Loading...
HomeMy WebLinkAboutGW1-2021-00103_Well Construction - GW1_20211109 WELL CONSTRUCTION RECORD For Internal Use ONLY: This forin can be used for single or multiple wells 1.Well Contractor Information: 14.-Ta� /?J �'1 /''1 Z FROM WATER ZONES. DESCRIPTION Well Contractor Name /� p /hV ft. 3 wft. �iJ�O ft. Uft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LINER tf a licable ' FROM TO DIe4VIETER THICKNESS MATERIAL e I t D ft ft. , in. / 1 e Company Name 16,INNER CA ING OR TUBING` eothermal closed-loo , (/ FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: 1921 1- fL fL in. List all applicable ivell construction permits(i.e.County,State,Variance,etc.) fL ft. in 3.Well Use(check well use): 19.SCREEN Water Supply'Sell: FROM TO DIAMETER SLOTSIZE TIUCK,NFSS MATERIAL ❑Agricultural ❑MunicipaUPublic ft. ft. in. ❑Geothermal(Heating/CoolingSupply) esidential Water SuPPIY(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑Irrigation FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ft. Oft. � 0 . Non-Water Supply Well: fLt. ft I-C id ❑Monitoring ❑Recovery Injection Well: ft_ iL ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ❑ FROM Aquifer Storage and Recovery ❑Salinity Barrier fL TO ft. MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. fL ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG attach additional sheets if necessary) ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION(color,hardness,soil/mck type,gmin size etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) fL lO� ft Q Lulu 114 / f 4.Date Well(s)Completed: .'/. U `oR(p ? t� u f [• fL ft. 5.Well Location: i ft 60IL v n U+V SU Nu-m a c1h c-r o ft. �6o ft. M e- Facility/Owner Name Facility ID#(if applicable) ft ft � '�• Ph I Address,City,and Zip 21.REMARKS County Parcel Identification No.(PEN) DNNK SE 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: INFORMAI (if well field,one lat/long is sufficient) k& Si re of Certified Well Contractor Date 6.Is(are)the well(s): 00ermanent or ❑Temporary By signing this form,i herebv certij+that the ivell(s)was(were)constructed in accordance with 15A NCAC 02C.0/00 or 15.4 NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or brfo copy of this record has been provided to the ivell oivner. If this is a repair,fill out lazoim well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: ! construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply ivells ONLY ivith the some construction,you can submit one form. 24.Submittal Instructions: 9.Total well depth below land surface: 10�� (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3Q200'and 2@100� construction to the following: 10.Static water level below top of casing: SO (ft.) Division of Water Quality,Information Processing Unit, If dater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: t/� 1/�_(in.) 24b. For Injection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Quality,Underground Injection Control Program, 13.FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test r 24c.For Water Supply&Geothermal Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 136.Disinfection type: Amount: ICJ completion of well construction to the county health department of the county where constructed.