Loading...
HomeMy WebLinkAboutWQ0010329_Regional Office Historical File Pre 2018 (2)tate of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director May 30, 1995 Greg Williams Union Development Group 1801 Tower Industrial Drive Monroe, North Carolina 28110 Icci Airp, Q 1 N.C. . v' . ' rF & NATURAL REST )URC S'S JUN 6 1�9� DIVISION OF EU;VIRONMENT",E MANAGEMENT EOORLSV;tLE OFFICE Subject: Permit No. WQ0010329 Amendment Union Development Group Shannamara Subdivision Sewer Extension Union County Dear Mr. Williams: In accordance with your permit amendment request received May 9, 1995, and your application received November 23, 1994, we are forwarding herewith Permit No. WQ0010329, dated May 30, 1995, to the Union Development Group for the construction and operation of the subject wastewater collection extension. This permit amendment is to change some of the 25 specific lots the subdivision is restricted to, until the receiving wastewater treatment plant is expanded. Lots 13, 62, 109, 138, and 408 are deleted and replaced by Lots 67, 107, 119, 120, and 122. No other changes are made to this permit. Please be advised of permit condition number 15 which states "By copy of this permit to the Union County Building Inspections Department, please be advised, this permit authorizes flow to serve only 25 lots in the Shannamara Subdivision. These 25 lots are indicated on the approved plan sheet SW-1A as lots 67, 14, 57, 107, 76, 84, 119, 121, 123, 120, 181, 198, 200, 221, 244, 269, 307, 316, 354, 360, 392, 122, 412, 448, and 450 and as identified on sheet SW-1 as lots 1 through 25. Any increase in flow beyond the quantity permitted herein (9,000 GPD) will require prior approval from the Division of Environmental Management in the form of an approved permit amendment." Any other connection is a violation of this permit and is enforceable by the Environmental Management Commission. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and Iimitations as specified therein. Issuance of this permit hereby voids Permit No. WQ0010329 issued March 17, 1995. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 503/4 recycled/ 10% post -consumer paper The one set of approved plans and specifications forwarded to you as part of the previous permit are considered a part of this permit. The approved revised plan sheets showing the new lot locations are made a part of the approved plans and this permit. if you need additional information concerning this matter, please contact Mr. John Seymour at (919) 733-5083, extension 546. Sincerely, A. PrestoHoward, P.E. cc: Mr. Lorey White, Director, Union County Health Services Mr. Fred Maier, Director, Union County Zoning and Inspections Department Luther McPherson, Director, Union County Planning Bob Davis, av NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Union Development Group Union County FOR THE construction and operation of approximately 25,916 linear feet of 8 inch gravity sewer to serve lots 67, 14, 57, 107, 76, 84, 119, 121, 123, 120, 181, 198, 200, 221, 244, 269, 307, 316, 354, 360, 392, 122, 412, 448, and 450 (as shown on sheet SW-1A of the approved plans) in the Shannamara Subdivision, and the discharge of 9,000 GPD of collected domestic wastewater into Fairview Developer's existing sewerage system, pursuant to the application received November 23, 1994, and in conformity with the project plan, specifications, and other supporting data subsequently filed and approved by the Department of Environment, Health and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. 4. The sewage and wastewater collected by this system shall be treated in the Fairview Developer's Wastewater Treatment Facility prior to being discharged into the receiving stream. 5. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 6. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 1 7 . Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting materials. Mail the Certification to the Water Quality Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626- 0535. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. 9. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Environmental Management, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 11. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater collection facilities. 12. Noncompliance Notification: The Permittee shall report by telephone to the Mooresville Regional Office, telephone number 704/663- 1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within 15 days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. 13. This permit shall become voidable unless the agreement between Fairview Developers and the Union Development Group for the collection and final treatment of wastewater is in full force and effect. 14. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by North Carolina General Statute 143-215.6(a) to 143-215.6(c) for violation of or failure to act in accordance with the terms and conditions of this Permit. 15. By copy of this permit to the Union County Building Inspections Department, please be advised, this permit authorizes flow to serve only 25 lots in the Shannamara Subdivision. These 25 lots are indicated on the approved plan sheet SW-1A as lots 67, 14, 57, 107, 76, 84, 119, 121, 123, 120, 181, 198, 200, 221, 244, 269, 307, 316, 354, 360, 392, 122, 412, 448, and 450 as identified on sheet SW-1 as lots 1 through 25. Any increase in flow beyond the quantity permitted herein (9,000 GPD) will require prior approval from the Division of Environmental Management in the form of an approved permit amendment. 2 16. Issuance of this permit hereby voids Permit No. WQ0010329 issued March 17, 1995. Permit issued this the 30th day of May, 1995 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION oc,a ,,_,,at-n C� A. Preston oward, Jr., P.E., Director Division Environmental Management ofg By Authority of the Environmental Management Commission Permit Number WQ0010329 Permit No. WQ0010329 May 30, 1995 ENGINEER'S CERTIFICATION 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Project Name Location Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of this permit, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 4