Loading...
HomeMy WebLinkAboutSWA000128_Design Calculations_20211214RAEFORD COMMONS STORMWATER IMPACT ANALYSIS October 01, 2021 PREPARED FOR: Forge Investment Group, LLC PREPARED BY: Timmons Group, NC License No. C-1652 Mike Zaccardo, PE 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 919.532.3281 phone 919.833.8124 fax m i ke. zaccardo(a)ti m m ons. com www.timmons.com owess i s TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. RAEFORD COMMONS Raeford, NC Proiect Number: 47049 Table of Contents Hwy 78 North Sanford, NC Proiect Number: 45739 Project Summary Introduction Raeford Commons is a proposed single-family community comprising of 191 lots on 85.19 acres located approximately 500 LF West from W Palmer St and in between Thomas Dr and Roger St in Raeford, NC. The site is zoned R-12 and will be served by public water and sewer. Stormwater Methodology • For each individual storm drainage inlet, a drainage area was measured as well as assigning impervious surface percentage. From this impervious percentage a rational `C' value was calculated. Impervious surfaces were given a `C' value of 0.95. This data was used for pipe sizing. The average "C" value for the site is 0.60. RCP is specified for all storm pipe on site and off site with a Manning's N value of 0.013 • Spread calculations have been performed using the 4" storm event, and have been performed using a 5 minute ToC. Maximum allowable spread is 7.25 feet from face of curb. Structures are spaced/placed to prevent flow crossing an intersection at intersecting streets. • The storm water network has been designed to pass the 10-year event and are sized to handle the 10-YR storm keeping the HGL within the structures. • The pipes were sized using Hydraflow Storm Sewers. This program accepts the input data from each inlet, as well as physical characteristics of the storm system to be designed, and calculates flow rates and pipe sizes through the system. For rainfall data, NOAA precipitation depths and intensities were utilized. Each inlet was modeled to capture 100% of the drainage area flow. The minimum storm drainage pipe size used for this project is 15 inches. • The NRCS Method and Hydraflow Hydrographs Extension for Autodesk Civil 3D were used to model the pre- and post -development peak flows as well as proposed pond routing to each POI. Time of Concentration (Tc) calculations were performed using TR-55 methodology for each POI. The results are provided in the section below. 1 I www.timmons.com TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. RAEFORD COMMONS Raeford, NC Proiect Number: 47049 Stormwater Treatment and Detention Stormwater conveyances will be provided to meet the NCDEQ requirements to control gutter spread and minimum pipe sizes to convey the required storm events. Four (4) Points of Investigation (POI) are identified on -site for the purpose of studying the pre- to post - development effects of the project on stormwater peak flows. The SCS Method was used to analyze the difference between the pre- and post -development peak runoff rates for the 1-year (24hr) storm, the 10-year (24hr) storm, and the 25-year (24hr) storm events. In addition, the 100-year storm event has been analyzed to ensure safe passage through the site. Pre/Post Stormwater Analysis Point of Interest 1 Drainage Area Q1 cfs Q10 cfs Q25 cfs Q100 (cfs) Pre -Development 4.075 13.92 18.85 27.57 Post -Development w/Detention 2.249 7.163 9.627 13.87 Point of Interest 2 Drainage Area Q1 cfs Q10 cfs Q25 cfs Q100 (cfs) Pre -Development 35.84 91.94 118.07 161.41 Post -Development w/Detention 3.951 18.26 25.88 39.25 Point of Interest 3 Drainage Area Q1 cfs Q10 cfs Q25 cfs Q100 (cfs) Pre -Development 53.2 156.41 206.55 291.02 Post -Development w/Detention 11.54 42.68 114.19 244.56 Point of Interest 4 Drainage Area Q1 cfs Q10 cfs Q25 cfs Q100 (cfs) Pre -Development 6.566 23.25 31.37 46.52 Post -Development w/Detention 1.26 4.585 6.302 9.274 Total Site Discharge Drainage Area Q1 cfs Q10 cfs Q25 cfs Q100 (cfs) Pre -Development 99.68 285.52 374.84 526.52 Post -Development w/Detention 19 72.688 155.99 306.85 TIMMONS GROUP 1 1 www.timmons.com Area Maps Pre -Development Peak Flow Map Post Development Peak Flow Map SCM Drainage Map TIMMONS GROUP RAEFORD COMMONS Raeford, NC Proiect Number: 47049 21 www.timmons.com LEGEND �. / / . / /� SHALLOW CONCENTRATED _ , I- -' - - PROPOSED BOUNDARY - - - - - - - - POI 1 DRAINAGE AREA / / // I I/ FLOW '� ® '� - - - - - - - POI 2 DRAINAGE AREA / / I I it 1377 LF -� ♦ �� ` - - - - - - I POI 3 DRAINAGE AREA ,/ // / I/ I I� I 0.2% SLOPE / \\ - - - - - - - - POI 4 DRAINAGE AREA / / I �'` I I I I / i�i� ♦ / `� TIME OF CONCENTRATION PATH J CENTERLINE OF CREEK I / I POI #1 " WETLANDS I I I DA: 1.72 AC NEUSE RIPARIAN BUFFER I CN: 71 - - - - - EXISTING CONTOUR TC: 4.3 MIN = SHALLOW CONCENTRATED _ FLOW L �^ s � 1 YR POST 10 YR POST 25 YR POST 100 YR POST 1 YR PRE 10 YR 25 YR 100 YR POI W/DETENTION W/DETENTION W/DETENTION W/DETENTION (cfs) PRE (cfs) PRE (cfs) PRE (cfs) (cfs) (cfs) (cfs) (cfs) 1 4.075 2.249 13.92 7.163 18.85 9.627 27.57 13.87 2 1 35.84 3.951 91.94 1 18.26 118.07 25.88 161.41 39.25 3 53.2 11.54 156.41 42.68 206.55 114.19 291.02 244.46 4 6.566 1.26 23.25 4.585 31.37 6.302 46.52 9.274 TOTAL 99.681 19 285.52 72.688 374.84 155.999 526.52 306.854 Poll 1 1�� in - woo i� v WE ,� , �' �i;�� � � � � + II �.� �III►_ � ,, l - �: � _ Z �n�ws�oa�t��� � � _ • I`� �. � �I ���;..'�'�-"�� lit CN: 69 POST -DEVELOPMENT •,•P DRAINAGE 11 AREA 1 1 � ' 11 • • Commons 1 300, •11 TIMMONS GROUP /-CHANNEL FLOW 304 LF / 0.898% SLOPE / POI #2 DA: 10.44 AC i / CN: 69 TC: 33 MIN � u�m - - PROPOSED BOUNDARY - - - - - - - - POI 1 DRAINAGE AREA - - - - - - - POI 2 DRAINAGE AREA - - - - - - I POI 3 DRAINAGE AREA - - - - - - - - POI 4 DRAINAGE AREA TIME OF CONCENTRATION PATH CENTERLINE OF CREEK " WETLANDS NEUSE RIPARIAN BUFFER EXISTING CONTOUR SOIL GROUP A SOIL GROUP B SOIL GROUP C SOIL GROUP D '7 - \\\1k, �4) SHALLOW CONCENTRATED FLOW / / // ( I I 1595 LF- / 0.22% SLOPE SHALLOW CONCENTRATED \ 1 ) I ) 1 POI #1 / \ \ l POI #2 / I FLOW \ I I ( I I DA: 3.27 AC _ ' h I 569 LF I III / \" I \a- DA: 34.27 AC 1 1.17% SLOPE / I 1 I CN: 69 aB , (, \ CN: 81 ( I 1 YR POST 10 YR POST 25 YR POST 100 YR POST 1 YR PRE 10 YR 25 YR 100 YR P01 W/DETENTION W/DETENTION W/DETENTION W/DETENTION (cfs) PRE (cfs) PRE (cfs) PRE (cfs) (cfs) (cfs) (cfs) (cfs) 1 4.075 2.249 13.92 7.163 18.85 9.627 27.57 13.87 2 35.84 3.951 91.94 18.26 118.07 25.88 161.41 39.25 3 53.2 11.54 156.41 42.68 206.55 114.19 291.02 244.46 4 6.566 1.26 23.25 4.585 31.37 6.302 46.52 9.274 TOTAL 99.681 19 285.52 72.688 374.84 155.999 526.52 306.854 NoA ^ / �• TC: 35.1 MIN J / FaB �f \\/a1 J> >^ -4 J`nc JD �J J . \/ \ \ \ Sn\ / c y je yNo t II J j /j J �- �\ ✓/ y / / I!� FaA + FaA ' f / y `° •-(- .� . ( \p // �V" ; \ 1. / Co v / aA ! . r / _IS \ `\ r � �.. //I /�Q / ; / 0 DpA 1��\ \ / r( II� N o B - J Q - ; o < ��) t �' )gyp ✓ a 1J/ /// / / / yl I I 1 \ \ / I 1 I I ° - / / �/ 1. _ - I �� '/c 7r v / _- ~ J / ✓\Q J J \ ` "r f 1 \ \ l \ •� - t I � I I !r � ;, // � J, ry p •` o v k +'~.. I� �� -r o /( /// / / / / Jlll II ID t \ \ \ \ \\ // // �� \I 1 I / I I FaA )/1 ��, ° l ) I / /I r /~ / / / r./\ �i✓� v p\ ) ep I / O I , < ! I ` ` l I l 215 �� f �� ,a \� ` �-- 1 .d r N � I I I I I - \ / I J �t l ') r 1,- -� \ Z70C 1 „1 �j/ ^ J 1 \ I 1 1 1 1 ( Ln J \ I° (( I 1 \ ` / / ! /� / 1 ` �[' v �� ( r �-` / 1 o c' �\ \� �I 1\� / 1 1 \\CA FaA !J \ �� \ J / ✓ i / / u / O'\, o -) 1 - J 2/ram o / b Z L \ 11 I J la 10, a rL��o a NOA >r ) / L } ` / J ® I 1 0 / n\ 4 J •^ L P / 1 \ \ I I •� f / J ) \/ / % ii /� /J < r eso r 2� ^1 \1 / 4 ■ I\ / r _ FaB P0I#3 7� ,✓\ / �� ,' ' // .' . /; - ° •C I No ! / J \ -, - /• 1 \ \ f s r _ ^ ' t J - ` <� \ . - _ r r / / s/! \y " DA: 59.32 AC J y a""" `` / :=� a.:"-�-� ^ + , , /• �• = ` _ �• / `_ - - J I/ j. CN: 76 - SHALLOW CONCENTRATED �^��= "/� > " "'° : �� - _� r , " ' �"+`= 4" .® 60' �� 5 r ^� °r J TC: 29.6 MIN _ - FLOW - - 800 LF i _"""`"` .= V" "� r= t rt'/ S /i r /.• c'`"".:`•�''"_" Y2" 60:`=.•ry'% / SHALLOW 1.11 % SLOPE CONCENTRATED FLOW - _ POI#4- �� ° 850LF �:"�SJT • r' - J\ �`" " W 1.71 /° SLOPE :t ." " . `,"� ` r - 1265 "" TC: 7.8 MIN \ �I )) I \ \� \ 1"W/ / -� 1 `�= / / , - \ CHANNEL FLOW I I \ I I `"" 2383 LF ( " �� ) L - / \ \ \ I J / ( �j \ / ♦ 0,5SLOPE " " / /° PRE -DEVELOPMENT DRAINAGE AREA MAP Raeford Commons - June 2, 2021 SCALE 1 "=300' ` % EMq 0 300' 600' TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. S:\331\47049-Raeford_Commons\DWG\47049-331C-SPHYDR-PRE.dwg I Plotted on 8/4/2021 4:44 PM I by Colie Crosby LEGEND l / I -� / / /l / / ��1�/j/ /' /' // -] \ l - - PROPOSED BOUNDARY I / - - - - - - - - SCM I DRAINAGE AREA - - - - - - - SCM 2 DRAINAGE AREA / / // / Il //// TIME OF CONCENTRATION PATH CENTERLINE OF CREEK WETLANDS NEUSE RIPARIAN BUFFER - - - - EXISTING CONTOUR /It 1 YR POST 10 YR POST 25 YR POST 100 YR POST 1 YR PRE 10 YR 25 YR 100 YR POI W/DETENTION W/DETENTION W/DETENTION W/DETENTION (cfs) PRE (cfs) PRE (cfs) PRE (cfs) (cfs) (cfs) (cfs) (cfs) 1 4.075 2.249 13.92 7.163 18.85 9.627 27.57 13.87 2 35.84 3.951 91.94 18.26 118.07 25.88 161.41 39.25 3 53.2 11.54 156.41 42.68 206.55 114.19 291.02 244.46 4 6.566 1.26 23.25 4.585 31.37 6.302 46.52 9.274 TOTAL 99.681 19 285.52 72.688 374.84 155.999 526.52 306.854 �II� + C� . we i f� 04 SCALE 11 SCM DRAINAGE 11 AREA 1 MAP Raeford Commons 1 300, •11 TIMMONS GROUP .•lie,0a • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Raeford Commons Calculated By: Colie Crosby Wet Pond DesignSCM Pollutant / Nutrient Removal Project No.: 47049 Date: 9/21/2021 1 Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus 40% Post -Development Drainage Area Basin Characteristics Estimated Impervious Area to Pond Lots Description Acres Description Qty (# of Lots) Imp / Lot (SF) Total Imp Area Impervious Lots 3.91 Single Family 41.5 4100 3.91 Impervious RMI 3.24 0.00 Managed Pervious 18.29 0.00 Impervious Other 0.05 0.00 0.00 0.00 Subtotal 42 - 3.91 Streets and SW Description Length (LF) Imp (SF) / LF Total Imp Area 50' ROW 3524 40 3.24 0.00 0.00 0.00 0.00 0.00 Subtotal 3.24 Other Parking Lot 2133 0.05 Total to Pond (AC) 25.48 0.00 Pond Basin C 0.52 Grand Total Impervious Area (AC): 7.19 Surface Drainage Area to SCM Impervious Area Offsite Impervious Area Area to Acres 0.00 Drainage Area Ratio for Permanent Pool Sizing Required Surface Area of Permanent Pool Onsite Impervious Area 7.19 Average Depth (ft) = 4.0 Total Impervious Area 7.19 SA/DA Ratio = 0.89 Required SA (ft2) = 9,878 Total Drainage Area To SCM 25.48 SA as Shown (ft2) = 21,731 Percent Impervious Area 28% SA/DA Ratio from latest NCDENR BMP Manual Elevation (ft) SA DA •• Main Forebay Area (sf) Area (sf) Depth (ft) Main Inc. Vol (cf) Pool) Forebay Inc. Vol (cf) Total Vol (cf) 257.0 Bottom of Sediment Storage 258.0 14,982 0 0.0 Top of Sediment Storage 259.0 16,289 3,000 1.0 15,636 1,500 17,136 260.0 17,620 3,350 2.0 16,955 3,175 37,265 261.0 18,977 4,300 3.0 18,299 3,825 59,389 262.0 20,358 5,000 4.0 19,668 4,650 83,706 263.0 21,731 6,000 5.0 21,045 5,500 110,251 Total 5.0 91,601 18,650 110,251 Verify the ForebayVolume Is Approximately• Pool Volume.20% Elevation (ft) Water Quality Main Area (sf) and Quantity Forebay Area (sf) Volumes (Above Depth (ft) Permanent / Normal Inc Total Vol (cf) Pool) Accum' Total I Vol (cf) 263.0 21,731 6,000 0.00 Permanent Pool Elevation Notes 263.5 31,508 - 0.50 13,310 13,310 263.95 33,838 - 0.95 14,808 28,118 WQE / TPE 264.0 34,078 - 1.00 11589 29,707 265.0 36,713 - 2.00 35,396 65,103 266.0 39,404 - 3.00 38,059 103,162 267.0 42,149 4.00 40,777 143,939 268.0 44,946 5.00 43,548 187,487 269.0 47,800 - 6.00 46,373 233,860 davg = [Vperm pool AverageVerify the • of ••• - [0.5 X Depth max over shelf X Perimeter perm pool X Width submerged part of shelf] Abottom of shelf Vperm = 91,601 C.F. (Main Pond) Abottom shelf = 21,731 S.F. (Main Pond) Depth of Water over shelf= 0.00 FT Perimeter perm pool = 830 L.F. (Main Pond) Width submerged part of shelf = 0.0 FT Davg = 4.22 FT Depth for SA/DA = 4.00 FT (Round Dav down to nearest 0.5 ft) 1.0"Quality Runoff• • Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Where: Rv = Runoff Coefficient, in/in I = Percent Impervious 1= 28.2% Rv = 0.05 + 0.009(1) Rv = 0.304 1.0 inch runoff volume (Required) Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) Design Rainfall = 1.0 inch Drainage Area = 25.48 acres Storage Required = 28,118 cu. ft. Depth Volume Storage For PPE SA (SF) 1.0" Runoff Above Permanent Pool (Provided) Top Temp Pool SA (SF) Volume (CF) Elevation 0.95 21,731 33,838 28,118 263.95 Size Water Quality Orifice for (2-5) Day Drawdown for 1 Runoff Q .. = CdA 2 h l z (Orifice Equation; Cd=0.60) Volume 3.00 Orifice Diameter (inches) 0.83 Driving Head to Centroid of Orifice (ft) 0.12 Q1.0" Drawdown Rate (cfs) 28,118 Water Quality Volume (VW ) VW /(Q1" x 86,400) Drawdown Time (days) iiiiiiiIN ir,71.!IF Time da s 2 - 5 da s •• • Riser Data & Elevations Pond Type Wet Pond TSS Removal 85% Top of Pond / Berm 269.00 ft Secondary Spillway Width 70.00 ft Bottom of Secondary Spillway 267.50 ft Top of Riser 266.50 ft (at least 1' Above TPE) Riser Type / Size 4X4 ft Top of Water Quality / Temp Pool Elev 263.95 ft (1" Runoff) Top of Veg. Shelf 264.00 ft Permanent Pool Elevation (Normal Pool) 263.00 ft Water Quality Orifice Elevation & Size 263.00 ft 3.00 in Secondary Orifice Elevation & Size (Rise & Span) 265.50 ft (2) TOTAL 8.00 inch 12.00 inch Bottom of Veg. Shelf 263.00 ft ^ Rise ^ Span Top of Sediment Storage / Pond Bottom 258.00 ft Bottom of Sediment Storage 257.00 ft (Min 1 ft) Invert Out of Riser 263.00 ft Outlet Pipe Size 30.00 in Diameter RCP Outlet Pipe Length & Slope 69.00 ft 0.58 % Downstream Outlet Elevation 262.60 ft 1 Yr Water Surface Elev / Peak Flow (CFS) 264.99 ft 0.32 CFS 2 Yr Water Surface Elev Peak Flow (CFS) NA ft 0.00 CFS 10 Yr Water Surface Elev Peak Flow (CFS) 266.60 ft 7.61 CFS 25 Yr Water Surface Elev Peak Flow (CFS) 267.15 ft 31.75 CFS 100 Yr Water Surface Elev Peak Flow CFS 267.96 ft •• • Detail Top of Riser: 266.50 3 in WQ Orifice Top of WQ Pool: 263.95 263.00 ------------------• •--- Pond Bottom 258.00 _ Perm Pool Sediment Bottom Invert Out: 263.00 263.00 257.00 Base: 257.00 115.65 CFS Elev 10' Berm 269.00 100 Yr 267.96 Spillway 267.50 25 Yr 267.15 10 Yr 266.60 2 Yr NA 1 Yr 264.99 See Plan for accurate outlet design Inv Out: 262.60 69 LF of 30" RCP @ 0.58% Riser Dimensions Anti-Bouyancy Weight of Structure Displaced Volume Outside Width 5.00 ft Walls = 12,825 LBS V = LxWx(HT) = C.F. Inside Width 4.00 ft Base = 3,675 LBS Outside Length 5.00 ft FILL = 13,200 Ibs Displaced Water = Inside Length 4.00 ft C.F. * 62.4 PCF = LBS Height 9.50 ft Outlet Pipe = 368 LBS Base Thick' (ft) 0.50 ft WQ Orifice = 4 LBS Add 15% Factor of Safety Wall Thick' (ft) 0.50 ft Ext Base (ft) 1.00 ft Weir #1 = 50 LBS V = 250 C.F. Areas removed from Riser Weir #2 = 0 LBS Disp. Water = 15,600 LBS Outlet Pipe 4.91 ft Weir #3 = 0 LBS 15% F.S. = 2,340 LBS WQ Orifice 0.05 ft Weir #4 = 0 LBS Orifice #1 0.67 ft Other #1 = 0 LBS Safety Factor 1.63 Orifice #2 0.00 ft Orifice #3 0.00 ft Weight = 29,278 LBS Weight = 17,940 LBS Orifice #4 Other 0.00 ft 0.00 ft Dam / Berm Precast Concrete Riser Structure to be 4 ft x 4 ft x 9.5 ft Tall, With a 0.5 ft Thick Precast Extended Base Planting Summary Requirements Non -Clumping Turf Grass 6' Shelf Length 727 Area of Shelf = 4362 SF (50 Plants per 200 SF of Area) Quantity Type Root Common Name Scientific Name Planting Size Notes 364 Herbaceous Container Quill Sedge Cerex Tenera 4" Pot 24"-36" OC 364 Herbaceous Container Virginia Sweetspire Itea Virginica 4" Pot 24"-36" OC 364 Herbaceous Container Joe Pye Weed Eupat' Fistulosus 4" Pot 24"-36" OC TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Raeford Commons Calculated By: Colie Crosby Wet Pond DesignSCM Pollutant Project No.: 47049 Date: 9/21/2021 2 Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus 40% Post -Development Drainage Area Basin Characteristics Estimated Impervious Area to Pond Lots Description Acres Description Qty (# of Lots) Imp / Lot (SF) Total Imp Area Impervious Lots 12.66 Single Family 134.5 4100 12.66 Impervious RNV 7.11 0.00 Managed Pervious 28.89 0.00 Impervious Other 0.00 0.00 0.00 0.00 Subtotal 136 - 12.66 Streets and SW Description Length (LF) Imp (SF) / LF Total Imp Area 50' ROW 7746 40 7.11 0.00 0.00 0.00 0.00 0.00 Subtotal 7.11 Other Parking Lot 0.00 Total to Pond (AC) 48.66 0.00 Pond Basin C 0.59 Grand Total Impervious Area (AC): 19.77 Surface Drainage Area to SCM Impervious Area Offsite Impervious Area Area to Acres 0.00 Drainage Area Ratio for Permanent Pool Sizing Required Surface Area of Permanent Pool Onsite Impervious Area 19.77 Average Depth (ft) = 4.0 Total Impervious Area 19.77 SA/DA Ratio = 1.27 Required SA (ft2) = 26,919 ainage Area To SCM EPeent 48.66 SA as Shown (ft2) = 44,563 Impervious Area 41 % SAIDA Ratio from latest NCDENR BMP Manual SA DA Pond Volumes Elevation Main Forebay (ft) Area (sf) Area (sf) and Areas (Below Depth (ft) Permanent / Normal Pool) Main Forebay Inc. Vol (cf) Inc. Vol (cf) Total Vol (cf) 252.0 Bottom of Sediment Storage 253.0 28,867 0 0.0 Top of Sediment Storage 254.0 31,949 4,525 1.0 30,408 2,263 32,671 255.0 35,059 5,577 2.0 33,504 5,051 71,226 256.0 38,198 6,674 3.0 36,629 6,126 113,980 257.0 41,366 7,817 4.0 39,782 7,246 161,007 258.0 44,563 9,006 5.0 42,965 8,412 212,383 Total 5.0 183,287 29,096 212,383 Verify the ForebayVolume Is Approximately (16% - • 16% Elevation (ft) Water Quality Main Area (sf) and Quantity Forebay Area (sf) VolumesA••ve Permanent / Normal Depth Inc Total (ft) Vol (cf) Pool) FAccum' Total Vol (cf) 258.0 44,563 9,006 0.00 Permanent Pool Elevation Notes 259.0 54,957 - 1.00 49,760 49,760 259.4 59,230 - 1.41 23,669 73,429 WQE / TPE 260.0 65,264 - 2.00 36,442 109,871 261.0 70,515 - 3.00 67,890 177,761 262.0 75,821 4.00 73,168 250,929 263.0 81,181 5.00 78,501 329,430 264.0 86,596 - 6.00 83,889 413,319 265.0 92066 - 7.00 89,331 502,650 davg = [Vperm pool - AverageVerify the • of '•• [0.5 X Depth max over shelf X Perimeter perm pool X Width submerged part of shelf] / Abottom of shelf Vperm = 183,287 C.F. (Main Pond) Abottom shelf = 44,563 S.F. (Main Pond) Depth of Water over shelf= 0.00 FT Perimeter perm pool= 1,701 L.F. (Main Pond) Width submerged part of shelf = 0.0 FT Davg = 4.11 FT Depth for SA/DA= 4.00 FT (Round Day down to nearest 0.5 ft) 1.0"Quality Runoff• • Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Where: Rv = Runoff Coefficient, in/in I = Percent Impervious 1= 40.6% Rv = 0.05 + 0.009(1) Rv = 0.416 1.0 inch runoff volume (Required) Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) Design Rainfall = 1.0 inch Drainage Area = 48.66 acres Storage Required = 73,429 cu. ft. Depth Volume• • For PPE SA (SF) 1" Runoff Above Permanent Pool• Top Temp Pool SA (SF) • • Volume (CF) Elevation 1.41 44,563 59,230 73,429 259.41 Size Water Quality • Q .. = CdA 2 h Day Drawdown (Orifice Equation; Cd=0.60) 4.00 Orifice Diameter (inches) 1.25 Driving Head to Centroid of Orifice (ft) 0.27 Q1.0" Drawdown Rate (cfs) 73,429 Water Quality Volume (VW ) VW /(Q1" x 86,400) Drawdown Time (days) 3.1 Pond Pond Type Drawdown Time da s 2 - 5 da s Riser Data & Elevations Wet Pond TSS Removal 85% Top of Pond / Berm 265.00 ft Secondary Spillway Width 60.00 ft Bottom of Secondary Spillway 263.50 ft Top of Riser 262.00 ft (at least 1' Above TPE) Riser Type / Size 5x5 ft Top of Water Quality / Temp Pool Elev 259.41 ft (1" Runoff) Top of Veg. Shelf 259.00 ft Permanent Pool Elevation (Normal Pool) 258.00 ft Water Quality Orifice Elevation & Size 258.00 ft 4.00 in Secondary Orifice Elevation & Size (Rise & Span) 260.00 ft (3) TOTAL 8.00 inch 12.00 inch Bottom of Veg. Shelf 258.00 ft ^ Rise ^ Span Top of Sediment Storage / Pond Bottom 253.00 ft Bottom of Sediment Storage 252.00 ft (Min 1 ft) Invert Out of Riser 258.00 ft Outlet Pipe Size 36.00 in Diameter RCP Outlet Pipe Length & Slope 99.46 ft 0.50 % Downstream Outlet Elevation 257.50 ft 1 Yr Water Surface Elev / Peak Flow (CFS) 259.59 ft 7.52 CFS 2 Yr Water Surface Elev Peak Flow (CFS) NA ft 0.00 CFS 10 Yr Water Surface Elev Peak Flow (CFS) 262.17 ft 19.79 CFS 25 Yr Water Surface Elev Peak Flow (CFS) 262.89 ft 53.77 CFS 100 Yr Water Surface Elev Peak Flow CFS 263.98 ft 137.19 CFS Pond Detail Top of Riser: 262.00 4 in WQ Orifice Elev Top of WQ Pool: 259.41 258.00 10' Berm 265.00 100 Yr 263.98 Spillway 263.50 25 Yr 262.89 10 Yr 262.17 2 Yr NA Pond Bottom 1 Yr 259.59 253.00 See Plan for accurate outlet design IF 11F Inv Out: 257.50 Perm Pool Sediment Bottom Invert Out: 258.00 99.46 LF of 36" RCP @ 258.00 252.00 Base: 252.00 0.50% Riser Dimensions Anti-Bouyancy Calculationsfor the Riser Structure Weight of Structure Displaced Volume Outside Width 5.00 ft Walls = 13,500 LBS V = LxWx(HT) = C.F. Inside Width 4.00 ft Base = 3,675 LBS Outside Length 5.00 ft FILL = 13,200 Ibs Displaced Water = Inside Length 4.00 ft C.F. * 62.4 PCF = LBS Height 10.00 ft Outlet Pipe = 530 LBS Base Thick' (ft) 0.50 ft WQ Orifice = 7 LBS Add 15% Factor of Safety Wall Thick' (ft) 0.50 ft Ext Base (ft) 1.00 ft Weir #1 = 50 LBS V = 263 C.F. Areas removed from Riser Weir #2 = 0 LBS Disp. Water = 16,380 LBS Outlet Pipe 7.07 ft Weir #3 = 0 LBS 15% F.S. = 2,457 LBS WQ Orifice 0.09 ft Weir #4 = 0 LBS Orifice #1 0.67 ft Other #1 = 0 LBS Safety Factor 1.58 Orifice #2 0.00 ft Orifice #3 0.00 ft Weight = 29,789 LBS Weight = 18,837 LBS Orifice #4 Other 0.00 ft 0.00 ft Dam / Berm Precast Concrete Riser Structure to be 4 ft x 4 ft x 10 ft Tall, With a 0.6 ft Thick Precast Extended Base Planting Summary Requirements Non -Clumping Turf Grass 6' Shelf Length 1634 Area of Shelf = 9804 SF (50 Plants per 200 SF of Area) Quantity Type Root Common Name Scientific Name Planting Size Notes 817 Herbaceous Container Quill Sedge Cerex Tenera 4" Pot 24"-36" OC 817 Herbaceous Container Virginia Sweetspire Itea Virginica 4" Pot 24"-36" OC 817 Herbaceous Container Joe Pye Weed Eupat' Fistulosus 4" Pot 24"-36" OC Rainfall Data NOAA Rainfall Precipitation Depth Estimate NOAA Rainfall Precipitation Intensity Estimate TIMMONS GROUP RAEFORD COMMONS Raeford, NC Proiect Number: 47049 31 www.timmons.com 5/13/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA* Latitude: 34.978*, Longitude:-79.25° Elevation: 270.81 ft** 'source: ESRI Maps "k0 "source: USGS "" POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parcybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 5.23 (4.76-5.77) 6.17 (5.63-6.82) 7.20 (6.56-7.94) 7.98 (7.25-8.78) 8.90 (8.05-9.78) 9.58 (8.64-10.5) 10.2 (9.17-11.2) 10.8 (9.66-11.9) 11.6 (10.2-12.7) 12.2 (10.7-13.3) 4.18 4.94 5.77 6.38 7.09 7.63 8.12 8.57 9.16 9.57 10-min (3.80-4.61) (4.50-5.45) (5.25-6.36) (5.79-7.02) (6.41-7.79) (6.88-8.36) 1 (7.28-8.90) 1 (7.66-9.40) 1 (8.10-10.0) 1 (8.41-10.5) 15-min 3.137 3884 3.7 4.56 4.43 5636 4.88 5892 5.42 6058 5.81--74.06 6. 4-67450 6.44-72.90 6. 0 8842 7.04 8178 2.39 2.86 3.45 3.904.85 5.24 5.62 6.11 6.48 30-min (2.17-2.63) 11 (2.61-3.15) (3.15-3.81) (3.54-4.29) (4.01-4.88) (4.37-5.32) (4.70-5.74) (5.02-6.15) (5.41-6.70) (5.70-7.11) 419 60-min 6 1 8 7 (1.3664) (1.64 1998) (2.02 2144) (2. 0- 79) (2.67 325) (2. 6-3.60) (3.24 395) (3.52 4432) (3.88 481) (4. 6 5.19) 0.867 1.05 1.32 1.53 1.81 2.03 2.26 2.49 2.80 3.05 2-hr (0.784-0.969) (0.951-1.17) 1 1 (1.62-2.01) (1.81-2.26) 1 (2.00-2.51) (2.19-2.76) (2.45-3.11) (2.65-3.39) 0.611 0.741 0.935 1.09 1.31 1.48 1.67 1.86 2.13 2.35 3-hr (0.553-0.685) (0.670-0.830) (0.844-1.05) (0.982-1.22) (1.17-1.46) 1 (1.32-1.65) 1 (1.47-1.85) 1 (1.63-2.07) (1.84-2.37) (2.01-2.61) 0.365 0.443 0.559 0.653 0.785 0.893 1.01 1.13 1.30 1.44 6-hr (0.331-0.407) (0.402-0.492) (0.507-0.620) (0.590-0.724) (0.703-0.868) (0.795-0.986) (0.890-1.11) (0.987-1.24) 1 (1.12-1.43) 1 (1.23-1.58) 0.214 0.259 0.329 0.387 0.468 0.535 0.607 0.684 0.796 0.887 12-hr (0.194-0.238) (0.234-0.289) (0.297-0.366) (0.348-0.430) (0.417-0.518) (0.474-0.591) (0.532-0.670) (0.594-0.754) (0.680-0.876) (0.748-0.976) 0.127 0.153 0.194 0.227 0.272 0.308 0.345 0.384 0.437 0.479 24-hr (0.118-0.137) (0.142-0.166) (0.180-0.210) (0.210-0.245) (0.250-0.293) (0.282-0.332) (0.316-0.372) (0.350-0.414) (0.396-0.471) (0.433-0.517) 0.074 0.089 0.112 0.130 0.155 0.175 0.195 0.217 0.246 0.269 2-day (0.069-0.079) (0.083-0.096) (0.104-0.120) (0.120-0.139) (0.143-0.166) (0.161-0.188) (0.179-0.210) (0.198-0.233) (0.224-0.265) (0.244-0.290) 0.052 0.063 0.078 0.091 0.108 0.122 0.136 0.150 0.170 0.186 3-day (0.049-0.056) (0.059-0.067) (0.073-0.084) (0.085-0.097) (0.100-0.116) (0.112-0.130) (0.125-0.145) (0.138-0.161) (0.156-0.183) (0.169-0.200) 0.041 0.050 0.062 0.071 0.085 0.095 0.106 0.117 0.133 0.145 4-day (0.039-0.044) (0.047-0.053) (0.058-0.066) (0.067-0.076) (0.079-0.090) (0.088-0.101) (0.098-0.113) (0.108-0.125) (0.122-0.142) (0.132-0.155) 0.027 0.033 0.040 0.046 0.054 0.061 0.068 0.074 0.084 0.091 7-day (0.026-0.029) (0.031-0.035) (0.038-0.043) (0.043-0.049) (0.051-0.058) (0.056-0.065) (0.063-0.072) (0.069-0.080) (0.077-0.090) (0.083-0.098) 0.022 0.026 0.032 0.036 0.042 0.046 0.051 0.056 0.062 0.067 10-day (0.021-0.023) (0.025-0.028) (0.030-0.034) (0.034-0.038) (0.039-0.044) (0.043-0.049) (0.048-0.054) (0.052-0.059) (0.057-0.066) (0.062-0.071) 0.015 0.018 0.021 0.023 0.027 0.030 0.033 0.035 0.039 0.042 20-day (0.014-0.016) (0.017-0.019) (0.020-0.022) (0.022-0.025) (0.025-0.029) (0.028-0.032) (0.030-0.034) (0.033-0.037) (0.036-0.042) (0.039-0.045) 2 30-day 0.01 013 0.014- 015 0.016-0 018 0.018-0 020 0.020-0.023 0.02 -0 025 0.024-0 027 0.025-0 029 0.028-0 031 0.029-0.033 0.010 0.012 0.014 0.015 0.017 0.019 0.020 0.021 0.023 0.024 45-day (0.010-0.011) (0.012-0.013) (0.013-0.015) (0.015-0.016) (0.016-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.022) (0.022-0.024) (0.023-0.026) 0.009 0.011 0.012 0.014 0.015 0.016 0.017 0.018 0.020 0.021 60-day (0.009-0.010) (0.010-0.011) (0.012-0.013) (0.013-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.019-0.021) (0.019-0.022) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9780&Ion=-79.250O&data=intensity&units=english&series=pds 1 /4 5/13/2021 Precipitation Frequency Data Server I016NSI61*1 ° 0.100 •L 49 CL a 0.010 PD5-based intensity -duration -frequency (IDF) curves Latitude- 34.9780 Longitude- -79.2500' 0.001 N A tb �y �{ LA O L' A O rl C'V f1�1 q rx O O O Ln O H rn �n � N rn ITLc Duration 100.000 10.000 L k 41 c 1.000 G� ° 0.100 L 49 a 0.010 0.0011 i i i i i i 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created {GMTY Thu May 13 16:47-39 2021 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 14 — 25 54 100 200 500 1000 Duration — "in — 2-day — 10-min — 3-day 15-min — "ay — 30-min — 7-day — 60-min — 10-day — 2-fir — 20-day — 3-hr — 30-day — "r — 45-day — 12-hr — 50-day - 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9780&Ion=-79.250O&data=intensity&units=english&series=pds 2/4 5/13/2021 Precipitation Frequency Data Server y A10N r h Raeford ! Urn 2mi Large scale terrain Winston-Salem Q r ■ . Durham Greensboro • Rocky iVi0Un1 Raleigh ■ NORTH CAROL INA Gree Charlotte Fayettville ■ Jacks, 1 T H C A R O L I N A Wilmington + 3 fa — 100km Omi ._ Large scale map Y}iFis#on�lem Greensboro � 4 Durham Rocky Mount v Raleigh N orttl Green Carolina art otte ' Fayetteville -- I Jacks( Wilm 100km Omi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9780&Ion=-79.250O&data=intensity&units=english&series=pds 3/4 5/13/2021 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9780&Ion=-79.250O&data=intensity&units=english&series=pds 4/4 5/24/2021 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Raeford, North Carolina, USA* Latitude: 34.98070, Longitude:-79.25240 Elevation: 274.18 ft** 'source: ESRI Maps "k0 "source: USGS "" POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parcybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 ���������� 2 5 10 25 50 100 200 500 1000 0.436 0.514 0.600 0.665 0.742 0.798 0.852 0.902 0.964 1.01 5-min (0.397-0.481) (0.469-0.568) (0.547-0.662) (0.604-0.732) (0.671-0.815) (0.720-0.875) (0.764-0.933) (0.805-0.988) (0.853-1.06) (0.890-1.11) 0.696 0.823 0.961 1.06 1.18 1.27 1.35 1.43 1.53 1.60 10-min (0.634-0.768) (0.750-0.908) (0.875-1.06) (0.965-1.17) 1 (1.07-1.30) 1 (1.15-1.39) 1 (1.21-1.48) 1 (1.28-1.57) (1.35-1.67) (1.40-1.75) 15-min 0.793-0960 0.943-1.14 1.11-21?34 1.223148 1.36-r1065 1.45-6176 1.531187 1.61-61098 1. 02?11 1. 60.20 1.19 1.43 1.73 1.95 2.22 2.42 2.62 2.81 3.06 3.24 30-min (1 .09-1.32) (1.30-1.58) (1.57-1.91) (1.77-2.14) (2.01-2.44) (2.19-2.66) (2.35-2.87) (2.51-3.08) (2.70-3.35) (2.85-3.56) 1.49 1.79 2.21 2.54 2.96 3.28 3.61 3.94 4.38 4.73 60-min (1.36-1.64) (1.64-1.98) (2.02-2.44) (2.30-2.79) (2.67-3.25) (2.96-3.60) (3.24-3.95) (3.52-4.32) (3.88-4.81) 1.73 2.10 2.64 3.06 3.62 4.06 4.52 4.98 5.61 6.11 2-hr (1 .57-1.94) (1.90-2.35) (2.39-2.95) (2.76-3.41) (3.24-4.03) (3.63-4.52) (4.01-5.02) (4.39-5.53) (4.90-6.22) (5.29-6.78 ) 1.84 2.23 2.81 3.28 3.92 4.45 5.00 5.58 6.40 7.06 3-hr (1 .66-2.06) (2.01-2.49) (2.54-3.14) (2.95-3.66) (3.51-4.37) (3.96-4.96) (4.41-5.56) (4.89-6.20) (5.54-7.11) (6.04-7.84) 6-hr (1.98 2944) (2. 0 2595) (3.03 3572) (3.53 4134) (4.2175.20) (4. 6 5590) (5.33 6365) (5.917 43) (6. 2 8855) (7.35 9146) 2.58 3.12 3.96 4.66 5.64 6.45 7.32 8.24 9.59 10.7 12-hr (2 .33-2.87) (2.82-3.48) (3.58-4.41) (4.19-5.18) (5.03-6.24) (5.71-7.13) (6.41-8.07) (7.16-9.09) (8.19-10.6) (9.01-11.8) 3.04 3.68 4.67 5.45 6.52 7.39 8.28 9.21 10.5 24-hr (2 .82-3.29) (3.42-3.98) (4.32-5.04) (5.03-5.88) (6.00-7.04) (6.78-7.97) (7.57-8.93) (8.40-9.93) (9.51-11.3) 10.4-12.4 3.53 4.26 5.36 6.23 7.43 8.38 9.37 10.4 11.8 12.9 2-day (3.29-3.80) 1 (3.97-4.59) (4.98-5.77) 1 (5.78-6.70) 1 (6.86-7.98) 1 (7.73-9.01) 1 (8.61-10.1) 1 (9.51-11.2) (10.7-12.7) 3.75 4.52 5.65 6.54 7.78 8.76 9.78 10.8 12.3 3-day (3.51-4.02) (4.22-4.84) (5.26-6.05) (6.09-7.00) (7.21-8.32) (8.10-9.38) (9.01-10.5) (9.94-11.6) ( 11.2-13.2) 12.2-14.4 3.97 4.78 5.94 6.86 8.13 9.14 10.2 11.3 12.7 13.9 4-day (3.72-4.24) (4.47-5.10) (5.55-6.33) (6.40-7.31) (7.56-8.66) (8.47-9.74) (9.41-10.9) (10.4-12.0) ( 11.7-13.6) ( 12.7-14.9) 4.61 5.51 6.77 7.77 9.14 10.2 11.4 12.5 14.1 15.3 7-day (4.31-4.92) 1 (5.16-5.89) 1 (6.33-7.24) (7.25-8.30) (8.50-9.76) 1 (9.49-10.9) 1 (10.5-12.1) 1 (11.5-13.4) (12.9-15.1) 5.28 6.30 7.62 8.65 10.0 11.1 12.2 13.4 14.9 16.1 10iiay (4 .97-5.61) 1 (5.93-6.70) 1 (7.17-8.09) 1 (8.13-9.18) 1 (9.41-10.7) 1 (10.4-11.8) 1 (11.4-13.0) 1 (12.4-14.2) (13.8-15.9) 7.11 8.42 10.0 11.3 13.0 14.3 15.6 17.0 18.8 20.2 20iiay (6.72-7.54) 1 (7.96-8.93) 1 (9.45-10.6) 1 (12.2-13.7) 1 (13.4-15.1) 1 (14.6-16.6) 1 (15.8-18.0) (17.4-20.0) (18.7-21.5) 3oiiay g 37 9334 9.87---141.0 1115- 2.9 12.8- 4.3 1415- 6.2 15 7--17.7 17.0- 9.2 18 29 0.6 19?9- 2.6 2121�24.1 11.2 13.1 15.1 16.6 18.6 20.0 21.5 22.9 24.8 26.2 45iiay (10 6-11.8) 1 (12.4-13.8) 1 (14.3-15.9) 1 (15.7-17.5) 1 (17.5-19.6) 1 (18.9-21.2) 1 (20.2-22.7) 1 (21.5-24.2) (23.2-26.3) 13.4 15.7 17.9 19.5 21.7 23.3 24.8 26.4 28.3 29.8 60iiay (12 7-14.1) (14.9-16.5) (17.0-18.8) (18.5-20.5) (20.5-22.8) (22.0-24.5) (23.5-26.1) (24.9-27.8) (26.6-29.9) (28.0-31.5) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9807&Ion=-79.2524&data=depth&units=english&series=pds 1 /4 5/24/2021 Precipitation Frequency Data Server M'.ill 25 C t 20 a-1 a Ul U 0 15 49 ,a �-j 10 a i 30 25 c s 20 Li a 15 49 a 10 CL PDS-based depth -duration -frequency (DDF) curves Latitude_ 34.9907D, Longitude--79.2524D ................ .............. • N A lb�{ Lis O Lil O O L-I rV A q O O O Ln O L� ri rn Lp rl N rn ITLG Duration .................. 0 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14, Volume 2, Version 3 Created (GMT): Mon May 24 19.29:15 2021 Back to Top Maps & aerials Small scale terrain Average recurrence interval {years} — 1 2 — 5 — 10 — 25 50 100 200 500 1000 Duration — "in — 2-day — 10-min — 3-day 15-min — "ay — 30--min — 7-day — 60-min — 10-day — 2-fir — 20-day — 3-hr — 30-day — "r — 45-day — 12-hr — 50-day - 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9807&Ion=-79.2524&data=depth&units=english&series=pds 2/4 5/24/2021 Precipitation Frequency Data Server Large scale terrain Winston-Salem Q ■ , Durham Rocky Greensboro • iVi0Un1 Raleigh NORTH CAROL INA Gree Charlotte Fayettville Jacks, 1 T H C A R O L I N A Wilmington + 3 fa — 100km Omi ._ Large scale map Y}iFis#on�lem Greensboro � 4 Durham Rocky Mount v Raleigh N orttl Green Carolina art otte ' Fayetteville -- I Jacks( Wilm 100km Omi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9807&Ion=-79.2524&data=depth&units=english&series=pds 3/4 5/24/2021 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=34.9807&Ion=-79.2524&data=depth&units=english&series=pds 4/4 Storm Analysis 100 Series Storm Sewer Summary Report Velocity Report Inlet Report Hydraulic Grade Line Computation TIMMONS GROUP RAEFORD COMMONS Raeford, NC Proiect Number: 47049 41 www.timmons.com STORM PIPE DESIGN INLETTYPE STRUCTURE A TC ILo C Ci ((ILEA QLo (T-) QCAPATM PIPELENGTH PIPESIZE MATERIAL PIPESLOPE UPPERINV LOWER INV RIM ELEV UP RIM ELEV DOWN HGLUP HGLDOWN FROM TO (AC) (MIN) (IN/HR) (CFS) (CFS) (CFS) (FT) (I N) m (FT) (FT) (FT) (FT) (FT) (FT) COMB CB 101 OUT 0.53 12.5 5.51 0.60 2.35 41.02 67.46 73 42 RCP 0.45 261.83 261.50 271.88 265.38 265.10 265.00 COMB CB 102 CB 101 0.26 11.3 5.75 0.60 1.15 31.22 63.30 240 42 RCP 0.40 262.78 261.83 274.28 271.88 265.69 265.51 COMB CB 103 CB 102 0.25 10.3 5.94 0.60 1.11 28.99 42.33 221 36 RCP 0.40 264.17 263.28 274.52 274.28 266.30 266.00 COMB CB 104 CB 103 0.35 9.7 6.08 0.60 1.55 28.79 42.01 161 36 RCP 0.40 264.81 264.17 272.38 274.52 266.78 266.53 COMB CB 105 CB 104 0.24 9.2 6.18 0.60 1.06 19.88 42.07 73 36 RCP 0.40 265.10 264.81 271.58 272.38 267.61 267.58 COMB CB 106 CB 105 0.31 8.7 6.31 0.60 1.37 18.39 26.59 119 30 RCP 0.42 266.10 265.60 271.78 271.58 268.01 267.84 COMB CB 107 CB 106 0.42 8.2 6.44 0.60 1.86 12.87 17.12 131 24 RCP 0.57 267.75 267.00 273.10 271.78 269.04 268.50 COMB CB 108 CB 107 0.56 7.2 6.69 0.60 2.48 9.84 16.80 181 24 RCP 0.55 268.75 267.75 275.04 273.10 269.87 269.04 COMB CB 109 CB 108 0.02 7.0 6.75 0.60 0.09 7.66 15.99 30 24 RCP 0.50 268.90 268.75 275.05 275.04 269.88 269.87 COMB CB 110 CB 109 0.08 6.6 6.87 0.60 0.35 7.71 14.72 59 24 RCP 0.42 269.15 268.90 275.04 275.05 270.18 269.93 COMB CB 111 CB 110 0.14 6.5 6.90 0.60 0.62 7.41 7.42 30 18 RCP 0.50 269.80 269.65 275.00 275.04 271.03 270.88 COMB CB 115 CB 111 0.01 5.5 7.22 0.60 0.04 1.82 13.22 62 15 RCP 4.19 272.67 270.05 276.74 275.00 273.21 271.64 GRATE DI 116 CB 115 0.41 5.0 7.38 0.60 1.81 1.81 6.46 40 15 RCP 1.00 273.07 272.67 276.52 276.74 273.61 273.21 COMB CB 112 CB 111 0.32 6.2 6.97 0.60 1.42 5.15 6.30 58 15 RCP 0.95 270.60 270.05 276.25 275.00 272.01 271.64 COMB CB 113 CB 112 0.12 5.7 7.14 0.60 0.53 3.90 4.27 103 15 RCP 0.44 271.05 270.60 277.31 276.25 272.66 272.29 GRATE DI 114 CB 113 0.79 5.0 7.38 0.60 3.50 3.50 7.69 121 15 RCP 1.42 272.76 271.05 279.18 277.31 273.51 272.83 COMB CB 117 CB 107 0.46 5.0 7.38 0.60 2.04 2.04 4.57 30 15 RCP 0.50 268.65 268.50 273.10 273.10 269.23 269.08 COMB CB 123 CB 102 0.65 5.0 7.38 0.60 2.88 2.88 4.57 30 15 RCP 0.50 267.75 267.60 274.28 274.28 268.47 268.32 COMB CB 118 CB 106 0.41 5.8 7.11 0.60 1.81 5.21 4.57 30 15 RCP 0.50 267.50 267.35 271.78 271.78 268.75 268.60 GRATE DI 119 CB 118 0.81 5.0 7.38 0.60 3.58 3.58 7.67 139 15 RCP 1.41 269.47 267.50 274.02 271.78 270.23 268.89 COMB CB 124 CB 101 0.55 5.9 7.07 0.60 2.43 11.97 15.99 30 24 RCP 0.50 263.60 263.45 271.88 271.88 265.59 265.51 GRATE DI 125 CB 124 0.42 5.2 7.31 0.60 1.86 9.95 32.86 135 24 RCP 2.11 266.45 263.60 271.70 271.88 267.58 265.70 GRATE D1126 D1125 1.85 5.0 7.38 0.60 8.19 8.19 9.69 80 15 RCP 2.25 269.00 267.20 272.50 271.70 270.12 268.08 COMB CB 120 CB 105 0.26 5.0 7.38 0.60 1.15 1.15 4.57 30 15 RCP 0.50 267.00 266.85 271.58 271.58 267.85 267.84 COMB CB 121 CB 104 0.56 5.7 7.14 0.60 2.48 9.34 7.17 30 18 RCP 0.47 266.45 266.31 272.38 272.38 268.05 267.81 GRATE DI 122 CB 121 1.62 5.0 7.38 0.60 7.17 7.17 10.24 171 18 RCP 0.95 268.08 266.45 274.33 272.38 269.12 268.26 COMB CB 151 #N/A 0.25 14.0 5.27 0.60 1.11 35.17 69.97 54 42 RCP 0.48 261.26 261.00 268.91 264.88 264.55 264.50 COMB CB 152A CB 151 0.38 13.9 5.29 0.60 1.68 34.51 63.63 30 42 RCP 0.40 261.38 261.26 268.91 268.91 264.68 264.66 COMB CB 153 CB 152A 0.03 13.3 5.38 0.60 0.13 15.66 63.72 60 42 RCP 0.40 261.62 261.38 269.39 268.91 265.17 265.15 COMB CB 154 CB 153 0.31 12.7 5.48 0.60 1.37 15.86 63.46 63 42 RCP 0.40 261.87 261.62 268.99 269.39 265.23 265.21 COMB CB 155 CB 154 0.54 11.4 5.72 0.60 2.39 14.11 47.18 164 36 RCP 0.50 263.19 262.37 270.68 268.99 264.39 265.29 COMB CB 156 CB 155 0.33 9.7 6.08 0.60 1.46 10.65 26.01 234 30 RCP 0.40 264.63 263.69 273.12 270.68 265.75 264.80 COMB CB 157 CB 156 0.03 8.6 6.34 0.60 0.13 9.86 25.86 141 30 RCP 0.40 265.19 264.63 274.61 273.12 266.24 265.94 COMB CB 158 CB 157 0.18 8.2 6.42 0.60 0.80 9.86 15.17 60 24 RCP 0.45 265.96 265.69 274.09 274.61 267.14 266.87 COMB CB 159 CB 158 0.07 8.1 6.46 0.60 0.31 9.23 15.45 30 24 RCP 0.47 266.10 265.96 274.10 274.09 267.60 267.57 COMB CB 160 CB 159 0.02 7.7 6.55 0.60 0.09 8.53 15.16 60 24 RCP 0.45 266.37 266.10 274.61 274.10 267.96 267.91 COMB CB 161 CB 160 0.37 7.0 6.76 0.60 1.64 8.72 14.77 131 24 RCP 0.43 266.93 266.37 273.32 274.61 268.28 268.13 COMB CB 162A CB 161 0.39 6.5 6.90 0.60 1.73 7.37 15.19 71 24 RCP 0.45 267.25 266.93 272.90 273.32 268.44 268.39 COMB CB 162B CB 162A 0.38 5.9 7.08 0.60 1.68 2.80 1.89 81 15 RCP 0.09 268.07 268.00 273.59 272.90 269.40 269.25 COMB CB 163B CB 162B 0.28 5.0 7.38 0.60 1.24 1.24 1.75 54 15 RCP 0.07 268.16 268.12 273.98 273.59 269.52 269.50 COMB CB 163A CB 162A 0.73 5.0 7.38 0.60 3.23 3.23 6.64 30 18 RCP 0.40 267.87 267.75 272.87 272.90 268.80 268.77 COMB CB 164 CB 159 0.14 5.0 7.38 0.60 0.62 0.62 13.99 69 15 RCP 4.69 270.09 266.85 274.52 274.10 270.40 267.91 COMB CB 165 CB 155 0.65 5.0 7.38 0.60 2.88 2.88 11.18 30 18 RCP 1.13 265.03 264.69 270.66 270.68 265.67 265.21 COMB CB 166 CB 154 0.40 5.0 7.38 0.60 1.77 1.77 8.83 30 18 RCP 0.71 264.08 263.87 268.92 268.99 264.58 265.29 COMB CB 152B CB 152A 0.45 5.0 7.38 0.60 1.99 1.99 9.13 5 15 RCP 2.00 263.73 263.63 268.90 268.91 265.16 265.15 GRATE DI 167 CB 152A 0.24 5.4 7.24 0.60 1.06 22.60 43.32 133 36 RCP 0.42 262.44 261.88 268.84 268.91 265.29 265.15 GRATE D1168 D1167 4.96 5.0 7.38 0.60 21.95 21.95 47.24 72 36 RCP 0.50 262.90 262.54 270.58 268.84 264.41 265.54 GUTTER SPREAD CALCULATIONS BASIN BYPASS DRAINAGE Q Q LONG. GUTTER BASIN ID Tc I C Q (INLET) Q (BYPASSED) TYPE STRUCTURE AREA (BYPASS) (CAPTURED) SLOPE SPREAD (AC) (MIN) (IN/HR) (CFS) (CFS) (CFS) (CFS) (FT/FT) (FT) CB 101 COMB NONE 0.53 5 4.00 0.60 1.27 NONE 0.99 0.28 0.01 6.59 CB 102 COMB NONE 0.26 5 4.00 0.60 0.62 NONE 0.56 0.06 0.01 4.64 CB 103 COMB NONE 0.25 5 4.00 0.60 0.60 NONE 0.55 0.05 0.01 4.54 CB 104 COMB NONE 0.35 5 4.00 0.60 0.84 NONE 0.73 0.11 0.01 5.16 CB 105 COMB NONE 0.24 5 4.00 0.60 0.58 NONE 0.58 NONE SAG 1.76 CB 106 COMB NONE 0.31 5 4.00 0.60 0.74 NONE 0.74 NONE SAG 2.00 CB 107 COMB NONE 0.42 5 4.00 0.60 1.01 NONE 0.83 0.18 0.01 5.91 CB 108 COMB NONE 0.56 5 4.00 0.60 1.34 NONE 1.03 0.31 0.01 6.75 CB 109 COMB NONE 0.02 5 4.00 0.60 0.05 NONE 0.05 NONE 0.01 1.21 CB 110 COMB NONE 0.08 5 4.00 0.60 0.19 NONE 0.19 NONE SAG 0.96 CB 111 COMB NONE 0.14 5 4.00 0.60 0.34 NONE 0.34 NONE SAG 1.32 CB 115 COMB NONE 0.01 5 4.00 0.60 0.02 NONE 0.02 NONE 0.03 0.78 CB 112 COMB NONE 0.32 5 4.00 0.60 0.77 NONE 0.67 0.10 0.01 5.17 CB 113 COMB NONE 0.12 5 4.00 0.60 0.29 NONE 0.28 NONE 0.01 2.88 CB 117 COMB NONE 0.46 5 4.00 0.60 1.10 NONE 0.89 0.22 0.01 6.17 CB 123 COMB NONE 0.65 5 4.00 0.60 1.56 NONE 1.16 0.40 0.01 7.22 CB 118 COMB NONE 0.41 5 4.00 0.60 0.98 NONE 0.98 NONE SAG 2.00 CB 124 COMB NONE 0.55 5 4.00 0.60 1.32 NONE 1.02 0.30 0.01 6.70 CB 120 COMB NONE 0.26 5 4.00 0.60 0.62 NONE 0.62 NONE SAG 1.84 CB 121 COMB NONE 0.56 5 4.00 0.60 1.34 NONE 1.05 0.29 0.01 6.36 CB 151 COMB NONE 0.25 5 4.00 0.60 0.60 NONE 0.60 NONE SAG 1.80 CB 152A COMB NONE 0.38 5 4.00 0.60 0.91 NONE 0.91 NONE SAG 2.00 CB 153 COMB NONE 0.03 5 4.00 0.60 0.07 NONE 0.07 NONE 0.01 1.40 CB 154 COMB NONE 0.31 5 4.00 0.60 0.74 NONE 0.74 NONE SAG 2.00 CB 155 COMB NONE 0.54 5 4.00 0.60 1.30 NONE 1.00 0.29 0.01 6.64 CB 156 COMB NONE 0.33 5 4.00 0.60 0.79 NONE 0.68 0.11 0.01 5.25 CB 157 COMB NONE 0.03 5 4.00 0.60 0.07 NONE 0.07 NONE 0.01 1.40 CB 158 COMB NONE 0.18 5 4.00 0.60 0.43 NONE 0.43 NONE SAG 1.51 CB 159 COMB NONE 0.07 5 4.00 0.60 0.17 NONE 0.17 NONE SAG 0.89 CB 160 COMB NONE 0.02 5 4.00 0.60 0.05 NONE 0.05 NONE 0.01 1.21 CB 161 COMB NONE 0.37 5 4.00 0.60 0.89 NONE 0.75 0.14 0.01 5.56 CB 162A COMB NONE 0.39 5 4.00 0.60 0.94 NONE 0.94 NONE SAG 2.00 CB 162B COMB NONE 0.38 5 4.00 0.60 0.91 NONE 0.74 0.17 0.01 6.63 CB 163B COMB NONE 0.28 5 4.00 0.60 0.67 NONE 0.58 0.09 0.01 5.74 CB 163A COMB NONE 0.73 5 4.00 0.60 1.75 NONE 1.75 NONE SAG 4.88 CB 164 COMB NONE 0.14 5 4.00 0.60 0.34 NONE 0.32 0.01 0.01 3.77 CB 165 COMB NONE 0.65 5 4.00 0.60 1.56 NONE 1.16 0.40 0.01 7.22 CB 166 COMB NONE 0.40 5 4.00 0.60 0.96 NONE 0.96 NONE SAG 2.00 CB 152B COMB NONE 0.45 5 4.00 0.60 1.08 NONE 0.85 0.23 0.01 7.15 PIPE VELOCITY CALCULATIONS INLET TYPE STRUCTURE ATOTAL Tc Iz % I Vz PIPE LENGTH PIPE SIZE MATERIAL SLOPE FROM TO (AC) (MIN) (IN/HR) (CFS) (FT/S) (FT) m COMB CB 101 OUT 12.40 14.7 3.93 29.27 3.10 73 42 RCP 0.45 COMB CB 102 CB 101 9.05 13.1 4.15 22.55 4.15 240 42 RCP 0.40 COMB CB 103 CB 102 8.14 11.9 4.33 21.14 5.99 221 36 RCP 0.40 COMB CB 104 CB 103 7.89 11.0 4.47 21.14 5.46 161 36 RCP 0.40 COMB CB 105 CB 104 5.36 10.5 4.56 14.67 2.65 73 36 RCP 0.40 COMB CB 106 CB 105 4.86 9.8 4.68 13.65 4.33 119 30 RCP 0.42 COMB CB 107 CB 106 3.33 9.1 4.81 9.61 5.49 131 24 RCP 0.57 COMB CB 108 CB 107 2.45 7.8 5.06 7.44 4.55 181 24 RCP 0.55 COMB CB 109 CB 108 1.89 7.6 5.12 5.80 4.20 30 24 RCP 0.50 COMB CB 110 CB 109 1.87 7.0 5.23 5.87 4.42 59 24 RCP 0.42 COMB CB 111 CB 110 1.79 6.9 5.27 5.66 4.62 30 18 RCP 0.50 COMB CB 115 CB 111 0.42 5.6 5.60 1.41 2.25 62 15 RCP 4.19 GRATE DI 116 CB 115 0.41 5.0 5.75 1.42 3.36 40 15 RCP 1.00 COMB CB 112 CB 111 1.23 6.6 5.34 3.94 3.70 58 15 RCP 0.95 COMB CB 113 CB 112 0.91 5.9 5.51 3.01 2.83 103 15 RCP 0.44 GRATE DI 114 CB 113 0.79 5.0 5.75 2.73 3.28 121 15 RCP 1.42 COMB CB 117 CB 107 0.46 5.0 5.75 1.59 3.39 30 15 RCP 0.50 COMB CB 123 CB 102 0.65 5.0 5.75 2.24 3.70 30 15 RCP 0.50 COMB CB 118 CB 106 1.22 6.0 5.48 4.01 4.20 30 15 RCP 0.50 GRATE DI 119 CB 118 0.81 5.0 5.75 2.80 3.36 139 15 RCP 1.41 COMB CB 124 CB 101 2.82 6.2 5.44 9.21 3.16 30 24 RCP 0.50 GRATE DI 125 CB 124 2.27 5.3 5.68 7.74 3.81 135 24 RCP 2.11 GRATE DI126 DI125 1.85 5.0 5.75 6.39 7.20 80 15 RCP 2.25 COMB CB 120 CB 105 0.26 5.0 5.75 0.90 2.38 30 15 RCP 0.50 COMB CB 121 CB 104 2.18 5.9 5.51 7.21 4.63 30 18 RCP 0.47 GRATE DI 122 CB 121 1.62 5.0 5.75 5.59 4.12 171 18 RCP 0.95 COMB CB 151 #N/A 11.13 16.6 3.72 24.81 2.62 54 42 RCP 0.48 COMB CB 152A CB 151 10.88 16.4 3.73 24.38 4.34 30 42 RCP 0.40 COMB CB 153 CB 152A 4.85 15.7 3.82 11.11 3.81 60 42 RCP 0.40 COMB CB 154 CB 153 4.82 14.9 3.91 11.31 4.89 63 42 RCP 0.40 COMB CB 155 CB 154 4.11 13.2 4.13 10.19 5.10 164 36 RCP 0.50 COMB CB 156 CB 155 2.92 11.0 4.47 7.82 4.63 234 30 RCP 0.40 COMB CB 157 CB 156 2.59 9.6 4.72 7.33 4.06 141 30 RCP 0.40 COMB CB 158 CB 157 2.56 9.2 4.79 7.36 4.79 60 24 RCP 0.45 COMB CB 159 CB 158 2.38 9.0 4.83 6.90 3.21 30 24 RCP 0.47 COMB CB 160 CB 159 2.17 8.5 4.92 6.41 2.80 60 24 RCP 0.45 COMB CB 161 CB 160 2.15 7.5 5.13 6.62 3.48 131 24 RCP 0.43 COMB CB 162A CB 161 1.78 6.9 5.27 5.63 3.63 71 24 RCP 0.45 COMB CB 162B CB 162A 0.66 6.1 5.45 2.16 1.76 81 15 RCP 0.09 COMB CB 163B CB 162B 0.28 5.0 5.75 0.97 0.79 54 15 RCP 0.07 COMB CB 163A CB 162A 0.73 5.0 5.75 2.52 2.86 30 18 RCP 0.40 COMB CB 164 CB 159 0.14 5.0 5.75 0.48 1.55 69 15 RCP 4.69 COMB CB 165 CB 155 0.65 5.0 5.75 2.24 4.31 30 18 RCP 1.13 COMB CB 166 CB 154 0.40 5.0 5.75 1.38 3.42 30 18 RCP 0.71 COMB CB 152B CB 152A 0.45 5.0 5.75 1.55 4.50 5 15 RCP 2.00 GRATE DI 167 CB 152A 5.20 5.5 5.62 17.53 5.77 133 36 RCP 0.42 GRATE DI168 DI167 4.96 5.0 5.75 17.12 5.92 72 36 RCP 0.50 Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 287.00 � CO C .. .. J QC J .. J O.S man J QC .. J QC J QC C , Qc C O P CO N w c 287.00 281.00 281.00 275.00 275.00 269.00 'EWA 269.00 NEON MEMENNIMMIN MEMINEEMEMIN MEMENNIMMIN MEMEMINE IMEN IMMEME 263.00 257.00 - 24" @ 0.55% '263.00 257.00 pIFWMM 0 100 200 300 400 500 600 700 800 HGL EGL Reach (ft) 900 1000 1100 1200 Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 290.00 O S It Cn Cn P- Imo- p aD CD r- C4 CD 0Cy NN oWWW to E > > C 'R c S rn J Q S J Q S 000 ' �W)Cn 9 CA CA N O W p W,C6 CC) O W,CA a; r' CO (0 r' CO CO M NCVN Oi NNN O WWW O WWW B E» m E» 0) Wcc CO Wcc J Q S ' OO O CD Cu:,)) O �66 �' CO C� 0' NNN WWW E i ;6 > (n'�—icc J Q S ' U)00 N N W Co aD 000 �' C- C+ NNN r WWW » B E rn Wcc J Q S ' CnCO M O O OD err �' C- f+ NNN N WWW ;g E» rn Wcc J O ' �O O I, ON �' C- O NN WW B E> (n WS 290.00 285.00 285.00 280.00 280.00 275.00 270.00 265.00 275.00 270.00 265.00 Lf 48U - 15" 44% a a a 0 50 HGL 100 EGL 150 200 250 Reach (ft) 300 350 400 450 Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 287.00 7 Q C Q CO Q In a;p O O 04 CMN owww N C 7 J Q C ti tDtD Co �10NN � NNN o Www va WS C`7 C 7 J O Co ti WC6 r- o NN + Ww CO WS 287.00 283.00 283.00 279.00 279.00 275.00 271.00 267.00 275.00 271.00 267.00 0 10 20 30 40 50 60 70 80 90 100 110 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 280.00 7 Q S Old Q (n O (6 Q n! N N owww C�>> 6� 7 J O c 0000 O M N N N o Www E» 0 N C 7 J O Nn M N N + Ww 280.00 277.00 277.00 274.00 271.00 274.00 271.00 268.00 265.00 268.00 265.00 5" 0 K 0 25 50 75 100 125 150 175 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 285.00 280.00 N O c OS N N CJ N p '285.00 280.00 275.00 275.00 270.00 265.00 260.00 270.00 '265.00 260.00 0 25 50 75 100 125 150 175 200 225 250 HGL EGL Reach (ft) ----------- Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 283.00 7 Q S CO MCOM Q N Q CIj N N _ C> WW m E>> u� R 5 5 4:7 N 7 J C Q ' CMV� O N to (o M N N N _ O WWW m E> in ir55 CD N C 7 J O ' M� 04� N N 4 N WW m E> 283.00 279.00 279.00 275.00 275.00 271.00 271.00 267.00 267.00 ° 263.00 263.00 a 0 25 50 75 100 125 150 175 200 225 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 287.00 281.00 275.00 269.00 263.00 257.00 0 n CO c» o N N N C� M C 7 C 7 C 5 n CO S J S J Q S J S J Q S J 0S sN*a M M C 7 � J QS 0 i i i i i i i ■�i I■ I �� I ICI I ���■ I ■����I I ��� ■III I■ I ■� I ICI I ���■ I ■����I I ��� �1�11■I■�II�II����I����®II —11 %III■I��I���I �—_®■I �il���ll III■III■■II����I�� � �' ' ' '' ii��� i�iii■lii'�iii�i�i�ii�lii"�i(ii�������� z 287.00 281.00 275.00 269.00 263.00 257.00 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 — HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 286.00 281.00 276.00 271.00 266.00 261.00 0 M v to to M co M M E E c 1:5 c 1:5 C J C J C J S J S m c» o r. sa rs v r> C S J 0 C J S J O F�_--N-�W --_■■-1-_�� NONE��11�1■I■�11�����1�� MI■ II���11�1■I■�11��■I■����■I■■I■ II���11�1■I■�11��■I■�I1�■I■■I■ II���11�1■I■�11��■I■�I1�■I■■;= II���11�1■I■�11��■I■III! i== Il���li _..I■■■11��■I■���1■■Yli■ 'Gibi•1 1 • 1 11' ■■■■■��-,-■■-� 50 HGL 286.00 281.00 276.00 271.00 266.00 15" @ 0.07% 261.00 100 150 200 250 300 350 400 450 500 550 600 650 EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 100.stm Elev. (ft) 279.00 275.00 C Q> CO CO O p N N N owww cn J Q C 7 LO OD CEO 4 Lb 11 (9 (D 0 CM N N N + Www Cn W -S E J O 00 7 1l? Cli O U'? D o N N N Ww rn it 5 279.00 275.00 271.00 271.00 267.00 267.00 263.00 263.00 259.00 259.00 0 0 25 50 75 100 125 150 175 200 225 HGL EGL Reach (ft) Storm Sewers Storm Analysis 200 Series Storm Sewer Summary Report Velocity Report Inlet Report Hydraulic Grade Line Computation TIMMONS GROUP RAEFORD COMMONS Raeford, NC Proiect Number: 47049 51 www.timmons.com STORM PIPE DESIGN INLETTYPE STRUCTURE A TC ILo C Ci ((ILEA QLo (T-) QCAPATM PIPELENGTH PIPESIZE MATERIAL PIPESLOPE UPPERINV LOWER INV RIM ELEV UP RIM ELEV DOWN HGLUP HGLDOWN FROM TO (AC) (MIN) (IN/HR) (CFS) (CFS) (CFS) (FT) (I N) m (FT) (FT) (FT) (FT) (FT) (FT) GRATE D1202 OUT 0.14 29.3 3.65 0.60 0.62 39.89 64.12 71 42 RCP 0.41 254.99 254.70 265.03 258.58 258.29 258.20 COMB CB 203 DI 202 0.95 28.9 3.68 0.60 4.20 39.86 63.85 137 42 RCP 0.40 255.54 254.99 265.28 265.03 258.66 258.49 COMB CB 204 CB 203 0.39 28.8 3.68 0.60 1.73 37.82 63.63 30 42 RCP 0.40 255.66 255.54 265.28 265.28 258.84 258.81 COMB CB 205 CB 204 0.04 13.0 5.43 0.60 0.18 44.29 63.57 170 42 RCP 0.40 256.34 255.66 266.93 265.28 259.54 259.26 COMB CB 206 CB 205 0.92 11.6 5.69 0.60 4.07 24.13 63.40 60 42 RCP 0.40 256.58 256.34 265.95 266.93 260.08 260.04 COMB CB 207 CB 206 0.26 11.4 5.73 0.60 1.15 21.15 63.63 30 42 RCP 0.40 256.70 256.58 265.90 265.95 260.20 260.19 COMB CB 208 CB 207 0.38 10.6 5.89 0.60 1.68 20.81 63.99 104 42 RCP 0.40 257.12 256.70 267.00 265.90 260.35 260.31 COMB CB 209 CB 208 0.17 9.6 6.09 0.60 0.75 20.15 42.33 169 36 RCP 0.40 258.30 257.62 268.75 267.00 260.48 260.39 COMB CB 210 CB 209 0.35 8.3 6.40 0.60 1.55 20.49 42.01 229 36 RCP 0.40 259.21 258.30 267.62 268.75 260.81 260.58 COMB CB 213 CB 210 0.15 7.8 6.52 0.60 0.66 11.74 20.42 117 24 RCP 0.81 261.65 260.70 266.83 267.62 262.88 261.79 COMB CB 214 CB 213 0.15 7.0 6.75 0.60 0.66 8.01 15.08 130 24 RCP 0.44 262.23 261.65 268.98 266.83 263.24 262.88 COMB CB 215 CB 214 0.06 6.0 7.06 0.60 0.27 2.37 11.12 126 15 RCP 2.96 266.73 263.00 271.32 268.98 267.35 263.83 COMB CB 216A CB 215 0.17 5.4 7.23 0.60 0.75 2.17 12.30 58 15 RCP 3.63 268.96 266.87 273.53 271.32 269.55 267.35 COMB CB 216B CB 216A 0.33 5.0 7.38 0.60 1.46 1.46 4.41 30 15 RCP 0.47 269.10 268.96 273.49 273.53 269.60 269.55 COMB CB 222 CB 205 0.03 12.2 5.57 0.60 0.13 21.67 74.91 119 42 RCP 0.55 257.36 256.70 266.23 266.93 258.79 260.04 COMB CB 223 CB 222 0.47 11.7 5.66 0.60 2.08 21.94 42.07 111 36 RCP 0.40 258.30 257.86 265.30 266.23 259.84 259.40 GRATE DI 233 CB 223 0.74 10.4 5.92 0.60 3.27 7.35 61.34 90 30 RCP 2.24 260.81 258.80 264.60 265.30 261.71 261.11 GRATE D1234 D1233 0.90 7.9 6.51 0.60 3.98 5.19 17.11 271 24 RCP 0.57 262.86 261.31 265.11 264.60 263.66 262.07 GRATE D1235 D1234 0.43 5.0 7.38 0.60 1.90 1.90 6.64 188 18 RCP 0.40 264.11 263.36 265.82 265.11 264.66 263.91 GRATE DI 217 CB 214 0.73 6.2 6.98 0.60 3.23 5.32 7.47 39 18 RCP 0.51 262.93 262.73 264.64 268.98 263.92 263.83 GRATE D1218 D1217 0.54 5.0 7.38 0.60 2.39 2.39 7.47 141 15 RCP 1.34 265.07 263.18 267.25 264.64 265.69 264.06 COMB CB 219 CB 213 0.87 5.0 7.38 0.60 3.85 3.85 6.64 30 18 RCP 0.40 262.36 262.24 266.83 266.83 263.18 263.06 COMB CB 224 CB 223 0.03 10.8 5.85 0.60 0.13 11.20 42.43 104 36 RCP 0.40 258.72 258.30 266.16 265.30 259.78 261.11 COMB CB 227 CB 224 0.10 9.2 6.19 0.60 0.44 7.50 31.84 110 36 RCP 0.23 259.46 259.21 267.26 266.16 260.45 260.20 COMB CB 228 CB 227 0.10 7.4 6.63 0.60 0.44 5.17 26.18 118 30 RCP 0.41 260.44 259.96 268.43 267.26 261.20 260.76 GRATE DI 229 CB 228 0.68 7.0 6.74 0.60 3.01 4.86 14.30 40 24 RCP 0.40 261.10 260.94 264.55 268.43 261.90 261.74 GRATE D1230 D1229 0.52 5.0 7.38 0.60 2.30 2.30 16.24 158 18 RCP 2.39 265.38 261.60 267.09 264.55 265.95 262.04 GRATE DI 236 CB 204 0.86 28.3 3.72 0.60 3.81 6.99 185.29 40 42 RCP 3.39 257.02 255.66 264.48 265.28 259.25 259.26 GRATE D1237 D1236 0.41 23.9 4.07 0.60 1.81 5.55 74.85 237 42 RCP 0.55 258.33 257.02 266.65 264.48 259.04 259.26 GRATE D1238 D1237 0.41 20.2 4.44 0.60 1.81 4.96 42.10 241 36 RCP 0.40 259.79 258.83 266.63 266.65 260.49 259.53 GRATE D1239 D1238 1.10 17.2 4.81 0.60 4.87 4.18 42.30 159 36 RCP 0.40 260.43 259.79 265.19 266.63 261.07 260.49 GRATE D1240 D1239 0.35 5.0 7.38 0.60 1.55 1.55 69.95 160 36 RCP 1.10 262.19 260.43 267.45 265.19 262.58 261.07 COMB CB 231 CB 227 0.62 5.0 7.38 0.60 2.74 2.74 13.13 31 15 RCP 4.13 262.51 261.21 267.35 267.26 263.17 261.60 COMB CB 211 CB 210 0.35 6.5 6.90 0.60 1.55 6.83 42.18 60 36 RCP 0.40 259.45 259.21 266.32 267.62 260.27 261.48 COMB CB 220 CB 211 0.59 5.0 7.38 0.60 2.61 2.61 8.92 188 15 RCP 1.91 264.80 261.20 270.00 266.32 265.45 261.66 COMB CB 221 CB 210 0.34 5.0 7.38 0.60 1.50 1.50 16.59 30 15 RCP 6.60 262.94 260.96 267.62 267.62 263.43 261.48 COMB CB 212 CB 211 0.71 5.0 7.38 0.60 3.14 3.14 54.44 30 36 RCP 0.67 259.65 259.45 266.30 266.32 260.20 260.27 COMB CB 232 CB 223 0.73 5.0 7.38 0.60 3.23 3.23 8.42 30 15 RCP 1.70 260.56 260.05 265.30 265.30 261.28 261.11 COMB CB 225 CB 224 0.49 6.2 6.98 0.60 2.17 4.77 42.49 59 36 RCP 0.41 258.96 258.72 265.85 266.16 259.64 259.78 COMB CB 226 CB 225 0.65 5.0 7.38 0.60 2.88 2.88 60.83 30 36 RCP 0.83 259.21 258.96 265.87 265.85 259.74 259.64 GRATE D1242 #N/A 0.89 16.4 4.90 0.60 3.94 51.06 64.06 113 42 RCP 0.41 254.64 254.18 264.95 258.06 257.93 257.68 COMB CB 242A DI 242 0.45 16.0 4.96 0.60 1.99 49.02 69.24 139 42 RCP 0.47 255.30 254.64 265.34 264.95 258.86 258.53 COMB CB 242B CB 242A 0.45 16.0 4.97 0.60 1.99 47.74 66.02 16 42 RCP 0.43 255.37 255.30 265.28 265.34 259.50 259.46 COMB CB 243 CB 242B 0.30 15.9 4.98 0.60 1.33 46.53 63.63 30 42 RCP 0.40 255.49 255.37 265.28 265.28 260.14 260.07 GRATE DI 244 CB 243 0.81 13.0 5.42 0.60 3.58 14.78 180.19 40 42 RCP 3.21 256.73 255.45 264.33 265.28 260.97 260.96 GRATE D1245 D1244 0.28 11.0 5.81 0.60 1.24 12.99 42.13 236 36 RCP 0.40 258.17 257.23 266.70 264.33 261.07 260.98 GRATE D1246 D1245 0.55 9.5 6.12 0.60 2.43 12.68 25.94 240 30 RCP 0.40 259.63 258.67 266.49 266.70 261.28 261.09 GRATE D1247 D1246 1.10 8.3 6.40 0.60 4.87 11.13 25.94 160 30 RCP 0.40 260.27 259.63 264.98 266.49 261.53 261.39 GRATE D1248 D1247 0.29 7.2 6.70 0.60 1.28 7.23 27.42 161 24 RCP 1.47 263.13 260.77 267.01 264.98 264.08 261.69 COMB CB 249 DI 248 0.34 6.6 6.85 0.60 1.50 6.21 8.15 119 18 RCP 0.60 264.35 263.63 269.53 267.01 265.33 264.61 COMB CB 250 CB 249 0.40 6.5 6.91 0.60 1.77 4.85 8.36 30 18 RCP 0.63 264.54 264.35 269.52 269.53 265.39 265.53 COMB CB 251 CB 250 0.29 6.2 6.97 0.60 1.28 3.22 4.15 36 15 RCP 0.41 264.94 264.79 269.78 269.52 265.77 265.62 GRATE DI 252 CB 251 0.48 5.0 7.38 0.60 2.12 2.12 4.06 129 15 RCP 0.40 265.45 264.94 269.89 269.78 266.23 266.09 COMB CB 253 CB 243 0.03 15.0 5.11 0.60 0.13 19.97 79.88 116 42 RCP 0.63 256.22 255.49 266.28 265.28 261.00 260.96 COMB CB 254 CB 253 0.58 14.7 5.16 0.60 2.57 20.08 42.20 62 36 RCP 0.40 256.97 256.72 265.82 266.28 261.13 261.08 COMB CB 255 CB 254 0.58 14.5 5.18 0.60 2.57 18.38 42.18 30 36 RCP 0.40 257.09 256.97 265.83 265.82 261.30 261.27 COMB CB 256 CB 255 0.20 13.1 5.42 0.60 0.89 17.33 42.76 231 36 RCP 0.41 258.04 257.09 268.14 265.83 261.61 261.45 COMB CB 257 CB 256 0.35 11.5 5.70 0.60 1.55 16.34 42.13 228 36 RCP 0.40 258.95 258.04 268.04 268.14 261.88 261.75 COMB CB 258 CB 257 0.94 10.2 5.96 0.60 4.16 14.58 42.55 172 36 RCP 0.41 259.65 258.95 266.46 268.04 262.06 262.00 COMB CB 259 CB 258 0.03 8.0 6.49 0.60 0.13 8.49 39.18 248 30 RCP 0.91 262.41 260.15 269.92 266.46 263.38 262.20 COMB CB 260 CB 259 0.03 7.4 6.63 0.60 0.13 8.56 28.78 57 30 RCP 0.49 262.69 262.41 270.61 269.92 263.66 263.38 COMB CB 261 CB 260 0.31 6.3 6.94 0.60 1.37 8.83 27.74 118 30 RCP 0.46 263.23 262.69 269.55 270.61 264.22 263.66 COMB CB 262 CB 261 0.45 6.1 7.00 0.60 1.99 7.61 14.30 30 24 RCP 0.40 263.85 263.73 269.55 269.55 264.88 264.77 COMB CB 263 CB 262 0.42 5.9 7.07 0.60 1.86 5.77 14.41 25 24 RCP 0.41 263.95 263.85 269.63 269.55 265.40 265.39 GRATE DI 264 CB 263 0.94 5.0 7.38 0.60 4.16 4.16 6.64 130 18 RCP 0.40 264.97 264.45 269.68 269.63 265.83 265.53 COMB CB 266 CB 257 0.35 5.0 7.38 0.60 1.55 1.55 4.08 30 15 RCP 0.40 262.34 262.22 268.05 268.04 262.87 262.75 COMB CB 265 CB 258 0.96 5.0 7.38 0.60 4.25 4.25 14.30 30 24 RCP 0.40 260.77 260.65 266.46 266.46 262.20 262.20 COMB CB 268 CB 243 0.01 11.5 5.70 0.60 0.04 14.41 42.14 118 36 RCP 0.40 256.46 255.99 266.31 265.28 261.01 260.96 COMB CB 269 CB 268 0.56 11.0 5.79 0.60 2.48 14.60 42.37 62 36 RCP 0.40 256.71 256.46 265.83 266.31 261.12 261.09 COMB CB 270 CB 269 0.20 8.8 6.29 0.60 0.89 11.54 42.22 232 36 RCP 0.40 257.64 256.71 268.14 265.83 261.26 261.19 COMB CB 271 CB 270 0.35 7.0 6.74 0.60 1.55 10.72 25.93 238 30 RCP 0.40 259.09 258.14 267.92 268.14 261.47 261.32 COMB CB 272 CB 271 0.97 5.4 7.25 0.60 4.29 8.53 25.95 177 30 RCP 0.40 259.80 259.09 266.29 267.92 261.64 261.59 COMB CB 273 CB 272 0.99 5.0 7.38 0.60 4.38 4.38 14.31 30 24 RCP 0.40 260.42 260.30 266.29 266.29 261.76 261.76 COMB CB 274 CB 271 0.34 5.0 7.38 0.60 1.50 1.50 6.46 30 15 RCP 1.00 260.64 260.34 267.92 267.92 261.13 261.59 COMB CB 267 CB 256 0.35 5.0 7.38 0.60 1.55 1.55 22.37 30 15 RCP 12.00 263.39 259.79 268.14 268.14 263.88 261.75 COMB CB 275 CB 270 0.21 5.0 7.38 0.60 0.93 0.93 9.21 30 15 RCP 2.03 260.00 259.39 268.14 268.14 261.33 261.32 COMB CB 276 CB 269 0.58 5.0 7.38 0.60 2.57 2.57 19.01 30 15 RCP 8.66 261.06 258.46 265.83 265.83 261.70 261.19 GRATE DI 278 #N/A 0.74 18.7 4.61 0.60 3.27 39.52 64.05 160 42 RCP 0.41 253.65 253.00 264.29 256.88 256.69 256.50 COMB CB 278A DI 278 0.37 18.1 4.68 0.60 1.64 38.04 65.17 155 42 RCP 0.42 254.30 253.65 265.46 264.29 257.30 257.14 COMB CB 278B CB 278A 0.37 18.0 4.70 0.60 0.00 37.13 64.79 34 42 RCP 0.41 254.44 254.30 265.28 265.46 257.77 257.74 COMB CB 279 CB 278B 0.34 17.9 4.71 0.60 1.50 36.20 63.63 30 42 RCP 0.40 254.56 254.44 265.28 265.28 258.17 258.13 GRATE DI 280 CB 279 0.81 12.3 5.56 0.60 3.58 16.88 147.08 40 36 RCP 4.86 257.01 255.06 264.22 265.28 258.32 258.50 GRATE DI 281 DI 280 0.29 10.4 5.92 0.60 1.28 15.08 42.06 236 36 RCP 0.40 257.95 257.01 266.58 264.22 259.19 258.32 GRATE DI 282 DI 281 0.57 9.1 6.21 0.60 2.52 14.77 25.99 249 30 RCP 0.40 259.45 258.45 266.26 266.58 260.80 259.80 GRATE DI 283 DI 282 1.14 8.4 6.37 0.60 5.04 12.96 14.26 166 24 RCP 0.40 260.61 259.95 264.76 266.26 262.11 261.45 GRATE DI 284 DI 283 0.31 7.5 6.61 0.60 1.37 8.93 27.37 166 24 RCP 1.46 263.04 260.61 266.96 264.76 264.11 262.31 COMB CB 285 DI 284 0.37 6.7 6.84 0.60 1.64 7.96 16.13 124 24 RCP 0.51 263.67 263.04 269.57 266.96 264.67 264.11 COMB CB 286 CB 285 0.53 6.5 6.91 0.60 2.35 6.50 14.30 30 24 RCP 0.40 263.79 263.67 269.57 269.57 264.74 264.67 COMB CB 287 CB 286 0.35 6.3 6.97 0.60 1.55 4.35 6.66 32 18 RCP 0.40 264.42 264.29 269.60 269.57 265.31 265.20 GRATE DI 288 CB 287 0.69 5.0 7.38 0.60 3.05 3.05 6.64 130 18 RCP 0.40 264.94 264.42 269.65 269.60 265.80 265.68 COMB CB 289 CB 279 0.03 17.1 4.81 0.60 0.13 21.36 63.54 115 42 RCP 0.40 255.02 254.56 266.28 265.28 258.52 258.50 COMB CB 298 CB 289 0.03 16.2 4.94 0.60 0.13 8.91 18.77 115 30 RCP 0.21 256.64 256.40 265.63 266.28 258.65 258.61 COMB CB 299 CB 298 0.16 15.3 5.06 0.60 0.71 9.05 24.25 109 30 RCP 0.35 257.02 256.64 263.17 265.63 258.72 258.68 GRATE DI 301 CB 299 0.38 14.9 5.12 0.60 1.68 7.77 25.27 42 30 RCP 0.38 257.18 257.02 265.31 263.17 258.95 258.95 GRATE DI 302 DI 301 0.28 12.6 5.50 0.60 1.24 7.09 25.79 220 30 RCP 0.40 258.05 257.18 267.51 265.31 259.12 258.99 GRATE DI 303 DI 302 0.14 10.8 5.84 0.60 0.62 6.55 14.23 240 24 RCP 0.40 259.50 258.55 267.68 267.51 260.45 259.50 GRATE DI 304 DI 303 0.69 9.6 6.10 0.60 3.05 6.33 14.30 160 24 RCP 0.40 260.14 259.50 266.08 267.68 261.03 260.60 GRATE DI 305 DI 304 0.12 8.0 6.49 0.60 0.53 4.05 6.61 240 18 RCP 0.40 261.59 260.64 268.59 266.08 262.44 261.49 COMB CB 306 DI 305 0.19 7.1 6.71 0.60 0.84 3.71 6.60 109 18 RCP 0.40 262.02 261.59 268.75 268.59 262.81 262.56 COMB CB 307 CB 306 0.42 6.9 6.77 0.60 1.86 2.96 4.08 30 15 RCP 0.40 262.39 262.27 268.84 268.75 263.18 263.06 GRATE DI 308 CB 307 0.31 5.0 7.38 0.60 1.37 1.37 4.42 130 15 RCP 0.47 263.00 262.39 268.89 268.84 263.49 263.28 COMB CB 290 CB 289 0.58 9.6 6.09 0.60 2.57 15.93 42.58 64 36 RCP 0.41 255.78 255.52 265.58 266.28 258.64 258.61 COMB CB 291 CB 290 0.21 8.1 6.45 0.60 0.93 12.38 36.44 234 30 RCP 0.79 258.13 256.28 267.92 265.58 259.31 258.73 COMB CB 292 CB 291 0.36 6.3 6.96 0.60 1.59 11.19 25.89 253 30 RCP 0.40 259.14 258.13 267.49 267.92 260.27 259.31 COMB CB 293A CB 292 0.39 5.4 7.25 0.60 1.73 8.96 14.74 158 24 RCP 0.42 260.31 259.64 266.06 267.49 261.39 260.90 COMB CB 294A CB 293A 0.39 5.0 7.36 0.60 1.73 4.59 23.72 30 24 RCP 1.10 260.64 260.31 266.06 266.06 261.39 262.01 COMB CB 294B CB 294A 0.65 5.0 7.38 0.60 2.88 2.88 4.09 5 15 RCP 0.40 261.64 261.62 266.08 266.06 262.41 262.39 COMB CB 293B CB 293A 0.63 5.0 7.38 0.60 2.79 2.79 4.09 5 15 RCP 0.40 261.64 261.62 266.08 266.06 262.40 262.38 COMB CB 295 CB 292 0.26 5.0 7.38 0.60 1.15 1.15 4.57 30 15 RCP 0.50 260.54 260.39 267.49 267.49 260.97 260.90 COMB CB 296 CB 291 0.31 5.0 7.38 0.60 1.37 1.37 6.46 30 15 RCP 1.00 259.68 259.38 267.92 267.92 260.14 259.77 COMB CB 300 CB 299 0.29 5.0 7.38 0.60 1.28 1.28 4.09 30 15 RCP 0.40 258.77 258.65 263.15 263.17 259.25 259.13 COMB CB 297 CB 290 0.58 5.0 7.38 0.60 2.57 2.57 25.94 30 30 RCP 0.40 256.40 256.28 265.58 265.58 258.73 258.73 GUTTER SPREAD CALCULATIONS DRAINAGE GUTTER BASIN ID BASIN TYPE TC I C Q(INLET) Q(CAPTURED) LONG.SLOPE SPREAD (MIN) (IN/HR) CFS) (CFS) (FT/FT) (FT) CB 203 COMB 0.95 5 4.00 0.60 2.28 2.28 SAG 6.71 CB 204 COMB 0.39 5 4.00 0.60 0.94 0.94 SAG 2.00 CB 205 COMB 0.04 5 4.00 0.60 0.10 0.10 0.01 1.56 CB 206 COMB 0.92 5 4.00 0.60 2.21 2.21 SAG 6.47 CB 207 COMB 0.26 5 4.00 0.60 0.62 0.62 SAG 1.84 CB 208 COMB 0.38 5 4.00 0.60 0.91 0.77 0.01 5.50 CB 209 COMB 0.17 5 4.00 0.60 0.41 0.39 0.01 3.53 CB210 COMB 0.35 5 4.00 0.60 0.84 0.72 0.01 5.41 CB 213 COMB 0.15 5 4.00 0.60 0.36 0.36 SAG 1.37 CB 214 COMB 0.15 5 4.00 0.60 0.36 0.36 0.02 2.68 CB 215 COMB 0.06 5 4.00 0.60 0.14 0.14 0.02 1.61 CB 216A COMB 0.17 5 4.00 0.60 0.41 0.40 0.02 2.83 CB 216B COMB 0.33 5 4.00 0.60 0.79 0.66 0.01 6.21 CB 222 COMB 0.03 5 4.00 0.60 0.07 0.07 0.01 1.38 CB 223 COMB 0.47 5 4.00 0.60 1.13 1.13 SAG 2.45 CB 219 COMB 0.87 5 4.00 0.60 2.09 2.09 SAG 6.07 CB 224 COMB 0.03 5 4.00 0.60 0.07 0.07 0.01 1.40 CB 227 COMB 0.10 5 4.00 0.60 0.24 0.24 0.01 2.51 CB 228 COMB 0.10 5 4.00 0.60 0.24 0.24 0.01 2.51 CB 231 COMB 0.62 5 4.00 0.60 1.49 1.12 0.01 7.07 CB211 COMB 0.35 5 4.00 0.60 0.84 0.84 SAG 2.00 CB 220 COMB 0.59 5 4.00 0.60 1.42 1.13 0.02 5.96 CB 221 COMB 0.34 5 4.00 0.60 0.82 0.70 0.01 5.33 CB 212 COMB 0.71 5 4.00 0.60 1.70 1.70 SAG 4.71 CB 232 COMB 0.73 5 4.00 0.60 1.75 1.75 SAG 4.88 CB 225 COMB 0.49 5 4.00 0.60 1.18 1.18 SAG 2.65 CB 226 COMB 0.65 5 4.00 0.60 1.56 1.56 SAG 4.17 CB 242A COMB 0.45 5 4.00 0.60 1.08 1.08 SAG 2.25 CB 242B COMB 0.45 5 4.00 0.60 1.08 0.85 0.01 7.15 CB 243 COMB 0.30 5 4.00 0.60 0.72 0.72 SAG 1.99 CB 249 COMB 0.34 5 4.00 0.60 0.82 0.82 SAG 2.00 CB 250 COMB 0.40 5 4.00 0.60 0.96 0.96 SAG 2.00 CB 251 COMB 0.29 5 4.00 0.60 0.70 0.60 0.01 5.84 CB 253 COMB 0.03 5 4.00 0.60 0.07 0.07 0.01 1.40 CB 254 COMB 0.58 5 4.00 0.60 1.39 1.39 SAG 3.52 CB 255 COMB 0.58 5 4.00 0.60 1.39 1.39 SAG 3.52 CB 256 COMB 0.20 5 4.00 0.60 0.48 0.45 0.01 4.01 CB 257 COMB 0.35 5 4.00 0.60 0.84 0.72 0.01 5.41 CB 258 COMB 0.94 5 4.00 0.60 2.26 2.26 SAG 6.63 CB 259 COMB 0.03 5 4.00 0.60 0.07 0.07 0.01 1.40 CB 260 COMB 0.03 5 4.00 0.60 0.07 0.07 0.01 1.40 CB 261 COMB 0.31 5 4.00 0.60 0.74 0.74 SAG 2.00 CB 262 COMB 0.45 5 4.00 0.60 1.08 1.08 SAG 2.25 CB 263 COMB 0.42 5 4.00 0.60 1.01 0.80 0.01 6.94 CB 266 COMB 0.35 5 4.00 0.60 0.84 0.72 0.01 5.41 CB 265 COMB 0.96 5 4.00 0.60 2.30 2.30 SAG 6.79 CB 268 COMB 0.01 5 4.00 0.60 0.02 0.02 0.01 0.93 CB 269 COMB 0.56 5 4.00 0.60 1.34 1.34 SAG 3.33 CB 270 COMB 0.20 5 4.00 0.60 0.48 0.45 0.01 4.01 CB 271 COMB 0.35 5 4.00 0.60 0.84 0.72 0.01 5.41 CB 272 COMB 0.97 5 4.00 0.60 2.33 2.33 SAG 6.87 CB 273 COMB 0.99 5 4.00 0.60 2.38 2.38 SAG 7.03 CB 274 COMB 0.34 5 4.00 0.60 0.82 0.70 0.01 5.33 CB 267 COMB 0.35 5 4.00 0.60 0.84 0.72 0.01 5.41 CB 275 COMB 0.21 5 4.00 0.60 0.50 0.47 0.01 4.12 CB 276 COMB 0.58 5 4.00 0.60 1.39 1.39 SAG 3.52 CB 278A COMB 0.37 5 4.00 0.60 0.89 0.75 0.01 5.56 CB 278B COMB 0.37 NONE NONE 0.60 NONE NONE SAG NONE CB 279 COMB 0.34 5 4.00 0.60 0.82 0.82 SAG 2.00 CB 285 COMB 0.37 5 4.00 0.60 0.89 0.89 SAG 2.00 CB 286 COMB 0.53 5 4.00 0.60 1.27 1.27 SAG 3.05 CB 287 COMB 0.35 5 4.00 0.60 0.84 0.69 0.01 6.38 CB 289 COMB 0.03 5 4.00 0.60 0.07 0.07 0.01 1.40 CB 298 COMB 0.03 5 4.00 0.60 0.07 0.07 0.02 1.21 CB 299 COMB 0.16 5 4.00 0.60 0.38 0.38 0.02 2.66 CB 306 COMB 0.19 5 4.00 0.60 0.46 0.45 0.02 2.93 CB 307 COMB 0.42 5 4.00 0.60 1.01 0.89 0.02 4.74 CB 290 COMB 0.58 5 4.00 0.60 1.39 1.39 SAG 3.52 CB 291 COMB 0.21 5 4.00 0.60 0.50 0.47 0.01 4.12 CB 292 COMB 0.36 5 4.00 0.60 0.86 0.73 0.01 5.48 CB 293A COMB 0.39 5 4.00 0.60 0.94 0.94 SAG 2.00 CB 294A COMB 0.39 5 4.00 0.60 0.94 0.94 SAG 2.00 CB294B COMB 0.65 5 4.00 0.60 1.56 1.13 0.01 8.40 CB293B COMB 0.63 5 4.00 0.60 1.51 1.10 0.01 8.29 CB 295 COMB 0.26 5 4.00 0.60 0.62 0.56 0.01 4.64 CB 296 COMB 0.31 5 4.00 0.60 0.74 0.65 0.01 5.08 CB 300 COMB 0.29 5 4.00 0.60 0.70 0.65 0.02 3.95 CB 297 COMB 0.58 5 4.00 0.60 1.39 1.39 SAG 3.52 PIPE VELOCITY CALCULATIONS INLET TYPE STRUCTURE ATOTAL Tc Iz % I Vz PIPE LENGTH PIPE SIZE MATERIAL SLOPE FROM TO (AC) (MIN) (IN/HR) (CFS) (FT/S) (FT) m GRATE D1202 OUT 18.21 36.2 2.37 25.90 2.74 71 42 RCP 0.41 COMB CB 203 DI 202 18.07 35.7 2.39 25.92 4.48 137 42 RCP 0.40 COMB CB 204 CB 203 17.12 35.6 2.40 24.61 6.01 30 42 RCP 0.40 COMB CB 205 CB 204 13.60 15.3 3.86 31.53 6.59 170 42 RCP 0.40 COMB CB 206 CB 205 7.07 13.5 4.10 17.39 3.85 60 42 RCP 0.40 COMB CB 207 CB 206 6.15 13.2 4.14 15.27 5.07 30 42 RCP 0.40 COMB CB 208 CB 207 5.89 12.2 4.28 15.14 5.27 104 42 RCP 0.40 COMB CB 209 CB 208 5.51 10.9 4.48 14.81 5.45 169 36 RCP 0.40 COMB CB 210 CB 209 5.34 9.3 4.77 15.28 5.47 229 36 RCP 0.40 COMB CB 213 CB 210 3.00 8.6 4.89 8.81 5.74 117 24 RCP 0.81 COMB CB 214 CB 213 1.98 7.6 5.11 6.07 4.11 130 24 RCP 0.44 COMB CB 215 CB 214 0.56 6.2 5.43 1.82 5.15 126 15 RCP 2.96 COMB CB 216A CB 215 0.50 5.5 5.61 1.68 4.28 58 15 RCP 3.63 COMB CB 216B CB 216A 0.33 5.0 5.75 1.14 2.73 30 15 RCP 0.47 COMB CB 222 CB 205 6.49 14.3 3.99 15.53 3.81 119 42 RCP 0.55 COMB CB 223 CB 222 6.46 13.6 4.08 15.80 5.52 111 36 RCP 0.40 GRATE DI 233 CB 223 2.07 12.0 4.32 5.36 2.80 90 30 RCP 2.24 GRATE D1234 D1233 1.33 8.7 4.88 3.89 4.22 271 24 RCP 0.57 GRATE D1235 D1234 0.43 5.0 5.75 1.48 3.03 188 18 RCP 0.40 GRATE DI 217 CB 214 1.27 6.5 5.35 4.08 4.32 39 18 RCP 0.51 GRATE D1218 D1217 0.54 5.0 5.75 1.86 3.18 141 15 RCP 1.34 COMB CB 219 CB 213 0.87 5.0 5.75 3.00 3.66 30 18 RCP 0.40 COMB CB 224 CB 223 3.19 12.4 4.25 8.14 2.97 104 36 RCP 0.40 COMB CB 227 CB 224 2.02 10.4 4.57 5.54 3.37 110 36 RCP 0.23 COMB CB 228 CB 227 1.30 8.1 5.00 3.90 3.82 118 30 RCP 0.41 GRATE DI 229 CB 228 1.20 7.6 5.11 3.68 3.82 40 24 RCP 0.40 GRATE D1230 D1229 0.52 5.0 5.75 1.80 4.75 158 18 RCP 2.39 GRATE DI 236 CB 204 3.13 34.9 2.43 4.56 2.46 40 42 RCP 3.39 GRATE DI237 D1236 2.27 29.3 2.71 3.69 3.32 237 42 RCP 0.55 GRATE D1238 D1237 1.86 24.5 3.01 3.36 3.55 241 36 RCP 0.40 GRATE D1239 D1238 1.45 20.6 3.32 2.89 2.94 159 36 RCP 0.40 GRATE D1240 D1239 0.35 5.0 5.75 1.21 2.09 160 36 RCP 1.10 COMB CB 231 CB 227 0.62 5.0 5.75 2.14 5.84 31 15 RCP 4.13 COMB CB 211 CB 210 1.65 6.9 5.27 5.22 2.56 60 36 RCP 0.40 COMB CB 220 CB 211 0.59 5.0 5.75 2.04 4.82 188 15 RCP 1.91 COMB CB 221 CB 210 0.34 5.0 5.75 1.17 5.48 30 15 RCP 6.60 COMB CB 212 CB 211 0.71 5.0 5.75 2.45 2.59 30 36 RCP 0.67 COMB CB 232 CB 223 0.73 5.0 5.75 2.52 4.22 30 15 RCP 1.70 COMB CB 225 CB 224 1.14 6.6 5.34 3.66 2.86 59 36 RCP 0.41 COMB CB 226 CB 225 0.65 5.0 5.75 2.24 2.73 30 36 RCP 0.83 GRATE D1242 #N/A 17.36 19.8 3.39 35.35 3.78 113 42 RCP 0.41 COMB CB 242A DI 242 16.47 19.2 3.45 34.04 5.17 139 42 RCP 0.47 COMB CB 242B CB 242A 16.02 19.2 3.45 33.17 6.68 16 42 RCP 0.43 COMB CB 243 CB 242B 15.57 19.0 3.46 32.35 6.61 30 42 RCP 0.40 GRATE DI 244 CB 243 4.54 15.4 3.86 10.51 2.94 40 42 RCP 3.21 GRATE D1245 D1244 3.73 12.7 4.21 9.42 4.78 236 36 RCP 0.40 GRATE D1246 D1245 3.45 10.8 4.51 9.33 4.85 240 30 RCP 0.40 GRATE D1247 D1246 2.90 9.3 4.77 8.30 4.14 160 30 RCP 0.40 GRATE D1248 D1247 1.80 7.8 5.06 5.47 5.64 161 24 RCP 1.47 COMB CB 249 DI 248 1.51 7.1 5.22 4.73 4.73 119 18 RCP 0.60 COMB CB 250 CB 249 1.17 6.9 5.27 3.70 3.98 30 18 RCP 0.63 COMB CB 251 CB 250 0.77 6.6 5.34 2.47 3.53 36 15 RCP 0.41 GRATE DI 252 CB 251 0.48 5.0 5.75 1.66 2.17 129 15 RCP 0.40 COMB CB 253 CB 243 6.52 17.9 3.57 13.98 3.32 116 42 RCP 0.63 COMB CB 254 CB 253 6.49 17.5 3.62 14.09 5.35 62 36 RCP 0.40 COMB CB 255 CB 254 5.91 17.3 3.64 12.92 4.19 30 36 RCP 0.40 COMB CB 256 CB 255 5.33 15.4 3.85 12.33 5.08 231 36 RCP 0.41 COMB CB 257 CB 256 4.78 13.4 4.11 11.78 5.01 228 36 RCP 0.40 COMB CB 258 CB 257 4.08 11.7 4.35 10.65 4.77 172 36 RCP 0.41 COMB CB 259 CB 258 2.18 8.8 4.87 6.36 5.15 248 30 RCP 0.91 COMB CB 260 CB 259 2.15 8.1 5.00 6.45 4.47 57 30 RCP 0.49 COMB CB 261 CB 260 2.12 6.7 5.31 6.75 4.59 118 30 RCP 0.46 COMB CB 262 CB 261 1.81 6.5 5.37 5.83 4.33 30 24 RCP 0.40 COMB CB 263 CB 262 1.36 6.2 5.44 4.44 2.10 25 24 RCP 0.41 GRATE DI 264 CB 263 0.94 5.0 5.75 3.25 3.57 130 18 RCP 0.40 COMB CB 266 CB 257 0.35 5.0 5.75 1.21 2.90 30 15 RCP 0.40 COMB CB 265 CB 258 0.96 5.0 5.75 3.31 3.71 30 24 RCP 0.40 COMB CB 268 CB 243 4.21 13.4 4.11 10.39 3.21 118 36 RCP 0.40 COMB CB 269 CB 268 4.20 12.8 4.20 10.58 4.95 62 36 RCP 0.40 COMB CB 270 CB 269 3.06 9.9 4.66 8.56 4.32 232 36 RCP 0.40 COMB CB 271 CB 270 2.65 7.6 5.11 8.12 4.68 238 30 RCP 0.40 COMB CB 272 CB 271 1.96 5.5 5.63 6.62 3.13 177 30 RCP 0.40 COMB CB 273 CB 272 0.99 5.0 5.75 3.42 3.19 30 24 RCP 0.40 COMB CB 274 CB 271 0.34 5.0 5.75 1.17 3.58 30 15 RCP 1.00 COMB CB 267 CB 256 0.35 5.0 5.75 1.21 6.46 30 15 RCP 12.00 COMB CB 275 CB 270 0.21 5.0 5.75 0.72 3.62 30 15 RCP 2.03 COMB CB 276 CB 269 0.58 5.0 5.75 2.00 6.89 30 15 RCP 8.66 GRATE DI278 #N/A 14.28 22.7 3.15 26.95 2.97 160 42 RCP 0.41 COMB CB 278A DI 278 13.54 22.0 3.21 26.04 4.54 155 42 RCP 0.42 COMB CB 278B CB 278A 13.17 21.8 3.22 25.44 6.13 34 42 RCP 0.41 COMB CB 279 CB 278B 12.80 21.7 3.23 24.82 6.08 30 42 RCP 0.40 GRATE DI 280 CB 279 5.06 14.4 3.98 12.09 5.37 40 36 RCP 4.86 GRATE DI281 DI280 4.25 12.0 4.31 10.99 4.82 236 36 RCP 0.40 GRATE DI282 DI281 3.96 10.3 4.59 10.92 5.06 249 30 RCP 0.40 GRATE DI283 DI282 3.39 9.4 4.75 9.65 4.88 166 24 RCP 0.40 GRATE DI284 DI283 2.25 8.2 4.98 6.73 3.83 166 24 RCP 1.46 COMB CB 285 DI 284 1.94 7.2 5.20 6.06 4.46 124 24 RCP 0.51 COMB CB 286 CB 285 1.57 6.9 5.27 4.97 3.96 30 24 RCP 0.40 COMB CB 287 CB 286 1.04 6.6 5.34 3.33 3.76 32 18 RCP 0.40 GRATE DI 288 CB 287 0.69 5.0 5.75 2.38 2.37 130 18 RCP 0.40 COMB CB 289 CB 279 7.40 20.7 3.32 14.72 4.44 115 42 RCP 0.40 COMB CB 298 CB 289 3.01 19.4 3.42 6.18 3.42 115 30 RCP 0.21 COMB CB 299 CB 298 2.98 18.3 3.53 6.32 3.66 109 30 RCP 0.35 GRATE DI 301 CB 299 2.53 17.8 3.59 5.44 1.93 42 30 RCP 0.38 GRATE DI302 DI301 2.15 14.8 3.93 5.07 2.94 220 30 RCP 0.40 GRATE DI303 DI302 1.87 12.5 4.24 4.75 4.08 240 24 RCP 0.40 GRATE DI304 DI303 1.73 10.9 4.48 4.66 3.77 160 24 RCP 0.40 GRATE DI305 DI304 1.04 8.8 4.87 3.04 3.66 240 18 RCP 0.40 COMB CB 306 DI 305 0.92 7.7 5.08 2.80 3.30 109 18 RCP 0.40 COMB CB 307 CB 306 0.73 7.5 5.14 2.25 3.41 30 15 RCP 0.40 GRATE DI 308 CB 307 0.31 5.0 5.75 1.07 2.22 130 15 RCP 0.47 COMB CB 290 CB 289 4.36 11.0 4.48 11.71 5.11 64 36 RCP 0.41 COMB CB 291 CB 290 3.20 9.0 4.82 9.26 5.58 234 30 RCP 0.79 COMB CB 292 CB 291 2.68 6.7 5.33 8.56 4.69 253 30 RCP 0.40 COMB CB 293A CB 292 2.06 5.5 5.62 6.95 4.56 158 24 RCP 0.42 COMB CB 294A CB 293A 1.04 5.0 5.74 3.58 2.69 30 24 RCP 1.10 COMB CB 294B CB 294A 0.65 5.0 5.75 2.24 3.41 5 15 RCP 0.40 COMB CB 293B CB 293A 0.63 5.0 5.75 2.17 3.38 5 15 RCP 0.40 COMB CB 295 CB 292 0.26 5.0 5.75 0.90 2.90 30 15 RCP 0.50 COMB CB 296 CB 291 0.31 5.0 5.75 1.07 3.49 30 15 RCP 1.00 COMB CB 300 CB 299 0.29 5.0 5.75 1.00 2.75 30 15 RCP 0.40 COMB CB 297 CB 290 0.58 5.0 5.75 2.00 2.64 30 30 RCP 0.40 Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 280.00 274.00 268.00 262.00 256.00 250.00 0 N C} CD N N 7 C 7 A .CD c J p S J p S J p S c p S J p S _ N CDM C C 7 C 7 J 7 ■■��!�q_ WO ■ 1 ■ MOM r� 11111 ■ 280.00 274.00 268.00 262.00 8"5boQ.10% 250.00 100 200 300 400 500 600 700 800 900 1000 1100 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 281.00 7 C 7 C 7 C 7 Q C N C 7 J Q C N C 7 J Q C CV CM C 7 C 7 J Q C J Q C N C 7 J O M281.00 275.00 275.00 269.00 269.00 263.00 257.00E-2301 251.00 263.00 257.00 9% 251.00 0 100 200 300 HGL EGL 400 500 Reach (ft) 600 700 800 900 1000 �� I����� ■I��I��J-ilk �II�■I��I�M�/®ice ��I��I1� �II�■I��I�I�� �� Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm . . . . . . . . . . . /1 /1 /1 /1 /1 /1 /1 /1 /1 Lil 1 /1 1 /1 1/ /1 �/1 /1 .1/ /1 :/1 •/1 /1/ 1/ . . . . . . . . . . �I�11�11��1���11 —Il���il•I�1�� �IM11�11��1�� �I■■Il��ll���i�� n 1 1 � , �����I�� _--�l.l [+�I✓�-----_ ��ifG! I��7Ii�►J� /.9'Y/ 7��IVi�- 11■11111■1■ �----111111■11111■-� �- ��1��nii7'���fi%Te Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 280.00 275.00 270.00 265.00 260.00 OD Q c Q c c Q c 50 HGL c Q v N W c 280.00 275.00 270.00 265.00 260.00 255.00 100 150 200 250 300 350 400 450 500 550 EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 280.00 7 O S OQ MM N 1-Q) O 00 C4 C 0CM N N owww m E>> va iY S S C. N C 7 J 0 C ' 'tMw CO O? r '7 6 M N N N o Www m E» ) it S S N C 7 J Q ' LO n, CD C N CD CD n' � CD N N + Ww m E> in WE 280.00 276.00 276.00 272.00 272.00 268.00 INI268.00 264.00 260.00 264.00 260.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 280.00 O Nor N N p~O)� p N N N CD WW v 0 N4n0 MAN Oi N N N LO O WWW LO O (DO OCO "t N CV N WW 280.00 275.00 275.00 270.00 270.00 265.00 260.00 265.00 260.00 IF 255.00 255.00 0 25 50 75 100 125 150 175 200 225 250 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 284.00 277.00 270.00 263.00 256.00 249.00 0 k ko LO � WE J O-S J O-S J O-S J O-S J O-S J O.S J O.S J O.S 0 7C O.S O.S O.S t t ■����1�■ mow,"I M ■ 1 I/% ■�i �� 1 ■ � �� ■��1 �� ■�®�I� _.alarm■� ■III �� 1 ■ � ��� ■��1 �� ■� �I��I��11111■!■�I■� _ ■MII �M 1 ■ M��� ■��� ��.�/��I��i'ii'iiVlN�i ' ■I�1 �� 1 ■ � ��� ��— ®�� %I��I�� ci�i iTiTi11f1�nTiT I�1®_: ■ II ��� LC*iralllllll �m1 F�111■����■� �� ice■ �■■ ■� �� � � �iiiill lii■'ii iii(i� � � � �■ � ���■��J■R■1�E■Cyr'zR��!%�i1E1ScT:�nTit�i�������■� ��i'iL��Li��r�e��;:�s��k:��r:Lr�cricir�w���������■� ��!1'�!!l�l1�,_,�'� .�l.�.R.11l1•E�_,*'R.S,���������■lE�LT 100 200 300 400 500 600 700 800 — HGL EGL Reach (ft) 65 f� Op ,�..� (O 0:6 1- � 0) M rn a C9) � 6. N CD CMNNN 'IT t� W t WWW � LL E>; E 284.00 277.00 270.00 MOO 0 256.00 ------ - 0.40% 249.9.00 900 1000 1100 1200 1300 1400 1500 Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 281.00 275.00 269.00 263.00 257.00 251.00 0 LO LO Co LO CO Q C J C J Q C J C J Q C J C J0 S C Co CO CO Co O O.S O.S Cis 05 0 . . . . . . . . . . . ■�������r��■�■■�� 1■ ■■ ■ 11 �■ ■ ■fir—%��� ■�■ ��■��� 1■ ■■ ■ 11 �■ ■ ��■I��■ ■�■ ■�—��� 1■ ■■ ■ 11 111111111W--�. ■ �� �ii ��■ ■�■ ■�■ ■�� 111114- ®:- � ■ �� ■ ■� ��■ ■�■ ■�■ ■�� 1■ ®Ittl� i� III �i�■ IMMEN ME MEMIN ME ■■-i / / l/ / 1 �i�i"a' ''' --■■-�ii�Yiiiiil 1 . 1-- �II�YiiiYiii"��ii■����Y�iiiii`ii"�Ilfii���� 100 200 300 400 500 600 700 800 — HGL EGL Reach (ft) Cq a) V Ch Qp CO m Os Cal 4 LO M i NNN It NN Www Ww �rcc U) Wc 81.00 275. 269.00 218"Op4 0.40% 41% Yo 257.00 251.00 900 1000 1100 1200 1300 1400 1500 Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 277.00 Co (Q M O ca n h O S N M n n C Q C C 0 277.00 272.00 272.00 267.00 262.00 257.00 252.00 267.00 262.00 257.00 f - 24" @ 0.40% 252.00 0 100 HGL 200 300 400 500 600 700 800 900 EGL Reach (ft) i i i i i i i �■ICI■��■i�� �����I■I� Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm -� mow� M IN on ■-■-1■ 11■-■-■-1■ 1■-■-■-111111' mil- ■� ■ ■ �'! ��■ �■ 1�■�i�caxma�.��yrn. � ����Nz�:yKi�izrrrn_i��r�:�a:ixci:����acirrnin - � • . Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 280.00 N 7 C 7 7 (� C J Q C C Q C O C 7 J Q S O O O C 7 C 7 C 7 J O S J Q S J O 280.00 274.00 274.00 268.00 262.00 256.00 250.00 268.00 262.00 2 Ab a - 4 1.10% 250.00 MIMMIM 0 100 HGL 200 300 400 500 600 700 800 900 EGL Reach (ft) �■ICI■��■I���I■�■I■I� �■ICI■��■I���I■�■I■I� �■ICI■��■I���I■��I�I� Storm Sewers Storm Sewer Profile Proj. file: STRM 200.stm Elev. (ft) 282.00 276.00 270.00 264.00 258.00 252.00 0 N In '7 LO O1 CO CO O1 7 C 7 C 7 C 7 C 7 Q C J C J Q C J Q C J C 0 CO rn o 0 CO N- 01 CO Cif CD != C C C C 7 C 7 J 7 J 7 J 1:5 J � J Q C J Q C Q C Q C Q C O ■ ■ ■ ■ ■ ■ ■ man -� _ram ■-� �--■ �� �-_-� ��_ � ___� � MEMO U, ■■, ■- MM 100 200 300 400 500 600 700 800 - HGL EGL Reach (ft) Ci-j C3 CYi C7 CO Ci Co Co N N W LLI j � C 282.00 276.00 270.00 264.00 )2U - 15" @ 0.47% E 0.40% A8.00 252.00 900 1000 1100 1200 1300 1400 Storm Sewers Area and Impervious Calculations TIMMONS GROUP RAEFORD COMMONS Raeford, NC Proiect Number: 47049 61 www.timmons.com TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 PRE -DEVELOPMENT PRE POI 1 Pre -development Existing Impervious Lots Description CN Acres Description Qty Inc Area Total Area Existing Impervious - Lots 98 0.00 Existing Roofs 0.00 Existing Impervious - Streets 98 0.00 0.00 Existing Impervious - Misc 98 0.00 0.00 Total to DA 98 0.00 0.00 Existing Pervious Sub Total 0 0.00 Description CN Acres Streets Wooded - Soil A 45 0.94 Total Area Wooded - Soil B 66 0.36 Existing Streets 0.00 Wooded - Soil C 77 0.00 0.00 Wooded - Soil D 83 0.00 0.00 Pasture - Soil A 68 0.00 0.00 Pasture - Soil B 79 2.28 0.00 Pasture - Soil C 86 0.00 Sub Total 0 0.00 Pasture - Soil D 89 0.00 Misc Total to DA 74 3.58 0.00 Total to DA 3.581 0.00 Basin CN 691 Sub Total 0.00 Storm Flows: Intensity 1 2 10 25 100 Q 1215.9 1417.7 1816.5 2010.9 2301.3 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 POST -DEVELOPMENT DA POST 1 Impervious to POI 1 Lots Description Acres Descriptiond Qty Inc Area Total Area Impervious Lots 98 0.33 Lot Product A 4 4100 0.33 Impervious Streets 98 0.00 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 0.33 0.00 Pervious to SCM 1A 0.00 Description Acres Sub Total 0 0.33 Lawn 50 1.39 Streets Wooded - Soil A 45 Description Length Imp/Ft Total Area Wooded - Soil B 66 50' ROW 0 0 0.00 Wooded - Soil C 77 0.00 Wooded - Soil D 83 0.00 Sub Total 0.00 Total to DA 64 1.39 Misc Amenity 0 0.00 Total to DA 1.72 Basin CN 71 Sub Total 0.00 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 PRE -DEVELOPMENT PRE POI 2 Pre -development Existing Impervious Lots Description CN Acres Description Qty Inc Area Total Area Existing Impervious - Lots 98 0.96 Existing Roofs 41745 0.96 Existing Impervious - Streets 98 0.00 0.00 Existing Impervious - Misc 98 0.00 0.00 Total to DA 98 0.96 0.00 Existing Pervious Sub Total 1 0.96 Description CN Acres Streets Wooded - Soil A 45 0.00 Total Area Wooded - Soil B 66 0.00 Existing Streets 0.00 Wooded - Soil C 77 0.00 0.00 Wooded - Soil D 83 0.00 0.00 Pasture - Soil A 68 7.87 0.00 Pasture - Soil B 79 9.62 0.00 Pasture - Soil C 86 3.03 Sub Total 0 0.00 Pasture - Soil D 89 12.78 Misc Total to DA 74 33.30 0.00 Total to DA 34.26 0.00 Basin CN 811 Sub Total 0.00 Storm Flows: Intensity 1 2 10 25 100 Q 13768.6 16054.0 20569.2 22771.1 26059.9 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 POST -DEVELOPMENT DA POST 2 Post -development Drainage Area Impervious Impervious MI MIMIts Description Acres Description Inc Area Total Area Impervious Lots 98 0.00 Lot Product A 0 0 0.00 Impervious Streets 98 0.00 Lot Product B 0 0 0.00 Impervious Misc 98 0.00 Lot Product C 0 0 0.00 Total to DA 98 0.00 0.00 Pervious to POI 2 0.00 Description Acres Sub Total 0 0.00 Lawn 60 10.96 Streets Wooded - Soil A 45 Description Length Imp/Ft Total Area Wooded - Soil B 66 50' ROW 0 0 0.00 Wooded - Soil C 77 0.00 Wooded - Soil D 83 0.00 Sub Total 0.00 Total to DA 66 10.96 Misc Amenity 0.00 Total to DA 10.96 Basin CN 661 Sub Total 0.00 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 PRE -DEVELOPMENT PRE POI 3 Pre -development Existing Impervious Lots Description CN Acres Description Qty Inc Area Total Area Existing Impervious - Lots 98 0.00 Existing Roofs 0.00 Existing Impervious - Streets 98 0.00 0.00 Existing Impervious - Misc 98 0.00 0.00 Total to DA 98 0.00 0.00 Existing Pervious Sub Total 0 0.00 Description CN Acres Streets Wooded - Soil A 45 1.26 Total Area Wooded - Soil B 66 2.42 Existing Streets 0.00 Wooded - Soil C 77 0.00 0.00 Wooded - Soil D 83 8.52 0.00 Pasture - Soil A 68 12.34 0.00 Pasture - Soil B 79 34.78 0.00 Pasture - Soil C 86 0.00 Sub Total 0 0.00 Pasture - Soil D 89 0.00 Misc Total to DA 74 59.32 0.00 Total to DA 59.32 0.00 Basin CN 761 Sub Total 0.00 Storm Flows: Intensity 1 2 10 25 100 Q 22281.2 25979.7 33286.5 36849.7 42172.0 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 POST -DEVELOPMENT DA POST 3 Post -development Drainage Area Impervious To POI 3 Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 17.37 Single Family 185 4100 17.37 Impervious Streets 98 10.55 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 27.92 0.00 Pervious to SCM 2 0.00 Description Acres Sub Total 0 17.37 Lawn 39 53.75 Streets Wooded - Soil A 45 0.00 Description Length Imp/Ft Total Area Wooded - Soil B 66 0.00 50' ROW 11491 40 10.55 Wooded - Soil C 77 0.00 Wooded - Soil D 83 0.00 0.00 Pasture - Soil A 39 1.08 Pasture - Soil B 61 7.68 Sub Total 10.55 Total to DA 62 62.50 Misc Amenity 0 0.00 Total to DA 90.42 Basin CN 73 Sub Total 0.00 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 POST -DEVELOPMENT DA POST 3A Post -development Drainage Area Impervious To SCM 1 Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 3.91 Single Family 42 4100 3.91 Impervious Streets 98 3.24 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 7.14 0.00 Pervious to SCM 2 0.00 Description Acres Sub Total 0 3.91 Lawn 39 9.58 Streets Wooded - Soil A 45 0.00 Description Length Imp/Ft Total Area Wooded - Soil B 66 0.00 50' ROW 3524 40 3.24 Wooded - Soil C 77 0.00 Wooded - Soil D 83 0.00 0.00 Pasture - Soil A 39 1.08 Pasture - Soil B 61 7.68 Sub Total 3.24 Total to DA 62 18.33 Misc Amenity 0.00 Total to DA 25.48 Basin CN 72 Sub Total 0.00 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 POST -DEVELOPMENT DA POST 313 Post -development Drainage Area Impervious To SCM 2 Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 12.66 Single Family 135 4100 12.66 Impervious Streets 98 7.11 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 19.77 0.00 Pervious Bypassing SCM 2 0.00 Description Acres Sub Total 0 12.66 Lawn 61 28.89 Streets Wooded - Soil A 45 Description Length Imp/Ft Total Area Wooded - Soil B 66 50' ROW 7746 40 7.11 Wooded - Soil C 77 0.00 Wooded - Soil D 83 0.00 Sub Total 7.11 Total to DA 66 28.89 Misc Amenity 0 0.00 Total to DA 48.66 Basin CN 79 Sub Total 0.00 TIMMONS GROUP Calculated By: WYATT NOVAK Date: 05/13/2021 0 0 POST -DEVELOPMENT DA POST 3 Bypass Post -development Drainage Area Impervious Bypass to POI 3 Lots Description Acres Description Qty Inc Area Total Area Impervious Lots 98 0.80 Single Family 9 4100 0.80 Impervious Streets 98 0.20 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 1.00 0.00 Pervious Bypassing SCM 2 0.00 Description Acres Sub Total 0 0.80 Lawn 39 15.28 Streets Wooded - Soil A 45 0.00 Description Length Imp/Ft Total Area Wooded - Soil B 66 0.00 50' ROW 221 40 0.20 Wooded - Soil C 77 0.00 0.00 Wooded - Soil D 83 0.00 0.00 Sub Total 0.20 Total to DA 62 15.28 Misc Amenity 0.00 Total to DA 16.28 Basin CN 64 Sub Total 0.00 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 PRE -DEVELOPMENT PREO Existing Impervious 7Qty Description CN Acres Inc Area Total Are Existing Impervious - Lots 98 0.00 Existing Roofs 0.00 Existing Impervious - Streets 98 0.00 0.00 Existing Impervious - Misc 98 0.00 0.00 Total to DA 98 0.00 1 0.00 Existing Pervious Sub Total 0 0.00 Description CN Acres Streets Wooded - Soil A 45 0.82 Total Area Wooded - Soil B 66 1.13 Existing Streets 0.00 Wooded - Soil C 77 0.00 0.00 Wooded - Soil D 83 0.00 0.00 Pasture - Soil A 68 1.83 0.00 Pasture - Soil B 79 2.61 0.00 Pasture - Soil C 86 0.00 Sub Total 0 0.00 Pasture - Soil D 89 0.00 Misc Total to DA 74 6.40 0.00 Total to DA 6.40 0.00 Basin CN 69 Sub Total 0.00 Storm Flows: Intensity 1 2 10 25 100 Q 2186.7 2549.6 3266.7 3616.4 4138.7 TIMMONS GROUP Project: RAEFORD COMMONS Project No.: 47049 Calculated By: WYATT NOVAK Date: 05/13/2021 POST -DEVELOPMENT "POST Impervious to POI 2 Lots Description Acres Description d Qty Inc Area Total Area Impervious Lots 98 0.28 Lot Product A 4100 0.28 Impervious Streets 98 0.00 0.00 Impervious Misc 98 0.00 0.00 Total to DA 98 0.28 0.00 Pervious to POI 2 0.00 Description Acres Sub Total 0 0.28 Lawn 39 1.11 Streets Wooded - Soil A 45 Description Length Imp/Ft Total Area Wooded - Soil B 66 50' ROW 0 0 0.00 Wooded - Soil C 77 0.00 Wooded - Soil D 83 0.00 Sub Total 0.00 Total to DA 62 1.11 Misc Amenity 0.00 Total to DA 1.40 Basin CN 691 Sub Total 0.00 Hydraflow Report TIMMONS GROUP RAEFORD COMMONS Raeford, NC Proiect Number: 47049 71 www.timmons.com Hydraflow Table of Contents 20210524 Raeford Commons 1st SIA.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, PRE POI 1............................................................................ 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, PRE POI 2............................................................................ 6 TR-55 Tc Worksheet........................................................................................................... 7 Hydrograph No. 3, SCS Runoff, PRE POI 3............................................................................ 8 TR-55 Tc Worksheet........................................................................................................... 9 Hydrograph No. 4, SCS Runoff, PRE POI 4.......................................................................... 10 TR-55 Tc Worksheet......................................................................................................... 11 Hydrograph No. 5, Combine, Total Pre.................................................................................. 12 Hydrograph No. 6, SCS Runoff, POST POI 1........................................................................ 13 TR-55 Tc Worksheet......................................................................................................... 14 Hydrograph No. 7, SCS Runoff, POST POI 2........................................................................ 15 TR-55 Tc Worksheet......................................................................................................... 16 Hydrograph No. 8, SCS Runoff, POST POI 3........................................................................ 17 TR-55 Tc Worksheet......................................................................................................... 18 Hydrograph No. 9, SCS Runoff, POST POI 4........................................................................ 19 TR-55 Tc Worksheet......................................................................................................... 20 Hydrograph No. 10, Combine, TOTAL DA POST.................................................................. 21 Hydrograph No. 11, SCS Runoff, POST POI 1 WITH DETENTION ...................................... 22 TR-55 Tc Worksheet......................................................................................................... 23 Hydrograph No. 12, SCS Runoff, POST POI 4 WITH DETENTION ...................................... 24 TR-55 Tc Worksheet......................................................................................................... 25 Hydrograph No. 13, SCS Runoff, POST 3A TO SCM 1......................................................... 26 Hydrograph No. 14, SCS Runoff, POST 3B TO SCM 2......................................................... 27 Hydrograph No. 15, SCS Runoff, POST 3C BYPASS............................................................ 28 TR-55 Tc Worksheet......................................................................................................... 29 Hydrograph No. 16, SCS Runoff, POST POI 2 WITH DETENTION ...................................... 30 TR-55 Tc Worksheet......................................................................................................... 31 Hydrograph No. 17, Reservoir, SCM 1................................................................................... 32 PondReport - SCM 1........................................................................................................ 33 Hydrograph No. 18, Reservoir, SCM 2................................................................................... 34 PondReport - SCM 2........................................................................................................ 35 Hydrograph No. 19, Combine, POST POI 3 TOTAL.............................................................. 36 10 -Year SummaryReport ....................................................................................................................... 37 HydrographReports................................................................................................................. 38 Hydrograph No. 1, SCS Runoff, PRE POI 1.......................................................................... 38 Hydrograph No. 2, SCS Runoff, PRE POI 2.......................................................................... 39 Hydrograph No. 3, SCS Runoff, PRE POI 3.......................................................................... 40 Hydrograph No. 4, SCS Runoff, PRE POI 4.......................................................................... 41 Contents continued... 20210524 Raeford Commons 1 st SIA.gpw Hydrograph No. 5, Combine, Total Pre.................................................................................. 42 Hydrograph No. 6, SCS Runoff, POST POI 1........................................................................ 43 Hydrograph No. 7, SCS Runoff, POST POI 2........................................................................ 44 Hydrograph No. 8, SCS Runoff, POST POI 3........................................................................ 45 Hydrograph No. 9, SCS Runoff, POST POI 4........................................................................ 46 Hydrograph No. 10, Combine, TOTAL DA POST.................................................................. 47 Hydrograph No. 11, SCS Runoff, POST POI 1 WITH DETENTION ...................................... 48 Hydrograph No. 12, SCS Runoff, POST POI 4 WITH DETENTION ...................................... 49 Hydrograph No. 13, SCS Runoff, POST 3A TO SCM 1......................................................... 50 Hydrograph No. 14, SCS Runoff, POST 3B TO SCM 2......................................................... 51 Hydrograph No. 15, SCS Runoff, POST 3C BYPASS............................................................ 52 Hydrograph No. 16, SCS Runoff, POST POI 2 WITH DETENTION ...................................... 53 Hydrograph No. 17, Reservoir, SCM 1................................................................................... 54 Hydrograph No. 18, Reservoir, SCM 2................................................................................... 55 Hydrograph No. 19, Combine, POST POI 3 TOTAL.............................................................. 56 25 - Year SummaryReport ....................................................................................................................... 57 HydrographReports................................................................................................................. 58 Hydrograph No. 1, SCS Runoff, PRE POI 1.......................................................................... 58 Hydrograph No. 2, SCS Runoff, PRE POI 2.......................................................................... 59 Hydrograph No. 3, SCS Runoff, PRE POI 3.......................................................................... 60 Hydrograph No. 4, SCS Runoff, PRE POI 4.......................................................................... 61 Hydrograph No. 5, Combine, Total Pre.................................................................................. 62 Hydrograph No. 6, SCS Runoff, POST POI 1........................................................................ 63 Hydrograph No. 7, SCS Runoff, POST POI 2........................................................................ 64 Hydrograph No. 8, SCS Runoff, POST POI 3........................................................................ 65 Hydrograph No. 9, SCS Runoff, POST POI 4........................................................................ 66 Hydrograph No. 10, Combine, TOTAL DA POST.................................................................. 67 Hydrograph No. 11, SCS Runoff, POST POI 1 WITH DETENTION ...................................... 68 Hydrograph No. 12, SCS Runoff, POST POI 4 WITH DETENTION ...................................... 69 Hydrograph No. 13, SCS Runoff, POST 3A TO SCM 1......................................................... 70 Hydrograph No. 14, SCS Runoff, POST 3B TO SCM 2......................................................... 71 Hydrograph No. 15, SCS Runoff, POST 3C BYPASS............................................................ 72 Hydrograph No. 16, SCS Runoff, POST POI 2 WITH DETENTION ...................................... 73 Hydrograph No. 17, Reservoir, SCM 1................................................................................... 74 Hydrograph No. 18, Reservoir, SCM 2................................................................................... 75 Hydrograph No. 19, Combine, POST POI 3 TOTAL.............................................................. 76 100 - Year SummaryReport ....................................................................................................................... 77 HydrographReports................................................................................................................. 78 Hydrograph No. 1, SCS Runoff, PRE POI 1.......................................................................... 78 Hydrograph No. 2, SCS Runoff, PRE POI 2.......................................................................... 79 Hydrograph No. 3, SCS Runoff, PRE POI 3.......................................................................... 80 Hydrograph No. 4, SCS Runoff, PRE POI 4.......................................................................... 81 Hydrograph No. 5, Combine, Total Pre.................................................................................. 82 Hydrograph No. 6, SCS Runoff, POST POI 1........................................................................ 83 Hydrograph No. 7, SCS Runoff, POST POI 2........................................................................ 84 Hydrograph No. 8, SCS Runoff, POST POI 3........................................................................ 85 Contents continued... 20210524 Raeford Commons 1 st SIA.gpw Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No Hydrograph No 9, SCS Runoff, POST POI 4........................................................................ 86 10, Combine, TOTAL DA POST.................................................................. 87 11, SCS Runoff, POST POI 1 WITH DETENTION ...................................... 88 12, SCS Runoff, POST POI 4 WITH DETENTION ...................................... 89 13, SCS Runoff, POST 3A TO SCM 1......................................................... 90 14, SCS Runoff, POST 3B TO SCM 2......................................................... 91 15, SCS Runoff, POST 3C BYPASS............................................................ 92 16, SCS Runoff, POST POI 2 WITH DETENTION ...................................... 93 17, Reservoir, SCM 1................................................................................... 94 18, Reservoir, SCM 2................................................................................... 95 19, Combine, POST POI 3 TOTAL.............................................................. 96 OFReport.................................................................................................................. 97 1 Watershed Model SchematicHydraflowHydrographs Extension forAutodesk® Civil 3D®2019 byAutodesk, Inc. v2019.2 5 TO CD 13 14 15 , 12 18 Legend Hvd. Origin Description 1 SCS Runoff PRE POI 1 2 SCS Runoff PRE POI 2 3 SCS Runoff PRE POI 3 4 SCS Runoff PRE POI 4 19 5 Combine Total Pre 6 SCS Runoff POST POI 1 7 SCS Runoff POST POI 2 8 SCS Runoff POST POI 3 9 SCS Runoff POST POI 4 10 Combine TOTAL DA POST 11 SCS Runoff POST POI 1 WITH DETENTION 12 SCS Runoff POST POI 4 WITH DETENTION 13 SCS Runoff POST 3A TO SCM 1 14 SCS Runoff POST 3B TO SCM 2 15 SCS Runoff POST 3C BYPASS 16 SCS Runoff POST POI 2 WITH DETENTION 17 Reservoir SCM 1 18 Reservoir SCM 2 19 Combine POST POI 3 TOTAL Project: 20210524 Raeford Commons 1st SIA.gpw Wednesday, 06 / 2 / 2021 Hydrograph Return Period RPF§� y ra o Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 4.057 ------- ------- ------- 13.92 18.85 ------- 27.57 PRE POI 1 2 SCS Runoff ------ 35.84 ------- ------- ------- 91.94 118.07 ------- 161.41 PRE POI 2 3 SCS Runoff ------ 53.20 ------- ------- ------- 156.41 206.55 ------- 291.02 PRE POI 3 4 SCS Runoff ------ 6.566 ------- ------- ------- 23.25 31.71 ------- 46.52 PRE POI 4 5 Combine 1, 2, 3, 89.95 ------- ------- ------- 252.33 329.64 ------- 459.10 Total Pre 4 6 SCS Runoff ------ 1.814 ------- ------- ------- 6.082 8.250 ------- 11.96 POST POI 1 7 SCS Runoff ------ 3.951 ------- ------- ------- 18.26 25.88 ------- 39.25 POST POI 2 8 SCS Runoff ------ 57.13 ------- ------- ------- 187.16 251.76 ------- 362.47 POST POI 3 9 SCS Runoff ------ 1.260 ------- ------- ------- 4.585 6.302 ------- 9.274 POST POI 4 10 Combine 6, 7, 8, 61.88 ------- ------- ------- 208.13 281.62 ------- 407.32 TOTAL DA POST 9 11 SCS Runoff ------ 2.249 ------- ------- ------- 7.163 9.627 ------- 13.87 POST POI 1 WITH DETENTION 12 SCS Runoff ------ 1.260 ------- ------- ------- 4.585 6.302 ------- 9.274 POST POI 4 WITH DETENTION 13 SCS Runoff ------ 28.89 ------- ------- ------- 93.49 125.96 ------- 181.28 POST 3A TO SCM 1 14 SCS Runoff ------ 67.19 ------- ------- ------- 180.33 233.45 ------- 321.88 POST 3B TO SCM 2 15 SCS Runoff ------ 4.334 ------- ------- ------- 22.90 33.09 ------- 51.16 POST 3C BYPASS 16 SCS Runoff ------ 3.951 ------- ------- ------- 18.26 25.88 ------- 39.25 POST POI 2 WITH DETENTION 17 Reservoir 13 0.316 ------- ------- ------- 7.610 31.98 ------- 115.67 SCM 1 18 Reservoir 14 7.521 ------- ------- ------- 19.79 53.77 ------- 137.19 SCM 2 19 Combine 15, 17, 18 11.54 ------- ------- ------- 42.68 114.19 ------- 244.46 POST POI 3 TOTAL Proj. file: 20210524 Raeford Commons 1st SIA.gpw Wednesday, 06 / 2 / 2021 Hydrograph Summary Repo rlydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 4.057 2 718 8,421 ------ ------ ------ PRE POI 1 2 SCS Runoff 35.84 2 736 165,332 ------ ------ ------ PRE POI 2 3 SCS Runoff 53.20 2 732 224,390 ------ ------ ------ PRE POI 3 4 SCS Runoff 6.566 2 720 16,059 ------ ------ ------ PRE POI 4 5 Combine 89.95 2 732 414,202 1, 2, 3, ------ ------ Total Pre 4 6 SCS Runoff 1.814 2 722 5,045 ------ ------ ------ POST POI 1 7 SCS Runoff 3.951 2 736 22,697 ------ ------ ------ POST POI 2 8 SCS Runoff 57.13 2 736 286,216 ------ ------ ------ POST POI 3 9 SCS Runoff 1.260 2 722 3,623 ------ ------ ------ POST POI 4 10 Combine 61.88 2 736 317,582 6, 7, 8, ------ ------ TOTAL DA POST 9 11 SCS Runoff 2.249 2 718 4,586 ------ ------ ------ POST POI 1 WITH DETENTION 12 SCS Runoff 1.260 2 722 3,623 ------ ------ ------ POST POI 4 WITH DETENTION 13 SCS Runoff 28.89 2 722 79,357 ------ ------ ------ POST 3A TO SCM 1 14 SCS Runoff 67.19 2 726 215,106 ------ ------ ------ POST 3B TO SCM 2 15 SCS Runoff 4.334 2 738 28,413 ------ ------ ------ POST 3C BYPASS 16 SCS Runoff 3.951 2 736 22,697 ------ ------ ------ POST POI 2 WITH DETENTION 17 Reservoir 0.316 2 1448 68,395 13 264.99 66,619 SCM 1 18 Reservoir 7.521 2 774 214,703 14 259.59 100,367 SCM 2 19 Combine 11.54 2 744 311,512 15, 17, 18 ------ ------ POST POI 3 TOTAL 20210524 Raeford Commons 1st SIA.gpw Return Period: 1 Year Wednesday, 06 / 2 / 2021 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 1 PRE POI 1 Hydrograph type = SCS Runoff Peak discharge = 4.057 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 8,421 cuft Drainage area = 3.580 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.40 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 r 11 1.00 0.00 1 0 2 4 — Hyd No. 1 PRE POI 1 Hyd. No. 1 -- 1 Year 6 8 10 12 14 Q (cfs) 5.00 4.00 3.00 2.00 1.00 ' ' 0.00 16 18 20 22 24 26 Time (hrs) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 1 PRE POI 1 Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 569.00 0.00 0.00 Watercourse slope (%) = 1.17 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.75 0.00 0.00 Travel Time (min) = 5.43 + 0.00 + 0.00 = 5.43 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 5.40 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 2 PRE POI 2 Hydrograph type = SCS Runoff Peak discharge = 35.84 cfs Storm frequency = 1 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 165,332 cuft Drainage area = 34.270 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 35.10 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 40.00 20.00 10.00 0.00 1 0 2 4 — Hyd No. 2 PRE POI 2 Hyd. No. 2 -- 1 Year 6 8 10 12 14 Q (cfs) 40.00 30.00 20.00 10.00 16 18 20 22 24 26 Time (hrs) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 2 PRE POI 2 Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 1595.00 0.00 0.00 Watercourse slope (%) = 0.22 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.76 0.00 0.00 Travel Time (min) = 35.13 + 0.00 + 0.00 = 35.13 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 35.10 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 3 PRE POI 3 Hydrograph type = SCS Runoff Peak discharge = 53.20 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 224,390 cuft Drainage area = 59.320 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 40.00 20.00 10.00 0.00 0 2 4 — Hyd No. 3 PRE POI 3 Hyd. No. 3 -- 1 Year 6 8 10 12 14 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 26 Time (hrs) TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 3 PRE POI 3 Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 850.00 0.00 0.00 Watercourse slope (%) = 1.71 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.11 0.00 0.00 Travel Time (min) = 6.71 + 0.00 + 0.00 = 6.71 Channel Flow X sectional flow area (sqft) = 159.00 0.00 0.00 Wetted perimeter (ft) = 213.00 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =1.73 0.00 0.00 Flow length (ft) ({0})2383.0 0.0 0.0 Travel Time (min) = 22.93 + 0.00 + 0.00 = 22.93 Total Travel Time, Tc.............................................................................. 29.60 min 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 4 PRE POI 4 Hydrograph type = SCS Runoff Peak discharge = 6.566 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 16,059 cuft Drainage area = 6.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.80 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 0.00 0 2 4 — Hyd No. 4 6 8 PRE POI 4 Hyd. No. 4 -- 1 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 1 • 1 1 1 1 1 1 r% 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 11 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 4 PRE POI 4 Description A B C Totals Sheet Flow Manning's n-value = 0.050 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 800.00 0.00 0.00 Watercourse slope (%) = 1.11 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.70 0.00 0.00 Travel Time (min) = 7.84 + 0.00 + 0.00 = 7.84 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 7.80 min Hydrograph Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 5 Total Pre Hydrograph type = Combine Peak discharge = 89.95 cfs Storm frequency = 1 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 414,202 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 103.570 ac Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 — Hyd No. 5 Total Pre Hyd. No. 5 -- 1 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (hrs) Hyd No. 4 Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 POST POI 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.720 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e 2 4 Hyd No. 6 POST POI 1 Hyd. No. 6 -- 1 Year Wednesday, 06 / 2 / 2021 = 1.814 cfs = 12.03 hrs = 5,045 cuft = 71 = 0 ft = 10.30 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 1 0.00 26 Time (hrs) 14 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 6 POST POI 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 2.35 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 568.00 0.00 0.00 Watercourse slope (%) = 0.32 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.92 0.00 0.00 Travel Time (min) = 10.34 + 0.00 + 0.00 = 10.34 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 10.30 min 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 7 POST POI 2 Hydrograph type = SCS Runoff Peak discharge = 3.951 cfs Storm frequency = 1 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 22,697 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 4.00 3.00 rM 1.00 0.00 1 0 2 4 — Hyd No. 7 POST POI 2 Hyd. No. 7 -- 1 Year 6 8 10 12 14 Q (cfs) 4.00 3.00 2.00 1.00 ' ' ' ' ' %, ' 0.00 16 18 20 22 24 26 Time (hrs) 16 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 7 POST POI 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 1377.00 0.00 0.00 Watercourse slope (%) = 0.20 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.73 0.00 0.00 Travel Time (min) = 31.49 + 0.00 + 0.00 = 31.49 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 18.50 0.00 0.00 Channel slope (%) = 0.90 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =2.87 0.00 0.00 Flow length (ft) ({0})304.0 0.0 0.0 Travel Time (min) = 1.76 + 0.00 + 0.00 = 1.76 Total Travel Time, Tc.............................................................................. 33.30 min 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 8 POST POI 3 Hydrograph type = SCS Runoff Peak discharge = 57.13 cfs Storm frequency = 1 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 286,216 cuft Drainage area = 90.420 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 40.00 20.00 10.00 0.00 0 2 4 — Hyd No. 8 POST POI 3 Hyd. No. 8 -- 1 Year 6 8 10 12 14 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 1 ' 0.00 16 18 20 22 24 26 Time (hrs) 18 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 8 POST POI 3 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 822.00 0.00 0.00 Watercourse slope (%) = 0.83 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.47 0.00 0.00 Travel Time (min) = 9.32 + 0.00 + 0.00 = 9.32 Channel Flow X sectional flow area (sqft) = 159.00 0.00 0.00 Wetted perimeter (ft) = 213.00 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =1.73 0.00 0.00 Flow length (ft) ({0})2562.0 0.0 0.0 Travel Time (min) = 24.65 + 0.00 + 0.00 = 24.65 Total Travel Time, Tc.............................................................................. 34.00 min Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 POST POI 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.400 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e 2 4 Hyd No. 9 POST POI 4 Hyd. No. 9 -- 1 Year Wednesday, 06 / 2 / 2021 = 1.260 cfs = 12.03 hrs = 3,623 cuft = 69 = 0 ft = 10.90 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 1 0.00 26 Time (hrs) 20 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 9 POST POI 4 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 568.00 0.00 0.00 Watercourse slope (%) = 0.29 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.87 0.00 0.00 Travel Time (min) = 10.90 + 0.00 + 0.00 = 10.90 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 10.90 min Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 10 TOTAL DA POST Hydrograph type = Combine Peak discharge = 61.88 cfs Storm frequency = 1 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 317,582 cuft Inflow hyds. = 6, 7, 8, 9 Contrib. drain. area = 104.490 ac Q (cfs) 70.00 40.00 20.00 10.00 0.00 ' -.L. 0 2 4 — Hyd No. 10 TOTAL DA POST Hyd. No. 10 -- 1 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 ' 0.00 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Hyd No. 7 Hyd No. 8 Time (hrs) Hyd No. 9 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 11 POST POI 1 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 2.249 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 4,586 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 4.30 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 1 WITH DETENTION Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 11 Time (hrs) 23 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 11 POST POI 1 WITH DETENTION Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 483.00 0.00 0.00 Watercourse slope (%) = 1.33 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.86 0.00 0.00 Travel Time (min) = 4.33 + 0.00 + 0.00 = 4.33 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 4.30 min Hydrograph Report 24 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 12 POST POI 4 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.400 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 e 2 4 Hyd No. 12 POST POI 4 WITH DETENTION Hyd. No. 12 -- 1 Year Wednesday, 06 / 2 / 2021 = 1.260 cfs = 12.03 hrs = 3,623 cuft = 69 = 0 ft = 10.90 min = Type II = 484 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 1 0.00 26 Time (hrs) 25 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 12 POST POI 4 WITH DETENTION Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 568.00 0.00 0.00 Watercourse slope (%) = 0.29 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.87 0.00 0.00 Travel Time (min) = 10.90 + 0.00 + 0.00 = 10.90 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 10.90 min 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 13 POST 3A TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 28.89 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 79,357 cuft Drainage area = 25.480 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.10 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' -.L. 0 2 4 — Hyd No. 13 POST 3A TO SCM 1 Hyd. No. 13 -- 1 Year 6 8 10 12 14 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 'V ' 0.00 16 18 20 22 24 26 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 14 POST 3B TO SCM 2 Hydrograph type = SCS Runoff Peak discharge = 67.19 cfs Storm frequency = 1 yrs Time to peak = 12.10 hrs Time interval = 2 min Hyd. volume = 215,106 cuft Drainage area = 48.660 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.10 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 70.00 40.00 20.00 10.00 0.00 ' -.L. 0 2 4 — Hyd No. 14 6 8 POST 3113 TO SCM 2 Hyd. No. 14 -- 1 Year Q (cfs) 70.00 .e e 50.00 40.00 30.00 20.00 10.00 I I I I I I I 1` 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 15 POST 3C BYPASS Hydrograph type = SCS Runoff Peak discharge = 4.334 cfs Storm frequency = 1 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 28,413 cuft Drainage area = 16.280 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 3C BYPASS Q (cfs) Hyd. No. 15 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ILI 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 15 Time (hrs) 29 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 15 POST 3C BYPASS Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 822.00 0.00 0.00 Watercourse slope (%) = 0.83 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.47 0.00 0.00 Travel Time (min) = 9.32 + 0.00 + 0.00 = 9.32 Channel Flow X sectional flow area (sqft) = 159.00 0.00 0.00 Wetted perimeter (ft) = 213.00 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.050 0.015 0.015 Velocity (ft/s) =1.73 0.00 0.00 Flow length (ft) ({0})2562.0 0.0 0.0 Travel Time (min) = 24.65 + 0.00 + 0.00 = 24.65 Total Travel Time, Tc.............................................................................. 34.00 min 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 16 POST POI 2 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 3.951 cfs Storm frequency = 1 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 22,697 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 2 WITH DETENTION Q (cfs) Hyd. No. 16 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 16 Time (hrs) 31 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Hyd. No. 16 POST POI 2 WITH DETENTION Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 0.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.68 0.00 0.00 Land slope (%) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 1377.00 0.00 0.00 Watercourse slope (%) = 0.20 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =0.73 0.00 0.00 Travel Time (min) = 31.49 + 0.00 + 0.00 = 31.49 Channel Flow X sectional flow area (sqft) = 6.75 0.00 0.00 Wetted perimeter (ft) = 18.50 0.00 0.00 Channel slope (%) = 0.90 0.00 0.00 Manning's n-value = 0.025 0.015 0.015 Velocity (ft/s) =2.87 0.00 0.00 Flow length (ft) ({0})304.0 0.0 0.0 Travel Time (min) = 1.76 + 0.00 + 0.00 = 1.76 Total Travel Time, Tc.............................................................................. 33.30 min 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 17 SCM 1 Hydrograph type = Reservoir Peak discharge = 0.316 cfs Storm frequency = 1 yrs Time to peak = 24.13 hrs Time interval = 2 min Hyd. volume = 68,395 cuft Inflow hyd. No. = 13 - POST 3A TO SCM 1 Max. Elevation = 264.99 ft Reservoir name = SCM 1 Max. Storage = 66,619 cuft Storage Indication method used. Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 10 20 — Hyd No. 17 SCM 1 Hyd. No. 17 -- 1 Year 30 40 50 60 70 80 90 Hyd No. 13 Total storage used = 66,619 cuft Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 1 0.00 100 Time (hrs) Pond Report 33 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Pond No. 1 - SCM 1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 263.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 263.00 29,005 0 0 1.00 264.00 34,078 31,504 31,504 2.00 265.00 36,697 35,376 66,880 3.00 266.00 39,370 38,022 104,902 4.00 267.00 42,095 40,721 145,623 5.00 268.00 44,874 43,473 189,096 6.00 269.00 47,706 46,278 235,374 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 30.00 3.00 8.00 0.00 Span (in) = 30.00 3.00 12.00 0.00 No. Barrels = 1 1 2 0 Invert El. (ft) = 263.00 263.00 265.50 0.00 Length (ft) = 69.00 5.00 5.00 0.00 Slope (%) = 0.58 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 6.00 41111 4.00 c m ►41I17 M 0.00 r 0.0 50.0 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 70.00 0.00 0.00 Crest El. (ft) = 266.50 267.50 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 Rect --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 269.00 w1k1*1<1I1l 267.00 266.00 264.00 263.00 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 Discharge (cfs) 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 18 SCM 2 Hydrograph type = Reservoir Peak discharge = 7.521 cfs Storm frequency = 1 yrs Time to peak = 12.90 hrs Time interval = 2 min Hyd. volume = 214,703 cuft Inflow hyd. No. = 14 - POST 3B TO SCM 2 Max. Elevation = 259.59 ft Reservoir name = SCM 2 Max. Storage = 100,367 cuft Storage Indication method used. Q (cfs) 70.00 40.00 20.00 10.00 0.00 0 4 8 — Hyd No. 18 SCM 2 Hyd. No. 18 -- 1 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 12 16 20 24 28 32 36 40 44 Time (hrs) Hyd No. 14 Total storage used = 100,367 cult Pond Report 35 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Pond No. 2 - SCM 2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 257.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 258.00 54,957 0 0 1.00 259.00 65,265 60,031 60,031 2.00 260.00 70,502 67,860 127,891 3.00 261.00 75,793 73,124 201,015 4.00 262.00 81,139 78,443 279,458 5.00 263.00 86,540 83,817 363,275 6.00 264.00 91,996 89,245 452,520 7.00 265.00 97,627 94,788 547,308 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 36.00 4.00 8.00 0.00 Span (in) = 36.00 4.00 12.00 0.00 No. Barrels = 1 1 3 0 Invert El. (ft) = 258.00 258.00 258.00 0.00 Length (ft) = 93.00 5.00 5.00 0.00 Slope (%) = 0.54 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a Yes Yes No Stage (ft) 8.00 . M 4.00 RIM 40.0 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 20.00 60.00 0.00 0.00 Crest El. (ft) = 262.00 263.50 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = 1 Rect --- --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Wet area) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 266.00 264.00 262.00 260.00 1 1 258.00 80.0 120.0 160.0 200.0 240.0 280.0 320.0 360.0 400.0 440.0 480.0 Discharge (cfs) Hydrograph Report 36 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 19 POST POI 3 TOTAL Hydrograph type = Combine Peak discharge = 11.54 cfs Storm frequency = 1 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 311,512 cuft Inflow hyds. = 15, 17, 18 Contrib. drain. area = 16.280 ac Q (cfs) 12.00 10.00 m am 4.00 r M e 10 20 Hyd No. 19 POST POI 3 TOTAL Hyd. No. 19 -- 1 Year 30 40 Hyd No. 15 50 60 Hyd No. 17 70 80 90 Hyd No. 18 Q (cfs) 12.00 10.00 4.00 2.00 1 0.00 100 Time (hrs) 37 Hydrograph Summary Repo rlydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.92 2 718 27,905 ------ ------ ------ PRE POI 1 2 SCS Runoff 91.94 2 734 416,455 ------ ------ ------ PRE POI 2 3 SCS Runoff 156.41 2 730 626,780 ------ ------ ------ PRE POI 3 4 SCS Runoff 23.25 2 720 53,213 ------ ------ ------ PRE POI 4 5 Combine 252.33 2 732 1,124,353 1, 2, 3, ------ ------ Total Pre 4 6 SCS Runoff 6.082 2 720 15,854 ------ ------ ------ POST POI 1 7 SCS Runoff 18.26 2 734 82,136 ------ ------ ------ POST POI 2 8 SCS Runoff 187.16 2 736 856,171 ------ ------ ------ POST POI 3 9 SCS Runoff 4.585 2 722 12,004 ------ ------ ------ POST POI 4 10 Combine 208.13 2 734 966,165 6, 7, 8, ------ ------ TOTAL DA POST 9 11 SCS Runoff 7.163 2 718 14,413 ------ ------ ------ POST POI 1 WITH DETENTION 12 SCS Runoff 4.585 2 722 12,004 ------ ------ ------ POST POI 4 WITH DETENTION 13 SCS Runoff 93.49 2 720 243,213 ------ ------ ------ POST 3A TO SCM 1 14 SCS Runoff 180.33 2 724 563,956 ------ ------ ------ POST 3B TO SCM 2 15 SCS Runoff 22.90 2 736 109,836 ------ ------ ------ POST 3C BYPASS 16 SCS Runoff 18.26 2 734 82,136 ------ ------ ------ POST POI 2 WITH DETENTION 17 Reservoir 7.610 2 774 221,901 13 266.60 129,204 SCM 1 18 Reservoir 19.79 2 766 563,485 14 262.17 293,925 SCM 2 19 Combine 42.68 2 738 895,224 15, 17, 18 ------ ------ POST POI 3 TOTAL 20210524 Raeford Commons 1st SIA.gpw Return Period: 10 Year Wednesday, 06 / 2 / 2021 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 1 PRE POI 1 Hydrograph type = SCS Runoff Peak discharge = 13.92 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 27,905 cuft Drainage area = 3.580 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.40 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 14.00 12.00 10.00 am 4.00 PRE POI 1 Hyd. No. 1 -- 10 Year Q (cfs) 14.00 12.00 10.00 M 4.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 2 PRE POI 2 Hydrograph type = SCS Runoff Peak discharge = 91.94 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 416,455 cuft Drainage area = 34.270 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 35.10 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE POI 2 Hyd. No. 2 -- 10 Year 0 2 4 — Hyd No. 2 Q (cfs) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 3 PRE POI 3 Hydrograph type = SCS Runoff Peak discharge = 156.41 cfs Storm frequency = 10 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 626,780 cuft Drainage area = 59.320 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 PRE POI 3 Hyd. No. 3 -- 10 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 ' 1 1 1 1 ' ' ' ' ' ' ' �% ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 Time (hrs) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 4 PRE POI 4 Hydrograph type = SCS Runoff Peak discharge = 23.25 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 53,213 cuft Drainage area = 6.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.80 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 24.00 20.00 16.00 12.00 :1M 4.00 0.00 1 0 2 4 — Hyd No. 4 PRE POI 4 Hyd. No. 4 -- 10 Year 6 8 10 12 14 Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 ' ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 42 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 5 Total Pre Hydrograph type = Combine Peak discharge = 252.33 cfs Storm frequency = 10 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 1,124,353 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 103.570 ac Total Pre ���� "22— 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 6 POST POI 1 Hydrograph type = SCS Runoff Peak discharge = 6.082 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 15,854 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.30 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 0.00 0 2 4 — Hyd No. 6 6 8 POST POI 1 Hyd. No. 6 -- 10 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 - ' ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 7 POST POI 2 Hydrograph type = SCS Runoff Peak discharge = 18.26 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 82,136 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 •M 3.00 0.00 1 0 2 4 — Hyd No. 7 6 8 POST POI 2 Hyd. No. 7 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 10- 1 1 1 1 1 1 I7� i 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 8 POST POI 3 Hydrograph type = SCS Runoff Peak discharge = 187.16 cfs Storm frequency = 10 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 856,171 cuft Drainage area = 90.420 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 210.00 180.00 150.00 120.00 0.00 0 2 4 — Hyd No. 8 6 8 POST POI 3 Hyd. No. 8 -- 10 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 .0— 1 1 1 1 1 1 I�% i 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 9 POST POI 4 Hydrograph type = SCS Runoff Peak discharge = 4.585 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 12,004 cuft Drainage area = 1.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 r 11 1.00 0.00 1 0 2 4 — Hyd No. 9 POST POI 4 Hyd. No. 9 -- 10 Year 6 8 10 12 14 Q (cfs) 5.00 4.00 3.00 2.00 1.00 ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 47 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 10 TOTAL DA POST Hydrograph type = Combine Peak discharge = 208.13 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 966,165 cuft Inflow hyds. = 6, 7, 8, 9 Contrib. drain. area = 104.490 ac Q (cfs) 210.00 180.00 150.00 120.00 0.00 ' -.L. 0 2 4 — Hyd No. 10 TOTAL DA POST Hyd. No. 10 -- 10 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Hyd No. 7 Hyd No. 8 Time (hrs) Hyd No. 9 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 11 POST POI 1 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 7.163 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 14,413 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 4.30 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 8.00 .M 4.00 rM 0.00 1 0 2 4 — Hyd No. 11 POST POI 1 WITH DETENTION Hyd. No. 11 -- 10 Year 6 8 10 12 14 Q (cfs) 8.00 M 4.00 2.00 0.00 16 18 20 22 24 26 Time (hrs) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 12 POST POI 4 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 4.585 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 12,004 cuft Drainage area = 1.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 4 WITH DETENTION Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 12 Time (hrs) 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 13 POST 3A TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 93.49 cfs Storm frequency = 10 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 243,213 cuft Drainage area = 25.480 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.10 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 — Hyd No. 13 6 8 10 12 14 POST 3A TO SCM 1 Hyd. No. 13 -- 10 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 16 18 20 22 24 26 Time (hrs) 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 14 POST 3B TO SCM 2 Hydrograph type = SCS Runoff Peak discharge = 180.33 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 563,956 cuft Drainage area = 48.660 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.10 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 3113 TO SCM 2 Q (cfs) Hyd. No. 14 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 14 Time (hrs) 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 15 POST 3C BYPASS Hydrograph type = SCS Runoff Peak discharge = 22.90 cfs Storm frequency = 10 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 109,836 cuft Drainage area = 16.280 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 3C BYPASS Q (cfs) Hyd. No. 15 -- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 15 Time (hrs) 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 16 POST POI 2 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 18.26 cfs Storm frequency = 10 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 82,136 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 2 WITH DETENTION Q (cfs) Hyd. No. 16 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 16 Time (hrs) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 17 SCM 1 Hydrograph type = Reservoir Peak discharge = 7.610 cfs Storm frequency = 10 yrs Time to peak = 12.90 hrs Time interval = 2 min Hyd. volume = 221,901 cuft Inflow hyd. No. = 13 - POST 3A TO SCM 1 Max. Elevation = 266.60 ft Reservoir name = SCM 1 Max. Storage = 129,204 cuft Storage Indication method used. Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 it 11 20.00 Nee 1 10 20 30 40 — Hyd No. 13 50 60 70 80 90 Total storage used = 129,204 cuft 100 Time (hrs) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 18 SCM 2 Hydrograph type = Reservoir Peak discharge = 19.79 cfs Storm frequency = 10 yrs Time to peak = 12.77 hrs Time interval = 2 min Hyd. volume = 563,485 cuft Inflow hyd. No. = 14 - POST 3B TO SCM 2 Max. Elevation = 262.17 ft Reservoir name = SCM 2 Max. Storage = 293,925 cuft Storage Indication method used. SCM 2 Q (cfs) Hyd. No. 18 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 EL ff Aff 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time (hrs) — Hyd No. 18 Hyd No. 14 Total storage used = 293,925 cult Hydrograph Report 56 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 19 POST POI 3 TOTAL Hydrograph type = Combine Peak discharge = 42.68 cfs Storm frequency = 10 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 895,224 cuft Inflow hyds. = 15, 17, 18 Contrib. drain. area = 16.280 ac Q (cfs) 50.00 40.00 20.00 10.00 POST POI 3 TOTAL Hyd. No. 19 -- 10 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 Time (hrs) — Hyd No. 19 Hyd No. 15 Hyd No. 17 Hyd No. 18 57 Hydrograph Summary Repo rlydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 18.85 2 716 38,065 ------ ------ ------ PRE POI 1 2 SCS Runoff 118.07 2 734 536,280 ------ ------ ------ PRE POI 2 3 SCS Runoff 206.55 2 730 825,342 ------ ------ ------ PRE POI 3 4 SCS Runoff 31.71 2 718 72,586 ------ ------ ------ PRE POI 4 5 Combine 329.64 2 732 1,472,273 1, 2, 3, ------ ------ Total Pre 4 6 SCS Runoff 8.250 2 720 21,397 ------ ------ ------ POST POI 1 7 SCS Runoff 25.88 2 734 113,978 ------ ------ ------ POST POI 2 8 SCS Runoff 251.76 2 734 1,143,790 ------ ------ ------ POST POI 3 9 SCS Runoff 6.302 2 720 16,374 ------ ------ ------ POST POI 4 10 Combine 281.62 2 734 1,295,539 6, 7, 8, ------ ------ TOTAL DA POST 9 11 SCS Runoff 9.627 2 716 19,451 ------ ------ ------ POST POI 1 WITH DETENTION 12 SCS Runoff 6.302 2 720 16,374 ------ ------ ------ POST POI 4 WITH DETENTION 13 SCS Runoff 125.96 2 720 326,553 ------ ------ ------ POST 3A TO SCM 1 14 SCS Runoff 233.45 2 724 732,570 ------ ------ ------ POST 3B TO SCM 2 15 SCS Runoff 33.09 2 736 154,312 ------ ------ ------ POST 3C BYPASS 16 SCS Runoff 25.88 2 734 113,978 ------ ------ ------ POST POI 2 WITH DETENTION 17 Reservoir 31.98 2 734 304,992 13 267.15 151,817 SCM 1 18 Reservoir 53.77 2 744 732,082 14 262.89 354,034 SCM 2 19 Combine 114.19 2 738 1,191,388 15, 17, 18 ------ ------ POST POI 3 TOTAL 20210524 Raeford Commons 1st SIA.gpw Return Period: 25 Year Wednesday, 06 / 2 / 2021 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 1 PRE POI 1 Hydrograph type = SCS Runoff Peak discharge = 18.85 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 38,065 cuft Drainage area = 3.580 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.40 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 •M 3.00 0.00 1 0 2 4 — Hyd No. 1 6 8 PRE POI 1 Hyd. No. 1 -- 25 Year Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 - ' ' ' I I 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 2 PRE POI 2 Hydrograph type = SCS Runoff Peak discharge = 118.07 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 536,280 cuft Drainage area = 34.270 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 35.10 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 0 2 4 — Hyd No. 2 PRE POI 2 Hyd. No. 2 -- 25 Year 6 8 10 12 14 Q (cfs) 120.00 100.00 40.00 20.00 ' — ' 0.00 16 18 20 22 24 26 Time (hrs) 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 3 PRE POI 3 Hydrograph type = SCS Runoff Peak discharge = 206.55 cfs Storm frequency = 25 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 825,342 cuft Drainage area = 59.320 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 210.00 180.00 150.00 120.00 0.00 0 2 4 — Hyd No. 3 6 8 PRE POI 3 Hyd. No. 3 -- 25 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 —r I I I I I I :N% i 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 4 PRE POI 4 Hydrograph type = SCS Runoff Peak discharge = 31.71 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 72,586 cuft Drainage area = 6.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.80 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 0.00 0 2 4 — Hyd No. 4 6 8 PRE POI 4 Hyd. No. 4 -- 25 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 y' ' ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 62 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 5 Total Pre Hydrograph type = Combine Peak discharge = 329.64 cfs Storm frequency = 25 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 1,472,273 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 103.570 ac Total Pre ������ 1IA I������� 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 6 POST POI 1 Hydrograph type = SCS Runoff Peak discharge = 8.250 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 21,397 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.30 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 1 Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Time (hrs) 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 7 POST POI 2 Hydrograph type = SCS Runoff Peak discharge = 25.88 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 113,978 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 0.00 1 0 2 4 — Hyd No. 7 6 8 POST POI 2 Hyd. No. 7 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 JJ I I I I I I I t i 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 8 POST POI 3 Hydrograph type = SCS Runoff Peak discharge = 251.76 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 1,143,790 cuft Drainage area = 90.420 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 0 2 4 — Hyd No. 8 6 8 POST POI 3 Hyd. No. 8 -- 25 Year Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 -r- I I I I I 1 1_ i 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 66 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 9 POST POI 4 Hydrograph type = SCS Runoff Peak discharge = 6.302 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 16,374 cuft Drainage area = 1.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 0.00 0 2 4 — Hyd No. 9 6 8 POST POI 4 Hyd. No. 9 -- 25 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 67 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 10 TOTAL DA POST Hydrograph type = Combine Peak discharge = 281.62 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 1,295,539 cuft Inflow hyds. = 6, 7, 8, 9 Contrib. drain. area = 104.490 ac TOTAL DA POST 68 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 11 POST POI 1 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 9.627 cfs Storm frequency = 25 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 19,451 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 4.30 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 1 WITH DETENTION Q (cfs) Hyd. No. 11 -- 25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 11 Time (hrs) 69 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 12 POST POI 4 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 6.302 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 16,374 cuft Drainage area = 1.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 5.00 3.00 1.00 0.00 ' -.L. 0 2 4 — Hyd No. 12 6 8 POST POI 4 WITH DETENTION Hyd. No. 12 -- 25 Year Q (cfs) 7.00 . We 5.00 4.00 3.00 2.00 1.00 10 12 14 16 18 20 22 24 26 Time (hrs) 70 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 13 POST 3A TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 125.96 cfs Storm frequency = 25 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 326,553 cuft Drainage area = 25.480 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.10 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' -.L. 0 2 4 — Hyd No. 13 6 8 POST 3A TO SCM 1 Hyd. No. 13 -- 25 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 ' ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 14 POST 3B TO SCM 2 Hydrograph type = SCS Runoff Peak discharge = 233.45 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 732,570 cuft Drainage area = 48.660 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.10 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 240.00 210.00 180.00 150.00 120.00 Q (cfs) 240.00 210.00 180.00 150.00 120.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 14 Time (hrs) 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 15 POST 3C BYPASS Hydrograph type = SCS Runoff Peak discharge = 33.09 cfs Storm frequency = 25 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 154,312 cuft Drainage area = 16.280 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 35.00 25.00 20.00 15.00 10.00 5.00 0.00 ' -.L. 0 2 4 — Hyd No. 15 6 8 POST 3C BYPASS Hyd. No. 15 -- 25 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 1J 1 1 1 1 1 1 1_ 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 16 POST POI 2 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 25.88 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 113,978 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 6.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 2 WITH DETENTION Q (cfs) Hyd. No. 16 -- 25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 16 Time (hrs) 74 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 17 SCM 1 Hydrograph type = Reservoir Peak discharge = 31.98 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 304,992 cuft Inflow hyd. No. = 13 - POST 3A TO SCM 1 Max. Elevation = 267.15 ft Reservoir name = SCM 1 Max. Storage = 151,817 cuft Storage Indication method used. Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0 4 8 — Hyd No. 17 SCM 1 Hyd. No. 17 -- 25 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 A ' 0.00 12 16 20 24 28 32 36 40 44 Time (hrs) — Hyd No. 13 Total storage used = 151,817 cult 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 18 SCM 2 Hydrograph type = Reservoir Peak discharge = 53.77 cfs Storm frequency = 25 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 732,082 cuft Inflow hyd. No. = 14 - POST 3B TO SCM 2 Max. Elevation = 262.89 ft Reservoir name = SCM 2 Max. Storage = 354,034 cuft Storage Indication method used. Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0 00 0 4 — Hyd No. 18 SCM 2 Hyd. No. 18 -- 25 Year Q (cfs) Hydrograph Report 76 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 19 POST POI 3 TOTAL Hydrograph type = Combine Peak discharge = 114.19 cfs Storm frequency = 25 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 1,191,388 cuft Inflow hyds. = 15, 17, 18 Contrib. drain. area = 16.280 ac POST POI 3 TOTAL Q (cfs) Hyd. No. 19 -- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 gas 0.00 0.00 0 4 8 12 16 20 24 28 32 Time (hrs) — Hyd No. 19 Hyd No. 15 Hyd No. 17 Hyd No. 18 77 Hydrograph Summary Repo rlydraflowHydrographsExtension for Autodesk® Civil 3D®2019byAutodesk,Inc. v2019.2 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 27.57 2 716 55,904 ------ ------ ------ PRE POI 1 2 SCS Runoff 161.41 2 734 738,770 ------ ------ ------ PRE POI 2 3 SCS Runoff 291.02 2 730 1,165,665 ------ ------ ------ PRE POI 3 4 SCS Runoff 46.52 2 718 106,602 ------ ------ ------ PRE POI 4 5 Combine 459.10 2 732 2,066,941 1, 2, 3, ------ ------ Total Pre 4 6 SCS Runoff 11.96 2 720 31,056 ------ ------ ------ POST POI 1 7 SCS Runoff 39.25 2 734 170,566 ------ ------ ------ POST POI 2 8 SCS Runoff 362.47 2 734 1,641,565 ------ ------ ------ POST POI 3 9 SCS Runoff 9.274 2 720 24,048 ------ ------ ------ POST POI 4 10 Combine 407.32 2 734 1,867,235 6, 7, 8, ------ ------ TOTAL DA POST 9 11 SCS Runoff 13.87 2 716 28,233 ------ ------ ------ POST POI 1 WITH DETENTION 12 SCS Runoff 9.274 2 720 24,048 ------ ------ ------ POST POI 4 WITH DETENTION 13 SCS Runoff 181.28 2 720 471,285 ------ ------ ------ POST 3A TO SCM 1 14 SCS Runoff 321.88 2 724 1,019,036 ------ ------ ------ POST 3B TO SCM 2 15 SCS Runoff 51.16 2 736 234,038 ------ ------ ------ POST 3C BYPASS 16 SCS Runoff 39.25 2 734 170,566 ------ ------ ------ POST POI 2 WITH DETENTION 17 Reservoir 115.67 2 728 449,430 13 267.96 187,004 SCM 1 18 Reservoir 137.19 2 738 1,018,525 14 263.98 450,614 SCM 2 19 Combine 244.46 2 736 1,701,995 15, 17, 18 ------ ------ POST POI 3 TOTAL 20210524 Raeford Commons 1st SIA.gpw Return Period: 100 Year Wednesday, 06 / 2 / 2021 78 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 1 PRE POI 1 Hydrograph type = SCS Runoff Peak discharge = 27.57 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 55,904 cuft Drainage area = 3.580 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.40 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 0.00 ' 0 2 4 — Hyd No. 1 6 8 PRE POI 1 Hyd. No. 1 -- 100 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 10 12 14 16 18 20 22 24 Time (hrs) 79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 2 PRE POI 2 Hydrograph type = SCS Runoff Peak discharge = 161.41 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 738,770 cuft Drainage area = 34.270 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 35.10 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 2 4 — Hyd No. 2 PRE POI 2 Hyd. No. 2 -- 100 Year Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 80 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 3 PRE POI 3 Hydrograph type = SCS Runoff Peak discharge = 291.02 cfs Storm frequency = 100 yrs Time to peak = 12.17 hrs Time interval = 2 min Hyd. volume = 1,165,665 cuft Drainage area = 59.320 ac Curve number = 76 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.60 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 PRE POI 3 Hyd. No. 3 -- 100 Year Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' 1 1 1 ' ' ' ' ' ' ' --r-� ! 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 Time (hrs) 81 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 4 PRE POI 4 Hydrograph type = SCS Runoff Peak discharge = 46.52 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 106,602 cuft Drainage area = 6.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.80 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 20.00 10.00 0.00 ---L 0 2 4 — Hyd No. 4 PRE POI 4 Hyd. No. 4 -- 100 Year 6 8 10 12 14 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report 82 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 5 Total Pre Hydrograph type = Combine Peak discharge = 459.10 cfs Storm frequency = 100 yrs Time to peak = 12.20 hrs Time interval = 2 min Hyd. volume = 2,066,941 cuft Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 103.570 ac Total Pre 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 6 POST POI 1 Hydrograph type = SCS Runoff Peak discharge = 11.96 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 31,056 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.30 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 1 Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Time (hrs) 84 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 7 POST POI 2 Hydrograph type = SCS Runoff Peak discharge = 39.25 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 170,566 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 40.00 20.00 10.00 0.00 1 0 2 4 — Hyd No. 7 POST POI 2 Hyd. No. 7 -- 100 Year 6 8 10 12 14 Q (cfs) 40.00 30.00 20.00 10.00 ' ' ' ' ' 1 ' 0.00 16 18 20 22 24 26 Time (hrs) 85 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 8 POST POI 3 Hydrograph type = SCS Runoff Peak discharge = 362.47 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 1,641,565 cuft Drainage area = 90.420 ac Curve number = 73 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 POST POI 3 Hyd. No. 8 -- 100 Year Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 ' ' ' ' ' ' ' ' ' � ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 8 Time (hrs) 86 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 9 POST POI 4 Hydrograph type = SCS Runoff Peak discharge = 9.274 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 24,048 cuft Drainage area = 1.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 4 Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 9 Time (hrs) Hydrograph Report 87 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 10 TOTAL DA POST Hydrograph type = Combine Peak discharge = 407.32 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 1,867,235 cuft Inflow hyds. = 6, 7, 8, 9 Contrib. drain. area = 104.490 ac Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 0.00 ' -.L. 0 2 4 — Hyd No. 10 TOTAL DA POST Hyd. No. 10 -- 100 Year Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 6 Hyd No. 7 Hyd No. 8 Time (hrs) Hyd No. 9 88 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 11 POST POI 1 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 13.87 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 28,233 cuft Drainage area = 1.720 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 4.30 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 1 WITH DETENTION Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 11 Time (hrs) 89 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 12 POST POI 4 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 9.274 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 24,048 cuft Drainage area = 1.400 ac Curve number = 69 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 4.00 e POST POI 4 WITH DETENTION Hyd. No. 12 -- 100 Year 2 4 6 8 10 12 14 Hyd No. 12 Q (cfs) 10.00 Me 4.00 2.00 0.00 16 18 20 22 24 26 Time (hrs) 90 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 13 POST 3A TO SCM 1 Hydrograph type = SCS Runoff Peak discharge = 181.28 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 471,285 cuft Drainage area = 25.480 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 11.10 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 3A TO SCM 1 Q (cfs) Hyd. No. 13 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 13 Time (hrs) 91 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 14 POST 3B TO SCM 2 Hydrograph type = SCS Runoff Peak discharge = 321.88 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 1,019,036 cuft Drainage area = 48.660 ac Curve number = 79 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.10 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST 3113 TO SCM 2 Q (cfs) Hyd. No. 14 -- 100 Year Q (cfs) 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 14 Time (hrs) 92 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 15 POST 3C BYPASS Hydrograph type = SCS Runoff Peak discharge = 51.16 cfs Storm frequency = 100 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 234,038 cuft Drainage area = 16.280 ac Curve number = 64 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 34.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 40.00 20.00 10.00 0.00 ' -.L. 0 2 4 — Hyd No. 15 POST 3C BYPASS Hyd. No. 15 -- 100 Year 6 8 10 12 14 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 ' 0.00 16 18 20 22 24 26 Time (hrs) 93 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 16 POST POI 2 WITH DETENTION Hydrograph type = SCS Runoff Peak discharge = 39.25 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 170,566 cuft Drainage area = 10.950 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 33.30 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST POI 2 WITH DETENTION Q (cfs) Hyd. No. 16 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 16 Time (hrs) 94 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 17 SCM 1 Hydrograph type = Reservoir Peak discharge = 115.67 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 449,430 cuft Inflow hyd. No. = 13 - POST 3A TO SCM 1 Max. Elevation = 267.96 ft Reservoir name = SCM 1 Max. Storage = 187,004 cuft Storage Indication method used. SCM 1 Q (cfs) Hyd. No. 17 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) — Hyd No. 17 Hyd No. 13 Total storage used = 187,004 cult 95 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 18 SCM 2 Hydrograph type = Reservoir Peak discharge = 137.19 cfs Storm frequency = 100 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 1,018,525 cuft Inflow hyd. No. = 14 - POST 3B TO SCM 2 Max. Elevation = 263.98 ft Reservoir name = SCM 2 Max. Storage = 450,614 cuft Storage Indication method used. Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 SCM 2 Hyd. No. 18 -- 100 Year 0.00 ' 0 4 8 12 — Hyd No. 18 Hyd No. 14 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 16 20 24 28 32 Time (hrs) Total storage used = 450,614 cult Hydrograph Report 96 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Hyd. No. 19 POST POI 3 TOTAL Hydrograph type = Combine Peak discharge = 244.46 cfs Storm frequency = 100 yrs Time to peak = 12.27 hrs Time interval = 2 min Hyd. volume = 1,701,995 cuft Inflow hyds. = 15, 17, 18 Contrib. drain. area = 16.280 ac POST POI 3 TOTAL 97 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO 2019 by Autodesk, Inc. v2019.2 Wednesday, 06 / 2 / 2021 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 57.0356 11.9000 0.8655 -------- 2 76.7932 13.3000 0.8914 -------- 3 380299488.00(0 120.0987 3.8041 -------- 5 75.2703 13.0000 0.8421 -------- 10 68.8066 11.9000 0.7899 -------- 25 67.2362 11.5000 0.7521 -------- 50 56.9160 9.9000 0.6914 -------- 100 52.7444 9.1000 0.6543 -------- File name: Raeford IDF.IDF Intensity = B / (Tc + D)^E Return Period Intensity Values (in/hr) (Yrs) 6 min 10 16 20 26 30 36 40 46 60 66 60 1 4.94 3.94 3.30 2.85 2.51 2.25 2.04 1.87 1.73 1.61 1.50 1.41 2 5.75 4.64 3.90 3.37 2.98 2.67 2.42 2.22 2.05 1.90 1.78 1.67 3 4.00 3.45 2.99 2.60 2.28 2.00 1.77 1.56 1.39 1.24 1.11 1.00 5 6.60 5.37 4.55 3.96 3.52 3.17 2.89 2.66 2.46 2.30 2.15 2.03 10 7.38 6.01 5.11 4.47 3.98 3.60 3.29 3.04 2.83 2.65 2.49 2.35 25 8.16 6.69 5.72 5.02 4.49 4.08 3.75 3.47 3.24 3.04 2.86 2.71 50 8.79 7.20 6.17 5.43 4.88 4.45 4.10 3.81 3.57 3.36 3.18 3.02 100 9.34 7.65 6.57 5.81 5.24 4.79 4.43 4.13 3.87 3.66 3.47 3.30 Tc = time in minutes. Values may exceed 60. Precip. file name: S:\331\47049-Raeford_Commons\Calc\Stm\Hydraflow\RAEFORD.pcp Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 6-yr 10-yr 26-yr 60-yr 100-yr SCS 24-hour 3.04 3.68 0.00 0.00 5.45 6.52 7.39 8.28 SCS 6-Hr 2.19 2.65 0.00 0.00 3.91 4.70 5.35 6.03 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00