Loading...
HomeMy WebLinkAboutGW1-2021-08068_Well Construction - GW1_20211105 i WELL CONSTRUCTION RECORD For Intern(Use ONLY: 'this form can be used for single or multiple wells i 1.Well Contractor Inrormation: CF1nS King FROM TO I DESCRIPTION Well Contractor Name ft ft 3415 ft. ft NC Well Contractor Certification Number I5`ODI�R'_CASINC for'meld cos d:Wells©RLIl�R rfi b1E FROM 7D DIAMETER I THICKNESS MATERIAL = Green River Well 81 Pump It fL in Company Name Afi MNEWCUINGORTUBING eothermsl`elosedlon' r 1 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Cotistruction Permit#: G 1 �+ 1 �Li ft fa g is 21 PVC List all applicable well permits r.e.Count};State,lrariance,hjection,etc) fL fL in. 3.Well Use(check well use): .1aCRBEN Water Supply Well: FROM TO DIAMETER I SLOT SIZE THICKNESS I MATERIAL ❑Agricultural ❑Municipal/Public R. R' in. ❑Geothermal(Heating/Cooling Supply) OResidential Water Supply(single) R R iv ❑IndustriaUCommercial ❑Residential Water Supply(shared) 18 GROUf FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT DIrrigation 0 it 20 fL Sakrete Mut 8t Pour Non-Water Supply Well: ❑Monitoring ❑Recovea R ft Injection Well: fL S. ❑Aquifer Recharge ❑Groundwater Remediation =19;%AND/GRAVEL PACH ff a ficable FROM TO MATERIAL EMPLACE WNTMETHOD ❑Aquifer Storage and Recovery FROM Barrier ft. D ❑Aquifer Test ❑Stormwater Drainage ft. tz ❑Experimental Technology ❑Subsidence Control :20:pR1LLIr,:AVG;IOG'attachpddttronlilslkefs fn �' ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCREMON(eolor,hardness,saWnwk type,.grain sa,ae. ❑Geothernal(Heating/Cooling Return) ❑Other(explain under#21 Remarks)J O fL 2 ft vR" 4.Date Well(s)Completed: Well I IL D# c;> fL 0' F- Sa.Well Location: 10 M R ft v'W tt It Facility/Owner Name Facility 0t1(if applicable) 5 i AVQL-e`i LW. ft fL Physical Address,City,and Zip �. D FRQa_ County Parcel Identification No-(PIN) , -5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field,one Iat long is sufficient) 22.Certifica a: 35 t � Z% N 9)Z S?a 4 �i W %� 71, o 2 f S' of Certified Well Cc Dare 6.Is(are)the well(s): ®Permanent or ❑Temporary By signing this form.I hereby certify that the well(s)was(were)constructed in accordance with I5A NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or allo ropy of this record has been prmdded to the well owner. If this is a repair,fill out knower well construction information and explain the nature of the repair tinder 421 remarks section or on the back of this fomL 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well &Number of wells constructed:' construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit oneform. 1, SUBMITTAL 1NSTUCfIONS 9.Total well depth below land surface: J ��� (fL) 24a. For AM Wells: Submit this form within 30 days of completion of well For multiple wells list off depths ifdifferent(example-3�1a 300'and 2@100) construction to the following: 10.Static water level below top of casing: (ft) Division of Water Resources,Information Processing Unit, If water letel is above casing,use" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b.For Iniection Wells ONLY4 In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: Rotary construction to the following: (ie.auger,rotary,cable,direct push,etc.) Division of Water Resources;Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Marl Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) _ Method of test: Air 24c.For Water Supply&Injection Wells: Also submit one copy of this form within 30 days of completion of 131L Disinfection type: HTH Amount, well construction to the county health department of the county where constructed. Form Get'-1 North Carolina Department of FJnironment and Natural Resources—Division of W ater Resources Revised August 2013