Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2021-00127_Well Construction - GW1_20211109
WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well Contractor Information: d i 0 k.% 14.WATER ZONES Well Contractor ame FROM TO DESCRIPTION 7 ft • fr. 7��� I i NC Wellft. '' ft Contractor Certification Number 15.OUTER CASING for multi-cos ells OR LINER tf a ticable YADKIN WELL COMPANY,INC. FROM To DIAME R TMCKNMSS MATERIAL f A� C fr. ft. in. Company Name KJ)40, V6' •��g' T®'r 16.INNER CASING OR TUBING(geothermal closed400 2.Well Construction Permit#: 6f 6v i'./s-e9(3 2. 2a FROM TO DLIMEnR THICICOSS I MATMRiAL List all applicable well construction permits ri.e.07C,County,Slate,Variance,etc) fr. *7 ft rn C/► 3.Well Use(check well use): fr' fr' Water Supply Well: 17.SCREEN / FROM TO DIAMETER SLOT SIZE TffiCKNESS MATERAL 1X6cultural •❑/MMunicipal/Public tt. fr. in. ❑Geothermal(Heating/Cooling Supply) MResidential Water Supply(single) ft. ft. io! ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Inlgation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: Q ft. ft. �. �. 1 ❑Monitoring ❑Recovery ft. ,y• ft. Ael Injection Well: ~ems u fr. ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACMMENTMETHOD ❑Aquifer Test ❑Stormwater Drainage ft fr ❑Experimental Technology ❑Subsidence Control ft ft. ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/CoolingRetum) ❑Other(explain under#21 Remarks) FROM To DESCRIPTION color,hardness,soivrork a ain size,eft /1^ O & 6 ' - s®sL 4.Date Well(s)Completed: 0• E J"I' Well ID#AAA -�� &y ft. ro>@fL 1we .f Of�� �j �D/Iv� heW 5a.Well Location: Phon t ft f -n a �Jze Y`�Sqv<e Or 1 ft. ft Facility/Owner Name Facility 1D#(if applicable) ft. ft. =\ ft ^S'vc .t r✓i .�1 ft Physical Address City,and Zip fr. /tf��Ir¢\ k'� 21.RtEMARKS t <� County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field one latllong is sufficient) 22.Certification• 3 2-71' N k0® V 7 FPC W /t7Lt8-ia� j`' 6.Is(are)the well(s): VPermanent or ❑Temporary Si a of ed Will Contractor Date By signing this form,1 hereby cent fy that the we/l(s)was(were)constructed in accordance with ` ` 7.Is this a repair to an existing well: ❑Yes or 04o 1 SA NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a ropy if this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of thisform. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).;You may also attach additional pages if necessary. drilled: l Z4.SUBMITTAL INSTRUCTIONS 0 9.Total well depth below land surface: Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths!f different(example-3©200'and 2©100D LS (ft.)I 24a. For All Wells: Original 'form to Division of Water Resources (DWR), 10.Static water level below top of casing: Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 lfwater level is above casing,use"+" 11.Borehole diameter; (in.) Bit Off: s.��� 24b.For Injection Wells: Copy to DWR,Underground Injection Control(TUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: AIR ROTARY 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELTS ONLY: 24d.For Water Wells producil g over 100,000 GPD: Copy to DWR,CCPCUA Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) Method of test: ISrt' ( S'C.A.Si•nj 13b.Disinfection type: 70%HTH Amount: f 9 OZ DATE SITE VISITED:_ L VISITED BY: Ugh n..:..:.,.,of U?_De......_. n...