Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
wq0032157_Regional Office Historical File Pre 2018
Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality October 12, 2007 Mr. James Inman, Administrator City of Locust 211 Town Centre Drive Locust, NC 28097 Subject: Permit No. WQ0032157 Whispering Hills Ph-1 Wastewater Collection System Extension Stanly County, North Carolina Dear Mr. Inman, In accordance with your complete application received on October 9, 2007, we are forwarding herewith Permit No. WQ0032157, dated October 12, 2007, to the City of Locust for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. The downstream pump station operated by the Town of Oakboro is currently having issues with compliant operations. Oakboro's reports on corrective actions taken to reduce SSO's are being evaluated at this time. Other permits may not be issued tributary to that pump station if the evaluation of this office determines that these actions have not been effective in significantly reducing SSO's in the Oakboro collection system. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Internet: www.ncmwatetquality.org Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycledl10% Post Consumer Paper Phone: (704) 663-1699 Fax: (704) 663-6040 One NCarolina Naturally 4 Mr. Inman Page 2 October 12, 2007 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the City of Locust for the construction and operation of approximately 3,634 linear feet of 8- inch gravity sewer and the discharge of 31,320 gallons per day of collected domestic wastewater into the Town of Oakboro existing sewerage system and the joint Town of Stanfield, City of Locust force main, pursuant to the application received October 9, 2007, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Town of Oakboro WWTP (NPDES No. NC0043532) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. Sincerely, r, ILL, -- for Coleen H. Sullins cc: Mooresville Regional Office, Collection System Permit File Larry Branch, Town of Oakboro Kevin Herring, Frontier Land Surveying Stephen Chambers, Chambers Engineering , PA Surface Water Protection Central Files PERCS 4. This permit shall not be transferable. !n the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached. to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity .Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina Genera! Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part 1 of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 12'h day of October, 2007. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0032157 3 Fast Track Engineering Permit No. W00032157 October 12, 2007 Owner/WQCS James Inman, Administrator City of Locust 211 Towne Center Drive Locust, NC 28097 Certification WQCS Gary Martin, Mayor Town of Stanfield PO Box 699 Stanfield, NC 28163 PE Kevin Herring Frontier Land Surveying 1394-B Walkup Ave Monroe, NC 28110 WQCSJWWTP Joe Lowder, Mayor Town of Oakboro PO Box 610 Oakboro, NC 28129 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial ❑ Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of Whispering Hills Ph-1, a Stanley County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. FAST -TRACK APPATI©N for GRAVITY S; PUMP STATIONS, AND FORCE MAINS PAGE 3 IJSE THE TAB KEY TO MOVE FROM FIELD TO FIELD Owner: City Of Locu Full Legal Name (company, r runicipa1ity, HOA, uiil'ity, etc, 1b. James Inman, Administrator Signing Official Name and Title (Please revie Application Number: (to be competed by DWQ) 5ANCAC2H.02 lhorized signing officials!) The legal entity who will own this system is: ❑ Individual ❑ Federal Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 1d. 211 Town Centre Dr Mailing Address 1f. NC Z State 1h. 704-8888-52 Telephone 2. Project (Facility) inform 2a. Whispering Hills P_h-1 Brief Project Name (permit 3. Contact Person: 3a. 3b, 704-888-1566 Facsimile lion: le Locust City 1 g, 28097 Zip Code 1j. jinman E-mail 2b. Stanly e Kevin EL_Herring PE, Project Engineer Name and Affiliation of Someone Who Can Answer 704-283-9726 ustnc. c County Where Project is Located estlons o Phone Number 1. Project is New ❑ Modification of an existing permit) this Application frontiiersurvey@carollina sr.con E-mail odi5eation, Permit No.: For modifications, attach a separate sheet clearly explaining the reason for the modification (i.e. addin phase, changing line size/length, etc.). Only include the modified information in this permit application duplicate project information in B(7) and B(14-11) that has already been included in the original permit. 2. Owner is Public (skip to Item 8(3)) 2a. If private, applicant will be: © Private (go to Item 2(a)) 2b. If sold, facilities owned by a (must choose one) ❑ Retaining Ownership (le. store, church, single office, etc.) or • Leasing units (lots, townhomes, etc. - skip to Item 8(3)) ❑ Selling units (lots, townhomes, etc, - go to Item B(2b)) 3. Town Of Oakboro ❑ Public Utility (Instruction III) El Homeowner Assoc,TDeveloper (Instruction IV) Owner of Wastewater Treatment Facility (WWTF) Treating Wastew 4a, Town of Oakboro Wastewater Treatment Plant Name of WWTF City of Locust 5b. 8 inches Gravity Owner of Downstream Sewer Receiving Sewer Size The origin of this wastewater is (check all that apply): Residential Subdivision • Apartments/Condominiums © Mobile Home Park School ❑ Restaurant ❑ Office Volume of wastewater to be allocat *Do not include previously permitted er From This Project 4b. NC0043532 WWTF Permit No. 5c. Force Main Permit Number of Downstream 5 © Car Wash ❑ Institution ❑ Hospital © Church ❑ Nursing Home ❑ Other (specify): his particular project ations 20 gallons per known estic/Commercial % Industrial Other (specify): y If the permitted flow is zero, indicate why: Q Interceptor Line - Flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 B. PERMIT INFORMATION (CONTINUED) 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1 2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(1)(3). 87 units X 120 gal / day / bedroom X 3 bedrooms / unit = 31,320 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) Gravity or Force Main (use the pull down menu) 8 3,634 Gravity ENTER TOTAL LINE LENGTH IN MILES 0.69 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID (self chosen - as shown on plans for cross-reference) Design Flow (MGD) Operational Point GPM @ TDH Power Reliability Option (1- dual line feed; 2- permanent generator w!ATS; 3- portable generator wltelemetry; 4-wet well storage) 12. Does the sewer system comply Mains (latest version), the with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? reference the pertinent minimum design criteria or regulation and indicate why a is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS TO THE VARIANCE WITH YOUR APPLICATION ® Yes ■ No If no, please variance PERTINENT 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? Sedimentation and Erosion Control Plan? Stormwater? 0 N/A @ Yes IN No CI Yes • No ■ N/A ❑ N/A ►. Yes ■ No 14. Does this project involve aerial lines or siphons? Check if yes: These lines vabe considered.hiattpriority_and_must.bO checked_nnce everv_sixmonths 15. Does this project have gravity sewer lines designed at minimum Be aware that the Division will not accept installed lines more than 10% flatter than corrected prior to submitting the final engineering certification.. ■ slopes? ■ the minimum slope. Lines installed outside this tolerance should be FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 C. STREAM CLASSIFICATION 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: ❑ A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND 0 A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on map for cross-reference) Name of Waterbody County River Basin Waterbody Stream Index Waterbody Classification #1 Big Meadow Creek Cabarrus Yadkin 13-17-15 C Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided) CO Z 1— CC 0 !L H Ce Ill C.) ro 1. Applicant's Certification: 1, James Inman attest that this application for Whispering Hills Phase 1 has been reviewed by me and is accurate and .complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10, 000 as well as civil penalties up to $25,000 per v! on: /ate Z a AA/ in- Z7-a7 ning Official Signatu Date . Professional Engineer's Certification: 1 attest that this application for Whispering Hills Phase-1 has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215 6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. ',t�lNrierrrlryrt 2a. Kevin E. Herring PE 0 vN CARa—'t•, OFt.S51p' 04.y�q�''% 4\ _ C9 ? &D Professional Engineer Name �.?.434 •• �. - _ Q.,SEAT. 2b. Frontier Land Surveying Engineering Firm S. 7 20165 '�� �' e E 2c. 1394-B Walkup Ave Mailing Address ''1. '� "'°,Q,��. rrrrrE'eHWW�` 2d. Monroe 2e. NC 2f. 28110 City State I Zip �r 8 pn ='-- Sear, ignatu 2g. 704-283-9726 2h. 704-238-8561 2i. frontiersurveyecarolina.rr.com Telephone Facsimile E-mail • if • 1' 109 :tj `N, I �trrt 'treet =P 0, '1io 610 0 L'bor'o, 28129 7o4-48 -33 S1 (phone, 704-48 5 243 9 NA') October 4, 2007 Harold Greene, Mayor City of Locust 113 South Central Ave. Locust, N. C. 28097 RE: Whispering Hills Subdivision Mission Church Rd. & Hwy 200 N. Locust, N. C. Dear Mayor Green, ENR tM RO Wafer Pry In response to your request for sewer t:reatnent allocation for referenced project, be advised the Town of Oakboro can effectively convey and treat the flow of 31,320 gpd at the Oakboro Wastewater Treatment Plant. This is based on 87 homes, 3 bedroom x 120 gpd or 360 gpd per unit. We aeeept this flow based on your current allocation flow capacity per intra-municipal agreement. Please advise if we can be of further assistance. Sincerely, Larry Branch Town Administrator Town of Oakboro /09-)4 9+4 'Main Street (PO, 130,1610 Oak(ioro,, At: 281.29 704-48.5•-335,1 (pliotte,, 704-48,5-24,39 (1K) August 27.2007 Harold Greene, Mayor City of Locust 113 South Central Ave. Locust, N, C. 28097 RE: Whispering Hills Subdivision Mission Church Rd & Hwy 200 N. Locust., N. C. Dear Mayor Green, In response to your request for sewer treatment allocation for the referenced project, be advised the Town of Oakboro Wastewater Treatment Plant has adequate capacity to accept and treat the flow in the amount of 31,320 gpd. This capacity is based on 87 homes, 3 bedroom x 120 gpd or 360 gpd per unit. We accept this flow based on your current allocation flow capacity per intra-municipal agreement. Please advise if I can be offurther assistance. Sincerely, Larry Branch Town Administrator Town of Oakboro Cc: James Inman City of Locust Permit Number WQ0032157 Central Files: APS SWP 10/11/07 Permit Tracking Slip Program Category Status Project Type Non -discharge In review New Project • Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer A Individual Extensions Primary Reviewer dee.browder Permitted Flow 31320 Facility Facility Name Whispering Hills Phase 1 Location Address Owner Owner Name City of Locust Dates/Events Scheduled Orig Issue App Received Draft Initiated Issuance 10/12/07 08/28/07 Permit Contact Affiliation Major/Minor Region Minor Central County Unknown Facility Contact Affiliation Owner Type Government - Municipal Owner Affiliation Harold Greene PO Box 190 Locust Public Notice issue 10/12/07 NC 280970190 affective expiration 10/12/07 Regulated Activities Reg uest_edlReceived Events Subdivision Wastewater collection Outfall NULL Additional information received Additional information received Additional information requested 09/11/07 Additional information requested 09/24/07 Additional information received 10/09/07 Waterbody Name Stream Index Number Current Class Subbasln .• oFWA1T (.T • QG 7 Michael F. Easley, Gover William G. Ross Jr., Secrets North Carolina Department of Environment and Natural Resources Coleen Sullins, P.E., Director Division of Water Quality September 11, 2007 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7007 0710 0005 2882 0991 Mr. James Inman, Administrator City of Locust 211 Town Centre Dr Locust, NC 28097 Subject: Additional Information Request WQ0032157 Whispering Hills Ph-1 Wastewater Collection System Extension Stanly County Dear Mr. Inman: The Division of Water Quality's Mooresville Regional Office will need the following information prior to processing your application: ✓ The flow acceptance letter provided by the owner of the downstream sewers and/or the owner of the receiving wastewater treatment facility, as required by Instruction V. and X. of the application, is incomplete. Please review the specific information required per instruction V. of the Application Instructions. Because of the concerns associated with Oakboro's downstream pump station. The NIRO requests that the Town of Oakboro's Flow Acceptance Letter specifically state that this additional flow will be successfully "conveyed and treated" at the Town of Oakboro WWTP. The Instructions for the Fast Track Application for Gravity Sewers, Pump Stations, and Force mains specifically requests that complete assessment of both the Treatment Plant Capacity to treat the conveyed wastewater and that the downstream sewer (piping and pump stations) be evaluated to assure that addition of this flow will not cause capacity related SSO's or overburden any part of the system en route to the treatment plant. T NCDENR Mooresville Regional Office 610 East Center Ave. Suite 301, Mooresville, NC 28115 DENR Customer Service Center An Equal Opportunity Action Employer Internet http://h2o.enr.state.nc.us/ Telephone (704) 663-1699 Fax (704) 663-6040 Telephone 1 800 623-7748 50% recycled/10% post -consumer paper Page Two Mr. Inman September 11, 2007 The MRO is granting consideration of this permit at this time. However if recent corrective actions have not eliminated the excessive overflows from the Oakboro Pump Station, then no future allocations will be allowed to be conveyed through the inadequate section of the Oakboro collection system until the system has been repaired or replaced. Please note that the item(s) listed above must be included and/or completed prior to consideration of the permit application package (with fee) for approval. The success of the fast -track approval process depends upon the receipt of complete and accurate applications. Please submit the appropriate additional attachments. The review process will then begin upon receipt of the completed and/or corrected application. Please be advised that construction and/or operation of wastewater collection system extension without a valid permit is a violation of North Carolina General Statute 143-215.1 and may subject the Applicant to appropriate enforcement actions in accordance with North Carolina General Statute 143- 215.6. Civil penalties of up to $25,000 per day per violation may be assessed for failure to secure a permit required by North Carolina General Statute 143-215.1. A copy of this letter will be forwarded to the Town of Oakboro. It is the responsibility of the applicant to obtain and submit all needed information. if you should have any questions regarding the acceptance of your application, please do not hesitate to contact me at 704.235.2203. Thank you for your cooperation. Environmental Engineer Enclosures cc: Kevin Herring, Frontier Land Surveying Harold Green, Mayor, City of Locust Deborah Gore, PERCS Larry Branch, Town Administrator FRONTIER LAND SURVEYING 1394-B Walk -Up Avenue Monroe, NC 28110 Ph. (704) 283-9726 Fax (704) 238 8561 LETTER OF TRANSMITTAL Date: 5/7/2007 Job #: Attention: NCDENR Job / Description: Whispering Hills Sub Water Quality Section Sewer Permit Stanly County Enclosed : ( X ) Herewithin ( ) Under separate cover Per 2 copies of permit application (1 original & 1 copy) 1 Review Fee ($ 400) X • REMARKS: Request For approval Approved as submitted For Review/Comments 2 copy(s) for your use Submitting copies for approval Resubmitting copies for approval Other: Please advise if additional information is needed. SIGNED: Kevin Herring PER( ACCEPTED: ESOUR. $ gREGIONAL • AUG iA?ER 0, g110 FRONTIER LAND SURVEYING 1394-B WALKUP AVENUE MONROE, NC 28110 (704) 283-9726 August 27, 2007 Memo To: Mr. Larry Helms From: Kevin E. Herring PE /.(s— 114 Frontier Land Surveying Reference: Whispering Hills Ph-1 Sewer Permit Application I have enclosed 2 copies (1 original & 1 copy) of the permit application. The following items need to be completed prior to submitting this application to NCDENR. 1. James Inman, Administrator for city of Locust needs to sign and date both the original and copy of the application. 2. A copy of the flow acceptance letter from the town of Oakboro needs to be attached to both copies of the application. 3. A $400 check payable to NCDENR needs to be included in the package. Both copies of the application with flow letters and $400 fee needs to be submitted to NCDENR. I have prepared a Fed -Ex envelope and transmittal slip for overnight delivery to NCDENR Construction plans are not required for NCDENR's Fast -Track permit process. If it wouldn't be any trouble I would like to get a copy of the signature page (page #5) and flow letter for our file. A fax copy of this would be sufficient. Or fax number is 704-238-8561. If any additional assistance is needed please advise. KEH/kh Enclosures 4• ti+ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen Sullins, Director Division of Water Quality December 3, 2008 City of Locust 211 Towne Center Drive Locust, North Carolina 28097 Attn: James Inman, Administrator SUBJECT: Whispering Hills Ph - 1 Permit No. WQ0032157 Wastewater Collection System Extension Final Engineering Certification Dear Permittee: The Division received a final engineering certification for the subject project on November 4, 2008. 'A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received a copy, please contact your consultant immediately to obtain a copy. You are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you, please complete Form PNOCF-S as this permit is not automatically transferable. Form PNOCF-S can be downloaded from htto://h2o.enr.state.nc.us/ndpu/ndpuapps.html#Sewer. If you have any questions concerning this document or the completion of Form PNOCF-S (if necessary), please contact Ms. Dee Browder at the letterhead address or via E-mail at dee.browder@ncmail.net. Sincerely, Jos} Robert Krebs l� Surface Water Protection Regional Supervisor Enclosure Cc: Kevin Herring, Frontier Land Surveying Gary Martin, Town of Stanfield Joe Lowder, Town of Oakboro Surface Water Protection Section Central Files (certification page only) One Pretreatment, Emergency Response and Collection Systems Unit Internet httpi/h2o.enr.nc.state.uslndpu North Carolina 1617 Mail Service Center, Raleigh, NC 27699-1617 An Equal Opportunity Action Employer Naturally Telephone (919) 733-5083 Fax (919) 733-0059 50% recycled/10% post -consumer paper suoiloe;!t uu oJo;ue e;eudoJdde c; ae;}IWJod aq;;aafgns Heys pue;lwJed eq; Jo uoi;eloin e paJeplsuao aq Heys uol;eoi;ipao sJaeuibu3 Sly} }© uoi;eidwoo o; Joud uoisue xe welsAs uo!pe lop ie;e,heiseM ay; o; hie;nqu apew Mol3 Jel MelseM huy 'panuaoaJ Si uci;eo!pl eo ieul} e lr;un do sua!leoi;i;Jeo lei.ed Ile 6uuyoei; Jc; algisuodsei s! ee;;IwJad a -a 9148Z ON 311IAS321Q©IN 1.0£ 31111S '3f NAd 1z131N33 1SV3 01.9 NOIIOR1011d b31VM Rat/dbflS 33Idd0 1 N©19aef 3-I1IAS380O N NtsigitreAPAVIPS 01 SlN3VIIH k 11V ti3 3lf1t33 H1IM NoI . , IQ NlJ oddns 'S €ADlioad SIH1 aN3 a :a;ep pue 'eJn;eu6ls 'lees ult5u3 leucisseicJd eulloJe3 LheN builJoddns Jay;o pue eigeoidde se Qa©Z ' L aun(` pe;dope sulei aoJod pue suoi e;s ayb J©; eiJa1J u6lsec wnwyui s"uooisl^IL7 ay3 'e geaildde se 966 L L ,(JenJgad s A;ineJO (uoisini©) s,h;ilenO Je;eM;a uoislni(J au; 'J_Z `JVoN bSL ';IwJed sly; uelldwoa le};ue;sgns ulq;iM }lrnq eq o; paniesgo seM uor;anJ;suoo ay; ;eq; yons uai;anJ;suoc ep;;c uoi;ei esge ey; ui pesn seen aoua6ilip pue aJeo enp "se!;Ilige hw to;seq eq; o; ley; e;e;s hgeJay 'ee;;lWJad ay; Jo4;oafojd h;uno0 (alue;s e L yd slliH 6ulJdslgM 3o uollonJ;succ eq; (nwil 3n3 'hl>leeM `hlleclpaped ) ehiasgo of pezucq;ne ue q 6uineq 'eualoJe0 y;JON ;o e;e;s aq; uI Jeau!6u3 leuolssa;0Jd peielsI6eJ h}np e se ' bu t J EaH • u z nab 'i papuawwo aea Ile ;pue uci;ecl}i; ieuod Ped NOIIV3IJI1l33 5 133NI5N3 ©lslAlldlaoeJ o loaud sepinoJd ;eyl Jauugw e uw lugs eq uol e l l;uaa sayl leNl eioleJegl uoisonia ay; ,{q peh!epeJ uaeq aney uol;e;uauinoop 6uftJoddns paJlnbaJ Ji6u3 s y; 'nun a;eJedo os; pennclle Jou alaidwoo paaepisuoo eq ;ou lle is ;pefaJd sfti,l eIJe;1Jo ublsep wnwVuiw Inca ;i Jw d iy; y l ecue_ ulduau -u©u ui builinsaj sa6ueyc hue Jo; paJlnbaJ e e suo!Teoi;lpow 'wJO; 9ewwns ue Jr , Li! Jo s6uoAr,eJp pJooei eq; uo pe!pwepi hpea p aq preys ;ca[oJd ay; o} sebuego }cafeJd siq; }o;Jed se pe};iwJGd suoge}s dwnd ,4ue Jaj (pa}vales ul}do h;iligeilaJ e6e;n>o JeaA GeJq; } ed ;se6ucl uey; JeleeJ6 a6eJo;s Ja (s)Jo;eJeue6 aigepad;l a6eJa;s algeliene 'luiod bui;eiedc 'anunc wa;sXs "sdwnd pe;o'e s) suaijeinoiep u6sep buq oddns u0Isueixe wa1Sf1S uo!;cellos Ja;e, as;seM ay};o (sausi Jahnas;o sMaln ell d ueld) sbugnneJp pJooeJ;aercuid ay; 7a hdoo eu0, :EulMogo; 9(4 GZLBZ ON °oJoq>fe0 01,9 X08 Od (Lcpe° sa uMol JoAeA 'Ja,pMo'1 ear dIM NSOOM 0 L L9Z JN 'aOJuoW any dn>{IeM buihanuns puei Je!luaJd 6uIJJa- ulnayi 3d 5uinssi'IwJad ayi o; iwgns pue ele!dwoo 9L8Z 3N `PI uelS 669 xc9 Od pleue;s )o unnol JoheiA1 "Uwekeg SOOM uogeay.i L6i8Z ON `}sno01 a,NJ° Je;ue3 auMoi L LZ ;s noa1 10 hli J J�J;eJ;siulwpe 'ueLuui sewer S00MJJaumo _, GOZ L Jegalc0 L8LZ8OOOM oN IiwJad bUueauibua )iaeal 4s.e