Loading...
HomeMy WebLinkAboutNCS000515_China Grove Draft Final SWMP_2021072121Draft Stormwater Management Plan Town of China Grove NCSOOO515 xxx xx, 20XX CHINAGROVE STORMWATER An original town. prrr-1N/E® 2 2021 D- 2-LAND QUALITY STORMMATIER-pcR ITTING This page intentionally left blank Table of Contents PART 1: INTRODUCTION...... PART 2: CERTIFICATION....... PART3: MS4 INFORMATION............................................................................................ 3.1 Permitted MS4 Area................................................................................................ 3.2 Existing MS4 Mapping............................................................................................ 3.3 Receiving Waters..................................................................................................... 3.4 MS4 Interconnection............................................................................................... 3.5 Total Maximum Daily Loads(TMDLs).................................................................. 3.6 Endangered and Threatened Species and Critical Habitat ....................................... 3.7 Industrial Facility Discharges.................................................................................. 3.8 Non-Stormwater Discharges................................................................................... 3.9 Target Pollutants and Sources................................................................................. PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION .............. 4.1 Organizational Structure......................................................................................... 4.2 Program Funding and Budget................................................................................. 4.3 Shared Responsibility............................................................................................. 4.4 Co-Permittees......................................................................................................... 4.5 Measurable Goals for Program Administration...................................................... 1 2 PART 5: PUBLIC EDUCATION AND OUTREACH PROGRAM......................................................... 14 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM .......................................... 18 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM ............................. 20 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM ................................................... 25 PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM ....................................... 27 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS ..................... 34 List of Tables Table 1: Summary of MS4 Mapping Table 2: Summary of MS4 Receiving Waters Table 3: Summary of Approved TMDLs Table 4: Summary of Federally Listed Species/Habitat Impacted by Surface Water Quality Table 5: NPDES Stormwater Permitted Industrial Facilities Table 6: Non-Stormwater Discharges Table 7: Summary of Target Pollutants and Sources Table 8: Summary of Responsible Parties Table 9: Shared Responsibilities Table 10: Co-Permittee Contact Information Table 11: Program Administration BMPs Table 12: Summary of Target Pollutants & Audiences Table 13: Public Education and Outreach BMPs Table 14: Public Involvement and Participation BMPs Table 15: Illicit Discharge Detection and Elimination BMPs Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Table 17: Construction Site Runoff Control BMPs Table 18: Qualifying Alternative Program(s) for Post -Construction Site Runoff Control Program Table 19: Summary of Existing Post -Construction Program Elements Table 20: Post Construction Site Runoff Control BMPs Table 21: Pollution Prevention and Good Housekeeping BMPs PART 1: INTRODUCTION The purpose of this Stormwater Management Plan (SWMP) is to establish and define the means by which the Town of China Grove will comply with its National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit and the applicable provisions of the Clean Water Act to meet the federal standard of reducing pollutants in stormwater runoff to the maximum extent practicable. This SWMP identifies the specific elements and minimum measures that the Town of China Grove will develop, implement, enforce, evaluate and report to the North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Minerals and Land Resources (DEMLR) in order to comply with the MS4 Permit number NCS000515, as issued by NCDEQ. This permit covers activities associated with the discharge of stormwater from the MS4 as owned and operated by the Town of China Grove and located within the corporate limits of the Town of China Grove. In preparing this SWMP, the Town of China Grove has evaluated its MS4 and the permit requirements to develop a comprehensive 5-year SWMP that will meet the community's needs, address local water quality issues and provide the minimum measures necessary to comply with the permit. The SWMP will be evaluated and updated annually to ensure that the elements and minimum measures it contains continue to adequately provide for permit compliance and the community's needs. Once the SWMP is approved by NCDEQ, all provisions contained and referenced in this SWMP, along with any approved modifications of the SWMP, are incorporated by reference into the permit and become enforceable parts of the permit. Any major changes to the approved SWMP will require resubmittal, review and approval by NCDEQ, and may require a new public comment period depending on the nature of the changes. DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 1 PART 2: CERTIFICATION By my signature below I hereby certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. I am also aware that the contents of this document shall become an enforceable part of the NPDES MS4 Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit compliance and enforcement authority. ❑ I am a ranking elected official. ® lam a principal executive officer for the permitted MS4. ❑ I am a duly authorized representative for the permitted MS4 and have attached the authorization made in writing by a principal executive officer or ranking elected official which specifies me as (check one): ❑ A specific individual having overall responsibility for stormwater matters. ❑ A specific position having overall responsibility for stormwater matters. Signature: J/ Print Name: Ken Deal Title: Town Manager Signed this day of 20 21 DRAFT NCS000515 S WMP Town of China Grove July 2151, 2021 Page 2 PART 3: MS4 INFORMATION 3.1 Permitted MS4 Area This SWMP applies throughout the corporate limits of the Town of China Grove, including all regulated activities associated with the discharge of stormwater from the MS4. The map below shows the corporate limits of Town of China Grove as of the date of this document. 3.2 Existing MS4 Mapping Storm drainage within the Town of China Grove consists of a network of pipes, ditches and open channels, which were installed at different times by many different entities. The flow of storm water travels through both public and privately maintained areas, and the level of improvements installed are the option of the property owner. The overall drainage area is relatively small and is served by three major creeks and numerous tributary streams. Therefore, the typical drainage path from overland flow to the outfall is short. The Town recently inventoried the conveyance system and prepared detailed maps of the entire system within the Town's municipal boundary limits. Existing stormwater piping: +24,000 feet of 8" to 48" diameter piping Stormwater inlets: +276 inlets Outfalls or discharge points: +60 (size from 12" to 60" diameter) DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 3 Figure 3 of Appendix A is a location map of all inventoried outfalls within the Town's municipal boundaries. Appendix M includes detailed system maps showing the location of all inlets, piping and outfalls. Table 1: Summary of Current MS4 Mapping Percent of MS4 Area Mapped 100 % No. of Major Outfalls* Mapped Unknown** total *An oufall is a point where the MS4 discharges from a pipe or other conveyance (e.g. a ditch) directly into surface waters. Major outfalls are required to be mapped to meet permit requirements. A major oufall is a 36-inch diameter pipe or discharge from a drainage area > 50-acres; and for industrial zoned areas a 12-inch diameter pipe or a drainage area > 2-acres. * *Outfalls have been mapped but the classification of the specific outfalls as major oufalls has not occurred, therefore the number of major outfalls is unknown at this time (See BW No. 16). 3.3 Receiving Waters The tributary streams are listed in the order in which they occur beginning at the most downstream point of the named Creek within the program area and proceeding upstream. The direction of flow of Grants Creek and Town Creek is from south to north. Cold Water Creek flows from the north to the south. The "E" and "W ' designations indicate that the tributary is located to either the east or the west side of the main creek. The numerical designation indicates the order of occurrence from the most far point in the program area downstream to most upstream point in the program area. Figure 2 in Appendix A illustrates the receiving streams in the program area. Major Receiving Stream Index Water Quality Use Support Water Quality Stream Name Classification Rating Issues Grants Creek 12-110 C O Fecal Coliform, Turbidity, Sediment Town Creek 12-112-3 C O DO, Turbidity Cold Water Creek 13-17-94.05 WS-IV O Fecal Coliform Cold Water Creek — Beginning north of intersection SR 1243 and 1-85 and ending north of NC 152 and south of intersection of 1-85 and 29/601. • Unnamed Tributary W-1 Cold Water Creek • Unnamed Tributary W-2 Cold Water Creek • Unnamed Tributary W-3 Cold Water Creek at SR 1232 • Unnamed Tributary E-I Cold Water Creek at SR 1339 • Unnamed Tributary W4 Cold Water Creek Unnamed Tributary W-5 Cold Water Creek at SR 1337 • Unnamed Tributary E-2 Cold Water Creek at SR 1337 • Unnamed Tributary E-3 Cold Water Creek at NC 152 DRAFT NCS000515 SWMP Town of China Grove July 211, 2021 Page 4 Grants Creek —Beginning southwest of SR1505 and ending at SR1211 • Unnamed Tributary E-1 to Grants Creek o Unnamed Tributary E-lA • Unnamed Tributary E-2 to Grants Creek o Unnamed Tributary E-2A • Unnamed Tributary E-3 to Grants Creek • Unnamed Tributary W-1 to Grants Creek o Unnamed Tributary W-lA • Unnamed Tributary W-2 to Grants Creek • Unnamed Tributary W-3 to Grants Creek • Unnamed Tributary E-4 to Grants Creek at SR 1225 • Unnamed Tributary W-4 to Grants Creek • Unnamed Tributary E-5 to Grants Creek • Unnamed Tributary W-5 to Grants Creek • Unnamed Tributary E-6 to Grants Creek Town Creek— Beginning at headwaters east of SR 2553 and ending at intersection SR 1505 and 1-85. No tributary streams are included in the program area. 3.4 MS4 Interconnection The Town of China Grove MS4 is not interconnected with another regulated MS4 and directly discharges to the receiving waters as listed in Table 2 above. The MS4 does not interconnect with the statewide NCDOT TS4 and includes: a. The interconnection is not receiving stormwater from the NCDOT TS4. The number of interconnections is unknown. Quantity: N/A b. The interconnection is not discharging stormwater into the NCDOT TS4. The number of interconnections is unknown. Quantity: N/A c. The Town of China Grove MS4 mapping does/does not identify interconnections with the NCDOT TS4. d. The Town of China Grove MS4 mapping does not include NCDOT TS4 outfalls. 3.5 Total Maximum Daily Loads (TMDLs) The USEPA developed an approach called total maximum daily loads (TMDL) for determining the total waste (pollutant) loading from point and nonpoint sources that a stream or other water body can assimilate and maintain its designated uses. With the TMDL approach streams, which do not meet water quality standards, are identified and the State establishes priorities for actions needed to meet water quality goals. The TMDL(s) listed in Table 3 below have been approved within the MS4 area, as determined by the map and list provided on the NCDEQ Modeling & Assessment Unit web page. The table also indicates whether the approved TMDL has a specific stormwater Waste Load Allocation (WLA) for any watershed directly receiving discharges from the permitted MS4, and whether a Water Quality Recovery Program has been implemented to address the WLA. DRAFTNCS000515 SWMP Town of China Grove July 2151, 2021 Page 5 Water Body Name TMDL Pollutant(s) Stormwater Waste Water Quality Load Allocation (Y/N) Recovery Program /N) Statewide Mercury N N Grants Creek Fecal Coliform, Turbidity The Statewide TMDL for mercury does not require any actions by the NPDES stormwater permittees because most mercury in stormwater comes from atmospheric deposition. 3.6 Endangered and Threatened Species and Critical Habitat Significant populations of threatened or endangered species and/or critical habitat are identified within the regulated MS4 urbanized area, Based upon a review of the Endangered and Threatened Species and Species of Concern by County for North Carolina Map and Listed species believe to or known to occur in North Carolina map as provided by the U.S. Fish and Wildlife Service, the species listed in Table 4 have the potential to occur within the regulated MS4 urbanized area Of those species listed, Table 4 summarizes the species that may be significantly impacted by the quality of surface waters within their habitat. Table 4: Potential Federally Listed Species/Habitat Impacted by Surface Water Quality Scientific Name Common name Species Group Federal Listing Status Haliaeetus leucoce halus Bald Eagle Vertebrate BGPA* Myotis septentrionalis Northern long-eared Vertebrate Threatened bat Helianthus schweinitzii Schweinitz's Vascular Plant Endangered sunflower *BGPA- Bald Eagle Protection Act 3.7 Industrial Facility Discharges The Town of China Grove MS4 jurisdictional area includes the following industrial facilities which hold NPDES Industrial Stormwater Permits, as determined from the NCDEO Maps & Permit Data web page. Table 5: NPDES Stormwater Permitted Industrial Facilities Permit Number Facility Name NCG070057 Hitachi Metals North Carolina NCG080909 R&L Carriers 3.8 Non-Stormwater Discharges The water quality impacts of non-stormwater discharges have been evaluated by the Town of China Grove as summarized in Table 6 below. The unpermitted non-stormwater flows listed as incidental do DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 6 not significantly impact water quality. The Town of China Grove has evaluated residential and charity car washing and street washing for possible significant water quality impacts. Street washing discharges are addressed under the Pavement Management Program in Part 10 of this SWMP. The Division has not required that other non-stormwater flows be specifically controlled by the Town of China Grove. Wash water associated with car washing that does not contain detergents or does not discharge directly into the MS4 is considered incidental. However, these types of non-stormwater discharges that do contain detergents have been evaluated by the Town of China Grove to determine whether they may significantly impact water quality. Table 6: Non-Stormwater Discharges Non-Stormwater Discharge Water Quality Impacts Water line and fire hydrant flushing Incidental Landscape irrigation Incidental Diverted stream flows Incidental Rising groundwater Incidental Uncontaminated groundwater infiltration Incidental Uncontaminated pumped groundwater Incidental Uncontaminated potable water sources Incidental Foundation drains Incidental Air conditioning condensate Incidental Irrigation waters Incidental Springs Incidental Water from crawls ace pumps Incidental Footing drains Incidental Lawn watering Incidental Residential and charity car washing Possible Flows from riparian habitats and wetlands Incidental Dechlorinated swimming pool discharges Incidental Street wash water N/A Flows from firefighting activities Incidental 3.9 Target Pollutants and Sources In addition to those target pollutants identified above, the Town of China Grove is not aware of other significant water quality issues within the permitted MS4 area. Table 7 below summarizes the water quality pollutants identified throughout Part 3 of this SWMP, the likely activities/sources/targeted audiences attributed to each pollutant, and identifies the associated SWMP program(s) that address each. In addition, the Town of China Grove has evaluated schools, homeowners and businesses as target audiences that are likely to have significant stormwater impacts. DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 7 Table 7: Summary of Target Pollutants and Sources Target Pollutants/Sources Target Audience(s) Education Programs General Non -point General Public, Website, Mailed Information, Social source pollution Businesses, Municipal Media, Posters Employees Used Motor Oil General Public, Website, Mailed Information Businesses, Municipal Employees Kitchen Fats, Oils, and Restaurants, Grocery Website, Mailed Information, Posters, Grease, Dumpster leaks Stores, Commercial Inspections Businesses, Municipal Employees, General Pubic Yard Waste and General Public, Website, Mailed Information, Posters, Fertilizer Businesses, Municipal Inspections Employees Illicit Discharges General Public, Website, Mailed Information, Posters, Businesses, Municipal Inspections Employees Illegal Dumping General Public, Website, Mailed Information, Posters, Businesses, Municipal Inspections Employees Improper Disposal of General Public, Website, Mailed Information, Posters, Waste, Litter Businesses, Municipal Inspections Employees Sediment Construction Sector Construction Site Run-off Control Mercury/Statewide Atmospheric Public Education and Outreach (fish TMDL Disposition consumption adviso Nutrients, Fecal Public Education & Outreach, Illicit Coliform Sewer overflows, Discharge Detection & Elimination, failing septic systems, Construction Site Runoff Control, Post urbanization Construction Site Runoff Control, Pollution Prevention & Good Housekeeping DRAFT NCS0005 15 SWMP Town of China Grove July 2111, 2021 Page 8 PART 4: STORMWATER MANAGEMENT PROGRAM ADMINISTRATION 4.1 Organizational Structure The Assistant Town Manager is responsible for the administration of the Stormwater Management Program. Town of China Grove Organizational Chart Town Manager Town Attorney Asst. Town Town Clerk Manager 1-1 Police Fire Planning&. Public Works Administration Parks& Development � � Recreation 11 Stormwater Program DRAFT NCS000515 SWMP Town of China Grove July 211, 2021 Page 9 Table 8: Summary of Responsible Parties SWMP Component Responsible Position Staff Name Department Stormwater Program Assistant Town Franklin Gover Administration Administration Manager SWMP Management Assistant Town Franklin Gover Administration Manager Public Education & Assistant Town Franklin Gover Administration Outreach Manager Public Involvement & Assistant Town Franklin Gover Administration Participation Manager Illicit Discharge Assistant Town Franklin Gover Administration Detection & Manager Elimination Construction Site Rowan County Joshua Canup Rowan County Planning Runoff Control Sediment and Erosion and Development Control Post -Construction Assistant Town Franklin Gover Administration Stormwater Manager Management Pollution Assistant Town Franklin Gover, David Administration, Public Prevention/Good Manager, Public Works Ketner Works Housekeeping for Director Municipal Operations Municipal Facilities Assistant Town Franklin Gover Administration Operation & Manager Maintenance Program Spill Response Program Assistant Town Franklin Gover Administration Mana er MS4 Operation & Assistant Town Franklin Gover Administration Maintenance Program Manager Municipal SCM Assistant Town Franklin Gover Administration Operation & Manager Maintenance Program Pesticide, Herbicide & Public Works Director David Ketner Public Works Fertilizer Management Program DRAFT NCS000515 SWMP Town of China Grove July 21s1, 2021 Page 10 Vehicle & Equipment Cleaning Program Assistant Town Manager Franklin Gover Administration Pavement Management Public Works Director David Ketner Public Works Program Total Maximum Daily N/A Load (TMDL) Requirements 4.2 Program Funding and Budget In accordance with the issued permit, the Town of China Grove shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and comply with the requirements of the NPDES MS4 Permit. The budget includes the permit administering and compliance fee, which is billed by the Division annually. The stormwater program currently receives funding of approximately $5,000 per year, this is funded through general funds. The Assistant Town Manager position is funded through the general fund. The program is currently under -funded to conduct all the proactive elements of the permit. Further fiscal analysis and investigation of funding options (such as additional general fund allocation or a stormwater fee) will be conducted as indicated in BMP No. 3 in order to fully fund the program by Permit year three. 4.3 Shared Responsibility The Town of China Grove will share the responsibility to implement the following minimum control measures, which are at least as stringent as the corresponding NPDES MS4 Permit requirement. The Town of China Grove remains responsible for compliance if the other entity fails to perform the permit obligation, and may be subject to enforcement action if neither the Town of China Grove nor the other entity fully performs the permit obligation. Table 9 below summarizes who will be implementing the component, what the component program is called, the specific SWMP BMP or permit requirement that is being met by the shared responsibility, and whether or not a legal agreement to share responsibility is in place. SWMP BMP or Legal Permit Requirement Implementing Entity & Program Name Agreement Y/N Public Outreach Regional Stormwater Partnership of the Carolinas Y Construction Runoff Rowan County Sediment and Erosion Control Y Post Construction McGill and Associates Y Runoff Plan Review DRAFTNCS000515 SWMP Town of China Grove July 21 ", 2021 Page 11 4.4 Co-Permittees There are no other entities applying for co-permittee status under the NPDES MS4 permits number NCS000515 for the Town of China Grove. Table 10 summarizes contact information for each co- petmittee. Table 10: Co-Permittee Contact Information Co-Permittee MS4 Name Contact Person Phone & E-Mail Interlocal Agreement Y/N N/A N/A N/A 4.5 Measurable Goals for Program Administration China Grove will manage and report the following Best Management Practices (BMPs) for the administration of the Stormwater Management Program. Table 11: Program Administration BMPs Permit 2.1.2 and Part 4: Annual Self -Assessment Ref. Measures to evaluate the performance and effectiveness of the SWMP program components at least annually. Results shall be used by the permittee to modify the program components as necessary to accomplish the intent of the Stormwater Program. The self -assessment re ortin eriod is the fiscal year Jul 1 — June 30 . BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 1. Annual Self -Assessment Perform an annual evaluation of 1. Prepare, certify and 1. Annually for permit 1. Yes/No SWMP implementation, suitability of submit the Annual Self- years 1-4 SWMP commitments and any Assessment to NCDEQ proposed changes to the SWMP prior to August 31 each utilizing the NCDEQ Annual Self- year. Assessment Template. Permit 1.6: Permit Renewal Application Ref. Measures to submit a pen -nit renewal application no later than 180 days prior to the expiration date of the NPDES MS4 permit. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric 2. Permit Renewal Application DRAFTNCS000515 SWMP Town of China Grove July 21It, 2021 Page 12 Table II: Program Administration BMPs Audit stormwater program 1. Participate in an 1 Permit Year 5 1. Yes/No implementation for compliance with NPDES MS4 Permit the permit and approved SWMP, and Compliance Audit, as utilize the results to prepare and scheduled and performed submit a permit renewal application by EPA or NCDEQ. package. 2. Self -audit and 2.Permit Year 5 2. Yes/No/Partial document any stormwater program components not audited by EPA or NCDEQ utilizing the DEQ Audit Template. Submit Self - Audit to DEMLR (required component of permit renewal application package). 3. Certify the stormwater 3. Permit Year 5 3. Date of permit renewal permit renewal application submittal application (Permit renewal application form, Self -Audit, and Draft SWMP for the next 5-year permit cycle) and submit to NCDEQ at least 180 days prior to permit expiration. Permit 2.1.1: Adequate Funding and Staffing Ref. The permittee shall maintain adequate funding and staffing to implement and manage the provisions of the SWMP and meet all requirements of this permit. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 3. Adequate Funding Perform a fiscal analysis and explore 1. Complete a fiscal gap 1. Permit Year 1 1. Yes/No/Partial, Report options to obtain adequate program anal sis monetary value gap funding to fully fund the stormwater 2. Determine available 2. Permit Year 1 2.Yes/No/Partial program and meet all requirements of funding mechanisms and the permit. Select and implement a evaluate options funding strategy for the Phase II 3. Sect a funding 3. Permit year 1-2 3. Yes/No/Partial, Report Stormwater Program. mechanism selected mechanism 4. Implement Funding 4. Permit Year 2-5 4. Yes/No/Partial, Report Mechanism I j Implementation status DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 13 PART 5: PUBLIC EDUCATION AND OUTREACH? PROGRAM The Town of China Grove implements a Public Education and Outreach Program to distribute educational materials to the community or conduct equivalent outreach activities about the impacts of storm water discharges on water bodies and steps the public can take to reduce pollutants in storm water runoff. The target audiences and identified pollutants listed in Part 3.9 of this SWMP, which will be addressed by the Public Education and Outreach Program, are summarized in Table 12 below. In addition, China Grove is required to inform businesses and the general public of the hazards associated with illicit discharges, illegal dumping and improper disposal of waste. Table 12: Summary of Target Pollutants & Audiences Target Pollutants/Sources Tar et Audience(s) Household Chemicals General Public, Businesses, Municipal Employees Used Motor Oil General Public, Businesses, Municipal Employees Litter Restaurants, Grocery Stores, Commercial Businesses, Municipal Employees, General Public Kitchen Fats, Oils, and Grease Restaurants, Grocery Stores, Commercial Businesses, Municipal Employees, General Public Dumpster leaks Restaurants, Grocery Stores, Commercial Businesses, Municipal Employees, General Public Yard Waste and Fertilizer General Public, Businesses, Municipal Employees Illicit Discharges General Public, Businesses, Municipal Employees General Public, Businesses, Municipal Em toees ,=ing osal of Waste General Public Businesses, Municipal Em eesEEE Sediment and Waste Management Construction Sector The Town of China Grove will manage, implement and report the following public education and outreach BMPs. Table 13: Public Education and Outreach BMPs Permit 3.2.2 and 3.2.4: Outreach to Targeted Audiences Ref. Measures to identify the specific elements and implementation of a Public Education and Outreach Program to share educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and how the public can reduce pollutants in stormwater runoff. The permittee shall provide educational information to identified target audiences on pollutants/sources identified in table 12 above, and shall document the extent of exposure of each media, event or activity, including those elements implemented locally or throu h a cooperative ajzreement. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric 4. Distribute public education materials to identified target audience and user groups DRAFT NCS000515 SWMP Town of China Grove July 211, 2021 Page 14 Table 13: Public Education and Outreach BMPs Distribute stormwater educational 1. Review and update 1. Permit Year 1 1. Yes/No/Partial materials to appropriate target groups Table 12 maintaining a which include hotline contact description of the target information to report pollution. We pollutants and/or may also use Public Education & stressors and likely Outreach materials supplied by the sources. Maintain a state when available. description of the target audiences likely to have significant stormwater impacts and why they were selected. 2. Develop brochures, 2. Permit Year 1 2. Yes/No/Partial handouts, and flyers for residential, and industry specific uses identified as target audiences in Table 12 and one general stormwater awareness brochure for all audiences. 3. Distribute brochures to 3. Continuously Permit 3. Yes/No/Partial; report target audiences, a Years 2-5 number of educational minimum of one specific items distributed audience each year. Distribute the general stormwater awareness brochure. 4. Display flyers for illicit discharge, illegal 4. Continuously Permit Years 2-5 4. Yes/No/Partial; Report number of materials dumping, and general distributed awareness at Town Hall kiosk 5. Attend all town events 5. Continuously Permit 5. Yes/No/Partial; Report with booth and SW truck Years 2-5 how many events? 6. Provide handouts, 6. Continuously Permit 6. Yes/No/Partial; Report coloring books, activity Years 2-5 how many books, and prizes at all promotional/educational town events. items are given out 7. Evaluate educational 7. Annually Permit Years 7. Yes/No/Partial materials 2-5 Materials updated? Permit 2.1.7, 3.2.3 and 3.6.5(c): Web Site Ref. Measures to provide a web site designed to convey the program's message(s) and provide online materials including ordinances, or other regulatory mechanisms, or a list identifying the ordinances or other regulatory mechanisms, providing the legal authority necessary to implement and enforce the requirements of the permit and SWMP. The web page shall also provide developers with all relevant post -construction requirements, design standards, checklists and/or other materials. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation I Annual Reporting Metric DRAFT NCS000515 SWMP Town of China Grove July 21",2021 Page 15 Table 13: Public Education and Outreach BMPs 5. Town Stormwater Website The China Grove web page will 1. Establish and maintain 1. Permit Year 1 1. Yes/No/Partial provide information on the town's Town Stormwater web stormwater program, including the page with up to date permit, SWMP, applicable information ordinances, and annual reports. The 2.Include information on 2. Permit Year 1 2. Yes/No/Partial web page will also include a program stormwater issue reporting mechanism, educational materials 3. Include information for developers 3. Permit Year 1 3. Yes/No/Partial developed by the town, and links to additional stormwater educational 4. Monitor website traffic 4. Annually beginning Permit Year 1 4. How many visits? resources. The web page will also serve to advertise the stormwater hotline, and opportunities for involvement. 5. Evaluate website 5. Annually beginning 5. Yes/No/Partial; Permit Year 1 Permit 3.2.5: Stormwater Hotline Ref. Measures for a stormwater hotline/helpline for the purpose of public education and outreach. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 6. Stormwater Hotline Establish a stormwater hotline line 1. Establish Hotline and 1. Permit Year 1 1. Yes/No/Partial for the purpose of public outreach email for public use and education 2. Establish specific staff 2. Permit Year 1 2. Yes/No/Status member who will serve as stormwater education and hotline contact 3.Publicize contact 3. Continuously 3. Yes/No/Partial information on the town website beginning Permit Year 1 Document & report a summary of the number of inquiries received, general type of inquiry, and the contact mechanism used 4.Employee training - 4. Annually beginning 4. Yes/No/Status; stormwater education Permit Year 1 number trained and hotline contact in general stormwater awareness, complaint call protocols and appropriate contacts for referral of stormwater issues DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 16 Table 13: Public Education and Outreach BMPs 7. Implement Media Program Traditional and Social Media 1. TV Ads 1. Annually beginning 1.Yes/No/Status Number Campaign with Staff and Regional Permit Year 1 of viewers Stormwater Partnership of the 2. Radio Ads 2. Annually beginning 2. Yes/No/Status Carolinas. Permit Year 1 Number of Ads 3. Website 3. Annually beginning 3. See BMP 5 Permit Year 1 4. Promote the RSPC 4. Annually beginning 4. Yes/No/Status Website Permit Year I 5. Social Media - The Annually beginning 5. Yes/No/Status; town's existing Permit Year 1 Document Number of Facebook account will be Posts used to reach the residential target audience and share information related to stormwater issues DRAFTNCS000515 SWMP Town of China Grove July 21", 2021 Page 17 PART 6: PUBLIC INVOLVEMENT AND PARTICIPATION PROGRAM This SWMP identifies the minimum elements and implementation of a Public Involvement and Participation Program that complies with applicable State, Tribal and local public notice requirements. The Town of China Grove will manage, implement and report the following public involvement and participation BMPs. Table 14: Public Involvement and Participation BMPs Permit 3.3.1: Public Input Ref. Mechanisms for public involvement that provide for input on stormwater issues and the Stormwater program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 8. Stormwater Public Input Email Establish a Stormwater Email I. Establish an email for 1. Permit Year 1 1. See BMP 6 stormwater input 2. Promote on all 2. Permit Year 1 2. See BMP 6 educational materials 3. Maintained by 3.Permit Year 1 3. See BMP 6 Stormwater Administrator 4. 4. 4. 5. 5. 5. 9. Hotline/Help Line The Town promotes its phone 1. See BMP No. 6 1. See BMP No. 6 1. See BMP No. 6 number a hotline for public 2• 2. 2. involvement 3. 3. 3. 10. Town Stormwater Webpage The web page will provide links to 1. See BMP No. 5 1. See BMP No. 5 1. See BMP No. 5 information on the City's stormwater 2. 2. 2. program, including the permit, SWMP, applicable ordinances, and annual reports. Permit 3.3.2: Volunteer Opportunities Ref. Measures to provide volunteer opportunities designed to promote ongoing citizen participation. BMP A I B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric It. Drain Marking Volunteer Program DRAFTNCS000515 SWMP Town of China Grove July 21", 2021 Page 18 Table 14: Public Involvement and Participation BNIPs Volunteer program aimed at Boy 1. Partner with local 1. Permit Years 1-5 1. Yes/No/Status; Report Scouts, or youth organization, to organizations to number of events and mark and inspect catch basins, complete drain marking participants limited opportunity programs 2.Mark and inspect 2. Permit Years 1-5 2. Yes/No/Status; Report drains Number of Inlets Marked, 12. Social Media Programs Volunteer program for residents to 1. Start social media 1. Permit Year 1 1. Yes/No/Status, report stream conditions, pollution, marketing for stormwater Document Social Media wildlife, and activities near creeks and streams. program Campaigns 2. Develop Social Media 2. Permit year 2 2. Yes/No/Status, materials for new stream Document new monitoring program advertisements and materials 3. Implement new 3. Permit year 3 3. Yes/No/Status, monitoring program Document Program Participants 4. Evaluate Program 4. Annually, Permit Year 4. Yes/No/Status Report 3-5 Program achievements 13 Curb Clean Up Weekend A town wide effort to clean curbs and 1. Develop bi-annual 1. Bi-annually, beginning 1. Yes/No/Status; curb lines. Residents can document curb clean-up program Permit Year 1 Report program policy their efforts through social media tags and details such as #cleanupgrantscreek 2. Implement the 2. Bi-annually, Permit 2. Yes/No/Status; Report program Years 2-5 Program Implementation Status 3. Social media post with 3. Annually, Permit Year 3. Yes/No/Status; Report event highlights 2-5 Participation Numbers 4. Evaluate Program 4. Annually, Permit Year 4. Yes/No/Status Report 2-5 ro am achievements DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 19 PART 7: ILLICIT DISCHARGE DETECTION AND ELIMINATION PROGRAM The Town of China Grove will develop, manage, implement, document, report and enforce an Illicit Discharge Detection and Elimination Program which shall, at a minimum, include the following illicit discharge detection and elimination BMPs. Table 15: Illicit Discharge Detection and Elimination BMPs Permit 3.4.1: MS4 Map Ref. Measures to develop, update and maintain a municipal storm sewer system map including stormwater conveyances, flow direction, major outfalls and waters of the United States receivin stormwater discharges. BMP A B C D No. Description of BMP Measurable Goals) Schedule for Annual Reporting Im lementation Metric 14. Maintain Storm Sewer System Base Map of Major Outfalls The MS4 map will be completed 1. Add a layer 1. Permit Year 1 1. Yes/No/Partial; Report through GIS analysis of existing data. identifying major outfalls number of major outfalls Major outfalls will be identified and to the map and number identified numbered, and flow directions and 2. Add flow directions to 2. Permit Year 2 2. Yes/No/Status; Report receiving waters will be added. the map ma u dates 3. Highlight receiving 3. Permit Year 2 3. Yes/No/Status; Update waters ma 15. Continual Updates to MS4 Map The MS4 map will be continuously 1. When new 1. Continuously 1. Yes/No/Status; Report updated for completeness. conveyances and outfalls Number of Outfalls are located or Added constructed add them to the ma Permit 3.4.2: Regulatory Mechanism Ref. Measures to provide an IDDE ordinance or other regulatory mechanism that provides legal authority to prohibit, detect, and eliminate illicit connections and discharges, illegal dumping and spills into the MS4, including enforcement procedures and actions. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 16. Maintain Adequate Legal Authorities Review annually the IDDE 1. Review ordinance and 1. Permit years 1-5 l.Yes/No/Partial; Report ordinances or other regulatory update if revision is if a revision is required mechanisms, or adopt any new required to maintain and if a revision is made ordinances or other regulatory legal authority mechanisms that provide the Town of 2. 2. —1- China Grove with adequate legal authority to prohibit illicit connections and discharges and enforce the approved IDDE Program. DRAFT NCS000515 SWMP Town of China Grove July 21', 2021 Page 20 Table 15: Illicit Discharge Detection and Elimination BMPs 17. Enforcement Implement a mechanism to track the 1. Implemented IWORQ 1. Permit Year 1 1. Yes/No/Status; Annual issuance of notices of violation and software to issue and IWORQ reporting enforcement actions as administered track violations by the town. This will include the ability to identify chronic violators 2. Code Enforcement Officer & Storwater 2. Permit Year 2-5 2. Yes/No/Status, Report Number of Violations for initiation of actions to reduce Administrator issue issued noncompliance. violations 3. 3. 3. Permit 3.4.3: IDDE Plan Ref. Measures to maintain and implement a written IDDE Plan to detect and address illicit discharges, illegal dumping and any non-stormwater discharges identified as significant contributors of pollutants to the MS4. The plan shall provide standard procedures and documentation to: a) Locate priority areas likely to have illicit discharges, b) Conduct routine dry weather outfall inspections, c) Identify illicit discharges and trace sources, d) Eliminate the source(s) of an illicit discharge, and e) Evaluate and assess the IDDE Program. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for _Implementation Annual Reporting Metric 18. Observe Dry Weather Flows Maintain a program for conducting dry weather flow field observations 1. Develop a written IDDE Program 1. Permit Year 1 1. Yes/No/Partial; Policy Adopted in accordance with a written procedure for detecting and removing 2. Submit IDDE Program for NCDEQ review and 2. Permit Year 1 2. Yes/No/Partial; Report Date Submitted to the sources of illicit discharges Approval NCDE 3. Train Staff to perform 3. Permit Years 2-5 3. Yes/No/Partial; dry weather flow Number of staff trained inspections and all field staff that may encounter illicit discharges 4. Implement written 4. Permit Years 2-5 4. Yes/No/Status IDDE Program 5. Perform dry weather 5. Annually beginning 5. Yes/No/Partial; major outfall inspections permit year 2 Number of inspections completed 19. Investigate sources of identified illicit discharges Develop and maintain a standard 1. Implement illicit 1. Permit Years 2-5 1. Yes/No/Status; operating procedure (SOP) for discharge investigation investigation of potential illicit SOP portion of IDDE Program DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 21 Table 15: Illicit Discharge Detection and Elimination BMPs discharges, illicit connections, and illegal dumping. 2. Investigate reported illicit discharges 2. Permit Years 2-5 2. Yes/No/Status; Report the number of found/reported, investigated, confirmed as illicit discharge and resolved/eliminated 20 IDDE Program Evaluation Evaluate and assess the Town of 1. Review the annual 1. Permit Years 2-5 1. Yes/No/Status China Grove IDDE Program. results of dry weather flow observations and NOVs issued 2. Document any 2. Permit Years 2-5 2. Yes/No/Status pollutant trends 3. Revise program SOP 3. Annually, Beginning 3. Yes/No/Status to address trends and permit year 2 concerns 4. Focus outreach on 4. Annually, Beginning 4. Yes/No/Status identified trends permit year 2 Permit 3.4.4: IDDE Tracking Ref. Measures for tracking and documenting the date(s) an illicit discharge, illicit connection or illegal dumping was observed, the results of the investigation, any follow-up of the investigation, the date the investigation was closed, the issuance of enforcement actions, and the abili to identify chronic violators. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 21. Track and document investigations of illicit discharges China Grove will track all 1. Develop procedures 1. Permit Year 1 1. Yes/No/Status investigations and document the date for inspections in the the illicit discharge was observed; the IDDE Program results of the investigation; any 2. Develop an inspection 2. Permit Year 1 2. Yes/No/Status follow-up of the investigation; and template for iWorq the date the investigation was closed. software to track cases 3. Identify case trends to 3. Permit Years 2-5 3.Yes/No/Status; help guide education Report Trends Permit 3.4.5: Staff IDDE Training Ref. Measures to provide training for municipal staff and contractors who, as part of their normal job responsibilities, may observe an illicit discharge, illicit connection, illegal dumping or spills. Training shall include how to identify and report illicit discharges, illicit connections, illegal dumping and spills. Each staff training event shall be documented, including the agenda/materials, date, and number of staff artici atin . A B C D DRAFTNCS000515 SWMP Town of China Grove July 21", 2021 Page 22 Table 15: Illicit Discharge Detection and Elimination BMPs BMP No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 22. Employee Training Develop a program to educate town 1. Develop staff training 1. Permit Year 1 1. Yes/No/Partial staff of indicators of potential illicit program for all discharges/connections and illegal employees dumping and the appropriate avenues 2. Train all staff to 2. Permit Year 2 2. See BMP 18 through which to report suspected recognize and report an illicit discharge. (See BMP No. 20 for illicit discharge SOPS by which to train staff) 3. Train new staff that 3. Annually, beginning 3. Yes/NO/Parnal; Report will be part of the IDDE in permit year 3 topics, training date, and program number of attendees 4. 4. 4. 23. Provide Public Education Inform employees, businesses, and 1. Create seasonal IDDE 1. Permit Year 1 1. See BMPs 8-10 the general public of hazards flyers for municipal associated with illegal discharges and facilities, website improper disposal of waste 2. Display IDDE flyer at 2. Permit Year I 2.See BMPs 8-10 municipal facilities, website 3. Distribute Illicit 3. Permit Year 1 3. See BMPs 8-10 Discharge Brochure to residents Permit 3.4.6: IDDE Reporting Ref. Measures for the public and staff to report illicit discharges, illegal dumping and spills. The mechanism shall be publicized to facilitate reporting and shall be managed to provide rapid response by appropriately trained personnel. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 24. Stormwater Hotline A hotline will be maintained for 1. See BMP No. 6 1. See BMP No. 6 1. See BMP No. 6 citizens to ask stormwater questions and report stormwater issues. (See BMP No. 6) 25. Stormwater Website The web page will provide links to 1. See BMP No. 5 1. See BMP No. 5 1. See BMP No. 5 information on the City's stormwater program, including the permit, SWMP, applicable ordinances, and annual reports. The web page will also include a stormwater issue reporting mechanism, educational materials developed by the City, and links to additional stormwater educational resources DRAFT NCS000515 SWMP Town of China Grove July 21', 2021 Page 23 DRAFT NCS000515 SWMP Town of China Grove July 21', 2021 Page 24 PART 8: CONSTRUCTION SITE RUNOFF CONTROL PROGRAM In accordance with 15A NCAC 0211.0153, the MS4name relies upon the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 as a qualifying alternative program to meet a portion of the NPDES MS4 Permit requirements for construction site runoff control measures. The SPCA requirements include reducing pollutants in stormwater runoff from construction activities that result in land disturbance of greater than or equal to one acre, and includes any construction activity that is part of a larger common plan of development that would disturb one acre or more. The state SPCA Program is either delegated to a city/town, delegated to a county, or implemented by NCDEQ in non -delegated areas. Table 16: Qualifying Alternative Program Components for Construction Site Runoff Control Program Permit Reference State or Local Program Name Legal Authority Implementing Entity Meets Whole or Part of Requirement 3.5.1 - Rowan County 15A NCAC Rowan County Whole 3.5.4 Delegated SPCA Program* Chapter 04 NCDEQ Approved Delegation Interlocal Agreement * The local delegated SPCA Program ordinance(s)/regulatory mechanism(s) can be found at: https:Hlibrary.municode.com/nc/rowan county/codes/code of ordinances?nodeld=COOR CHI8SOE RSE The Town of China Grove also implements the following BMPs to meet NPDES MS4 Permit requirements. Table 17: Construction Site Runoff Control BMPs Permit 3.5.6: Public Input Ref. Measures to provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementatian Metric 26. Municipal Staff Training Train municipal staff who receive 1. Train municipal staff 1. Annually Permit Year 1. Number of staff calls from the public on the protocols on proper handling of 1 (FY20/21) trained for referral and tracking of construction site runoff construction site runoff control control complaints. complaints. 2. 2. 2. 27. Stormwater Hotline I. See BMP No. 6 1. See BMP No. 6 1. See BMP No. 6 DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 25 Table 17: Construction Site Runoff Control BMPs A hotline will be maintained for 2. 2. citizens to ask stormwater questions t3. tf] 3. 3. and report stormwater issues (See BMP No. 6). Permit 3.5.5: Waste Management Ref. Measures to require construction site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impact to water quality. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lememation Metric 28. Establish and Maintain Legal Authority Develop and implement an ordinance 1. Adopt ordinance 1.Permit Year 1 1. Yes/No/Partial; to require construction site operators Document and report to control waste. 2. Maintain legal 2. Permit Year 1 - 5 2. Yes/No/Status; Assess authority and reDort annuall 3. Implement and 3. Permit Years 2-5 3. See BMP 19 Enforce Ordinance 29. Contractor Education Make available through paper and 1. Create brochure to 1. Permit Year 1 1. Yes/No/Status electronic means materials share at preconstruction appropriate for developers meetings concerning construction site solid 2. Add brochure to 2. Permit Year 1 2. Yes/No/Status waste management. website 3. Distribute brochure at 3. Permit Years 2-5 3. Yes/No/Status; preconstruction meetings Number of sheets distributed DRAFT NCS000515 SWMP Town of China Grove July 21It, 2021 Page 26 PART 9: POST -CONSTRUCTION SITE RUNOFF CONTROL PROGRAM This SWMP identifies the minimum elements to develop, implement and enforce a program to address stormwater runoff from new development and redevelopment projects that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, that are located within the Town of China Grove and discharge into the MS4. These elements are designed to minimize water quality impacts utilizing a combination of structural Stormwater Control Measures (SCMs) and/or non-structural BMPs appropriate for the community and ensure adequate long- term operation and maintenance of SCMs. In accordance with 15A NCAC 02H .0153 and .1017, the Town of China Grove implements the following State post -construction program requirements, which satisfy the NPDES Phase II MS4 post - construction site runoff control requirements as Qualifying Alternative Programs (QAPs) in the MS4 area(s) where they are implemented. Table 18: Qualifying Alternative Program(s) for Post-Constniction Site Runoff Control Program State QAP Name State Requirements Local Ordinance / Regulatory Mechanism Reference None N/A N/A Water Supply Watershed (WS-N) 15A NCAC 2B China Grove Unified Development .0620 - .0624 Ordinance Chapter 3 Table 19: Summary of Existing Post -Construction Program Elements DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 27 Permit Requirements for Plan Review and Approval Municipal Ordinance/Code Reference(s) and/or Document Title(s) Date Adopted 3.6.2(a) Authority Town of China Grove Code of Ordinances Section 54-332 8-2-2011 3.6.3(a) & 15A NCAC 02H.0I53(c) Federal, State & Local Projects Unified Development Ordinance 8.11.8 9-24-2019 3.6.3 b Plan Review Unified Development Ordinance 8.11.9 9-24-2019 3.6.3 c O&M Agreement Unified Development Ordinance 8.11.11 9-24-2019 3.6.3 d O&M Plan Unified Development Ordinance 8.11.11 9-24-2019 3.6.3(e) Deed Restrictions/Covenants Unified Development Ordinance8.1 1. 10 & 8,11.11 9-24-2019 3.6.3 Access Easements Unified Development Ordinance 8.11.10 9-24-2019 Permit Requirements for Inspections and Enforcement Municipal Ordinance/Code Reference(s) and/or Document Title(s) Date Adopted 3.6.2(b Documentation Unified Development Ordinance 9.11.10 9-24-2019 3.6.2 c Right of Entry Unified Development Ordinance 8.11.10 9-24-2019 3.6.4 a Pre -CO Inspections Unified Development Ordinance 8.11.11 9-24-2019 3.6.4 b Compliance with Plans Unified Development Ordinance 8.11.11 9-24-2019 3.6.4 c Annual SCM Inspections Unified Development Ordinance 8.11.11 9-24-2019 3.6.4 d Low Density Inspections Unified Development Ordinance 8.11.11 9-24-2019 3.6.4 eQualified Professional Unified Development Ordinance 8.11.11 9-24-2019 Permit Requirements for Fecal Coliform Reduction Municipal Ordinance/Code Reference(s) and/or Document Title(s) Date Adopted 3.6.6(a) Pet Waste Town of China Grove Code of Ordinances Section 10-24 8-2-2016 3.6.6(b) On -Site Domestic Wastewater Treatment Unified Development Ordinance 8.10.1 8-1-2006 The annual reporting metrics for the post construction program are provided in Table 20: Post Construction Site Runoff Control BMPs below. Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.5(a), 3.6.5(b), and 4.1.3: Minimum Post -Construction Reporting Requirements Ref. Measures to document activities over the course of the fiscal year (July 1 — June 30) including appropriate information to accurately describe rogress, status, and results. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric 30. Standard Reporting Implement standardized tracking, 1. Track number of low 1. Continuously 1. Yes/No/Partial; documentation, inspections and density and high density Permit Years 1-5 Number of plan reviews reporting mechanisms to compile plan reviews performed. performed for low appropriate data for the annual self- density and high density. DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 28 Table 20: Post Construction Site Runoff Control BMPs assessment process. Data shall be 2. Track number of low 2. Continuously 2. Yes/No/Partial, provided for each Post -Construction/ density and high -density Permit Years 1-5 Number of plan Qualifying Alternative Program plans approved. approvals issued for low being implemented as listed in Tables density and high densi 18 and 19. 3. Maintain a current 3. Continuously 3. Yes/No/Partial; inventory of low -density Permit Years 1-5 Summary of number and projects and constructed type of SCMs added to SCMs including SCM the inventory; and type or low -density number and acreage of acreage, location and last low -density projects ins ection date. constructed. 4. Track number of SCM 4. Continuously 4. Yes/No/Partial; inspections performed. Permit Years 1-5 Number of SCM inspections. 5. Track number of low- 5. Continuously 5. Number of low density density inspections Permit Years 1-5 projects inspected. performed. 6. Track number and 6. Continuously 6. Number of type of enforcement Permit Years 1-5 enforcement actions actions taken. issued. Permit 3.6.2: Legal Authority Ref. Measures to maintain adequate legal authorities through ordinance or other regulatory mechanism to: (a) review designs and proposals for new development and redevelopment to determine whether adequate stormwater control measures will be installed, implemented, and maintained, (b) request information such as stormwater plans, inspection reports, monitoring results, and other information deemed necessary to evaluate compliance with the Post -Construction Stormwater Management Program, and (c) enter private property for the purpose of inspecting at reasonable times any facilities, equipment, practices, or operations related to stormwater discharges to determine whether there is compliance with the Post -Construction Stormwater Management Program. BMP `� B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting implementation Metric 31. Site Plan Design Review - This permit requirement is fully met by the existing post -construction program, see references provided in Table 19. Maintain ordinance(s)to ensure 1. adequate stormwater control 2. 2. 2. measures will be installed, implemented and maintained DRAFT NCS000515 SWMP Town of China Grove July 2151, 2021 Page 29 Table 20: Post Construction Site Runoff Control BMPs Permit 3.6.3: Plan Review and Approval Ref. Measures to maintain plan review and approval authority, standards and procedures to: (a) Require Federal, State, and local government projects to comply with Post -Construction Program requirements throughout the entire MS4 permitted area, unless the entity is subject to its own NPDES MS4 permit or a qualifying alternative program, (b) Conduct site plan reviews of all new development and redeveloped sites that disturb greater than or equal to one acre, and sites that disturb less than one acre that are part of a larger common plan of development or sale for compliance with 15A NCAC 02H. 1017 and the qualifying alternative programs that apply within your jurisdiction, (c) Ensure that each project has an Operation and Maintenance Agreement that complies with 15A NCAC 02H .1050(12), (d) Ensure that each project has an Operation and Maintenance Plan that complies with 15A NCAC 02H .1050(13), (e) Ensure that each project has recorded deed restrictions and protective covenants, that require the project to be maintained consistent with approved plans, and (f) Ensure that each SCM and associated maintenance accesses be protected in a permanent recorded easement per 15A NCAC 02H 1050 9 and (10). BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Im lementation Metric 32. Legal Authority Maintain compliance by Federal, 1. Revise code to require 1. Permit year 1 1. Yes/No/Partial; State, and Local government projects Federal, State, and local Review and assess and revise reference to stormwater government projects to effectiveness design manual to specify NCDEQ comply with post Stormwater Design manual. construction requirements unless subject to its own NPDES MS4 permit or qualifying alternative program 2. Revise code to specify 2. Permit year 1 2. Yes/No/Partial, Report NCDEQ Stormwater code reference and date Design Manual as the adopted reference stormwater design manual 33. Developer Resources Establish a developer stormwater 1. Upload links to 1. Permit year 1, in 1. Yes NO/Partial; link to resources section on the city website ordinances, post conjunction with webpage so relevant materials are easily construction stormwater website accessible for developers. requirements, link to development design standards, and other relevant material to website 2. Update when changes 2. Continuously 2. Yes/No/Partial; Report to resources occur date of updates and char es made 34. O&M Plan Maintain an ordinance requiring each 1. Maintain legal 1. Permit Year 1 1. Yes/NO/Partial; stormwater control measure to have authority through Review and assess an Operation and Maintenance Plan ordinance revisions effectiveness DRAFTNCS000515 SWMP Town of China Grove July 2111, 2021 Page 30 Table 20: Post Construction Site Runoff Control BMPs that complies with 15A NCAC 02H 2. Enforcement of new 2. Continuously, after 2. Yes/No/Partial; .1050(13) code by requiring ordinance is adopted. Number of O&M plans approval of O&M Plan approved by Stormwater Administrator prior to plan approval Permit 3.6.4: Inspections and Enforcement Ref. Measures to maintain inspection and enforcement authority, standards and procedures to: (a) Conduct post - construction inspections prior to issuing a Certificate of Occupancy or a Temporary Certificate of Occupancy. Alternatively, the project owner may provide a surety bond to guarantee compliance with the approved plan(s), (b) Ensure that the project has been constructed in accordance with the approved plan(s), (c) Ensure annual inspection of each permitted SCM to ensure compliance with the approved Operation and Maintenance Agreement, (d) Ensure inspection of low density projects at least once during the permit term, and (e) Require that inspections be conducted by a qualified professional. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 35. Inspection of low -density projects Establish the legal authority for 1. Establish legal 1. Permit year 2 1. Yes/No/Partial; Report inspection of low -density projects at authority through code code reference and date least once during the permit term; and revision adopted carry out the inspections. 2. Conduct inspection of 2.Permit Year 2 2. Yes/No/Partial 20% of low -density projects each year (See BMP No. 30.5 36. Inspection Tracking Track the results of regular 1. Establish inspection 1. Permit year 2 1. Yes/No/Status postconstruction SCM and low- tracking mechanism to density meet all requirements of inspections to provide documentation 2. Implement Inspection 2. Continuously Permit 2. Yes/No/Status and the ability to identify chronic tracking Years 3-5 violators. 37. Inventory of SCM and low -density projects Develop a comprehensive inventory 1. Establish list of 1. Permit year 1 1. Yes/No/Status, of permitted post -construction SCMs existing structural SCMs Number of SCMs and and low -density projects to be and low -density projects low -density projects utilized for inspections and tracking. inventoried 2. Develop a low -density 2. Permit year 1 2. Yes/No/Status inspection and enforcement SOP to standardize and consistently manage process DRAFT NCS000515 SWMP Town of China Grove July 2111, 2021 Page 31 Table 20: Post Construction Site Runoff Control BMPs 3. Issue letter of 3. Permit year 1 3. Yes/No/Status; notification to owners Number of letters sent making them aware of upcoming inspections 4. Add SCMs and low- 4. Permit year 1 4. Yes/No/Partial density projects to inventory list when project as-builts are approved Permit 3.6.6: Fecal Coliform Reduction Ref. Measures to control, to the maximum extent practicable, sources of fecal coliform per 15A NCAC 02H .1017(7). At a minimum, the program shall include: (a) A pet waste management component, which may be achieved by revising an existing litter ordinance, and (b) An on -site domestic wastewater treatment system component, if applicable, which may be coordinated with local county health department, to ensure proper operation and maintenance of such systems. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 38. Pet Waste Litter Program Review the Town of China Grove pet 1. Review ordinance for 1. Permit Year 1 1. Yes/No/Status Waste disposal ordinance Pet Waste disposal requirements and Update 2. Include pet waste 2. Permit Year 1 2. Yes/No/Status; disposal information on Report number of social media and websiteposts/views 3. Maintain current town 3. Permit Year 1 3. Yes/No/Status; owned Pet Waste Stations Number of bags replaced 4. Review Pet Waste 4. Continuously Permit 4. Yes/No/Partial; New Station Locations Years 2-5 stations required? Relocations? 5. 5. 5. 39. Septic System Education Program Provide Educational Brochures to 1. Develop brochure 1. Permit Year 2 1. Yes/No/Status town residents who have private addressing the operation septic systems regarding operation and maintenance of and maintenance private septic sstems 2. Identify parcels using 2. Permit Years 3-5 2.Yes/No/Status, Report private septic systems number of brochures and distribute mailed educational brochure annually 3. 3. 3, 4. 4. 4. 5. 5. 5. DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 32 DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 33 PART 10: POLLUTION PREVENTION AND GOOD HOUSEKEEPING PROGRAMS This SWMP provides a comprehensive pollution prevention and good housekeeping strategy for the Town of China Grove municipal facilities and operations. Pollution prevention and good housekeeping is accomplished through the implementation of seven required programs, which collectively address the ultimate goal of preventing or reducing pollutant runoff from municipal operations such as parks and open space maintenance, fleet and building maintenance, new construction and land disturbances, and municipal storm sewer system maintenance. Pollution prevention and good housekeeping for municipal operations includes the following programs: 1. Municipal Facilities Operation and Maintenance Program 2. Spill Response Program 3. MS4 Operation and Maintenance Program 4. Municipal SCM Operation and Maintenance Program 5. Pesticide, Herbicide and Fertilizer Management Program 6. Vehicle and Equipment Maintenance Program 7. Pavement Management Program The Town of China Grove will manage, implement and report the pollution prevention and good housekeeping BMPs as specified in Table 21 below for each required program. Table 21: Pollution Prevention and Good Housekeeping BMPs Permit 3.7.1: Municipal Facilities Operation and Maintenance Program Ref. Measures to manage facilities that are owned and operated by the permittee and have the potential for generating polluted stormwater runoff. The permittee shall maintain a current inventory of municipal facilities; perform facility inspections and routine maintenance; establish specific frequencies, schedules, and standard documentation; provide staff training on general stormwater awareness and imp ementing pollution prevention and good housekeeping ractices. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 40. Inventory of Municipal Facilities Develop and maintain an up-to-date 1. Compile list of 1. Permit Year 1 1. Yes/No/Partial; inventory of municipal facilities with existing City -owned Number of facilities potential to generate polluted nmoff. facilities inventoried; date list is cointleted 2. Perform initial 2. Permit year 2 2. Yes/No/Partial,- inspection of facilities Number of inspections for potential to generate performed and number of polluted runoff or facilities classified as requiring spill response high potential and low procedures. Classify potential facilities as having high or low potential for stormwater pollution DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 34 Table 21: Pollution Prevention and Good Housekeeping BMPs 3. Determine which 3. Permit year 2 3. Yes/No/Partial; facilities require a SPCC Number of SPCC Plans Plan required 4. Determine which 4. See BMP No. 50 4. See BMP No. 50 facilities require a NPDES Industrial permit See BMP No. 50 5. Update inventory as 5. As required 5. Yes/No/Partial; needed when facilities Number of facilities are added or closed added/revisions made 41. Facility Inspections Inspection of Town facilities to 1. Establish a SOP for 1. Permit Year 1 1. Yes NO/Partial; confirm good housekeeping practices town facility inspections, Number of inspections are being followed including an inspection and issues corrected schedule, inspection report documentation, and tracking system 2. Implement annual 2. Annually conduct 2. Yes/No/Partial; facility inspections for inspections Number of inspections high stormwater and issues corrected pollution potential facilities and once per permit term inspections for low potential facilities 42. Staff Training Develop or identify a staff training 1. See BMP No. 45 1. See BMP No. 45 1. See BMP No. 45 program for general stormwater pollution prevention and provide to public works department employees See BMP No. 45). Permit 3.7.2. Spill Response Program Ref. Measures for facilities and operations that store and/or use materials that have the potential to contaminate stormwater runoff if spilled. The permittee shall maintain written spill response procedures and train staff on spill response procedures. BMP A B C D No. Description of BMP Measurable Goals) Schedule for Annual Reporting Implementationn Metric 43. Inventory of facilities with Spill potential Maintain a list of city facilities and 1. See BMP 40 1. See BMP 40 1. See BMP 40 operations storing materials that would be a pollutant if spilled and introduced to the stormwater system and classify by hazard and quantity See BMP No. 40). 44. Spill Response Procedures DRAFTNCS000515 SWMP Town of China Grove July 2111, 2021 Page 35 Table 21: Pollution Prevention and Good Housekeeping BMPs Maintain spill response procedures 1. Review general spill 1. Permit year 1 1. Yes/No/Partial; Are and continue training of appropriate staff. response procedures procedures adequate? — es/no/status 2. Review specific spill 2. Permit year 1 2. Yes/No/Partial; Are response procedures for procedures adequate? — town facilities and yes/no/status operations with potential to produce high hazard spills 3. Update as facilities 3. As required 3. Yes/No/Partial; and operations are Number of additions or revised revisions made 4. Train new fire 4. As required 4. Yes/No/Partial; department staff in spill Number of new staff response procedures trained 5. Train staff at facilities 5. Annually 5. Yes/No/Partial; with potential for high Number of staff trained hazard spills in first response actions and reporting rocedures Permit 3.7.3: MS4 Operation and Maintenance Program Ref. Measures to minimize pollutants in the stormwater collection system. The permittee shall provide operation and maintenance staff training on stormwater awareness and pollution prevention, perform MS4 inspections, maintain the collection system including catch basins and conveyances; and establish specific frequencies, schedules, and standard documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 45. Staff Training Develop or identify a staff training 1. Develop or identify 1. Permit year 2 1. Yes/No/Partial program for general stormwater appropriate training pollution prevention and provide to program public works department employees 2. Provide initial training 2. Annually, beginning 2. Yes/NO/Partial; for all employees in permit year 3 Number of staff members trained and topics from training 3. Provide training for 3. Annually, beginning 3. Yes/No/Partial; new hires in permit year 3, as Number of new hires necessitated by staffing trained and topics from changes trainin 46. MS4 System Inspections and Maintenance A proactive plan for MS4 system 1. Develop a SOP that 1. Permit year 2 1. Yes/no/Partial; maintenance, requiring regular includes proactive Created? inspections and maintenance. inspection schedules, standard documentation, staff responsibilities, and proper maintenance training DRAFT NCS000515 SWMP Town of China Grove July 21', 2021 Page 36 Table 21: Pollution Prevention and Good Housekeeping BMPs 2. Perform regular 2. Continuously Permit 2. Yes/No/Status; inspections in Years 3-5 Number of inspections accordance with the SOP documented (See BMPs No. 44.1 and 44.4) 3. Verify, document, and 3. Continuously, as 3. Yes/No/Partial; prioritize maintenance potential maintenance Number of maintenance activities identified by activities are identified activities performed inspections or citizen reports 4. Develop an inspection 4. Permit year 2 4. Yes NO/Partlal; and maintenance tracking system to be used in accordance with the SOP and to identify "hot spot" locations for system maintenance Permit 3.7.4: Municipal SCM Operation and Maintenance Program Ref. Measures to manage municipally -owned, operated, and/or maintained structural stormwater control measures (SCMs) that are installed for compliance with the permittee's post -construction program. The permittee shall maintain a current inventory of SCMs, perform SCM inspections and maintenance, and shall establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Annual Reporting Implementation Metric 47. Inventory of Municipal structural SCMs Development and maintain of a 1. Create an inventory of 1. Permit year 1 1. Yes/NO/Partial; current inventory of municipally existing City -owned Number of municipal owned structural SCMs. SCMs with information structural SCMs including type, year built, date of last inspection, and maintenance actions 2. Compile, and develop 2. Permit year 2 2. Yes/No/Partial; as needed, Operation and Maintenance Plans for all City -owned SCMs 3. Update as necessitated 3. As required 3. Yes/No/Partial; by new City Number of updates to list development 48. SCM Inspections and Maintenance Development an SOP to inspect and 1. Locate City -owned 1. Permit year 1 1. Yes/NO/Partial; Report maintain municipally owned SCMs and add them to the number and type of structural SCMs. the MS4 Map with type SCMs added to the map of SCM indicated DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 37 Table 21: Pollution Prevention and Good Housekeeping BMPs 2. Update the map when 2. Annually, once BMPs 2. Yes/No/Partial;-Note new City -owned SCMs No. 45.1 and 46.1 are annually whether new are constructed completed City -owned SCMs were added. If any are added, note number and type added as well as number and type of SCMs mapped to date 3. Maintain NC SCM 3. Continuously, 3. Yes/No/Status; Inspections and beginning in permit year Number of staff Maintenance 2 members with active Certification for certification appropriate ersonnel 4. Develop SCM 4. Permit year 2 4. Yes/No/Partial; inspection forms 5. Inspect each device 5. Annually, beginning 5. Yes/No/Partial; using appropriate SCM in permit year 3 Number of SCMs inspection form inspected, number passing inspection, number requiring maintenance 6. Perform maintenance tasks identified in 6. As required 6. Yes/No/Partial; Number of SCMs inspections maintained 7. Develop a tracking 7. Permit year 2 7. Yes/No/Partial; document (See BMP No. 46.13.4) Permit 3.7.5: Pesticide, Herbicide and Fertilizer Management Program Ref. Measures to minimize water quality impacts from the use of landscape chemicals. The permittee shall provide routine pollution prevention and chemical use, storage and handling training, and shall ensure compliance with permits and applicator certifications. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Im lementation Annual Reporting Metric 49. Pesticide, Herbicide, Fertilizer Applicator Training Training of town staff who apply 1. Maintain Right -of- 1. Continuously 1. Yes/No/Partial; landscape chemicals in order to Way Pest Control, Public Number of staff minimize water quality impacts from Health Control, and members with active pesticides, herbicides, and fertilizers Ornamental & Turf Pest certification Control applicator certifications for appropriate ersonnel 2. Require contractors 2. Continuously 2. Yes/No/Partial; provide copies of NC Pesticide License DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 38 Table 21: Pollution Prevention and Good Housekeeping BMPs 3. Develop or identify 3. Permit year 2 3. Yes/No/Partial; pollution prevention and chemical use, storage and handling training program 4. Provide staff training 4. Annually, beginning 4. Yes/NO/Partial; in pollution prevention in permit year 3 Number of staff trained and chemical use, and topics covered storage and handling training Permit 3.7.6: Vehicle and Equipment Maintenance Program Ref. Measures to prevent and minimize contamination of stormwater runoff from areas used for municipal vehicle and equipment maintenance and/or cleaning. The permittee shall ensure that municipal industrial facilities subject to NPDES industrial permitting comply with those permit requirements, provide routine pollution prevention training to staff, perform routine inspections, and establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goals) Schedule for Im lementation Annual Reporting Metric 50. NPDES Industrial Permit Compliance Review municipal facilities inventory 1. Review municipal 1. Permit year 1 1. Yes/No/Partial; to ensure NPDES Industrial Permit facilities inventory to Number of facilities Compliance. determine which determined to require a facilities require a NPDES Industrial Permit NPDES industrial stormwater permit 2. Permitting of 2. Permit year 1, 2. Yes/No/Partial; municipally owned following review of Report number of new facilities; apply for new facilities, and permits received or permits and confirm that continuously thereafter renewed as well as all existing permits are number of active valid. Renew permits as required permits. 3. Develop a municipal 3. Permit year 1 3. Yes/No/Partial; industrial facility inspection form 4. Perform facility 4.Annually, after NPDES 4. Number of inspections inspections for permits acquired performed compliance with permit 5. Establish NPDES 5. Permit year 1 5. Yes/no/status Industrial Permit tracking mechanism to document list of municipally owned facilities with permit, permit expiration dates, and inspections 51. Vehicle and Equipment Cleaning and Maintenance Facility Inspection Routine inspections as part of general I 1. Develop an inspection 1. 1. Permit year 1 1. Yes/No/Partial; facility inspections See BMP No. checklist DRAFTNCS000515 SWMP Town of China Grove July 21", 2021 Page 39 Table 21: Pollution Prevention and Good Housekeeping BMPs 39) to ensure that vehicle and 2. Perform inspections 2. Bi-annually, beginning 2. Yes/No/Partial; equipment facilities are following using inspection in permit year 1 Number of inspections proper procedures to minimize water checklist and notify quality impacts from vehicle and facility manager of any equipment cleaning and maintenance. corrective actions required 3. Perform re -inspections 3. As required by 3. Yes/No/Partial; of any facility that corrective actions issued Number of facilities required corrective requiring corrective action action, number of resolutions 52. Staff Training Provide general stormwater 1. See BMP No. 44 1. See BMP No. 44 1. See BMP No. 44 awareness training and pollution prevention training to employees working in vehicle maintenance and cleaningareas See BMP No. 44). Permit 3.7.7: Pavement Management Program Ref. Measures to reduce pollutants in stormwater runoff from municipally -owned streets, roads, and parking lots within the pennittee's corporate limits. The permittee shall implement measures to control litter, leaves, debris, particulate and fluid pollutants associated with vehicles and establish specific frequencies, schedules, and documentation. BMP A B C D No. Description of BMP Measurable Goal(s) Schedule for Implementation Annual Reporting Metric 53. Street Sweeping Street sweeping following a regular 1. Develop a SOP, 1. Permit Year 1 1. Yes/No/Partial; schedule in order to reduce pollutants including a schedule and from City owned and maintained plan to document streets. 2. Implement SOP and 2.Annually beginning in 2. Yes/No/Partial; Total documentation permit year 2 number of street miles swept 3. Identify "hot spot" 3. Permit Years 3-5 3. Yes/No/Status areas for more frequent sweeping 54. Leaf Collection Periodic collection of leaves, at least 1. Develop a SOP, 1. Permit year 1 1. Yes/No/Status twice a year, from residential and including a schedule and public areas to reduce pollutants and plan to document clogging of storm system inlets. 2. Implement SOP and 2. Regularly, beginning 2. Yes/No/Status; documentation in permit year 2 3. Provide periodic 3. Permit Year 1 3. Yes/No/Status; seasonal leaf collection Volume of leaves collected tons 4. Evaluate seasonal leaf 4. Permit Years 3-5 4. Yes/No/Status; collection routes to Report Results identify "hot spot" areas for more frequent collection DRAFT NCS000515 SWMP Town of China Grove July 21', 2021 Page 40 Table 21: Pollution Prevention and Good Housekeeping BMPs 55. Vehicle Spill Cleanup An organized vehicle spill cleanup 1. Maintain spill 1. See BMP No. 43 1. See BMP No. 43 response to prevent pollutants from response procedures vehicular accidents from entering the 2. Provide public 2. See BMP No. 7 2. See BMP No. 7 storm drain system. education about stopping vehicle leaks 56. Litter Collection Collect litter weekly in public spaces 1. Develop a SOP, 1. Permit Year 1 1. Yes/No/Partial; including a schedule and plan to document weekly litter collection 2. Implement SOP and 2.Annually beginning in 2. Yes/No/Partial; documentation permit year 2 Document collection results 3. Identify "hot spot' 3. Permit Years 3-5 3. Yes/No/Status areas for more frequent collection DRAFT NCS000515 SWMP Town of China Grove July 21", 2021 Page 41