Loading...
HomeMy WebLinkAboutGW1-2021-07542_Well Construction - GW1_20210903 WELL CONSTRUCTION RECORD(GW-1) IFRO _mil Use Only: 1.Well Contractor Information: ' ' Chris King %TER ZONES I TO DESCRIPTION Well Contractor Name $ 7ft• A 100 2080-A ft t ft. NC Well Contractor Certification Number 15. L+'IER.CASING for multi cased+wells OR L[NEE if Iteablc Aqua Drill, Inc. FR R To DIAMETER THICKNESS MATERIAL ft. ft in. Company Name 16.INNER CASING OR TUBING` eothermai t[oseddoo _ 2.Well Construction Permit#: FROM TO I DIAMETERI THICKNESSI MATERIAL List all applicable well construction permits#.e.UIC,Coimn+,State,Variance,etc.) ft. fL In. 3.Well Use(check well use): ft. ft. In. I17. Water Supply Well: FR ME TO DIAMETER SLOT SIZE THICKNESS MATERIAL ' Agricultural [3MunicipaUPublic R. & in. Geothermal(Heating(Cooling Supply) Okesidential Water Supply(single) ft. ft. in. Industrial/Commercial Residential Water Supply(shared) 18:GROOT _ !Ini ation FROM TO MATERIAL EMPLACI M UN-17 METHOD&AMOUNT Non-Water Supply Well, Ll ft. ? ft. Monitoring 1311ecovery ft. & Injection We": it. ft. I Aquifer Recharge E3Groundwater Remediation 19:SAND/GRAVEL PACK if a llcable._ Aquifer Storage and Recovery OSalinity Barrier FROM TO MATERIAL I EMPLACEMENT METHOD Aquifer Test OStomrwater Drainage ft. ft. Experimental Technology Subsidence Control % fL Geothermal(Closed Loop) Tracer 20.DRILLING LOG attach addidonal'sheets ifnecessary) Geothermal eatin Coolin Return) Other lain under#21 Remarks) FROM TO DESCRU'1'ION color,hardn soil/rack tym in e' eta 4.Date Well(s)Completed _q -z ► Well ID# R. Sa.Well Location: S v -C ft. ft. s. Facility/Owner Name Facility ID#(if applicable) ft. ft. R. ft. Physical Address,City,and Zip ^ �2 ft. ft 21.REDiARKS County Parcel Identification No.(P" WOW. r aging Unit 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: 3t�n. dIOT1 (if well field,one lat/long is sufficient) 22.Certification: W %2 6.Is(are)the wells Permanent or a Temporary S to of Certified Well ntracto Date O By signing this form,1 hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: E]Yes or)ETVo with 15A NCAC 01C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that 1f this is a repair,fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: � 7 5 00 24s. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if dtfferent(example-3@200'and 2@100) construction to the following: 10.Static water level below top of casing: 5-0 (ft.) Division of Water Resources,Information Processing Unit, If water level is above casing,use"+" 1617 Mall Service Center,Raleigh,NC 27699-1617 1.1.Borehole diameter: (in.) 24b.For Infection Wells: In addition to sending the form to the address in 24a , �f3T� above,also submit one copy of this form within 30 days of completion of well 12.Well construction method: fZ i construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: 24c.For Water Supply&Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b.Disinfection type: Amount: ® completion of well construction to the county health department of the county where constructed. Form GW-i North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016