Loading...
HomeMy WebLinkAbout20131251 Ver 1_Approval Letter_20131206A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary December 6, 2013 Brunswick County DWR Project #: 13 -1251 St. James Plantation Property Owners Association Mr. Jack Noland 4140 Southport- Supply Road, Suite B Southport NC 28461 Subject Property: Bulkhead Replacement & Future Pedestrian Walkway — St. James Plantation Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Noland: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.033 acres (1,419 square feet) of 404 jurisdictional wetlands in order to replace roadway bulkheads and to construct a golf cart/pedestrian walkway over coastal marsh, as described within your application received by the DWR on December 3, 2013. After reviewing your application, the proposed impacts are covered by General Water Quality Certification Numbers 3883 (GC3883) and 3886 (GC3886). These Certifications allow you to use Nationwide Permits 3 and 14 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non - discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permits. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. vl L L �• — Wetlands, Buffers, Stormwater— Compliance and Permitting (Webscape) Unit - 1650 Mail Service Center, Ralegh, North Carolina 27699 -1650 ' � •�• ` •� �� � � � :a i �� Location: 512 N. Salisbury St Raleigh, North Carolina 27604 ��''.••� i _ ;, ;• 1� O Carolina Phone 919$07 -63001 FAX: 919-807 -64941 Customer Service- 1 -877 -62L48 at�ra!!f/ Internet www.ncwaterquaidy.org i/ 2 Polly Gully Bndge Bulkheads — St. James POA Brunswick County 2013 -1251 The Additional Conditions of the Certification are: 1. Impacts Approved $ The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Impact Type Amount Approved nits Plan Location or Reference 404 Wetlands (Permanent) 0.033 acres 1,419 Square Feet CAMA Major Application 2. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre - Construction Notification and authorized by this written approval, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. ` Z4 -ti !" � —T-•S iA I_ u t1 eA_ 3 Polly Gully Bridge Bulkheads — St James POA Brunswick County 2013 -1251 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by DWR. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral, and Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699- 1650. 7. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permits. You can contest this Certification as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings. You may obtain a petition form from the Office of Administrative Hearings at http: / /www.ncoah.com or call (919) 431 -3000 for information. Within sixty (60) calendar days of receipt of this Certification, you must file the petition with the Office of Administrative Hearings. A petition is considered filed when the original and one (1) copy is received in the Office of Administrative Hearings during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the Office of Administrative Hearings at (919) 431 -3100, provided the original and one copy of the petition is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. Mailing address for the Office of Administrative Hearings: Office of Administrative Hearings k - 6714 Mail Service Center �`� �� ��� �, 1' Raleigh, NC 27699 -6714 ♦ . , 5' �? � � � t � L Inc ' t `' 1 4 Polly Gully Bndge Bulkheads — St James POA Brunswick County 2013 -1251 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 Unless such a petition is filed, this Certification shall be final and binding. This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please telephone Karen Higgins in the Central Office in Raleigh at 919- 807 -6301 or Chad Coburn in the DWR Wilmington Regional Office at 910 - 796 -7215. Sincerely, o as A. Reeder Division of Water Resources Enclosures: Certificate of Completion GC 3883 GC 3886 cc: Rana Stansell — WSP, 15401 Weston Parkway, Suite 100, Cary, NC 27513 David Timpy — USACE Wilmington Field Office Karen Higgins — 401 and Buffer Permitting Unit WiRO Certification of Completion DWR Project No.: Applicant: Project Name: Date of Issuance of Wetland Permit: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Agent's Certification , hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. `_' � F i _ Signature: Registration No. Date