HomeMy WebLinkAbout20211866 Ver 1_04_SAW-2017-02509 Virginia Line Solar JD_032519_20211220U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2017-02509 County: WARREN U.S.G.S. Quad: JOHN H KERR DAM
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Requestor: TRC
Ms. Heather Patti
Address: 5540 Centerview Drive, Suite 100
Raleigh, North Carolina 27606
Size (acres) --692 Nearest Town Manson
Nearest Waterway Newmans Creek River Basin Roanoke River
USGS HUC 03010102 & 03010106 Coordinates Latitude: 36.523931
Longitude:-78.281119
Location description: The proiect boundary is identified as an approximate 692 acre tract of land, located on Warren
Countv Parcels 2011108278 and 2001906694. These parcels are located near the intersection of Drewrv-Virginia Line
Road and Nutbush Road, Manson, Warren Countv, North Carolina.
Indicate Which of the Following Apply:
A. Preliminary Determination
X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the
Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The
waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently
accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process,
including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation
requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all
waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional
waters of the U. S. This preliminary determination is not an appealable action under the Regulatory Program
Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an
appealable action, by contacting the Corps district for further instruction.
_ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act
(CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the
waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be
used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an
effective presumption of CWA/RHA jurisdiction overall of the waters, including wetlands, at the project area, which is
not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the
waters of the U. S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a
timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps.
B. Approved Determination
_ There are Navigable Waters of the United States within the above described property subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC
§ 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period
not to exceed five years from the date of this notification.
_ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements
of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
_ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to
accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that
can be verified by the Corps.
Page 1 of 2
SAW-2017-02509 Virania Line Solar, LLC
_ The waters of the U. S., including wetlands, on your project area have been delineated and the delineation has been
verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be
reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to
CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be
relied upon for a period not to exceed five years.
_ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat
signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
X There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act
(CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to
determine their requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit
may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material,
construction or placement of structures, or work within navigable waters of the United States without a Department of the
Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If
you have any questions regarding this determination and/or the Corps regulatory program, please contact Ms. Samantha
Dailev at 919-554-4884, ext. 22 or by email at Samantha.J.Dailevnusace.armv.mil.
C. Basis For Determination: See attached Approved JD forms.
D. Remarks: Refer to the enclosed Approved JD Form, Preliminary JD Form, Figure 4. Virginia
Line Solar, and Figure 4. Virginia Line Solar — Additional Land for a detailed evaluation of the
aquatic resources on -site.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the
particular site identified in this request. The delineation/determination may not be valid for the wetland conservation
provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation
in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources
Conservation Service, prior to starting work.
F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above)
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request
to appeal this determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 1OM15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for
appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP.
Should you decide to submit an RFA form, it must be received at the above address by Mav 24, 2019.
SAW-2017-02509 Virania Line Solar, LLC
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence.
Corps Regulatory Official:
GIBBY.JEAN.B.122978363 Digitally :c=S onus Governmento� D9oD,o�3PKI,
3 ou=USA, cn=GIBBY.JEAN.B.1229783633
Date: 2019.03.25 12:45:43-04'00'
Date: March 25, 2019 Expiration Date: March 25, 2024
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
http://co!psmapu.usace.army.mil/cm qpex/f?p=l36A:0.
SAW-2017-02509 Virania Line Solar, LLC
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Cypress Creek Renewables, LLC File Number: SAW-2017-02509
Date: March 25, 2019
Attached
is:
See Section below
INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission)
A
PROFFERED PERMIT (Standard Permit or Letter of permission)
B
PERMIT DENIAL
C
APPROVED JURISDICTIONAL DETERMINATION
D
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The followin dentifies your rights and options regarding an administrative appeal of the above decision.
Additional information maybe found at http://www.usace.anny.mil/Missions/CivilWorks/Res4ulatolyProgramandPennits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or obj ect to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein you may request that the
permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal
the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the
permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer
will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
SAW-2017-02509 Virginia Line Solar LLC
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved
JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new
information for further consideration by the Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POIJ4T OF CONTACT FOR QUESTIONS OR INFORMATIO
If you have questions regarding this decision and/or
If you only have questions regarding the appeal process you may also
the appeal process you may contact:
contact:
District Engineer, Wilmington Regulatory Division
Mr. Jason Steele, Administrative Appeal Review Officer
Raleigh Regulatory Field Office
CESAD-PDO
Attn: Samantha Dailey
U.S. Army Corps of Engineers, South Atlantic Division
3331 Heritage Trade Drive, Suite 105
60 Forsyth Street, Room 1OM15
Wake Forest, North Carolina 27587
Atlanta, Georgia 30303-8801
Phone: 404 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportuni to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: Ms. Samantha Dailey, 69 Darlington Avenue, Wilmington,
North Carolina 28403
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele,
Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
APPENDIX 2
PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD):
March 21, 2019
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
Requestor: TRC
Ms. Heather Patti
Address: 5540 Centerview Drive, Suite 100
Raleigh, North Carolina 27606
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Virginia Line Solar, LLC, Cypress Creek
Renewables, LLC, Warren County, SAW-2017-02509
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES)
State: NC County/parish/borough: Warren County City: Manson
Center coordinates of site (lat/long in degree decimal format): Lat. 36.523931°N, Long.-78.281119' W.
Universal Transverse Mercator:
Name of nearest water body: Roanoke River (8-digit HUC: 03010106 and 03010102)
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLIES):
® Office (Desk) Determination. Date: March 21, 2019
® Field Determination. Date(s): December 12, 2017
1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this
PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed
decision after having discussed the various types of JDs and their characteristics and circumstances when they may be
appropriate.
2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other
general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or
other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made
aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official
determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms
and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less
compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual
permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can
accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever
mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject
permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD, (6) accepting a
permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by
that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial
compliance or enforcement action, or in any administrative appeal or in any Federal court, and (7)whether the applicant elects to
use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and
all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R.
Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic
jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic
resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds
that there "may be " waters of the U. S. and/or that there "may be " navigable waters of the U. S. on the subject review area, and
identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following
information:
SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply): Checked items should be included in
subject file. Appropriately reference sources below where indicated for all checked items:
® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: TRC submitted a jurisdictional
determination to our office on November 17, 2018, with additional information submitted on March 8, 2018.
® Data sheets prepared/submitted by or on behalf of the PJD requestor.
® Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
❑ USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
® U.S. Geological Survey map(s). Cite scale & quad name: 1:24K, NC -John H Kerr Dam
® USDA Natural Resources Conservation Service Soil Survey. Citation: Web Soil Survey: December 2017.
® National wetlands inventory map(s). Cite name: Corps of Engineers SimSuite — December 2017.
❑ State/Local wetland inventory map(s):
❑ FEMA/FIRM maps:
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
® Photographs: ® Aerial (Name & Date): .
or ❑ Other (Name & Date):
❑ Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarilv been verified by the Corns and should
not be relied upon for later jurisdictional determinations.
DAILEY.SAMAN
THA.JA 387567
948
Digitally signed by
DA I L EY.SAMANTH AJ.1387567948
DN: c=US, o=U.S. Government, ou=DoD,
ou=PKI, ou=USA,
cn=DAILEY.SAMA NTH AJ.1387567948
Date: 2019.03.25 12:53:17-04'00'
Signature and date of
Regulatory Project Manager
(REQUIRED)
Signature and date of
person requesting preliminary JD
(REQUIRED, unless obtaining the signature is
Impracticable)
i Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the
established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an
action.
APPROVED JURISDICTIONAL DETERMINATION FORM
U.S. Army Corps of Engineers
This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook.
SECTION L• BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): March 21, 2019
B. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Virginia Line Solar, LLC, Cypress Creek
Renewables, Warren County, SAW-2017-02509
C. PROJECT LOCATION AND BACKGROUND INFORMATION:
State: North Carolina County/parish/borough: Warren County City: Manson
Center coordinates of site (lat/long in degree decimal format): Lat. 36.523931' N , Long.-78.281119' W
Universal Transverse Mercator.
Name of nearest waterbody: Newmans Creek
Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: Roanoke River
Name of watershed or Hydrologic Unit Code (HUC): 03010102 and 03010106
❑ Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request.
❑ Check if other sites (e.g., offsite mitigation sites, disposal sites, etc...) are associated with this action and are recorded on a different
JD form:
D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
® Office (Desk) Determination. Date: March 21, 2019
® Field Determination. Date(s): December 12, 2017
SECTION II: SUMMARY OF FINDINGS
A. RHA SECTION 10 DETERMINATION OF JURISDICTION.
There Are No "navigable waters of the U.S." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the
review area. [Required]
❑ Waters subject to the ebb and flow of the tide.
❑ Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce.
Explain:
B. CWA SECTION 404 DETERMINATION OF JURISDICTION.
There Are "waters of the U.S." within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required]
1. Waters of the U.S.
a. Indicate presence of waters of U.S. in review area (check all that apply): 1
❑ TNWs, including territorial seas
❑ Wetlands adjacent to TNWs
❑ Relatively permanent watersz (RPWs) that flow directly or indirectly into TNWs
❑ Non-RPWs that flow directly or indirectly into TNWs
❑ Wetlands directly abutting RPWs that flow directly or indirectly into TNWs
❑ Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs
❑ Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs
❑ Impoundments of jurisdictional waters
❑ Isolated (interstate or intrastate) waters, including isolated wetlands
b. Identify (estimate) size of waters of the U.S. in the review area:
Non -wetland waters: linear feet, wide, and/or acres.
Wetlands: acres.
c. Limits (boundaries) of jurisdiction based on: Pick List
Elevation of established OHWM (if known):
Non -regulated waters/wetlands (check if applicable):'
® Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional.
Explain: Two wetland features (W4: 0.08 acres; W3: 0.09 acres) were observed entirely in uplands. These features
are 1130 and 660 feet, respectively, from the nearest jurisdictional reach. During the on -site field verification soil
samples were collected within the upslope and downslope areas and did not exhibit any saturation, nor was there
any observable evidence that water from the wetland/open water contributed any flow, via either surface or
subsurface connection, to a downslope receiving stream/lake. The wetlands are situated in a depression area with no
inlet or outlet. In addition, based on USGS topographic mapping, the feature is situated near the top of the
watershed, on a relatively flat ridge. There was no evidence of an OHWM on the upslope or downslope side of the
1 Boxes checked below shall be supported by completing the appropriate sections in Section III below.
z For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least "seasonally"
(e.g., typically 3 months).
s Supporting documentation is presented in Section 1H.F.
-2-
features. The areas upslope and downslope of the open water feature did not meet the hydrophytic vegetation,
wetland hydrology, or hydric soil criteria of the 1987 Corps of Engineers Wetland Delineation Manual and the
Eastern Mountains and Piedmont Regional Supplement. Therefore, the two wetland features were determined to be
isolated, non -jurisdictional features.
These isolated, non -jurisdictional features were coordinated with the U.S. Environmental Protection Agency, Region
4 (USEPA) on March 21, 2019. Concurrence was received from the USEPA, via email, on March 22, 2019.
SECTION III: CWA ANALYSIS
A. TNWs AND WETLANDS ADJACENT TO TNWs
The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete
Section IILA.1 and Section IILD.1. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections I LA.1 and 2
and Section IILD.1.; otherwise, see Section I LB below.
1. TNW
Identify TNW:
Summarize rationale supporting determination:
Wetland adjacent to TNW
Summarize rationale supporting conclusion that wetland is "adjacent'
B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY):
This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps
determine whether or not the standards for jurisdiction established under Rapanos have been met.
The agencies will assert jurisdiction over non -navigable tributaries of TNWs where the tributaries are "relatively permanent
waters" (RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3
months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round
(perennial) flow, skip to Section IILD.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow,
skip to Section I LDA.
A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and
EPA regions will include in the record any available information that documents the existence of a significant nexus between a
relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even
though a significant nexus finding is not required as a matter of law.
If the waterbody4 is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the
waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must
consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for
analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is
the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section III.BA for
the tributary, Section III.B.2 for any onsite wetlands, and Section III.B.3 for all wetlands adjacent to that tributary, both onsite
and offsite. The determination whether a significant nexus exists is determined in Section ULC below.
1. Characteristics of non-TNWs that flow directly or indirectly into TNW
(i) General Area Conditions:
Watershed size: Pick List
Drainage area: Pick List
Average annual rainfall: inches
Average annual snowfall: inches
(ii) Physical Characteristics:
(a) Relationship with TNW:
❑ Tributary flows directly into TNW.
❑ Tributary flows through Pick List tributaries before entering TNW.
Project waters are river miles from TNW.
Project waters are M river miles from RPW.
'Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the and
West.
-3-
Project waters are aerial (straight) miles from TNW.
Project waters are M aerial (straight) miles from RPW.
Project waters cross or serve as state boundaries. Explain:
Identify flow route to TNW 5:
Tributary stream order, if known:
(b) General Tributary Characteristics (check all that apply):
Tributary is: ❑ Natural
❑ Artificial (man-made). Explain:
❑ Manipulated (man -altered). Explain:
Tributary properties with respect to top of bank (estimate):
Average width: feet
Average depth: feet
Average side slopes: Pick List.
Primary tributary substrate composition (check all that apply):
❑ Silts ❑ Sands ❑ Concrete
❑ Cobbles ❑ Gravel ❑ Muck
❑ Bedrock ❑ Vegetation. Type/% cover:
❑ Other. Explain:
Tributary condition/stability [e.g., highly eroding, sloughing banks]. Explain:
Presence of run/riffle/pool complexes. Explain:
Tributary geometry: Pick List
Tributary gradient (approximate average slope): %
(c) Flow.
Tributary provides for: kck List
Estimate average number of flow events in review area/year: Pick List
Describe flow regime:
Other information on duration and volume:
Surface flow is: Pick List. Characteristics:
Subsurface flow: Pick Lis+. Explain findings:
❑ Dye (or other) test performed:
Tributary has (check all that apply):
❑ Bed and banks
❑ OHWM6 (check all indicators that apply):
❑ clear, natural line impressed on the bank
❑ changes in the character of soil
❑ shelving
❑ vegetation matted down, bent, or absent
❑ leaf litter disturbed or washed away
❑ sediment deposition
❑ water staining
❑ other (list):
❑ Discontinuous OHWM.7 Explain:
❑ the presence of litter and debris
❑ destruction of terrestrial vegetation
❑ the presence of wrack line
❑ sediment sorting
❑ scour
❑ multiple observed or predicted flow events
❑ abrupt change in plant community
If factors other than the OHWM were used to determine lateral extent of CWA jurisdiction (check all that apply):
❑ High Tide Line indicated by: ❑ Mean High Water Mark indicated by:
❑ oil or scum line along shore objects ❑ survey to available datum;
❑ fine shell or debris deposits (foreshore) ❑ physical markings;
❑ physical markings/characteristics ❑ vegetation lines/changes in vegetation types.
❑ tidal gauges
❑ other (list):
(iii) Chemical Characteristics:
5 Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b, which then flows into TNW.
6A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where
the OHWM has been removed by development or agricultural practices). Where there is a break in the OIIWM that is unrelated to the waterbody's flow
regime (e.g., flow over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the breaks
')bid.
-4-
Characterize tributary (e.g., water color is clear, discolored, oily film; water quality; general watershed characteristics, etc.).
Explain:
Identify specific pollutants, if known:
(iv) Biological Characteristics. Channel supports (check all that apply):
❑ Riparian corridor. Characteristics (type, average width):
❑ Wetland fringe. Characteristics:
❑ Habitat for:
❑ Federally Listed species. Explain findings:
❑ Fish/spawn areas. Explain findings:
❑ Other environmentally -sensitive species. Explain findings:
❑ Aquatic/wildlife diversity. Explain findings:
2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TN`17
(i) Physical Characteristics:
(a) General Wetland Characteristics:
Properties:
Wetland size: acres
Wetland type. Explain:
Wetland quality. Explain:
Project wetlands cross or serve as state boundaries. Explain:
(b) General Flow Relationship with Non-TNW:
Flow is: -. Explain:
Surface flow is: -
Characteristics:
Subsurface flow: -. Explain findings:
❑ Dye (or other) test performed:
(c) Wetland Adjacency Determination with Non-TNW:
❑ Directly abutting
❑ Not directly abutting
❑ Discrete wetland hydrologic connection. Explain:
❑ Ecological connection. Explain:
❑ Separated by berm/barrier. Explain:
(d) Proximity (Relationship) to TNW
Project wetlands are PIPM river miles from TNW.
Project waters are Pick Ll aerial (straight) miles from TNW.
Flow is from: Pick List.
Estimate approximate location of wetland as within the � floodplain.
(ii) Chemical Characteristics:
Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality; general watershed
characteristics; etc.). Explain:
Identify specific pollutants, if known:
(iii) Biological Characteristics. Wetland supports (check all that apply):
❑ Riparian buffer. Characteristics (type, average width):
❑ Vegetation type/percent cover. Explain:
❑ Habitat for -
El Federally Listed species. Explain findings:
❑ Fish/spawn areas. Explain findings:
❑ Other environmentally -sensitive species. Explain findings:
❑ Aquatic/wildlife diversity. Explain findings:
3. Characteristics of all wetlands adjacent to the tributary (if an�
All wetland(s) being considered in the cumulative analysis:
Approximately acres in total are being considered in the cumulative analysis.
For each wetland, specify the following:
Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres)
-5-
Summarize overall biological, chemical and physical functions being performed:
C. SIGNIFICANT NEXUS DETERMINATION
A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed
by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity
of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent
wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW.
Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the now
of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent
wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a
tributary and its adjacent wetland or between a tributary and the TNW). Similarly, the fact an adjacent wetland lies within or
outside of a floodplain is not solely determinative of significant nexus.
Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and
discussed in the Instructional Guidebook. Factors to consider include, for example:
• Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to
TNWs, or to reduce the amount of pollutants or flood waters reaching a TNW?
• Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and
other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW?
• Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that
support downstream foodwebs?
• Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or
biological integrity of the TNW?
Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented
below:
Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain
findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section III.D:
Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into
TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its
adjacent wetlands, then go to Section IILD:
3. Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of
presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to
Section III.D:
D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL
THAT APPLY):
TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area:
❑ TNWs: linear feet, wide, Or acres.
❑ Wetlands adjacent to TNWs: acres.
RPWs that flow directly or indirectly into TNWs.
❑ Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that
tributary is perennial:
❑ Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g., typically three months each year) are
jurisdictional. Data supporting this conclusion is provided at Section IILB. Provide rationale indicating that tributary flows
seasonally:
Provide estimates for jurisdictional waters in the review area (check all that apply):
❑ Tributary waters: linear feet wide.
❑ Other non -wetland waters: acres.
Identify type(s) of waters:
-6-
Non-RPWs1 that flow directly or indirectly into TNWs.
❑ Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has a significant nexus with a
TNW is jurisdictional. Data supporting this conclusion is provided at Section IILC.
Provide estimates for jurisdictional waters within the review area (check all that apply):
❑ Tributary waters: linear feet, wide.
❑ Other non -wetland waters: acres.
Identify type(s) of waters:
4. Wetlands directly abutting an RPW that flow directly or indirectly into TNWs.
❑ Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands.
❑ Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that
tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW:
❑ Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is
seasonal in Section IILB and rationale in Section IILD.2, above. Provide rationale indicating that wetland is directly
abutting an RPW:
Provide acreage estimates for jurisdictional wetlands in the review area: acres.
5. Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TNWs.
❑ Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent
and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisidictional. Data supporting this
conclusion is provided at Section IILC.
Provide acreage estimates for jurisdictional wetlands in the review area: acres.
Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs.
❑ Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and
with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this
conclusion is provided at Section IILC.
Provide estimates for jurisdictional wetlands in the review area: acres.
Impoundments of jurisdictional waters?
As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional.
❑ Demonstrate that impoundment was created from "waters of the U.S.," or
❑ Demonstrate that water meets the criteria for one of the categories presented above (1-6), or
❑ Demonstrate that water is isolated with a nexus to commerce (see E below).
E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE,
DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY
SUCH WATERS (CHECK ALL THAT APPLY):"
❑ which are or could be used by interstate or foreign travelers for recreational or other purposes.
❑ from which fish or shellfish are or could be taken and sold in interstate or foreign commerce.
❑ which are or could be used for industrial purposes by industries in interstate commerce.
❑ Interstate isolated waters. Explain:
❑ Other factors. Explain:
Identify water body and summarize rationale supporting determination:
Provide estimates for jurisdictional waters in the review area (check all that apply):
❑ Tributary waters: linear feet, wide.
❑ Other non -wetland waters: acres.
Identify type(s) of waters:
❑ Wetlands: acres.
'See Footnote # 3.
9 To complete the analysis refer to the key in Section III.13.6 of the Instructional Guidebook
"Prior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for
review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Following Rapanos.
-7-
F. NON -JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY):
❑ If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers
Wetland Delineation Manual and/or appropriate Regional Supplements.
® Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce.
® Prior to the Jan 2001 Supreme Court decision in "SWANCC," the review area would have been regulated based solely on the
"Migratory Bird Rule" (MBR).
❑ Waters do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction. Explain:
❑ Other: (explain, if not covered above):
Provide acreage estimates for non jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR
factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional
judgment (check all that apply):
❑ Non -wetland waters (i.e., rivers, streams): linear feet, wide.
❑ Lakes/ponds: acres.
❑ Other non -wetland waters: acres. List type of aquatic resource:
❑ Wetlands: acres.
Provide acreage estimates for non jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such
a fmding is required for jurisdiction (check all that apply):
❑ Non -wetland waters (i.e., rivers, streams): linear feet, wide.
❑ Lakes/ponds: acres.
❑ Other non -wetland waters: acres. List type of aquatic resource:
® Wetlands: 0.17 acres.
SECTION IV: DATA SOURCES.
A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked
and requested, appropriately reference sources below):
® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: TRC submitted a jurisdictional determination to
our office on November 17, 2018, with additional information submitted on March 8, 2018.
® Data sheets prepared/submitted by or on behalf of the applicant/consultant.
® Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
❑ USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
® U.S. Geological Survey map(s). Cite scale & quad name: 1:24K; NC -John H Kerr Dam
® USDA Natural Resources Conservation Service Soil Survey. Citation: USDA Web Soil Survey accessed December 2017
® National wetlands inventory map(s). Cite name: USACE SimSuite — December 2017
❑ State/Local wetland inventory map(s):
❑ FEMA/FIRM maps:
❑ 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929)
® Photographs: ® Aerial (Name & Date):
or ❑ Other (Name & Date):
❑ Previous determination(s). File no. and date of response letter -
El Applicable/supporting case law.
❑ Applicable/supporting scientific literature:
❑ Other information (please specify):
B. ADDITIONAL COMMENTS TO SUPPORT JD: Representatives from the United States Army Corps of Engineers (Corps) and
TRC participated in an on -site field verification on December 12, 2017 to verify the limits of jurisdiction. During this investigation,
the Corps requested additional information required to accurately describe and delineate waters within the Virginia Line Solar, LLC
project boundary. Final revisions were received by our office on July 17, 2018.
v
v
v
v
v
v
v
v
v
v
v
v
v
Ca
L
L
L
L
L
L
L
L
L
L
L
L
L
Co
Q
N
N
N
N
N
N
N
N
N
N
N
N
N
J
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
61
m
l0
n
(14
L.0
L.0
Ln
L.0
1-
0)
1,
N
0)
1,
Ln
0)
-Zl-
r,
N
c-1
m
Ln
w
Ln
Ln
Ln
O
m�t
m
l0
r-�t
l0
m
r-1
M
M
=
N�t
N
w
w
M
O�t
N
w
N
m
O
O
N
N
N
N
N
N
N
N
N
N
N
N
N
Q
00
00
00
00
00
00
00
00
00
00
00
00
00
n
l0
Ln
rn
00
1-
00
N
rn
N
L.0
rn
�t
N
-0
O
00
N
N
L.0
1-
l0
�t
n
�t
00
O
00
L.0
L.0
00
Ln
Ln
N
N
ri
1l
Ln
L.0
�t
�t
=5
N
N
N
N
N
N
N
N
N
N
N
N
N
4,
LqLqLqLqLqLqLqLqLqLqLqLn
L!1
J
rn
rn
rn
rn
rn
rn
rn
rn
rn
rn
rn
rn
rn
H
H
H
H
H
H
H
H
w
w
w
w
w
0
0
0
0
0
0
0
0
=
=
=
=
=
O
O
O
O
O
O
O
O
Q
Q
Q
Q
Q
4 �
M
L.0
1-
00
w
M
7
N
c-I
1O
00
61
00
O
N
o0
ri
01
0
0
O
l0
L(1
M
O
E
'zl-
n
O
mr-l'
r�i
chi
n
O
w
M
O
O
Q
ri
N
rn
N
Ln
N
Q
L
L
L
L
L
L
L
L
G
W
W
a)
LU
LU
LU
LU
LU
LU
LU
LU
LUz
z
z
a)
Q
Z
Z
Z
Z
Z
z
z
z
c
Q
Q
c
W
W
W
W
W
W
W
W
N
N
N
G
>
>
>
>
>
>
>
>
D
D
O
O
Q
Q
Q
_
J
J
J
U
C
v
O
O
m
(o O
D_
D_
O
U
CN
C
m
ci
>N
>
>
N
N
W z
� a
Q J
W zW
J O
Q
z o
U
o a
N LU
z O
O cr-
z W
W
cr-
W Q
Q
O O
sn LU
N m
LU N
H
O Q
Z w
LU
0 �
* Ln
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
L
.
.
L
.
L
.
L
.
L
.
L
L
L
L
L
L
L
L
L
L
L
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
Y
a,0
Y
a,0
Y
a,0
41
an
41
an
Y
a,0
Y
a,0
41
an
41
an
41
an
41
an
41
an
41
an
Y
a,0
Y
a,0
41
an
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
m
N
Ln
Ln
w
w
N
M
Ln
1l
N
Ln
w
1l
O
w��-Zl-
N-Zl-
M
1l
Ln
w
Ln
N
m
c-1
O
w-Zl-
M
O
m
w
LA
N
m
m
r-1
N
N
Ln
m
rl
m
r-1
ry)
-Zl-
ry)
ry)
ry)
N
O
00
01
01
ry)
1l
00
01
00
01
01
01
0)
0)
01
01
01
N
00
00
00
1l
n
n
N
N
N
N
N
N
N
N
N
00
N
N
N
N
N
N
00
00
00
00
00
00
00
00
00
1,
00
00
00
00
00
00
01
ri
LA
U)
1l
KI
N
01
l0
ri
(YI
N
01
N
O
00
1l
-Zl-
N
1,
N
ri
O
LA
-Zl-
M
U)
O
-Zl-
01
l0
00
01
O
O
O
01
00
01
00
01
O
O
O
N
ri
ri
O
O
ri
ri
ri
O
O
O
O
O
ri
ri
ri
ri
Lq
Ln
Ln
Ln
Lq
Lq
Lq
Lq
Lq
Lq
Lq
Lq
Lq
Lq
Lq
Lq
rrf
rn
rn
rn
M
M
M
M
M
M
M
M
M
M
M
M
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Lq
W
01
O
00
00
':I:N
ry!
ry!
01
1-
O
ry)
N
N
O
c
01
00
N
r14
6
00
ry)
01
U)
N
r
r-1
N
00
lN0
ON
00
N
ry)
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
110
110
rn
rn
L.0
L.0
L.0
L.0
L.0
L.0
rn
rn
rn
t
U
C
co
m
ri
N
M
-Zl-
U)
LA
1l
00
01
O0
r-1
r-1
r-1
O
rUi
LO
N
N
N
N
N
N
In
N
N
N
Ln
Ln
Ln
aD
Ln
Ln
w
c-I
LL
--L—
I
.
.
.
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
m
r-I
r-�t
�t
m
m
w
ri
Ln
m
m
U'
w
m
w
Ln
Ln
m�
1-
LO
r-Iw
r-Im
w
O
m
1-
m
m
1-
0
00
O
m
I-
O
w�
m
O
Ln
O
LO
w
LO
O
r-I
m
Ln
w
LO
Il
LO
Ln
Ln
M
N
Ln
LO
Ln
Ln
Ln
Il
N
M
Ln
Ln
I-
w
w
w
w
00
00
00
61
61
61
61
N
00
00
00
61
00
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
00
00
00
00
00
00
00
00
00
00
00
00
W
00
00
00
00
00
Ln
N
Ol
Ln
Il
N
r-I
-zl-
M
N
Ln
N
r-I
N
Ol
01
LO
M
O
�t
rn
N
O
Ln
M
M
I,
r-I
O
Ln
-zl-
r-I
r-I
O
LO
61
N
N
Il
rl
O
00
-zl-
N
Ol
r-I
N
0)
O
-zl-
(YI
-zl-
r-I
N
r-I
r-I
O
O
r-I
O
r-I
r-I
O
r-I
r-I
O
ri
ri
ri
ri
ri
ri
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
.
LO
.
LO
.
LO
.
110
.
110
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
.
LO
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
H
H
H
H
H
H
H
H
W
W
W
W
W
w
w
w
w
W
O
O
O
O
O
O
O
O
=
=
=
=
=
=
=
=
=
=
O
O
O
O
O
O
O
O
v
U
v
U
v
U
v
U
v
v
W
W
W
W
W
W
W
W
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
M
N
I-
Ol
r-I
N
l0
N
00
c-I
Ol
00
c-I
c I
(YI
N
LO
�
N
�
N
M
�
N
r-I
I,
l0
O
O
N
O
c-I
O
O
00
cI
cI
cI
O
61
00
M
LO
Ln
ri
Ln
�
L.0
ri
00
��
ri
c 1
O
O
O
O
N
c I
O
O
c I
O
L
L
L
L
L
L
L
L
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
J
J
J
J
J
J
J
J
W
W
W
W
W
W
W
W
W
W
W
W
W
W
z
Ln
W
z
Ln
N
z
z
z
z
z
z
z
z
z
z
z
z
N
z
N
N
E
LU
E
LU
Lu
W
i
W
i
W
i
W
i
W
i
W
i
W
i
W
i
W
i
W
i
Ln
D_
W
i
LnD_
D
D_
Ln
D
Ln
D
Q
W
Q
W
0
W
Q
Q
J
J
J
J
LL
W
W
w
W
w
w
W
C
C
C
C
C
C
C
O
J
(0
(0
(0
(0
(0
(0
(0
lB
���
ON
(0
r-I
�
r-I
N
N
C
O
C
O
C
O
C
O
C
O
C
O
C
O
C
O
c-I
N
Ln
Ln
Ln
Ln
N
cn
N
cn
N
N
+,
O
O
Q
Q
Q
Q
Q
Q
Q
Q
r-I
U)
L.0
I>�
00
>N
>M
>�
°
/ :
\
g
\
\
`�
«
§
k
\ ( \ \ &
]
��a
&
}
/
y <
< S < 2
!§r
& 2
2
2
/ ( / /
. _
§_§
§ W
-
\
/
(
\
: ):
e
:
®
} § } \ (
: <
_Z
\ w
/..:
° \
2 ^ `
`
\(�
\§
k /
(��}_
/
/ 2
3 } / \
m
W '
a
® /
y ` /
\
(j\
§ *
§ ®
g
J
/ 4
± \ } E
§!/
_
d
Ago
LU
°' vmrmm_,m�ma2 _2 ®
., _,
27 A &_» a _7
§
/
\
J
z a-
) \
\ G
m a
\ \
§ ƒ
a .
5
R §
z
0 \ \
/ -
g»(\
\ } §
} ± _
\ / /
\
\
b
/
}
A
//z
\ § } 0
z 2 z/
\ \ } j
b b ƒ %
/
5k-
.
\\
§ )}
�`
�J /®
`
�§§
Z.
§u
|§_
\
§
_e
45
/�\
°k`
k
&0
.§
w§
\§
�w
§§
2�
-
2
}
(��}
\_\ }
-
\
\ -
� §
�.._
..
..�..�
.. ..�.�..�}g
:
z
E:r
w.
p,
c<
\S�9
\
.
..
\
.
.�...,
�.
-
+
�
, -
z � ,
`
�
-
.
;!y
2
~
:
<
«
e
~
3
�(§
�
}}
fz
s
•.
2 ¥¢
..^:/
^- 32FL
vmrmm_,m_mm2
_ 2-mr.r.—WO_cl M -- 7