HomeMy WebLinkAbout20130037 Ver 3_Application_20131126RECEIVED
F: N.C. Dept. of ENR
NOV 14 2013
.�.�� T WINSTON -SALEM
■`vD`•`^ REGIONAL OFFICE
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Pat McCrory Thomas A. Reeder John E. Skvada, III
Governor Director Secretary
North Carolina Division of Water Resources
Transportation Permitting Unit
In -Field Minor 401 Water Quality Certification, Buffer Certification and Isolated Water Permit
Modification
Project Name/ TIP Project No.:
DOT Division: I County: ��-� 0 SCE DWR Project No. / Permit Type: 1
DOT Staff: '7- 1 a,�l DWR Staff:lte (lr'iexz
ACE Staff: DWR Regional Office V_YW_0
C§Dy -s<'- 0 � .ta e-� �rn Pa 17
Modification Sketch:
< 4,Y1
S
RECEIVED
N.C.Dept. of ENR
DEC 0 5 2013
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699 -1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919$07 -63001 FAX: 919$07-6492
Internet: www.ncwaterauality.om
An Equal Opportunity, 1 Affirmative Action Employer
One
N Carolina
N &nallry
?n -Field Modification
Page 2 of 3
This in -field modification is required for the following reason(s):
F-1 The information contained in the application or presented in support thereof is incorrect in the
following manner:
Conditions under which the original certification was issued have changed in the following
manner: „ , , , ! _ - --I I /-,
This in -field modification is valid only if issued by an authorized agent of the NC Division of Water Quality,
Transportation Permitting Unit'.
This in -field modification authorizes the
l 0. N G
to
in County. The project shall be constructed as described in the Modification Description and
Sketch on Page 1 of this document dated _lp 13 to improve /construct the section of
The approved
depign is that described in the Modification Description and Modification Sketch on Page 1 of this document dated
4 Any further changes to the original Water Quality Certification dated may require a
formal written modification request.
The description of the proposed action provides adequate assurance that the proposed action in the
River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality
Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not
violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92 -500 and PL 95 -217 if conducted in
accordance with the application and conditions hereinafter set forth. Should your project change, you are required
to notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of
this Certification and approval letter, and is thereby responsible for complying with all the conditions. For this
approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should
obtain all other federal, state or local permits before proceeding with your project including (but not limited to)
Sediment and Erosion control, Coastal Stormwater, Non - discharge and Water Supply watershed regulations. This
Modification Approval shall expire on the same day as the expiration date of the corresponding Corps of Engineers
Permit.
Condition(s) of Modification Approval:
1. As -built drawings of the proposed action shall be submitted to the NC DWQ Transportation Permitting
Unit within 30 -days of the completion of the action.
2. All the authorized activj'tiesand conditions of the certification associated with the original Water Quality
Certification dated 7Z and all other corresponding modifications still apply except where
superceded by this certification.
In- Field Modification
Page 3 of 3
3. Additional Conditions:
Failure to construct the proposed action as described in the Modification Description and Sketch on
Page 1 of this document and /or violations of any condition herein set forth may result in revocation of this
modification approval and may result in criminal and /or civil penalties. This modification approval shall
become null and void unless the above conditions are made conditions of the Federal 404 and /or Coastal
Area Management Act Permit. If the Corps of Engineers requires a formal written modification to the 404
permit for the proposed action, the NC DWR must require a formal written modification to the 401 WQC,
and therefore, this in -field modification is invalid. If additional (wetland, stream, buffer) impacts for this
project (now or in the future) exceed (one acre, 150 linear feet, or one -third of an acre /150 linear feet,
respectively), or if mitigation is required above and beyond the current mitigation requirement for this
project, this in -field modification is invalid and a formal written modification is required.
This in -field modification is effective upon the date the last party signs this document. This in -field
modification is made upon mutual agreement between DOT and DWR as indicated by the signatures
below and is, therefore, not subject to appeal by either party. Appeals by third parties must be made
within sixty (60) days of notification pursuant to the contested case provisions of the Administrative
Procedure Act, NC Gen. Stat. 1506 -23 et seq.
DWR Staff Signature: ,
Date: " �
DOT Staff Signature:
Date: 110 1
Staff Signatun
Date:
— An authorized agent of the Transportation Permitting Unit is defined as DWR staff that are DOT - funded and
review and issue 401 Water Quality Certification for DOT projects. These staff include Central Office and Regional
Office personnel.