December 21, 2021
Tony Konsul
Carolina Water Service Inc. of North Carolina
4944 Parkway Plaza Blvd
Charlotte, NC 28217
SUBJECT: Compliance Inspection Report
Regalwood WWTP
NPDES WW Permit No. NCO032239
Onslow County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Regalwood WWTP on
12/08/2021. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0032239. The findings and comments
noted during this inspection are provided in the enclosed copy of the inspection report entitled
"Compliance Inspection Report". There were no significant issues or findings noted during the inspection and
therefore, a response to this inspection report is not required.
If you should have any questions, please do not hesitate to contact Helen Perez with the Water
Quality Regional Operations Section in the Wilmington Regional Office at 910-796-7215 or via email at
helen.perez@ncdenr.gov.
Sincerely,
EDocuSigned by:
Toµ�cOA,
7F141E73B6F3456... for
Morella Sanchez -King, Regional Supervisor
Water Quality Regional Operations Section
Wilmington Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Cc: Anthony Futrell — electronic copy
Greg Spillman — electronic copy
DE North Carolina Department of Environmental Quality I Division of Water Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
910.796.7215
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN I 2 u 3 I NCO032239 I11 121 21/12/08 I17 18I � I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
701� I 711ni I 72 I Lni I 71 I 74 79 I I I I I I I80
LJ L -1 I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
10:25AM 21/12/08
17/09/01
Regalwood WWTP
228 Regalwood Dr
Exit Time/Date
Permit Expiration Date
Jacksonville NC 28546
11:00AM 21/12/08
22/06/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Anthony Garland Futrell//910-938-5277 /
Gregory D Spillman/ORC//
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Tony Konsul,4944 Parkway Plz Blvd Charlotte NC 28217/Regional
Manager/704-319-0523/7045258174 Yes
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Doc signe y: DWR/WIRO WQ/910-796-7387/�e,�e,�, ene� 1212112021
Helen I PerezE
1 D645B4A39694BE...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
WQ/ - - / 12/21/2021
Tom Tharringt 'Cuµ
� &Alr�DWR/WIRO
F1 3B6F3456
EPA Form 3560-3 (Rev 6 41 Devious editions are obsolete.
Page#
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
NPDES yr/mo/day Inspection Type (Cont.)
NCO032239 I11 12I 21/12/08 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
A routine compliance inspection of the Regalwood WWTP was conducted on December 8, 2021. The
purpose of the evaluation was to verify that the facility is operating in compliance with the conditions
and limitations specified in Permit NC0032239. Greg Spillman, Anthony Futrell and staff were present
during the inspection.
This older 0.125-MG facility consists of an originally designed 0.065-MG contact stabilization basin
and a 0.060-MG extended aeration basin, both with clarifiers. Currently, flows averages
approximately 0.073-MG. The contact stabilization basin has been changed to operate as an
extended aeration basin. Effluent from the clarifier units flows to a polishing pond for further solids
removal and then discharges to the Northeast Creek.
A review of violations for this permit cycle shows:
10/17 daily TSS
10/19 daily Enterococci
05/20 monthly flow
06/20 monthly flow
10/20 daily BOD
11/20 frequency for BOD, Enterococci, ammonia, TP, TSS
12/20 daily BOD
02/21 daily BOD
04/21 daily, monthly BOD & daily Enterococci
A technical assistance visit was requested by Carolina Water Service staff in June of this year to
discuss issues with COD from de -chlorination influencing BOD and possibly other composite
parameters. As sugested, floats have been adjusted to allow volume to build up in the EQ during the
day providing a more consistent and continuous 24-hour flow pace, and dosing of the dechlorination
chemical has been adjusted so that TRC values produced are in the 20-35 ug/I range to reduce any
COD impact.
The current permit expires on June 30, 2022 and a renewal application is due by December 31,
2021. The facility is compliant with NPDES Permit NC0032239. Please review the comment sections
of the inspection report for more details.
Page#
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
Permit: NCO032239 Owner -Facility: Regalwood WWTP
Inspection Date: 12/08/2021 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The permit expires on June 30, 2022. The renewal application is due by December 31,
2021.
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Comment: DMRs, COCs and lab results are stored at the White Oak Estates WWTP. They were
well maintained and available for review. The operator log was detailed and complete.
Laboratory
Yes No NA NE
Page# 3
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
Permit: NCO032239 Owner -Facility: Regalwood WWTP
Inspection Date: 12/08/2021 Inspection Type: Compliance Evaluation
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Comment: The facility is field certified, Certification #5162. Envirochem Lab, Certification #94
analyzes the remaining parameters. The calibration curve for the Hach Chlorine Meter
was being updated by Envirochem. It was confirmed, during the inspection, that it was
calibrated down to 10 ug/I. Field meters are routinely calibrated and samples analyzed
at White Oak Estates WWTP.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ■ ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: Settleable solids testing, along with measurements of sludge blanket in clarifiers, are
routinely analyzed to determine RAS/WAS rates and approximate MLSS. DO is also
monitored for process control.
Flow Measurement - Effluent
Yes
No
NA
NE
# Is flow meter used for reporting?
■
❑
❑
❑
Is flow meter calibrated annually?
■
❑
❑
❑
Is the flow meter operational?
■
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
■
❑
Comment: The effluent flow meter was calibrated on 1/2/2021 by Delta Environmental Systems.
Bar Screens
Yes
No
NA NE
Type of bar screen
a.Manual
■
b.Mechanical
❑
Are the bars adequately screening debris?
■
❑
❑
❑
Is the screen free of excessive debris?
■
❑
❑
❑
Is disposal of screening in compliance?
■
❑
❑
❑
Is the unit in good condition?
■
❑
❑
❑
Page# 4
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
Permit: NCO032239 Owner -Facility: Regalwood WWTP
Inspection Date: 12/08/2021 Inspection Type: Compliance Evaluation
Bar Screens
Comment: The manual bar screen is cleaned twice a day.
Equalization Basins
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Yes No NA NE
Yes
No
NA
NE
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
■
■
❑
❑
❑
Comment: The influent pump station supplies wastewater to a 30,000-qallon EQ basin. The EQ
high level alarm is connected to the Missions telemetry system. Floats have been
adjusted to allow volume to build up in the EQ during the day providing a more
consistent and continuous 24-hour flow pace, as sugested during a technical
assistance visit in June.
Nutrient Removal
# Is total nitrogen removal required?
# Is total phosphorous removal required?
Type
# Is chemical feed required to sustain process?
Is nutrient removal process operating properly?
Comment: Ferric Sulfate is added at the EQ tank for phosphorus removal.
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Yes
No
NA
NE
EIN
❑
❑
■
❑
❑
❑
Chemical
■
❑
❑
❑
■
❑
❑
❑
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Comment: There is a back-up chemical feed pump at the White Oak Estates WWTP site.
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system
Diffused
Page# 5
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
Permit: NCO032239 Owner -Facility: Regalwood WWTP
Inspection Date: 12/08/2021 Inspection Type: Compliance Evaluation
Aeration Basins
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ■ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
Comment: The facility is operating the original contact stabilization basin as an extended aeration
basin. Both the basins appear to be well maintained and operated.
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
■
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
■
Comment: Effluent from the clarifier units flows to a polishing pond for further solids removal. The
pond solids are removed by Aragona Brothers annually.
Pumps-RAS-WAS
Yes
No
NA
NE
Are pumps in place?
0
❑
❑
❑
Are pumps operational?
0
❑
❑
❑
Are there adequate spare parts and supplies on site?
❑
❑
❑
Comment: No comment.
Aerobic Digester
Is the capacity adequate?
Is the mixing adequate?
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 6
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
Permit: NCO032239 Owner -Facility: Regalwood WWTP
Inspection Date: 12/08/2021 Inspection Type: Compliance Evaluation
Aerobic Digester Yes No NA NE
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
■
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment: There are three sludge digesters and waste is removed by Aragona Brothers.
Disinfection -Liquid
Yes
No
NA
NE
Is there adequate reserve supply of disinfectant?
■
❑
❑
❑
(Sodium Hypochlorite) Is pump feed system operational?
0
❑
❑
❑
Is bulk storage tank containment area adequate? (free of leaks/open drains)
❑
❑
❑
Is the level of chlorine residual acceptable?
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
■
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
❑
❑
❑
Comment: Currently, liquid chorine is added based on a constant time, contant volume as effluent
from the polishing pond goes over weir into a chlorine contact tank.
Plans are in place
to install a flow paced system soon.
De -chlorination
Yes
No
NA
NE
Type of system ?
Liquid
Is the feed ratio proportional to chlorine amount (1 to 1)?
■
❑
❑
❑
Is storage appropriate for cylinders?
❑
❑
■
❑
# Is de -chlorination substance stored away from chlorine containers?
0
❑
❑
❑
Are the tablets the proper size and type?
❑
❑
0
❑
Comment: Effluent from the chlorine contact tank flows to a dechlorination tank before discharqin
to outfall. As suggested during the technical assistance visit in June, the dosing of the
liquid dechlorination chemical has been adjusted so that TRC values produced are in
the 20-35 ug/I range to reduce any COD impact.
Are tablet de -chlorinators operational? ❑ ❑ 0 ❑
Number of tubes in use?
Comment: No comment.
Effluent Sampling
Yes
No
NA
NE
Is composite sampling flow proportional?
0
❑
❑
❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
❑
❑
❑
Is the tubing clean?
❑
❑
❑
Page# 7
DocuSign Envelope ID: 883730AF-63E0-4B17-BC2B-A065CF181B81
Permit: NCO032239 Owner -Facility: Regalwood WWTP
Inspection Date: 12/08/2021 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 0 ❑ ❑ ❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type ■ ❑ ❑ ❑
representative)?
Comment: The composite sample is collected at the end of the dechlorination tank. Temperature
inside sampler was 5 degrees Celcius during the inspection. Samples are typically
collected on Monday. Tuesday and Wednesday.
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
■
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: Effluent flows by gravity to the outfall located at the upper portion of the Northeast
Creek. The outfall pipe is equipped with a flapper valve due to occasional high levels in
the creek. Effluent can be pumped over the polishing pond beam into the creek during
creek high water levels.
Page# 8