Loading...
HomeMy WebLinkAboutGW1-2021-08045_Well Construction - GW1_20211105 WELL CONSTRUCTION RECORD For internal Use ONLY: Ibis form can be used for single or multiple wells 1.Well Contractor Information: Chris King All FROM TO DFSCRIMON Well Contractor Name f4 ft. 3415 IL iz NC Well Contractor Certification Number 1X) CASINt; forelataselw ORd?fIELE rr` FROM I TO 1 DUMErER 'ffiCti1VES5 MATERIAL Green River Well 81 Pump tL IL I in. Company Name 16 1NN£1tGAS! G O 1-I)B1NG. edthsml;I oo ` i r FROM I TO I DIAMETER R THICKNESS I MATERIAL 2.Well Construction Permit# ZJ 1 l fL EL6 m 21 PVC List all applicable well permits(t.e.Cmwy,State,Variance,Injection,etc.) & ft. is 3.Well Use(check well use): . Water Supply Well- FROM TO DIAMXMR SLOT SIZE THICKNESS I MATERIAL ❑Agricultural ❑Municipal/Public & is ❑Geothermal(Heating/CoolingSupply) OResidential Water SuPP1Y(single) & & rn ❑IndustriallCommereial ❑Residential Water Supply(shared) FROM TO "MATERIAL k EMPLACEMENTMEI'HOD&AMOUNT Non- on Supply Well: M ❑ on p & 20 Salmete Mot&Pour❑Monitoring ❑Recovery & ft. Injection Well: & fc ❑Aquifer Recharge ❑GroundwaterRemediation -=,SAWDJGRAYRLPACii MATERIAL .. ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO� FL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. R ❑Experimental Technology ❑Subsidence Control >20;:DRILT.IIVG_[AG:Yattaetiadditionslshi:etsif" ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRD'TION1robr,hardness,suWrw, sse,e1c. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) fL InfL R & I 4.Date Wells)Completed: Well too 2_ fL Sa.Well Location: Facility/Owner Name Facility lD#(ifapplicable) 1A >t f Physical Address,City,and Zip County parcel ldentificatiopNo.(PFN) NUV s 202 Sb.Latitude and Longitude in degrees/miootes/seconds or decimal degrees: (ifwell field,one lat/long is sufficient) 22 zz f T � 1 21 N i�Z W Zi Si6mauacofCerified Wel�L.r Date 6.Is(are)the well(s): ®Permanent or ❑Temporary By signing this form,f herebp that the well(s)was(were)constructed in accordance with 1 SA NCAC 02C.0100 or 15A NCAC 01C.0100 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or 9lNo copy of this record has been provided to the well owner. Ifdds is a repair,fill aid known well construction information and explain the native ofthe repair tinder'21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page'to provide additional well site details or well &Number of wells constructed: construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the satire conshvichan,you can submit oneform. SUBMITTAL 1NSTUCTIONS 9.Total well depth below land surface: ill ) (ft.) 24a. For All Wells: Submit this'form within 30 days of completion of well For andiiple wells list all depths ifdii erent(example-3Q200'and 2 a@100) construction to the following: 10.Static water level below top of easing: (ft.) Division of Water Resources,Information Processing Unit, ffivater level is above casing,rise"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 I 11.Borehole diameter: 6 (in-) 24b.For Iniection Wells ONLY: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: Rotary construction to the following: (Le.auger,rotary,cable,direct push,etc.) Division of Water Resources,(Underground Injection Control Program, FOR'WATER SUPPLY WELLS ONLY: 16M Mail Service Center,Raleigh,NC 27699-16M 13a.Yield(gpm) � Method of test: Air 24c.For Water Supply&Injection Wells: HTH Also submit one copy of this form within 30 days of completion of 13b.Disinfection type Amount: well construction to the counh'health department of the county where constructed. ! Form GW-1 North Camlma Department of Environment and Natural Resources—Division of Water Resources Revised August 2013 i