HomeMy WebLinkAbout20131285 Ver 1_CAMA Permit Application_20131213ou
Pat McCrory
Governor
December 11, 2013
MEMORANDUM:
201 31 285
ER
NCDEE R
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Braxton C. Davis
Director
EXPRESS
TO: Karen Higgins
401 Oversight
DEMLR - Surface Water Protection
John E. Skvaria, III
Secretary
FROM: Debbie Wilson, NC DENR -DCM Express Major Permits- Southern Region
127 Cardinal Drive Ext.28405 (Courier 04 -16-33)
SUBJECT: CAMA Permit Application Review
Applicant: Kim Quinn
Project Location: 804 Channel Blvd., adjacent to Topsail Sound, in Topsail Beach, Pender County
Proposed Project: to remove the existing docking facility and construct a new residential docking facility
Please indicate below your agency's position or viewpoint on the proposed project and return
form to Debbie Wilson at the address above by January 3, 2014. If you have any questions
regarding the proposed project, contact her at (910) 796 -7215, when appropriate, in -depth comments
with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910 - 796 -72151 FAX: 910 - 395-3964 Internet: www.ncooastalmanagement.net
An Equal opportunity %Affinnalive Action Employer
�c��oe�
DEC f 3 2013
N
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Kim Quinn c/o Gary Ange
2. LOCATION OF PROJECT SITE: 804 Channel Blvd., adjacent to Topsail Sound, in Topsail Beach, Pender
County.
= Photo Index — 2006.25 -6588, L-20 2000: 25 -324, L-M, 5 '1995-- 25 -307, K -L; 17
State Plane Coordinates - X: 2978497 Y: 1507413 GPS — N120309A
Lat:34 °22'02.177 "N Long: 77 °37'49.484 "W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 12/03/13
Was Applicant Present — Yes
S. PROCESSING PROCEDURE: Application Received Complete — 12/09/13
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Town of Topsail Beach
Land Classification from LUP — Developed / Conservation
(B) AEC(s) Involved: EW, PT
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing — Septic System
Planned - None
(F) Type of Structures: Existing — Residential home, bulkhead, pier, platform and floating dock.
Planned — New pier, platform floating docks and boatlift.
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
TIRpnrMn 1PR I .Fly OTHER
(A) Vegetated Wetlands
(B) Non - Vegetated Wetlands
(Open water
1,305 sq. ft.
inc o orated
(C) Other — High ground
(D) Total Area Disturbed: 1,305 sq. ft. (0.030 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: Yes
8. PROJECT SUMMARY: The applicant proposes to remove an existing docking facility and construct a new
residential docking facility.
Quinn Dock
Page Two
9. PROJECT DESCRIPTION:
Gary Ange, on behalf of Kim Quinn, has requested that the attached application be processed under the Express
Review Permitti ng Program. The applicant's project is locate_ d at 804 Channel Blvd., adjacent to Topsail Sound, in
Topsail Beach, Pender County. To find the property from the Wilmington Regional Office, take Highway 17 North
-_ - =from Wilmington approximately 20 miles and turn right on 9. C. State Highway 210. Travel approximately 2.8 miles to =
the intersection of NC 210 and NC 50. Turn right onto NC 50INC 210 and travel approximately 1.9 miles onto Topsail
Island. Turn right onto S. Topsail Dr. /NC 50 and travel approximately 6.1 miles to Maritime Way and turn right.
Travel approximately 0. 10 miles on Maritime Way to the first left which is Channel Blvd. Turn left onto Channel Blvd.
and travel approximately 0.2 miles and the subject property will be located on the right.
The applicant currently maintains a single- family residence on the property. Existing man-made features include a
residence, driveway, bulkhead, pier, platform and floating dock. The high ground portion is elevated approximately
4' above the normal high water (NHW) level. Vegetation on the tract consists of lawn grasses and ornamental
landscaping. There are no Coastal or "404" type wetlands, on, or adjacent to the subject property. The property has
approximately 69.5 linear feet of shoreline which is stabilized by an existing vinyl bulkhead. Currently, the
applicant maintains an elevated pier measuring approximately 28' in length by 6' in width which terminates at an
elevated fixed "T- head" platform measuring approximately 16' in length by 15' in width. An access ramp extends
waterward from the center on the fixed platform onto a floating dock measuring approximately 16' in length by 10'
in width. Water depths in the vicinity of the existing water dependent structure ranges from -2.0' to -7.0', relative
to normal low water (NLW). Residential properties border the site to the south and east, Topsail Assembly building
to the north and Topsail Sound to the west.
The previous property owner (Gary Sunderland) received a CAMA General Permit (No. 34229) on October 23,
2003 which authorized the construction of a bulkhead and CAMA General Permit (No. 54403) on November 19,
2009 for the construction of a pier, platform, floating dock and boatlift.
The waters of Topsail Sound (adjacent to the project site) are classified as SA by the North Carolina Division of Water
Quality. They ARE NOT designated as a Primary Nursery Area (PNA) by the North Carolina Division of Marine
Fisheries, and they are OPEN to the harvest of shellfish.
PROPOSED PROJECT:
The applicant proposes to remove an existing docking facility and construct a new residential docking facility. As
proposed, a new small triangular shaped elevated fixed pier measuring approximately 5' in length by 5' in width would
extend from the existing bulkhead. An access ramp would extend from this pier onto a new floating dock measuring
approximately 56' in length by 6' in width which would run perpendicular to the channel. The applicant states that this
floating dock will be designated for one (1) large (60') vessel on the south side. Located adjacent to this structure to the
north would be a new elevated fixed platform extending from the bulkhead and measuring approximately 16' - 25' in
length by 14' in width. An access ramp would extend waterward from the northwest end of this platform onto a new
floating dock measuring approximately 30' in length by 4' in width which would run perpendicular to the channel. As
proposed, a new boatlift measuring approximately 12' in length by 12' in width would be located in between the two
floating docks. According to the application package, water depths in the vicinity of the proposed docking facility range
from approximately -2.0' to -7.0', relative to the NLW level.
As proposed, the applicant's proposal would extend a maximum distance of approximately 65' into the waterbody
which measures approximately 1200' in this location, thus, not exceeding ' /e the width of the waterbody. The proposed
docking facility would NOT extend into either of the adjacent 15' riparian corridor setbacks, would be outside of the
federal channel setback and would not exceed the established pier head alignment.
Quinn Dock
Page Three
10. ANTICIPATED IMPACTS:
As proposed, the planned development would incorporate approximately 1,305 sq. ft. of Estuarine Waters and Public
-- -- — - - -- - - - - - -- - - - -
Trust Waters. The applicant has approximately 69.5 linear feet of shoreline allowing up to 556 sq. ft. of platform or
As proposed ,=the- total-squa 6- footage of the= facility (platform=and=floating dock) equals approximately -_
432 sq. ft. No impacts to Coastal or "404" wetlands would occur as a result of construction. As previously indicated,
the planned development would be located within the applicant's area of riparian access, within' /4 of the width of the
waterbody and outside of the federal channel setback. The applicant indicates that the new docking facility will
accommodate three (3) large (36' - 60') vessels, however, there is potential for the facility to accommodate four (4)
vessels of smaller size. Short term increases in turbidity could be expected due to piling installation.
Submitted by: Debra Wilson Date: December 10, 2013 Office: Wilmington
Dgll MP-1
norm
Maier Development Permit
(last revised 12127/06) - - - - - - -
-- Carolina DIVISION-OF COASTAL_MANAGEMENT-__ -
1. Primary Applicant/ Landowner Information
Business Name
Na
Project Name (if applicable)
Quinn Dock
Applicant 1: First Name
Kim
MI
Last Name
Quinn
Agent/ Contractor 2: First Name
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
City
Wallace
Mailing Address
PO Box 336
PO Box
City
Kenansville
Phone No. 1
910 - 547 -2955 ext.
State
NC
ZIP
12W6 a g a 4 q
Country
USA
Phone No.
910 - 290 -1007 ext.
FAX No.
910 - 296 - 0306
Street Address (if different from above)
City
State
ZIP
ZIP
Email
kim @kmq- inc.com
2. Agent/Contractor Information
Business Name
Na
Agent/ Contractor 1: First Name
Gary
MI
S
Last Name
Ange
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
107 Candlewood Drive
PO Box
City
Wallace
State
NC
ZIP
28466
Phone No. 1
910 - 547 -2955 ext.
Phone No. 2
- - ext.
FAX No.
Contractor #
Street Address (d different from above)
City
State
ZIP
Email
gange08O3 @yahoo.com
RECEIVED
<Form continues on back> DCM WILMINGTON, NC
DEC 0 3 2013
252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoestalmanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Pender
804 Channel Blvd
d. Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
City
State
Zip
-New Topsail-Beach- -
Topsail Beach
-NC
28445-
Phone No.
Lot No. (s) (d many, attach additional page with list)
910 -290-1007 ext.
1
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Cape Fear River Basin
Topsail Sound
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Aga n 41 VV W
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
Topsail Township
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
69.5'
6360 sq ft
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
Size Varies, I I
NWL (normal waterleveq
(If many lot sizes, please attach additional page with a list)
4' ®NHW or ❑NWL
e. Vegetation on tract
Long Grass; Ornamental Landscape
f. Man -made features and uses now on tract
Residence, Bulk Head, Docking Facilities
g. Identify and describe the existing land uses adoacent to the proposed project site.
Residential
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
B -1
(Attach zoning compliance certificate, if applicable)
®Yes []No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does ft involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
EC"a —A E0
<Form continues on next page> DCM WILMINGTON, NC
DEC 0 3 2013
252- 808 -2808 :: 1- 888 -4SC ®AST :: www.nccoastalmanagement.net
Fgrm DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes []No--
(Affach documentation, if available)
n. Describe existing wastewater treatment facilities.
Municipal Water
Septic System is a low pressure system, septic and pump tank located on site - nitrification system located on lot 3, block 12
on the east side of Channel Blvd
o. Describe existing drinking water supply source.
Municipal Water and Sewer
p. Describe existing storm water management or treatment systems.
NA
5. Activities and Impacts
a. Will the project be for commercial, public, or private use?
❑Commercial ❑Public/Govemment
®Private /Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Personal Use Dock, Resident Owners
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Typical Marine Construction
d. List all development activities you propose.
Construction Platform, Docking Facility
e. Are the proposed activities maintenance of an existing project, new work, or both?
New Construction
f. What is the approximate total disturbed land area resulting from the proposed project?
<1.0 ❑Sq Ft or ®Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
None
i. Will wastewater or stormwater be discharged into a wetland?
[]Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes ❑No ®NA
j. Is there any mitigation proposed?
❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back >DCM WlLNINGTON NC
DEC 0 3 2013
252 - 808 -2808 :: 1- 888- 4RCOAST :: www►.nccoastaI management. not
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Adriana Cowan Phone No. 540 840 -3137
Address,27472 Strawberry Hill Rd Rhoadsville, VA 22542
Name Historical Society of Topsail Island Phone No. 910 358 -1298
Address PO Box 2645 Surf City, NC 28445
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
GP 5440311/19/2009 GP 3422910/23/2003
CM 03-40 03/12/2003
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. CertWication and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the injprmation provided in this application is truthful to the best of my knowledge.
•
Date I , I- I Print Name Gary Ange
Signature Y V 5
Please indicate application attachments pertaining to your proposed pr ject.
❑DCM MP -2 Excavation and Fill Information
❑DCM MP -3 Upland Development
®DCM MP-4 Structures Information
❑DCM MP -5 Bridges and Culverts
REL EIS. IEFD
;)CIV; WILMINGTON, NC
DEC 0 3 L0013
252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoestaimanagement.net
Orr DCM MP4
STRUCTURES
(Construction within Public Trust Areas)(�SVJ
- - -Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the_- Joint
- - Application that - relate to this proposed - project.- Please - include all-supplemental information. -- -- - - --
1. DOCKING FACILITY /MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
❑Commercial ❑Public/Govemment ®Private /Community
c. (i) Dock(s) and /or pier(s)
(ii) Number
2 �%' �0f
(iii) Length
JAV 1- '
(iv) Width
1-6' 1 y.
(v) Floating
®Yes ❑No
e. (i) Are Platforms included? ®Yes ONO
If yes:
(ii) Number 1
(iii) Length 21.5
(iv) Width 14
(v) Floating []Yes ®No
Note: Roofed areas are calculated from dripline dimensions.
g (i) Number of slips proposed
3
(ii) Number of slips existing
2
i Check the proposed type of siting.
❑ Land cut and access channel
❑Open water; dredging for basin and /or channel
®Open water; no dredging required
❑Other; please describe:
k Typical boat length* 36-60'
m. (i) Will the facility have tie pilings?
❑Yes ®No
(ii) If yes number of tie pilings?
❑This section not applicable
b. (i) Will the facility be open to the general public?
❑Yes ®No
d (i) Are Finger Piers included? []Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating []Yes []No
f. (i) Are Boatlifts included? VdYeS IdNo
If yes:
(ii) Number I
(iii) Length I Z'
(iv) Width I Z
h. Check all the types of services to be provided.
❑ Full service, including travel lift and /or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ( wet slips") only, number of slips: 3
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Open Run /Sailboats
I. (i) Will the facility be open to th q�ra
eneral public?
[]Yes E D
Yes ®No en
DCM WILMINGTON, NC
DEC 0 3 2013
252 -801113-2808 :: 9- 888ARCOAST :: www.nccoastalrnananement.net revised: 12/27/06
Form DCM MP-4 (Structures, Page 2 of 4)
2. DOCKING FACILITY /MARINA OPERATIONS ®This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for-patrons;-Number: Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of " Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h• Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel- handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live- aboard dockage?
k. Describe design measures that promote boat basin flushing?
I If this project is an expansion of an existing marina, what types of services are currently provided?
RECEIVED
m. Is the marina/docking facility proposed within a primary or secondary nursery area? DCM WILMjNGT N, NO
[]Yes ❑No
Q[EC 0 3 1013
252 -808 -2808 :: 9- 888- 4RCOAST :: wvwv.nccoastalmanane nerit.n ®t rev6sed: 92127/06
Form -OC6A �f1i F-4 (Structures, Page 3 of 4)
F1 its the ind,inufdocking Mcility proposed Within os adjacerit to any Shellfish harvesting ereaO
❑Yes ®No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL - ®None -
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
13. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Govemment ❑Private /Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable I
a (i) Number
(ii) Length
(iii) Width
15. BREAKWATER (e.g., wood, sheetpile, etc.) 10 This section not applicable
a. Length
c. Maximum distance beyond NHW, NWL or wetlands
b. Average distance from NHW, NWL, or wetlands
6. MOORING PILINGS and BUOYS [a This section not applicable
a Is the structure(s).
❑Commercial ❑Public/Govemment ❑Private /Community
C. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, /f present.
e. Arc of the swing
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc)
R,—= r E J V,EQ
DCM WILMINGTON, NC
DEC 0 3 2013
252- 808 -2808 :: 1- 888.4RCOASY :: www.nccoastaimanagement.net revised: 12/27/06
ForM ®CM MP-4 (Sttmcturee, Page 4 of 4)
+ -16' + -50'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
-
c.-- Width of water body d. Water depth at waterward end of structure at NLW or NWL-
1200'_ 7'
e. (i) Will navigational aids be required as a result of the project?
OYes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
8. OTHER 10 This section not applicable
a. Give complete description:
Date
Project Name
Quinn Dock
Applicant Name "
Gary Ange
Applicant Signatu
RECINE FO
DCjM WILMINGTON, NO
DEC 0 3 2M
282- 808 -2808 :: 1- 888.4RCO/ST :: www.ncconstaimanaaement.net revised: 12127/06
5 0 u/ m D FLOW- - ' - - - -- -
ASSEMBLY BUILDING
-; VICINITY FLAN
0
Ar5 •r�r,i
Data: July 2Z 2007 ,,,�•
_•r•w i7
r•r• � 1
"'' noon y„ woao.lw� i
ear
Fro QJf
i
e
3�
9
'I. •faooXwrandr
844 806 � 806
_ r•
�._ ._ �....... _ � _ ...._ - tiNi4AiAt�6. BOUI.;�V,4RD••r-..
NOltllWplumm Roy anCA'4V All.
!j
i
+1 �
(1
i
I �
i
i
to try.. -• -..• i scam
LNKOP
��'- ' w r• ' -R ; fir• `
1 3 Yf'
i .► 1 t, c
t 'r
ar°�s i f so"wraiNm
mob" SinG.w
gALPON w ie 4 i4G r , ASSEMBLY
BUILDING
r
E Im [lip
aJIRr wlmapLARO �1ooRieetr suuollta
11114
9w I-V.Jf, I '�3
EXISTING SITE CONDITIONS FOR KIM QUINN
804 Channel Blvd., Topsail Beach, NC
r
1
I
i
f
t
DECEIVED
' DCM WILMINGTON, NC
DEC 0 9 2013
Z x
I r,
.4p
O C
Z
Z
�v
00
Z
Z
�r Z
Z
>�
X
�a
zzv
R
k
O
EBB T O P S A I L S O U N D FLOW
ASSEMBLY BUILDING
Off
VICINITY PLAN ;^z, a 275 169"
12s,
Scale: T Inch = 60 Feet
•
-
10
Date: November 22, 2013
_
0 0�•
I
b
- g' ewr
awr m pp
YS i
.p
LEE OMF
aLfigem A.
oBlnT
-
r sr7TNOPOlO1
OMER wATae
20
22 21 �.•
2 alDPOO11sNr!
19
a ,a
OAWLmff
paw" Pam
L
-1• ,
AMOK �
valmm
-rr Pool eurrea — — — — - --
— - - --
ASSEMBLY
BUILDING _ .....................
-BLOCK 5 @(9(5@
AopurTU eo ' ( wr oueTr TuarsLr WELDING
810 808 806 �1 I 804
— — — - — — — — — — �— crIANNeLeouLEVARg
y =—
S MGM sAVSrsrT NOT ON OY Or eAXL
I
I
14
---I------------------- ---- - - - - --
. ew, NAOUrTts moe NPe aaw sTNar T — — — —
I amrLarrmusncTwNOttoTt �
CHANNEL BOULEVARD
I
. / I
I
LOUIS r,T42i! N,TOIU FLOete 6 OAST surstrLANe
0 CAROLINA BOULEVARD �
cmA & SEPTIC PERMIT APPLICATION LOT 19, BLOCK 5 & LOT 3 BLOCK 12 Scab:1 h,ah a 30 Feet
W_
w
BLOCK 9
11
10
0 0�•
oo..
s
r
LOUIS r,T42i! N,TOIU FLOete 6 OAST surstrLANe
0 CAROLINA BOULEVARD �
cmA & SEPTIC PERMIT APPLICATION LOT 19, BLOCK 5 & LOT 3 BLOCK 12 Scab:1 h,ah a 30 Feet
W_
CAROLINA BOULEVARD
.o
w
BLOCK 9
11
10
CAROLINA BOULEVARD
.o
CAMA MAJOR PERMIT APPLICATION
EBB T O P S A I L S O U N N D FLOW
1200 FT TO BANKS CHANNEL
AREA CALCULATION ;r--6o Fr DoT 4 -
i
SOale:1 In = 30 FT �� g COVERED '� 21'10 275
i
Date' November 22, 2013 ! 5 12'2 _ _ _;
TOTAL COVERED -.
MINUS FLOATING _ - ! ! 722MW BOAT AND
DOCK 500 SF ; o #•o +-N asHEADCE ON
� 34' � oursmE FACE ooac
P
UNEOFOOSma
amwwm
UFT
i $$
i
woon
i- —
A.OAT
i
k %=D DEG(
x373 2 'esF in I ----- •-- - - -- --
[2M OF 036M 10 i 1i
MAJ(H MSa6FT 14'
! I
aunemnoorw.aaumLm
m.wro�m+u�a�
wu�mrataxowsraot �.�
30 FOOT &IFM
...mno.or0000aq,•'f98j5�5
ovuwwawrmoa+aw
v
Draw wood uaw TlIP'!
c 76 Fr AEC
BUMEAD COS7i110 raaaw Wattv6ao9.r �r
omw�na I . 3 BEDROOM HOUSE
oormwwaaw 52 398 2
awn Y i I L
20 19 ; 181 N 18
21 11'10 16 11'10
5v a
uw�er
75 FOOT FRONT YARD 7 FOOT FRONT YARD
-- --- -____�.... _._ .__1._..* --- l-----------------------
NEW ODNCRETE APRON
■111111
RECEIVE
.. DCM WILMINGTON, NC
QUINN A98MBLY BUILDING
CHANNEL BOULEVARD
PROPOSED DOCK FOR KIM QUINN
804 CHANNEL BLVD, TOPSAIL BEACH NC S /)EP`J ,? O;F y�
®Se9 e-�► Q
Soo C- #tNWL- -Dc..
V-Irn QuwN
7
DCNI VVIL MINGTON, NC
DEC 00, 2013
511x1 y dp y
ATTACHMENT
Tract 1:
Lot. 19 in Block 5 of a subdivision know as New Topsail Beach, North Carolina, shown on map recorded in Map
Book 3, Page 56, of the Registry of Pender County; the land herein conveyed being a portion of a tract of land
conveyed by- Evelyn P.- Empie- and-others to J.-G. Anderson -and others by deed - recorded -in Book 277, Page 171,
Registry of Pender - County. -
Tract2:
BEGINNING at a point, being the Southeastern corner of Lot 19 and Channel Boulevard, along the line of Lot 19,
North 40 degrees 30 minutes West 92.52 feet to a point along the sea wall of Topsail Sound; thence -with the sea
wall, North 10 degrees 20 minutes East 19.90 feet to an existing nail on the sea wall; thence South 40 degrees 30
minutes East 109.72 feet to appoint; thence along Channel Boulevard, South 49 degrees 30 minutes West 10 feet
to the point and place of BEGINNING, according to plat entitled, "Plot Plan for Topsail Beach Economic
Development Council ", dated May 11, 1995, and drawn by Daniel Horace Thompson, Registered Land Surveyor, to
which plat is hereby referenced for a more particular description of same.
QUINN -13 -693
804 Channel Blvd, Topgail Beach, NC 28445
RECEIVED
IDCM WIL- MINGTON, NC
DEC 032013
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory _ Braxton C. Davis John E. Skvatia, III
Governor Director Secretary
AGENT AUTHORIZATION FORM
Date: December 2, 2013
Name of Property Owner Applying for Permit: Name of Authorized Agent for this project:
Km Quinn
Owner's Mailing Address:
PO Box 336
Kenansville, NC 28349
Phone Number 910 290 -1007
Gary Ange
Agent's Mailing Address:
107 Candlewood Drive
Wallace, NC 28466
Phone Number 910 547 -2955
I certify that I have authorized the agent listed above to act on my behalf, for the purpose of applying
for and obtaining all CAMA Permits necessary to install or construct the following (activity):
Quinn Dock
For my property located at 804 Channel Blvd Topsail Beach, NC 28445
This certificatio valid th date) December, 2015.
Property ner Signature
Date
127 Cardinal Drive Ext., Wilmington, NC 28405
Phone: 910 - 796 -72151 FAX: 910 - 395-3964 Internet: www.necoastalmanagement.net
An Equal opporiunily 1 Affirmative Action Employer
DECEIVED
DCM WILMINGTON, NC
DEC 0 3 2013
��f. ?• t % ��v� X32 a7k�.,»ix
opsail +Qf acn,,NC 2£3,:x:5 US
,5 f.
. • � - � CAoglC part =h.
Wilson. Debra
From: Dail, Jason
Sent: Wednesday, December 04, 2013 11:20 AM
To: Wilson, Debra
Subject: FW: CAMA Narrative - 804 Channel Blvd Topsail Beach, NC
FYI,
This is the project narrative for the Kim Quinn project. O
Jason
xLDhW= *few"
1217 CXNI" 11VIk""
°9,64
*Please note that e-mail correspondence to and from this address may be subject to the North Carolina Public records
Law and may be disclosed to third parties.*
From: Gary Ange rmailto:aange0803 yahoo.coml
Sent: Wednesday, December 04, 2013 11:09 AM
To: Dail, Jason
Subject: CAMA Narrative - 804 Channel Blvd Topsail Beach, NC
Jason,
Kim Quinn is making application for a CAMA permit for installation of a personal use dock at his
principle place of residence (at Topsail Beach) 804 Channel Blvd, Topsail Beach NC 28445. Typical
boat length will be 30 -60' and entirely for personal use.
Please add this narrative to our application.
regards,
Gary Ange
Agent for Kim Quinn
910 547 -2955
gange0803A- vahoo.com
1
DCM WIILLMINOMN, NO
DEC 0 42093