Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20211833 Ver 1_CAMA Application_20211217
DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Owen Andrews c/o Andre Webb 2. LOCATION OF PROJECT SITE: 543 North Kinston Avenue, Atlantic Beach, Carteret County State Plane Coordinates - Longitude: 76 44' 43", Latitude: 34 42' 17" 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit—12/13/2021 Was Applicant Present - No 5. PROCESSING PROCEDURE: iApplication Received Complete—11/29/2021 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Atlantic Beach Land Classification from LUP — Single Family Residential (B) AEC(s) Involved: PTA (C) Water Dependent: yes (D) Intended Use: Private (E) Wastewater Treatment: Existing --- Septic Systems Planned none (F) Type of Structures: Existing — bulkhead, driveway, house and 2 slip pier Planned — new platform on existing dock, finger pier extension, new floating platform on existing dock, new second pier location with pier access, platform and third slip with boatlift 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Shallow bottom n/a n/a 758sf Inc. 927sf Shaded (B) Coastal Wetlands n/a n/a 23 sf shaded and Inc. (D) (E) (F) Total Area Disturbed: 950 square feet Primary Nursery Area: No Water Classification: SA, HQW PROJECT SUMMARY: Canals are closed to shellfish harvesting The applicant is proposing to replace the fixed platform on the existing 2 slip docking facility as well as add a floating platform, remove a portion of the existing platform along slip # 2 and add a finger pier extension to connect to the existing outer finger along slip # 2 to high ground. They are also proposing a second pier location along the southern canal. They propose to add a pier access, platform and a third slip with boatlift. There is currently a single family residence with driveway, bulkhead and existing two slip docking facility. A total of three slips are proposed Field Investigation Report: Owen Andrews c/o Andre Webb Page 02 (2 existing and 1 new). The boat size would be limited to a maximum of 23' and would be of open runabout design. Water depths within the existing and proposed slip areas are at least 4' nlw. 9. Project Description The existing .262-acre (11,412sf) tract is located at 543 North Kinston Avenue, Atlantic Beach, Carteret County. The project area is found by turning off Highway 70 East in Morehead City (Arendell Street) onto the on -ramp for Atlantic Beach. Follow the Atlantic Beach Causeway for approximately 3610' (.68 miles) to the 4 way stop light. Turn right onto West Fort Macon Road and take the first right onto North Kinston Ave. Follow North Kinston to the end and the property will be located on the left. The site is bordered by the "main entrance" canal that is contiguous with Bogue Sound as well as a man-made canal along the south side of the property. The property shoreline is stabilized with a bulkhead, has an elevation of 4' above NHW and has 211' of shoreline per the applicant (however CC GIS shows 165' of shoreline). The main entrance canal has a width of 180' with the manmade canal along the south side of the property having a width of 112' at the most constrictive point. The waters of Bogue Sound adjacent to the project areas are classified as "SA, HQW" by the Division of Water Resources and have been previously dredged within the canal areas. There are no nearby Primary Nursery Areas. According to the maps provided by the Shellfish Sanitation Section of the NC Division of Marine Fisheries, the waters of the canals contiguous to Bogue Sound are predominately closed to shellfish harvesting. No SAV were observed within the project area. There is no dredging proposed within navigable waters and there are no known historic or archaeological areas of value known within the project sites. 10. Proposed Project The applicant is proposing to reconfigure the existing two slip docking facility by replacing the existing fixed platform with a new 12' x 24' platform in the same footprint. They also are proposing a new 8' x 16' floating platform to the north of the fixed platform. This platform would not exceed a max distance of 33' from NHW and would be a minimum of 15' from the .Andrews/Town of Atlantic Beach riparian access line. They are also proposing to remove a portion of the existing platform along slip # 2 and add a 1.2' x 16' finger pier extension that would extend from high ground and connect to the existing finger pier located along the south side of existing slip # 2. All work within this area would not exceed a maximum distance of 45' into the 180' wide water body. The final portion would be the construction of a second pier with a third slip area along the south side of the property and located within the southern manmade canal. The applicant is proposing a 6' x 8' fixed dock that would extend over coastal wetlands and intersect an 8' x 14' platform. A 13' x 13' boatlift would be located at Field Investigation Report: Owen Andrews c/o Andre Webb Page 03 the end of the platform to create the third slip area. All work would not exceed a maximum distance of 30' from the bulkhead or a max of 25' from the edge . of coastal wetlands and maintain a distance of approximately 20' plus from the Andrews/Schenck riparian access line. The canal has a width of 112' at the most constrictive point along this area of the property. 11. Anticipated Impacts: The development would shade 758 sf and incorporate 927 sf of shallow bottom habitat. The proposed docking facilities would not interfere with navigation and would meet the '/4 width rule and not extend into the channel portion of the canals. The proposed finger extending from high ground to connect to the existing finger pier along slip # 2 has the potential to usurp a portion of Public Trust Area. No dredging is proposed at this time due to -3' to 4' nlw water depths within the slip areas. There would be no impacts to wetlands, shellfish or SAV resources. Submitted by: Heather Styron Date: 12/13/2021 Morehead City District Office ig " D -Zd� 2, 00H 100 0M APPLICATION for 4� 7 a_ 6;agt�yc��r a t Major Development Permit &at M%ft a 112f27108] North Carolina DIVISION OF COASTAL MANAGEMENT Business Name Project Name (it applicable) Applicant 1: First Name � f MI Last Name Applicant 2: First Name MI Last Name if addihonal applicants; please attach an ad6honal page(s) with names listed Mailing Address _ PO Box City State ZIP Country Phone No. FAX No. O!�L65-6 Z 0%� I 2- - :71- 61jext. - - Street Address (if different from above) City state ZIP Email ff Business Name Agent/ Contractor 1: First Name MI Last Name N9,%zv lv�6 Agent( Contractor 2: First Name MI Last Name Mailing Address PO Box City Statne) ZIP / Phone No.1/` • Phone No. 2 *z8�Q L+ zJ Z- 665'- ext. FAX No. Contractor# Street Address f,f different from above) City State ZIP Email // I� e,4,,1affc, 0 Y7 �t r ' IR 6m e E dorm continues on back> �2 &tt3-2� tt a 8 a t �a CP@s'ai o s��r ara�: zp � leaaaraaa eaaas ash '¢Al , ' Ca. Form DCM MR-1 (Page 2 of 4) APPLICATION for Major Development Permit,, County (can be multiple) I Street Address State Rd. # 64Vt!,<�f I ! 6 .. IeilvrM ,4 vC Subdivision Name city state Zip TC0n�) /c '&�cA I /%./C, 7 � I Phone No. Lot No.(s) (it many, attach additional page with fist) 25 z - 60� 1 f f a. In which NG river basin is the project located? b. Name of body of water nearest to proposed project c. Js the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. Natural ❑Manmade ❑Unknown -X06 e. Is proposed work within city limits or planning jurisdiction? f. if applicable, list the planning jurisdiction or city limit the proposed . s []No work falls within. 7GA O/c F&O Cl l a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) c. Size of individual lots) d. Approximate elevation of tract a ve NHW (normal high water) or r pc��°�C; N WL (normal water level) (if many lot sizes, please attach addibanat page with a list) WHW or ❑NWL e. Vegetation on tract 5s lt-S SCNIv�� E f. Man-made features and uses now on tract g. Identify and describe the existing land uses adjacent to the proposed project site. orl✓6 h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) �1 %f�iQG Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? UYes/oIDlVo k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes o NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Oyes No MA National Register listed or eligible property? <Form continues on next page> RG,C e? ti#td3- �+ e. -BI; tt-� Y � ST vli^givvtrAa�s �raza a �t a aaa�a� �Bea�t:olWN14VIFID CITY Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Devetopmerd Permit m. (i) Are there wetlands on the site? Yes ❑No (ii) Are there coastal wetlands on the site? [],Yes []No (M) If yes to either Q) or (ii) above, has a delineation been conducted? El Yes ',gNa (Attach documentation, it available) n. Describe existing wastewater treatment facilities. (tzoL-;Y 4D :wl I& j,ona�C o. Describe existing drinking water supply source. p. Describe existing storm water management or treatment systems. L,/CFili6& 12ulu - 6PF a. Will the project be for commercial, public, or private use? , []Commercial b. Give a brief description of purpose, use, and daily operations of the project when complete. �.C� �A�/1 � �� � �d��y •Y �I �Ir JJV �, c. Describe the proposed construction methodology, types of construction equipmen-t to be used during construction, the number of each type of equipment and where it is to be stored. cyv 5 nzc d. List all development activities you propose. Xoor G/r r e. Are the proposed activities maintenance of an existing project, new work, or both? _ f. What is the approximate total disturbed land area resulting from the proposed project? .T .Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes o ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. V/P L Will wastewater or stormwater be discharged into a wetland? Oyes )RNo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? Dyes ONO—ONA j. Is there any mitigation proposed? []Yes No ❑NA If yes, attach a mitigation proposal. (; O4 <Form cordinues on baciv N,Ov 2, 2) 20Z1 Ys���63•�?��tiff sr �pFtt�����;�D�t;s't' .o �v�r��ru�aa;�cr�s4:R�trua�a�a�t�ea�t.•rr�t Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any porlion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map chat is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant daims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name •'Y,0u)J> 15ZW&JC(C rnwue ]XV. Address /0 r�E2f � okc� Lea C.44? IVC g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permitfee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. I i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), d necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the devetopment described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evacuating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date �l ZZ)Z / Print Name _ 4%Lplu 46 Signature Please indicate application attachments pertaining to your proposed project. hi CM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development "'R FCIIIIE Ae CM MP-4 Structures Information NOV,>I � 2.0`l.i wJl�i��'liN:•aVEllrl�l�:}v`t. ���-§ttPF9;���a� se ^lT�t�gR���tpE�i�vu"f' ,A ve+��ir�r=zn�ccxa.bt:�t�raaeaaat�n'se�et.ige� Form DCM MPA STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form RCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposedproject. Please include all supplemental information. a. (i) Is the docking facility/marina: ©Commercial QPu1,liclGavemme�Private/Community b. (i) Will the fa 'city be open to the general public? ❑Y'e c. (i) Dock(s) and/or ier(s) d. (i) Are Finger Piers included? DYes�lo " (ii) Number ! If yes-.GG (iii) Length (ii) Number (iv) Width V (iii) Length (v) Floating ❑Yes �jNo '1 (iv) Width (v) Floating ❑Yes ONO e. (i) Are Platforms included? Yes ❑No f. () Are Boatlifts included? —Yes ❑No If yes: ►� If yes: (ii) Number _ (iii) Length (ii) Number (Ili) Length (iv) Widthrzq� �ty���7 (iv) Width (v) Floating Yes []NO ry Iq1 rIxFP Mote: !Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 3 Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies ;:r_11Dockage (`wuet slips") only, number of slips: 13 Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: p Other, please describe: i. Check the proposed type of siting: j. Describe the typical boats to be served (e.g., open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types). []Open water; dredging for basin and/or channel 6AW '/Z4V P15D�I1 Open water; no dredging required ❑Other; please describe: k. Typical boat length. 1. (i) Will the facility be open to the general public? ❑Yes®®®®®®No m. (i) Will t e facility have tie pilings? ❑Yes YLNo (ii) if yes umber of tie pilings? lJ 1 252-8e8-2008 : 1�888-4RCGAST s: �tr�e ta���� 1 al �et��� �rt�;a�reef vevisad,., 1212?106 FOMW DCAR MP-4 (f;ructztres, Page 2 0) a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets /� � / ❑ Toilets for patrons; Number: : Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposallocation far all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? 113 e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. t. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the locafion of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat pasin flushing? I. ff this project is an expansion of an existing marina, what types of services are currently provided? li� E C` EI �,q "„e 262-908-2808 �, 1-8884R O ST WHOM arBc a ca,��i�sas�a ��rayat �ae�P�a�� !rave sd: •tV2e7MO Fore DCM MP-4(Structures, Page 3 of ) m. Is the mad docking facility proposed within a primary or secondary nursery area? ❑Yes �No n. Is the marin docking facility proposed within or adjacent to any shellfish harvesting area? Oyes Vo o. Is the marinaidocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom `(,�S ), or other wetlands (WL)? It any boxes are checked, provide the number of square feet affected. f �W ❑SAV ❑SB ,"OWL ❑Mane p. Is the proposed marinaldocking facility located within or within close proximity 10 any shellfish leases? ❑Yes ONO If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. ❑Commercial ❑Public/Government ❑PrivatelCommunity (U) Number (iii) Length (iv) Width Note. Roofed areas are calculated from dripfine dimensions (ii) Length (iii) Width a. Length c. Maximum distance beyond NHW, NWL or wetlands a. is the structure(s): ❑Commercial ❑Public/Govemment OPrivate/Communily c. Distance to be placed beyond shoreline Note: This should he measured from marsh edge, if present. e. Are of the swing b. Average distance from NHW, NWL; orwetands b- Number d. Description of buoy (color, inscription, size, anchor, etc.) NaV 2; �3 ?()L If 252-808-2808 -. 1-•83tt-4RCOASi" s: ravased; 12i27/06 a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of siructure(s) to adjacent docking facilities. i"'©A) AOCIQ itWG 50` ©N 5-0 !Vote: For buoy or mooring piling, use am of swing including length of vowel. c. Width of water body —:JZO ® of 911i,T,74 /�� e. (i) Will naviga'onal aids be required as a result of the project? ❑Yes o ❑NA (ii) ff yes, lain what type and haw they will be implemented. a. Give complete description. d. Water depth at waterward end of structure at NLW or NWL 1 Nct-1 N()V 2115 ill? - I x s2-803-2808 revis,-A: 12[27106 Submission Completed 11119/21, 7:32 AM DVVIR Pre -Ring Meeting R�-,%,quast Form tStJ Ii'C3{ CAi7t41J N! - fnvAammrnk�4eWiry Contact Name* Andre Webb Contact Email Address* webbddc@gmaii.com Project (honer* Owen Andrews Project Name` Owen Andrews Major Permit Project County* Carteret Owner Address:* Street Address 543 North Kinston Ave Address Line 2 City State I Province I Region Atlantic Beach NC Postal / Zip Code Country 28512 usa is this a transportation project?* Yes No Type(s) of approval sought from the DIA R: 401 Water Quality Certification - Regular 441 Water Quality Certification - Express Individual Permit Modification " Shoreline Stabilization Does this project have an existing project lD#? * Yes No Do you know the name of the staff member you would like to request a meeting with? Holly Snider Please give a brief project description below and include location information. 6'x16fEoating dock r � 3'xlZ ramp 8'x24' fixed dock N 0 V S P"", ? 0 t 6'xB' dock walkway 8'x14' fixed dock 7 13'x13' boat lift By digitally signing Below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: https:/ledocs.deq.nc.gov/Forms/Form/showformsubmission/6bd17dU-06-4069-bOdd-38eb8bad92611a71b366c-aa7f-4866-9bd2-14e202352f13 Page 1 of 2 Submission Completed 11/19121, 7:32 AM This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. i understand by signing this form that I cannot submit my application until 34 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature` clwItl Submittal Date 11119M21 }I0V cu !� 1{l�'! https.Iledocs.deq.nc.govIFormSiForm/showformsubmission/6bdl7d5f..A6-4069-bOdd-3gebgbadg261la7lb366c-8a7f-4866-9bd2-14e202352flS Page 2 of 2 MAJOR PEIaMIT FEE MATRIX �d $a9v �- avoY Applicant: Dwell Al�Ir'e .5., Selection Development Type Fee DCM % DWQ % (14300 16014361000931625 6253) (243001602 435100096 2341) I. Private, non-commercial j development that does not $250 100%($250) 0% ($0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial Ej development that does not $400 100% ($40.0) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: Major Modification to a $2S0 100% ($250) 0% ($0) CAMA Major permit 111. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies. III(A). Private, non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 4097 (See attached) can be applied: 111(B). P<ublic or commercial development, if General $400 100°l0 ($400) 0% ($0) Water Quality Certification No. 4097 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: lll(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 4097 (see attached) cannot be applied: IV. For development that El involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: INFIR I OR WIYI FOR REBIST"ITION NESISrER OF OEM .1. Tarr Carl�r�t Count NG 71iia Kist al ��COUNTY April 15, 11 th03: �4:06 A11 e date and 5"grid in the gook and � MD 2 p on tha asipage heroo/ K EM STAMP: S1,523.00 ' f FILE # 1373159 PW,td No, 6375.11.75.4148 I, [�i a No- 13MIANDREN.4-0.x /Prrpared 1W 7hs serris r®Phe:, PLW V/ P.0. Bar 7.1,% Xbr+eheaar Ctt & M =M7 NORTH CAROLINA GENERAL WARRANTY DEED This F7BEt) made this the 4— day of April, toil, by sect between 1V woN R. FLETCEiER, tma tarried, whose mailing address is P.O. Box 2096, Lexington, NC 27293, hereinafter "Grantor" and OWEN D. ANDREWS AND WHY, DEBRA C. ANDREWS, whose thing address is 103 Trent Shores Dr., New Bern, NC 28562, hereinafter "Grantee". The designation Grantor and Grantee as used herein shall Mode said parties, their heirs, successom and assigns, and shall include singular, plural, masculige, feminine or neuter as required by context. Pur=aw to NCW 105-317.Z Grantor ee does the prop" does __Z__4uw nor imh* ik Grantur's prirmrryy ra4k wR WITNESSETH: That the Grantor, for a valuable consideration paid by the Grattee, the receipt ofwhich is hereby acknowledged, has and by these presents does grant, bargain, sell and convey wito the Grantee in fee simple, all that certain kit or parcel of land situated in Morehead Township, Carteret County, North Camlina and more particularly descrilvil as follows: BEING all of Cots Twenty Two (22) and Twenty Three (23), Block "l 7 , Atlantic Beach Isles, as shown in Map Book 11, page 29, Carteret County ftgistry, TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenaneestimeto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in five simple, has the right to convey the same in flee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title agama the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. e00tt%3� PAGE_ 1_s3__ (5� Title to the property hereinabove is subject to the f )Bowing exceptions: 1. Restrictive CovcnaM of record. 2. Public utility easements of record. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal the day and year first above written. � d d. U 44 Vi4 -1 (SEAL) MARION R_ Fi.ETC,AER STATE OF JJWJJ COAIQJI,3G& COUNTY OF,,,ae�.! L " hr , a Notary Public of the aforesaid County and State, do hereby certify ON IL ILETCHER personally came before me this day and acknowledged the due execution ofthe forcg4Ymg instnment. WITNESS my hand and official stamp or seal, this the J`' day ofAprk 201 n "2' i5 d . N ARY PUB • , ' ` bury Commission Expires: _�, ^1 t ae 14 ewc1a�' . PnGU1-,C-n— TICIFFIVFD kfli 1i12 ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director December 17, 2021 MEMORANDUM: NORTH CAROLINA Environmental Quality FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) gregg.bodnara-NCDENR.gov SUBJECT: CAMA /Dredge and Fill Application Review Applicant: Andrew Owens Project Location: Atlantic Beach, Carteret County Proposed Project: Replace & Update Existing Docking Facility Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by January 14, 2022. If you have any questions regarding the proposed project, contact Heather Styron 252-808-2808. when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME__ AGENCY SIGNATURE DATE 4�eu\ North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1400 Commerce Avenue I Moorehead City, North Carolina 28557 252,808.2808 r eo 1 e3Dp Aq YO1B1"` ea s dVW NOUVOM / 133HS 2IAAOO :6uiwou Z958Z 3N 'NdAfl MAN rt�/ 1 �/ -I �/ L UVOC�.�GI�LJ[ 6 0 V ILRlllL 0w AM MI5ALI �WAV'M 493M xp stpuyuand e� 6u�Mnu l—Do °" °"° ° ON 'HOV38 OUNVUV " 3AV NOlSNI I H1NON �tiS SM32JONV N3MO oDZoN Laoa/a1/u .a u N � N U LU c' LU ccG Z C U � U Ln Ln 00 N U z m w ` L� m ' j CD F z s z Q <I O _ _O J (n sue' O w LLJ LJw LLI z Q C) LLJ Z O z a Jo a '°' Rq ' �U3M0 SNOLIGNOO ONUSIX3 — NV' d HIS Z969ZDN'NJI� M3N MP'S.?"°J :6"iMn� No` Aodiv Clio N QI b4 GRON ON 'HOV38 OIINVIIV `3AV NOISNIN HlaON �tiS 99�M;ULINV —1 � SM3b4NV N3MO N l� ll' ML-J dJdOW LU CV V �3 J Z ® S i m Z QcnU Q Z F O Of H ¢ - _ - - - - - - - - - - - - - - - - - - , - 00 O :2 N K X p CV �` �g 0 a z Y N U X O W � O O O N O I x Ix Ix Ix `el O W U H O J Z W J m � d � J W W Z Q o a a ¢ o w J a N a w o CD w x I J W Q U CnZZ wOU fy- nQ p ZL] Zym 2 U �oz ozg It N - AD, w�a:,9eGz J.P ® - . N9d HIS mmaAa ®" 66y g mm mN NoloJ av:9vQk- wy %:± ms lm: ;wy . %f © ON 'SeGOUVliv'' VNem> QSN ag S amA mM _._ �\ _Am.\, MLj . y u . 2 g /e / LLJ / / k \)j _ 2 _ C) _ 00 =2 - - - - - - - - - -- - - - - -- -- - �\ Of ) CN ;<- i \/ cn O» [ LLJ 0� j G� }/ }\ z< \ � N / §)L) _ » ° c c 5 22_( \ � . / ^ ) a 0�\ \\ ƒ / { { \ \3 / -\ S _ \ k/ \2 LLJ @3 / \ G ° 00 \ e^ \\ \) - }0-0 � _�» �� cm) \ -� }>< S _ e2 \ Of+ _ < ° © /< ® 2 � 3.5 // 2 q.� w . � 430> 8G4b-599 ZSZ e'°' Aq _asIMM NOUVh313 311JObd 03SOdOid :eu o Z969Z 3N `%dM MAN two` jWcUM dio v rI K 443M �&Iw N%J d ? !9%Md 9 M •P',�,PW�O a i buiMa l-D od ON 'HOV38 OI1NVl1V ''3AV NOlSNDi HiHON £tS SM3bONV N3MO o�d aaLoH sr . Izoz/QL/<< :a o Z W o o > oa = -"7 M X Z Z LU Z J V) O t W O -j a� OQ O �M Z z J O Q W W W I� I� 0 n� O LL_I I U� II 0 O 0 w N J LL Q U L� N U Z J_ Y U O X co rn W N O a - CD 0- I Y U O � J X J W W N U Z O d O (/ w