Loading...
HomeMy WebLinkAboutGW1-2021-00124_Well Construction - GW1_20211109 WELL CONS 1 'UCTI+( N RECORD (GH-1) For Internal Use Only: 1.Well C ntractor I ormstion: // J`7 �ilN P[� li✓l'1 14.WATER ZONES P Well Contractor Name FROM TO DB.SCRIPTION "', :Ilk } �►e, 3®3 6.� D d J NC Well Contractor Certification Number 7� ft 3 ft 1!y i 15.OUTER CASING for multi-rased wills ORLINER rf a Geable YADKIN WELL COMPANY,INC. t FROM T DIAMETER TffiC7QIESS MATERIAL ft m. Company Name /� 16.INNER CASING OR TUBING g eothutiud elosed4no 2.Well Construction Permit#: 6 6 2� FROM TO DvNXrER I TMc1G rss I mATERIAL List all applicable well construction permfis(Le.DIC,County,State,Parlance,et¢) fL off R 6,21 in. 0,lMv up AV SAee fL 3.Well Use(checkwell use): fi' 1°" ly �(, J• Water Supply Well: 17.SCREEN FROM TO❑ DIAA'iHrER SLOT SIZE THIC[QYESS MATERIAL ❑Agricultural Municipal/Pubiic ft ft. in. ❑Geothermal(Heating/Cooling Supply) fesidential Water Supply(single) ❑Industrial/Commercial ❑Residential Water Supply(shared) IS.GROUT - 01n igation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT ATETHOD&AMOUNT Non-Water Supply Well: d ft. 3 R ❑Monitoring ❑Recovery R a ft P v Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ft 8 ❑ r Storage and Recovery ❑$ Barrier 19.SAND/GRAVEL PACK(if a licable Aqulfe rage erY ty FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑SImmwater Drainage R- ❑Experimental Technology ❑Subsidence Control ft it . 01 ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Heating/Cooling Retum) ❑Other(explain under#21 Remarks) FROM I TO DUCRIMOx color,hardness,soMmektypr,gnin sire,cte. � 4.Date Wells)Completed: /� t` © Well ID#Aw y l "L 70 ft ...r ssC,v Sa.Well Location: �✓ Phone # 33(#-g5 0j4; 70 g/o,�, ft r AQm tU/s V 0 tf ft ft C ft ft. b Facility/OwnerNamE' Facility ID#(if applicablgj/��� Ile fL NOV Physical Address, ' ,and Zip ' &A county ParcelIdentifiostionNo. v / �Av 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one Iat/loagis sufficient) 22.Certification: —34 bra-&5T N 01 lGj, '' _ 6.Is(are)the well(s): pbermanent or ❑Temporary Signature of Certified Well Contractor Date Bysigning thisform,I hereby certify that the wells)was(were)constructed in accordance with 7.Is this a repair to an eidsting well: ❑Yes or Mo 15A NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a copy ythis is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repgir tinder#21 remorkrsecitan or on the back ofthisform. 23.Site diagram or additional well details: S.-For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. UM Indicate TOTAL NUMBER of wells (add'See Over'in Remado Box).,You may also attach additional pages if necessary. drilled: ! 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (ft) j For multiple wells list all depths Ifdifferent(erample-3 a0200'and 2Q1001 Submit this GW-1 within 30 days of well completion per the following: _ 0 ft. 24a. For All Wells: Original form to Division of Water Resources (DWR),J 10.Static water level below top of casing: ( ) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 lfwaier level is above casing useCK 11.Borehole diameter: fD (in,) Bit Off: . 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 AIR ROTARY 12.Well construction method: 24c.For Water Supply and Op en-Loop Geothermal Return Wells•Copy to the (Le.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells yroducida over 101000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) Method of test: Permit rogmn,1611 MSC,Raleigh,NC 27699-1611 ', � Q L` 70%HTH __ OZ DATE SITE VISITED: 13b.Disinfection type: Amount: - VISITFn RY• a /