HomeMy WebLinkAboutNCC216839_ESC Approval Submitted_20211213ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Colin & Erica Brothers
4089 Tonbridge Court
Harrisburg, North Carolina 28075
. SFATF ¢
NORTH CAROLINA
£nyfronmenfal Qualify
September 20, 2021
LETTER OF APPROVAL
RE: Project Name: Brothers Estate
Acres Approved: 2 1. 0
Project ID: CABAR-2022-002
County: Cabarrus, City: Harrisburg
Address: Hickory Ridge Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Colin & Erica Brothers
Date Received by LQS: September 13, 2021
Plan Type: Revised
Dear Colin & Erica:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has
been undertaken, as is required by Title 15A NCAC 4B .0129.
;s of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in
Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115
704-663-1699
r+M
Letter of Approval
Colin & Erica Brothers
September 20, 2021
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
c: DPR Associates
Attention: HY V. Nguyen, PE
919 Berryhill Road, Suite 101
Charlotte, North Carolina 28208
Inspection Department