Loading...
HomeMy WebLinkAbout20131301 Ver 1_More Info Received_20131218Dennison, Laurie From: Yates, Kevin <yates @mcadamsco com> Sent: Wednesday, December 18, 2013 3 00 PM To: Dennison, Laurie Subject: RE Purdue Pharma Manufacturing LP (Durham) Attachments: 2013 -12 -18 Purdue Pharma - Pg 6 & 13 pdf i?) -i3�0� Laurie, Thank You for the email' Attached is the revised Pg 6 and signed Pg 13 That is terrible oversight on my part, and thanks for sending an email instead of a letter Any word from Karen on Public Notice fee for 5401 Mod request? Much Appreciated'"' Kevin From: Dennison, Laurie [mailto laurie 1 dennisonCcbncdenr gov] Sent: Wednesday, December 18, 2013 2:35 PM To: Yates, Kevin Subject: FW: Purdue Pharma Manufacturing LP (Durham) Importance: High Also Kevin on page 6 or 14 you show 40 If of stream impact but show the total stream & tributary impacts as 135 If Need the correct LF of impact please Laurie Dennison Administrative Assistant 919 - 807 -6303 NCDENR - Division of Water Resources Wetlands Branch - Water Quality Programs 401 & Buffer Permitting Unit Mailing address 1650 Mail Service Center Raleigh NC 27699 -1650 Physical location 512 N Salisbury St 91h FI Archdale Bldg Raleigh NC 27604 -1170 Fax line 919 -807 -6494 Website http / /portal ncdenr org /web /wq /swp /ws /webscape From: Dennison, Laurie Sent: Wednesday, December 18, 2013 2.32 PM To: Yates, Kevin (gates @mcadamsco.com) Cc: 'Dennison, Laurie (laurie j dennison (&ncdenr gov)' Subject: Purdue Pharma Manufacturing LP (Durham) Importance: High 1 Kevin — Received the above project today but page 13 of 14 is not signed & dated' Please do that for me, scan it in & email it back to me to get this thing off the ground Thanksi Laurie Dennison Administrative Assistant 919 - 807 -6303 NCDENR - Division of Water Resources Wetlands Branch - Water Quality Programs 401 & Buffer Permitting Unit Mailing address 1650 Mail Service Center Raleigh NC 27699 -1650 Physical location 512 N Salisbury St 9th Fl Archdale Bldg Raleigh NC 27604 -1170 Fax line- 919 - 807 -6494 Website http / /portal ncdenr org /web /wq /swp /ws /webscape P(A,r v At P kqr&f 13 -1_-� C�1 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The USFWS web page http / /www fws gov /nc -es /es /countyfr html and the Natural Heritage virtual workroom http / /nhpweb enr state nc us /nhis /public /gmap75_main phtml was accessed on November 6, 2013 to determine if the project would impact Endangered Species or Designated Critical habitat Based on this research, the bald eagle (Haliaeetus leucocephalus - BGPA), Michaux's sumac (Rhus michauxn - E), Smooth Cone Flower, and red - cockaded woodpecker (Picoides borealis - E) are federally listed species to occur within Durham County Based on field inspections, it is believed no adverse impacts will occur to threatened and endagered species and their known habitiat due to the contruction of the proposed project 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitats ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? An interactive map located at http Hocean floridamanne orgefh_coral /i ms/vi ewer htm was wn�fffl",) determine if the protect will impact Essential Fish Habitat 7. Historic or Prehistoric Cultural Resources (Corps Requirement) DE 7a Will this project occur in or near an area that the state, federal or tribal LD governments have designated as having historic or cultural preservation 14R - i 1 UAUTY ❑Yes status (e g , National Historic Trust designation or properties significant in e afar Branch North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources A review of the list of properties and districts in North Carolina entered in the National Register of Historic Places (http / /www hpo ncdcr gov /nrlist htm) was conducted on November 6, 2013 for Durham County, and it did not reveal any listing within the project area It is believed the proposed project will not occur in or near an area that has been designated as having historic or cultural preservation status by the state, federal, or tribal governments 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements This project will be designed to meet FEMA requirements and reviewed by the local delegated Floodplain Manager within the City of Raleigh 8c What source(s) did you use to make the fioodplain determination? North Carolina Flood Insurance Rate Map Panel 1748 does not show 100 -year flood areas or floodways located on the subject property 12/i Date Kevin Yates Page 13 of 14 PCN Form — Version 1 3 December 10, 2008 Version CA,cACAC Fka r A%ti 13-- 13-D1 C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ® Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T Inset 1 (perm) & Backfdl Sewer Install Riparian ® Yes ❑ No ® Corps ® DWQ 0 02 ac 2g. Total wetland impacts 0 02 ac 2h Comments (See Figure 4, Insets 1) 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) Inset 1 (temp) Trench & Backfill Sewer Install Stream "A" Imp Int ® Corps ® DWQ 3 ft 40 S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 40 31 Comments (See Figure 4, Insets 1) 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number (if applicable) Type of impact Waterbody type Area of impact (acres) — Permanent (P) or Temporary T 01 ❑P ❑T L`5 U V Ls' n I I 02 ❑P ❑T 03 ❑P 04 ❑P D s r N/A 4f. Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, then complete the chart below Page 6 of 14 PCN Form — Version 1 3 December 10, 2008 Version