
+23.54 -Y2-
+33.33 -Y2-
4
2
.
0
0
’
+
4
9
.
6
8
-
Y
2
-
+65.00 -L-
200.00’
+34.43 -L-
200.00’
17
18
18
21
23
25
29
60.00’
+90.00 -Y2-
67.00’
+50.00 -Y2-
42.00’
42.00’
+00.00 -Y2-
+00.00 -Y2-
END C/A
42.00’
42.00’
+50.00 -Y2-
+50.00 -Y2-
EN D C/A
EN D C/A
END C/A
+50.00 -L-
192.80’
+50.00 -L-
110.00’
+00.00 -L-
65.00’
+35.00 -Y2-
200.00’
991
25
2GI
2GI
2G I
JB w/M H
2G I
2GI
2GI
2G I
1
5
"
1
5
"
FS
FS
2G I-A
2G I-A FS
FS
FS
FS
FS
HW
FS
2GI
77
78
79
80
84
83
82
81
85
87
86
87A
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FRO M STA 512+50 TO 513+45 -L- LT
FRO M STA 511+75 TO 512+50 -L- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 522+60 TO 523+50 -L- LT
FRO M STA 522+00 TO 523+20 -L- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
M in. D= 2 Ft.
FRO M STA. 522+42 TO 522+45 -L- LT
TBDI
TBDI
77A
78A
78B
30" RCP-III
2
4
"
R
C
P
-
I
I
I
24" RCP-III 24" RCP-III
2
4
"
R
C
P
-
I
V
1
5
" R
C
P
-III
1
5
"
RC
P
-III
15"
R
C
P-III
1
8
"
R
C
P
-
I
I
I
18" RCP-III 18" RCP-III
4
8
"
R
C
P-
I
V
4
8
"
R
C
P-
I
V
12
"
RC
P
POND
WE 878.1’
3
6
"
C
O
N
C
GR
S
S
G
R
W/
L
T
SO
IL
S
S
S
S
S
HT
R
W
DK
WD
W/
L
T
1
S
B
K
D
SOIL
SOIL
G
R
G
R
S
RUINS
S
1S
FD
SOIL
T
8
" D
I
G
R
AU
3
5
0
CAT-1
GRAU-350
CAT-1
B
-7
7
G
R
AU
3
5
0
B
-
7
7
G
RA
U
3
5
0
G
RA
U
3
5
0
TYPE-III
TYP
E-III
-BL-20
-BL-21
-BL-22
-BL-23
12
"
RC
P
FAM ILY TRUST
THE TABOR
ILENA B. DILLON
ROBERT J. DILLON
16’ ACCESS EASEM ENT DB 1111 PG 1
16’ ACCESS EASEM ENT DB 1948 PG 287
BAPTIST CHURCH
GOSPEL LIGHT
W ILM A D. W ALKER
RONALD H. W ALKER
DB 1621 PG 3161
DB 2528 PG 77
DB 1851 PG 2236
DB 2044 PG 3201
DB 1948 PG 290
DB 1948 PG 287
DB 1872 PG 3238
DB 1684 PG 3098
DB 1684 PG 2508
DB 1560 PG 1136
DB 1342 PG 115
DB 1244 PG 471
DB 1574 PG 984
DB 1574 PG 978
DB 1574 PG 975
DB 1373 PG 1152
DB 1574 PG 984
DB 1574 PG 978
DB 1574 PG 975
DB 1373 PG 1152
ILENA B. DILLON
ROBERT J. DILLON
ROBERT JEFFREY BARBER
T
O
WN
O
F
WA
L
K
E
R
T
O
WN
TOWN
OF
WALKERTOWN
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH
COUNTY
DB 2632 PG 3941
DB 2632 PG 3938
DB 2632 PG 3923
DB 2598 PG 3575
3
9
8
.
9
0
’
+
7
7
.
0
9
3
1
.
0
4
’
+
5
7
.
2
0
3
0
.
8
4
’
+
5
7
.
2
0
32.90’+62.07
34.27’+89.18
D
B
2
8
6
2
P
G
3
8
8
ROBERT JEFFREY BARBER
DB 2862 PG 382
TRANSPORTATION
NORTH CAROLINA DEPARTM ENT OF
DB 2825 PG 866
EM M A M. W HISENHUNT
DB 2680 PG 1572
STA 528+75 -L- LT
EN D SHO ULDER BERM GUTTER
CO N NECTO RS
AN D RO D AND LUG
30" CSP W / 2 ELBO W S
EL=878.2
IN V. IN
EST 21 SY FF
EST 8 TO N S
RIP RAP
CLASS ’B’
SEE DETAIL#30
RO CK FILL IN PO N D
SEE DETAIL#5
LATERAL 3’ BASE DITCH
EST. 3 TO NS
CLASS I RIP RAP
REM O VESTA 528+46.90 -L- RT
END SHO ULDER BERM G UTTER
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
8
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
8U-2579B
M
A
T
C
H
LIN
E
-
L
-
S
T
A
.
5
2
4
+
6
2
S
H
E
E
T
7
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
3
7
+
0
0
S
H
E
E
T
9
NOTE:
FOR -L- PROFILE, SEE SHEET 34
MORRIS RD
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
5
2
5
5
3
0
5
3
5
0
2
0
2
3
6
’
4
6
’
3
6
’
-L-
-L-
12’P.S.
12’P.S.
3
6
’
3
6
’
4
6
’
GRADE TO DRAIN
OBLITERATE AND
GRADE TO DRAIN
OBLITERATE AND
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
30’
R 20’
25’
20’
R
2
0
’
10’ R
52’R40’ R5
2
’
R
4
0
’
R12’1
2
’
20’
F
F
F
C
C
CC
C
+40.00 -L-
+55.10 -L-
+90.00 -L-
280.00’
210.00’
200.00’
29
31
32
33
29
+30.08 -L-
+90.00 -L-
+24.47 -L-
330.07’
310.00’
241.05’
-L- +33.00
307.00’
-L- +95.46
356.05’
-L- +40.08
299.33’
+24.00 -L-
150.00’
200.00’
+10.00 -L-
110.00’
+50.00 -L-
200.00’
991
29
2GI
2G I
2GI-A
FS
FS
FS
FSFS
HW
2G I-A
2G I W / FLAT G RATE
2G I W / FLAT G RATE 2GI W / FLAT GRATE
2G I W / FLAT G RATE
2G I-A
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #30
Elev.= 880.0
879.9
N.W .S. Elev.=
NG
1.0’M IN.
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #30
Elev.= 880.0
879.9
N.W .S. Elev.=
NG
1.0’M IN.
88
90
89
94
91
92
93
96
97
95
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
M in. D= 3 Ft.
FRO M STA 527+08 TO 528+75 -L- LT
FRO M STA. 525+00 TO STA. 528+15 -L- RT
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
18" RCP-III
4
8
"
R
C
P
-
I
V
4
8
"
R
C
P
-
I
V
24" RCP-III24" RCP-III
15" R
C
P
-IV
3
0
"
R
C
P
-
I
V
24" RCP-III
1
8
"
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
15" 98A
POOL
WD DK
CONC
2
S
BKD
B
S
T
36" STONE
36" S
T
O
N
E
STO N E36"
S
T
O
N
E
3
6
"
CONC
1
2
"
R
C
P
1SFD
G
S
4 8 " C O N C
48"
C
O
N
C
12" HDPE
12"
H
D
P
E
CONC
CONC
BST
DI
G
R
36" VINYL
S
DI
BK W ALL
GATEMTL
GATE
MTL
1SFD
CONCHTR
P
O
O
L
2SFD
6 0 " C O N C
36" L
O
G
GR
S
I
L
O
D
I
W
D
D
K
12
" H
D
P
E
MTL GATE
48" W
W
B
5SB
W HTR
LT
C
O
N
C
48" CHL
4
8
"
C
H
L
W
D
&
W
W
48"
GR
60"
W
D
W /LT
4
8"
W
D
R
AIL
&
W
W
4SBW
WS
15" RCP48" WD RAIL & WW
G
R
S
B
B
10
’ B
S
T
12" RCP
4 S B W
G
A
T
E
M
T
L
3
6"
W
W
&
1S
B
W
4
S
B
W
3
6
"
V
I
N
Y
L
W
A
L
L
B
K
W
A
L
L
B
K
15"
R
C
P
15"
R
C
P
GR
9’ BST
S
R
2
4
0
7
M
O
R
RIS
R
D
18’
B
S
T
W /LT
W
2SFD
W
15"
R
C
P
W
GR
LT
W
D
D
K
WD
D
K
DK
WD
W
C
ON
C
G
W
POND
WE 877.9’
B
S
T
12"
H
D
P
E
POND
WE 878.2’
W
D
4
8
"
W
D
R
AI
L
36"
W
D
R
AIL
48"
W
D
R
AIL
48"
W
D
R
AIL
12" R
C
P
12" RCP
RAMPWD
RAIL48" W D
W /LT
RIPRAP
T
T
8"
DI
8"
DI
CAT-1
GRAU-350
CAT-1
GRAU-350
TES
TES
TES
TES
-BL-24
-BL-25
-BL-26
1
2
"
R
C
P
RUINSSPILLWAY
ROCK W ALL
JOSEPH R. DANIELS
D
B
13
0
3
P
G
16
3
3
0
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
433.14’
9.95’
10.02’
10 0 .0 0 ’
110 .0 0 ’
12 0 .0 0 ’
FAM ILY TRUST
THE TABOR
EILEEN P. CHAM BERS
HOWARD B. CHAM BERS
SUSANNA L. M CCASKILL
M ICHAEL L. M CCASKILL
60.00’50.00’EXISTING R/
W
EXISTING R/
W
DB 829 PG 329
DB 2261 PG 1020
DB 1693 PG 2528
DB 2528 PG 77
DB 1851 PG 2236
FAM ILY TRUST
THE TABOR
DB 2528 PG 77
DB 1851 PG 2236
TO W N OF W ALKERTOW N
T O W
N O F W
A L K E R T O W
N
FO RSYTH CO UNTY
F O R S Y T H C O U N T Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
471.75’+13.91
TRANSPORTATION
NORTH CAROLINA DEPARTM ENT OF
DB 2825 PG 866
M AROLYN G. SPARKS
DB PG
ANITA HILTON MCGO
WAN
NO DEED LISTED
FAM ILY TRUST
THE TABOR
DB 2528 PG 77
DB 1851 PG 2236
STA 539+30 TO 541+80 -L- LT
BERM DITCH
STA 541+80 TO 544+55 -L- LT
BERM DITCH
STA 544+55 TO 546+00 -L- LT
BERM DITCH
W / ELBO W
24" CSP
W / ELBO W
15" CSP
W / ELBO W
30" CSP
SEE PRO FILE FO R G RADE
SPECIAL DITCH G RADE
SEE
PROFILE
FO R
GRADE
SPECIAL
DITCH
GRADE
SEE PRO FILE FO R G RADE
SPECIAL DITCH G RADE
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
9
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
9U-2579B
M
A
T
C
H
LI
N
E
-
L
-
S
T
A
.
5
3
7
+
0
0
S
H
E
E
T
8
PIs Sta 543+50.33
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
PI Sta 576+22.74
D
L = 5,826.87’
T = 3,192.41’
R = 5,740.00’
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
4
9
+
3
9
S
H
EET
10
SE = .04
-L-
FOR -L- PROFILE, SEE SHEET 34 - 35
NOTE:
PIs Sta 603+37.20
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
RO = SEE PLANS
SR 2575 W EST O N BRO O K TRA IL
PAVED SHOULDER
5
4
0 5
4
5
0
4
0
4
0
2
0
3
0
2
0
1
0
0
0
1
0
3
0
2
60’ INC
3
6
’
4
6
’
3
6
’
3
6
’
4
6
’
3
6
’
-L-
-L-
-
L
-
T
S
S
t
a
.
5
4
1+
9
0
.
3
3
-
L
-
S
C
S
t
a
.
5
4
4
+
3
0
.
3
3
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
30’25’20’
20’ R
2
0
’
R
10’ R
C
C
C
C
C
+90.33 -L-
+30.33 -L-
+30.33 -L-
+90.33 -L-
200.00’
200.00’
200.00’
200.00’
32
33
34
35
37
33
+96.00 -L-
+94.00 -L-
+57.58 -L-
200.00’
290.00’
329.66’
+50.00 -L-
+00.00 -L-
+15.00 -L-
+50.00 -L-
200.00’
200.00’
260.00’
235.00’
CHO RD
CHO RD
CHO RD
CHO RD
978
2G I
2G I
BDO
2G I
BDO
2GI
BDO
2GI
2GI-A
2G I-A
2GI-A
2GI-A
2G I-A
FS
FS
FS
FS
2G I
FS
FS
FS
FS
FS
FS2GI
FS
FS
2GI
98
99
102
101
100
103
104
106
105
107
108
109
110
111
112
113
24" RCP-III
15" RCP-III
3
0
"
R
C
P
-
I
I
I
1
8
"
R
C
P
-
I
I
I
30" RCP-III
2
4
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
36" RCP-III
1
5
"
R
C
P
-
I
I
I
3
6
"
R
C
P
-
I
I
I
36" RCP-III
15
"
RC
P
-
III
15
"
RC
P
-
III
42" RCP-III
15"
98B
S
1
S
F
D
S 10’ BST60" C
O
N
C
4
8
"
W
D
&
W
W
1S
F
D
3
S
B
W
2SFD
W
60" BK
48" W D RA IL & W W
POOL
CO NC
W D
12" RCP
D
K
W
D
SR
2552 WR
A
N
G
LE
R
D
R
18’ B
ST
1
2
’
B
S
T
8"
DI
-BL-27
-BL-28
-BL-29
-BL-30
-BY4-514
-BY5-516
CHARLES LEW IS, ET AL
CHARLES LEW IS, ET AL
20’ DRA INA GE/U TILITY EA SEM ENT PB 30 PG 179
20’ DRAINA GE/UTILITY EA SEM ENT PB 30 PG 179
10 0 .0 0 ’
110 .0 0 ’
185.77’
1377.72’
833.93’
565.50’
35.86’
212.92’
612.01’
EIP
EIP
506.05’
60.00’
EXISTING R/
W
EXISTING R/
W
EIP
5
0
1.
2
3
’
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
EI
P
EIP
DANNY T. CAUDILL
PB 30 PG 179
DB 1555 PG 1697
DB 1502 PG 599
PB 27 PG 144
DB 1367 PG 1669
T O W
N O F W
A LK E R T O W
N
F O R S Y T H C O U N T Y
257.95’+00.72
98.32’+92.46
414.08’
+
00.72
713.46’+94.56
ANITA HILTON M CGOW AN
J
A
M ES R
MATT
HE
WS (TR
USTEE)
P
B 27 P
G 144
D
B 2807 P
G 3194
GWEN M . FAGERBERG
DB 2933 PG 3337
L
A
U
R
A
E
L
A
I
N
E
C
O
X
J
O
N
A
T
H
A
N
H
O
W
A
R
D
C
O
X
&
NCDOT
PB 30 PG 179
DB 2742 PG 511
NO DEED LISTED
ANITA HILTON M CGOW AN
NO DEED LISTED
M AROLYN G. SPARKS
DB PG
REM O VE
CO NN ECTO RS
AN D RO D AN D LUG
18" CSP W / 2 ELBO W S
2@ 10’x6’ RCBC
REM O VE
RIP RAP
CLASS ’I’
2 ELBO W S
15" CSP W /
AT BEG IN BRIDG E
END SHO ULDER BERM G UTTER
RIP RAP
CLASS ’I’
SEE DETAIL#10
SPECIAL LATERAL 2’ BASE DITCH
SEE PRO FILE FO R G RADE
SPECIAL DITCH G RADE
EST. DDE 4CY
SEE DETAIL#9
TAIL DITCH
SEE PRO FILE FO R GRADE
SPECIAL DITCH G RADE
EST. DDE +/- 54 CY
SEE DETAIL#17
TAIL DITCH
SILL
EST 75 SY FF
EST 40 TO NS
SEE DETAIL 32
(BANKS O NLY)
CLASS I RIP RAP
STA 554+22.53 -L- RT
BEGIN SHO ULDER BERM G UTTER
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
0
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
10U-2579B
PI Sta 576+22.74
D
L = 5,826.87’
T = 3,192.41’
R = 5,740.00’
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
4
9
+
3
9
S
H
E
E
T
9
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
6
1+
6
1
S
H
EET
11
SE = .04
-L-
FOR -L- PROFILE, SEE SHEET 35
NOTE:
PIs Sta 543+50.33
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
PIs Sta 603+37.20
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
W ESTON BROOKE TRAIL
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
5
5
0
5
6
0
0
4
0
4
3
6
’
3
6
’
3
6
’
4
6
’
3
6
’
4
6
’
-L--L-
MI
L
L
C
R
E
E
K
M
A
R
TI
N
C
R
E
E
K
MI
L
L
M
A
R
TI
N
12’P.S.
12’P.S.
12’P.S.
END BRIDGE
END APPROACH SLAB
12’P.S.
12’P.S.
3
6
’
3
6
’
6
0
’
6
0
’
4
6
’
0
4
0
4
R = 4 2 ’
12’P.S.
12’P.S.
12’P.S.
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
GRADE TO DRAIN
OBLITERATE AND
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
12’
12’
12’
12’
-L- POC STA. 555+73.00
BEGIN BRIDGE
-L- POC STA. 555+49.00
BEGIN APPROACH SLAB
-L- POC STA. 557+98.01
-L- POC STA. 558+22.01
30’
25’
20’
R 20’
R
2
0
’5
5
5
-NWL1-
BEG. NOISE WALL
BARRIER FACE
PAVE TO
F
F
F
C
C
F
F
F
F
C
C
F
+00.00 -L-
+00.00 -L-
+60.00 -L-
+25.00 -L-
200.00’
225.00’
225.00’
278.07’
+70.00 -L-
238.30’
38
40
42
34
43
44
45
46
213
235.23’
280’
280’
+00
260’
+65
218.18’
260’
37
272.00’
554+54.00 -L-
554+72.35 -L-
242.40’
554+01.50 -L-
200.00’
555+12.00 -L-
308.00’
280.12’
555+28.76
+05.00 -L-
+40.00 -L-
+38.31 -L-
240.76’
+28.80 -L-
297.93’
+75.00 -L-
+75.00 -L-
+90.00 -L-
200.00’
235.00’
200.00’
920
988
CH O RD
CHO RD
CHO RD
CHO RD
224
223
225
46
+70.00 -L-
+10.00 -L-
+50.00 -L-
218.19’
240.00’
240.00’
225.04’
978
2GI
2G I
2G I
2GI
2G I-A
FS
FS
FS
FS
FS
2G I-A
2G IFS
FS
G RATE
2G I W / FLAT GRATE
2G I W / FLAT
G RATE
2G I W / FLAT
M CF
116
115
114
117
118
119
120
121
122
Natural
Ground 2:
1 D
B
( Not to Scale)
Flatter4:1 or
Slope
Fill
SPECIAL LATERAL BASE DITCH
DETAIL #10
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA 552+50 TO 553+40 -L- LT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
M in. D= 2 Ft.
FRO M STA. 560+70 TO 560+97 -L- RT DETAIL 32
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
M ax. d= 2.0Ft.
M in. D= 2.0Ft.
TAIL DITCH
Natural
GroundNatural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
M ax. d= 2.0 Ft.
M in. D= 2.0 Ft.
FRO M STA. TO STA.
117A
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
42" RCP-III
42" RCP-III
1
5
"
R
C
P
-
I
I
I
42"
CSP
15
"
RC
P
-
IV
15
"
RC
P
-
IV
15" RCP-IV
15" RCP-IV
EST. FF +/- 89 SY
EST. DDE +/- 102 CY
EST. CLASS I RIPRAP +/- 88 TO NS
W / O UTLET CHANN EL
ENERG Y DISSIPATO R BASIN
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
EN ERGY DISSIPATO R BASIN
60" RCP-III
-NWL1-
60" RCP
60" RCP
IN
V=846.43
IN
V=846.58
IN
V=846.92
IN
V=846.92
CONC HW
CONC HW
12" RCP
COLUM NSBK
COLUM NSBK
10’ BST
36" W D RA IL & W W
POOL
7
2"
W
D
CO NC2SBKD
W
15" CM P
W
8’
C
O
N
C
60" CONC
2SBKD
S
15" RCP
10’ CONC
W
4
8
" C
O
N
C
2
S
F
D
C
ONC
72" W D
W
C
O
N
C
2-60" RCP
POND
W E 850.2
3 6
"
W
W
3
6
"
W
W
36" W W
SR 2575 W ESTON BROOKE TRAIL 21’ BST
3
6"
W
D
&
W
W
R
AI
L
P
OOL
GRAU-350
CAT-1
B-77
B-77
B-77
B-77
B-77
B-77
B-77
T
E
S
T
E
S
ELEV. = 866.68
E = 1665137
N = 870288
N 79 20’37" E 145’
-BY5- STA 5+00.00 TO BM #5
BM #5
-BL-31
-BL-32
-BL-33
-BL-34
-BY5-515
DANNY CAUDILL
DANNY CAUDILL
M ARGARET LUCINDA ROBBINS LINVILLE
20’ DRAINAGE/UTILITY EASEM ENT PB 30 PG 179
20’ DRAINAGE/UTILITY EASEM ENT PB 30 PG 179
3
0
’
D
R
AI
N
A
G
E/
U
T
I
LI
T
Y
E
A
S
E
M
E
N
T
P
B
3
0
P
G
1
7
9
20’ DRAINAGE/UTILITY EASEMENT PB 30 PG 179
DANNY T. CAUDILL
494.88’
EIP
T
O
C
O
R
495.17’
R/
W
T
O
C
O
R
101.12’
CHARLENE L. CAUDILL
DANNY CAUDILL
481.71’
461.94’
442.16’
3
8
8.5
7’
78.70’
134.99’
134.99’
95.09’
71.01’
DANNY CAUDILL
M ELISSA W HITE
DAVID W HITE
317.00’ EIP TO COR
317.50’ R/
W TO COR
3
8
1.
9
9
’
E
I
P
T
O
C
O
R
3
7
3.
4
6
’
R/
W
T
O
C
O
R
419.0
1’
EIP
T
O
C
O
R
418.70’
R/
W
T
O
C
O
R
60.0
0’
EXISTING R/W
677.74’
EIP
EIP
EIP
EIP
EIP
CHARLES LEWIS, ET AL
DB 1473 PG 1110
DB 1367 PG 1669
DB 1367 PG 1669
PB 30 PG 179
DB 1681 PG 4068
DB 1367 PG 1669
DB 1367 PG 1669
DB 1147 PG 612
PB 30 PG 179
DB 1555 PG 1697
(PB 30 PG 179)(DB 1542 PG 1089)
2
0
’ S
A
N
IT
A
R
Y
S
E
WE
R
E
A
S
E
M
E
N
T
2
0
’ S
A
N
IT
A
R
Y
S
E
WE
R
E
A
S
E
M
E
N
T
423.29’
+
81.0
4
2
3
2.7
5’
+
8
4.0
8 221.69’+91.41147.59’+16.01
NCDO T
PB 30 PG 179DB 2742 PG 511 SUSAN W ILSON)CHRISTOPHER W ILSON
(FORM ERLY -
DB 2636 PG 3047
NC D.O.T.
DB 2820 PG 3666
NCDOT
KATHY SM ITH)
CRAIG SM ITH
(FORM ERLY-
(PB 30 PG 179)
(DB 1710 PG 928)
RANDI MARIE CARRIER
FRITZ BRADLEY CARRIER and wifeDB 2609 PG 3646PB 45 PG 126
PB 45 PG 126
DB 2619 PG 1332PB 45 PG 126
THERESA PATRICK
REGAN S. PATRICK and wifeDB 2810 PG 633
MARY C. MURPHY
BRENDA L. CHESMAR and
N 8820’21" W
63.47’
N 8820’30" W
41.77’
N 8819’20" W
134.99’N 0119’33" W670.85’N 8820’03" W
445.04’
100.14’
100.18’
63.44’
N 8820’03" W
181.29’
N 8820’03" W
218.44’
S 0119’33" E665.99’Q3 INVESTM ENTS, LLC
DB 2747 PG 2741
ENTERPR
ISES
LLC
SHUGART
DB
2324
PG
4251
ENTERPRISES LLC
SHUGART
DB 2324 PG 4251
ENTERPRISES LLC
SHUGART
DB 2324 PG 4251
REM O VE
REM O VE
REM O VE
REM O VE
CO N NECTO RS
AN D RO D AND LUG
24" CSP W / 2 ELBO W S
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
EST 14 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#13
W / 600 SY FF
EST. 231 TO N S
LATERAL 3’ BASE DITCH W / CLASS ’B’ RIP RAP
SEE DETAIL#11
LATERAL 3’ BASE DITCH
EST. 258 SY FABRIC
EST. 106 TO N S
SEE DETAIL#24
LATERAL 3’ BASE DITCH W / CLASS "B" RIPRAP
SEE DETAIL#6
EST 625 SY FF
EST 232 TO N S
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
EST 75 SY FFEST 40 TO N SSEE D ETAIL 32(BAN KS O N LY)CLASS I RIP RAP
60" RCP-III
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
1
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
11U-2579B
L = 5,826.87’
PI Sta 576+22.74
D
T = 3,192.41’
R = 5,740.00’
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
6
1
+
6
1
S
H
E
E
T
1
0
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
7
4
+
3
6
S
H
EET
12
-L-
SE = .04
PIs Sta 543+50.33
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
PIs Sta 603+37.20
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
NOTE:
FOR -L- PROFILE SEE SHEET 35 - 36RO
BBIN
S PERCH
WEST CT
A
F
T
O
N
P
A
R
K
D
R
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
0
4
0
4
3
6
’
4
6
’
3
6
’
3
6
’
-L-
4
8
’
3
6
’
300’ TAPER
4
6
’
-L-
12’P.S.
12’P.S.
12’P.S.
12’P.S.
GRADE TO DRAIN
OBLITERATE AND
12’P.S.
12’ P.S.
R
2
0’25’
R 20’
20’
41’
3
0’
GRADE TO DRAIN
OBLITERATE AND
5
7
0
5
6
5
BARRIER FACEPAVE TO -NWL1-
PROP. NOISE WALL
-NWL1-
PROP. NOISE WALL
BARRIER FACE
PAVE TO
C
C
C
F
FF
F
F
F
+25.00 -L-
+25.00 -L-+55.85 -L-
+50.00 -L-
+50.00 -L-
+00.00 -L-
+00.00 -L-
240.00’
331.67’
245.00’
255.00’
235.00’
200.00’
200.00’
47
48
49
50
51
52
55
53
54 58
57
56
214
+74.67 -L-
245.45’
+67.61 -L-
387.11’
46
46
46
CHO RD
CHO RD
CHO RD
CHO RD
CHO RD
CHO RD
225
59
2GI
2G I
2G I
2GI
FSFS
FS
FS
HW
4O TCB
HW
JB w/M H
4O TCB
JB w/M H
1
8
"
C
S
P
FS
GRATE
2G I W / FLAT
GRATE
2GI W / FLAT
GRATE
2G I W / FLAT
GRATE
2G I W / FLAT
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #24
d
d= 5 Ft.
b= 10 Ft.
B= 3 Ft.
M in. D= 2 Ft.
Fabric
Filter
123
124
125
126
127
131
128 129
132
133
130
134
135
136
137
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FRO M STA 566+75 TO 569+25 -L- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 561+45 TO 565+50 -L- RT
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #11
b= 5 Ft.
B= 3 Ft.
M in. D= 2 Ft.
FRO M STA 572+50 TO 576+60 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #13
*W hen B is < 6.0’b= 5 Ft.
B= 3 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 569+30 TO 572+50 -L- LT
FRO M STA 567+00 TO 568+70 -L- RT
Type of Liner= Class ’B’ Rip-Rap
60" RCP-IV
15" RCP-IV
1
5
"
R
C
P
-
I
V
60" RCP-IV
60" RCP-IV
2
4
"
R
C
P
-
I
V
42" RC
P-C
D
42" RC
P-C
D
18" RCP-IV
15
"
R
C
P
-
IV
15
"
RC
P
-
IV
15" RCP-IV
-NWL1-
8" VC
IN
V
=847.01’
TO
P=854.31’
6
0
"
RCP
FES
1
8"
R
CP
42" RCP
C
O
N
C
H
W
RO
BBIN
S PERCH
WEST CT 18’ BST
4
8"
C
O
N
C
18 " RC P
18" RCP
48
"
CONC
W
D
D
K
1
8"
R
CP
48"
C
O
N
C
12’ B
ST
1
8"
R
C
P
10 ’ B S T
4
8
"
C
O
N
C
18"
R
C
P
12’ B
ST
4
8"
C
O
N
C
4
8
"
CONC
BST
A
F
T
O
N
P
A
R
K
1
8’
B
S
T
2SFD
2SFD
2SFD
1SFD
1S F D
1SFD
S
12’
B
S
T
2
S
F
D
10’ CON C
15" HD
PEROBBINS PERCH
CT 20’ BST
C
O
N
C
4
8"
48" CONC
W
D
2
S
F
D
2
5’
CO
N
C
1
S
F
D
12’ CO
N
C
1
5"
R
C
P
C
O
N
C
R
O
B
BI
N
S
P
E
R
CH
T
R
AI
L
2
0’
B
S
T
2 0’ B ST
W
D
D
K
W
D
D
K
W
D
D
K
W
D
D
K
C
O
N
C
C O
N
C
B
S
T
B
S
T
AREA U/C
69
CAT-1 GRAU-350
T
E
S
T
E
S
ELEV. = 900.49
E = 1665048
N = 869271
N 66 59’34" E 56’
-BY8- STA 20+78.55 TO BM #6
BM #6
-BL-35
-BL-36
-BL-37
-BY8-521
-BY6-517
C
O
N
C
H
W
6
0
"
RCP
FES
18 " RC P
42" RCP
INV=887.07
INV =892.75
BOARD OF EDUCATION
W INSTON-SALEM/FORSYTH COUNTY
M ELODY R. ANDERSON
CECIL K. ANDERSON &
STANLEY STIGALL
TAM M Y THOM AS
DAVID SCOTT THOM AS &
CHARLIE M ARTIN
17 6.0 5 ’
3 3.5 9 ’
2
2
1.
0
4’
2
2
9.
9
6’
419.42’
419.91’
420.40’
420.59’2 9 2 .1 9 ’
1
0
0.
0
0’
1
0
0.
0
0’
1
0
0.
0
0’
1
0
0.
0
0’
1
0
0.
0
0’
1
0
0.
0
0’
3
3
2.
6
5’
2
5
5.
0
1’
2
3
0.
0
0’
4
6
3.
1
7’
177.48’
173.99’
139.99’14
2.
0
7
’
5
0.
0
0’
EX
ISTIN
G
R/W
EX
ISTIN
G
R/W
50.00’
E
XI
S
TI
N
G
R/
W
E
XI
S
TI
N
G
R/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
144.03’
ELLEN COLETTE MATHIS
CHARLES AARON M ATHIS, JR.
M ELINDA ANDERSON W OOD
RICHARD KEVIN W OOD
LISA HOLLOW AY
BOBBY D. HOLLOW AY
NICOLE A. HOW ARD
CLAY M . HOW ARD
KIM BERLY D. SCOTT
RONALD L. SCOTT, JR.
5
0.
0
0’
EX
ISTIN
G
R/W
EX
ISTIN
G
R/W
50.00’
E
XI
S
TI
N
G
R/
W
E
XI
S
TI
N
G
R/
W
5
0.
0
0’
EX
ISTIN
G
R/W
EX
ISTIN
G
R/W
L=21.02’
R=25.00’
L=21.02’
R=25.00’L=86.72’R=50.00’
L
=54.52’
R
=50.00’
L
=
9
9.
9
7
’
R
=
5
0.
0
0
’
M ELODY ROBBINS ANDERSON
KAYE ROBBINS FULP
M ABEL S. ROBBINS
R.R. ROBBINS
BONNIE M . ROBBINS
RICHARD R. ROBBINS
119.97’
KEYA LEAK
W ILLIE LEAK
EI
P
BONNIE
M
.
ROBBINS
RICHARD
R
.
ROBBINS
ED
WA
R
D
R
IC
H
A
R
D
SO
N
DB 2276 PG 1196
DB 1676 PG 2743
PB 42 PG 178
DB 2079 PG 1083
DB 2287 PG 2658
PB 42 PG 178
DB 2342 PG 4869
PB 42 PG 179
DB 2130 PG 1622
DB 847 PG 177
PB 42 PG 178
DB 2451 PG 2357
PB 42 PG 179
DB 2311 PG 188
DB 2189 PG 691
PB
42 PG
178
D
B
2349 PG
1982
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FO R SY TH COUN T Y
T
O
W
N
O
F
K
E
R
N
E
R
S
VI
L
L
E
T O W
N O F K E RN E R SV IL L E
20’ SANITARY SEWER EASEMENT
105.97’
+45.91
6.03’
+45.15
225.76’
+79.56
2 6 8.9 9 ’
+12.0 9
334.83’
+07.85
247.37’
+63.95
4 7 5 .5 1 ’
+2 7 .8 5
R
A
N
DI
M
A
RI
E
C
A
R
RI
ER
F
RI
T
Z
B
R
A
D
L
EY
C
A
R
RI
ER
a
n
d
w if
e
T
H
ER
ES
A
P
A
T
RI
C
K
R
EG
A
N
S.
P
A
T
RI
C
K
a
n
d
wif
e
S
0
1
1
9’
3
3"
E
N
0
1
1
9’
3
3"
W
6
6
1.
1
3’
S
0
1
2
3’
4
1"
E
6
4
1.
7
5’
10.0’ U
TILITY
EA
SEM
EN
T
10.0’ U
TILITY
EA
SEM
EN
T
TINA M . W HITE
RICHARD L. W HITE, JR. and w ife
PB 42 PG 179
DB 2932 PG 473
DANNY RAY BAYS
EM ILY EBERT M CDUFFIE)DAVID KEITH M CDUFFIE(FORM ERLY-DB 3019 PG 4312NCDOT
)(PB 42 PG 179
(DB 2341 PG 3436)
)(PB 42 PG 179
(DB 2341 PG 3436)
EM ILY EBERT M CDUFFIE)
DAVID KEITH M CDUFFIE
(FORM ERLY-
DB 3019 PG 4312
NCDOT
PB 42 PG 179
PB 42 PG 178
DB 2882 PG 3445
PB 45 PG 125-126
DB 2998 PG 1756
APRIL LEIGH CRAFFORD
JONATHAN CARL BRITT and
PB 45 PG 125-126
DB 2553 PG 1661
PB 45 PG 112-113
PB 45 PG 125-126
DB 2507 PG 773
PB 45 PG 112-113
PB 45 PG 125-126
DB 2523 PG 3688
M ICHELLE OELKER
KEITH OELKER and w ife
PB 45 PG 112-113
PB 45 PG 125-126
DB 2626 PG 3505
PB 45 PG 112-113
PB 45 PG 125-126
DB 2423 PG 1874 PB 45 PG 112-113
PB 45 PG 125-126
DB 2458 PG 2882
S
0
1
2
3’
4
1"
E
1
0
2.
0
5’
S
0
1
2
3’
4
1"
E
5
1.
1
0’
D
EA
N
N
A
P. LA
W
SO
N
A
N
TH
O
N
Y
D
EREK
LA
W
SO
N
and w
ife
PB 45 PG
112-113
PB 45 PG
125-126
D
B 2617 PG
2486
EIP
EIP
6
5
3.
8
9’
6
4
6.
6
0’
ENTERPRISES LLC
SHUGART
DB 2324 PG 4251
ENTERPRISES LLC
SHUGART
DB 2324 PG 4251
ENTERPRISES LLC
SHUGART
DB 2324 PG 4251
ENTERPRISES LLCSHUGART
M
A
R
Y
C.
M
U
R
P
H
Y
B
R
EN
D
A
L.
C
H
ES
M
A
R
a
n
d
D
B
2
6
1
9
P
G
1
3
3
2
P
B
4
5
P
G
1
2
6
AM Y L. W ILLIAM S
and w ife
LARRY W . W ILLIAM S
REM O VE
REM O VE
REM O VE
DITCH
TIE TO EXIST
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
CO N N ECTO RS
AN D RO D AN D LUG
18" CSP W / 2 ELBO W S
CO N N ECTO RS
AN D RO D AN D LUG
15" CSP W / 2 ELBO W S
EST 5 SY FF
EST 1 TO N S
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TO N S
RIP RAP
CLASS ’B’
SEE DETAIL#11
LATERAL 3’ BASE DITCH
SEE PRO FILE FO R G RADE
SPECIAL DITCH G RADE
EXIST. 18" RCP
REM O VE 6FT
EXTEND
CO LLAR AN D
REM O VE
18" RCP-III
REM O VE
EST 10 SY FF
EST 3 TO NS
CLASS ’B’ RIP RAP
REM O VE
FLAT G RATE
2GI W / NARRO W SLO T
SEE PRO FILE FO R G RADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
CLASS ’B’ RIP RAP
EST +/-1 TO N
CLASS ’B’ RIP RAP
EST. DDE 9CY
SEE DETAIL#7
TAIL DITCH
SEE DETAIL#3
LATERAL 2’ BASE DITCH
NARRO W SLO TS
2G I W /
24" RCP-III
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
2
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
12U-2579B
PI Sta 576+22.74
D
L = 5,826.87’
T = 3,192.41’
R = 5,740.00’
-L-
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
7
4
+
3
6
S
H
E
E
T
1
1
M
A
TC
H
LIN
E
-
L
-
S
TA
.5
8
7
+
5
0
S
H
EET
13
SE = .04
NOTE :
LT = 160.00’
PIs Sta 543+50.33
F
Ls = 240.00’
ST = 80.00’
PIs Sta 603+37.20
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
FOR -Y2A- PROFILE, SEE SHEET 49A
PI Sta 13+90.67
D
L = 258.49’
T = 130.67’
R = 716.00’
PI Sta 22+28.91
L = 312.90’
T = 158.99’
R = 716.00’
D
-Y2A-
FOR -DR5- PROFILE, SEE SHEET 97
FOR -L- PROFILE, SEE SHEET 37
FOR -Y3- PROFILE, SEE SHEET 49B-49C
PAVED SHOULDER
M
A
TC
H
LIN
E -
D
R5
-
S
TA
.13
+
4
6
S
H
EET 13
PI Sta 11+77.33
D
L = 77.39’
T = 40.75’
R = 100.00’R = 100.00’
PI Sta 13+38.58
D
L = 56.40’
T = 28.97’
-DR5-
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
E
R
M
A
N
E
N
T
A
C
C
E
S
S
E
A
S
E
M
E
N
T
A
D
D
E
D
A
R
O
U
N
D
-
D
R
5
-
5
7
5 5
8
5
0
4
0
4
15
20
20
25
35
40
1300’ FULL LANE
4
8
’
3
6
’
300’ TAPER
4
8
’
4
8
’
4
6
’
4
6
’
4
8
’
3
6
’
-L-
-L-
2800’ FULL LANE
S
R
2
4
10
P
IS
GAH
C
H
U
R
C
H
R
D
2
0
’ B
S
T
S
R
2
3
7
7
W
E
S
T
M
O
U
N
T
A
I
N
R
D
2
4
’
B
S
T
N
O
R
F
O
R
K
S
O
U
T
H
E
R
N
R
A
I
L
R
O
A
D
N
O
R
F
O
R
K
S
O
U
T
H
E
R
N
R
A
I
L
R
O
A
D
12’P.S.
-Y2A- PT Sta. 15+18.49
-Y2A- PC Sta. 20+69.92
-
Y
2
A
-
P
T
St
a.
2
3
+
8
2.
8
2
-
S
R
R
-
-
Y
3
-
-
Y
2
A
-
-
Y2
A
-
12’P.S.12’P.S.
12’P.S.
12’ P.S.
7
2
’
7
2
’
12
’
4
8
’
12
’
4
8
’
-L- POC Sta. 584+36.24
-SRR- POT Sta. 35+12.32
-Y2A- POT Sta. 18+29.06
-L- POC Sta. 583+49.61
-
Y
3
-
P
O
T
S
t
a
.
2
2
+
7
4
.
0
8
-
L
-
P
O
C
S
t
a
.
5
8
5
+
0
6
.
9
9
12
’
12
’
& SINGLE FACE BARRIER
BEGIN ABUTMENT WALL
E
N
D
A
B
U
T
M
E
N
T
W
A
L
L
&
S
I
N
G
L
E
F
A
C
E
B
A
R
R
I
E
R
8
:
1
T
A
P
E
R
-Y3- STA. 18+25.00
8
:
1
T
A
P
E
R
-Y3- STA. 26+25.00
BEGIN CONSTRUCTION
END CONSTRUCTION
END CONSTRUCTION
-Y2A- STA. 22+00.00
8
:1 T
A
P
E
R
8:1TAPER
BEGIN CONSTRUCTION
-Y2A- STA. 16+00.00
BEGIN 3" RESURFACING
BEGIN 3" RESURFACING
END 3" RESURFACING
END 3" RESURFACING
TO EXIST.
TAPER
TO EXIST.
TAPER
EXIST.
EXIST.
24’
24’
24’
24’
10
0
’ T
R
A
N
S
IT
IO
N
R
T
&
LT
S
ID
E
10
0
’
T
R
A
N
S
I
T
I
O
N
R
T
&
L
T
S
I
D
E
24’
4
’
P
.
S
.
4
’
P
.
S
.
5
0
’
T
A
P
E
R
T
O
E
X
I
S
T
.
R
T
.
A
N
D
L
T
.
S
I
D
E
24’
4
’
P
.
S
.
5
0
’
T
A
P
E
R
T
O
E
X
I
S
T
.
0
4
0
4
BEGIN APPROACH SLAB LT.
BEGIN APPROACH SLAB RT.
BEGIN BRIDGE RT. & LT.
END APPROACH SLAB RT.
END APPROACH SLAB LT.
END BRIDGE RT. & LT.
B
E
G
I
N
W.
W.
F
E
N
C
E
BEGIN W.W. FENCE
P
O
T
S
ta. 10+00.00
-DR5- PC Sta. 11+36.59
-DR5- PT Sta. 12+13.97
N
C
30.5’
T
A
P
E
R
24’33.5’
WALL
PROPOSED
17.5’
-DR5- PC Sta. 13+09.61
5
8
0
-L- POC STA. 585+60.73
-L- POC STA. 585+82.32
-L- POC STA. 586+03.26
-Y3- STA. 21+03.39
(45.5’ LT.)
-
Y
3
-
S
T
A.
2
4
+
3
2
.
1
1
(
4
5
.
5
’
L
T
.
)
T
A
PE
R
-L- POC STA. 582+56.85
-L- POC STA. 582+62.32
-L- POC STA. 582+85.67
END W.W. FENCE
581+75.00 -L-
200’
BARRIER FACEPAVE TO
END W.W. FENCE
BEG NOISE WALL -NWL2-
END NOISE WALL ON BRIDGE
BARRIER FACE
PAVE TO
F
F
C C
F
C C
C
C
C
C
C
F
C
F
F
F
F
C
C
C
C
F
F
F
C
F
C
F F
F
+56.00 -L-
200.00’+24.00 -L-
+50.00 -L
34.44’
+50.00 -Y2A-
32.29’
+50.00 -Y3-
71.00’
30.00’
+00.00 -Y3-
30.14
+69.28 -L-
200.00’
+00.00 -L-
+30.00 -L-
200.00’
200.00’
+94.73 -Y2A-
200.00’
260.00’
71.00’
59
56
60
61
60
63
64
62
65
66
67
68
70
64
67
EN D C/A
EN D C/A
+36.00 -Y3-
90.00’
71.00’
+98.00 -Y3-
END C/A
+87.77 -L-
292.01’
+35.00 -L-
200.00’
+25.00 -Y3-200.00’
60.00 -L-
300.00’
945
CHO RD CHORD
CHO RD
CHO RD
27.77
18.00
14.6
3
22.85
+74.62 -DR5-
+13.97 -DR5-
+
3
7.8
1 -
D
R5-
+
37.81 -
D
R5-
57
59
907
PE
P
E
P
E
P
E
PE
P
E
for Access
Perm anent Easem ent
2GI
2G I
2GI
2G
I
FS2GI
FS
FS
FS
G RATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2G I W / FLAT
M CF M CF
138
139
141
140
142
143
144
145
146
147
150
149
152
151
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #11
b= 5 Ft.
B= 3 Ft.
M in. D= 2 Ft.
FRO M STA 572+50 TO 576+60 -L- LT
Natural Natural
Ground Ground
2:
1
2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
M in. D= 2 Ft.
FRO M STA. 584+81 TO 585+13 -L- LT
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
15" RCP-IV
1
5
"
R
C
P
-
I
V
2
4
"
R
C
P
-
I
V
1
8
"
R
C
P
-
I
V
1
8
"
R
C
P
-
I
V
1
8
"
R
C
P
-
I
V
18
"
RC
P
-
IV
18" RCP-IV
15
"
RC
P
-
IV
FS
1
5
"
R
C
P
-
I
V
18" RCP-IV 18" RCP-IV
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA 581+70 TO 583+20 -L- RT
148
148B
148A
GRATE
2GI W / FLAT
1
8
"
R
C
P
-
I
V
JB w/M H
JB w/M H
-NW L1-
NOISE WALL ON BRIDGE-NWL1-
-NWL2-
1S
F
D
12
" R
C
P
15
" R
C
P
12
" R
C
P
15
"
R
C
P
2
S
F
D
1
S
B
K
D
C
A
N
O
P
Y
M
T
L
C
A
N
O
P
Y
M
T
L G
1S
F
D
1
S
F
D
1
S
B
K
D
2
S
F
D
C
H
U
R
C
H
B
K
C
E
M
E
T
A
R
Y
S
S
G
1
S
F
D
1S
F
D
1S
F
D
1S
F
D
1
S
F
D
2
S
B
K
D
2
0
’ C
O
N
C
15’ PLA
STIC4
8
" C
O
N
C
4
8
" C
O
N
C
2
4
"
C
O
N
C
GR
ROBBINS PERCH TR 20’ BST
G
R
7
2
"
C
O
N
C
C
O
N
C
G
R
G
R
B
S
T
12" RCP
15" RCP
12
’ C
O
N
C
48" CONC
SB
K
8’ BST
20’ BST
9’ BST
1
2
’
B
S
T
BST
GR
GR
GR
GR
GR
GR
20’ BST
4
8
"
C
O
N
C
7
2
"
W
D
S
15
"
R
C
P
15
"
R
C
P
12
"
R
C
P
W
W
/
L
T
W
/
L
T
W
/
L
T
W/
L
T
18
"
R
C
P
18
" R
C
P
1
5
"
R
C
P
C
B
C
B
18
"
C
M
P
R
O
C
K
H
W
D
I
18
" R
C
P
18
" R
C
P
15
" H
D
P
E
12" HDPE12
" R
C
P
12
"
H
D
P
E
W/L
T
W/L
T
W
/
L
T
P
L
A
Y
G
R
O
U
N
D
C
E
M
E
T
A
R
Y
B
S
T
60" CONC
72" CONC
60" CONC
W
/
L
T
1
2
"
R
C
P
D
K
W
D
WD
D
K
WD
D
K
CONC
W
/
L
T
48" CONC
2SFD
12
’ C
ON
C
S
15" HDPE
1SFD
WD DK
48" CONC
1
2
’
C
O
N
C
15" HDPE
WD DK
T
T
T
TE
O
I
W
T
T
T
T
2
4
"
D
I
8
"
D
I
8
"
D
I
8
"
D
I
6" DI
6
"
S
T
4
" P
L
4
"
P
L
4" PL
BEG NOISE WALL ON BRIDGEEND NOISE WALL -NWL1-
B-77
B-77
B-77
B-77
B-77
B-77
B-77
G
R
A
U
3
5
0
G
R
A
U
3
5
0
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
G
R
A
U
3
5
0
T
Y
P
E
B
-
7
7
T
YP
E
B
-
7
7
T
Y
P
E
B
-
7
7
2
0
0
16
2
0
0
17
U
2
5
7
9
B
-
4
-BL-38
-BL-39
C
B
C
B
R
O
C
K
H
W
D
I
18
"
RC
P
15
" P
L
A
S
T
IC
18
" R
C
P
18" RCP
18
" R
C
P
PLASTIC
12"
TYPE/SIZE UNKNOW N
1
5
"
R
C
P
T
Y
P
E/
S
I
Z
E
U
N
K
N
O
W
N
PLASTIC
12"
18" CM P
M ELO D Y R. A NDERSO N
CECIL K. A NDERSO N &
STANLEY STIGALL
PISGAH M ETHODIST CHURCH
30’ ACCESS
EASEMENT
DB
1660
PG
2202
30’ ACCESS EASEM ENT DB 1956 PG 1045
7
5
8
.4
4
’
4
0
9
.
0
0
’
1
3
0
.
7
5
’
1
7
4
.
6
6
’
3
2
7
.
2
6
’
2
4
2
.2
7
’
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
3
6
8
.
0
7
’
1
9
0
.
3
3
’
10
0
.19
’
7
8
.
6
5
’
13
2
.
8
7
’
334.26’
22.67’
115
.6
0
’
2
5
9
.5
4
’
238.70’
165.42’
2
5
7
.6
0
’
13
2
.3
0
’
5
3
7
.8
9
’
211.84’
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
LOLITA M ONTES INGLE
RONNIE DEAN INGLE, JR.
131.
0
7’
156.63’ EIP TO COR
154.44’ R/W TO COR
374.55’ EIP TO CO R
375.43’ R/W TO COR
194.91’ EIP TO COR
195.81’ R/W TO COR
237.03 EIP TO COR236.82’ R/W TO COR
E
X
I
S
T
I
N
G
R
A
I
L
R
O
A
D
R
/
W
PISGAH M ETHODIST CHURCH
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
A
I
L
R
O
A
D
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EIP
EIP
M ABEL S. ROBBINS
R.R. ROBBINS
BONNIE M . ROBBINS
RICHARD R. ROBBINS
GLENDA BROADNAX
W ENDELL BROADNAX
DB 1459 PG 173
DB 1646 PG 3206
DB 2020 PG 1675
DB 516 PG 79
DB 741 PG 202
DB 741 PG 201
DB 927 PG 347
DB 1834 PG 4293
DB 2015 PG 3092
PB 42 PG 178
DB 2349 PG 1982
EDW ARD RICHARDSON
STANLEY RUSSELL STIGALL
PB 42 PG 178
DB 1895 PG 1095
DB 1929 PG 2499
DB 2079 PG 1083
DB 516 PG 79
DB 741 PG 202
DB 741 PG 201
DB 927 PG 347
DB 1834 PG 4293
PB 42 PG 178
DB 2301 PG 838
PB 42 PG 178
DB 2079 PG 1083
DB 1929 PG 2499
DB 1895 PG 1095
STIGALL
STANLEY RUSSELL
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
100.00’
3
7
.
11’
90.00’
90.00’
200.00’
2
3
2
.5
6
’
+
9
9
.0
6
10
8
.0
2
’
+
0
2
.4
5
3
9
8
.
17
’
+
3
0
.
8
5
3
1.
9
8
’
+
18
.
2
1
34.31’
+51.09
30.92’
+70.11
30.07’+42.31
DB 2687 PG 4097
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
DB 3030 PG 0480
SONYA G. M ABE
PB 42 PG 179
PB 42 PG 178
DB 2882 PG 3445
DANNY RAY BAYS
SOUTH POINT, INC.
PB 42 PG 178
DB 2584 PG 3896
RICHARD HERRICK
DB 2776 PG 2948
M ARY M . W ILSON
GARY V. W ILSON and w ife
ROBIN W. JONES
LARRY EDWARD JONES and w ife
M ONETTE SHIPLEY
ROBERT SHIPLEY and w ife
MONETTE
SH
IPLEY
ROBERT
SH
IPLEY
and
w
ife
DB 3023 PG 0254
TRANSPORTATION
DEPARTM ENT OF
NORTH CAROLINA
REM O VE
CO N NECTO RS
AN D RO D AND LUG
18" CSP W / 2 ELBO W S
CO NN ECTO RS
AND RO D AND LUG
" CSP W / 2 ELBO W S15
CO N NECTO RS
AN D RO D AND LUG
15" CSP W / 2 ELBO W S
EST. 30 SY
EST. 15 TO N S
RIP RAP W / FILTER FABRIC
CLASS ’I’
EST. 30 SY
EST. 15 TO NS
RIP RAP W / FILTER FABRIC
CLASS ’I’
EST +/-1 TO N
CLASS ’B’ RIP RAP
EST +/-1 TO NCLASS ’B’ RIP RAP
EST +/-1 TO N
CLASS ’B’ RIP RAP
EST +/-1 TO N
CLASS ’B’ RIP RAP
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#12
W / 724 SY FF
EST.276 TO N S
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#14
W / 285 SY FF
EST. 115 TO NS
LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
3
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
13U-2579B
M
A
TC
H
LIN
E
-
L
-
S
TA
. 5
9
9
+
0
0
S
H
EET
14
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
8
7
+
5
0
S
H
E
E
T
1
2
D
PI Sta 576+22.74
T = 3,192.41’
L = 5,826.87’
R = 5,740.00’
-L-
SE = .04
FOR -L- PROFILE, SEE SHEET 37
PIs Sta 543+50.33
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
ST = 80.00’
PIs Sta 603+37.20
F
Ls = 240.00’
LT = 160.00’
FOR -DR5- PROFILE, SEE SHEET 97
PAVED SHOULDER
L = 142.51’
PI Sta 22+00.44
D
T = 86.40’
R = 100.00’
PI Sta 19+01.08
D
L = 41.21’
T = 20.90’
R = 100.00’
PI Sta 13+38.58
D
L = 56.40’
T = 28.97’
R = 100.00’
-DR5-
M
A
TC
H
LIN
E
-
D
R
5
-
S
TA
.13
+
4
6
S
H
E
E
T
13
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
E
R
M
A
N
E
N
T
A
C
C
E
S
S
E
A
S
E
M
E
N
T
A
D
D
E
D
A
R
O
U
N
D
-
D
R
5
-
5
9
0 5
9
5
300’ TAPER
1300’ FULL LANE
6
0
’
4
8
’
4
8
’
4
6
’
6
0
’
4
8
’
4
6
’
-L-
2800’ FULL LANE
12’P.S.
-L-
12’P.S.
12’P.S.
12’P.S.
0
4
0
4
12’ P.S.
12’P.S.
END APPROACH SLAB RT.
1
5
2
0
-DR5- PC Sta. 21+14.03
-DR5- PT Sta. 22+56.55
-DR5- POT Sta. 22+96.07
-DR5- PT Sta. 13+66.01
-DR5- PT Sta. 19+21.39
-DR5- PC Sta. 18+80.18
12’
12’
N
C
N
C
AT -DR5- DRAINAGE
H YDRO IS LOOKING
BARRIER FACEPAVE TO BARRIER FACE
PAVE TO
F
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F F
F
+50.00 -L-
200.00’
70
72
72
+70.00 -L-
200.00’
70
67
+80.00 -L-
248.00’
+28.00 -L-
+28.00 -L-
+65.00 -L-
+45.00 -L-
+90.00 -L-
+50.00 -L-
365.00’
295.00’
322.00’
370.00’
342.00’
200.00’
907
CHO RD CHORD
18.00
18.00
+91.56 -DR5-
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
+96.94 -DR5-
ACCESS
EASEM EN T FO R
EN D PERM AN EN T
67
2GI
2GI 2GI
2GI
FS
FS
FS
G RATE
2GI W / FLAT
GRATE
2G I W / FLAT
GRATE
2GI W / FLAT
153
154
156
155
157
158
159
160
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 590+00 TO 594+10 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
FRO M STA 594+15 TO 596+00 -L- RT
15" RCP-IV
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
3
6
"
R
C
P
-
C
D
3
6
"
R
C
P
-
C
D
15
"
RC
P
-
IV
3
6
" RC
P
-III
HW
157A
HW
-NW L2-
-NWL2-
1SFD
36" WD
48" CONC
SOIL
LT
SR 2655 ELLIOT RD GR
1SFD
S
RUINS
S
S
B
S
HTR
S
SS
G
R
B
S
4
8
"
C
H
L
S
POOL
SR 2654 PISGAH RD GR
18
" R
C
P
R
A
I
L
4
8
"
W
D
24" RCP
W /LT
W/
L
T
W
/
L
T
W
/
L
T
-NWL2-
PROP. NOISE WALL
-BL-40
-BL-41
30’ ACCESS EASEM ENT DB 1660 PG 2202
30’ A CCESS EA SEM ENT DB 1660 PG 2202
30’ ACCESS EASEM ENT DB 1660 PG 2202
30’ ACCESS EASEM ENT DB 1956 PG 1045
EARLINE M . SAPP
PHYLLIS E. LONG
PHYLLIS E. LONG
TAM ERA GRAY
BRIAN GRAY
ANNE T. ELLIOTT
DAVID S. ELLIOTT
ANN H. W ILSON
DALE V. W ILSON
DB 1820 PG 1684
DB 1963 PG 1045
DB 2103 PG 3539
DB 970 PG 614
DB 691 PG 95
DB 879 PG 504
DB 1256 PG 795
DB 1413 PG 1458
DB 1256 PG 795
DB 1413 PG 1458
ANN H. W ILSON
DALE V. W ILSON
DB 1963 PG 1045
DB 2103 PG 3539
DB 1660 PG 2200
DB 2280 PG 3096
ROBIN JONES
LARRY JONES
19
4
.
8
2
’
+
2
8
.
3
4
2
3
5
.6
4
’
+
4
4
.0
5
3
4
3
.
8
5
’
+
7
3
.
2
0
DB 3071 PG 2445
MARY C. DUNLAP
DB 3023 PG 0254
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 2015 PG 3092
DB 1820 PG 1684
M ARY M . W ILSON
GARY V. W ILSON and w ife
M ARY M . W ILSON
GARY V. W ILSON and w ife
M ONETTE SHIPLEY
ROBERT SHIPLEY and w ife
M ONETTE SHIPLEY
and w ife
ROBERT SHIPLEY
STA 605+00 -L- LT
BEGIN SHO ULDER BERM G UTTER
REM O VE
SEE DETAIL#12
W / 450 SY FF
EST. 171 TO N S
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
SEE DETAIL#14
W / 293 SY FF
EST. 118 TO N S
LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP EST. 30 SY
EST. 15 TO NS
RIP RAP W / FILTER FABRIC
CLASS ’I’
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
SEE DETAIL#3
LATERAL 2’ BASE DITCH
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
SEE DETAIL#12
W / 450 SY FF
EST. 171 TO N S
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
STA 607+18.45 -L- LT
EN D SHO ULDER BERM GUTTER
STA 609+68.44 -L- RT
BERM GUTTER
BEG IN SHO ULDER
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
CO NN ECTO RS
AN D RO D AN D LUG
15" CSP W /2 ELBO W S
CO N NECTO RS
AND RO D AN D LUG
18" CSP W /2 ELBO W S
CO N NECTO RS
AN D RO D AND LUG
15" CSP W /2 ELBO W S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
4
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
14U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
5
9
9
+
0
0
S
H
E
E
T
1
3
M
A
TC
H
LIN
E
-
L-
S
T
A
.
6
0
9
+
5
2
S
H
E
E
T
15
-L-
PI Sta 13+57.81
D
L = 715.41’
T = 357.81’
R = 12,000.00’
-Y4CD-
FOR -L- PROFILE, SEE SHEET 37 - 38
FOR -Y4CD- PROFILE, SEE SHEET 60
NOTE :
PIs Sta 543+50.33
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
PI Sta 576+22.74
D
L = 5,826.87’
T = 3,192.41’
PIs Sta 603+37.20
F
Ls = 240.00’
LT = 160.00’
ST = 80.00’
R = 5,740.00’
SE = 0.04
PAVED SHOULDER
6
0
0
6
0
5
0
4
0
4
0
2
0
0
0
2
0
2
0
2
0
1
0
3
0
1
0
3
300’ TAPER
6
0
’
3
6
’
2800’ FULL LANE
-L-
-Y4CD-
60’ INC.
0
2
12’P.S.
3
6
’
4
8
’
6
0
’
4
8
’
4
6
’
4
6
’
12’P.S.
12’P.S.
12’ P.S.
-
L
-
C
S
S
t
a
. 6
0
2
+
5
7
.2
0
-
L
-
S
T
S
t
a
. 6
0
4
+
9
7
.2
0
-
Y4
C
D
-
P
C
S
t
a
. 10
+
0
0
.0
0
-
L
-
S
T
A
. 6
0
6
+
0
0
.0
0
(
5
9
’
L
T
)
7
2
’
BARRIER FACEPAVE TO
BARRIER FACE
PAVE TO
-NWL2-
PROP. NOISE WALL
BARRIER FACE
PAVE TO
F
FF
F
F
+57.20 -L-
+97.20 -L-
+00.00 -L-
+98.82 -L-
200.00’
200.00’
200.41’
237.00’
72
73
+57.20 -L-
237.00’
200.00’
+66.00 -L-
CH O RD
CHO RD
C
H
O
R
D
CHO RD
72
73
73
2GI
2G I
2G I
FS
FSFS
G RATE
2G I W / FLAT
161
162
163
164
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA 602+60 TO 605+00 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA 601+00 TO 602+90 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 603+90 TO 605+90 -L- LT
FRO M STA 600+00 TO 602+55 -L- RT
15" RCP-III
36" RCP-V
36" RCP-V
15
"
RC
P
-
III
15" RCP-IV
HW
453
452
G RATE
2GI W /FLAT G RATE
2G I W /FLAT
G RATE
2GI W /FLAT
GRATE
2G I W /FLAT
451
454
15
"
R
C
P
-
III
1
8
"
R
C
P
-
I
V
-NWL2-
-NWL3-
GR
SR
2655
ELLIOT
RD
GR
RUINS
SOIL
S
S
S
W
RUINS
2SFD
H
T
R
-NWL3-
BEG NOISE WALL
-NWL2-
END NOISE WALL
GRAU-350 CAT-1
TYPE B-77
-BL-42
1683.24’
ANN H. W ILSON
DALE V. WILSON
HELEN ELLIOTT
DB 1963 PG 1045
DB 2103 PG 3539
DB 193 PG 290
801.42’+79.88
S 00 16’35" W
289.16’
HELEN ELLIOTT
3@ 10’X9’ RCBC
AT BEGIN BRIDGE
END SHO ULDER BERM GUTTER
REM O VE
REM O VE
REM O VE
CUT AND FILL
CO M BINATIO N O F
GRADE TO DRAIN W ITH
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
CL ’I’ RIPRAP
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
36" CSP W / 2 ELBO W S
RIP RAP
CLASS ’I’
SILL
3@ 10’x9’ RCBC
SEE DETAIL#5
LATERAL 3’ BASE DITCHSEE DETAIL#5
LATERAL 3’ BASE DITCHTO BEGIN BRIDGE
STA 24+00 -Y4RPBD- LT
SHO ULDER BERM GUTTER
DDE= 200 CY
30’ BASE CHANNEL
EST. DDE 18 CY
SEE DETAIL#8
HEAD DITCH
SEE DETAIL #17
EST. DDE 44 CY
W / CL ’I’ RIPRAP
3’ BASE DITCH
STA. 626+30 -L- RT TO BEGIN BRIDGE
SHO ULDER BERM GUTTER
FLAT GRATE
2GI W /
AND RO D&LUG CO NNECTO RS
5’ CSP W / 2 ELBO W S1
SEE DETAIL#6
EST 154 SY FF
EST 57 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 272 SY FF
EST 101 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 509 SY FF
EST 189 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL #6
EST 216 SY FF
EST 80 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 336 SY FF
EST 126 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
W / 2365 SY FF
EST. 333 TO NS
CLASS ’I’ RIP RAP
EST. DDE 330CY
SEE DETAIL#25
TAIL DITCH
EST 5 SY FF
EST 1 TO NS
RIP RAP
CLASS ’B’
STA 31+00 -Y4RPBD- RT
END BRIDGE TO
SBG
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
15" RCP-IV
EST +/-375 TO NS
CLASS ’I’ RIP RAP
SEE DETAIL #34
CHANNEL CHANGE
CHANNEL
FILL IN EXISTING
SEE DETAIL#6
EST 154 SY FF
EST 57 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 54 SY FF
EST 20 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#14
W / 328 SY FF
EST. 100 TO NS
W / CLASS B RIPRAP
LATERAL V-DITCH
STA 609+68.44 -L- RT
BERM G UTTERBEGIN SHO ULDER
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
5
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
15U-2579B
M
A
T
C
H
LI
N
E
-
L-
S
T
A
.
6
0
8
+
9
2
S
H
E
E
T
1
4
M
A
TC
H
LIN
E
-
L-
S
TA
.6
3
3
+
0
0
S
H
EET
16
Y4CD
Y4RPA
-Y4RPBD-
M
A
TC
H
LIN
E
-Y4RP
B
D
- S
T
A
.32+
21 S
H
E
E
T 16
M
A
T
C
H
LI
N
E -
Y4
RP
A- S
T
A.20
+
50
S
H
E
E
T 16
NOTE :
FOR -Y4RPA- PROFILE, SEE SHEET 69
FOR -Y4RPBD- PROFILE, SEE SHEET 72-73
FOR -Y4RPB- PROFILE, SEE SHEET 71
FOR -Y4CD- PROFILE, SEE SHEET 60-61
-L-
PI Sta 633+75.85
D
L = 3,180.22’
T = 1,595.11’
R = 16,400.00’
PI Sta 13+57.81
D
L = 715.41’
T = 357.81’
R = 12,000.00’
PI Sta 26+76.17
D
L = 1,918.03’
T = 960.76’
R = 13,000.00’
PI Sta 45+09.60
D
L = 1,750.69’
T = 876.16’
R = 16,517.00’
PIs Sta 11+33.35
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
PI Sta 28+67.56
D
L = 2,741.74’
T = 1,667.56’
R = 1,910.00’
PIs Sta 40+08.43
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
PIs Sta 11+33.35
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
PI Sta 16+68.86
D
L = 925.35’
T = 468.86’
R = 2,330.00’
PIs Sta 21+92.03
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
PIs Sta 33+05.42
F
Ls = 240.00’
LT = 160.07’
ST = 80.06’
PI Sta 61+52.40
D
L = 2,986.50’
T = 2,767.05’
R = 1,330.00’
PIs Sta 64+51.91
F
Ls = 240.00’
LT = 160.07’
ST = 80.06’
SE = NC SE = NC SE = NC
SE = NC
SE = .05
SE = .06
SE = .06
PAVEMENT TO BE OBLITERATED
FOR -L- PROFILE, SEE SHEET 38
PAVED SHOULDER
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
A
R
C
E
L
9
8
A
A
D
D
E
D
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
A
R
C
E
L
9
8
A
D
J
U
S
T
E
D
O
N
P
L
A
N
S
T
O
M
A
K
E
I
T
V
I
S
I
B
L
E
2
"
P
L
2
"
P
L
2" PL
6" DI
6
"
DI
6
"
D
I
6" DI
6" DI
2
" P
L
6" DI
6"
DI
2" P
L
2
" P
L
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R
)
(ATUR)
(
A
T
U
R)
(ATUR)
(ATUR)
(
A
T
U
R)
(ATUR)
(
A
T
U
R)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R)
6
1
0
6
1
5
6
2
0
6
2
5
6
3
0
0
2
0
2
0
2
0
2
0
3
0
4
0
6
0
5
1300’ FULL LANE
3
6
’
3
6
’
1
6
’
4
’
1
2
’
3
6
’
3
6
’
3
6
’
2
4
’
3
6
’
3
6
’
4
6
’
-L--L-
-L--L-
-Y4CD-
-Y4CD-
-Y4RPA-
-Y4RPBD-
-Y4RPBD-
-
Y
4
R
P
B
D
-
-Y4CD-0
2
0
2
0
2
2
4
’
1
0
1
5
2
0
2
4
’
2
4’
4’ P.S.
1
0
1
5
2
0
25
30
02
02
02
02
66.67’ INC.
4
0’
IN
C.
02
02
02
01
00
01
02
40’ I
N
C.
10
12’P.S.
1
5
2
0
2
5
3
0
3
5
400’ TAPER LT. LANE
3
6
’
4
8
’
40’ inc
+
2
8
.8
2
SIGN SUPPORT LOCATIONPROPOSED OVERHEAD
GRADING
END SPECIAL MEDIAN
-L- STA 627+96.00
02
02
02
50’ INC.
8:1 TAPER
8:
1
T
A
P
E
R
8
:1 TAPER
0
5
04
03
02
02
01
00
01
02
03
04
05
12’
12’
12’
24’
O
F
G
U
A
R
D
R
A
I
L
P
A
V
E
T
O
F
A
C
E
1
2
’
-Y4RPA- TS Sta. 10+00.00
1
2
’
0
2
0
3
0
4
0
5
0
5
0
4
0
30
2
4
6
’
-Y4CD- POC Sta. 26+81.24
(24.00’ LT.)
-L-PCSta. 617+80.74
-Y4RPBD- SC Sta. 12+00.00
-Y4RPBD- TS Sta. 10+00.00
-Y4RPBD- CS Sta. 21+25.35
-Y4RPBD- ST Sta. 23+25.35
-Y4RPB- POT Sta. 10+00.00
-Y4RPBD- POT Sta. 30+50.00
-Y4RPBD-
BEGIN BRIDGE
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
12’P.S.
-Y4CD- STA. 19+22.07
END -L- PAVEMENT
BEGIN -Y4CD- PAVEMENT
OF GUARDRAIL
PAVE TO FACE
BEGIN -Y4RPA- PAVEMENT
-Y4RPA- STA. 13+73.64
END -Y4CD- PAVEMENT
-Y4RPBD- STA. 15+65.91 100’GUARDRAIL TRANSITION
BEGIN -Y4RPBD- PAVEMENT
END -L- PAVEMENT
TS Sta. 31+45.35
24’
O
F
G
U
A
R
D
R
A
I
L
P
A
V
E
T
O
F
A
C
E
O
F
G
U
A
R
D
R
A
I
L
P
A
V
E
T
O
F
A
C
E
38’
6
0
’
6
0
’
3
0
’
3
8’
1
0
’
2
4
’
4’
1
0
’
1
6
’
4
’
3
6
’
1
2
’
1
2
’
1
2
’
1
2
’
3
6
’
24’
10’
4’
-L- STA.610+30.0000 (59’RT)
END BRIDGE END APPROACH
(12’ RT)
-Y4RPBD- POT STA. 28+05.00
-Y4RPA- POC STA. 19+00.50
END BRIDGE
-Y4CD- POC STA. 31+63.73
-Y4CD- POC STA. 34+68.98
END BRIDGE
-L- POC STA. 627+13.78
BEGIN BRIDGE
END BRIDGE
-L- POC STA. 630+18.74
-Y4CD-
PCC Sta. 36+33.44
12’P.S.
POT STA. 25+40.00
-Y4RPBD-
POT STA. 25+15.01
-Y4RPBD-
-Y4CD- POC STA. 31+38.43
BEGIN APPROACH SLAB
-Y4CD- POC STA. 34+94.05
END APPROACH SLAB
-Y4RPA- POC STA. 14+94.36
BEGIN APPROACH SLAB
-Y4RPA- POC STA. 19+30.54
END APPROACH SLAB
-L- POC STA. 630+68.34
END APPROACH SLAB
-L- POC STA. 626+88.96
BEGIN APPROACH SLAB
-L- POC STA. 626+63.24
BEGIN APPROACH SLAB
-L- POC STA. 630+43.34
END APPROACH SLAB
O
F
G
U
A
R
D
R
A
I
L
P
A
V
E
T
O
F
A
C
E
BEGIN BRIDGE
BEGIN APPROACH
END W.W. FENCE
END W.W. FENCE
W.W. FENCE
BEGIN
10
5.0
0
’
+
3
2.0
0
FENCE
W.W.
END
FENCE
W.W.
BEGIN
POT STA. 27+80.00
-Y4RPBD-
W.W. FENCE
BEGIN
W.W. FENCE
BEGIN
141.00’
+30.00 -Y4RPBD-
GRADE TO DRAIN
OBLITERATE AND
GRADE TO DRAIN
OBLITERATE AND
141.00’
+00.00 -Y4RPBD-
200.00’
+75.00 -L-
W.W. FENCE
END
200.00’
+10.00 -L-
W.W. FENCE
END
W.W. FENCE
END
W.W. FENCE
BEGIN
152.05’
+80.00 -Y4RPA-
107.00’
+95.00 -Y4RPA-
W.W. FENCE
END
2
5
’
2
0
’
R
2
0’
R
2
0
’
30’
-Y4RPA- SC
W.W. FENCE
BEGIN
5
1
’
W
A
Y
G
R
E
E
N
F
U
T
U
R
E
Sta. 17+15.41
-Y4CD- PRC
88.00’
-Y4CD-
+70.00
105.00’
-Y4CD-
+66.00
12+00.00
STA. 15+19.24
-Y4RPA- POC
BEGIN BRIDGE
GRADE TO DRAIN
OBLITERATE AND
81.00’
+00.00 -Y4RPA-
81.00’
+00.00 -Y4RPA-
GRADE TO DRAIN
OBLITERATE
110’
-Y4CD-
+05.00
144.56’
-Y4CD-
+54.25
175’
-Y4CD-
+10.00
GREENWAY
R/W FOR FURTURE
OF WALL
FACE
PAVE TO
W.W. FENCE
END
BARRIER FACEPAVE TO
BARRIER FACE
PAVE TO
NOISE WALL ON BRIDG
FOR STRUCTURE PAY ITEM
SEE STRUCTURE PLANS
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
F
F
F
F
F
C
C
200.00’+00.00 -Y4RPBD-
141.00’
+25.35 -Y4RPBD-
141.00’
148.00’
+30.00 -Y4RPA-
150.00’
+81.00 -Y4RPA-
169.00’+15.41 -Y4CD-
141.00’
141.00’
+00.00 -Y4RPBD-
+45.00 -Y4RPBD-
141.00’
73
74
76
78
73
73
73 80
81
83
85
86
87
88
89
90
91
92
92
93
94
95
97
96
98
109
108
105
104
270’
+20
230’
+80
250’
+65
225’
156.00’
+85.00 -Y4CD-
+38.13 -Y4CD-
+00.00 -Y4CD-
156.00’
234.00’
244.01’
+85.00 -Y4RPBD-
+34.00 -Y4RPBD-
160.00’
187.00’
152.00’
+82.00 -Y4RPBD-
194’
+33.00 -Y4RPBD-
+60.00 -Y4RPBD-
171.00’
+00.00 -Y4RPBD-
171.00’
141.00’
173.00
-Y4RPBD-
+25.35
156.00’
-Y4CD-
+71.00
+88.80 -Y4CD-
141.00’
+28.00 -Y4CD-
162.81’
204.00’
+82.00 -Y4CD-
234.00’
+15.79 -Y4CD-
212.35’
+13.64 -Y4CD-
229
938
(
989
C
H
O
R
D
C
H
O
R
D
CHO RD
CHO RD
+00.00 -Y4RPB-
997
979
(
(
+00.00 -Y4RPBD-
240.00’
+00.00 -Y4RPBD-
98A
73
2GI
2GI
2GI
2GI
2GI
2GI
3GI-A
3GI-A
FS
FS
FS
FS
FSFS
2GI
FS
GRADE TO DRAIN
GRADE TO DRAIN
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI-A W / FLAT
GRATE
2GI-A W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI-A W / FLAT
HW
GRATE
2GI-A W / FLAT
GRADE TO DRAIN
15"
C
S
P
167
166
165
170
169
168
171
182
172
183
185
184
173
174
175
177
176
179
180
178
186
187
188
189
190
191
Natural
Ground
( Not to Scale)
2:12:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FRO M STA 630+50 TO 633+35 -L- RT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA 619+50 TO 621+25 -L- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FRO M STA. 23+43 TO 23+49 -Y4CD- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FRO M STA. 627+85 TO 628+85 -L- RT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 24+00 TO 25+40 -Y4RPBD- LT
FRO M STA 30+20 TO 33+50 -Y4RPBD- RT
FRO M STA 16+50 TO BO X CULVERT -Y4RPBD- RT
FRO M STA 625+00 TO 626+00 -L- RT
FRO M STA 619+00 TO 619+35 -L- LT
FRO M BO X CULVERT TO STA 616+25 -L- LT
195A
FS2GI
M CF
MCF
175A
178A
FLAT GRATE
2GI W /
187A
15" RCP-IV
HW
15" RCP-IV
18
"
R
C
P
-
IV
1
5
"
R
C
P
-
I
V
18" RCP-IV
15
"
R
C
P
-
I
V
15
"
RC
P
-
I
V
24" RCP-IV
24" RCP-IV
24" RCP-IV
4
8
" RC
P-
C
D
4
8
" RC
P-
C
D
30" RCP-IV
3
0
"
RC
P
-
I
V
18
"
RC
P
-
I
I
I
15" RCP-III
18" RCP-III
1
5
"
R
C
P
-
I
V
15" RCP-III
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
15
"
RC
P-
III
15" RCP-III
18" RCP-III
3
6
" C
SP
1
5
" RC
P
-IV
15" RC
P-IV
Natural Natural
Ground Ground2:12:
1
( Not to Scale)
Filter Fabric
B
Type of Liner= Class ’I’ Rip-Rap
DETAIL #34
CHANNEL CHANGE
B= 15.0 Ft.
1 foot
Key In Rip Rap
FRO M STA. 19+98 TO 21+22 --Y4RPBD- RT
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
SEE SHEET 2-TT
PSH
-NWL3-PROP. NOISE WALL
BEG NOISE WALL ON BRIDGE
END NOISE WALL -NWL3-
BEG NOISE WALL -NWY4RPA-
END NOISE WALL ON BRIDGE
-NWL2-END NOISE WALL
T
O
P
=
8
6
1.
7
0
I
N
V
=
8
5
4
.
2
0
T
O
P
=
8
8
3
.
9
6
I
N
V
=
8
7
2
.
0
6
T
O
P
=
8
5
6
.
7
8
I
N
V
=
8
4
9
.
18
T
O
P
=
8
8
9
.
7
6
I
N
V
=
8
8
4
.
0
6
T
O
P
=
8
4
2
.
9
8
I
N
V
=
8
3
5
.
5
8
T
O
P
=
8
4
1.
0
6
I
N
V
=
8
3
5
.
16
T
O
P
=
8
2
7
.
14
I
N
V
=
N
/
A
T
O
P
=
8
2
5
.
6
1
I
N
V
=
8
15
.
6
1
T
O
P
=
8
2
3
.
2
9
I
N
V
=
8
17
.
7
3
T
O
P
=
8
2
5
.
13
I
N
V
=
8
16
.
7
9
T
O
P
=
8
2
3
.
5
9
T
O
P
=
8
2
5
.
2
7
I
N
V
=
8
18
.
9
7
T
O
P
=
8
2
4
.
9
0
I
N
V
=
8
17
.
2
0
T
O
P
=
8
2
8
.
9
7
I
N
V
I
N
=
8
2
2
.
4
7
I
N
V
O
U
T
=
8
2
0
.
0
7
T
O
P
=
8
4
8
.
9
4
I
N
V
=
8
3
2
.
5
4
T
O
P
=
8
2
5
.
2
3
I
N
V
=
8
18
.
4
3
T
O
P
=
8
2
6
.
5
9
I
N
V
=
8
19
.
4
9
T
O
P
=
8
2
8
.
2
7
I
N
V
=
8
2
0
.
4
7
T
O
P
=
8
3
4
.
5
8
I
N
V
=
N
/
A
T
O
P
=
8
4
3
.
7
1
I
N
V
=
N
/
A
T
O
P
=
8
5
3
.
5
1
I
N
V
=
8
3
7
.
9
1
T
O
P
=
8
2
8
.
2
0
I
N
V
=
8
18
.
6
0
T
O
P
=
8
3
0
.
9
6
I
N
V
=
8
2
2
.
16
T
O
P
=
8
4
4
.
4
5
I
N
V
=
8
3
4
.
5
5
T
O
P
=
8
5
7
.
4
7
I
N
V
=
8
4
6
.
9
7
T
O
P
=
8
8
6
.
7
5
I
N
V
=
8
7
7
.
8
5
8" VC
8
"
V
C
T
O
P
=
8
3
2
.
8
6
I
N
V
=
8
11.
2
6
T
O
P
=
8
18
.
3
2
I
N
V
=
8
10
.
5
2
I
N
V
O
U
T
=
8
14
.
2
9
I
N
V
I
N
=
8
16
.
6
9
8"
V
C
8" DI
8" VC
8
"
V
C
8" VC
18" V
C
18
" V
C
18
" V
C
3
6"
V
C
36"
V
C
2
4"
V
C
2
4
" V
C
2
4
"
V
C
2
4"
V
C
18
"
V
C
18
" V
C
L
O
C
A
T
I
O
N
A
P
P
R
O
X
.
T
O
P
=
N
/
A
I
N
V
=
N
/
A
-NWL3-
NOISE W ALL ON BRIDGE
-NWL3-
-NWL3-
SCRUB
15" RCP
HTR
HTR
W D
S
S
S
10’
B
S
T
L
T
W
W
L
T
W/L
T
GERRY RD 20’ BST
B
L
K
W
A
L
L
S
S
S
S
S
72" C
H
L
S
2SBK APT
2
S
B
K
A
P
T
2
S
B
K
A
P
T
2
S
B
K
A
P
T
18" RCP
LT
3
0
"
C
&
G
B
S
T
3
0
"
C
&
G
CONC
CONC
CONC
CONC
CONC
DI
CB LT
CONC
H
U
N
T
E
R
L
A
N
E
2
3
’
B
S
T
L
T
TIMBER RIDGE 19’ BST
L
T
3
0
"
C
&
G
SOIL
S
OIL
48" CONC
H
T
R
H
T
R
H
T
R
S S
CANOPYMTL
HT
R
C
A
N
O
P
Y
M
T
L
C
A
N
O
P
Y
MT
L
C
A
N
O
P
Y
MT
L
W
S
L
T
W
/
L
T
W
/
L
T
W
/
L
T
HTR
S
GR
W
48"
W
W
12"
R
C
P
PUM P STATION RD 12’ BST
48" W W
48" W D
G
R
1
2
"
R
C
P
12
"
R
C
P
GR
1S
F
D
WALL
BK
C
O
N
C
3
6
"
W
S
GR
W1SFD
HTR
WS
12
" R
C
P
H
T
R
12
" R
C
P
12
" R
C
P
2
4
" R
C
P
18
" R
C
P
HTR
GUY
2SFD
48" CONC
C
O
N
C
9’
C
O
N
C
15" RCP
LT
2 S B K D
15" RCP
2 3 ’ B S T
L
T
CONC
D
I
2
S
B
K
D
2SBKD
2
S
B
K
D
2SBKD
2SBKD
2SBKD
CONC
CONC
10’ CONC
10’ CONC
10’ CONC
W ASHINGTON CT 20’ BST
4
8
"
C
O
N
C
48" CO
N
C
C
O
N
C
L
T
K
OI
P
O
N
D
4
8
"
C
O
N
C
15
"
R
C
P
15
"
R
C
P
1
5
"
R
C
P
L
T
2SFD
4
8
"
W
D
&
W
W
4
8
"
C
O
N
C
9’ CONC
4
8
"
C
O
N
C
2SBKD
CONC
S
LT
1
5
"
R
C
P
FOUNDATION
1
5
"
R
C
P
L
T
1
5
"
R
C
P
1
5
"
R
C
P
4
8
"
C
O
N
C
4
8
"
B
K
1
5
"
R
C
P
L
T
L
T
BK W ALL
L
O
N
G
W
A
L
K
D
R
2
0
’
B
S
T
G
S
ABAND
2SFD
WALLBK
WALKBK
15’ CONC
1
0
’
C
O
N
C
10’ C
O
NC
2SBK
D
2S
B
K
D
2SBKD
48" CO
N
C
4
8
" C
O
NC
48" CONC
CONC
30"C&G
30"C&G
3
0
"C
&
G
POOL
CONC
48"IRON
S
R 4241 R
E
G
E
N
TS P
A
R
K
R
D 26’ B
S
T
8’ CONC
W
D
D
K
DKWD
W D DK
W D DK
CONC
W
D
D
K
W
D
D
K
D
I
1
5
"
R
C
P
BST
3
0
"
C
&
G
S
C
R
U
BS
C
R
U
B
S
C
R
U
B
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
SCRUB
15
"
R
C
P
15
"
R
C
P
W
D
D
K
W
D
D
K
W
D
D
K
D
K
W
D
L
T
15" RCP
CONC
W
CONC
CONC
CONC
D
KWD 1
8
"
R
C
P
1
5
"
R
C
P
1
5
"
R
C
P
15" RCP
15
"
R
C
P
D
I
D
I
18" RCP
24" CM P
15" RCP
W/
L
T
CONC
CONC48" CONC
72’ LATTICE
GR
W
/
L
T
LT
LT
W
L
B
WLB
W
L
B
WLB
WL
B
GRAU-350
B-77
B-77
B-77
B-77
B-77
GRAU-350
G
R
A
U
-
3
5
0
B
-
77
B
-
77
B
-
77
C
A
T
-
1
B-77
B-77
B
-
77
B-77
CAT- 1
TYPE M 350
TYPE M 350
B-77
B-77
TES
TES
TYPE B-77
ELEV. = 881.42
E = 1666936
N = 864512
N 35 32’52" E 55’
-BY11- STA 5+00.00 TO BM #8
BM #8
-BL-43
-BL-44
-BL-45
-BL-46
-BL-47
-BL-48
-BL-49
-BY11-531
-BY11-530
-BY13-534
-BY12-533
-BY12-532
18" RCP
INV=857.12 INV=857.47
1
5
"
R
C
P
D
I
1
5
"
R
C
P
1
8
"
R
C
P
D
I
15" RCP
15"
RCP
1
5
"
R
C
P
D
I
D
I
24" M ETAL
BRANDON P. M ILLER
DEBORAH P. MILLER
GLADYS L. CROTTS
JOHN R. CROTTS
JOHN NATHAN TABOR
PENNSTON CORP.
20’ DRAINAGE EASEM ENT PB 33 PG 115
2
0
’
D
R
A
I
N
A
G
E
E
A
S
E
M
E
N
T
P
B
3
3
P
G
115
20’ DRAINAGE EASEM ENT PB 33 PG 115
20’ S
A
NIT
A
R
Y S
E
WE
R
E
AS
E
ME
NT P
B 36 P
G 16
2
0
’ S
A
NIT
AR
Y
S
EWE
R
E
A
S
E
ME
N
T
P
B
3
6
P
G 16
20’ DRAINAGE EASEM ENT PB 33 PG 115
2
0’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
16
20’ S
A
NIT
A
R
Y S
E
WE
R
E
AS
E
M
E
N
T P
B 36 P
G 16
50.28’
16.86’
EIP
EIP
EIP
EIP
EIP
HELEN ELLIOTT
HELEN ELLIOTT
227.25’11.00’
200.30’
385.98’
353.43’
285.00’
225.00’
261.00’
160.76’
173.12’
163.38’
9.06’
260.88’
338.16’
311.36’
267.35’
236.87’
10.98’
230.31’
204.41’
43.48’
90
.43
’
4
9
4
.9
6
’
328.00’
337.59’
344.96’
265.92’
5
9
.3
6
’
266.04’
270.17’
3
3
0
.5
3
’
EIP
EIP
EIP
EIP
EIP
EIP
EIP
MARCIA H. POTTER
DENNIS L. POTTER
SUSAN E. HANSON
JAMES M. HANSON
PENNSTON CORP.
SUZANNE TEDDER
RUSSELL F. TEDDER
ANNE C. FRAZIER
MARK H. FRAZIER
1
3
1.
9
8
’
33.51’
119.26’
10.60’
32.66’
5
5.
5
0’
25.11’
10.72’
101.
13’
106.09’
117.80’
115.6
6’
24.88’
232.32’
32.03’163.65’
126.33’
18.90’
10.20’L=63.86’
R=52.00’
L=26.17’
R=52.00’
L=63.96’
R=52.00’
L
=
2
7
.7
6
’
R
=
5
2
.0
0
’
L
=6
2.2
5’
R
=5
2.0
0’
228.26’ EIP TO COR
231.89’ R/W TO COR
122.50’
5
7.
4
3’
167.27’ EIP
T
O
C
O
R
167.50’ R/
W
T
O
C
O
R
288.28’ EIP TO COR
288.09’ R/W TO COR
8
9.
7
1’
2
6.
1
5
’
8
7.
3
8
’
2
8.
9
2
’
1
0
2.
0
8
’
1
4.
2
0
’
1
3
1.
8
0
’
8.93’
1
6
1.
0
7
’
1
5
5.
9
6
’
1
7
1.
1
2
’
1
2
2.
0
0
’
5
1.
9
9’
1
3
6.
0
1’
250.00’
2
1
2.
5
1’
1
0
0
.
0
0
’
1
2
5
.
0
0
’
1
2
0
.
0
0
’
160.64’
1
5
5.
5
3
’
1
4
5
.
6
8
’
3
9
6
.
4
4
’
15
6
.
0
4
’
16
0
.
0
0
’
CONNIE J. CALDWELL
SIDNEY N. CALDWELL
BARBARA MURRAY
JAMES D. MURRAY
GINA MORRISON
RONALD J. MORRISON
PENNSTON CORP.
PENNSTON CORP.14
7
.5
7
’
PENNSTON CORP.
ALLISON THOMASON
SAMUEL L. THOMASON
JANE E. STEPHENS SUNTER
MARK J. SUNTER
GAYLE W. BURGENER
STEPHEN D. BURGENER
GAYLE W. BURGENER
STEPHEN D. BURGENER
PENNSTON CORP.
PENNSTON CORP.
GREGORY FULLER
60.00’
E
XIS
TIN
G
R/
W
E
XIS
TIN
G
R/
W
60.00’
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
E
XI
S
T
I
N
G
R/
W
E
XI
S
T
I
N
G
R/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
60.00’
L=211.34’R=50.00’
L=18.96’
R=20.00’
L=13.89’
R=20.00’
L=143.26’
R=50.00’
L=66.21’
R=50.00’
L=27.66’R=50.00’
2
3
7
.5
1’
2
3
2
.3
9
’
9
4
.17
’
2
0
0
.0
0
’
10
9.9
2’
10
4.0
1’
211.74’
196.15’
207.58’
20.36’
104.64’
358.89’
JESSIE COELL HAUSER
GEROLENE WIDENER HAUSER
GLADYS L. CROTTS
JOHN R. CROTTS
BERDINA SMITH
199.65’
200
.02’
200
.00’
200
.00’
249
.08’
322.06’
6
0.
0
0
’
EXISTING R/W
EXISTING R/W
L=117.52’R=429.78’
L=11.31’
R=369.78’
L=42
.7
3
’
R=3
5
.0
0
’
L
=201.33’
R
=50.00
421.13’ EIP TO COR421.56’ R/W TO COR
60.00’
E
X
IS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
5
0
5.
3
6
’
6
0
.
9
3
’
2
4
8
.4
9
’
200.00’
L
=
5
2
.3
1
R
=
4
5
.0
0
EXISTING R/W
EXISTING R/W
60.00’
12.25’
EIP
EIP
EIP
EIP
GINA CHILDRESS
WOODROW H. CHILDRESS JR.
249.47’
EIP
EIP
288.16’
10.00’
HELEN ELLIOTT
VICKIE O. DAVIS
PHILLIP A. DAVIS
POPE L.E. BUILDING CO. INC.
DB 1137 PG 1712
PB 18 PG 97
DB 1980 PG 2940
PB 18 PG 97
DB 1405 PG 1207
DB 2398 PG 1660
DB 193 PG 290
DB 193 PG 290
DB 193 PG 290
PB 36 PG 20
DB 1755 PG 1572
PB 36 PG 20
DB 1821 PG 3694
PB 36 PG 16
DB 1519 PG 957
PB 36 PG 16
DB 2370 PG 4527
PB 36 PG 16
DB 1826 PG 3788
PB 36 PG 16
DB 1877 PG 1389
PB 33 PG 115
DB 1750 PG 3239
PB 33 PG 115
DB 1780 PG 869
PB 33 PG 115
DB 1702 PG 3659
PB 33 PG 115
DB 1774 PG 3395
PB 33 PG 115
DB 1519 PG 957
PB 33 PG 115
DB 1519 PG 957
PB 33 PG 115
DB 1519 PG 957
PB 33 PG 115
DB 1776 PG 976
PB 33 PG 115
DB 2279 PG 317
PB 33 PG 115
DB 1812 PG 3009
PB 33 PG 115
DB 2231 PG 4625
PB 33 PG 115
DB 2231 PG 4625
DB 1519 PG 957
DB 1519 PG 957
PB 33 PG 115
DB 2454 PG 2239
PB 29 PG 3
DB 2233 PG 1645
DB 2398 PG 1660
DB 1692 PG 3186
PB 33 PG 115
DB 1677 PG 4565
KAREN R. YOKLEY
BRENT E. YOKELY
PB 36 PG 16
DB 2174 PG 222
KATHERINE ARMSTRONG
STEPHEN T. ARMSTRONG
JOHN W. DAVIS III
DB 33 PG 115
DB 2227 PG 4180
JEAN LOCKLEAR
BURNICE L. LOCKLEAR
HELEN ELLIOTT
DB 193 PG 290
20’ SA
N
ITA
RY
SEWER EA
SEM
EN
T
2
0
’ S
A
NIT
A
R
Y
S
E
WE
R
E
A
S
E
ME
NT
2
0
’ S
A
N
IT
AR
Y S
E
WE
R
E
A
S
E
ME
NT
20’ SANITARY SEW ER EASEM ENT
2
0
’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
2
5
’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
6
P
G
1
6
20’ SANITARY SEWER EASEMENT
20’ SANITARY SEWER EASEMENT
20’ S
A
NIT
A
R
Y S
E
W
E
R
E
AS
E
M
E
N
T
DB 1345 PG 455
REGRESS EASEMENT
INGRESS/EGRESS/
TOWN OF KERNERSVILLE
3
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
PB
3
3
PG
115
2
0
’ DRA
INAG
E
EA
SEM
ENT
275.22’+82.76
758.98’+78.87
1
3
9.
8
9
’
+
6
6.
8
2
546
.79’
+17.46
463.45’+03.36
335.09’+93.45
215.02’+70.99
1
9
3.
3
6
’
+
8
6.
6
8
272.39’+68.56
156.08’+58.94
83.23’+04.52
118
.
2
5
’
+
9
9
.
0
7
PB 18 PG 20
DB 2639 PG 4366
SILVESTRE VEGA CASTILLO
DB 18 PG 20
DB 3129 PG 4405
P
B 18
P
G 20
D
B
10
17
P
G 0
505
R
O
B
E
R
T
M.
R
U
S
S
E
L
L
H
EIR
S
PB 18 PG 97
DB 1035 PG 641
JOHN ROY CROTTS, JR. HEIRS
PB 18 PG 97
DB 2774 PG 0960
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 18 PG 97
DB 2762 PG 3311
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
P
B
29
P
G
3
D
B
2114
P
G
22
4
7
A
LI
SA
K.
Y
A
N
N
O
P
O
U
L
O
S
G
E
O
R
G
E
S.
Y
A
N
N
O
P
O
U
L
O
S
PB 29 PG 3
DB 2114 PG 2247
ALISA K. YANNOPOULOS
GEORGE S. YANNOPOULOS
PB 29 PG 3
DB 1460 PG 48
GEROLENE HAUSER
JESSIE C. HAUSER
PB 18 PG 97
DB 2720 PG 1834
KAYON CRAIG CROTTS
PB 33 PG 115DB 3015 PG 4350
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 33 PG 115
DB 1519 PG 957
PB 33 PG 115DB 2821 PG 2585
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 33 PG 115
DB 2676 PG 2414
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 33 PG 115DB 2747 PG 3792
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 36 PG 16
DB 2918 PG 3650
TRACY G. BURKART
WILLIAM R. BURKART
PB 36 PG 20
DB 1878 PG 3165
CYNTHIA M. LUDWIG
KENNETH M. LUDWIG
PB 30 PG 154
DB 1225 PG 4
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
IL
D
IN
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
IL
D
IN
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
IL
D
I
N
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
IL
D
I
N
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
IL
D
I
N
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
I
L
D
IN
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
I
L
D
IN
G
C
O
.
I
N
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
IL
D
I
N
G
C
O
.
IN
C
.
P
B
3
0
P
G
15
2
D
B
12
2
5
P
G
4
P
O
P
E
L
.
E
.
B
U
I
L
D
IN
G
C
O
.
I
N
C
.
PB 33 PG 115DB 3128 PG 4240
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
S 00 16’35" W
360.43’
N
8
9
4
5
’
3
3
"
W
17
9
.
4
5
’
S 00 16’35" W
115.00’
S 00 16’35" W
115.00’
N
8
9
4
5
’
3
3
"
W
17
9
.
3
1’
S 00 16’35" W
115.00’
S 00 16’35" W
115.00’
N
8
9
4
5
’
3
3
"
W
17
9
.
6
0
’
S 00 16’35" W
115.00’
EXISTING R/W (TIMBER RIDGE ROAD, PB 30 PG 152)
EXISTING R/W (TIMBER RIDGE ROAD, PB 30 PG 152)
E
X
IS
T
IN
G
R
/
W
(
H
U
N
T
E
R
S
L
A
N
E
,
P
B
3
0
P
G
15
2
-
15
3
)
S 00 16’35" W
145.00’
S 5304’17"
W
188.02’
S 00 16’35" W
289.16’
S 65
35’25"
W
175.79’
N 5550’59" E
174.49’
N
7
4
0
6
’
4
8
"
E
1
9
4.
3
4’
S
8
9
4
5
’
3
3
"
E
17
9
.
5
2
’
S
8
9
4
5
’
3
3
"
E
17
9
.
3
8
’
S
8
9
4
5
’
3
3
"
E
17
9
.
2
4
’
N 3017’59" W
135.00’
N 3017’59" W
110.01’
S 00 16’35" W
20.00’
20 DRAINAGE/UTILITY EASEMENT
20 DRAINAGE/UTILITY EASEMENT
20 DRAINAGE/UTILITY EASEM ENT
BRANDON P. MILLER
DEBORAH P. MILLER
TRAFFIC DIAGRAM
-L-
21,300
27,300
24,660
36,980
32,600
43,800
2010 ADT
2030 ADT 47,720
61,160
5,360
7,280
4,940
5,420
6,600
11,800
53,560
79,880
DUAL = 5%
TTST = 6%
DIR = 60%
DHV = 10%
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
-Y4- (US 421/I-40 BUS. )
BELTLINE
REM O VE
REM O VE
REMO VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
PLUG
REM O VE
REM O VE
REM O VE
REM O VE
DITCH
TIE TO EXISTING
REM O VE
M ATERIAL
FILL W / FLO W ABLE
REM O VE
REM O VE
RETAIN
RETAIN
RETAIN
JB w/ M H
CO NVERT TO
REM O VE
PLUG
RETAIN
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
2 ELBO W S
15" CSP W /
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
18" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
18" CSP W / 2 ELBO W S
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
W / ELBO W
" CSP18
STA 18+50 TO 19+95 -Y4LPD- RT
BERM DITCH
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
STA 42+25 TO BEGIN BRIDGE -Y4RPBD- LT
SHO ULDER BERM GUTTER
REMO VE
REM O VE FES
REM O VE HW
REM O VE FES
REM O VE
REM O VE
2 ELBO W S
15" CSP W /
STA. 31+60 -Y5- TO BEGIN BRIDGE
SHO ULDER BERM GUTTER
STA. 55+20 -Y4RPBD- LT TO END BRIDGE
SHO ULDER BERM GUTTER
STA. 640+50 -L- RT TO BEGIN BRIDGE
SHO ULDER BERM GUTTER
EST 60 SY FF
EST 30 TO NS
RIP RAP
CLASS ’I’
EST 22 SY FF
EST 6 TO NS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 5 SY FF
EST 1 TO NS
RIP RAP
CLASS ’B’
EST 8 SY FF
EST 2 TO NS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TO NS
RIP RAP
CLASS ’I’
EST 75 SY FF
EST 40 TO NS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TO NS
RIP RAP
CLASS ’I’
EST 16 SY FF
EST 4 TO NS
RIP RAP
CLASS ’I’
SEE DETAIL#6
TO E PRO TECTIO N
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE DETAIL#13
W / 385 SY FF
EST. 148 TO NS
W / CLASS ’B’ RIP RAP
LATERAL 3’ BASE DITCH
SEE DETAIL#5
LATERAL 3’ BASE DITCH
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
W / 108 SY FF
EST. 40 TO NS
SEE DETAIL#20
W / CLASS ’B’ RIP RAP
SPECIAL LATERAL ’V’ DITCH
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
FLAT GRATE
2GI W / NARRO W SLO T
STA. 640+50 -L- LT TO BEGIN BRIDGE
SHO ULDER BERM GUTTER
CO NNECTO RS
AND RO D AND LUG
24" CSP W / 2 ELBO W S
W / 2 ELBO W S
15" CSP
SEE DETAIL#6
EST 386 SY FF
EST 143 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 432 SY FF
EST 160 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#27
EST 66 SY FF
EST 32 TO NS
CLASS "I" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#27
EST 66 SY FF
EST 32 TO NS
CLASS "I" RIPRAP
TO E PRO TECTIO N W /
18" RCP-III
15" RCP-III
15" RCP-III
15" RCP-IV
SHO ULDER BERM GUTTER
SEE DETAIL #6
TO STA 50+00 -Y4RPBD- LT
STA 47+15 -Y4RPBD-
TO E PRO TECTIO N
STA 24+50 -Y4RPA- LT
END SHO ULDER BERM GUTTER
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
CO NNECTO RS
AND RO D AND LUG
15" CSP W /2 ELBO W S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
3
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
6
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
16U-2579B
M ATCHLIN E -Y4- STA.82+26 SHEET 27
M
A
TC
H
LIN
E
-
L
-
S
TA
.6
3
3
+
0
0
S
H
EET
15
M ATCHLINE -Y4- STA.102+90 SHEET 28
M
A
TC
H
LIN
E
-
L -
STA
.6
5
6
+
5
1 S
H
EET
17
DF
D
L = 1,048.05’
T = 572.33’
R = 262.00’
D
PIs Sta 64+51.91
Ls = 240.00’
LT = 160.07’
ST = 80.06’
PI Sta 61+52.40
L = 2,986.50’
T = 2,767.05’
R = 1,330.00’
Ls = 240.00’
LT = 160.07’
ST = 80.06’
PIs Sta 33+05.42
F D F
Ls = 240.00’
PI Sta 23+02.72
R = 1,200.00’
PIs Sta 30+59.60
LT = 160.08’
ST = 80.08’
F
Ls = 240.00’
R = 1,200.00’
T = 403.41’
PI Sta 22+28.62
D
PIs Sta 26+83.62
Ls = 240.00’
LT = 160.08’
ST = 80.08’
F
PIs Sta 22+81.70
Ls = 210.00’
LT = 141.20’
ST = 71.09’
F
PIs Sta 11+41.20
Ls = 210.00’
LT = 141.20’
ST = 71.09’
F D
L = 1,000.62’
T = 743.56’
R = 262.00’
L = 1,055.27’
T = 552.12’
R = 262.00’
D
PIs Sta 23+36.36
F
Ls = 210.00’
LT = 141.20’
ST = 71.09’
PIs Sta 11+41.20
Ls = 210.00’
LT = 141.20’
ST = 71.09’
F
PI Sta 633+75.85
L = 3,180.22’
T = 1,595.11’
R = 16,400.00’
L
Y4RPBD
Y4CD
Y4RPA
Y4RPB
Y4LPB
Y4LPD
Y4LPA
Y4RPD
Y4RPC
PIs Sta 11+60.08
LT = 160.08’
ST = 80.08’
L = 1,739.53’
T = 1,062.72’
Ls = 240.00’
ST = 80.08’
PIs Sta 17+45.29
F
LT = 160.08’L = 778.34’
PIs Sta 23+29.14
Ls = 210.00’
LT = 141.20’
ST = 71.09’
F
PIs Sta 15+47.32
F
Ls = 240.00’
LT = 160.05’
ST = 80.05’
PI Sta 23+89.01
D
L = 1,413.54’
T = 761.74’
R = 1,530.00’
PIs Sta 31+20.86
F
Ls = 240.00’
LT = 160.05’
ST = 80.05’
PI Sta 45+09.60
L = 1,750.69’
T = 876.16’
R = 16,517.00’
D
M
A
TC
H
LIN
E
- Y4RP
B
D
- S
TA
.32+
21 SH
E
E
T
15
M
A
T
C
H
LI
N
E -
Y4
R
P
A -
S
T
A.2
0
+
5
0
S
H
E
E
T 15
M ATCHLINE -Y4RPB- STA.19+00 SHEET 28
M ATCHLINE -Y5- STA. 38+50 SHEET 28
FOR - Y5 - PROFILE, SEE SHEET 82
FOR - Y4CD - PROFILE, SEE SHEET 61-63
FOR - Y4LPA - PROFILE, SEE SHEET 66
FOR - Y4LPB - PROFILE, SEE SHEET 67
FOR - Y4RPBD - PROFILE, SEE SHEET 73 - 75
FOR - Y4RPD - PROFILE, SEE SHEET 80-81
FOR - Y4LPD - PROFILE, SEE SHEET 68
FOR - L - PROFILE, SEE SHEET 38 - 40
FOR - Y4RPA - PROFILE, SEE SHEET 69-70
NOTE:
LT = 133.35’
PIs Sta 11+33.35
F
Ls = 200.00’
ST = 66.68’
PI Sta 28+67.56
D
L = 2,741.74’
T = 1,667.56’
R = 1,910.00’
PIs Sta 40+08.43
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
SE = .06
SE = NCSE = NC
SE = .08
SE = .08
SE = .08
SE = .08
SE = .08
SE = .08
SE = .06
PI Sta 26+96.77
D
L = 1,110.30’
T = 555.55’
R = 12,000.00’
SE = NC
Y5
PI Sta 19+53.56
Ls = 210.00’
LT = 140.15’
ST = 72.25’
F
PIs Sta 11+40.15 PI Sta 17+82.33
PI Sta 17+62.12
M ATCHLINE -Y4RPA- STA.26+95 SHEET 27 M ATCHLINE -Y5- STA.18+00.00 SHEET 27MATCHLINE -Y4RPBD- STA.63+00.00 SHEET 27
PAVEMENT TO BE OBLITERATED
FOR - Y4EB - PROFILE, SEE SHEET 52
FOR -Y4WB- PROFILE, SEE SHEET 57
FOR - Y4RPC - PROFILE, SEE SHEET 78
FOR - Y4RPB - PROFILE, SEE SHEET 71
PAVED SHOULDER
R
I
G
H
T
O
F
W
A
Y
R
E
V
I
S
I
O
N
,
1
1
/
5
/
1
2
-
P
L
A
N
S
A
D
J
U
S
T
E
D
S
O
T
H
A
T
P
A
R
C
E
L
9
8
I
S
V
I
S
B
L
E
O
N
P
L
A
N
S
6
3
5
6
4
0
6
4
5
6
5
0
6
5
5
5
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
1
0
10
0
0
2
0
2
0
2
50’ INC.
+
5
0
.0
0
08
07
06
05
04
03
02
02
03
04
05
06
07
0
8
0
2
0
3
0
4
0
5
0
6
0
7
08
0
8
0
70
6
0
5
0
4
0
3
0
2
0
2
0
30
4
0
5
0
6
0
7
0
8
02
03
04
05
06
07
0
8
25
30
35
10
0
’ T
AP
E
R
T
AP
E
R
T
O
E
X
IS
T
IN
G
R
T
. &
LT
. S
ID
E
24’
20.54’
A
400’ TAPER LT. LANE
B
2
4
’
C
1000’ FULL LANE
300’ TAPER
3
6
’
1
2
3
0
’
F
U
L
L
L
A
N
E
D
3
6
’
3
6
’
4
6
’
2
4
’
24’
2
4
’
20’
4
8
’
3
6
’
2
4
’
4
6
’
4
6
’
-L-
-L-
-L-
-Y4CD-
-Y4CD-
-
Y
4
R
P
D-
-Y 4R PC --Y4RPBD-
-Y4LPB-
-Y4LPB-
-Y 4 L P D -
-Y4
LP
D
-
-
Y
4L
P
A-
-
Y
4
L
P
A-
-
Y5
-
-
Y5
-
-
Y5
-
-L-
35’ INC
3
5
’
I
N
C
35’ INC
02 02
0301
2
0
’ IN
C
15
20
25
30
3
5
I
N
C
3
5
’
I
N
C
3
0
0
’
T
A
P
E
R
16’
-
Y
4
R
P
D-
1
5
20
2
5
12’ P.S.
-Y4RPA-
3
5
4
0
45
50
60
10
’
P
.S
.
4
’ P
.S
.
16’
16’
-
Y4
R
P
B
D
-
4
’ P
.S
.10
’ P
.S
.
2
4
’
03
03
04
0
5
0
6
0
4
0
5
0
6
-Y4RPD-
4’
P.
S.
4’
P.
S.
16’
02
03
04
05
06
07
08
15
07
08
4
0’ I
N
C.
12’P.S.
4
’P.S.
10’P.S.
12’P.S.
1
0
’
P
.
S
.
4’P.S.
4’P.S.
4
0
4
5
5
0
5
5
6
0
24’
4
’
P
.
S
.
1
0
’
P
.
S
.
4
’
P
.
S
.
2
0
’
4’P.S.
20’
4
’P.S.
15
1
0
15
2
0
1
0
15
2
0
20
25
30
-
Y
4
W
B
-
-
Y
4
E
B
-
-
Y
4
E
B
-
-
Y
4
W
B
-
-
Y
4
W
B
-
-
Y
4
E
B
-
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
85
90
95
100
4’ P.S.
4’ P.S.
02
02
-
Y
4R
P
B-
02
03
04
05
06
8:1 TAPER
8:1 TAPER
-Y4RPBD- SC Sta. 33+85.35
-Y4RPB- SC Sta. 16+27.27
-L- PT Sta. 649+60.9565
-Y5-PT Sta. 32+51.52
-Y5-PC Sta. 21+41.22
-Y5DET- PRC Sta. 29+63.61
-Y5DET- PT Sta. 32+32.54
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
-Y4CD- POC STA. 46+87.16
-Y4CD- POC STA. 46+60.01
-Y4WB- POT STA. 90+06.05
-Y4CD- POC STA. 47+14.31
-Y4EB- POT STA. 90+11.82
-Y4EB- POT STA. 91+29.51
-L- POC STA. 643+08.58
-L- POC STA. 642+81.42
-Y4WB- POT STA. 91+23.70
-L- POC STA. 642+54.27
-Y4- POT STA. 91+26.58
-L- POC STA. 649+19.78
-Y4RPBD- POC STA. 52+94.28
-Y4RPBD- POC STA. 54+16.42
-Y4CD- POC STA. 53+77.69
-Y5DET- POC STA. 22+50.51
-Y4CD- POC STA. 55+70.84
-Y4CD- POT STA. 57+01.14
-Y5- POC STA. 27+33.16
-Y5DET- POC STA. 23+67.72
-L- POT STA. 651+54.57
-Y5- POC STA. 28+50.16
-L- POT STA. 652+78.47
-Y4EB- POT STA. 97+90.41
-Y4WB- POT STA. 98+14.65
-Y4- POT STA. 98+02.89
-Y4RPBD- POC STA. 43+79.19
-Y4RPBD- POC STA. 44+08.64
-Y4RPBD- POC STA. 44+38.39
24’
1
0
’
P
.
S
.
4’
P.S.
4
’
P
.
S
.
4’
P.S.
I
N
C.
4
0’
-
Y5
D
E
T
-
4
8
’
3
6
’
-
Y
4
-
-
Y
4
-
-
Y
4
-
BEGIN APPROACH
BEGIN APPROACH
BEGIN BRIDGE
END APPROACH
END BRIDGE
BEGIN APPROACH
BEGIN BRIDGE
END APPROACH
END BRIDGE
END BRIDGE
END APPROACH
BEGIN APPROACH
BEGIN BRIDGE
END BRIDGE
BEGIN BRIDGE
BEGIN APPROACH
4’ P.S.
MATCH EXISTING
OF
GU
AR
D
R
AIL
P
AVE
T
O
F
ACE
OF
GUAR
D
R
AIL
P
AVE
T
O
F
ACE
T
AP
E
R
8
:1
END APPROACH
12’P.S.
12’P.S.
12’P.S.
12’P.S.
12’P.S.
3
0
’
-Y5- POC STA. 23+59.12
-Y4RPD- POC STA. 23+71.54
-Y5- POC STA. 30+21.54
-Y4RPC- POC STA. 16+38.67
OF GUARDRAIL
PAVE TO FACE
24’
8:1 TAPER
8:1 TAPER
BEGIN
-Y4RPC-
PAVEMENT
8:1 TAPER
4’P.S.
8:1 TAPER
10’P.S.
4’P.S.
END APPROACH
END BRIDGE
-Y4CD- POC Sta. 44+44.26 (12’ Lt.)
35’ I
N
C
10
0
’
R
10
0
’ R
B
E
G
.
C
&
G
B
E
GIN C&G
-Y4- POT STA. 90+08.91
END C&G
100’ R
8:1
8:1
TAPER
TAPER
100’ R
END C&G
+23.09
+68.44
+
5
2
.17
+
5
2
.
9
5
END C&G100’ R +15.10
100’ R
+25.00
+
5
8
.
9
6
B
E
G
I
N
C
&
G
END -Y4LPB- PAVEMENT
-Y4LPB- STA. 22+20.19
BEGIN -Y4LPB- PAVEMENT
-Y4LPB- STA. 12+27.92
END -L- PAVEMENT
BEGIN -Y4WB- PAVEMENT
END
-L-
PAVEMENT
-Y4RPC-
STA
. 13+88
.00
-Y4RPB- STA. 13+78.61
BEGIN -Y4RPB- PAVEMENT
END -Y4RPBD- PAVEMENT
8:1 T
A
P
E
R
BEGIN -Y4LPA- PAVEMENT
-Y4LPA- STA. 12+44.36
END -L- PAVEMENT
-Y4LPA- STA. 21+98.27
END -Y4LPA- PAVEMENT
BEGIN -Y4WB- PAVEMENT
-Y4LPD- STA. 22+66.21
END -Y4LPD- PAVEMENT
BEGIN -Y4EB- PAVEMENT
-Y4LPD- STA. 12+19.08
END -L- PAVEMENT
BEGIN -Y4LPD- PAVEMENT
12’
24’
4’
40’
24’
4’
4’24’
7
2
’
6
0
’
5
0
’
3
6
’
10
’
4
8
’
12
’
12
’
4
’
3
6
’
1
2
’
12
’
2
4
’2
4
’
8:1
-Y4RPD- ST Sta. 28+43.54
-Y4RPD- CS Sta. 26+03.54
8
:1
8:
1
8
:1
T
AP
E
R
T
A
P
E
R
T
AP
E
R
8:1 TAPER
OFFSET 82’ LT
-L- STA 652+66.00
GRADING
BEGIN SPECIAL MEDIAN
-Y4LPA- TS Sta. 10+00.00
-Y4LPA- ST Sta. 24+20.62
-Y4LPB- TS Sta. 10+00.00
-Y4LPB- ST Sta. 24+68.05
-Y4LPB- SC Sta. 12+10.00
-Y4LPD- TS Sta. 10+00.00
-Y4LPD- ST Sta. 24+75.27
-
Y
4
L
P
D
-
S
C
S
t
a
.
12
+
10
.
0
0
-Y
4LPD
-
CS
S
ta
. 2
2
+
6
5
.2
7-Y4WB- POT Sta.87+99.9664 (24’RT)
-Y4CD- POC STA. 45+52.41
-Y4LPA- SC Sta. 12+10.00
-Y4CD- POC STA. 45+76.53
-L- POC STA. 641+46.71
-L- POC STA. 640+94.12 (59’ RT)
-L- POC STA. 641+70.82
-Y4WB- POT STA. 93+20.03 (24’ RT)
-Y4RPBD- POC STA. 43+04.00
-Y4RPBD- POC STA. 42+78.60
-L- POC STA. 643+82.64
-L- POC STA. 644+06.79
-Y4CD POC STA. 47+88.32
-Y4CD POC STA. 48+08.85
-Y4CD- POC STA. 48+59.71 (12’ LT)
-Y4EB- POT STA. 88+65.70 (12’ LT)
-Y5- POC STA. 30+97.13
-Y5- POC STA. 31+23.80
-Y5- POC STA. 22+63.82
-Y5- POC STA. 22+95.35
-Y5- POC STA. 24+06.99
-Y5- POC STA. 24+37.34
-Y5- POC STA. 26+62.28
-Y5- POC STA. 26+38.28
-Y4LPA- CS Sta. 22+10.62
-Y4RPBD- POC STA. 54+96.08
-Y4RPBD- POC STA. 54+72.30
-Y4CD- PT Sta. 53+84.13
END CONSTRUCTION
-Y5- POT STA. 33+30.00
GERRY RD 20’ BST
1
0
’
P
.
S
.
1
0
’
P
.
S
.
7.5’
35.5’
35.5’
7.5’
-Y4CD- POC STA. 34+94.05
END APPROACH SLAB
-L- POC STA. 630+68.34
END APPROACH SLAB
-L- POC STA. 641+55.79
BEGIN APPROACH SLAB
END APPROACH
-L- POC STA. 644+16.29
BEGIN BRIDGE
-Y
4
L
P
B
-
C
S
S
t
a.
2
2
+
5
8.
0
5
W.W. FENCE
END
W.W. FENCE
BEGIN
W.W. FENCE
BEGIN
W.W. FENCE
END
1
0
’
P
.
S
.
1
0
’
P
.
S
.
1
0
’
P
.
S
.
1
9
.
5
’
P
.
S
.
1
9
.
5
’
P
.
S
.
END APPROACH
-Y4RPBD- POC STA. 45+44.69
END BRIDGE
-Y4RPBD- POC STA. 45+17.13
-Y4RPBD- POC STA. 51+70.14
-Y4RPBD- POC STA. 51+43.58
BEGIN APPROACH
BEGIN BRIDGE
13.5’ P.S.
12’ P.S.
13.5’ P.S.
12’ P.S.
GRADE TO DRAIN
OBLITERATE AND
GRADE TO DRAIN
OBLITERATE AND
-Y4RPB- TS Sta. 13+87.27
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
C
F
C
C
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
F
F
F
F
+27.27 -Y4RPB-
141.00’
+50.00 -Y4RPA-
150.00’
+50.00 -Y5-
42.00’
30.00’
+50.00 -Y5-
42.00’
30.00’
42.12’
+98.28 -Y5-
42.00’
+51.52 -Y5-
42.00’
42.00’
42.00’
+25.82 -Y5-
+41.22 -Y5-
42.00’
+41.22 -Y5-
129.00’
+43.54 -Y4RPD-
74.09’
+52.82 -Y5-
+57.26-Y5-57.00’
+51.02 -Y5-
+47.50 -Y5-
124.14’
98
99
100
101
994
117
118
924
113
114
111
110
981
115
980
104
985
102
115
159
160
175
176
162
158
155
157
921
921
155
147
972
165
166
167
168
169
968
162
172
171
173
174
218
+10
200’
+00.00 -Y5-+00.00 -Y5-
50.00’
30.00’
57.00’
30.00’
+63.61 -Y5DET-
50.00’
+51.52 -Y5-
57.00’
+00.00 -Y5-
60.00’
73.00’
-Y5DET-
+50.00
NCDO T
CHORD
141.00
+87.27 -Y4RPB-
C
H
O
R
D
42.00’
42.00’
+00.00 -Y5-
-Y5-
+00.00
NCDO T
NCDO T
98
164
155A
155
2GI
2GI
2GI
2GI
2GI
2GI
2GI
2GI
CB
CB
CB
CB
CB
CB CB
CB
2GI
CB
2GI
BDO
CB
2GI
2GI
2GI
2GI
2GI
2GI
JB w/M H
2GI
JB w/M H
2GI
4O TCB
2GI
2GI
2GI
2GI
JB w/M H
4O TCB
15
"
C
S
P
3GI-A
3GI-A
2GI-A
2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
HW
HW
HW
JB w/MH
JB w/M H
2
4"
C
SP
FS
FS
FS
FS
FS
2GI
2GI
P
GRATE
2GI W / FLAT
2GI
FS
2GI
FS
2GI
FS
2GI
Conv. O TCB To 2GI
FS
P
P
FS
2GI
15
" C
SP
GRATE
2GI W / FLAT GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
GRATE
2GI W / FLAT
FLAT GRATE
2GI W /
192
193
194
195
196
197
201
200
202
203
199 198
212
211
210
209
196A
224
228
227
226
236
235
234
232
233
231
230
237
238
244
223
222
225
213
214
208
206
207
205
204A
204
221
217
218
219
220
216
215
247
248
249
250
251
252
255
254
253
239
240
241
242
243
229
FROM
STA
18+25
TO
19+25
-Y4RPD-
LT
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #5
b= 5 Ft.
B= 3 Ft.
Min. D= 3 Ft.
FRO M STA 638+35 TO 640+55 -L- LT
FRO M STA 630+50 TO 633+35 -L- RT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #13
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 644+00 TO 646+05 -L- LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA 59+75 TO 60+15 -Y4RPBD- RT
FRO M STA 17+20 TO 17+50 -Y4LPD- RT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #25
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 4 Ft.
Max. d= 3 Ft.
Min. D= 3 Ft.
FRO M STA. 19+29 TO 21+12 -Y4RPA- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
FL
A
T
T
ER
2:
1
O
R
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FRO M STA. 39+01 TO STA. 39+35 -Y4CD- LT
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
221A
221B
395A
18" RCP-III
18" RCP-III
15
"
RC
P
-
III
15" RCP-III
42" RCP-C
D
42" RCP-C
D
15
"
RC
P
-
IV
15
"
RC
P-
III
18
"
RC
P-
IV
15
" RC
P-
III
18
" RC
P-
III
24" RCP-III
2
4"
RCP-III
2
4
" RC
P-
III
15" RCP-III
18
" RC
P-III 24" RCP-III
15" RCP-III
18" RCP-III
1
5
"
R
C
P-III
15" RCP-IV
15" RCP-III
2
4"
R
C
P-I
V
24" RCP-IV
15" RCP-III
30" R
CP-III
1
5
" R
C
P
-III
15
"
RC
P-
III
TRENCHLESS INSTALLATIO N 48" W ELDED STEEL
15" RCP-III
15" RCP-IV
24" RCP-V
24" RCP-V
24" RCP-IV
24" RCP-III
18
" RC
P-IV
18" RCP-III
15"
R
C
P-I
V
18
"
RC
P-
III
15" RCP-III
1
5
"
R
C
P
-
I
V
18" RCP-III 18" RCP-IV 1
5
"
R
C
P-II
I
18" RCP-III
54" RCP-V
54" RCP-V
60"
R
CP-
C
D
60"
R
CP-
C
D
1
5
"
R
C
P
-
I
I
I
2GI
15" RC
P-III
FS
2O TCB
FLAT GRATE
2GI W /
223A
231A
244A
SEE SHEET 2-TT
PSH
STA 22+72.73 -Y4RPA- LT
BEGIN SHO ULDER BERM GUTTER
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 26+50 TO 29+40 -Y4RPD- RT
FRO M STA 60+00 TO 62+50 -Y4RPBD- LT
GRATE
2GI W / FLAT
462
24" RCP-III
18
"
RC
P
-CD
15" CSP
W/2 ELBO
WS
-
N
W
Y
4
R
P
B
D
1-
-NW Y4RPA-
S
C
R
U
B
U
CS
H
T
R
S
4
8
"
4
S
B
W
18
"
R
C
P
15" RCP
18" CMP
18" RCP
4" HDPE
C
O
N
C
H
W
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
I
P
E
E
N
D
2
4
"
R
C
P
F
E
S
FES
1
8
"
R
C
P
1
5
"
R
C
P
4
2
"
R
C
P
1S
F
D
3
S
B
W
10’ BST
S
R
2
6
8
7 H
AS
T
INGS
H
ILL R
D
2
2
’ B
S
T
12
" R
C
P
B
W D
W
/LT
S
1S
B
K
D
20’ CONC
GR
S
S
1S
B
KD
20’ CONC
72" CHL
7
2
" WD
15’ BST
1S
B
KD
18’ BST
S
1S
F
D
36" CONC
48" PLASTIC
1S
F
D
WD
CONC
3
6
"C
O
N
C
C
A
N
O
P
Y
M
T
L
S
W
48" PLAST
IC
1SBW
48"WW
15
"
R
C
P
WEAVIL RIDGE RD GR
1S
B
K
D
3
6
" B
K
60" CHL
W/
L
T
W/
L
T
S
1S
F
D
GR
S
12’ CONC
1S
B
K
D
4
8
" C
O
N
C
12" RCP
W
/
L
T
12
" R
C
P
15
" R
C
P
C
O
N
C
2
S
B
K
D
4
8
" C
HLW
G
CONC
WD
2SBKD
GR
GR
GR
12
" R
C
P
12
" R
C
P
S
R
2
6
8
7
H
AS
T
IN
GS
H
ILL
R
D
2
0
’ B
S
T
S
B
S
GATEMTL
GATEMTL SILO
2SFD
W
/
L
T
1SFD
S
B
S
T
20’ BST
CONC CURB
CONC CURB
G
3
6
"
C
O
N
C
B
K
W
A
L
L
B
K
W
A
L
L
48" 5SELEC
60" WD
48" WW
48" W W
M
T
L
M
T
L
M
T
L
M
T
L
6
0
"
W
W
&
1
S
B
W
DOCKWD
1SLO GD
S
S
S
C
A
N
O
P
Y
M
T
L
H
T
R
C
O
N
C
BST
4
8
" C
HL
60" CHL
6
0
"W
W
&
1S
B
W
GERRY RD 20’ BST
F
O
U
N
D
A
TI
O
N
A
B
A
N
D
12" RCP 12" RCP
HTR
HTR
HTR
HTR
S
S
S
W
W
/
L
T
W
/
L
T
W /LT
1S
B
KD
S
B
1SFD
S
W
D
GR
12
" R
C
P
12
" R
C
P
B
6
0
"
W
W
&
1
S
B
W
W
/
L
T
W
/
L
T
3
6
"
W
W&
1S
B
W
M
T
L
M
T
L
48" WW
60" W D
15
"
R
C
P
1
8
"
R
C
P
1
5
"
R
C
P
GATE
M
T
L
W /LT
6
0
"
W
W
1
S
B
W
6
0
"
W
W
&
1
S
B
W
WD
DK
WD
D
K
D
KW
D
4
8
" C
O
N
C
4
8
"
B
K
WD
DK
WD
D
K
GATE
M
TL
3
6
" C
O
N
C
12
" R
C
P
WD
D
K
CONC
CONC CURB
CONC CURB
S
O
I
L
G
R
12
" R
C
P
GR
GR
6
0
" C
H
L
3
6
"
C
O
N
C 1S
B
KD
D
K
W
D
G
R
G
R
G
R
W/LT
48"W W &1SBW
D
I
D
I
D
I
D
I
D
I
24"
R
C
P
D
I
D
I
PONDW.E.852.7
P
O
N
D
W.E
.8
6
5
.5
SCRUB
SCRUB
5S
E
L
E
C
4
S
B
W
S
C
R
U
B
S
C
R
U
B
SCRUB
4SBW
4
S
B
W
5
S
E
L
E
C
BST
36" CONC
S
C
R
U
B
I
-
4
0
B
U
S
W
B
L
U
S
4
2
1
N
B
L
2
6
’
B
S
T
I-
4
0
B
U
S
E
B
L
US
4
2
1 S
B
L
2
6
’ B
S
T
10’ CONC
4
8
" P
L
A
S
T
IC
R
A
IL
9’ CONC
RAIL
3
S
B
W
3
S
B
W
HTR
HTR
HTR
HTR
HTR
H
T
R
H
T
R
HTR
HTR
s
12" RCP
12" RCP
W /LT
W/
L
T
12" RCP
12" RCP
CANOPYMTL
15" RCP
12" RCP
LT
W
W /LT
G
R
4
8
"
C
H
L
S
S
W
48"
C
H
L
S
W
36"
W
D
HTR
S
G
R
GR
S
OIL
S
S
7
2"
W
D
W/
L
T
L
TW S
48"
W
D
S
R 2827
H
A
M
M
O
N
D
S
T 17’ B
S
T
S
48" CHL
15" RCP
15" RCP
48"
C
H
L
G
R
LT
W/
L
T
12" RCP
G
R G
R
S
W
72"
W
D S
S
48"
C
H
L
S
S
48"
C
H
L
HTR
HT
R
H
T
R
HTR
HTR
HT
R
HTR
HT
R
H
T
R
HT
R
HTR
H
T
R
2SBKD
CANOPYMTL
12"
R
C
P
12"
R
C
P
GR
SS
LT
12" RCP G
R
S
OIL48" CHL
12" RCP
12" RCP
S
GR
G
R
GR
LT
W
1
2
"
R
C
P
1
2
"
R
C
P
GR
SOIL
W
15
"
R
C
P
12
" R
C
P
12
" R
C
P
15
" R
C
P
GR
GR
GR
GR
GR
GR
S
S
W
W
W
S
S
S
1SFD
S
SS
S
S
S
S
SS
SSS
G
CANOPYMTL
H
T
R
C
A
N
O
P
Y
M
T
L
W
W
W
W
S
W
W
24" RCP
18" RCP
18
"
R
C
P
1
8
"
R
C
P
ABANDHTR
GR
G
R
GR
S
1
S
F
D
CONC
36"
ABANDS
S
S
SW
S
S
S
12"
R
C
P
12"
R
C
P
S
48"
W
W
48" W W
4
8"
C
H
L
GR
4
8"
W
W
GR
GR
4
WW 1S
B
W
H
T
R
SCRUB
SCRUB
SCRUB
SCRUB
W. E. 852.8
APPROX
S
C
R
U
B
S
36" W W &1SBW
GR
GR
48"
C
H
L
W
POND
T
IMB
E
R
S
HTR
H
T
R
HTR
S
R
2
8
2
8
R
A
C
H
E
L
S
T
17’
B
S
T
18"
R
C
P
18
"
R
C
P
6 " HDPE
6" DIP
W
/
L
T
W
/
L
T
W/
L
T
PONDW. E. 852.7
W/L
T
12" RCP
12
" R
C
P
G
R
W
T
W
16
" D
I
16
" D
I
16
" D
I
6
" D
I
6
" D
I
6
" D
I
4
" P
L
4
" P
L
4
" P
L
END NOISE WALL -NWY4RPA-
-NWY4RPBD1-
BEG NOISE WALL
GRAU-350
GRAU-350
GRAU-350
GRAU-350
C
A
T
-
1
B-77
B-77
B-77
B-77
GRAU-350
B-77
B-77
C
A
T
-
1
CAT-1
CAT-1
G
R
A
U
-
3
5
0
B-77CAT-1
B-77
B-77
CAT-1
GRAU-350
GRAU-350
CAT-1
GRAU-350
CAT-1
GRAU-350
ATTENUATORTYPE-350
TYPE
B-
7
7
G
RAU
3
5
0
G
RAU
3
5
0
B-77
B-77
B-77
GRAU-350 CAT-1
C
AT-
1
G
RAU
3
5
0
G
R
A
U
3
5
0
C
A
T
-
1
TYPE
B-
7
7
TYPE
B-7
7
TYPE B-7
7
TYPE
B-
7
7
TYPE
B-
7
7
G
RAU
3
5
0
TYPE
B-
7
7
TYPE
B-
7
7
G
RAU
3
5
0
TYPE B-77
TYPE B-77
TYPE B-77
TY
PE B-77
G
R
A
U 350 TL-3
T
Y
P
E
B-77
TYPE B-77
ELEV. = 899.76
E = 1665571
N = 862500
-BY15- STA 8+99 27’ LT
BM #9
-BL-50
-BL-51
-BL-52
-BL-53
-BL-54
-BL-55
-BY13-537
-BY15- 419
-BY13-535
-BY14-536
-BY16- 133
-B
Y
15
-
5
3
8
-BY15-539
-BY16-
-
B
Y
1
6
-
-BY17-554
-BY17-555
18" CMP
6" DIP
30" CMP
R
U
S
T
E
D
B
R
O
K
E
N
A
N
D
P
I
P
E
E
N
D
6 " HDPE
42" RCP
4" HDPE
INV=866.23INV=858.11
18" RCP
INV=865.36INV=864.14
2
4
"
RCP
FES
FES
15" RCP C
B
C
B
C
B
C
B
C
BC
B
18"
RCP
1
8
"
R
C
P
18
" R
C
P
18"
R
C
P
C
B
18"
R
C
P
18" RCP
18"
R
C
P
18" RCP
15" RCP
C
O
N
C
H
W
DOROTHY T. BAKER
DOROTHY A. BAKERBERDINA SMITH
SANDRA F. SHREVE
BRANDON P. MILLER
DEBORAH P. M ILLER
TED F. SWAIM JR.
3
0
’ A
C
C
E
S
S
E
A
S
E
ME
NT
DB
2
0
3
0
P
G 12
7
9
3
0
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
1
6
4
7
P
G
4
0
2
511.84’
498.50’
2
0
0
.0
0
’
13
0
.0
0
’
9
9
.8
8
’
109.41’
50.00’
50.00’
100.00’
100.00’
100.00’
2
3
4
.6
3
’
9
9
.9
2
’
9
9.
1
5
’
177.69’
1
6
4
.
2
0
’
140.00’
119
.
4
0
’
8
2
.
0
0
’
7
0
.
0
0
’
200
.02’
209
.23’
153.01’ EIP TO COR
150.00’ R/W TO COR
60
.00’
E
X
IS
T
ING
R
/
W
E
X
IS
T
ING
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
3
7
9
.
6
3
’
8
1.
3
5
’
2
1.
3
3
’
276
.03
’
E
I
P
E
I
P
E
I
P
E
I
P
E
I
P
E
I
P
E
I
P
200.00’
300.00’
200.00’
200.00’
100.00’
200.00’
200.00’100.00’
200.00’
99.82’
324.35’
199.93’
199.94’
199.97’
199.98’
W.L. TRULL
FAY C. WOODS
ROLAND WILLIS WOODS
PATTI RHODES
JERRY W . RHODES
60.00’
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
60.00’
60.00’
EXISTING R/W
EXISTING R/W
E
I
P
E
I
P
272.00’
294.00’
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
289.81’
15
0
.0
0
’
290.05’
229.92’
2
3
7
.9
2
’
78.06’
E
I
P
E
X
I
S
T
I
N
G
R
/
W
278.00’
E
X
I
S
T
I
N
G
R
/
W
EIP
EIP
EIP
EIP
EIP
EIP
392.80’
191.29’
50.92’
9
9
.7
9
’
2
3
8
.7
0
’
635.42’
34.00’
159.91’
205.03’ EIP TO COR
205.47’ R/W TO COR
253.27’ EIP TO COR
253.03’ R/W TO COR
168.55’ EIP TO COR
168.35’ R/W TO COR
178.87’ EIP TO COR
177.92’ R/W TO COR
60.00’
E
X
IS
T
ING
R
/
W
205.28’
233
.70’
259
.18’ EIP
TO
COR
258
.74’ R/W
TO
COR
E
XIS
TI
N
G
R/
W
E
XIS
TIN
G
R/
W
E
IP
E
IP
324
.27’ COR
TO
R
/W
323
.83’ COR
TO
EIP
218.05’
250.00’
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
E
X
IS
T
ING
R
/
W
60.00’
R/W MON
R
/
W
M
O
N
R
/
W
M
O
N
R
/
W
M
O
N
R
/
W
M
O
N
E
IP
60.35’
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
PENNY NELSON ENSCORE
RICHARD LEE ENSCORE
106.94’
577.08’
272.00’
DB 2030 PG 1276
DB 2030 PG 1279
DB 1692 PG 3186
DB 1137 PG 1712
PB 18 PG 97
DB 1405 PG 1207
PB 18 PG 20
DB 1645 PG 2777
PB 18 PG 20
DB 1781 PG 1864
PB 18 PG 20
DB 1165 PG 748
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
F
O
R
S
Y
T
H
C
O
U
N
T
Y
F
O
R
S
Y
T
H
C
O
U
N
T
Y
PRESERVATION TRUST)
(FORMERLY - GRIFFIN FAMILY
NC D.O.T.
BETTY W. PEDDYCORD)
DONALD L. PEDDYCORD
(FORMERLY -
NC D.O.T.
;
;
;
;
100.00’
176
.31’
+96
.68
445
.53’
+96
.68
305
.84
’
+56
.86
7
5
.
4
8
’
+
14
.
6
3
124.80’
+37.37
196.66’
+84.75
195.48’
+93.18
126.17’
+27.42
142.41’
+86.97
125.31’+14.52
143
.60’
+61.16
30.03’
+04.19
32.56’
+16.23
36.43’
+15.11
38.25’
+84.09
376.52’
+39.89
26.28’
+37.41
5
.2
2
’
+
3
1.0
1
1
1
5
.
4
1
’
+
8
6
.
6
8
9
6
.
0
8
’
+
8
6
.
6
1
89
.79
’
+06
.84
DB 915 PG 488
SUE S. ROUTH
CAROL S. DEBUSK
DB 2747 PG 2674
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 2747 PG 2674
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 2666 PG 2563
DB 2666 PG 2563
(FORMERLY - GRIFFIN FAMILY PRESERVATION TRUST)
NC D.O.T.
DB 2700 PG 3508
DB 2603 PG 2115
MELODY MYERS PEDDYCORD
STEPHEN MICHAEL PEDDYCORD
DB 1535 PG 0368
DB 1772 PG 1342
DB 2059 PG 3356
DB 0770 PG 0482
FAYE G. PEDDYCORD
REX LANIER PEDDYCORD
DB 1535 PG 0368
DB 1772 PG 1342
DB 2059 PG 3356
DB 0770 PG 0482
FAYE G. PEDDYCORD
REX LANIER PEDDYCORD
DB 1535 PG 0368
DB 1772 PG 1342
DB 2059 PG 3356
DB 0770 PG 0482
FAYE G. PEDDYCORD
REX LANIER PEDDYCORD
PB 37 PG 46
NO RECORDED DEED
SUE S. ROUTH
CAROL S. DEBUSK
LINDA W . REED)
(FO RM ERLY -
NC D.O.T.
PB 18 PG 20
DB 2649 PG 1979
PB 18 PG 20
DB 2439 PG 0875
P
B
18
P
G
2
0
D
B
16
6
0
P
G
3
5
8
3
F
A
Y
E
G
A
R
D
N
E
R
P
E
D
D
Y
C
O
R
D
R
E
X
L
A
N
IE
R
P
E
D
D
Y
C
O
R
D
P
B 18 P
G 20
D
B 1813 P
G 2678
O
F S
E
V
E
N
T
H
D
A
Y
A
D
V
E
N
TIS
T
S, I
N
C.
S
O
U
T
H
E
R
N
U
NI
O
N
C
O
NF
E
R
E
N
C
E
A
S
S
O
CI
A
TI
O
N
P
B
18
P
G
20
D
B 1813
P
G
26
78
O
F
S
E
V
E
N
T
H
D
A
Y
A
D
V
E
N
TIS
T
S, I
N
C.
S
O
U
T
H
E
R
N
U
NI
O
N
C
O
N
F
E
R
E
N
C
E
A
S
S
O
CI
A
TI
O
N
PB 18 PG 97
DB 1660 PG 3583
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
P
B 18 P
G 20
D
B 2823
P
G 0065
O
F
T
R
A
NSP
O
R
T
A
TIO
N
N
O
R
T
H
C
A
R
O
LI
N
A
D
E
P
A
R
T
M
E
N
T
P
B 18 P
G 20
D
B 2983 P
G 0254
M
Y
R
N
A
W
HIT
L
E
Y
J
A
M
ES J.
Mc
C
UIS
T
O
N, T
R
U
S
T
E
E
P
B 18 P
G 20
D
B 2928 P
G 2303
C
A
S
HIO
N
E
N
T
E
R
P
RIS
ES, L
L
C
P
B 18 P
G 20
D
B 2224 P
G 3701
J
E
A
N
S
N
Y
D
E
R
L
O
C
K
L
E
A
R
B
U
R
NIC
E
L
O
C
K
L
E
A
R J
R.
P
B 18 P
G 20
D
B 1650
P
G 1576
J
A
M
ES
R.
A
T
KI
N
S
P
B 18 P
G 20
D
B 1660
P
G 3583
F
A
Y
E
G
A
R
D
N
E
R
P
E
D
D
Y
C
O
R
D
R
E
X
L
A
NIE
R P
E
D
D
Y
C
O
R
D
PB 18 PG 97
DB 1660 PG 3589
FAYE GARDNER PEDDYCORD
REX LANIER PEDDYCORD
PB 18 PG 97
PB 18 PG 20DB 725 PG 28LOUIS D. REECE
PB 18 PG 97
DB 3039 PG 2235
DOROTHY T. BAKER
PB 18 PG 97
DB 1887 PG 2493
REGIONAL REALTY INC.
PB 18 PG 97
DB 1035 PG 641
JOHN ROY CROTTS, JR. HEIRS
PB 18 PG 97
DB 2774 PG 0960
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 18 PG 97
DB 2762 PG 3311
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 2794 PG 2158
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
E
I
P
NO DEED LISTED
SUE S. ROUTH
CAROL S. DEBUSK
30’ ACCESS EASEMENT DB 1538 PG 142
339.46’
329.60’
9.72’
260.76’
77.82’
334.71’
CHARLES M. SIMMONS
EIP
EIP
EIP
EIP
EIP EIP
EIP
10.94’
261.09’ EIP TO EIP
260.68’ R/W TO EIP
E
XIS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
E
IP
I
M
O
G
E
N
E
L
.
E
L
A
M
3
3
8
.8
5
’ E
IP
T
O
C
O
R
3
3
8
.4
4
’ R
/
W
T
O
C
O
R
GARY LEE WEAVIL
DB 1477 PG 1552
D
B
1
1
4
9
P
G
1
6
8
6
D
B
1
3
4
1
P
G
4
3
8
P
B
2
8
P
G
1
9
3
D
B
1
3
6
8
P
G
1
6
5
3
D
B
1
0
1
1
P
G
9
4
4
DB 1177 PG 1598
DB 1803 PG 226
DB 1538 PG 142
DB 1456 PG 108
E
I
P
339.27’ EIP TO COR
339.54’ R/W TO COR
29.98’
+29.42
28.54’
+63.58
21.10’
+01.50
30.31’
+21.81
D
B
2
7
2
7
P
G
1
1
2
7
B
R
I
A
N
J
A
M
E
S
S
I
M
M
O
N
S
R
E
N
E
E
L
Y
N
N
F
A
B
I
N
I
A
K
DB 1489 PG 797
KENNETH ANDREW HOLDER
BETSY GORDON
BOBBY F. GORDON & WIFE
FAYE G. PEDDYCORD
REX L. PEDDYCORD & WIFE
ANGELA WAUGH
JOHN LEWIS WAUGH & WIFE
DB 930 PG 137
JANICE LAWSON LONG
ALBERT RAY LONG & WIFE
DB 2919 PG 1995
DENA B. WILLIAMS
BRIAN K. WILLIAMS & WIFE
DB 2997 PG 2335
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
TRAFFIC DIAGRAM
-L-
21,300
27,300
24,660
36,980
32,600
43,800
2010 ADT
2030 ADT 47,720
61,160
5,360
7,280
4,940
5,420
6,600
11,800
53,560
79,880
DUAL = 5%
TTST = 6%
DIR = 60%
DHV = 10%
DUAL = 6%
TTST = 12%
DIR = 60%
DHV = 10%
-Y4- (US 421/I-40 BUS. )
BELTLINE
STA 666+25 -L- RT
BEG IN SHO ULDER BERM GUTTER
SILL
3@ 12’x10’ RCBC
RIP RAP
CLASS ’I’
EST 10 SY FF
EST 3 TO N S
RIP RAP
CLASS ’B’
RIP RAP
CLASS ’I’
SEE DETAIL#4
LATERAL V-DITCH
SEE DETAIL#12
W / 957 SY FF
EST. 417 TO NS
W / CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#6
EST 309 SY FF
EST 114 TO NS
CLASS "B’ RIPRAP
TO E PRO TECTIO N W /
EST 21 SY FF
EST 8 TO N S
RIP RAP
CLASS ’B’
EST
7
SY
FF
EST
2
TO
N
S
R
IP
RA
P
C
LA
SS
’B
’
15" RCP-IV
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
7
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
17U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A
.
6
5
6
+
5
1
S
H
E
E
T
1
6
M
A
TC
H
LIN
E
-
L-
S
TA
.6
6
8
+
17
S
H
EET
18
Y4RPD Y4RPC L
Y4CD
NOTE :
FOR -Y4CD- PROFILE, SEE SHEET 63-64
FOR -L- PROFILE, SEE SHEET 40, 41
Ls = 300.00’
LT = 200.01’
ST = 100.01’
F
PI Sta 633+75.85
D
L = 3,180.22’
T = 1,595.11’
R = 16,400.00’
ST = 100.01’
LT = 200.01’
Ls = 300.00’
PIs Sta 677+38.67
F
PI Sta 669+49.81
D
T = 699.51’
R = 4,595.00’
L = 1,388.36’
PIs Sta 661+50.31PIs Sta 30+59.60
F
Ls = 240.00’
LT = 160.08’
ST = 80.08’
PI Sta 23+02.72
D
L = 1,739.53’
T = 1,062.72’
R = 1,200.00’
PIs Sta 11+60.08
F
Ls = 240.00’
LT = 160.08’
ST = 80.08’
PIs Sta 17+45.29
F
Ls = 240.00’
LT = 160.08’
ST = 80.08’
PI Sta 22+28.62
D
L = 778.34’
T = 403.41’
R = 1,200.00’
PIs Sta 26+83.62
F
Ls = 240.00’
LT = 160.08’
ST = 80.08’
PIs Sta 65+57.81
F
Ls = 280.00’
LT = 186.68’
ST = 93.34’
PI Sta 75+48.93
D
L = 1,774.33’
T = 897.80’
R = 4,712.00’
PIs Sta 85+18.80
F
Ls = 280.00’
LT = 186.68’
ST = 93.34’
SE = 08 SE = NC SE = 05
SE = 04
SE = 08
FOR -Y4RPC- PROFILE, SEE SHEET 78
FOR -Y4RPD- PROFILE, SEE SHEET 80
PAVED SHOULDER
6
6
0
6
6
5
0
0
0
2
0
2
0
1
0
2
0
3
0
4
0
1
0
5
0
4
0
3
0
5
0
4
0
4
0
3
0
3
0
4
0
3
0
2
0
1
0
0
0
10
20
30
40
50
6
0
2
0
2
0
2
0
2
0
0
0
2
0
2
0
2
0
1
70’ INC.
0
70
8
0
1
3
6
’
2
4
’
16
’
2
4
’
3
6
’
4
6
’
4
8
’
3
6
’
2
4
’
4
6
’
4
6
’
-L--L-
-Y4CD--Y4CD-
-Y4RPC-
1
0
0
8
0
2
0
3
0
4
0
5
0
6
0
7
12
’
40’ INC.
-Y4RPD-
30’ INC.
4
’ P
.S
.
4
’ P
.S
.
16
’
-Y4RPD
-
10’P.S.
12’P.S.
6
5
7
0
10
15
OFFSET 82’ LT
-L- STA 656+87.00
BEGIN SPECIAL MEDIAN GRADING
OF GUARDRAIL
PAVE TO FACE
-Y4CD- TS Sta. 63+71.14 -Y4CD- SC Sta. 66+51.14
-Y4RPC- SC Sta. 12+40.00
-Y4RPC- TS Sta. 10+00.00
-L-TSSta. 659+50.30
-L-SCSta. 662+50.30
-Y4RPD- POT Sta. 10+00.00
-Y4RPD- TS Sta. 15+85.20
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
-Y4CD- POC Sta. 70+00.00
(12’ LT)
12’P.S.
12’P.S.12’P.S.
4’P.S.
-Y4RPD- STA. 13+97.64
BEGIN -Y4RPD- PAVEMENT
END -Y4CD- PAVEMENT
8:1 TAPER
4’P.S.
12’ P.S.
720’ TRANSITION
12
’
-Y4RPD- SC Sta. 18+25.20
-L- STA 64+73.00 OFFSET 82’ LT
-L- POT STA. 659+03.90 (59’ RT)
GRADING
END SPECIAL MEDIAN
W.W. FENCE
END
W.W. FENCE
BEGIN
W.W. FENCE
END
W.W. FENCE
BEGIN
271.52’
+28.00 -L-
229.01’
+80.00 -L-
F
F
F
C C
C
C C
F
F
F F
F
+50.30 -L-
+40.00 -L-
+40.00 -Y4RPC-
141.00’
200.00’
230.00’
+19.18 -Y4CD-
186.19’
+25.20 -Y4RPD-
129.00’
+85.20 -Y4RPD-
142.40’
+50.30 -L-
146.64’
205.30’
+51.14 -Y4CD-
192.75’
+00.00 -Y4RPC-
319’
+63 324’
+00
+87.87 -Y4CD-
154.71’+83.37 -Y4CD-
151.46’
207
166
165
208
+15
240’
230’
+40
240’
+41.00 -Y4CD-
+88.90 -Y4CD-
172.72’
150.47’
CHO RD
CHO RD
CHO RD
CHO RD
CHO RD
167
2G I
2GI
2G I
2G I
2GI
2G I
2G I
2GI
2G I-A
2G I-A
2G I-A 2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
JB w/M H
SPRIN G BO X
SPRIN G BO X
G
RATE
2G
I W
/ FLA
T
257
258
259
256
271
268
269
270
262
261
260
263
264
265
266
267
272 273 274
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
M in. D= 2 Ft.
FRO M STA 18+25 TO 19+25 -Y4RPD- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 659+00 TO 661+00 -L- RT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 657+60 TO 663+80 -L- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #21
*When B is < 6.0’b= 5 Ft.
B= 3 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’I’ Rip-Rap
FRO M STA 663+80 TO 666+70 -L- LT
1
8
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
8
" D
IP
HW
HW
HW
18" R
C
P-III
24" RCP-III 30" RCP-III
30" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
3 0 " R C P -I II
3 0 " R C P -IV
3 0 " RC P -IV
30" RCP-III
15"
R
C
P-III
15
"
RC
P
-
III
30" RCP-III
15
"
RC
P
-
III
30" RCP-III
6
0
"
R
C
P
-
I
V
6
0
"
R
C
P
-
I
V
6
0
"
R
C
P
-
I
V
8
" D
IP
8" D IP
SEE DETAIL #21
W / 544 SY FF
EST. 209 TO N S
W / CLASS ’I’ RIP RAP
LATERAL 3’ BASE DITCH
455
G RATE
2G I W /FLAT
-NWCD2-
BEG NOISE WALL
-NWCD2-
PROP. NOISE WALL
T
O
P
=
8
4
2.
1
4
I
N
V
=
8
3
3.
9
4
T
O
P
=
8
4
2.
2
1
I
N
V
=
8
3
4.
6
1
T
O
P
=
8
4
4.
4
8
I
N
V
=
8
3
5.
0
8
1
5
"
V
C
15
"
V
C
15"
V
C
2SFD
S
S
4
8
"
C
H
L
36"CO
N
C
S
GR
W/
L
T
G
S
S
C
O
N
C
W
D
D
K
SCRUB
8 8 7.9
W
.E .
SCRU B
1
0
GRAU-350
ATTENUATOR
TYPE-350
CAT-1
CAT-1 GRAU-350
-BL-56
-BL-57
-BL-58
30’ ACCESS EASEM ENT DB 1538 PG 142
579.14’
182.12’
18
2
.
6
8
’
39.96’
220.48’
323.10’
10
7.
6
3’
50.59’
6
7
.
7
0
’
2
3
9
.
9
2
’
8
0
.
4
1’
115
.
3
5
’
18
6
.
6
3
’
18
1.
5
7
’
989.18’
994.04’
EIP
EIP
EIP
817.03’
GROUP GGK, LLC
GLENN D. HART
1307.53’
FAYE G. PEDDYCORD
REX L. PEDDYCORD
DB 1489 PG 797
DB 1634 PG 2372
DB 2143 PG 3750
DB 2356 PG 43
DB 2112 PG 146
BETSY GORDON
BOBBY F. GORDON
DB 1477 PG 1552
KENNETH ANDREW HOLDER
DB 1489 PG 797
F
O
R
S
Y
T
H
C
O
U
N
T
Y
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
2
0
’ S
A
N
IT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
14
7
.
5
7
’
+
4
0
.
6
4
2
8
8
.
2
4
’
+
4
0
.
19
DB 1177 PG 1598
D
B
2
7
7
4
P
G
0
6
8
8
C
H
E
R
Y
L
A.
M
Y
E
R
S
E
R
I
C
Z
.
M
Y
E
R
S
DB 2909 PG 2299 JOHN E. CRUTCHFIELD
REBECCA WHITLEY LADD
CHARLES SPENCER LADD JR. & W IFE
60.47’
8
8
.
0
8
’
250.05’
STA 669+00 -L- RT
EN D SHO ULDER BERM G UTTER
CO NN ECTO RS
AND RO D AN D LUG
15" CSP W / 2 ELBO W S
W / ELBO W
30" CSP
EST 50 SY FF
EST 26 TO N S
RIP RAP
CLASS ’I’
SEE PRO FILE FO R GRADE
SPECIAL DITCH G RADE
SEE PRO FILE FO R G RADE
SPECIAL DITCH G RADE
W / 313 SY FF
EST. 125 TO NS
CLASS ’I’ RIP RAP
EST. DDE 170CY
SEE DETAIL#25
TAIL DITCH
CO NN ECTO RS
AN D RO D AN D LUG
15" CSP W / 2 ELBO W S
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
STA 671+50 TO 674+00 -L- LT
BERM DITCH
STA 671+50 - 672+50 -L- LT
BERM DITCH
30"
GRATE
2GI W /FLAT
CO NN ECTO RS
AND RO D AN D LUG
15" CSP W /2 ELBO W S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
8
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
18U-2579B
M
A
T
C
H
L
I
N
E
-
L
-
S
T
A.
6
6
8
+
1
7
S
H
E
E
T
1
7
M
A
T
C
H
LIN
E
-
L-
S
T
A
.
6
8
1+
0
4
S
H
E
E
T
1
9
L
FOR -L- PROFILE, SEE SHEET 41
NOTE :
PI Sta 669+49.81
D
L = 1,388.36’
T = 699.51’
R = 4,595.00’
PIs Sta 677+38.67
F
Ls = 300.00’
LT = 200.01’
ST = 100.01’
PIs Sta 661+50.31
F
Ls = 300.00’
LT = 200.01’
ST = 100.01’
Y4CD
PIs Sta 85+18.80
Ls = 280.00’
LT = 186.68’
ST = 93.34’
F
PI Sta 75+48.93
L = 1,774.33’
T = 897.80’
R = 4,712.00’
D
PI Sta 92+21.85
L = 752.53’
T = 376.39’
R = 12,000.00’
D
PIs Sta 87+98.80
F
Ls = 140.00’
LT = 93.33’
ST = 46.67’
SE = 04
SE = 05
FOR -Y4CD- PROFILE, SEE SHEET 64-65
PAVED SHOULDER
6
7
0
6
7
5
6
8
0
0
5
0
5
0
2
0
4
0
3
0
2
0
1
0
0
0
1
0
2
0
3
0
4
0
2
0
2
0
4
0
4
0
3
0
3
2
4
’
3
6
’
4
8
’
3
6
’
2
4
’
4
6
’
3
6
’
4
8
’
4
6
’
-L-
-L-
-Y4CD-
60’ INC.
-
L
-
C
S
S
t
a
.
6
7
6
+
3
8
.
6
6
-
L
-
S
T
S
t
a
. 6
7
9
+
3
8
.6
6
10’P.S.
12’P.S.
7
5
8
0
8
5
-
Y4
C
D
-
C
S
S
t
a
. 8
4
+
2
5
.4
6
OFFSET 82’ LT
-L- STA 668+93.00
GRADING
END SPECIAL MEDIAN
OF GUARDRAILPAVE TO FACE
12’P.S.
12’P.S.
12’ P.S.
4’P.S.
8:1 TAPER
END -Y4CD- PAVEMENT
-Y4CD- STA. 85+65.67
BEGIN -L- PAVEMENT
10’ P.S.720’ TRANSITION
4’P.S.
8:1 TAPER
W .W . F E NCEBEGIN
C
C
C
C
F
C
C
+38.66 -L-
+38.66 -L-
+63.95 -L-
+53.19 -L-
265.00’
200.00’
321.16’
269.56’
193.51’
+25.46 -Y4CD-
208
953
953
+25.00 -L-
+00.00 -L-
230.00’
330.00’
CH O RD
CHO RD
CHORD CH O RD
CH O RD CHO RD
CHO RD
CHO RD
CHO RD
2G I
2GI
2GI
2G I
2GI
2GI
2G I
2GI
2G I
2GI
2GI
2GI
2G I-A
2GI-A
2G I-A
2GI-A
2G I-A
2GI-A
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
G RATE
2G I W / FLAT
G RATE
2GI W / FLAT
277
278
279
275
276
283
282
281
280
284
285
286
287
288
289
290
291
292
293
294
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #25
*W hen B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 4 Ft.
M ax. d= 3 Ft.
M in. D= 3 Ft.
FRO M STA. 667+88 TO 669+14 -L- RT
276A
30" RCP-III 30" RCP-III
1
5
"
R
C
P
-
I
I
I
4
8
"
R
C
P
-
I
I
I
48" RCP-III
15" RCP-IV
42" RCP-III
3
0
"
R
C
P
-
I
I
I
3
0
"
R
C
P
-
I
I
I
36" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
30" RCP-III
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
24" RCP-III
15
"
R
C
P
-
III
15
"
RC
P
-
III
15
"
RC
P
-
III
18" RCP-III
SEE SHEET 2-TT
PSH
457
2O TCB
456
114889.11
*E
L3401
115873.00
*
B
L3401
116873.59
*E
L3401
117888.96
*
B
L3401
118888.81
*E
L3401
119877.95
*
B
L3401
120877.53
*E
L3401
121887.81
*
B
L3401
122882.06
*E
L3401
134871.65
125906.94
126893.02
129873.38
130870.41
*
B
L3401
131870.50
132873.00
*E
L3401
133869.69
SOIL
60" W D
PEACH TREE M EADOW S CIRCLE
-NWCD2-
PROP. NOISE WALL
-NWCD2-
END NOISE WALL
T
OP=841.77
IN
V=832.27
15
"
V
C
LOCATION
APPROX.16" DI
CAT-1
G RAU 350 TL-3
TYPE B-77
-BL-59
-BL-60
-BL-61
6
26.55’
1150.09’
185.0
0’
380.58’
256.30’
208.73’
1145.44’
GLENN D. HART
254.67’
DB 2112 PG 146
FO RSY TH CO U N TY
CITY O F W IN STO N -SA LEM
2
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
18
1.6
1’
+
3
9.0
0 330.63’+60.32
D
B
2
7
7
4
P
G
0
6
8
8
C
H
E
R
Y
L
A.
M
Y
E
R
S
E
RI
C
Z.
M
Y
E
R
S
DB 2909 PG 2299
JOHN E. CRUTCHFIELD
DB 2937 PG 4418
CHRISTOPHER M. CLOER
KRISTIN R. JESSUP
D
B
2
9
13
P
G
2
2
7
8
C
H
RIS
T
Y
F
AIT
H
N
O
L
A
N
C
H
A
N
NI
N
G
V.
B
A
L
L
E
W
D
B
2
8
7
5
P
G
13
3
6
J
O
N
A
T
H
A
N
A.
M
A
R
S
H
D
B
2
9
14
P
G
18
5
2
J
A
M
E
S
G. P
E
C
H
E J
R
L
EI
G
H
A. P
E
C
H
E
D
B
3
0
2
6
P
G
0
0
7
5
T
E
R
R
A
N
C
E
E
V
E
R
E
T
T
E
R
A
Y
M
O
N
D
V
A
U
G
H
A
N
D
B
2
7
8
3
P
G
4
2
5
8
G
A
N
E
S
H
W
A
R
D. S
HI
W
C
H
A
R
R
A
N
D
B
2
8
11 P
G
113
0
P
H
Y
L
LIS J. F
R
A
N
K
S
M
A
RI
O
N
A. F
R
A
N
K
S
D
B
2
8
5
0 PG 3571
M
A
R
VI
N SLADE
V
A
L
O
RI
E
L. SLADE
DB 2974 PG 2439
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
DB 2974 PG 2439
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
102
12
0
.3
7
’
110.7
7’
110.7
7’
119.9
7’
119.9
3’
119.8
9’
12
0.17’
12
0.12’
59.79’
65.16’
60.00’
55.00’
65.05’
131.85’
60.00’
PG 2847DB 2688
HOLDEN M . SIZEM O RE
ANDREW S. M A NGIA CA PRE A ND
DB 2795 PG 4359
60.00’
EIP
EIP
EIP
EIP
EXISTING R/W
STA 692+33 -L- RT
EN D SHO ULDER BERM GUTTER
STA 687+90 -L- LT
BEGIN SHO ULDER BERM G UTTER
STA 690+50 -L- LT
EN D SHO ULDER BERM GUTTER
STA 688+00 -L- RT
REVISE FILL SLO PE 2.75:1
CO N NECTO RS
AN D RO D AND LUG
15" CSP W / 2 ELBO W S
CO NN ECTO RS
AND RO D AN D LUG
18" CSP W / 2 ELBO W S
CO NN ECTO RS
AND RO D AN D LUG
15" CSP W / 2 ELBO W S
EST 108 SY FF
EST 51 TO NS
RIP RAP
CLASS ’I’
EST 8 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 108 SY FF
EST 51 TO NS
RIP RAP
CLASS ’I’
SEE DETAIL#31
RO CK FILL IN PO ND
SEE DETAIL#31
RO CK FILL IN PO ND
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
W / ELBO W
42" CSP
STA 686+50 -L- RT
BEG IN SHO ULDER BERM GUTTER
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
1
9
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
19U-2579B
M
A
TC
H
LIN
E
-
L-
S
T
A
.
6
8
1+
0
4
S
H
E
E
T
18
Y4CD
PIs Sta 85+18.80
Ls = 280.00’
LT = 186.68’
ST = 93.34’
F
PI Sta 75+48.93
L = 1,774.33’
T = 897.80’
R = 4,712.00’
D
PI Sta 92+21.85
L = 752.53’
T = 376.39’
R = 12,000.00’
D
NOTE :
FOR -L- PROFILE, SEE SHEET 41-42
PIs Sta 87+98.80
F
Ls = 140.00’
LT = 93.33’
ST = 46.67’
SE = NC
FOR -Y4CD- PROFILE, SEE SHEET 65
PAVED SHOULDER
6
8
5
6
9
0
6
9
5
0
2
0
2
0
1
0
1 0
2
0
2
70’ INC.
0
1
0
1 0
0
0
0
3
6
’
2
4
’
4
8
’
4
8
’
4
8
’
3
6
’
4
6
’
2
4
’
4
6
’
-L-
-L-
-L-
-Y4CD-
0
0
0
1
0
2
-
L
-
T
S
S
t
a
. 6
9
3
+
5
2
.9
8
END TIP PROJECT U -2579B
BEGIN TIP PROJECT U -2579AB
-L- POT STA. 692+32.98
12’P.S.
12’P.S.
12’P.S.
9
0
9
5
-
Y4
C
D
-
S
C
S
ta
. 8
8
+
4
5
.4
6
-
Y4
C
D
-
S
R
S
S
ta
. 8
7
+
0
5
.4
6
SIGN SUPPORT LOCATION
PROPOSED OVERHEAD
8:1 TAPER
12’P.S.
12’P.S.
-Y4CD- PT Sta. 95+97.99
W.W. FENCE
END
USE FOR ON-SITE MITIGATION
DE-WATER
F F
F
F
F
C
C
C
C
C
F
C
F
+52.98 -L-
200.00’
141.00’
+33.00 -L-
200.00’
+45.46 -Y4CD-
210
211
212
+30.00 -L-
+33.00 -L-
500.00’
500.00’
+50.00 -Y4CD-
141.00’
219 220
220
220
221
222
200.00’
200.00’
+15.00 -L-
+25.00 -L-
245.00’
200.00’
CHO RD
O N PL -L-
O N PL -L-
2GI
2GI
2GI
2G I
2G I
2G I
BDO
2G I-A
FS
FS
FS
FS
FS
HW
FS
FS
2G I
FS
GRATE
2G I W / FLAT
G RATE
2G I W / FLAT
G RATE
2G I W / FLAT
G RATE
2G I W / FLAT
Earth Fill
Rock Fill
To Berm
Proposed
2:1
10.0’
1.
5
:
1
( Not to Scale)
ROCK FILL IN POND
DETAIL #31
Elev.= 850.0
845.7
N.W.S. Elev.=
NG
295
296
297
298
299
300
305
301
302
303
304
306
307
308
STA. 687+90 TO 688+98 -L- RT
18
"
R
C
P
-
III
18" RCP-III
18
"
RC
P
-
III 42" RCP-IV
42" RCP-IV
15" RCP-IV
15
"
RC
P
-
IV
15
"
RC
P
-
IV
7
2
" RC
P-V
7
2
" RC
P
-V
18
"
RC
P
-
III
18
"
R
C
P
-
IV
SEE SHEET 2-TT
PSH
620
S
DA
M
CONC/ROCK
G
R
S
617
618
CONC
1SBKD
S
B
SOIL
3S ELEC
W . E. = 845.7’
POND
W . E. = 860.9’
POND
110
111
112
GRAU-350
GRAU-350
CAT-1
-BL-62
4
2.2
5’
20
8.6
9’
DB 1709 PG 1194
729.69’
DB 2673 PG 1185
DB 2673 PG 1182GLENDA JUNE COCKERHAM
PATTY W EAVIL MABE
735.24’
662.0
2’
4
2.2
5’
4
2.2
5’
206.35’
156.74’
+
73.37
10’
A
C
C
ES
S
E
A
S
E
M
E
N
T
D
B 954
P
G 8
40.00’
P
B
13
P
G 203
40’ S
T
R
E
E
T
EIP
EIP
EIP
E
XIS
TI
N
G
R/
W
E
XIS
TI
N
G
R/
W
2.00’
N 04 17’42" E
185.91’
N
86
32’30"
W
10
24.90’
N 86
32’30"
W
249.34’
N 04 07’49" E
29.42’
N 04 07’49" E
7.30’
N 04 07’49" E
N 03 53’15" E
638.93’
S 88
39’18" E
255.00’
S 00 06’18" E
205.32’
N 04 11’08" E
39.29’N 04 11’08" E
426.10’ EIP
T
O
C
O
R
R/
W
T
O
C
O
R
429.09’
600.00’
S 04 21’00" W
302.59’
PB 13 PG 203
DB 1029 PG 918
DB 954 PG 8
DB 1006 PG 551
DB 954 PG 8
DB 937 PG 28
DB 1211 PG 125
DB 1257 PG 1282
CHARLES JERRY HART
CHARLES JERRY HART
W ANDA L. BOOTH
BOBBY LEE M OORE
CHARLES JERRY HART
FRANCIS L. M ANUEL
BILLIE M ANUEL
12.58’ EIP TO CO R
10.58’ COR TO CO R
DB 1250 PG 444
DB 0954 PG 0008
SANDRA B. HART
CHARLES JERRY HART
PB 9 PG 98
DB 3096 PG 1416
KATHRYN GRAY M OTSINGER
JONAH RAY M OTSINGER JR
S 0411’01" W
302.80’
M A RCIA S W EA V IL
RA N DY NELSO N W EA V IL & W IFE
M ARCIA S. W EAVIL
RANDY NELSON W EAVIL & W IFE
SILL
REM O VE
REM O VE
G RATES
N ARRO W SLO T
REM O VE
REM O VE
REM O VE
REM O VE
W / FLAT G RATE
N ARRO W SLO T
REM O VE
STA 22+75 -Y1- RT
BERM G UTTER
BEG IN SHO ULDER
W / ELBO W
24" CSP
CO N NECTO RS
AN D RO D AND LUG
15" CSP W / 2 ELBO W S
2@ 7’x6’ RCBC
STA 18+50 -Y1- LT
BEGIN SHO ULDER BERM G UTTER
REM O VE
EST 11 SY FF
EST 3 TO N S
RIP RAP
CLASS ’B’
EST 28 SY FF
EST 11 TO NS
RIP RAP
CLASS ’B’SEE DETAIL#19
SPECIAL 2’ CUT BASE DITCH
SEE DETAIL#6
TO E PRO TECTIO N
EST. DDE=24CY
SEE DETAIL#18
HEAD DITCH
SEE DETAIL#12
W / 432 SY FF
EST. 165 TO N S
W / CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#12
W / 300 SY FF
EST. 114 TO N S
W / CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
SEE DETAIL#3
W / 397 SY FF
EST. 151 TO NS
W / CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
S
T
A
2
4
+
0
0
-
Y
1
-
LT
E
N
D
S
H
O
U
LD
E
R
B
E
R
M
G
U
T
T
E
R
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
0
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
PI Sta 16+19.17
R = 8,000.00’
L = 438.23’L = 438.23’
T = 219.17’
D D
PI Sta 20+57.40
T = 219.17’
R = 8,000.00’
FOR -Y1- PROFILE, SEE SHEET 43
FOR -Y7- PROFILE, SEE SHEET 92
D
20U-2579B
M
A
TC
H
LIN
E
-
Y1-
S
TA
. 2
3
+
6
5
S
H
EET
5
-Y1-
SE = NCSE = NC
RO = 0RO = 0
FOR -DR1- PROFILE, SEE SHEET 93
FOR -DR2- PROFILE, SEE SHEET 93
FOR -DR3- PROFILE, SEE SHEET 93
PI Sta 10+14.44
L = 28.79’
T = 14.44’
R = 150.00’
-DR1-
NOTE:
PI Sta 12+30.02
D
L = 452.17’
T = 230.02’
R = 1,000.00’
PI Sta 16+82.19
D
L = 452.17’
T = 230.02’
R = 1,000.00’
-Y1DET-
PAVED SHOULDER
10
15
2
0
10
-Y7- POT Sta. 10+00.00
10
-Y7- POT Sta. 12+30.57
10
-DR2- POT Sta. 10+00.00
-DR2- POT Sta. 11+90.74
-DR3- POT Sta. 10+00.00
-
Y7
-
D
R
3-
-
-DR1- POT Sta. 11+02.70
-DR
1
-
-Y1-PRCSta. 18+38.23
-Y1-PCSta. 14+00.00
PC Sta. 10+00.00
-DR1-
PT Sta. 10+28.79
-DR1-
BEGIN CONSTRUCTION
-DR3- POT Sta. 11+72.16
-Y1- POC Sta. 17+44.58
-Y1- POC Sta. 18+88.07
2
4
’
MAT
C
H
E
X
IS
T
ING
100’ TAPER
-Y1-
4’P.S.
4’P.S.
0
1
0
2
0
1
0
2
20 FT
20 FT
2
0
.0
0
+
18’
12’
8’
8’
8’
10’
10’
MATCH EXISTING
02
02
01
00
30’ R
30’ R
TAPER
8:1
18
’
2
4
’
GUARDRAIL
FACE OF
PAVE TO
18’
-Y1-POTSta. 10+00.00
BEGIN CONSTRU CTION
675’ MEDIAN TRANSITION RT. SIDE
675’ MEDIAN TRANSITION LT. SIDE
2
4
’
2
4
’
2
4
’
3
6
’
15
’
3
’
550’ TRANSITION LT OUTSIDE LANE
12
’
400’ TRANSITION RT OUTSIDE LANE
20’R
20’R
10’R
15’R
15’R15’R
15’ R
7.5’ R
7.5’ R
15’ R
D
R
2
-
-
TAPER
8:1
PAVEMENT MARKINGS
-Y1- STA. 14+32.71
BEGIN MEDIAN
-Y1- STA. 21+71.59
8.5’ R
-Y1-PT
Sta. 22+76.47
10’ INC
02
01
00
01
02
10’ INC
END PAVEMENT MARKINGS
BEGIN RAISED GRASS MEDIAN
10
1
5
2
0
-Y1DET- PT Sta. 19+04.35
-Y1DET-
-Y1DET- PRC Sta. 14+52.17
-Y1DET- PC Sta. 10+00.00
-Y1- POT Sta.11+88.83
END CONSTRUCTION
-Y1- POC Sta.22+31.99
-Y7- POT Sta.13+93.72
END W.W. FENCE
BEGIN W.W. FENCE
F
F
F
F
F
F
F
C
C
C
C
C
F
F
F
F
C
C
+
7
2
.
8
8
-
Y
1
R
P
A
-
93.63’
+37.00 -Y1-
+53.00 -Y1-
135.00’
+00.00 -Y7-
133.72’
+76.47 -Y1-
125.00’
+00.00 -Y1-
125.00’
53.93’
49.16’
+00.00 -Y1-
31.03’
+00.00 -Y7-
5B
6
8
9
10
7
+55
75’
49.23’
10+00.00
75.00
85.00’
+93.00 -Y1-
+62.00 -Y1-
125.00’
236.00’
261.00’300.00’
325.00’
-Y1-+54.00 -+30.00 -Y1-
44.00’
28.97’
+40.00 -Y1-
149.00’
+37.00 -Y1-
109.00’
+00.00 -Y1-
116.00’
100.84’
30.58’
50.00’
+00.00 -Y7-
+70.00 -Y1-
BEG. C/A
+62.22 -Y1-
BEG. C/A
1
1A
2
3 3A
4A
5C
5A
5
9
2G I
2GIBDO
2G I
HW
2G I
2GI
W / FLAT GRATE
2G I N ARRO W SLO T
W / FLAT GRATE
2GI N ARRO W SLO T
309
310
311
312
313
314
315
320
319
316
317
318
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA 10+65 TO 12+90 -Y7- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 23+00 TO 26+00 -Y1- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*W hen B is < 6.0’b= 5 Ft.
B= 2 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 19+35 TO 21+80 -Y1- RT
FRO M STA 22+90 TO 24+60 -Y1- RT
Natural
Ground 2:
1 D Slope
Ditch
Front
B
( Not to Scale)
SPECIAL CUT BASE DITCH
Flatter4:1 or
DETAIL #19
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA 17+00 TO 19+00 -Y1- RT
B
Natural Natural
Ground Ground3:1
3:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #18
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA. 11+31 TO 11+51 -Y1- RT
EST. 3 TO NS
CLASS ’B’ RIPRAP
309A
24" RCP-III
24" RCP-III
2
4
"
RC
P
-
III
15"
15"
24"
2
4
"
15" RCP-IV
15" RCP-IV
15
"
RC
P
-
IV
36" RCP-III
SEE SHEET 2-TT
PSH
T
OP=888.34’
T
OP=891.09’
T
OP=889.33’
T
OP=888.34’
T
OP=891.09’
T
OP=889.33’
IN
V=879.53’
IN
V=881.74’
IN
V=880.69’
FES
18" RCP
18" RCP
DI
18" RCP
MTL
W D DK
36" CMP
W/LT
18" RCP W/LT
1
0
’
B
S
T
2SFD
W
BK W ALL
W/LT
48" CONC
2SBKD
BK WALL
S
48" WD
S
HT
R
W/LT
12" RCP
G
R
2SFD
S
S
W/LT
WD WALL
15" RCP
1SFD
S
GR
W/LT
W/LT
S
1SFD
W/LT
MTL
M
T
L
W/LT
W/LT
S
R
2
6
6
5
E
S
T
H
E
R
LN
18
’ B
S
T
S
15
" R
C
P
12
’ CONC
4
8
" C
O
N
C
2SBKD
5’ X 5’ CONC
12" RCP
BST
B
S
T
IN
A LN BST
W
3
6
"
C
O
N
C
2SFD
C
O
N
C
B
S
T
W
W
G
R
S
W
W
48" CONC
W
D
US 158 BST
US 158 BST
T
T
T
8" DI
8" DI
8" DI
12
"
S
T
12
"
S
T
12
" S
T
12" ST
6
"
D
I
6
" D
I
(A
T
U
R
)
G
R
AU
-
3
5
0
G
R
A
U
-
3
5
0
CAT-1
GRAU 350
-BY1-501
CUL1 CUL2
CUL3CUL4
1-
5
X
5
B
A
R
R
E
L
CE1
HW1
HW2
CE2
DI
36" CMP
18
" R
C
P
18
"
R
C
P
12" RCPFES
18
"
R
C
P
REBECCA ANN FREEMAN
14.30’
4
9
0
.7
3
’ E
IP
T
O
C
O
R
4
9
0
.9
5
’ R
/
W
T
O
C
O
R
424.17’ EIP
T
O
C
O
R
423.88’ R/
W
T
O
C
O
R
15
0
.0
0
’
EXISTING R/W
EXISTING R/W
85.22’
205.56’
544.49’
219.56’ EIP T
O
C
O
R
218.87’ R/
W
T
O
C
O
R
112.76’
159.96’
16
4.6
1’
EIP
T
O
C
O
R
16
3.7
9’
R/
W
T
O
C
O
R
179.98’ EIP
T
O
C
O
R
178.91’ R/
W
T
O
C
O
R
M ARY ANN PHILLIPS
WAYNE E. PHILLIPS, JR.
136.28’
103.64’
R=55.00’
R=55.00’
L=124.80’
L=128.78’
24.88’
EIP
EIP
EIP
EIP EIP EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
182.35’
FRANCES B. WHICKER
JAMES N. W HICKER
MEARILEASE HARDY, TRUSTEES
RAMOND F. HARDY
10
0
.0
0
’
113.56’
86.86’
5
3
8.6
9’
411.99’143.98’243.11’
206.45’
31.08’
1
6
3
.
7
3
’
E
I
P
T
O
C
O
R
1
6
3
.
2
2
’
R/
W
T
O
C
O
R
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’
60.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
273.83’
DB 2075 PG 1238
PB 31 PG 167
DB 1953 PG 2287
DB 2075 PG 1235
DB 2261 PG 3390
JACQUELINE CUSTER
TERRY K. CUSTER
DB 2390 PG 4804
PB 27 PG 138
DB 2265 PG 3656
DB 1391 PG 1557
PB 33 PG 197
DB 2487 PG 3598
REBECCA C. STRAUSS
KEITH E. STRAUSS
JACQUELINE CUSTER
TERRY K. CUSTER
PB 33 PG 197
DB 2487 PG 3598
M ARSHALL S. BROWN
M ARY M YERS
JAM ES R. M YERS, III
M ARY B. M YERS
JAM ES R. M YERS III &
PB 31 PG 167
PB 27 PG 138
DB 1585 PG 1013
TOW N OF W ALKERTOW N
T
O
W
N
OF
W
A
L
K
E
R
T
O
W
N
TOWN OF WALKERTOWN
FORSYTH COUNTY
F
O
RS
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
EIP
EIP
EIP
19.56’
TOWN OF WALKERTOWN
FORSYTH COUNTY
84.12’
+13.75
109.48’
+14.49
125.20’
+45.18
128.56’
+58.01
4
9
.18
’
+
6
7
.19
S
5
0
0
9
’3
6
" E
3
0
6
.17
’
S
5
0
0
9
’3
6
" E
2
6
8
.8
4
’
S
5
0
0
9
’3
6
" E
19
4
.14
’
117.00’
93.37’
PUBLIC UTILITY EASEMENT
25’ PRIVATE ACCESS &
286.47’
496.83’ (EIP TO COR)
EIP
EIP
EASEMENT
25’ PRIVATE SEWER
SEWER EASEMENT
APPROX. LOCATION 20’
395.12’
S 8923’54" E
JAMIE REYNOLDS
WILLIAM REYNOLDS &
ADRIANNE STYERS
ROBERT DWYERS &
KERI MAULDIN
VAN MAULDIN &
PB 52 PG 98
DB 2787 PG 3756
PB 52 PG 98
DB 2921 PG 2783
PB 52 PG 98
DB 2787 PG 3764
ROBERT REYNOLDS
AS PER PB 52 PG 98
10’ UTILITY EASEMENT (PRIVATE)
NEGATIVE ACCESS &
AS PER PB 52 PG 98
10’ UTILITY EASEMENT (PRIVATE)
NEGATIVE ACCESS &
PB 52 PG 98
DB 2787 PG 3772
KRYSTAL R. W OOD
DB 2899 PG 1798
REDUS GREENSBORO SUBDIVISIONS, LLC
ROBINS WALK SUBDIVISION HOM EOW NERS ASSOCIATION INC.
DB 3033 PG 1533
S 8923’54" E
96.91’
S 8923’54" E
28.76’
N
2437’08" W
45.67’
N
2437’08" W
142.72’
N 3428’07" E
28.48’
N 3428’07" E
94.83’
N 3735’26" E
85.27’
N 3735’26" E
66.04’
N 3735’26" E
58.49’
S
4
1
3
6
’4
8
" E
4
8
.5
6
’
N
5
0
2
8
’5
0
" W
116
.9
4
’
SONNY BOUTDAVONG
PB 59 PG 82
DB 3083 PG 3647
N
5
0
2
8
’5
6
" W
114
.8
3
’
WA
D
E
J
U
R
N
E
Y
H
O
M
E
S
, IN
C
.
P
B
5
9
P
G
8
2
D
B
3
0
7
6
P
G
5
2
9
10.0’ PUBLIC UTILITY EASEMENT
N
6
0
0
5
’
3
6
"
W
119
.
8
7
’
25.00’
2
5
.
0
’
P
E
D
E
S
T
R
I
A
N
A
C
C
E
S
S
E
A
S
E
M
E
N
T
N
7
3
1
8
’
1
5
"
W
1
3
2.
4
0
’
S
5
2
3
0
’0
2
" W 1
1
5
.
6
2
’
EASEMENT 10.0’ PUBLIC UTILITY
10.0
0’
W
A
D
E
J
U
R
N
E
Y
H
O
M
E
S
,
IN
C
.
P
B
5
9
P
G
8
2
D
B
3
0
9
2
P
G
5
2
7
W
A
D
E J
U
R
N
E
Y
H
O
M
E
S, I
N
C.
5
0
.0
0
’
EXISTING R/W
EXISTING R/W
P
B
5
9
P
G
8
2
D
B
3
0
6
7
P
G
2
9
0
1
W
A
D
E J
U
R
N
E
Y
H
O
M
E
S, I
N
C.
P
B
5
9
P
G
8
2
D
B
3
0
7
6
P
G
5
2
9
W
A
D
E J
U
R
N
E
Y
H
O
M
ES, INC.
P
B
5
9
P
G
82
D
B
3
0
7
6
P
G
529
10.0’ PUBLIC UTILITY EASEMENT
2
0
.
0
0
’
20.0’ SANITARY SEWER EASEMENT
20.00’
E
A
S
E
M
E
N
T
2
0
.
0
’
S
A
N
I
T
A
R
Y
S
E
W
E
R
2
0.0
0’
EA
SEM
EN
T
20.0’ SA
N
ITA
RY
SE WER
E
A
S
E
M
E
N
T
2
0.
0
’
S
A
N
IT
A
R
Y
S
E
W
E
R
STA. 45+00 -Y4- RT
END SHO ULDER BERM G UTTER
REM O VE REM O VE
PLUG
CO NN ECTO RS
AND RO D AN D LUG
15" CSP W / 2 ELBO W S
EST 5 SY FF
EST 1 TO N S
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
1
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
21U-2579B
M
A
T
C
H
LIN
E
-
Y
1
-
S
T
A
.
4
4
+
0
0
S
H
E
E
T
5
PI Sta 50+83.87
L = 438.23’
T = 219.17’
R = 8,000.00’
D
PI Sta 46+45.64
L = 438.23’
T = 219.17’
R = 8,000.00’
D
-Y1-
SE = NC SE = NC
RO = 0 RO = 0
PI Sta 43+10.02
D
L = 450.07’
T = 228.91’
R = 1,000.00’
PI Sta 47+59.46
D
L = 448.86’
T = 228.28’
R = 1,000.00’
-Y1DET-
-Y1DET-
FOR -Y9- PROFILE, SEE SHEET 92
NOTE:
FOR -Y1- PROFILE, SEE SHEET 44
-Y9-
PI Sta 11+43.68
D
L = 118.54’
T = 62.56’
R = 150.00’
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
4
5
5
0
5
5
-Y1-PCSta. 44+26.47 -Y1-PRCSta. 48+64.70
-Y1-PTSta. 53+02.93
-Y1-
-Y1-
SR 2405 OLD BELEWS CREEK RD 6.2 m BST
US 158 28’ BST
2
4
’
2
4
’
2
4
’
100’ TAPER
675’ MEDIAN TRANSITION LT. SIDE
3
6
’
675’ MEDIAN TRANSITION RT. SIDE
500’ TRANSITION RT OUTSIDE LANE
500’ TRANSITION LT OUTSIDE LANE
END PAVEMENT MARKINGS
-Y1- STA. 49+00.00
PROP. PAVEMENT MARKINGS
2
4
’
-Y1-POT Sta. 54+00.00
END CONSTRU CTION
45
-
Y
1D
E
T
-
-Y1DET- PRC Sta. 45+31.18
-Y1DET- PT Sta. 49+80.05
-Y1- POC Sta.51+09.25(4.18LT)
W.W. FENCE
END
BEGIN W.W. FENCE
10
-Y9- POT Sta. 14+60.24
-
Y
9
-
-Y1- Sta. 52+25.00
05
04
03
02
01
02
03
020100
01
00
03
GRADE TO DRAIN
OBLITEREATE AND
-Y9- PC
Sta. 10+81.12
-Y9- PT Sta. 11+99.66
-Y9- Sta. 10+00.00
R= 50’R= 50’
24’
RT & LT100’ TAPER TO EXISTEND CONSTRUCTION
-Y9- POT Sta. 13+00.0024’EXIST
C
C
C
F
F
C
C
F
C
F
C
C
C
C
C
C
C
C
F
F
F
94.94’
55.15’
12
4
+00.00 -Y1-
245.00’
+13.00 -Y1-
120.00’
78.00’
+30.00 -Y1-
50.00’
30.00’
30.00’
60.00’
+20.00 -Y9-
+20.00 -Y9-
+90.00- Y9-
64.01’
60.00’
+50.00 -Y9-
99.38’
+85.00 -Y9-
53.36’
+80.00 -Y1-
30.00’
74.49’
+95.21 -Y1-
+00.00 -Y9-
+23.00 -Y1-
EN D C/A
+23.00 -Y1-
END C/A
226
FS FS
P
SLO T GRATE
2GI W / N ARRO W
SLO T G RATE
2GI W / NARRO W
SLO T G RATE
2GI W / NARRO W
SLO T GRATE
2GI W / N ARRO W
FLAT G RATE
2GI W / N ARRO W SLO T
58
321
322
323
324
15" RCP-IV
15" RCP-III
1
8
"
R
C
P
-
I
I
I
1
5
"
R
C
P
-
I
I
I
TOP=855.76
INV=843.66
TOP=856.57
INV=842.67
TOP=857.65
INV=842.15
TOP=854.00
INV=841.00
TOP=848.07
INV=838.77
TOP=850.06
INV=841.56
TOP=856.32
INV=848.62
TOP=847.43
INV=834.73
TOP=842.60
INV=830.10
TOP=843.39
INV=829.19
16
" D
I
16" D
I
12" DI
12" DI12"
D
I
12"
VC CHANGE
IN
MATERIAL
APPROX
. LOCAT
ION
OF
8" VC8" DI
SHRUB
CONC H
W
CONC H
W
15" RCP
B
55
GR
18" CLAY
36
15" RCP
B
K
WA
LL
35
34
3839
HTR
37
R
D
G
R
40
B
S
T
C
U
R
B
B
S
T
C
U
R
B
41
42
S
CREEK BOTTOM
BOTTOM IS NATURAL
W
3-7’ X 11’ CONC
15
"
RC
P
18" RCP
SR 2405 OLD BELEWS RD 19’ BST
S
S
S
S
S
SS36" CONC
2S
B
K
D
15" CMP15" C
MP
G
U
Y
MTL
18" RCP
S
CO
N
C1SFDWD
W /LT
B
ST
C
O
N
C
S
M TL
MTL
15" RCP
F
R
AN
K
LIN
F
AR
M
S
1SFBUS
S15" RCP GR
1SFD
CONC
S
SGR
18"
R
C
P
GR
GR
C
O
N
C
WA
L
L
ISLC
O
NC
G
A
T
E
M
T
L
W
S
OI
L
JB
US 158 BST
US 158 BST
T
T
T
12" DI
12" DI
CAT-1
GRAU-350
-BY2-506
-BY10-502
18"
R
C
P
15" RCP
15
"
RC
P
1
8
"
R
C
P
3-7X
11 B
A
R
R
ELS
CUL1 CUL2
CUL3
CUL4
CUL5
CUL6
CE1
18" CLAY
HW1
CUL7
CUL8
CUL9
CUL10
CUL11CUL12
CE2
HW2
C
R
EEK
B
O
TTO
M
B
O
TTO
M
IS N
A
TU
R
A
L
CONC H
W
CONC H
W
A
P
P
R
O
X J
B
863.10
EIP
EIP
EIP
EIP
EIP
EXISTING R/W
EXISTING R/W
DB 2333 PG 3048
DB 1889 PG 1126
DB 2466 PG 1003
DB 1809 PG 3712
DB 983 PG 526
DB 2105 PG 4144
DB 573 PG 367
DB 107 PG 246
DB 2124 PG 2239
DB 2226 PG 1302
DB 573 PG 367
DB 107 PG 246
DB 2124 PG 2239
DB 2226 PG 1302
DB 520 PG 97
DB 843 PG 125
DB 2703 PG 4233
DB 2686 PG 2459
DB 2817 PG 1752
DB 2589 PG 4046
REM O VE
REM O VE
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
2
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
22U-2579B
M
A
T
C
H
LIN
E
-
Y2
-
S
TA
.
15
+
6
1
S
H
E
E
T
7
PI Sta 14+90.64
L = 587.59’
R = 758.00’
T = 309.45’
D
-Y2-
SE = .08
RO = SEE PLANS
NOTE :
FOR -Y2- PROFILE, SEE SHEET 49
PAVED SHOULDER
10
0
4
0
4
0
4
0
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
2
4
’
2
4’
M
A
T
C
H
E
XIS
TI
N
G
24’ INC
BEGIN CONSTRU CTION
-Y2-POTSta. 10+00.00
-Y2-
-Y2-PCSta. 11+81.19
TO EXIST
50’ TAPER
TO EXIST
50’ TAPER
2’ P.S.
2’ P.S.
2’ P.S.
SR 2385 W ALKERTOW N / GUTH RIE RD 23’ BST
2’ P.S.
10’R10’R
10’ R
F
F
C
C
C
C C
+00.00 -Y2-
+00.00 -Y2-
+81.19 -Y2-
+81.19 -Y2-
17
19
20
21
67.00’
42.00’
29.19’
65.00’
42.00’
30.81’
67.00’
42.00’
+
5
0
.
0
0
-
Y
2
-
E
N
D
C
/
A
42.00’
28
325
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
D
E
T
A
I
L
#
4
15"
15"
1SBKD
POOL
15" CMP
18" RCP
15" RCP
4 " HDPE
15" RCP
FES
64
65
66
67
68
S
R
2
4
0
7
MOR
R
IS
R
D
2
0
’ B
S
T
18" RCP
30" C&G
18" RCP
69
L
T
L
T
L
T
12" RCP
BST
GR
70
71
12" RCP
72
1SBKD
2SBKD
SR
2504
K
INGS
GATE
DR
20
’
BST
73
74
75
76
77
78
79
15" RCP
15" RCP
80
36" CONC
G
R
JB
FES
30" C&G
BST
B
S
T
B
S
T
DI
15
"
R
C
P
15" RCP
DI
C
B
DI
DI
DI
S
W/
L
T
72"
C
O
N
C
84" CONC
W/
L
T
W/
L
T
48" CONC
S
2
S
F
D
15
" R
C
P
G
U
Y
3
0
"
C
&
G
3
0
"
C
&
G
3
0
"
C
&
G
CONC
G
R
G
R
W
D
P
O
S
T
S
W
D P
OS
TS
4
8
" C
H
L
W/
L
T
36" CONC 12’
C
O
N
C
3
0
"
C
&
G
W/
L
T
S
2SBKD
48" CONC
2
3’
C
O
N
C
WD DK
W
/
L
T
L
T
2
S
F
D
G
R
7
2
"
C
O
N
C
H
D
P
E
4"
C
O
V
E
R
M
T
L
W/
L
T
W/
L
T
48" CONC
G
A
T
E
M
T
L
G
A
T
E
M
T
L
G
A
T
E
M
T
L
L
T
L
T
L
T
L
T
L
T
L
T
L
T
L
T
T
T
T
T
T
T
8" DI
8" DI
8" DI
8
" D
I
8
"
D
I
-BY3-507
-BY3-508
-BY4-512
DI
18" RCP
POSSIBLE JB
15"
C
M
P
15
"
R
C
P
15" RCP
FES
15" RCP
DI
C
B
15" RCP
4 "
H
D
P
E
DI
DI
DI
4 " HDPE
BAPTIST CHURCH
GOSPEL LIGHT
ROBERT W. BIBY
937.54
188.73’
B
A
P
T
IS
T
C
H
U
R
C
H
G
O
S
P
E
L
L
IG
H
T
BAPTIST CHURCH
GOSPEL LIGHT
M ARGARET B. BIBY
ROBERT W. BIBY
LOUISE BEESON BIBY
ROBERT W AYNE BIBY
6
0.
0
0’
E
X
IS
T
IN
G
R
/
W
60.00’
6
0.
0
0’
DB 1588 PG 1492
DB 1302 PG 145
DB 2044 PG 3201
DB 1948 PG 290
DB 1948 PG 287
DB 1872 PG 3238
DB 1684 PG 3098
DB 1684 PG 2508
DB 1560 PG 1136
DB 1342 PG 115
DB 1244 PG 471
DB 1939 PG 3472
DB 1939 PG 3471
DB 1039 PG 1668
DB 1117 PG 543
S
T
E
P
H
A
N
IE
L
. J
O
H
N
S
O
N
J
E
F
F
R
E
Y
K
Y
L
E
J
O
H
N
S
O
N
P
B
2
5
P
G
4
0
D
B
19
12
P
G
12
5
7
E
I
P
EIP
EIP
EIP
EIP
EIP
STONE
E
X
IS
T
IN
G
R
/
W
EX
IST
IN
G
R
/W
EX
IST
IN
G
R
/W
3
9
9.3
1’
5
6
0.5
6’
6
3
5.5
2’ S
T
O
N
E
T
O
C
O
R
6
3
6.9
4’
R/
W
T
O
C
O
R
6
9
2.
2
0’
EI
P
T
O
C
O
R
6
9
0.
8
9’
R/
W
T
O
C
O
R
R/W MON
TO W N O F W A LKERTO W N
TO W N O F W A LKERTO W N
FO RSY TH CO U NTY
FO RSY TH CO U NTY
3
7.7
0’
+
3
3.2
8
JACQUELYN W . ROBERSON
ROBERT E. ROBERSON &
DB 2731 PG 1048
2
6
0.
4
9’
46.51’
194.40’
4
3
2.2
8’
N 0259’40" E
123.37’
REM O VE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
3
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
23U-2579B
M
A
TC
H
LIN
E
-Y2
- S
TA
. 2
4
+
8
1 S
H
E
E
T 7
-Y2-
PI Sta 27+32.39
L = 358.58’
T = 182.71’
R = 758.00’
D
SE = .08
RO = SEE PLANS
NOTE :
FOR -Y2- PROFILE, SEE SHEET 49
PAVED SHOULDER
2
5
3
0
0
8
0
7
0
6 0
6
0
6 0
6
0
5 0
4 0
3
0
7
0
8
0
6
0
5
0
4
0
3
2
4
’
2
4
’
2
4
’
M
A
T
C
H
E
X
I
S
T
I
N
G
END CONSTRU CTION
-Y2-
-Y2-PCSta. 25+49.68
-Y2-PTSta. 29+08.26
-Y2-POTSta. 30+30.91
24’ INC 12’
TO EXIST50’ TAPER
TO EXIST50’ TAPER
2’ P.S.
2’ P.S.2
’
P
.
S
.
2
’
P
.
S
.
-
Y2
-
P
O
T
S
T
A
.2
1+
6
6
.4
2
-Y2- POT STA. 29+75.00
F
F
F
C
C
C
42.00’
+49.68 -Y2-
42.00’
+08.26 -Y2-
+95.00 -Y2-
42.00’
+80.81 -Y2-
42.00’
+08.26 -Y2-
42.00’
+49.68 -Y2-
25
27
28
26
60.00’
+49.68 -Y2-
42’
60’
65’
+52
42’
60’
65’
+72
60.00’
42.00’
29.39’
65.00’
+71.94 -Y2-
65.00’
+08.26 -Y2-
65.00’60.00’
65.00’
65.00’
+00.00 -Y2-+42.00 -Y2-
+00.00 -Y2-
+49.68 -Y2-
+
0
0
.0
0
-
Y2
-
60.00’
+08.26 -Y2-
326
1
8
"
R
C
P
-
I
V
15" RCP
9
3
W
/LT
S
12" RCP
9
8
HTR
S
99
W/LT
12" RCP
S
R
2
5
5
0
C
AR
B
IN
E
D
R
2
0
’ B
S
T
S
10
0
10
1
12
" R
C
P
1S
F
D
10’ BST
S
S
1SBKD
10
2
12" RCP
1SFD
2SFD
S
S
10
5
W/LT
1SFD
S
S
S
S
S
S
SR 2385 WALKERTOW N / GUTHRIE RD 20’ BSTT
T
T
T
T
8" DI
8"
DI
8" DI
8
" D
I
EOI
EO
I
-BY3-509
-BY3B-511
15
"
R
C
P
EXISTING R/W
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
DB 656 PG 27
DB 1741 PG 1708
DB 1030 PG 552
DB 1850 PG 990D
B
15
7
4
P
G
9
8
4
D
B
15
7
4
P
G
9
7
8
D
B
15
7
4
P
G
9
7
5
D
B
13
7
3
P
G
115
2
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
DB 2632 PG 3941DB 2632 PG 3938DB 2632 PG 3923DB 2598 PG 3575
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
F
O
R
S
Y
T
H
C
O
U
N
T
Y
E
IP
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
EIP
TO W N O F W A LKERTO W N
TO W N O F W A LKERTO W N
FO RSY TH CO U NTY
FO RSY TH CO UN TY
T
O
W
N
O
F
W
A
L
K
E
R
T
O
W
N
FO RSY TH CO U N TY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
W A LKERTOW N
TO W N O F
3
5
.5
5’
+
0
8
.5
2
3
1.
2
8
’
+
1
3.
1
3
DB 2731 PG 1582
PB 27 PG 30
DB 3052 PG 3573DB 3068 PG 1900
DB 2862 PG 388
REM O VE
RETAIN AN D EXTEND
RETAIN
CO LLAR
18" RCP-III
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
4
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
24U-2579B
NOTE :
1. FOR - Y4EB - PROFILE SEE SHEET 50
2. FOR - Y4WB - PROFILE SEE SHEET 55
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
3
0
+
5
0
S
H
E
E
T
2
5
PAVED SHOULDER
BEGIN CONSTRU CTION
300’ TAPER
4’ P.S.
10’ P.S.
10’ P.S.
4’ P.S.
-Y4WB-
-Y4EB-
-Y4W B-POT Sta. 26+80.00
-Y4EB-POT Sta. 26+80.00
2
0
2
5
3
0
-Y4WB-
-Y4EB-
-Y4--Y4-
20’ INC.
30’
2
4
’
1
5
’
1
5
’
2
4
’
0
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
BEGIN W.W. FENCE
C
C
+47.29 -Y4EB-
123.00’
99.18’
119
215
2G I
FS
Conv. O TCB To 2G I
FS
327
328
327A
1
8
"
R
C
P
F
E
S
M TL
MTL
60" CHL
I-40 BUS WBL US 421 NBL 24’ BST
I-40 BUS EBL US 421 SBL 24’ BST
DI
DI
DI
15" RCP
15" RCP10’ BST
9’ BST
4’ BST
4’ BST
3 S B W
TIE TO EXISTING
PROP. MEDIAN GUARDRAIL
50:1 TRANSITION
CB
CB
CB
18
" R
C
P
1
8
"
R
C
P
F
E
S
1-
6
X
6
B
A
R
R
E
L
CUL1
CUL2 CE2
HW
2
CUL3 CUL4
CE2
HW2
B
A
R
R
E
L
H
A
S
N
A
T
U
R
A
L
R
O
C
K
B
O
T
T
O
M
2
2
5
.
2
5
’
177.98’
17
4
.
5
9
’
C
O
R
T
O
R
/
W
17
5
.
3
2
’
C
O
R
T
O
E
IP
HELEN H. PRINCE
ARNOLD G. KING
HELEN H. PRINCE
ARNOLD G. KING
7
7
2
.
5
7
’
PATRICIA O. W ALL
ROSS D. W ALL
TOW N OF KERNERSVILLE
3
0
0
.
0
0
’
2
5
8
.
0
0
’
EXISTING R/W
EXISTING R/W EXISTING R/W
EXISTING R/W
EXISTING R/WEXISTING R/W
2
4
8
.
6
2
’
C
O
R
T
O
E
IP
2
4
6
.
3
3
’
C
O
R
T
O
R
/
W
EIP
EIP
2
6
8
.
0
0
’
PATRICIA O. W ALL
ROSS D. W ALL
DB 2250 PG 829
DB 2250 PG 829
DB 2188 PG 355
DB 2065 PG 1771
DB 2188 PG 355
DB 2188 PG 355
D
B
2
18
8
P
G
3
5
5
T
O
W
N
O
F
K
E
R
N
E
R
S
V
IL
L
E
TOW N OF KERNERSVILLE
TO W N O F KERNERSV ILLE
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
FO RSYTH CO U NTY
;
;
DB 2056 PG 1319
ARNOLD G. KING
THOM AS W . PRINCE
N 80 27’50" E
410.54’
S
5
7
4
7’
5
9
"
E
4
15.
2
1’(
T
O
T
A
L)
2
7
2.
2
6’
5.0’ NEGA TIVE A CCESS EASEM ENT
N 4 2 5 7 ’3 5 " E
3 1.7 3 ’
RETAIN
RETAIN AND EXTEND
RETAIN AN D EXTEN D
JB w/ M H
RETAIN
RETAIN AND EXTEND
REM O VE FES CO LLAR
REM O VE
STA 41+00 -Y4- LT
BEGIN SHO ULDER BERM GUTTER
CO LLAR
JB w/ M H
CO LLAR
REM O VE FES
M IN. HEIG HT 1.0’
DITCH BLO CK
REM O VE FES
CO N NECTO RS
AN D RO D AND LUG
15" CSP W / 2 ELBO W S
CO N NECTO RS
AN D RO D AN D LUG
15" CSP W / 2 ELBO W S
M ATERIAL
FILL W / FLO W ABLE
EST 5 SY FF
EST 1 TO N S
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
EST 39 SY FF
EST 20 TO N S
RIP RAP
CLASS ’I’
EST. DDE 40CY
SEE DETAIL#9
HEAD DITCH
EST. DDE 17CY
SEE DETAIL#9
TAIL DITCH
SEE DETAIL#27
EST 779 SY FF
EST 380 TO NS
CLASS "I" RIPRAP
TO E PRO TECTIO N W /
36" W ELDED STEEL
TREN CHLESS IN STALLATIO N
36" RCP-III
24" RCP-III
24" RCP-III
24" RCP-III
18" RCP-III
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
5
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
25U-2579B
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
4
3
+
6
5
S
H
E
E
T
2
6
NOTE :
M
A
T
C
H
L
I
N
E
-
Y
4
S
T
A
.
3
0
+
5
0
S
H
E
E
T
2
4
PAVED SHOULDER
1. FOR - Y4EB - PROFILE SEE SHEET 50
2. FOR - Y4WB - PROFILE SEE SHEET 55
1300’ FULL LANE
300’ TAPER
4’ P.S.
10’ P.S.
4’ P.S.
10’ P.S.
4’ P.S.
4’ P.S.
4’ P.S.
4’ P.S.
10’ P.S.
-Y4WB-
-Y4EB-
-Y4WB-
-Y4EB-
3
5
4
0
300’ TAPER
-Y4-
1300’ FULL LANE
-Y4-
3
6
’
2
4
’
30’
2
4
’
3
6
’
3
6
’
3
6
’
10’ P.S.
10’ P.S.
10’ P.S.
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
F
F
F
F
F
F
F
C
C
C
C
C C
+59.80 -Y4EB-
123.00’
+52.98 -Y4W B-
107.39’
32+35.00
128.00
+05.00
105.06’
128.00’
+00.00
123.00’
138.00’
123.00’
138.00’
+35.00
119
120
2GI
FS
HW
Conv. O TCB To 2G I
FS
2G I
Conv. O TCB To 2G I
FS
Conv. O TCB To 2G I
FS
2G I FS
2GI
2G I W / FLAT G RATE
2G I W / FLAT G RATE
2G I
FS
FS
FS
329 330
334
335
331
333
336
332A
337
340
339
338
341
342
343
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
M in. D= 2 Ft.
FRO M STA. 35+02 TO 35+27 -Y4- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
FL
A
T
T
E
R
2:
1
O
R
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FRO M STA. 40+30 TO RCBC -Y4- RT
330A
332
340A
15" RCP-III
42" RCP-III
15" RCP-III
15" RCP-III
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
JB w/ M H
SEE SHEET 2-TT
PSH
60" CHL
18" CM P
24" RCP
60" CHL
M TL
2
S
B
K
D
2
S
B
K
D
15’ C
O
N
C
30" C&G
B
R
E
N
T
C
R
E
E
K
R
D
2
6’
B
S
T
8 4 " W
D
48" CONC
S
W
HTRWD DK
DI
DI
F
E
S
DI
2 4 " R C P
2 4 " R C P
DI
F E S
F E S
15" RCP
FISH HATCHERY
W. E. 859.7
POND
S
W /LT
LT
18"
R
C
P
LT
4
8
"
C
O
N
C
TOP=851.12
INV=847.19
TOP=852.99
INV=847.39
TOP=855.30
INV=848.10
18"
V
C
1
8
"
V
C
GRAU-350
CAT-1GRAU-350
CAT-1
-BY16-
1
8
"
C
M
P
1
8
"
R
C
P
F
E
S
15" RCP
CB
CBCBCB
24" RCP
FES
24" RCP
FES
18" RCP
DAVID D. W EAVER
AM Y J. M EAD
THEODORE R. M EAD
5
6
2
.
8
5
’
EIP
HELEN H. PRINCE
ARNOLD G. KING
13.24’
28.88’58.15’
1.23’
182.60’
111.76’
99.95’
24.80’
189.21’
58.83’
2
0 ’
S
T
O
R
M
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
3
4
P
G
13
4
EIP
EIP
EIP
ARNOLD G. KING
THOM AS W . PRINCE
135.00’
280.82’
152.70’L
=41.65’
R
=50.00’
L=56.30’
R=50.00’
L=18.54’
R=20.00’
L=176.84’R=50.00’
L=18.54’
R=20.00’
5.
0
4’
60.70’
136.88’
125.39’
5
9
.7
5
’
99.97’
1
2
7.
8
5
’
14
4.5
5’101.01’
2
5
0
.
0
0
’
EXISTING R/W
EXISTING R/W
R/W MON
R/W MON
EIP
EIP
226.52’
SUSAN E. KUBIAK
TIM OTHY A. KUBIAK
PB 34 PG 103
DB 2480 PG 28
PB 34 PG 103
DB 1862 PG 3875
DB 2250 PG 829
DB 2056 PG 1310
PB 34 PG 103
DB 1813 PG 130
TOW N OF KERNERSVILLE
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
FORSYTH COUNTY
F
O
R
S
Y
T
H
C
O
U
N
T
Y
20’ S
A
NIT
A
R
Y S
E
WE
R
E
AS
E
ME
NT
;
;
1
2
9
.
2
8
’
+
1
1.
1
1
536.96’+52.98
12
4
.8
4
’
+
2
2
.6
7
96.69’
+66.76
106.49’
+57.38
DB 3113 PG 1518
HAROLD DAVID HOPKINS
DB 3084 PG 4432
LEXA LEIGH HARRIS
DON ALLEN HARRIS
DB 2797 PG 2978
DAW N A. PAYNE
DENNIS H. PAYNE, JR.
DB 2797 PG 2978
DAW N A. PAYNE
DENNIS H. PAYNE, JR.
DB 3078 PG 0373
WHITE W ALNUT, LLC
DB 3054 PG 1059
W HITE W ALNUT, LLC
DB 3054 PG 1059
W HITE W ALNUT, LLC
PB 42 PG 137
DB 2858 PG 0267
W HITE W ALNUT, LLC
PB 42 PG 137
DB 2858 PG 0267
WHITE WALNUT, LLC
N 4738’24" E101.26’
1
5
4.
9
8
’
C
O
R
T
O
EI
P
N
1
4
3
4
’
2
5
"
W
1
5
5.
4
8
’
C
O
R
T
O
R/
W
10.0’ UTILITY EASEMENT
14
2.
9
5’
N 80 27’50" E
514.38’
DB 2704 PG 784
PAGE AND ASSOCIATES, INC.
4
15.
2
1’(
T
O
T
A
L)
5.0’ NEGATIVE ACCESS EASEM ENT
S
15
4
1’2
6
" W
14
1.4
6
’
30.0’ R/W PER PB 14 PG 11, PB 44 PG 134
30.0’ R/W PER PB 14 PG 11, PB 44 PG 134
STA 50+00 TO 50+50 -Y4- RT
W / RO CK PLATING
REVISE FILL SLO PES TO 1.5:1
END O F RCBC TO STA 47+75 -Y4- RT
RETAIN ING W ALL
STA 50+50 TO 55+50 -Y4- RT
RETAIN ING W ALL
STA. 46+00 -Y4- LT
EN D SHO ULDER BERM GUTTER
STA. 55+50 -Y4- RT
END SHO ULD BERM G UTTER
STA 55+50 TO 66+00 -Y4- RT
W / RO CK PLATING
REVISE FILL SLO PES TO 1.5:1
REM O VE
RETAIN AND EXTEN D
CO LLAR
REM O VE FES
18" RCP
RETAIN AND EXTEN D
CO LLAR
RETAIN AN D EXTEN DMATERIAL
FILL W / FLO W ABLE
BO RE AND JACK
30" STEEL PIPE
SEE DETAIL#16
EARTH BERM
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 8 TO N S
RIP RAP
CLASS ’B’
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
SEE DETAIL#3
LATERAL 2’ BASE DITCH
535 SY FF
EST. 206 TO NS
CLASS ’I’ RIP RAP
EST. DDE 235CY
SEE DETAIL#17
TAIL DITCH
EST. 37 SY
EST. 18 TO N S
(TO W ATERS EDGE)
RIP RAP
CLASS ’I’
SEE DETAIL#27
EST 779 SY FF
EST 380 TO NS
CLASS "I" RIPRAP
TO E PRO TECTIO N W /
SEE DETAIL#6
EST 123 SY FF
EST 46 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
CO LLAR
24" RCP-III
RCP-III
24"
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
4
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
6
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
26U-2579B
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
4
3
+
6
5
S
H
E
E
T
2
5
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
5
6
+
6
1
S
H
E
E
T
2
7
NOTE :
1. FOR -Y4EB- PROFILE SEE SHEET 50-51
2. FOR -Y4WB- PROFILE SEE SHEET 55-56
PAVED SHOULDER
300’ TAPER
300’ TAPER
1300’ FULL LANE
4’ P.S.4’ P.S.
10’ P.S.
4’ P.S.4’ P.S.4’ P.S.
1300’ FULL LANE
-Y4WB-
-Y4EB-
-Y4WB-
-Y4EB-
-Y4WB-
-Y4EB-
4
5
5
0
5
5
-Y4--Y4-
10’ P.S.
-Y4-
30’
3
6
’
3
6
’
4
8
’
3
6
’
4
8
’
4
8
’
4’ P.S.
10’ P.S.
10’ P.S.
10’ P.S.
10’ P.S.
I-40 BUS EBL US 421 SBL 26’ BST
I-40 BUS WBL US 421 NBL 26’ BST
123.00’
+11.00 -Y4EB-
END W.W. FENCE
BEGIN W.W. FENCE
F
F
F
F
F
F F
C
C C
C
+00.00 -Y4EB-
123.00’
+85.00 -Y4EB-
133.00’
+50.00 -Y4EB-
133.00’+35.00 -Y4EB-
123.00’
+10.00
123’
128’
+00.00
128’
+35.00
97.16’
128’97.16’
+69.00 -Y4W B-
120
121
122
123
127
216
2GI FS
2G I W / FLAT G RATE
2GI W / FLAT GRATE
2GI W / FLAT G RATE 2GI W / FLAT GRATE
Conv. O TCB To 2GI
FS
2G I
2GI
FS
FS
FS
Conv. O TCB To 2GI
2G I W / FLAT G RATE
3:
13:1
5’
( Not to Scale)
EARTH BERM
DETAIL #16
STA. 47+93 -Y4- LT
N.G.N.G.
862.0’
HW 2G I-A
346
345
344 349
348
347
350
351
352
354
355
358
356
357
353
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA 53+85 TO 54+50 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
M ax. d= 2.0 Ft.
M in. D= 2.0 Ft.
FRO M STA. 44+68 TO 47+53 -Y4- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Fill
Slope
F
L
A
T
T
E
R
2:
1
O
R
DETAIL #27
d= 1 Ft.
Type of Liner= Class ’I’ Rip-Rap
FRO M STA. 40+30 TO RCBC -Y4- RT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA. 53+05 TO 53+85 -Y4- LT
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
I
I
15" RCP-IV
1
5
"
R
C
P
-
I
V
1
5
"
R
C
P
-
I
I
I
18" RCP-III
15" RCP-IV
30" RCP-III
3
0
"
R
C
P
-
II
I
T
R
E
N
C
H
L
E
S
S
I
N
S
T
A
L
L
A
T
I
O
N
3
0
"
W
E
L
D
E
D
S
T
E
E
L
SEE SHEET 2-TT
PSH
MTLSILT IN THIS BARREL
P
L
A
S
T
I
C
5
5
"
3-8’X9’ CONC 15" CM P
D
A
M
D
A
M
PIER
MTL
CONC BLD
M TL
M TL
MTL
60" CHL
GR
SOIL & GR
W D PIER
1SFD
36
"
CONC
S
GR
MTL
M TL
MTL
S
1SFD
POOL
W D DK
S
W
S
S S
S
S
B
C
O
N
C
CANOPYMTL
GR
CONC
S
W /LT
DI
18
"
R
C
P
F
E
S
DI
DI
F
E
S
12
" R
C
P
1
2
"
R
C
P
FISH HATCHERY
W. E. 847.2
POND
FISH HATCHERY
W. E. 859.7
POND
W. E. 855.7
POND
W. E. 855.6
POND
S
S
96" CHL&3SBW
24" RCP
24" RCP
STONE W ALL
TOP=849.73
INV=837.13
INV=839.75 TOP=848.65
TOP=854.76
INV=840.76
TOP=856.98
INV=843.98
TOP=859.26
INV=844.56
TOP=853.80
INV=845.10
TOP=850.78
INV=846.88
18"
V
C
1
8"
V
C
18" VC
18
"
V
C
18
"
V
C
18" VC
18
"
V
C
T
120
GRAU-350
-BY16-545
2
4
"
R
C
P
2
4
"
R
C
P
F
E
S
18
"
R
C
P
F
E
S
18
"
C
M
P
STONE RET WALL
5
5
"
P
L
A
S
T
I
C
I
N
V
=
8
6
1.
5
2
CBCBCB
3-8X9 BARRELS
CUL1CUL2
CUL3CUL5
CUL4CUL6
HW1
CE1
CUL7 CUL8
CUL9
CE2
HW2
CUL10
CUL11
CUL12SILT IN THIS BARREL
PATTIE CRANFILL
HAROLD D. CRANFILL
2
0’
S
T
O
R
M
S
EW
ER
E
A
S
EM
EN
T
P
B
4
2
P
G
1
3
7
2
0
’
S
T
O
R
M
S
E
W
E
R
E
A
S
E
M
E
N
T
P
B
4
2
P
G
13
7
119.54’
5
9
6
.
13
’
NANCY B. PEGRAM
JERRY M . PEGRAM
2
0
3
.6
1
’
2
5
1.
7
7’
9
5.
9
2’
15
0.
0
0’
10
5.
9
3’
18.95’
13
9
.9
9
’
RONALD LEE ANGEL SR.
DB 1404 PG 661
DB 1950 PG 3271
DB 1864 PG 2389
DB 1985 PG 81
20’ SANITARY SEW ER EASEM ENT
;
;
12
5
.
8
6
’
+
12
.
4
5
12
6
.
4
1’
+
2
9
.
0
6
DB 3119 PG 1159
HAROLD DAVID HOPKINS, JR.
DB 3113 PG 1518
HAROLD DAVID HOPKINS
PB 42 PG 137
DB 2858 PG 0267
WHITE W ALNUT, LLC
PB 42 PG 137
DB 2858 PG 0267
W HITE W ALNUT, LLC
PB 42 PG 137
DB 2858 PG 267
W HITE W ALNUT, LLC
PB 42 PG 137
DB 2858 PG 267
W HITE W ALNUT, LLC
N
0
1
0
0
’
0
1"
W
2
9
8
.
2
7
’
S
0
1
4
1’
14
"
E
3
16
.
10
’
PLUG
PLUGPLUG
REM O VE
STA 55+50 TO 66+00 -Y4- RT
W / RO CK PLATING
REVISE FILL SLO PES TO 1.5:1
RETAIN AND EXTEND
CO LLAR
REM O VE FES
CO LLAR
RETAIN AND EXTEND
REM O VE FES REM O VE FES
CO LLAR
CO LLAR
RETAIN AND EXTEND RETAIN AND EXTEND
REM O VE
CO LLAR
REM O VE
REM O VE FES
RETAIN AND EXTEND
CO LLAR
RETAIN AND EXTEND
CO LLAR
REM O VE
REM O VE
M O VERE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
REM O VE
TIE TO EXISTING DITCH
TIE TO EXISTING DITCH
REM O VE FES
REM O VE FES
RETAINING W ALL
ELBO W
30" CSP W /
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S
W / ELBO W
24" CSP
REM O VE FES
REM O VE HW
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 11 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
EST 16 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
EST 14 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 47 SY FF
EST 20 TO NS
RIP RAP
CLASS ’I’
EST 22 SY FF
EST 11 TO NS
RIP RAP
CLASS ’I’
EST 47 SY FF
EST 20 TO NS
RIP RAP
CLASS ’I’
SEE DETAIL#12
W / 353 SY FF
EST. 134 TO NS
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
SEE DETAIL#14
W / 270 SY FF
EST. 100 TO NS
LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP
SEE DETAIL#20
W / 764 SY FF
EST. 283 TO NS
SPECIAL LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
EST. DDE 19CY
SEE DETAIL#8
HEAD DITCH
EST. 3TO NS
CLASS ’B’ RIP RAP
EST. 3TO NS
CLASS ’B’ RIP RAP
EST. DDE 35CY
EXCAVATE TO ELEV. 838.0
EST. DDE 12CY
SEE DETAIL#9
TAIL DITCH
EST. DDE 8CY
SEE DETAIL#8
HEAD DITCH
W / 529 SY FF
EST. 161 TO NS
CLASS ’B’ RIP RAP
EST. DDE 170CY
SEE DETAIL#26
TAIL DITCH
248 SY FF
EST. 95 TO NS
CLASS ’I’ RIP RAP
EST. DDE 105CY
SEE DETAIL#17
TAIL DITCH
STA 56+25 TO 59+50 -Y4- LT
BERM DITCH
CO NNECTO RS
RO D AND LUG
2 ELBO W S AND
15" CSP W /
-Y4RPA- LT
STA.37+00 TO STA.40+00
SBG
REM O VE FES
SEE DETAIL#6
EST 177 SY FF
EST 66 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
18" RCP-III
18" RCP-III 18" RCP-III 30" RCP-III
30" RCP-III
18" RCP-III
SEE DETAIL#4
LATERAL ’V’ DITCH
15" RCP-III
STA. 64+80 TO 66+58 -Y4RPBD- RT
BERM DITCH
SEE DETAIL#20
STA 81+24 TO 83+07 -Y4 RPBD- RT
SPECIAL LATERAL ’V’ DITCH W /CLASS ’B’ RIP RAP
REM O VE
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
Geotextile
SEE DETAIL#34
BERM DITCH
CO NNECTO RS
AND RO D AND LUG
18" CSP W / 2 ELBO W S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
5
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
7
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
8
2
+
2
6
S
H
E
E
T
1
6
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
5
6
+
6
1
S
H
E
E
T
2
6
27U-2579B
Y4RPA
NOTE :
FOR -Y4RPBD- PROFILE, SEE SHEET 75-77
FOR -Y4RPD- PROFILE, SEE SHEET 81
FOR -Y4RPA- PROFILE, SEE SHEET 70
FOR -Y4EB- PROFILE, SEE SHEET 51-52
Y4RPBD
Y4RPBD
Ls = 200.00’
PIs Sta 84+71.19
F
LT = 133.35’
ST = 66.68’
R = 2,330.00’
PI Sta 80+21.76
D
L = 772.66’
T = 389.91’
PIs Sta 75+65.20
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
PIs Sta 33+05.42
F
Ls = 240.00’
LT = 160.07’
ST = 80.06’
PI Sta 61+52.40
D
L = 2,986.50’
T = 2,767.05’
R = 1,330.00’
LT = 160.07’
PIs Sta 64+51.91
F
Ls = 240.00’
ST = 80.06’
PIs Sta 40+08.43
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
R = 1,910.00’
PI Sta 28+67.56
D
L = 2,741.74’
T = 1,667.56’
PIs Sta 11+33.35
F
Ls = 200.00’
LT = 133.35’
ST = 66.68’
SE = 0.05
SE = 0.06
SE = 0.06
PI Sta 11+39.44
D
L = 277.37’
T = 139.44’
R = 1,090.00’
Y5DET
M
A
T
C
H
L
I
N
E
-
Y
4
R
P
B
D
-
S
T
A
.
6
3
+
0
0
S
H
E
E
T
1
6
M
A
T
C
H
L
I
N
E
-
Y
4
R
P
A
-
S
T
A
.
2
6
+
9
5
S
H
E
E
T
1
6
M
A
T
C
H
L
I
N
E
-
Y
5
-
S
T
A
.
1
8
+
0
0
.
0
0
S
H
E
E
T
2
7
PAVEMENT TO BE OBLITERATED
FOR -Y4WB- PROFILE, SEE SHEET 56-57
FOR -Y5- PROFILE, SEE SHEET 82
PAVED SHOULDER
1
0
100’ TAPERTAPER
TO
EXISTING
RT
&
LT
SIDE
2
4
’
2
4
’
2
4
’
300’ TAPER
2
4
’
4
’
4
’
24’
-Y4RPA-
-Y4RPBD-
BEGIN CONSTRU CTION
-Y5D
E
T
- P
R
C
S
ta. 12+
77.37
-
Y5
D
E
T
-
P
C
S
ta
. 10
+
0
0
.0
0
-Y4RPBD-
-Y4RPD-
30
3
5
4
0
-
Y4
RP
A-
2
4
’
4’ P.S.
10’ P.S.
10’ P.S.
6
5
7
0
7
5
8
0
8
5
3
6’
1350’ FULL LANE
10’ P.S.
4’ P.S.
4’P.S.
-
Y4
R
P
A-
C
S
S
ta
. 3
9
+
4
1.7
4
-
Y
4
R
P
A
-
S
T
S
t
a
.
4
1
+
4
1
.
7
4
-
Y4
R
P
B
D
-
C
S
S
ta
. 6
3
+
7
1.8
5
-
Y
4
R
P
B
D-
T
S
Sta. 7
4
+
3
1.8
5
-
Y
4
R
P
B
D-
S
C
Sta. 7
6
+
3
1.8
5
-
Y4
R
P
B
D
-
C
S
S
t
a
.
8
4
+
0
4
.
5
1
-
Y
4
R
P
B
D
-
S
T
S
t
a
.
8
6
+
0
4
.
5
1
-
Y
4
R
P
B
D-
S
T
Sta. 6
6
+
11.8
5
4’ P.S.
2
4
’
4’ P.S.
10’ P.S.
4’ P.S.
2
0
-Y4WB-
-Y4EB--Y4EB-
-Y4WB-
6
0
6
5
7
0
7
5
8
0
4’ P.S.
-Y4--Y4-
30’
TAPER
8
:1
1300’ FULL LANE
100’ P.S. TAPER
4
8
’
3
6
’
3
6
’
2
4
’
2
4
’
3
6
’
8:1 T
APER
30
-Y4RPA- STA. 36+24.33
END -Y4RPA- PAVEMENT
10’ P.S.
-Y4RPBD- STA. 81+62.11
-
Y4
R
P
D
-
S
T
A
.
2
9
+
5
6
.2
7
E
N
D
-
Y4
R
P
D
-
P
A
V
E
M
E
N
T
B
E
G
I
N
-
Y4
R
P
B
D
-
P
A
V
E
ME
N
T
END -Y4RPBD- PAVEMENT
BEGIN -Y4EB- PAVEMENT
BEGIN -Y4WB- PAVEMENT
10’P.S.
60’R
-
Y
4
R
P
D-
P
O
T
Sta. 3
3
+
19.6
7
-Y5- POT STA. 16+00.00
-
Y
4
E
B
-
P
O
T
S
t
a
.
6
0
+
5
3
.
9
8
2
4
.
0
0
’
L
T
.
-
Y
4
W
B
-
P
O
T
S
t
a
.
6
8
+
8
7
.
7
3
2
4
.
0
0
’
R
T
.
12.0
0’
R
T.
1300’ FULL LANE
BEGIN W.W. FENCE
R= 20’
R 20’
30’
GRADE TO DRAIN
OBLITERATE &
GRADE TO DRAIN
OBLITERATE AND
BEGIN W.W. FENCE
END W.W. FENCE
BEGIN W.W. FENCE
8:1 TAPER
8:1 TAPER
-NWY4RPBD2-END NOISE WALL
-NWY4RPBD2-
PROP NOISE WALL
-NWY4RPBD1-
END NOISE WALL
-NWY4RPBD2-
BEG NOISE WALL
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
C
C
C
C
C
C
C
C
C
C
C
99.00’
+04.51 -Y4EB-
+20.00 -Y4RPBD-
141.00’
+31.85 -Y4RPBD-
141.00’
+28.30 -Y4RPBD-
141.00’
+68.69 -Y4RPBD-
282.21’
+62.18-Y4RPBD-
141.00’
+31.85 -Y4RPBD-
141.00’
+08.52 -Y4RPBD-
152.82’
+11.85 -Y4RPBD-
141.00’
+48.49 -Y4RPBD-
141.00’
97.29’
+29.45 -Y4W B-
+67.76 -Y4RPA-
106.20’
+00.99 -Y4RPA-
107.82’
+46.00 -Y4RPA-
117.00’
+80.00 -Y4RPA-
117.00’
94.49’
+41.74 -Y4RPA-
+04.51 -Y4RPBD-
126.92’
+53.76 -Y4RPBD-
316.87’
42.00’
+64.00 -Y5-
124
126
127
906
915
130
959
986
133
984
135
136
137
138
996
901
141
993
982
987
145
146
928
983
990
949
152
153
992
156
155
155
217
42.00’
+10.81 -Y5-
+32.86 -Y5-
42.00’
30.00’
+40.00 -Y5-
60.00’
908
977
998
146A 155A
127
P
P
2GI
2GI2GI
2GI
Conv. O TCB To 2GI
P
PConv. O TCB To 2GIP
P
BDO
FS FS
FS
2GIFS
FS
FS
P
FS
Conv. O TCB To 2GI
FS
HW
2GIFS
2GIFS
2GI
2GI
FS
2GI
FS
2GI
FS
FS
2GI
FS
FS
JB w/M H
HW
2GI-A2GI
BDO
FS
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
360
359
363
364
362
361
365
366
370
371
375
368
369
372
374
367
373
376
377
381
380
378
379
384
382
383
385
389
390
391
388
386
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground
D
2:
1 2:1
b
Fill
Slope
1"/Ft.
DETAIL #4
b= 5 Ft.
Min. D= 2 Ft.
FRO M STA. 65+28 TO 65+80 -Y4- LT
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 31+25 TO 32+00 -Y4RPA- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 71+25 TO 73+25 -Y4- LT
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA 73+25 TO 75+00 -Y4- LT
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
4:1 or
Flatter
Natural
Ground D
d
Fill
Slope
2:
1
Fabric
Filter
DETAIL #20
Type of Liner= Class ’B’ Rip-Rap
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA 70+50 TO 75+45 -Y4RPBD- RT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
Min. D= 2 Ft.
FRO M STA. 75+36 TO 75+48 -Y4RPBD- RT
FRO M STA. 65+22 TO STA. 65+81 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #26
*When B is < 6.0’
Type of Liner= Class ’B’ Rip-Rap
B= 3 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
FRO M STA. 73+48 TO 75+71 -Y4- LT
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
Filter Fabric B
d
DETAIL #17
*When B is < 6.0’
Type of Liner= Class ’I’ Rip-Rap
B= 3.0 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
FRO M STA. 73+21 TO 73+48 -Y4- LT
B
Natural Natural
Ground Ground2:12:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #9
B= 3 Ft.
Min. D= 2 Ft.
FRO M STA. 37+36 TO 37+46 -Y4- LT
FLAT GRATE
2GI W /
382A
384A
387
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
15
"
15
"
30" RCP-III 30" RCP-III
15" RCP-III 15" RCP-III
TREN
C
H
LESS IN
STALLATIO
N
4
2
" W
ELD
ED
STEEL
3
0
" RC
P-I
I
I
15" RCP-III
1
8
"
C
S
P
3
0
" RC
P-III
1
8
" R
C
P
-III
18" RCP-III
2
4
" RC
P-III
15" RCP-III 15" RCP-III
3
0
"
R
C
P
-
I
I
I
18
"
R
C
P
-
I
I
I
1
5"
R
C
P-III
FLAT GRATE
2GI W /
FLAT GRATE
2GI W /
FLAT GRATE
2GI W /
FLAT GRATE
2GI W /
1
5
"
R
C
P
-
I
I
I
458
459
460
461
15
"
RC
P
-
I
I
I
VAR.
5.0’
D
2:
1
L
I
M
I
T
S
C
L
E
A
R
I
N
G
( Not to Scale)
BERM DITCH
10.0’ V.C.d
DETAIL #34
Type of Liner=CLASS ’B’ RIPRAP
FRO M STA. 67+20 TO STA. 70+50 -Y4RPBD- RT
W
A
L
L
N
O
I
S
E
2.0’
6.0’
Max. d=1.5 Ft.
Min. D=1.5 Ft.
9.0’
2GI
2GI
18"
R
C
P-III
18" RCP-III
1
5"
C
S
P
15"
C
S
P
3
0
" R
C
P
F
E
S
18" RCP18" RCP
F
E
S
SCRUB
W.E. 843.3
18" RCP
DAM
DAM
GR
I-40 BUS WBL US 421 NBL 24’ BST
I-40 BUS EBL US 421 SBL 24’ BST
60" CHL
60" CHL
60" CHL
60" CHL
MTL
MTL
MTL
MTLDI
1
8
"
R
C
P
F
E
S
F
E
S
DI
18" RCP
DI
CONC HWHW
CONC
12" RCP
FISH HATCHERY
W. E. 843.4
POND
SCRUB
SCRUB
SCRUB
9’ BST
9’ BST
BST
BST
POND
W.E. 8420
W.E. 843.4
60" CHL
MTL
MTL
MTL
48" WW
B
S 72" MTL
RIDING
RING
GR
S
SOIL
HTR
1SBKD
1SBKD1SBKD
1SFD
1SFD
48" CONC 48" CONC48" CONC
S
FAST CREST DR 20’ BST
9
’
C
O
N
C
1SFD
2SBKD
1SBKD2SFD1SBKD
1SBKD
1SBKD
1SFD
1SBKD
1SBKD
18’ CONC
1SBKD
9’ BST
G
W
GR
20’ CONC
GR
1SBKD
60" CHL
W
1SFD
G
CONC
S 72" WD
GR
36" CONC
7
2
"
C
H
L
S
60" CHL
W/LT
W/LT
S
72"
WD
9
’
C
O
N
C
36" CONC
7
2
"
W
D
S
48" CONC
W/LT
9
’
C
O
N
C
16’ CONC
CONC
4
8
"
C
O
N
C
10’ CONC
BST
BST
72" WD
72" WD
S
18
" R
C
P
48" CHL
S
60" CHL
DK
WD
60" CHL
1SBKD
S
WD DK
1SFD
S
CONC
72" WD
1SBKD
1SBKD
S
S
S
2SBKD
2SFD
DK
WD WD DK
MONT CREST DR 20’ BST
1SBKD
4
8
"
C
O
N
C
4
8
"
C
O
N
C
H
E
D
GE
M
O
R
E
D
R
2
0
’
B
S
T
12
’
C
ON
C
9
’ CON
C
4
8
"
C
H
L 18
"
R
C
P
18
"
R
C
P
15
"
R
C
P
15
"
R
C
P
10
’
C
ON
C
1
0
’
C
O
N
C
14
’
C
O
N
C
3
6
"
C
O
N
C
8
’
C
O
N
C
B
LU
F
F
S
C
H
O
O
L
R
D
2
0
’
B
S
T
10
’
C
O
N
C C
O
N
C
10
’
C
O
N
C
18" RCP
CB
JB
JB
12" RCP
12" RCP 12" RCP
12" RCP
18
"
R
C
P
15" RCP
APPROX JB
15" RCP DI
2
4
"
R
C
P
2
4
"
R
C
P
OWNER PER PROPERTY APPROX JB
OWNER
PER PROPERTY APPROX JB
18" RCP
12"
PLASTIC
12" RCP
DI
DI
DI
DI
18
" R
C
P
DI
3
0
" R
C
P
F
E
S
F
E
S
1
8
"
C
M
P
DI
18" RCP
F
E
S
F
E
S
DI
12" RCP
12’ CONC
16’ CONC
4
8
"
C
O
N
C
1SFD
CONC
1SBKD
12’ CONC
60" WD
1SBKD
S
S
60" WD
4
8
"
C
O
N
C
10’ CONC
S
S
1SBKD
10’ BST
4
8
"
C
O
N
C
S1SBKD
BST
1SBKD
48" CHL
15
’ C
ONC
48" CHL
1SFD
1SBKD
1SBKD
14’ CONC
3
6
"
C
O
N
C
CONC
7
2
"
C
H
L
36" CONC
6
0
"
W
D
8
’
B
S
T
8
’
B
S
T
1SBKD
1S
B
K
D
16’ CONC1S
B
K
D
s
s
1SBKD
CONC
60" CONC
CONC
S
S
2SBKD
CONC
GR
12" RCP
12"
RCP
S
G
A
T
E
M
T
L
6
0
"
C
H
L
19
’
B
S
T
MTL
12" RCP
JB18" RCP
12" RCP
8
"
R
C
P
G
R
48" CONC
48" CONC
48" CONC
48" CONC
36" CONC
CONC WD DK
CONC
WD DK
36" CONC
48" CONC
CONC
CONC
36" CONCJB
3
6
"
C
O
N
C
36" CONC
4
8
"
C
O
N
C
LT
4
8
"
C
O
N
C
CONC
G
R
GATE
CONC
12"
HDPE
36" CONC
3
6
"
C
O
N
C
P
A
T
I
O
S
T
O
N
E
W
D
D
K
S
PLANTER
TIMBERS
T
IM
B
E
R
S
5
S
B
W
5
S
B
W
6
0
"
W
D
POOL
8
"
R
C
P
POOL
DI
DI
DI
B
S
T
BST
POOL
S
C
R
U
B
S
C
R
U
B
B
S
T
3SBW
18" RCP
-NWY4RPBD1-
-NWY4RPBD2-
W.E.
8
3
9.1
HTRSS
WD
W
1
S
F
D
W
D
G
R
GR
G
R
W
H
A
T
C
H
E
R
Y
SCRUB
SCRUB
4
8
"
W
D
R
A
I
L
P
O
N
D
W.
E.
8
3
2.
9
P
O
N
D
W.E. 843.0
POND
W.E. 843.4TOP=844.55
INV=836.45
TOP=N/A
INV=N/A
LOCATION
APPROX.
1
8
"
V
C
18" VC
18
"
VC
T
16" DI
16" DI
6" DI
4" PL
6
"
D
I
6
"
D
I
6
"
D
I
6" DI
6" DI
6" DI
6" DI
6
"
D
I
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R
)
(ATUR)
(ATUR)
(
A
T
U
R
)
6
"
D
I
GR
A
U-350
CAT-1
CAT-1
GRAU-350
CAT-1 GRAU-350
GRAU 350
TES
TES
TYPE-III
G RAU 350 TL-3
ELEV
. =
935
.89
E
=
1667600
N
=
860489
-BY17
-
STA
8+83
14
’
RT
BM
#10
-BY16-546
-BY16-547
-BY18-564
-BY18-563
-
B
Y18
A-
5
6
5
-BY18-562
-
B
Y
17
-
5
5
3
18
"
R
C
P
3
0
" R
C
P
F
E
S
1
8
"
R
C
P
F
E
S
18
" R
C
P
F
E
S
18
" R
C
P
CB
1
8
"
R
C
P
F
E
S
3
0
" R
C
P
F
E
S
F
E
S
F
E
S
1
8
"
C
M
P
CB
2
4
"
R
C
P
18
"
R
C
P
CB
1
8
"
R
C
P
CBCBCBCB
15" RCP
18
" R
C
P
CB
F
E
S
18" RCP
CB
CB
JB
JB
JB
CB
APPROX JB
OWNER
PER PROPERTY APPROX JB
OWNER
PER PROPERTY APPROX JB
2
4
"
R
C
P
15" RCP
12" RCP
CB
S
IZ
E
/
T
Y
P
E
U
N
K
N
O
WN
E
N
D
U
N
K
N
O
W
N
S
IZ
E
/
T
Y
P
E
U
N
K
N
O
W
N
E
N
D
U
N
K
N
O
W
N
SIZE/TYPE UNKNOWN
18
" R
C
P
U
N
K
N
O
W
N
E
N
D
12" RCP U
N
K
N
O
WN
E
N
D
UNKNOWN
SIZE/TYPE
UNKNOWN
SIZE/TYPE
CONC HW
CONC HW
12" RCP INV=914.71
UNKNOWN
END
UNKNOWN
END
UNKNOWN
SIZE/TYPE INV=915.05
12" RCP
UNKNOWN
END
UNKNOWN
SIZE/TYPE
UNKNOWN
SIZE/TYPE
UNKNOWN
END 12" RCP
INV=921.87 12" RCP
CB INV=921.89CB
CB
18" RCP
DI
CB CB
12" PLAST
IC
UNKNOWN
S
IZE
/TYPE
UNKNOWN
END
12" RCP
UNKNOWN
SIZE/TYPE
UNKNOWN
END
100.00’
JOAN G. DICKEY
EIP
5
2
5
.
3
1
’
82.40’30’ ACCESS EASEMENT DB 1647 PG 402
1
5
8.
9
9
’
CHARLES ALLEN KEARNS
PATRICIA GALBOE
ROBERT J. GALBOE
SANDRA B. ROSE
LARRY S. ROSE
JEAN OLIVEROS
CARLOS Z. OLIVEROS
G.L.G. CORPORATION
CREOLA TUNING
M ARCELENE HAMPTON
LARRY W . HAMPTON
MARGARET A. MCDONALD
HELEN EGAN
PHILLIP R. EGAN
JEROME SCOTT BEESON
MARGARET C. CHESNEY
JOHN A. CHESNEY
REBECCA WHITAKER
KENNETH GRAY WHITAKER
ALISTEEN C. KING
SYLVESTER L. MARTIN
220.00’
5
9
4
.0
0
’
220.00’
4
18
.8
7
’ C
O
R
T
O
R
/
W
4
19
.2
7
’ C
O
R
T
O
E
IP
5
9
4
.0
0
’
30’ACCESS EASEMENT DB 1819 PG 3160
2
9
6
.
6
1’
2
9
8
.
5
4
’
418.15’
30’ACCESS EASEMENT DB 1819 PG 3160
15.31’
195.45’ COR TO R/W
199.94’ COR TO EIP
196.93’
10.00’
198.26’
2
6
0.
0
0’
255.00’
1
6
3
.
5
2
’
1
7
7
.
6
9
’
10’ DRAIN/UTILITY EASEMENT 10’ DRAIN/UTILITY EASEMENT
10’ DRAIN/UTILITY EASEMENT
EIP
EIP
14.62’
13.75’
6.65’
1
7
4
.
7
4
’
1
7
4
.
7
4
’
1
7
4
.
7
4
’
116.60’115.00’115.00’115.00’
115.00’115.08’EIP
EIP
EIP
EIP
EIP
M
E
L
I
S
S
A
A
D
A
M
S
J
A
M
E
S
B
.
A
D
A
M
S
MARTHA MARIE SOYARS
ROBERT JAMES FEESER
1
7
5
.
0
0
’
1
7
5
.
0
0
’
EIP
EIP
EIP
10’ DRAIN/UTILITY EASEMENT
10’ DRAIN/UTILITY EASEMENT
1
7
5
.
1
0
’
115.00’67.03’47.97’51.96’63.04’115.02’
EIP
224.71’
5
8
.3
5
’
140.02’
DOROTHY W. FLYNN
DOROTHY T. JORDAN
152.16’
12
7
.6
4
’
EIP
EIP
L=54
.69
’
R=50
.00
’
L =7 0 .7 6 ’
R =5 0 .0 0 ’
L
=
7
5
.6
9
’
R
=
5
0
.0
0
’
L
=30.47’
R
=50.0
0’
L=18.10’R=50.00’
4
3
.
9
3
’
1
5
3.
5
4
’
160
.14
’
174.56’
170.00’
170.00’
170.00’
170.00’
170.00’
170.00’
EIP
1
1
8
.
0
0
’
1
1
8
.
0
0
’
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
10
’
D
R
A
IN
/
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
RONALD LEE ANGEL SR.
2
9
2
.
0
0
’
1120
.00’
472.19’
214.42’
19
9.2
8’
190.00’
2
6
6.0
2’
6
0
.
7
9
’
60.00’
2
8
2
.
0
0
’
3
0
0
.
0
0
’
EXISTING R/W
EXISTING R/W
EXISTING R/WEXISTING R/W
EXISTING R/W
EXISTING R/W
60.00’
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60.00’
60.00’
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
6
0
.
0
0
’
EXISTING R/W
EXISTING R/W
60
.00’
EX
IS
T
IN
G
R/
W
E
X
IS
T
ING
R
/
W
10
1.
0
0
’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W 1
7
4
.
7
4
’
6
7
.
9
3
’
4
2
.
4
5
’
4
2
.
9
1’
1
6
0
.
1
6
’
1
8
9
.
0
9
’
1
8
6
.
2
8
’
1
8
3
.
4
5
’
E
X
IS
T
IN
G
R
/
W
1
1
8
.
0
0
’
1
1
8
.
0
0
’
EIP
E
X
IS
T
IN
G
R
/
W
EIP
1
7
5
.
0
0
’
EIP
1
7
5
.
0
0
’
1
7
5
.
0
0
’
EIP
1
7
4
.
7
4
’
1
7
5
.
1
0
’
1
7
5
.
1
0
’
1
7
5
.
1
0
’
EIP
1
7
4
.
7
4
’
EIP
14
0
.
7
5
’
C
O
R
T
O
R
/
W
14
1.
19
’
C
O
R
T
O
E
IP
EIP
E
X
IS
T
IN
G
R
/
W
EIP
9
9
.
3
3
’
1
1
8
.
0
0
’
1
1
8
.
0
0
’
EIP
7
7
.
9
6
’
4
1
3
.
1
4
’
E
X
I
S
T
I
N
G
R
/
W
EIP
E
X
I
S
T
I
N
G
R
/
W
R/W MON
110
.
0
0
’
EIP
EIP
E
X
IS
T
IN
G
R
/
W
181.94’
10 7.
13’
2
5
0
.
0
0
’
C
A
T
H
E
R
IN
E
A
N
N
R
E
IN
L
N
O
R
B
E
R
T
H
E
R
M
A
N
N
R
E
IN
L
DB 952 PG 460
DB 1734 PG 4384
DB 1840 PG 2770
PB 26 PG 68
DB 1788 PG 919
PB 26 PG 68
DB 1595 PG 1447
PB 26 PG 68
DB 1246 PG 656
PB 26 PG 68
DB 1809 PG 3239
PB 26 PG 68
DB 1214 PG 624
PB 26 PG 68
DB 1229 PG 574
PB 26 PG 68
DB 1650 PG 1113
PB 26 PG 68
DB 1232 PG 589
PB 26 PG 68
DB 2212 PG 116
PB 26 PG 68
DB 1732 PG 2878
P
B
2
6
P
G
6
8
D
B
1
2
8
1
P
G
5
4
9
PB 26 PG 68
DB 2342 PG 4396
P
B
2
6
P
G
6
8
D
B
2
4
7
8
P
G
4
3
4
5
PB 26 PG 68
DB 1744 PG 798
PB 26 PG 68
DB 1430 PG 431
DB 1985 PG 81
C
A
T
H
E
R
IN
E
A
N
N
R
E
IN
L
N
O
R
B
E
R
T
H
E
R
M
A
N
N
R
E
IN
L
P
B
2
6
P
G
6
8
D
B
2
4
7
8
P
G
4
3
4
5
TOWN OF KERNERSVILLE
FORSYTH COUNTY
20
’ SAN
ITARY
SEWER
EASEMENT
;
;
53.80’
1
5
7
.
5
1
’
+
3
8
.
1
9
1
2
5
.
6
7
’
+
9
3
.
1
5
1
2
5
.
6
9
’
+
7
3
.
2
9
1
2
5
.
7
0
’
+
4
8
.
5
5
1
2
5
.
7
1
’
+
3
3
.
1
6
4
2
4
.
3
2
’
+
4
9
.
4
7
5
4
5
.0
3
’
+
2
8
.8
3
13
5.5
6’
+
7
5.3
3
1
2
4
.
3
6
’
+
9
0
.
7
0
3
0
.
7
7
’
+
7
5
.
6
0
3
0
.0
8
’
+
4
6
.6
3
149.04’
+64.41
220.62’
+45.48
1
3
6
.
8
2
’
+
9
6
.
1
9
2
1
2
.
9
1
’
+
9
6
.
1
9
1
3
2
.
9
6
’
+
4
5
.
0
6
5
3
.
2
7
’
+
9
3
.
9
3
72.15’
+09.78
DB 1535 PG 0368
DB 1772 PG 1342
DB 2059 PG 3356
DB 0770 PG 0482
FAYE G. PEDDYCORD
REX LANIER PEDDYCORD
DB 1535 PG 0368
DB 1772 PG 1342
DB 2059 PG 3356
DB 0770 PG 0482
FAYE G. PEDDYCORD
REX LANIER PEDDYCORD
DB 1950 PG 3271
ROBYN N. PEGRAM
MARK R. PEGRAM
DB 2973 PG 0542
NFPS INC.
DB 2973 PG 0542
NFPS INC.
DB 2634 PG 3366
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 3114 PG 3713
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 1042 PG 1504
WILLENA M. WHITAKER
HAROLD LEE WHITAKER
DB 1484 PG 0630
PENNY B. HOBSON
DARRELL G. HOBSON
NO RECORDED DEED
VIRGINIA SHUMATE
FRANK G. SHUMATE
NO RECORDED DEED
CHARLES KEARNS
P
B
2
6
P
G
6
8
D
B
2
7
9
7
P
G
4
13
9
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
8
3
7
P
G
0
4
7
2
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
8
3
0
P
G
4
0
9
4
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
3
0
3
5
P
G
4
2
5
1
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
6
3
1 P
G
3
10
2
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
7
0
0
P
G
16
0
7
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
8
2
1
P
G
1
8
1
8
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
7
9
7
P
G
0
5
2
1
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
7
8
4
P
G
4
4
0
3
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
7
8
7
P
G
3
3
5
4
S
A
N
D
R
A
H
.
M
A
R
T
IN
D
O
N
A
L
D
R
.
M
A
R
T
IN
PB 26 PG 68
DB 2666 PG 3164
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
PB 26 PG 68
DB 2666 PG 3164
OF TRANSPORTATION
NORTH CAROLINA DEPA RTM ENT
PB 26 PG 68
DB 2768 PG 0027
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
PB 26 PG 68
DB 2660 PG 2493
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
PB 26 PG 68
DB 2743 PG 1987
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
PB 26 PG 68
DB 2917 PG 3338
MEREDITH N. SNEED
P
B
2
6
P
G
6
8
D
B
2
8
5
9
P
G
2
19
9
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
P
B
2
6
P
G
6
8
D
B
2
7
15
P
G
2
3
3
5
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
PB 26 PG 68
DB 3030 PG 1746
LINDA JOHNSON
PB 26 PG 68
NO RECORDED DEED
TANYA BRUMFIELD
BERT N. BRUMFIELD
PB 26 PG 68
DB 2704 PG 2666
LYNETTE A. SLAUGHTER
SHAWN SLAUGHTER
PB 26 PG 68
DB 1686 PG 3321
PB 26 PG 68
DB 2819 PG 4181
M ILDRED L. PATTERSON
JAMES H. PATTERSON JR.
PB 26 PG 68
DB 1635 PG 2644
CYNTHIA M. BRINKLEY
PB 26 PG 68
DB 1544 PG 2142
JANET HILL
FRANKLIN E. HILL
PB 26 PG 68
DB 2897 PG 0131
RACHEL H. COLLINS
JASON MARK COLLINS
PB 26 PG 68
DB 1510 PG 0855
KATHERINE S. OSBORNE
DB 1985 PG 81
RONALD LEE ANGEL SR.
DB 1985 PG 81
RONALD LEE ANGEL SR.
JEFFREY WAYNE M ASTEN
DB 2465 PG 764
DB 2465 PG 761
DB 2661 PG 2035
PHYLLIS JOAN GARDNER DICKEY TRUSTEE
ROBERT JOSEPH DICKEY TRUSTEE
DB 2997 PG 2335
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
DB 2823 PG 777
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
S 8534’41" E
209.32’
S 8550’48" E
356.38’
N
0
4
4
2
’
2
8
"
E
4
1
3
.
2
1
’
EIP
S 87 01’41" E
55.98’
N
0
2
5
8
’
5
2
"
E
1
7
5
.
1
0
’
S 87 01’40" E
115.64’
S 87 01’40" E
58.99’
S 8540’30" E
201.83’
S 8540’30" E
200.30’
N
0
2
3
1’
2
6
"
E
19
9
.
9
6
’
N
0
2
3
1’
2
6
"
E
15
0
.
0
4
’
N 8537’04" W
213.92’
N
0
2
3
0
’
3
0
"
E
2
0
0
.
0
0
’
N
0
2
3
0
’
3
0
"
E
12
5
.
0
0
’
S
0
3
0
4
’
19
"
W
1
1
5
.
0
0
’
S
0
3
0
4
’
19
"
W
1
1
6
.
1
5
’
N 8701’41" W
174.56’
S
19
3
5
’4
4
" W
14
0
.7
3
’
19
5
.3
6
’
EIP
EIP
IMOGENE L. ELAM
PB 28 PG 193
DB 1368 PG 1653
DB 1011 PG 944
3
0
.0
0
’
+
3
2
.9
5
P
B
2
6
P
G
6
8
D
B
3
0
2
5
P
G
0
7
6
5
O
F
T
R
A
N
S
P
O
R
T
A
T
IO
N
N
O
R
T
H
C
A
R
O
L
IN
A
D
E
P
A
R
T
M
E
N
T
PLUG
RETAIN
REM O VE
PLUG
PLUG
REM O VE
PLUG
PLUG
PLUG
PLUG
RETAIN
RETAIN
RETAIN
RETAIN
JBw/ M H
CO NVERT TO
REM O VE
TO 2GI
CO NVERT
CO LLAR
RETAIN AND EXTEND
REM O VE REM O VE
CO LLARRETAIN AND EXTEND
M O VERE
REM O VE
REM O VE FES
RETAIN AND EXTEND
CO LLAR
CO LLAR
REMO VE
M ATERIAL
FILL W / FLO W ABLE
PLUG
REMO VE
REM O VE
DITCH
TIE TO EXIST.
REM O VE
CO NNECTO RS
AND RO D AND LUG
15" CSP W / 2 ELBO W S2 ELBO W S
24" CSP W /
REM O VE FES
REM O VE
REM O VE FES
REM O VE FES
REM O VE FES
REM O VE FES
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
EST 21 SY FF
EST 6 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#15
SPECIAL LATERAL ’V’ DITCH
SEE DETAIL#3
LATERAL 2’ BASE DITCH
SEE DETAIL#12
W / 312 SY FF
EST. 27 TO NS
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
SEE PRO FILE FO R GRADE
SPECIAL DITCH GRADE
EST. DDE 5CY
SEE DETAIL#7
HEAD DITCH
SEE DETAIL#12
W / 247 SY FF
EST. 94 TO NS
W / CLASS ’B’ RIP RAP
LATERAL 2’ BASE DITCH
REM O VE
EST. 62 SY
EST. 33 TO NS
EST. DDE +/- 15 CY
SEE DETAIL#32
(BANKS O NLY)
CLASS ’I’ RIP RAP
EST. 11 SY
EST. 3 TO NS
CLASS ’B’ RIP RAP
EST. 11 SY
EST. 3 TO NS
RIP RAP W / FF
CLASS ’B’
RETAIN
REM O VE
CO LLAR
REM O VE
EXTEND
RETAIN AND
15" RCP-III
54" RCP-III
EL=882.3
INV. IN
SEE DETAIL#6
EST 170 SY FF
EST 63 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
REM O VE FES
EXST 72" CO NC DITCH
RETAIN +/-64’ O F
EST 14 SY FF
EST 5 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#12
W / 318 SY FF
EST. 121 TO NS
LATERAL 2’ BASE DITCH W / CLASS ’B’ RIP RAP
15" RCP-III
STA 110+91 TO 112+75 -Y4- LT
BERM DITCH
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
STA 118+41 TO 119+20 -Y4- LT
BERM DITCH
STA 122+00 TO 125+90 -Y4- LT
BERM DITCH
CO NN ECTO RS
AND RO D AN D LUG
15" CSP W / 2 ELBO W S
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
5
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
8
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
28U-2579B
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
1
0
2
+
9
0
S
H
E
E
T
1
6
PIs Sta 30+59.60
Ls = 240.00’
LT = 160.08’
ST = 80.08’
PI Sta 23+02.72
T = 1,062.72’
L = 1,739.53’
R = 1,200.00’
PIs Sta 11+60.08
LT = 160.08’
ST = 80.08’
FDF
Y4RPC
Y4RPB
PIs Sta 15+47.32
F
Ls = 240.00’
LT = 160.05’
ST = 80.05’
PI Sta 23+89.01
D
L = 1,413.54’
T = 761.74’
R = 1,530.00’
PIs Sta 31+20.86
F
Ls = 240.00’
LT = 160.05’
ST = 80.05’
M
A
TC
H
LIN
E
-
Y5
-
S
TA
. 3
8
+
5
0
S
H
EET
16
MATCHLINE -Y4RPB- STA.19+00 SHEET 16
PI Sta 58+16.25
D
L = 543.39’
T = 280.67’
R = 880.00’
Y6
Ls = 240.00’
NOTE :
FOR -Y4RPC- PROFILE, SEE SHEET 78-79
FOR -Y4RPB- PROFILE, SEE SHEET 71
FOR -Y6- PROFILE, SEE SHEET 89-91
Y5A
RO = SEE PLANS
SE = 0.06
PI Sta 36+88.22
D
L = 266.80’
T = 133.79’
R = 1,420.00’
PI Sta 21+34.27
D
L = 451.85’
T = 240.51’
R = 533.00’
RO = SEE PLANS
SE = 0.04
RO = SEE PLANS
SE = 0.06
PI Sta 10+77.83
D
L = 154.73’
R = 575.00’
PI Sta 10+77.83
D
L = 154.73’
T = 77.83’
R = 575.00’
PI Sta 10+77.83
D
L = 154.73’
T = 77.83’
R = 575.00’
PI Sta 10+77.83
D
L = 154.73’
T = 77.83’
R = 575.00’
PI Sta 10+77.83
D
L = 154.73’
T = 77.83’
R = 575.00’
PI Sta 10+77.83
D
L = 154.73’
T = 77.83’
R = 575.00’
PI Sta 10+77.83
L = 154.73’
T = 77.83’T = 77.83’
R = 575.00’R = 1,000.00’
T = 41.36’
L = 82.67’
PI Sta 17+23.06
DD
Y8
PAVEMENT TO BE OBLITERATED
FOR -Y4EB- PROFILE, SEE SHEET 52-53
FOR -Y4WB- PROFILE, SEE SHEET 57-58
PAVED SHOULDER
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
1
2
4
+
7
0
S
H
E
E
T
2
9
M
A
T
C
H
L
I
N
E
-
Y
6
-
S
T
A
.
2
3
+
9
4
.
1
5
S
H
E
E
T
2
9
(GRADING, PAVING, DRAINAGE, & STRUCTURE)
TO BE CONSTRUCTED UNDER TIP PROJECT U-2579G
DRAINAGE TO BE CONSTRUCTED UNDER TIP PROJECT U-2579G
PARCELS IMPACTED UNDER TIP PROJECT U-2579G
RIGHT OF WAY TO BE PURCHASED UNDER TIP PROJECT U-2579G
TIP PROJECT U-2579G
PERAMENT DRAINAGE EASEMENT TO BE PURCHASED UNDER
UNDER TIP PROJECT U-2579G
PERAMENT DRAINAGE/UTILITY EASEMENT TO BE PURCHASED
FOR TIP PROJECT U-2579G, SEE U-2579G PLAN SHEET 4
(CO N STRUCTED UN DER TIP PRO JECT U-2579G)
M ATCHLINE -Y5A- STA.62+50 SHEET 29
5
0
5
5
6 0
-
Y5
A
-
P
C
S
ta
. 5
5
+
3
5
.5
8
-Y5A-PT Sta. 60+78.97
-Y6-
900’ FULL LANE
3
0
3
5
4
0
4’ P.S.
10’ P.S.
0
6
1
6
’
40’ INC.
4
8
’
10’ P.S.
2
4
’
4’ P.S.
10’ P.S.
4’ P.S.
2
5
3
0
10’ P.S.
40’ INC.
10’ P.S.
-
Y
4
R
P
B
-
C
S
S
t
a
.
3
0
+
4
0
.
8
1
4’ P.S.
10’ P.S.
-Y4WB-
-Y4EB-
4
0
45
1
0
5
1
1
0
1
1
5
1
2
0
4’ P.S.
4’ P.S.
16’
-Y6-
0
1
0
0
0
1
0
2
0
2
0
2
0
2
0
1
0
0
0
1
0
2
0
2
0
3
0
3
0
4
0
4
0
2
0
2
0
2 0
2
0
2
0
2
-Y4-
30’
IDENTITY
-Y5- POT Sta. 45+00.00 LB =
-Y5A- POT Sta. 45+00.00 LA
2
4
’
2
4
’
16
’
2
4
’
2
4
’
0
8
0
7
0
5
0
4
0
3
0
2
0
8
0
7
0
6
0
5
0
4
0
3
0
2
8:1 TAPER
-Y4RPB- STA. 28+66.16
BEGIN -Y4WB- PAVEMENT
END -Y4RPB- PAVEMENT
-Y4RPC- STA. 35+56.52
BEGIN -Y4EB- PAVEMENT
END -Y4RPC- PAVEMENT
10’ P.S.
4’ P.S.
2
5
3
0
3
5
60’ R
-
Y
6
-
P
C
S
t
a
.
3
5
+
5
4
.
4
3
0
2
0
1
0
0
0
1
0
2
0
3
0
4
0
4
0
2
0
1
0
0
0
1
0
2
0
3
21’ INC.
+
5
8
.
4
6
-Y4RPB-
END CONSTRU CTION
-Y4RPC--Y4EB- POT Sta. 114+00.00
-Y4RPC- POT Sta. 40+03.40 =
12.00’ RT.
-
Y
4
W
B
-
P
O
T
S
t
a
.
1
1
4
+
2
5
.
4
3
-
Y
4
R
P
B
-
S
T
S
t
a
.
3
2
+
8
0
.
8
1
=
2
4
.
0
0
’
L
T
.
3
0
’
R
30’ R
+
3
2
.
6
1
+
5
1
.
7
3
EXIST.
-Y8- POC STA. 10+77.31
10
15
-Y8- PC Sta. 16+81.70
-Y8- PT Sta. 11+54.73
-Y8- PC Sta. 10+00.00
-Y6- PT Sta. 38+31.89
22’
BEGIN -Y8- Sta. 10+00.00
-
Y4
R
P
C
-
S
T
S
t
a
.
3
2
+
19
.
5
3
45.00’
+30.00 -Y6-
C
S
S
ta
. 2
9
+
7
9
.5
3
-
Y4
R
P
C
-
DE-WATER POND
0202
02
02
01
01020203
0304
0405
0506
0
1
0
5
0
4
0
5
0
6
0
6
18’
18’
18’18’
2
4
’
18’
18’
6’
R
24’ INC
2
4
’
4’ P.S.
4’ P.S.
100’
TAPER TO EXISTING
RT & LT SIDE
E
X
IS
T
.
24’ INC
0
4
0
3
0
3
0
2
0
2
0
3
0
4
0
2
0
2
-Y
5A
-
E
D
I
S
.T
L
D
N
A .T
R
R
E
P
AT ’
0
0
3
10’
15’
R
5’
R
10’
10’ R
300’ TAPER
BEGIN CONSTRU CTION
TYP.
EXISTING
MATCH
INC
15.58’
30’ R
30’ R
100’
T
A
PE
R
100’ F
UL
L
L
ANE
-Y5A- LT.
59+25.00 TO 60+25.00
RETAINING WALL
06
30’ R
30’ R
02
00
TIP PROJECT U -2579G
CONSTRU CTED U ND ER
-Y5A- POT STA. 53+48.46
TIE TO NOISE WALL
END WW FENCE
8:1 TAPER
8:1 TAPER
-NWY41-
BEG NOISE WALL
-NWY41-
PROP NOISE WALL
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C
C
C
C
C
C
C
C
C
C
C
C
F
F
F
F
FF
F
C
C
C
C
F
F
F F
C
C
+36.83 -Y4RPB-
141.00’
+55.64 -Y4RPB-
144.67’
+50.19 -Y5A-
70.00’
+78.97 -Y5A-
42.00’
+60.00 -Y5A-
+32.65 -Y5A-
+74.44 -Y5A-
60.00’
70.00’
+35.58 -Y5A-
+35.58 -Y5A-
+50.00 -Y5A-
+50.00 -Y5A-
98.38’
+51.00 -Y4EB-
+55.00 -Y4RPC-
107.00’
+17.34 -Y6-
33.00’
+66.99 -Y6-
33.00’
33.00’
+54.43 -Y6-
+40.81 -Y4RPB-
145.63’
+50.00 -Y4RPB-
141.00’
42.00’
42.00’
+19.00 -Y5A-
33.00’
+52.00 -Y6-
162
162
178
177
180
960
179
182
183 185
184
186 946
189
192
193
187
191
195
196
197
194
65.62’
-Y5A-
+79.00
75.00’
91.00’
+18.00 -Y5A-
+41.00 -Y5A-
-Y5A-
+19.75
-Y5A-
+46.83
+90.00 -Y6-
+70.00 -Y6-
104.00’
104.00’
33.00’
141.00’
+75.00 -Y4RPC-
141.00’
-Y4RPC-
+19.53
+10.00 -Y4RPC-+10.00 -Y4RPC-
+70.00 -Y4RPC-
148.47’
245.00’245.00’
+97.44 -Y4RPB-
214.73’
69.14’
+12.20 -Y6-
69.14’
+61.41 -Y6-
+48.46 -Y5A-
EX. R/W
70.00’
EX. R/W
60.00’
EX. R/W
EX. R/W
+55.02 -Y5A-
+34.23 -Y5A-EASEM ENT
EXIST.
EASEM ENT
EXIST.
EX. R/W
EX. R/W
+00.00 -Y5A-
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
187
192A
Under U-2579G
Purchased
Under U-2579G
Purchased
P
P
2GI
P
P
2GI
JB w/M H
JB w/M H
P
P
P
P
HW
P
2GI
P
Conv. O TCB To 2GI
2GI
FS
FS
FS
FS
2GI
FS
FS
Conv. O TCB To 2GI
2GI
GRADE TO DRAIN
P
P
FS
FS
2GI
FS
2GI-A
2GI-A
2GI-A
245
246
394
393395
396
398
397
405
403
402
401
404
392
400
399
392A
406
407
408
409
Natural
Ground
( Not to Scale)
2:1
2:
1 D
B
Fill
Slope
b
LATERAL BASE DITCH
1"/Ft.
DETAIL #3
b= 5 Ft.
B= 2 Ft.
Min. D= 2 Ft.
FRO M STA 19+90 TO 22+50 -Y4RPB- LT
( Not to Scale)
LATERAL BASE DITCH
Natural
Ground 2:
1 D
B
b
Fill
Slope
d
Fabric
Filter
2:1 1"/Ft.
DETAIL #12
*When B is < 6.0’b= 5 Ft.
B= 2 Ft.
Max. d= 2 Ft.
Min. D= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA 105+30 TO 107+10 -Y4- LT
FRO M STA 22+50 TO 23+90 -Y4RPB- LT
FRO M STA. 117+85 TO 118+25 -Y4- LT
4:1 or
Flatter Fill
Slope
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
Natural
Ground 2:
1 D
DETAIL #15
Min. D= 2 Ft.
FRO M STA. 25+60 TO 27+85 -Y6- RT
Natural Natural
Ground Ground
2:
1 2:1
D
( Not to Scale)
STANDARD ’V’ DITCH
DETAIL #7
Min. D= 2 Ft.
FRO M STA. 36+42 TO 36+67 -Y4RPC- LT
Natural
Ground
Filter Fabric
d
2:
1
B
D
( Not to Scale)
Type of Liner= Class I Rip-Rap
B= 3.0Ft.
Max. d= 2.0Ft.
Min. D= 2.0Ft.
DETAIL #32
TAIL DITCH
Natural
Ground
FRO M STA.107+50 TO STA.107+61
2:1
404A
403A
15" RCP-III
18" RCP-III 18" RCP-III
18"
R
C
P-III
1
8
"
R
C
P
-
I
I
I
15"
RCP
-
III
T
R
E
N
C
H
LE
S
S
I
N
S
T
A
L
L
A
T
I
O
N
4
2
"
W
E
LD
E
D
S
T
E
E
L
3
0
"
R
C
P
-V
30" RCP-III
18" RC
P-IV
18"
RC
P-III
18" RCP-IV
18"
R
C
P-III
18"
30" RCP-III
30" RCP-V
30" RCP-III
3
0
"
R
C
P
-
I
I
I
0401
0402
24" RCP-III
0403
15"
FLAT GRATE
2GI W /
464
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA. 107+20 TO 108+22 -Y4- LT
2GIFS
18"
463
18 "
466
18" RC P-III
465
24"24"
468
467
5’NEGATIVE ACCESS EASEMENT
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
P
B
3
3
P
G
11
2
0’ S
A
NIT
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
10’ UTILITY EASEM ENT
EIP
EIP
EIP
EIP
EIP
E
IP
EIP
EIP
EIP
EIPEIPEIPEIPEIPEIP
2
7
5.
0
0
’
273.15’
9
6
.
5
8
’
4
0
.
9
5
’
10
5
.
0
0
’
258.19’
270.01’
202.48’
14
9.7
0’
197.20’
6
5.
0
0’
7
8.
12’
3
8.
9
2’
270.00’
115.
0
0’
115.
0
0’
270.21’
270.21’
EIP
EIP
EIP
EIP
EIP
EIP
115.
0
0’
15.
0
0’
10
5.
0
0’
10.
0
0’
115.
0
0’
110.
0
0’
266.38’
266.85’
10
9.
6
2’
2
8
0.
7
2
’19
7
.6
2
’
337.66’
390.43’
291.20’
2
7
8.6
6’
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP 175.00’
265.00’
5’NEGATIVE ACCESS EASEMENT 5’NEGATIVE ACCESS EASEMENT5’NEGATIVE ACCESS EASEMENT
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5
’
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
5’
U
TI
LI
T
Y
E
A
S
E
M
E
N
T
50.00’
E
XI
S
TI
N
G
R/
W
E
XI
S
TI
N
G
R/
W
5’ UTILITY EASEM ENT
5’ UTILITY EASEM ENT
PB 33 PG 44
20’ SANITARY SEWER EASEMENT
P
B
3
3
P
G
4
4
2
0’
S
A
NI
T
A
R
Y
S
E
W
E
R
E
A
S
E
M
E
N
T
PB
3
3
PG
44
2
0’
SA
NIT
A
R
Y
SEW
ER
EA
SEM
E
N
T
50.00’
E
X
I
S
T
I
N
G
R
/
W
E
X
I
S
T
I
N
G
R
/
W
EXISTING R/W
5
0.
0
0
’
L=31.15
R=25.00
L=88.71’
R=50.00’
L
=41.15’
R=50.00’
L =3 5.7 5 ’
R =5 0 .0 0 ’
L
=12.03’
R
=50.00’
L
=
4
1.
15
’
R
=
5
0
.
0
0
’
7
0
.
7
1’
7
1.0
6’
20.00’
266.31’ EIP TO COR
266.57’ R/W TO COR
272.27’ EIP TO COR270.81’ R/W TO COR
E
X
IS
T
I
N
G
R
/
W
E
X
I
S
T
IN
G
R
/
W
50.00’
50.00’
289.32’
10 4.2 9 ’
61.60’
189.69’
19
6
.7
6
’
10’ UTILITY EASEMENT
10’ UTILITY EASEMENT
268.03’
230
.27
’
10’ UTILITY EASEMENT
2
2
6
.
17
’
2
9
8
.
3
4
’
15
5
.
6
3
’
20.40’
18
9
.7
8
’
6
3.
9
3
’
142
.33
’
193
.38
’
261.42’ EIP TO COR
260.61’ R/
W TO COR
18
4
.
5
6
’
E
I
P
T
O
R
/
W
18
5
.
12
’
R
/
W
T
O
R
/
W
15
8
.
11’
E
I
P
T
O
R
/
W
15
9
.
0
0
’
R
/
W
T
O
R
/
W
343.29’
334.15’
260.22’
254.25’
1
6
9
.
4
6
’
110
.
0
0
’
8
6
.
0
6
’
19
2
.
6
4
’
EXISTING R/W
EXISTING R/W
5
0
.
0
0
’
L=16.84’R=50.00’L=59.31’R=50.00’
L
=
5
2.3
6’
R
=
5
0.0
0’
L=52.36’
R=50.00’
L=60
.32
’
R=50
.00
’
L
=
2
1.
0
2
’
R
=
2
5.
0
0
’
L=21.02’
R=25.00’
13.70’
EXISTING R/W
6
0
.0
0
’
6
0
.0
0
’
1
4
6.
0
0
’
E
I
P
T
O
C
O
R
1
4
5.
8
3
’
R/
W
T
O
C
O
R
247.85’
5’ NEGATIVE ACCESS EASEMENT
5’ NEGATIVE ACCESS EASEMENT
10’
UTI
LI
T
Y
E
AS
E
M
E
NT
10’ UTILITY EASEMENT
10
’ U
T
IL
IT
Y
E
A
S
E
ME
N
T
10
’ U
T
IL
IT
Y
E
A
S
E
ME
N
T
9
4
.
5
4
’
EIP
EIP
2
1
0.
3
6
’
EXISTING R/W
EIP
6
8
4
.
2
2
’
E
I
P
T
O
R
/
W
6
8
3
.
7
5
’
R
/
W
T
0
R
/
W
10
6
.
3
1’
E
I
P
T
O
C
O
R
10
7
.
2
0
’
R
/
W
T
O
C
O
R
8
0
.
0
0
’
E
I
P
T
O
C
O
R
7
9
.
12
’
R
/
W
T
O
C
O
R
269.83’ EIP TO COR
270.21’ R/W TO COR
EIP
E
I
P
251.94’ EIP TO COR
252.21’ R/W TO COR
EXISTING R/W
266.71’
270.00’
270.00’
EIP
PB 40 PG 14
DB 2496 PG 3035
PB 40 PG 14
DB 2219 PG 5636
PB 40 PG 14
DB 2316 PG 2429
PB 40 PG 14
DB 2511 PG 759
PB 40 PG 14
DB 2325 PG 3228
PB 40 PG 14
DB 2200 PG 870
PB 40 PG 14
DB 2110 PG 3596
PB 40 PG 14
DB 2237 PG 797
PB 40 PG 14
DB 2484 PG 1066
PB 40 PG 14
DB 2468 PG 4228
PB 40 PG 14
DB 2287 PG 2200
PB 40 PG 14
DB 2361 PG 4095
NANCY W. GOSSARD
JERRY G. GOSSARD
KAREN FLEMING
MICHAEL FLEMING
KELLY THOMPSON
MICHAEL G. THOMPSON
LEIGH YARBROUGH
ERIC J. YARBROUGH
WATSON BROTHERS, INC.
SHERESE R. ROBBINS
ROBERT W. ROBBINS
RACQUEL INGRAM
CHINNO INGRAM
ALEJANDRO ROCHA
EDWARD GUNTER
JOHN TYSON
TERESA A. TYSON
CHRISTINA R. NEWSOM
DONALD R. NEW SOM
JOHN H. W OOD
TALEONA L. MAYFIELD
KELVIN L. MAYFIELD
CATHY P. RAYLE
RONALD W. RAYLE JR.
CHARISSA FISCHER
MICHAEL J. FISCHER
DORIS M. DUMAS
BARRY D. HUFF
KIMBERLY J. LYNCH
TIMOTHY D. LYNCH
SOPHIA BLACK
PERRIN BLACK
CI
T
Y
O
F
WI
N
S
T
O
N-
S
A
L
E
M
CITY OF W INSTON-SALEM
F
O
R
S
Y
T
H
C
O
U
N
T
Y
FORSYTH COUNTY
TOWN OF KERNERSVILLE
TOWN OF KERNERSVILLE
FORSYTH COUNTY
FORSYTH COUNTY
;
;
20’ SAN. SEW ER EASEM ENT
E
I
P
EIP
E
XI
S
TI
N
G
R/
W
E
XI
S
TI
N
G
R/
W
LAVONDA FAYE GADDY
JOHN AVERY GADDY
TO
WN
O
F K
ER
N
ER
SV
ILLE
FO
R
SY
TH
C
O
U
N
TY
1
4
6
.
5
7
’
+
8
8
.
2
1
12
6
.
2
5
’
+
2
6
.
7
7
2
4
4
.
16
’
+
2
8
.
8
7
2
2
8
.
0
0
’
+
0
5
.
2
7
2
6
7.
7
7’
+
8
3.
8
8
184.08’+51.44
12
6
.
14
’
+
0
0
.
12
13
5
.7
6
’
+
0
6
.8
8
12
5
.
9
4
’
+
3
5
.
8
6
25.10’+55.13
24.01’+90.19
25.00’+70.67
26.06’+00.67
31.23’+99.17
8
1.
2
6
’
+
9
3
.
5
3
37.65’
+82.71
25.48’+57.07
PB 22 PG 84
DB 2595 PG 1797
KIP J. MILLER
PB 22 PG 84
DB 2321 PG 2542
DANIEL A. MCKENZIE
PB 40 PG 14
DB 2713 PG 0838
DEANNA M. TAWNEY
JOEL A. TAWNEY
PB 40 PG 14
DB 2136 PG 3729
PB 40 PG 14
DB 2650 PG 4336
YVONNE L. GONZOLEZ
JOSEPH F. GONZOLEZ
PB 40 PG 14
DB 2379 PG 2015
CARLA DESHAZO HOLT
DONNIE ORLANDO HOLT
DB 2915 PG 3870
MARY ANN P. SMITH
WADE W. SMITH JR.
DB 2915 PG 3870
MARY ANN P. SMITH
WADE W. SMITH JR.
DB 915 PG 488
SUE S. ROUTH
CAROL S. DEBUSK
PB 37 PG 46
DB 3083 PG 1918
ELIZABETH H. JONES
MARK H. JONES, JR.
PB 37 PG 46
DB 2200 PG 4078
CATHERINE W HISMAN MORGAN
JEFFREY DALE MORGAN
PB 37 PG 46
DB 2145 PG 232
ANN FLYNN WATKINS
JAMES ALLAN WATKINS
PB 37 PG 46
DB 1624 PG 2903
WATSON BROTHERS, INC.
PB 37 PG 46
DB 1790 PG 2230
HOMEOWNERS ASSOCIATION
DOE RUN
PB 37 PG 46
DB 1706 PG 2650 PB 37 PG 46
DB 2335 PG 134
PB 37 PG 46
DB 2254 PG 3359
PB 37 PG 46
DB 1846 PG 967
ALYCE W. GRAHAM
TIMOTHY A. GRAHAM
PB 37 PG 46
DB 2557 PG 2210
MARTHA P. GONZALEZ
RAMON GONZALEZ
PB 37 PG 46
DB 2691 PG 2801
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 37 PG 46
DB 1740 PG 1900
PB 37 PG 46
DB 1940 PG 1373
PB 37 PG 46
DB 1624 PG 2903
PB 37 PG 46
DB 1834 PG 1937
CAROL M. WESTMORELAND
PB 37 PG 46
DB 1800 PG 1440
DONNA L. HESTER
MICHAEL A. HESTER
PB 37 PG 46
DB 2547 PG 1766
WATSON BROTHERS, INC.
PB 37 PG 46
DB 2547 PG 1766
BRETT A. GITTER
PB 37 PG 46
DB 2430 PG 832
SHERRI D. BERRIER
STEPHEN PEGG
PB 37 PG 46
DB 2044 PG 550
KIM L. CASHWELL-MURRAY
WILLIAM L. MURRAY
PB 37 PG 46
DB 2893 PG 2953
LEI ZHANG
PB 37 PG 46
DB 1624 PG 2903
WATSON BROTHERS, INC.
PB 37 PG 46
DB 2547 PG 1764
BRETT A. GITTER
PB 37 PG 46
DB 2701 PG 2500
OF TRANSPORTATION
NORTH CAROLINA DEPARTMENT
PB 37 PG 46
DB 915 PG 487
WADE WESSLEY SMITH JR.
PB 37 PG 46DB 915 PG 489MICHAEL J. ROUTH
PB 37 PG 46
NO RECORDED DEED
SUE S. ROUTH
CAROL S. DEBUSK
PB 37 PG 46
NO RECORDED DEED
SUE S. ROUTH
CAROL S. DEBUSK
S 76 39’22" W
270.57’
N
17
3
1’
0
7
"
W
12
0.
0
0’
3
5
.
0
1’
2
5
’
A
C
C
E
S
S
E
A
S
E
M
E
N
T
D
B
16
2
1
P
G
2
8
2
5
EIP
EIP
EIP
EIP
EIP
EIP
EIP
E
X
I
S
T
IN
G
R
/
W
60.00’
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
368.37’L=75.28’R=333.70’
L=62.45’R=333.70’
L=100.19’
R=333.70’
182.70’
22.04’
190.09’
273.71’ EIP T
O
C
O
R
272.85’ R/
W T
O
C
O
R
1
9
8.
2
7
’
E
I
P
T
O
C
O
R
1
9
9.
2
7
’
R/
W
T
O
C
O
R
149.68’
EXISTING R/W
2
5
0
.
0
0
’3
11.
5
8
’
3
5
3
.7
0
’
ANTHONY GURLEY
REBECCA S. GURLEY
174.78’
EIP
3
4
6
.3
9
’ E
IP
T
O
C
O
R
3
4
6
.6
6
’ R
/
W
T
O
C
O
R
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
60.00’EXISTING R/W
SADIE S. WEAVIL
69.47’
4
3
.
7
8
’
E
X
IS
T
IN
G
R
/
W
DB 1621 PG 2825
PB 25 PG 114
DB 1822 PG 574
DB 1722 PG 4027
DB 714 PG 123
W
IN
S
T
O
N
-
S
A
L
E
M
C
IT
Y
O
F
F
O
R
S
Y
T
H
C
O
U
N
T
Y
3
6
.
3
5
’
+
7
6
.
5
3
3
0
.0
1’
+
0
3
.14
29.48’
+22.19
SIGHT EASEMENT
PB 25 PG 114
DB 3090 PG 4208
THE BANK OF NEW YORK MELLON
DB 2930 PG 2838
DONALD J. BROWN
PB 22 PG 84
DB 2133 PG 4003
DB 1914 PG 112
DB 1792 PG 1895
DB 1660 PG 1343
DB 2918 PG 3620
DB 724 PG 196
ROYCE B. SMITH HEIRS
PB 22 PG 84
DB 2133 PG 4003
DB 1914 PG 112
DB 1792 PG 1895
DB 1660 PG 1343
DB 2918 PG 3620
DB 724 PG 196
ROYCE B. SMITH HEIRS
DB 2136 PG 2998
DB 2136 PG 2995
BERRIER CONSTRUCTION COMPANY, INC.
DB 2727 PG 1127
BRIAN JAM ES SIM MONS
RENEE LYNN FABINIAK
TAMMY W. SIMMONS
BRIAN D. SIMMONS & WIFE
DB 3058 PG 3284
KAREN W. MANNING
CHARELS L. MANNING & WIFE
FROM HASTINGS HILL ROAD
FOR PURPOSE OF INGRESS, EGRESS AND REGESS,
EASEMENT IS PERMANENT NON-EXCLUSIVE
DEED 1621 PAGE 2825
ACCORDING TO
PB 25 PG 114
DB 3076 PG 3630
SUSAN P. MILLER
LACY BEN MILLER & W IFE
RHONDA FAYE JOHNSON
THOMAS E. JOHNSON & WIFE
PB 25 PG 114
PB 22 PG 84
DB 2547 PG 1447
JILL WHITE NELSON
SHANNON WILSON NELSON & WIFE
2
3
9
.
9
0
’
E
I
P
T
O
C
O
R
2
2
8
.
6
4
’
R
/
W
T
O
C
O
R
N 4747’40" E186.61’
N 6445’25" E
278.96’
S
0
1
4
6
’
2
9
"
W
17
.
4
4
’
N
7207
’20" W 108
.48
’
N
C
D
O
T
D
B
3
0
6
7
P
G
4
2
3
6
NCDOT
DB
3026
PG
3124
N
7207
’20" W
193
.38
’
N
7207
’20"
W
72
.91’
NCDOT
DB
3026
PG
3124
112.00’
13
0
.0
0
’
-NWY41-
TOP=887.27
INV=874.37
TOP=907.88
INV=902.18
TOP=910.61
INV=897.11
TOP=903.39
INV=895.09
8
"
V
C
8
"
V
C
8
"
V
C
TOP=873.24’
INV=860.74’
CAMERA
T
T
EOI
T
T
W
T
T
W
16" DI
16" DI
16" DI
16" DI
6"
DI
6
" D
I
6" DI
6" DI
8" DI8" DI8" DI8" DI8" DI
6
"
DI
6
"
DI
6
"
D
I
6
"
DI
6" DI
4"
P
L
4" PL
4" PL
4" PL
6
" D
I
2
"
P
L
2
"
P
L
2
"
P
L
2
"
P
L
2
"
P
L
2" PL
(
A
T
U
R
)
(
A
T
U
R)
(
A
T
U
R)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R
)
(
A
T
U
R)
(
A
T
U
R)
6
" D
I (A
T
U
R
)
92
CAT-1GRAU-350
GRAU-350 GRAU-350
GRAU-350
GRAU-350
GRAU-350
CAT-1
AT-1
G
R
AU 350
GRAU 350 TL-3TYPE B-77
-BY15A-421
-BY15-540
-BY15A-543
-BY15-541
-BY15B-544
-BY17- 556
-BY19- 426
-BY20- 427
-BY20-567
-BY16-548 -BY16-549
-BY17-558
-BY21-428
-BY17-557
CB
18" R
C
P
F
E
S
F
E
S
2
4
"
R
C
P
F
E
S
30"
R
C
P
F
E
S
1
8
"
C
M
P
CB
18" RCP
FES
FES
18"
R
C
P
U
N
K
N
O
W
N
S
I
Z
E
/
T
Y
P
E
15
"
C
M
P
CB
CB
CB
CB
CB
CB
CB
CB CB
CB
30" R
CP
FES
FES
DI
UNKNOWNSIZE/TYPE
18
"
R
C
P
18" RCP
18
" R
C
P
UNKNOWN
SIZE/TYPE
2
4"
R
C
P
I
N
V
=
8
8
5.2
0
F
E
S
18
"
R
C
P
15
"
R
C
P
18" RCP
U
N
K
N
O
W
N
T
Y
P
E
/
S
I
Z
E
24" RCP
18
" RC
P
18"
R
CP
CB
CB
CB
18" RCP
18
"
R
C
P
F
E
S
12" PLASTIC
12" PLASTIC
OVER FES
DI BUILT
18" RCPFES
15" PLASTIC
15" PLASTIC
FES
15" P
L
A
S
TIC
FES
18" RCP
FES
FES
18" RCP
30"
R
C
P
F
E
S
F
E
S
F
E
S
2
4
"
R
C
P
F
E
S
DI
1SFD
1SFD
S
POOL
W
W
D
G
G
R
12" RCP
12" RCP
W
36" CONC
CON
C
B
S
W D
4
8
"WW
15" RCP
12" RCP
370
GUY
12" RCP
S
R
2
6
3
2
S
E
D
GE
GAR
D
E
N
R
D
2
0
’ B
S
T
SR 2657 HASTINGS HILL RD 22’ BST
AME
R
S
H
AM
C
T
2
1’ B
S
T
16’ CONC
20’ CONC
S
48" IRON
2
S
B
K
D
3
6
"
C
O
N
C
2
S
B
K
D
2SBKD
2
S
B
K
D
2
S
B
K
D
2SBKD
2
S
B
K
D
2
S
B
K
D
1SBKD
2
0
’
C
O
N
C
12
’ CONC
12’ CONC
12’ CONC
12
’
C
O
N
C
4
8
"
C
O
N
C
W
D
48"
C
O
N
C
48"
C
O
N
C
48"CONC
12" H
DPE
15" HDPE
15
"
H
D
P
E
1
5
"
H
D
P
E
15"
H
DP
E
LT
L
T
18" RCP
FES
48" CONC
15" CMP
15" RCP
LT
AMERSHAM CT 21’ BST
MTL
MTL
60"WW 1SBW
60"WW 1SBW
POOL
311
W/LT
LT
LT
L
T
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
12’
C
H
L
1
2’
C
H
L
S
C
O
N
C
72" CHL&1SBW
72" CHL&1SBW
BST
12’ CHL
48"CONC
GERRY RD 20’ BST
B
K
B
K
S
S
S
60
"
CHL
4
8
"
W
W
L
T
4
8
"
P
L
A
S
T
I
C
12
" R
C
P
S
B
C
O
N
C
6
0
"B
K
BK W ALL
1
8
"
C
M
P
GATE
MTL
12" RCP W/LT
15" RCP
LT
48" CONC
15"
RCP
CO
N
C
18" RCP
18" RCP
18
" R
C
P
MTL MTL
M TL
48"CONC
WD
DK
W
D
D
K
WD DK
W
D
D
K
DKWD
D
K
W
D
4
8
" WW&
1S
B
W
6
0
"
W
D
S
O
I
L
2
S
B
K
DW
D
D
K
18" RCP
18" RCP
18" RCP
DK
WD
W/LT
GAZEBO
WD
D
K
W /LT
12" RCP
36" CONC
1SBKD
APPROX
S
DK
WD CONC
B
S
T
D
K
W
D
DI
DI
I-40 BUS WBL US 42 NBL 23’ BST
10’ BST
I-40 BUS EBL US 42 SBL 24’ BST
11’ BST
4’ BST
4’ BST
48" WW&PLASTIC RAIL
48"
W
W&
WD RAIL
W
ALL
12’ CONC 48" PLASTIC RAIL
SCRUB
SCRUB
SCRUB
P
OND
WE
.8
8
4
.6
DI
DI
DI
DI
DI
DI
DI
CON
C
48" PLASTIC RAIL
48" PLASTIC RAIL
18"
R
C
P
W/LT
1SBKD
S
S
1
2
’
B
S
T
2
S
B
KD
11’ C
ON
C
12’ CONC
12’ CONC
15"
H
D
P
E
DI
POOL HOUSECONC
L
T
L
T
L
T
L
T
B
K
B
K
W/LT
48" CONC
4
8
"
W
W
&
1
S
B
W
B
S
T
36" WW&1SBW
10
’ B
S
T
LT
B
S
T
T
E
N
NI
S
C
O
U
R
T
S
48" PLASTIC RAIL
18
" RC
P
18"
R
CP
2
4"
R
C
P
F
E
S
C
B
CB
CB
18" RCP
FES
12" PLASTIC OVER FES
DI BUILT
CB
30" RCP
FES
FES
CB
18" RCP 15" RCP
18" CMP
1
5
"
R
C
P
1
5
"
R
C
P
15
"
R
C
P
321
357
W
D
S
356
30" C&G
359
7
2
"
W
D
10’ CONC
1SBKD
36" CONC
1S
B
K
D
48" CONC
1
4
’
C
O
N
C
48" C
HL
60"
W
D
S
S 3
0
"
W
D
POOL
354
W
1S
B
K
D
2
S
B
K
D
2SBKD
10’ CONC
15
’
C
O
N
C10
’
C
O
N
C
15" HDPE
15" H D PE 15" R
CP12" HDPE
48" CONC
48" CONC
4
8
" C
O
N
C
S
362
B
S
T
2
SFD
LT
L
T
L
T
L
T
S
R
4
2
0
8
B
E
N
S
M
IT
H
R
D
2
0
’
B
S
T
MTL
MTL MTL
60" CHL&1SBW
316
315
317
318
319
320
W/LT
15" RCP
C
O
N
C
BST
1
S
F
D
3
6
"
C
O
N
C
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
CONC
3
6
"
C
O
N
C
2
S
B
K
D
2
S
B
K
D
CONC
2
S
B
KD
C
O
N
C
CONC
B
K
WA
L
L
2
S
B
K
D
CONC
W /LT
W/LT
W /LT
W D DK
W/LT
MTLMTL
CB
L
T
W
D
D
K
W D DK
LT
1S
B
K
D
DK
W D
DK
WD
L
T
L
T
CONC
CONC
C
O
N
C
CONC
W
D
D
K
W
D
D
K
W
D
D
K
C
O
N
C
DK
W D
MTL
CONC
R
AI
L
4
8
"
W
D
&
W
W
48
"
PLAST
IC
RA
IL
&
WW
RIPRAP
BST
BST
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
10’ BST
10’ BST
10’ CONC
2
4"
RCP
W /LT
1SF
D
72" CHL
1S
B
K
D
36" CONC
9’ C
O
N
C
S
W
D
2
S
B
K
D 10
’
C
O
N
C
48" CONC
48" CONC
AMERSHAM CT 21’ BST
C
O
N
C
60" CHL 1SBW
SR 2825 GERRY RD 20’ BST
CONC
B
K
L
T
10’ CONC
48" PLASTIC
2
S
B
K
D
MTL
DEER RACK CIR 22’ BST
GR
RAIL48" W D&W W
LT
SCONCCONC
CONCCONC
CONC
C
O
N
C
2
S
B
K
D
48" S
T
O
N
E
2SBKD
72"
W
D
D
E
E
R
R
U
N
D
R
2
1’
B
S
T
15
"
R
C
P
15"
R
C
P
W
D
D
K
LT
12’
C
H
L 12’ CHL
C
O
N
C
P
L
A
N
T
E
R
S
S
OIL
WALL36" WD
REM O VE
REM O VE
RETAIN AN D EXTEND
CO LLAR
REM O VE
REM O VE
REM O VE
REM O VE REM O VE
REM O VE FES
RETAIN
REM O VE FES
END BRIDG E TO 69+80 -Y5A- RT
SHO ULDER BERM GUTTER
AND FLAT G RATE
TB 2G I W / NARRO W SLO T
EXTEND
RETAIN AND
REM O VE FES
CO LLAR
RETAIN AND EXTEND
CO LLAR
REM O VE
18" RCP-III
18" RCP-III
RETAIN
RETAIN
15" RCP
REM O VE +/-20’
CO LLAR
EN D BRIDGE TO 70+17 -Y5A- LT
SHO ULDER BERM G UTTER
EST 21 SY FF
EST 8 TO N S
RIP RAP
CLASS ’B’
SEE DETAIL#6
EST 401 SY FF
EST 149 TO NS
CLASS "B" RIPRAP
TO E PRO TECTIO N W /
EXST 72" CO NC DITCH
RETAIN +/-64’ O F
CO N NECTO RS
AN D RO D AND LUG
15" CSP W / 2 ELBO W S
REM O VE
EST 7 SY FF
EST 2 TO N S
RIP RAP
CLASS ’B’
CO NN ECTO RS
AN D RO D AND LUG
15" CSP W /2 ELBO W S
REM O VE
W / ELBO W
18" CSP
TO 2GI W / FLAT GRATE
CO N VERT JB W / M H
18" RCP-III
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIG N
ENG IN EER EN GIN EER
R/W SHEET NO .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
5
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
2
9
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
29U-2579B
Y6
MATCHLINE -Y6- STA 18+30 SHEET 31
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
1
3
7
+
3
2
S
H
E
E
T
3
0
PI Sta 21+34.27
D
L = 451.85’
T = 240.51’
R = 533.00’
RO = SEE PLANS
SE = 0.06
M
A
T
C
H
L
I
N
E
-
Y
6
-
S
T
A
.
2
3
+
9
4
.
1
5
S
H
E
E
T
2
8
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
1
2
4
+
7
0
S
H
E
E
T
2
8
(GRADING, PAVING, DRAINAGE, & STRUCTURE)
TO BE CONSTRUCTED UNDER TIP PROJECT U-2579G
DRAINAGE TO BE CONSTRUCTED UNDER TIP PROJECT U-2579G
PARCELS IMPACTED UNDER TIP PROJECT U-2579G
RIGHT OF WAY TO BE PURCHASED UNDER TIP PROJECT U-2579G
TIP PROJECT U-2579G
PERAMENT DRAINAGE EASEMENT TO BE PURCHASED UNDER
UNDER TIP PROJECT U-2579G
PERAMENT DRAINAGE/UTILITY EASEMENT TO BE PURCHASED
PAVED SHOULDER
PAVEMENT TO BE OBLITERATED
FOR -Y4EB- PROFILE, SEE SHEET 53-54
FOR -Y4WB- PROFILE, SEE SHEET 58-59
FOR -Y5A- PROFILE, SEE SHEET 83-84
FOR -Y6- PROFILE, SEE SHEET 89
NOTE :
FOR TIP PROJECT U-2579G, SEE U-2579G PLAN SHEET 5
M
ATCH LINE -Y5A- STA.62+50 SHEET 28
(CO N STRU CTED U N D ER TIP PRO JECT U -2579G)
(CO N STRUCTED UN DER TIP PRO JECT U-2579G)
M ATCHLINE -Y5A- STA 73+00 SHEET 31
65
70
300’ TAPER 1000’ FULL LANE
-Y6-
22’
3
6
’
2
4
’
4’ P.S.
10’ P.S.
4’ P.S.
4’ P.S.
10’ P.S.
2
4
’
4’ P.S.
-Y4WB-
-Y4EB-
-Y4WB-
-Y4EB-
1
2
5
1
3
0
1
3
5
PI Sta 21+34.27
D
L = 451.85’
T = 240.51’
R = 533.00’
-Y4--Y4-
30’
3
6
’
-Y4- POT STA. 129+64.57
-Y5A- POT STA. 68+06.51
PI Sta 21+34.27
D
L = 451.85’
T = 240.51’
R = 533.00’
-
Y
6
-
P
T
S
t
a
.
2
3
+
4
5
.
6
2
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
45.00’
+45.67 -Y6-
END W.W. FENCE
BEGIN W.W. FENCE
TIE TO EXISTING
END W.W. FENCE
GRADE TO DRAIN
OBLITERATE AND
T
APER
8:1
T
APER
8:1
T
APER
8:1
-
Y5
A-
-
Y5
A-
1
0
’
25’ R
10’ R
10’15’ R
60’ R50’
R
BEGIN APPROACH SLAB
BEGIN BRIDGE
END BRIDGE
END APPROACH SLAB
300’ T
APER RT. AN
D LT. SIDE
4’P.S.
24’
GRADE TO DRAIN
OBLITERATE AND
T
APER
8:1
4’P.S.24’4’P.S.
TIP PROJECT U-2579G
CONSTRUCTED UNDER
-Y5A- POT STA. 66+83.52
TIP PROJECT U-2579G
CONSTRUCTED UNDER
-Y5A- POT STA. 67+07.01
TIP PROJECT U-2579G
CONSTRUCTED UNDER
-Y5A- POT STA. 69+47.75
TIP PROJECT U-2579G)
(CONSTRUCTED UNDER
FULL DEPTH PAVEMENT
TIP PROJECT U-2579G)
(CONSTRUCTED UNDER
FULL DEPTH PAVEMENT
PC Sta. 18+93.77-Y6-
4’P.S.
8:1 TAPER
121.46’
+67.34 Y4
W.W. FENCE
END
W.W. FENCE
BEGIN
-Y4- STA. 129+50.00
TIE TO EXISTING
END W.W. FENCE
124.00’
+75.00 Y4
24’35.5’
125.39
+00.00 -Y4-
TIP PROJECT U-2579G
CONSTRUCTED UNDER
-Y5A- POT STA.69+24.26
TIE NOISE WALL
BEGIN W.W. FENCE
END NOISE WALL -NWY41-
BEG NOISE WALL -NWY42-
END MSE WALL
-NWY42-
PROP NOISE WALL
BARRIER FACE
PAVE TO
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
33.00’
+35.66 -Y6-
33.00’
45.90’
40.00’
+59.16 -Y6-
+50.00 -Y6-
+93.77 -Y6-
33.00’
+93.77 -Y6-
42.00’
+47.35 -Y5A-
42.00’
+54.55 -Y5A-
42.00’
+69.69 -Y5A-
33.00’
+45.62 -Y6-
18+93.77
33.00
+20.75 -Y5A-
277.10’
198
196 199
201202
200
+90
EX. R\W EX. R\W
+60
+27
160’
37.00’
53.00’
+53.00 -Y6-
+00.00 -Y6-
53.00’
+93.77 -Y6-
61.18’+94.48-Y5A-
EX. R/W
+41.17 -Y5A-
+20.00 -Y5A-
71.00’
100.00’+13.00 -Y5A-
70.00’
+54.01 -Y5A-
+54.01 -Y5A-
70.00’
+78.07 -Y5A-
EX. R/W
+45.81 -Y5A-
EX. R/W
+81.55 -Y5A-
EX. R/W
+40.00 -Y5A-
145.00’
+00.00 -Y5A-
145.00’
70.00’
197
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Partial Purchase
+13.49 -Y5A-
EX. R/W
2G I
Conv. O TCB To 2G I
FS
FS
2G I
426
427
Fill
Slope
( Not to Scale)
TOE PROTECTION
d
Fabric
Filter
FLATTER2:1 OR
Ground
Natural
DETAIL #6
d= 2 Ft.
Type of Liner= Class ’B’ Rip-Rap
FRO M STA. 129+00 TO 130+00 -Y4- LT
427A
15" RCP-III
0522
15"
15" 0525
18" RCP-III
0501
0502
18" RCP-III
15" RCP-III
FALSE SUM P
18" RCP-III
SHO ULDER BERM GUTTER
B
0505
15" RCP-III
0505
0506
FALSE SUM P
18" RCP-III
A
0505
0507 0508
18" RCP-III
0509 JB w/M H
0503
18" CSP
0504
0516
0517
2
4
" R
C
P
-III
JB W / M H
30" RCP-III0518
2GI
0515
FALSE SUM P
0510
FLAT G RATE
2G I W /
15" RCP-III
FLAT G RATE
2G I W / 0513
15" RCP-III
2
GI15" CSP
0512
W / FLAT GRATE
2GI NARRO W SLO T
15" RCP-IV
0511
2GI W/ NARRO
W SLOTS
2GI W/ NARRO
W SLOTS
0514
JB w/M H
A
0512
2G I FS
BDO
469
FLAT GRATE
2GI W /
15
"
R
C
P
-
III
472
470
2GI
W / FLAT G RATE
2G I
2G I
2G I
FLAT G RATE
2GI W /
2G I
15" RCP-III
471
DI
DI
FES
DI
18" RCP
FES
15" RCP
24" RCP
24" RCP
18" RCP
FES
18"
R
C
P
STONE
1SD
16’ CONC
15" RCP
2
S
B
K
D
9’
C
O
N
C
12" RCP
BK
1
S
F
D
36" CONC
MTL
M TL
MTL
2SFD
2
S
F
D
G SGR
GR
S
R 2825
GE
R
R
Y
D
R 20’ BST
12" R
CP
12
"
R
C
P
S
S
S
BS
T
9’
B
S
T
12" RCP
LT
GR
12" RCP
P
O
O
L
C
O
N
C
72" W D
S
36" C
O
N
C36" BK1S
B
K
D
CONC
9’ CONC
B
A
R
RI
C
A
D
E
W /LT
W
W /LT 36" CONC
CONC36"2SFD
W /LT
9’ GR & CONC
W/LT
CO NC48"
72" CONC 60" CONC
WD DK
DI
C
O
N
C
12" RCP
DKWD
60" W W &1SBW
BK15’
C
O
N
C
12" RCP
W /LT
W
3
6
"
C
O
N
C
B
S
T
9’ BST
S
R
2
6
6
7
H
A
S
TI
N
G
S
HI
L
L
R
D
2
0’
B
S
T
S
4
8"
C
H
L
C
O
N
C
4
8"
C
O
N
C
W
D
D
K
W/
L
T
R
AI
L
6
0
"
W
D
W
16"
DI
16"
DI
8"
DI
GR
A
U 350
TYPE B-77
GRAU 350
TYPE B-77
TYPE B-77TYPE B-77
GR
A
U 350
GR
A
U 350
TYPE B-77GRAU 350 TL-3
GUARDRAIL TO BE RESET
-BY15-542
-BY15B-422
-BY15-420
-BY17-559
-BY16-550
CB
F
E
S
18"
R
C
P
CB
JB
APPROX
2
4
" R
C
P
F
E
S
2
4
" R
C
P
F
E
S
18" RCP15" RCP
ELBOW
APPROX
THIS AREA
DAMAGED IN
TOP OF PIPE
18" RCP
CB
CB
15" RCP
2
5
7
.
0
1’
1
9
5
.
4
8
’
125.38’5
2.
8
6
’
4
0
.
0
0
’
90.00’
60.00’EXISTING R/
W
EXISTIN
G R/
W
2
7
2
.
0
0
’
EXISTING R/W
EXISTING R/W
2
5
0
.
0
0
’
EXISTING R/W
2
5
8
.
0
0
’
EXISTING R/W
EIP
EIP
147.32’ EIP TO COR
147.76’ R/W TO COR
113.4
0’
R/W MON
62.15’
L
=
17
1.2
1’
R
=
15
0.7
9’
DB 2113 PG 1940
JANET THOM PSON
LARRY D. THOM PSON
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
CI
T
Y
O
F
WI
N
S
T
O
N-
S
A
L
E
M
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
;
5
4.6
9’
E
XIS
TI
N
G
R/
W
101.12’ EIP TO CO R
97.70’ R/W TO CO R
2 8 4.4 0 ’
+15.7 3
86.23’+32.98
71.40’+67.77
97.08’
+24.17
PB 22 PG 84
DB 2595 PG 1797
KIP J. M ILLER
PB 22 PG 84
DB 2935 PG 1763
RACHEL L. MORROW
KEITH A. MORROW
PB 22 PG 84
DB 3035 PG 4335
CINDY B. M ONTGOM ERY
TIM OTHY A. M ONTGOM ERY
PB 22 PG 84
DB 1755 PG 2672
SUSAN CARTER
DENNIS W . CARTER
S 3605’25" E
206.04’
S 3605’25" E
209.58’N 5341’40" E
196.81’
108.96’
EIP
EIP
EIP
EXISTING R/W
EXISTING R/W
100.22’
2
1
5
.
5
2
’
EXISTING R/W
EX ISTING R /W
241.43’ EIP T
O
C
O
R
242.75’ R/
W
T
O
C
O
R
R/W MON
60.00’
;
205.00’+69.76
99.22’+38.14
PB 25 PG 114
DB 2954 PG 1994
PREM IER STORES INC.
PB 25 PG 114
PB 22 PG 84
DB 3026 PG 0449
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 25 PG 114
DB 2239 PG 1119
PB 25 PG 114
PB 22 PG 84
DB 3009 PG 1962
OF TRANSPORTATION
NORTH CAROLINA DEPARTM ENT
PB 25 PG 114
DB 2535 PG 2302
SUSAN D. TERRY
JARED W . TERRY & W IFERUTH C. SELLARS
JAM ES O. SELLARS & W IFE
PB 25 PG 114
DB 1297 PG 570
GERALD W . M CGEE
N 7329’05" E
230.06’
108.34’
PB 25 PG 114
PB 22 PG 84
DB 2547 PG 1447
JILL WHITE NELSON
SHANNON WILSON NELSON & WIFE
89.25’
N 6948’05" E
121.60’
N 7014’23" E
285.92’
ROAD ELEV=880.61 BEAM ELEV=897.83
ROAD ELEV=879.70 BEAM ELEV=897.56
ROAD ELEV=880.23 BEAM ELEV=898.21
ROAD ELEV=881.15 BEAM ELEV=898.49
ROAD ELEV=881.61 BEAM ELEV=899.03
ROAD ELEV=880.81 BEAM ELEV=898.85
ROAD ELEV=881.25 BEAM ELEV=899.39
ROAD ELEV=882.05 BEAM ELEV=899.60
RETAIN AN D EXTEN D
DAYLIG HT
EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’EST 10 SY FF
EST 3 TO NS
RIP RAP
CLASS ’B’
SEE DETAIL#14
W / 386 SY FF
EST. 156 TO N S
LATERAL ’V’ DITCH W / CLASS ’B’ RIP RAP
EST. DDE 25CY
SEE DETAIL#8
TAIL DITCH
EST. 3 TO N S
CLASS ’B’ RIP RAP
EXIST. 18" CM P
REM O VE 8ft O F
18" CSP
EST 7 SY FF
EST 2 TO NS
RIP RAP
CLASS ’B’
CO N NECTO RS
AND RO D AN D LUG
15" CSP W /2 ELBO W S
CO N NECTO RS
AND RO D AN D LUG
15" CSP W /2 ELBO W S
STA 139+00 TO 140+00 -Y4- LT
W /RO CK PLATIN G
1.5:1 FILL SLO PES
STA 142+00 TO 142+50 -Y4- LT
W / RO CK PLATIN G
1.5:1 FILL SLO PES
142+00 -Y4- LT
STA 140+00 TO
W /RO CK PLATING
1:1 FILL SLO PES
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
5
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
3
0
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
30U-2579B
M
A
T
C
H
L
I
N
E
-
Y
4
-
S
T
A
.
1
3
7
+
3
2
S
H
E
E
T
2
9
NOTE :
1. FOR -Y4EB- PROFILE, SEE SHEET 54
2. FOR -Y4WB- PROFILE, SEE SHEET 59
PAVED SHOULDER
300’ TAPER
4’ P.S.
2
4
’
4’ P.S.
4’ P.S.
2
4
’
4’ P.S.
-
Y
4
W
B
-
P
O
T
S
t
a
.
1
5
0
+
2
2
.
8
9
-
Y
4
E
B
-
P
O
T
S
t
a
.
1
5
0
+
2
2
.
8
9
-Y4WB-
-Y4EB-
1
4
0
1
4
5
1
5
0
-Y6- POT STA. 10+00.00
20’ INC.
-Y4-30’
-Y5A- POC STA. 77+61.41 =
2
4
’
1
5
’
1
5
’
2
4
’
0
2
0
2
0
2
0
1
0
2
10’ P.S.10’ P.S.
I-40 BUS WEST US 421 NORTH 24’ BST
I-40 BUS EAST US 421 SOUTH 24’ BST
END CONSTRU CTION
END GRAD E
-Y4EB-POT Sta. 143+00.00
BEGIN 3" OVERLAY
-Y4W B-POT Sta. 143+00.00
END 3" OVERLAY
-Y4EB-POT Sta. 148+00.00
-Y4W B-POT Sta. 148+00.00
2
4
’
4’ P.S.
4’ P.S.
2
4
’
10’ P.S.
E
X
I
S
T
E
X
I
S
T
120’ TAPER
TO EXIST
120’ TAPER TO EXIST
12.25’ P.S.
BARRIER FACE
PAVE TO
BARRIER FACE
PAVE TO
-NWY42-
PROP NOISE WALL
-NWY42-
END NOISE WALL
F
F
F
FF
F
C
FF
F
F
F
205
65.00’+50.00 -Y5A-
FS
ELBELBOW
Conv. O TCB To 2G I
FS
428
429
LATERAL ’V’ DITCH
( Not to Scale)
Natural
Ground 2:
1
2:1
D
b
Fill
Slope
d
Fabric
Filter
1"/Ft.
DETAIL #14
Type of Liner= Class ’B’ Rip-Rap
b= 5 Ft.
M ax. d= 2 Ft.
M in. D= 2 Ft.
FRO M STA 138+00 TO 140+50 -Y4- RT
B
Natural Natural
Ground Ground2:1
2:
1 D
( Not to Scale)
STANDARD BASE DITCH
DETAIL #8
B= 2 Ft.
M in. D= 2 Ft.
FRO M STA. 140+48 TO 141+20 -Y4- RT
427A
18
"
RCP
-
III
FLAT GRATE
2G I W /
FLAT G RATE
2GI W /
FLAT G RATE
2GI W / 15" RCP-IV
473
474 475
PSH
INV=N/A
INV=N/A
INV=N/A
INV=N/A
INV=N/A
INV=N/A
INV=N/A TOP=814.54
TOP=815.63
TOP=825.71
TOP=813.96
TOP=809.42
TOP=812.24
TOP=814.66
30" TYPE UNKNOWN
TOP=817.07
(PER RECORD)
INV=806.12
3
0
"
T
Y
P
E
U
N
K
N
O
W
N
3
0
" T
Y
P
E
U
N
K
N
O
WN
8
"
T
Y
P
E
U
N
K
N
O
W
N
-NWY42-
M TL
M TL
M TL
MTL
M TL
DIDI
18" RCP
DI
18" RCP
18" CM P
18
"
C
M
P
OL
D
W
O
O
D L
A
NE 20’ BST
1S
B
K
D
1S
B
K
D
1SBKD
1SBKD
CONCGR
SS
G
S
S
48" CONC
18’ CONC
B
K
B
K
18
’
C
O
N
C
S
6
0
" C
H
L
W/
L
T
MTL
MTL
MTL
CURB
W /LT
W /LT
W /LT
W
D
D
K
W
D
D
K
1S
B
K
D
C
O
N
C
36"
8’ BST
12
" R
C
P
12" R
C
P
60" W W &1SBW
4-10’X12’ CONC
S
A
L
E
M
C
R
E
E
K
S
ALE
M
C
R
E
E
K
60" W W &1SBW
60" W W &1SBW
8’ BST
B
K
B
K10’
B
S
T
S
BST
60" W W &1SBW
KK
K
K K
KKK
K
K
KK
KK
K
KK
KK
KKKK
GRAU-350
TIE TO EXISTING
PROP. GUARDRAIL
50:1 TRANSITION
30:1 TAPER
TYPE B-77
-BY16- POT 129+65.46 =
-Y4- STA. 139+04.09, 2.45 LT.
-BY16- PINC 128+79.75 =
U2579B-9
-BY16-551
4
-
1
0
X
1
2
B
A
R
R
E
L
S
18
"
C
M
P
1
8
"
R
C
P
CB CB
1
8
"
C
M
P
FES
18" RCP
CB CB
CUL1CUL2
CUL3CUL4
CUL5CUL7
CUL6
CUL8
CUL9
CUL11 CUL12
CUL13
CUL14
CUL15 CUL16CUL10
CE2
HW2
CE1
CITY OF W INSTON-SALEM
2
5
0
.
0
0
’
EXISTING R/W
348.71’
SHOW ING SALEM WATER SHED
CITY OF W INSTON SALEM , N.C.
UNRECORDED MAP FOR
NO DB REFERENCE
THE FORSYTH COUNTY BOARD OF EDUCATION
CITY O F W IN STO N -SA LEM
C
I
T
Y
O
F
W
I
N
S
T
O
N
-
S
A
L
E
M
T
O
W
N
O
F
K
E
R
N
E
R
S
V
I
L
L
E
TO W N O F KER N ERSV ILLE
3
0
’ S
A
N
IT
A
R
Y
S
E
WE
R
E
A
S
E
M
E
N
T
;
CITY OF W INSTON-SALEM
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EXISTING R/W
2
0
0 .
0
0
’
18
9
.6
6
’
8
4
.9
2
’ E
IP
T
O
E
IP
8
5
.18
’ R
/W T
O
E
IP
60.00’E
XISTI
N
G
R/
W
89.68’
6
0.
0
0
’
E
X
IS
T
IN
G
R
/W
279.55’ EIP TO
EIP
281.60’ R/W
TO
R/W
184.37’
L
=
5
3.2
3’
R
=
5
0.0
0’
L=64.06’
R=50.00’
L
=
6
9
.0
9
’
R
=
5
0
.0
0
’
E
XISTI
N
G
R/
W
155.68’
PB 25 PG 114
DB 2017 PG 741
SHOW ING SALEM WATER SHED
CITY OF W INSTON SALEM , N.C.
UNRECORDED MAP FOR
NO DB REFERENCE
PB 25 PG 114
DB 1297 PG 570
PB 25 PG 114
DB 1710 PG 960
PB 25 PG 114
DB 1314 PG 1159
PB 25 PG 114
DB 1151 PG 1549
GERALD W . M CGEE
;
3
0
’ S
A
N
IT
A
R
Y
S
E
WE
R
E
A
S
E
M
E
N
T
13
6
.6
8
’
+
0
4
.2
7
PB 25 PG 114
DB 1297 PG 570
GERALD W . M CGEE
110.00’
LINDA M. MORRELL
NORMAN G. MORRELL & WIFE PEGGY PAULINE GUNN
TOM M Y M ILLS GUNN & W IFE
CAROL PERRY
FRANK J. PERRY JR. & W IFE
JENNIFER W ILLIAM S
M ACK D. W ILLIAM S & W IFE
REM O VE
REM O VE
REM O VE
SEE DETAIL#1
FALSE CUT
STA. 79+50 -Y5A- RT
ELIM IN ATE CUT DITCH
STA. 80+00 TO 80+50 -Y5A- RT
TO 4:1
REVISE FILL SLO PE
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
R
E
V
I
S
I
O
N
S
HYDRAULICSROADWAY DESIGN
ENG INEER ENG IN EER
R/W SHEET N O .
SHEET N O .PRO JECT REFERENCE N O .
0
8
-
N
O
V
-
2
0
1
3
0
9
:
4
5
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
u
-
2
5
7
9
b
_
r
d
y
_
p
l
n
_
s
h
t
3
1
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
8
/
1
7
/
9
9
31U-2579B
PI Sta 77+45.60
D
L = 579.78’
T = 290.43’
R = 3,890.00’
PI Sta 13+91.60
D
L = 601.66’
T = 346.44’
R = 485.00’
SE = 06
RO = SEE PLANS
SE = 03
RO = SEE PLANS
-Y5A--Y6-
(
C
O
N
S
T
R
U
C
T
E
D
U
N
D
E
R
T
I
P
P
R
O
J
E
C
T
U
-
2
5
7
9
G
)
M
A
T
C
H
L
I
N
E
-
Y
5
A
-
S
T
A
7
3
+
0
0
S
H
E
E
T
2
9
(TIP PROJECT U -2579G)(TIP PROJECT U -2579B)
CONSTRU CTED U ND ER
-Y6- STA. 17+25.77
CONSTRU CTED U ND ER
-Y6- STA. 17+25.77
(
C
O
N
S
T
R
U
C
T
E
D
U
N
D
E
R
T
IP
P
R
O
J
E
C
T
U
-
2
5
7
9
B
)
M
A
T
C
H
LI
N
E
-
Y
6
-
S
T
A
1
8
+
3
0
S
H
E
E
T
2
9
PAVEMENT TO BE OBLITERATED
PAVED SHOULDER
(GRADING, PAVING, DRAINAGE, & STRUCTURE)
TO BE CONSTRUCTED UNDER TIP PROJECT U-2579G
NOTE :
FOR -Y5A- PROFILE, SEE SHEET 84-85
FOR -Y6- PROFILE, SEE SHEET 89
FOR TIP PROJECT U-2579G, SEE U-2579G PLAN SHEET 5-6
*
DRAINAGE TO BE CONSTRUCTED UNDER TIP PROJECT U-2579G
PARCELS IMPACTED UNDER TIP PROJECT U-2579G
RIGHT OF WAY TO BE PURCHASED UNDER TIP PROJECT U-2579G
PERAMENT DRAINAGE EASEMENT TO BE PURCHASED UNDER TIP PROJECT U-2579G
PERAMENT DRAINAGE/UTILITY EASEMENT TO BE PURCHASED UNDER TIP PROJECT U-2579G
1
0
-
Y
5
A
-
P
C
S
t
a
.
7
4
+
5
5
.
17
-
Y5
A
-
P
T
S
t
a
. 8
0
+
3
4
.9
5
-Y6-
-Y6- POT STA. 10+00.00
-
Y6- PC Sta. 10+45.16
-Y5A- POC STA. 77+61.41 =
0
0
0
2
0
1
0
2
0
2
0
2
0
2
0
1
0
2
0
0
1
0
-
Y
6
-
P
T
S
t
a
.
1
6
+
4
6
.
8
2
SR 2667 HASTINGS HILL RD 20’ BST
SR 2825 GERRY DR 20’ B ST
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
1
0
1
0
00
3
0
3
0
2
0
3
0
3
2
4
’
2
4
’
24’ INC
0
2
2
4
’
100’ TAPER TO EXIST.
RT. & LT. SIDE
2
2
’
0
6
05
05
0
4
0
3
0
2
0
2
01
01
0
4
0
1
0
2
-Y5A-
21’ IN
C
+
8
7.
16
0
6
0
6
0
5
0
4
0
4
0
3
0
3
0
2
0
2
0
1
0
2
-Y6
-
13’
10’
15’ R
15’ R
-Y5A- STA. 81+25.00
4’P.S.
4’P.S.
4
5
’
R
+
9
0.
5
3
-
Y
6
-
0
6
+
4
9
.
0
8
-Y
6
-
6
0
’R
0
3
00
000101020203030404
05
05
0606
2
2
’
0
5
21’ INC.
4’P.S.
24’
18.05’
EXISTING
MATCH
4’P.S.
2
4
’
E
X
IS
T
.
(TIP PROJECT U -2579G)
END CONSTRU CTION
F
F
F
FF
C
C
C
C C
C
C
+50.00 -Y5A-
+34.95 -Y5A-
42.00’
+55.17 -Y5A-
42.00’
+55.17 -Y5A-
42.00’
40.00’
+50.00 -Y5A-
+63.00 -Y6-
40.00’
+46.82 -Y6-
53.00’
+50.00 -Y5A-
+52.75 -Y6-
205
205
204
206
53.00’
+46.82 -Y6-
54.00’
+50.00 -Y5A-
60.00’
42.00’
65.00’
+50.00 -Y5A-
+50.00 -Y5A-
+75
86’
+50.00 -Y5A-
97.00’
+75.00 -Y5A-
114.00’
+63.00 -Y5A-
120.00’
+90.00 -Y5A-
125.00’
+67.00 -Y6-
64.00’
204
203
202
100.00’
+13.00 -Y5A-
64.00’
42.00’
+50.00 -Y5A-
+12.00 -Y5A-
131.00’
64.00’
42.00’
53.00’
+18.42 -Y6-
+14.15 -Y6-
EX. R/W
60.70’
80.12’
75.43’
42.93’
+59.05 -Y5A-
+73.83 -Y5A-
+85.58 -Y6-
+30.06 -Y6-
28.61’
+48.99 -Y5A-
+91.15 -Y5A-
EX. R/W
EX. R/W
+40.00 -Y5A-
EX. R/W
42.00’
EX. R/W
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
Under U-2579G
Purchased
6:
1
Fill
Slope
2:1
W
( Not to Scale)
FALSE CUT
DETAIL #1
N.G.
6:1
D
M in. D = 2 ’
W = 5’ M in.
2GI W / NARRO W SLO TS
FRO M STA. 78+50 TO 79+50 -Y5A- LT
G RADE TO DRAIN
O BLITERATE AND
FS
2GI W / N ARRO W SLO TS
2GI W / N ARRO W SLO TS
FS
0523
0524
1
5
"
R
C
P
-
I
I
I
15" RCP-III
15" RCP-III
0519
15" RCP-III
0520
2G I W / N ARRO W SLO TS
2G I W / N ARRO W SLO TS
0521
FS
15" RCP-III
15" RCP-III
2G I W / N ARRO W SLO TS
0601
FS
18" RC P-III
2G I W / N ARRO W SLO TS
0603
FS NARRO W SLO TS
2G I W /
0602
FS
18
" RC
P-
III
15" RCP-III
2G I W / NARRO W SLO TS
0604
2
4
"
RC
P
-
III
FS
NARRO W SLO TS
2G I-A W /
0605
2G I W / N ARRO W SLO TS
FS
0606
15 " RC P-III
FS
0608
24" RCP-III
SLO TS
NARRO W
2GI-A W /
0607
24" RCP-III
EST. FF +/- 70 SY
EST. DDE +/- 80 CY
EST. CLASS I RIPRAP +/- 70 TO NS
ENERG Y DISSIPATO R BASIN # 1
2SFD
2
S
B
K
D
11’ B
S
T
12" RCP
6
0
" C
O
N
C
LT
1
3
’ C
O
N
C
2SFD
G
12" RCP
POOL
18" RCP
9
’ B
S
T
36" CONC
W
S
W/LT
W
/LT
W
/LT
W
/LT
WD DK
C
O
N
C
INV =N /A
T O P =8 14 .6 6
(P E R R E C O R D )
IN V =8 0 6 .3 2
T O P =8 1 7 .1 8
30"
T
YP
E
U
N
K
N
O
W
N
3
0
"
T
Y
P
E
U
N
K
N
O
W
N
T O P =8 1 7 .0 7
(P E R R E C O R D )
IN V =8 0 6 .12
{
{
{
{
{
{
{
{
{
{
{
{
z
z
z
z
z
z
z
z
z
z
z
S
a
lem
C
r
ee
k
1W/LT
1 6
W/LT
1 7
SEAT ELEVATIONS
810.89’
810.88’
810.91’
810.92’
SEAT ELEVATIONS
WOOD & STEEL
BRIDGE #201
W OODSWOODS
W
16" DI
EO
I
16" DI
16" DI
-BY17-560
-BY17-561
19.72’
3
4
6
.
5
9
’
2
0
3
.
9
6
’
8
7
2
.8
5
’
EXISTING R/W
EXISTING R/W
60.00’
14
7
.3
2
’ E
IP
T
O
C
O
R
14
7
.7
6
’ R
/
W
T
O
C
O
R
SHOW ING SALEM W ATER SHED
CITY OF W INSTON SALEM , N.C.
UNRECORDED M AP FOR
NO DB REFERENCE
CITY OF W INSTON-SALEM
CARLA J. DEOSKEY
CHRISTOPHER DECOSKEY
DB 2553 PG 877
30’ S
A
NIT
A
R
Y
S
E
W
E
R
E
AS
E
M
E
N
T
3
0
.
0
0
’
+
0
6
.
9
1
8
1.5
0
’
+
8
4
.9
5
4
4
.4
4
’
+
8
4
.9
5
7
1.
4
0
’
+
6
7
.
7
7
P B 2 2 P G 8 4
D B 3 0 9 3 P G 3 5 0 6
M
E L V IN L E E S W
IS H E R
DB 2183 PG 3156
CITY OF W INSTON-SALEM
PB 22 PG 84
DB 3093 PG 3506
JAM ES LAW RENCE SW ISHER
M ELVIN LEE SW ISHER
PB 22 PG 84
DB 3095 PG 0068
RPP DIVERSIFIED INC.
P
B
2
2
P
G
8
4
D
B
3
0
3
5
P
G
4
3
3
5
C
IN
D
Y
B
.
M
O
N
T
G
O
M
E
R
Y
T
IM
O
T
H
Y
A
.
M
O
N
T
G
O
M
E
R
Y
E IP
S 36 05’25" E
209.58’
S
5
3
5
4
’
3
6
"
W
18
4
.
7
0
’
N
5
3
4
1’
4
0
"
E
19
6
.
8
1’
P B 2 2 P G 8 4
D B 3 0 9 3 P G 3 5 0 6
M
E L V IN L E E S W
IS H E R
6/16/99
SHEET NO.PROJECT REFERENCE NO.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
16-DEC-2013 11:46
R:\Roadway\XSC\u2579b_rdy_x-section_index.dgn
$$$$USERNAME$$$$
U-2579B
C
R
O
S
S
S
E
C
T
I
O
N
I
N
D
E
X
X
-
S
E
C
T
I
O
N
E
A
R
T
H
W
O
R
K
S
U
M
M
A
R
Y
-
L
-
R
T
-
L
-
L
T
-
Y
1
-
-
Y
1
R
P
A
-
-
Y
1
R
P
D
-
-
Y
1
L
P
A
-
-
Y
1
L
P
D
-
-
Y
2
-
-
Y
4
E
B
-
-
Y
4
W
B
-
-
Y
4
R
P
A
-
-
Y
4
R
P
B
-
-
Y
4
R
P
B
D
-
-
Y
4
R
P
C
-
-
Y
4
R
P
D
-
-
Y
4
L
P
A
-
-
Y
4
L
P
B
-
-
Y
4
L
P
D
-
-
Y
6
-
-
Y
7
-
-
Y
1
D
E
T
-
-
Y
5
D
E
T
-
-
Y
5
A
-
1
6
+
9
4
.
0
0
T
O
3
0
+
5
0
.
0
0
1
7
+
8
8
.
0
0
T
O
3
1
+
9
9
.
0
0
1
3
+
1
8
.
0
0
T
O
1
8
+
5
0
.
0
0
1
3
+
4
5
.
0
0
T
O
1
8
+
6
0
.
0
0
SHEET #149 - 322 323 - 344 345 - 355 356 - 364 365 - 369 370 - 374 375 - 381 520 - 537 538 - 544 544A - 577 578 - 585 586 - 590 591 - 597 598 - 601 602 - 6041 - 148 605 - 613 614 - 627 628 - 633 634 - 635 636 - 651 652 - 660
1
0
+
0
0
.
0
0
T
O
1
3
+
5
0
.
0
0
-
Y
5
-
1
7
+
0
0
.
0
0
T
O
2
8
+
0
0
.
0
0
661 - 665 666 - 669
-
Y
3
-
-
Y
2
A
-
1
3
+
0
0
.
0
0
T
O
2
4
+
0
0
-
Y
9
-
1
0
+
0
0
.
0
0
T
O
1
3
+
0
0
.
0
0
670 - 671
1
0
+
0
0
.
0
0
T
O
2
2
+
9
6
.
0
7
-
D
R
5
-
672 - 675
2
6
+
8
0
.
0
0
T
O
1
4
9
+
0
0
.
0
0
2
6
+
8
0
.
0
0
T
O
1
4
9
+
0
0
.
0
0
449 - 519G382 - 448D
4
7
8
+
0
0
.
0
0
T
O
6
9
2
+
0
0
.
0
0
4
7
8
+
0
0
.
0
0
T
O
6
9
2
+
0
0
.
0
0
1
0
+
0
0
.
0
0
T
O
5
4
+
0
0
.
0
0
1
0
+
0
0
.
0
0
T
O
3
0
+
0
0
.
0
0
1
5
+
2
4
.
0
0
T
O
3
4
+
3
6
.
0
0
1
5
+
0
4
.
0
0
T
O
2
6
+
6
3
.
0
0
1
7
+
6
6
.
0
0
T
O
8
0
+
1
2
.
0
0
1
5
+
9
8
.
0
0
T
O
3
0
+
5
5
.
0
0
1
6
+
7
8
.
0
0
T
O
2
8
+
0
2
.
0
0
1
3
+
1
2
.
0
0
T
O
2
1
+
3
4
.
0
0
1
3
+
2
9
.
0
0
T
O
1
8
+
8
5
.
0
0
1
6
+
2
1
.
3
8
T
O
2
0
+
0
0
.
0
0
1
4
+
5
0
.
0
0
T
O
3
9
+
0
0
.
0
0
5
1
+
0
0
.
0
0
T
O
8
7
+
0
0
.
0
0
1
0
+
7
5
.
0
0
T
O
2
2
+
2
5
.
0
0
1
2
+
0
0
.
0
0
T
O
4
6
+
0
0
.
0
0
1
0
+
0
0
.
0
0
T
O
3
2
+
0
0
.
0
0