Loading...
HomeMy WebLinkAbout20211559 Ver 1_Approval Letter_20220104 January 4, 2022 DWR # 2021559 Wake County Christopher and Rebecca Monge 206 Ketrick Court Cary, NC 27519-8383 (via email at beccimaymonge07@yahoo.com) Subject: APPROVAL OF NEUSE RIVER BASIN RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS Monge Residence 21-E135: 206 Ketrick Court Dear Mr. Monge: You have our approval for the impacts listed below for the purpose described in your application dated October 26, 2021, received by the Division of Water Resources (Division) October 26, 2021 with additional information received on January 4, 2022. These impacts are covered by the Neuse River Buffer Rules and the conditions listed below. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Neuse River Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B Neuse .0611(b)(2)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers – Zone 1 B1: Covered Deck 60 (square feet) 0 (square feet) Buffers – Zone 2 B1: Covered Deck 48 (square feet) 0 (square feet) Compensatory Mitigation Using a Private Mitigation Bank Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the EBX-Neuse I, LLC Neuse Riparian Buffer Umbrella Mitigation Bank (EBX-Neuse I, LLC) or EBX Upper Neuse Riparian Buffer Umbrella Mitigation Bank (EBX). Specific bank sites that will be debited are Buffalo Branch, Selma Mill, Cedar Grove, Hatley, Bucher, Hannah Bridge, Stone Creek, Meadow Spring, Uzzle, Poplar Creek, and Polecat, to meet this mitigation requirement. Until EBX-Neuse I, LLC or EBX receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to EBX-Neuse I, LLC or EBX to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Compensatory Mitigation Required Bank Sponsor River & Sub-basin Number Buffer-Zone 1 180 (square feet) EBX-Neuse I, LLC or EBX Neuse: 03020201-Outside Falls Lake Watershed DocuSign Envelope ID: B98576E0-AB19-4485-A7CF-F18CD07EF486 Monge Residence 21-E135 DWR# 20211559 Buffer Authorization Certificate Page 2 of 2 Justification: A project that affects waters shall not be permitted unless the existing uses, and the water quality to protect such uses, are protected. In determining that the proposed activity will comply with state water quality standards (including designated uses, numeric criteria, narrative criteria and the state’s antidegradation policy), the project must provide for replacement of existing uses through compensatory mitigation. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] If you are unable to comply with any of the conditions below, you must notify the Raleigh Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Raleigh Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0714]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under the Neuse River Riparian Buffer Rules as described in 15A NCAC 02B .0714. Please contact Stephanie Goss at 919-791-4256 or Stephanie.Goss@ncdenr.gov if you have any questions or concerns. Sincerely, for Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: DWR 401 & Buffer Permitting via Laserfiche Adrian Harkey, CORE Remodeling Group, Inc. (via email) DocuSign Envelope ID: B98576E0-AB19-4485-A7CF-F18CD07EF486